Loading...
HomeMy WebLinkAboutContract 59379CSC No. 59379 STATE OF TEXAS' § Funding InterIocal Agreement for § WJ Boaz Road Widening COUNTY OF TARRANT § This interlocaI agreement (ILA) is entered into between Tarrant County, Texas, hereinafter referred to as the "COUNTY", and the City of Fort Worth, hereinafter referred to as the "CITY", and collectively referred to as the "parties", for the purpose of providing funding through the Tarrant County'2021 Transportation Bond Program (2021 TBP) to a needed transportation project within the boundaries of both parties which the Commissioners Court of the COUNTY and the governing body of the CITY find serves a public purpose and promotes the public welfare of the citizens of Tarrant County. The COUNTY and the CITY make the'following findings of fact: This ILA is made pursuant to Chapter 791 of the Texas Government Code and the Tarrant County 2021 Transportation Bond Program Policy, as amended; 2. To the extent necessary, the parties will use current revenues to pay obligations in this ILA; The project benefits the public in that it is a needed transportation project; 4. The COUNTY and the CITY each has the legal authority to perform its obligations in this ILA; 5. The division of costs provided in this ILA constitute adequate consideration to each party; and 6. Both parties acknowledge they are each a "governmental entity" and not a "business entity" as those terms are defined in Texas Government Code Section 2252.908, and therefore, no disclosure of interested parties is required. I. PROJECT DESCRIPTION This project, hereinafter referred to as the "Project", will consist of the construction (or reconstruction) of WJ Boaz Road from Boat Club Road (FM 1220) to 600' East of Elkins School Road. This project will consist of widening and reconstructing approximately one mile of the existing two-lane asphalt roadway to a four -lane divided concrete urban arterial that includes curb and gutter, internal drainage, one major creek crossing, streetlights, traffic signals, and shared use paths. This reconstruction project will also include constructing a major culvert crossing to carry the 100-year design storm and to raise the road outside the floodplain. OFFICIAL RECORD II. CITY SECRETARY SCOPE OF SERVICES PROVIDED BY CITY FT. WORTH, Tx The services to be provided by the CITY shall include, but are not limited to, the following: WJ Boaz Road Widening Funding ILA: 2021 Transportation Bond Program Page 1 A. All total project costs including construction, right of way acquisition, utility relocation, engineering, planning, surveying, and governmental approval costs (collectively referred to as "Costs"); B. Following project completion, the CITY will provide the overall total project cost summary with final cost share between funding partners; C. Construction agreement administration, site review, permitting, and inspection; D. The CITY agrees to facilitate the efficient operations of the Project through ongoing transportation system maintenance efforts, including signal timing optimization as applicable; E. Interagency coordination, including CITY notification. to the North Central Texas Council of Government (NCTCOG) and the COUNTY of any amendments or modifications to NCTCOG's Transportation Improvement Program (TIP); F. A detailed quarterly project schedule documenting the percent complete for each major component of the PROJECT shall be provided to the COUNTY; G. The CITY agrees to invite the COUNTY to any project groundbreaking or ribbon cutting events; and H. The CITY will include the following language on all public notices, web pages, and on -site signage related to the Project: "This project is funded by the City of Fort Worth and the Tarrant County Commissioners Court through the Tarrant County 2021 Transportation Bond Program." I. Compliance with Laws: In providing the services required by this Agreement, CITY'S Contractor must observe and comply with all applicable federal, state, and local statutes, ordinances, rules, and regulations, including, without limitation, workers' compensation laws, minimum and maximum salary and wage statutes and regulations, and non- discrimination laws and regulations. CITY' S Contractor shall be responsible for ensuring its compliance with any laws and regulations applicable to its business, including maintaining any necessary licenses and permits. M. TERM This ILA shall become effective upon the approval of both parties and shall terminate on September 30, 2023, unless terminated as described in Section XIII in this ILA or extended in writing and approved by both parties. Yearly renewals are required and will be initiated by the COUNTY prior to the expiration date herein. WJ Boaz Road Widening Funding ILA: 2021 Transportation Bond Program Page 2 IV. FISCAL FUNDING ACKNOWLEDGEMENT In the event no funds or insufficient funds are appropriated and budgeted or are otherwise unavailable by any means whatsoever in any fiscal period for payments due under this ILA, then the affected party will immediately notify the other party of such occurrence and this ILA shall be terminated on the last day of the fiscal period for which appropriations were received without penalty or expense to the affected party of any kind whatsoever, except to the portions of annual payments herein agreed upon for which funds shall have been appropriated. V. REIMBURSEMENT PROCESS The COUNTY agrees to reimburse the CITY for 50% of the actual eligible PROJECT costs in an amount not to exceed $10,700,000.00. The COUNTY's reimbursement will be in accordance with the reimbursement schedule shown in Attachment A. Any reimbursement request from the CITY should include: 1) a copy of the invoice or billing for design services, right-of-way acquisition purchase, and construction; and 2) a copy of the check, a certification letter, or other documentation to verify the CITY's proof of payment. The final reimbursement payment to the CITY will be contingent upon the City Manager or Mayor providing written notification to the COUNTY that the project is complete along with identification of final project costs. The CITY understands that the CITY will be responsible for cost overruns and any other expenses incurred by the CITY in performing the services described herein. VI. AGENCY -INDEPENDENT CONTRACTOR Neither the COUNTY nor any employee thereof is an agent of the CITY, and neither the CITY nor any employee thereof is an agent of the COUNTY. This ILA does not and shall not be construed to entitle either party or any of their respective employees, if applicable, to any benefit, privilege or other amenities of employment by the other party. The COUNTY will have no right to control the manner or means of construction of the CITY's contractor for this PROJECT. VII. ASSIGNMENT Neither party may assign, in whole nor in part, any interest it may have in this ILA without the prior written consent of the other party. WJ Boaz Road Widening Funding ILA: 2021 Transportation Bond Program Page 3 VHL THIRD -PARTY BENEFICIARY EXCLUDED No person other than a party to this ILA may bring a cause of action pursuant to this ILA as a third -party beneficiary. This ILA may not be interpreted to waive the sovereign or governmental immunity of any party to this ILA to the extent such party may have immunity under Texas law. IX. AUDIT OF RECORDS The CITY's records regarding this Project shall be subject to audit by the COUNTY during the term of this ILA and for five years after the completion of the Project. X. ENTIRE AGREEMENT This ILA represents the entire understanding of and between the parties and superseded all prior representations. This ILA may not be varied orally but must be amended by written document of subsequent date duly executed by these parties. XI. VENUE This ILA shall be governed by the laws of the State of Texas and venue for any action under this ILA shall be in the district courts of Tarrant County, Texas. XII. SCHEDULING The CITY agrees that the COUNTY retains control over the reimbursement payment schedule identified , in Attachment A. The COUNTY agrees to notify the CITY of any changes to the reimbursement. payment schedule 30 days in advance, if such changes are the result of COUNTY requirements. Such notification will be in the form of written correspondence by e-mail or regular mail. WJ Boaz Road Widening Funding ILA: 2021 Transportation Bond Program Page 4 XIII. TERMINATION Until funded by the COUNTY as described in Section V, this ILA may be terminated by either party by providing written notice to the other party at least thirty (30) days prior to the intended date of termination. Such notice shall be deemed given when personally delivered or mailed by certified or registered mail (with return -receipt and postage prepaid) and addressed to: COUNTY: County Administrator Tarrant County 100 E. Weatherford Street, Ste. 404 Fort Worth, Texas 76196 CITY: City Manager City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 WJ Boaz Road Widening Funding ILA: 2021 Transportation Bond Program Page 5 XI V. SOVEREIGN POWERS The COUNTY and the CITY agree and understand neither Party waives nor surrenders any of its governmental powers by execution of this ILA. APPROVED on this day the 0 day of , 2023, by Tarrant County. Commissioners Court Order No. Q `! TARRANT COUNTY, TEXAS Tim O'Hare, County Judge APPROVED AS TO FORM. Crimi istrict Attorney's Office* CITY OF FORT WORTH Willi amjohnson(Ma 13,2023I`,U7CI,I William Johnson, Assistant City Manager Mack (Mar L3, 2023 09,.00 COT) City Attorney M&C 23-0154 (ltec 4) 2/28/23 By law, the Criminal District Attorney's Office may only approve contracts for its clients. We reviewed this document as to form from our client's legal perspective. Other parties may not rely on this approval. Instead, those parties should seek contract review from independent counsel. CERTIFICATION OF AVAILABLE FUNDS IN THE AMOUNT OF: $ A 3W, oW - 610 as follows: Fiscal year ending September 30, 2023: $3,500,000.00 Fiscal year ending September 30, 2024: $0.00 Fiscal year ending September 30, 2025: $2,700,000.00 Fiscal year ending September 30, 2026: $3,600,000.00 Fiscal year ending September 30, 2027: $900,000.00 $10,700,000.00 Auditor's Office OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX WJ Boaz Road Widening Funding ILA: 2021 Transportation Bond Program Page 6 44 nvpgq� v�� �F�RT�9dd O l.g ATTEST: pdU*vo 00 *�d A .;��S2ezo aand�tEzps44 Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX � r � ATTACHMENT A Proiect Information Jurisdiction: City of Fort Worth Project Name: WJ Boaz Road Widening Proiect Schedule (by monthlyear) Design: ROW Acquisition: Construction: County Payment by Phase* Design: ROW Acquisition: Construction: TOTAL: Start Date Duration (mo.) Jul-21 12 Jul-22 13 Jan-25 24 $1,100,000.00 $2,400,000.00 $7.200.000.00 $10,700,000.00 TBP Funding Category: 2021 CaII for Projects End Date Jun-22 Jul-23 Jan-27 *Invoice Schedule Design = Completion of Design Phase ROWAcquisitdon = Completion of PropertyAcquisition and/or utility relocation Construction =Monthly or quarterly throughout the construction period. Reimbursement.payments will be issued by the COUNTYfor eligible expenses incurred during the Fiscal Year for which bond funds are certified by the Tarrant County Auditor. Reimbursement Schedule by Fiscal Year Quarter (SUBJECT TO CHANGE) FY2023 FY2024 FY2025 FY2026 FY2027 1 st Ouarter 2nd Ouarter 3rd Ouarter 4th Ouarter Total $1,100,000.00 $0.00 $0.00 $2,400,000.00 $3,500,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $900,000.00 $900,000.00 $900,000.00 $2,700,000.00 $900,000.00 $900,000.00 $900,000.00 $900,000.00 $3,600,000.00 $900,000.00 $0.00 $0.00 $0.00 $900,000.00 WJ Boaz Road Widening Funding ILA: 2021 Transportation Bond Program Page 7 3/3/23, 5:11 PM M&C Review CITY COUNCIL AGENDA Create New From This M&C Official site of the City of Fort Worth, Texas FORT WoRm DATE: 2/28/2023 REFERENCE M&C 23-0154 LOG NAME: 202021TARRANTCO NO.: BONDILA NON- PUBLIC CODE: C TYPE: CONSENT HEARING: NO SUBJECT: (CD 2, CD 7, and CD 8 / Future CD 2, CD 7, CD 8, and CD 10) Authorize Execution of Six Interlocal Agreements with Tarrant County to Receive 2021 Tarrant County Transportation Bond Funds in the Collective Amount of $78,410,000.00 to Supplement City of Fort Worth's 2022 Bond Program Arterial Projects with City Participation in the Approximate Amount of $121,353,876.00, Adopt Appropriation Ordinance and Amend the Fiscal Years 2023-2027 Capital Improvement Program (2022 Bond Program) RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of an Interlocal Agreement with Tarrant County for the Cromwell Marine Creek Road project (City Project No. 101012) withTarrant County funds in the amount of $13,910,000.00 and City participation in the amount of $ 23,330,000.00; 2. Authorize execution of an Interlocal Agreement with Tarrant County for the Avondale Haslet Road project (City Project No. 101014) with Tarrant County funds in the amount of $19,300,000.00 and City participation in the amount of $29,600,000.00; 3. Authorize execution of an Interlocal Agreement with Tarrant County for the Bonds Ranch Road and Wagley Robertson Road project (City Project No. 103278) with Tarrant County funds in the amount of $12,400,000.00 and City participation in the amount of $20,007,000.00; 4. Authorize execution of an Interlocal Agreement with Tarrant County for the WJ Boaz Road project (west - half) (City Project No. 103299) with Tarrant County funds in the amount of $10,700,000.00 and City participation in the amount of $16,600,000.00; 5. Authorize execution of an Interlocal Agreement with Tarrant County for the Everman Parkway project (City Project No. 103271) with Tarrant County funds in the amount of $15,350,000.00 and City participation in the amount of $26,066,876.00; 6. Authorize execution of an Interlocal Agreement with Tarrant County for the Intermodal Parkway project (City Project No. 103332) with Tarrant County funds in the amount of $6,750,000.00 and City participation in the amount of $5,750,000.00; 7. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Intergovernmental Contribution Fund in the collective amount of $78,410,000.00, from Tarrant County contributions, for the purpose of funding 1) $13,910,000.00 for the Cromwell Marine Creek Road project (City Project No. 101012), 2) $19,300,000.00 for the Avondale Haslet Road project (City Project No. 101014), 3) $12,400,000.00 for the Bonds Ranch Road and Wagley Robertson Road project (City Project No. 103278), 4) $10,700,000.00 for the WJ Boaz Road project (City Project No. 103299), 5) $15,350,000.00 for the Everman Parkway project (City Project No. 103271), and 6) $6,750,000.00 for the Intermodal Parkway project (City Project No. 103332); and 8. Amend the Fiscal Years 2023 - 2027 Capital Improvement Program. DISCUSSION: The purpose of this Mayor and Council Communication is to authorize execution of six interlocal agreements (ILAs) with Tarrant County, totaling to an amount of $78,410,000.00 with City participation in the expected amount of $121,353,876.00 and to appropriate the Tarrant County 2021 Transportation Bond funds. These ILAs are established on an annual basis and are subject to yearly renewal throughout the life of the projects. On January 28, 2021, Tarrant County issued a "call for projects" to all the communities within their jurisdiction. They received about 196 submittals from 24 municipalities for projects totaling approximately $1.6 billion. apps.cfwnet.org/council_packet/mc_review.asp?ID=30781 &councildate=2/28/2023 1/3 3/3/23, 5:11 PM M&C Review The City of Fort Worth submitted twenty-five projects requesting a total of $146,625,000.00 in County funding. The Commissioner's Court formed a Project Evaluation Committee (PEC) to review all submittals and to recommend priority for selection. The PEC developed ranking criteria to rank all the projects. As a result, six arterial projects from the city of Fort Worth submittals were selected to receive funding from the Tarrant County transportation bond program. On Aug 3, 2021, Tarrant County awarded funding to six city arterial roadways, five of which are identified in the City's 2022 Bond Program, for a total amount of $78,410,000. The following table lists the total project budgets and current and future appropriations: Project Existing City Funding Future City Funding Tarrant County ILA Project Total 101012 - Cromwell -Marine Creek $23,330,000.00 $0 $13,910,000.00 $37,240,000.00 101014 -Avondale Haslet Road $29,600,000.00 $0 $19,300,000.00 $48,900,000.00 103278 - Bonds Ranch- Wagley Robertson $20,007,000.00 $0 $12,400,000.00 $32,407,000.00 103299 - WJ Boaz Road $10,450,000.00 $6,150,000.00 $10,700,000.00 $27,300,000.00 103271 - Everman Parkway $14,966,876.00 $11,100,000.00 $15,350,000.00 $41,416,876.00 103332 - Intermodal Parkway $5,750,000.00 $0 $6,750,000.00 $12,500,000.00 Project Total $104,103,876.00 $17,250,000.00 $78,410,000.00 $199,763,876.00 Appropriations for the Tarrant County ILAs were not included in the Fiscal Years 2023-2027 Capital Improvement Program due to ILA negotiations with the County not being completed at the time of the CIP development. The actions in this M&C will amend the Fiscal Years 2023-2027 Capital Improvement Program as approved in connection with Ordinance 25773-09-2022. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations, execution of the Interlocal Agreements and adoption of the attached appropriation ordinance, funds will be deposited in the Intergovernmental Contribution Fund. The Transportation and Public Works Department (and Financial Management Services) is responsible for the collection and deposit of funds due to the City. Prior to expenditures being incurred, the Transportation and Public Works Department has the responsiblity of verifying the availability of funds. TO Fund Department Account Project Program Activity Budget Reference # Amount ID �D Year Chartfield 2 FROM Fund Department Account Project Program Activity Budget Reference # Amount ID ID Year (Chartfield 2) Submitted for City Manager's Office by_ Originating Department Head: Additional Information Contact: William Johnson (5806) Lauren Prieur (6035) Monty Hall (8662) apps.cfwnet.org/council_packet/mc_review.asp?ID=30781 &councildate=2/28/2023 2/3 313/23, 5:11 PM ATTACHMENTS M&C Review 2022 City Bond Proj with 2021 TC Bond Participationmap.pdf (Public) ILA FID Table.XLSX (CFW Internal) ORD.APP202021TARRANTCO BONDILA 30106 A023(r7)_(2.10.23).docx (Public) apps.cfwnet.org/council_packet/mc_review.asp?ID=30781 &councildate=2/28/2023 3/3 103299-EPIA-WJ Boaz Rd- County Funding ILA Final Audit Report 2023-05-11 Created: 2023-05-10 By: Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) Status: Canceled / Declined Transaction ID: CBJCHBCAABAAZ6wOhzrMaMgpn9RTowcGxXuBrkleyU5U "103299-EPIA-WJ Boaz Rd- County Funding ILA" History Document created by Andrea Munoz (Andrea. Munoz@fortworthtexas.gov) 2023-05-10 - 8:42:54 PM GMT- IP address: 204.10.90.100 Document emailed to Allison Tidwell (allison.tidwell@fortworthtexas.gov) for filling 2023-05-10 - 8:44:38 PM GMT Email viewed by Allison Tidwell (allison.tidwell@fortworthtexas.gov) 2023-05-11 - 6:53:00 PM GMT- IP address: 204.10.90.100 LO Document declined by Allison Tidwell (allison.tidwell@fortworthtexas.gov) Decline reason: Missing a place for the City Secretary to sign. 2023-05-11 - 6:53:47 PM GMT- IP address: 204.10.90.100 FORT W❑RTH, P"I'l by Adobe Acrobat Sign eon q 0�qo coNmussrorrExs couxT COMMiJNICATION REFERENCE NUMBER PAGE 1 OF 8 DATE: 05/02/2023 SUBJECT: APPROVAL OF AN INTERLOCAL AGREEMENT WITH THE CITY OF FORT WORTH RELATED TO THE W. J. BOAZ WIDENING PROJECT - 2021 TRANSPORTATION BOND PROGRAM *** CONSENT AGENDA *** COMMISSIONERS COURT ACTION REQUESTED It is requested that the Commissioners Court approve an Interlocal Agreement (ILA) with the City of Fort Worth to provide funding through the 2021 Transportation Bond Program (TBP) related to the WJ Boaz Road Widening Project. BACKGROUND On August 3, 2021, the Commissioners Court, through Court Order #136021, accepted a prioritized list of thirty-three (33) projects recommended by the participating cities and the Court -appointed Project Evaluation Committee (PEC) for funding in the Call for Projects category of the 2021 TBP. The WJ Boaz Road Widening Project is included in the approved list of projects. With voter approval of Proposition A on November 2, 2021, and with Commissioner Court approval of the issuance of bond funds on May 24, 2022, through Court Order #138185, the County is now proceeding with the execution of an ILA with the City of Fort Worth related to the WJ Boaz Road Widening Project. This project will be funded through the 2021 TBP. This project is for the construction (or reconstruction) of WJ Boaz Road from Boat Club Road (FM 1220) to 600' East of Elkins School Road. The project consists of widening and reconstructing approximately one (1) mile of the existing two (2) lane asphalt roadway to a four (4) lane divided concrete urban arterial, and includes curb and gutter, internal drainage, one major creek crossing, streetlights, traffic signals, and shared use paths. This reconstruction project will also include constructing a major culvert crossing to carry the one hundred (100) year design storm and to raise the road outside the floodplain. This ILA has been reviewed by the Auditor's Office and approved as to form by the Criminal District Attorney's Office. FISCAL IMPACT i The fiscal impact to Tarrant County for FY 2023 will be $3,500,000.00 in 2021 TBP funds to be disbursed in accordance with the schedule in Attachment A of this ILA. Funds are available in account 579061 /47800-2023/6840100000. SUBMITTED BY: Transportation PREPARED BY: Abbas Rastandeb APPROVED BY: Randy Skinner