Loading...
HomeMy WebLinkAboutContract 44156-CO1 (2)Change Order No. 1 City of Fort Worth Construction Change Order Date Prepared 5/30/13 TPW Project No. Project Description Fort Worth Convention Center Arena Meeting Room Renovations CITY SECRETARY' l , ��� , CONTRACT NO. Funding GG04-539120-0246000 City Secretary Contract No. CS-44156 ORIGINAL CONTRACT AMOUNT $ 466,074 EXTRAS TO DATE 0 CREDITS TO DATE 0 CONTRACT COST TO DATE $ 466,074 AMOUNT OF PROPOSED CHANGE ORDER $ 66,135 REVISED CONTRACT AMOUNT $ 532,209 ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS $ 61,926 REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS $ 0 ADDITIONAL FUNDING (IF NECESSARY) $ 4,209 IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: Demo and remove approximately 33,300 square feet of plaster sub ceilings as per attached proposalotY 0. so �� �o°©�_f Oa � ► o� 0O0o0o00° ADD $66,135 i2[ ©OG�/iJl Cgrr It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order Contractor's Name Dennett Construction Original Contract Time 90 cd () Contracto dditional Approved Time To Date 0 cd er irc 14 t2•" Projec � rc itect Assistant City Attorne i Approved Contract Time To Date Additional Time For This Change Order 90 cd 0 cd Date Pro' t M r Date Date Dr— 7ansportation and Public Works Department Date AW3/xpgg l cJ. c,J , o6/4//3 Date itylulan ge/-L Date —2-1/41 4/43 Date Council Action (If Required) )4 Not Applicable Date G_.6<i3 ❑ M&C T/PW FACILITIES MANAGEMENT CHANGE ORDER FORM September 30, 2002 RECEIVED JUN 11 2013 Proposed Change Request Project FWCC Ceiling Upgrades PM / Supt SM / KB Date 5/7/2013 Description: Plaster Demolition Request Number: 1 Scope of Work Unit Cost Total Plaster demolition described in Demolition Specialties proposal (Attached) $ 60,923 Credit for Warehouse Deliveries Phase One (To be paid by Dennett Const) $ (800) Subtotal $ 60,123 Overhead & profit $ 6,012 General conditions N/A Tax Exempt Total $ 66,135 ONTRUC ,Ai" IDN DULT I fCD1 Specialties May 7, 2013 Mr. Shawn Moore Dennett Construction 2313 Cullen Street Fort Worth, Texas 76107 1421 Perry Street Irving, Texas 75060 972-438-DEMO (ofc) 972-438-4466 (fax) Re: Fort Worth Convention Center - Fort Worth, TX - Plaster Ceiling Demolition Dear Mr. Moore: Please accept this letter as our instrument of proposal to complete the work at the above referenced project as described below. ➢ Inclusions and clarifications: Furnish all labor, material and equipment as required to demolish the plaster ceilings and provide air filtration devices for dust control as per drawings A1.2 and A1.3 dated 12/30/13. The pricing is based upon 3 phases and GC removing chairs in auditorium prior to demo. ➢ Exclusions: Sales tax, permits, bonds, disposal, disconnects, relocations, demo other than listed, corridor work, MEP demo, temporary protection, barriers and salvage for reuse. Pricing: Phase 1: 17,550 SF Labor/Supervision Materials Equipment (lifts/fork truck/AFD's) Warehouse Deliveries Subtotal P&OH Total Phase 2: 5,350 SF Labor/Supervision Materials Equipment (lifts/fork truck/AFD's) Remob Fee Subtotal P&OH Total $ 19,000.00 $ 1,175.00 $ 3,250.00 $ 800.00 $ 24,225.00 $ 4.275.00 $ 28,500.00 $ 7,000.00 $ 845.00 $ 1,890.00 $ 550.00 $ 10,285.00 $ 1.542.75 $ 12,367.75 Dennett Construction Fort Worth Convention Center 5/03/13 Page 2 of 2 Phase 1 Phase 2 Phase 3 Total Phase 2: 10,360 SF with sloped floor in auditorium Labor/Supervision Materials Equipment (lifts/fork truck/AFD's) Remob Fee Subtotal P&OH Total $ 28,500.00 $ 12,367.75 $ 20.056.00 $ 60,923.75 $ 13,000.00 $ 1,750.00 $ 2,140.00 $ 550.00 $ 17,440.00 $ 2.616.00 $ 20,056.00 We trust you will find this proposal in order, but should you have any questions, please do not hesitate to call. Respectfully, T'ocal Ingersoll - Demolition Speeiaitie