HomeMy WebLinkAboutContract 55969-A2CSC No. 55969-A2
AMENDMENT No . 2
TO CITY SECRETARY CONTRACT No. 55969
WHEREAS, the City of Fort Worth (CITY) and Neel -Shaffer, Inc.,
(ENGINEER) made and entered into City Secretary Contract No. 55969, (the
CONTRACT) which was authorized by M&C 21-0406 on the 22nd day of June,
2021 in the amount of $ 285,711.00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number
1 in the amount of $12,110.59 which was administratively authorized on
July 8th, 2022; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
2022 Bond Year 1, Contract 2, CPN 102927; and
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $38,252.41. (See Attached Funding
Breakdown Sheet, Page -4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $336,074.00.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as
designated Assistant City Manager.
of the date subscribed by the City's
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021
Page 1 of 4
OFFICIAL RECORD 2022 Bond Year 1, Contract 2
CITY SECRETARY cPN 102927
FT. WORTH, TX
APPROVED:
City of Fort Worth
William Johnson (M4j 15, 2023 14:48 CDT)
William Johnson
Assistant City Manager
DATE: May 15, 2023
ENGINEER
Neel -Schaffer, Inc.
Jim Amick (May 10, 2023 08:59 CDT)
Jim Amick
Senior Engineering Manager
DATE: May 10, 2023
APPROVAL RECOMMENDED:
Lauren Prieur
Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Greg Robbins
Senior Project Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas 2022 Bond Year 1, Contract 2
Prof Services Agreement Amendment Template CPN 102927
Revision Date: November 23, 2021
Page 2 of 4
APPROVED AS TO FORM AND LEGALITY:
I
DBIack (May 15, 2023 14:02 CDT)
Douglas W. Black
Sr. Assistant City Attorney
CFFORt�LaO
ATTEST: pro ° '.'�,od
Ovo °=d
s darn �'FX ASo�p
bdnanaa
Jannette Goodall
City Secretary
M&C No.: N/A
M&C Date: N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021
Page 3 of 4
2022 Bond Year 1, Contract 2
CPN 102927
FUNDING BREAKDOWN SHEET
City Secretary No. 55969
Amendment No. 2
Department Fund -Account -Center
Water 56002 0600430 5330500 102927 001730
Paving 39001 0200431 5330500 102927 006230
Amount
$8,770.00
$29,482.41
Total: $38,252.41
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021
Page 4 of 4
2022 Bond Year 1, Contract 2
CPN 102927
III HEEL-SCHAFFER
Solutions you can build upon
April 24, 2023
Mr. Greg Robbins, PE, PMP
Senior Project Manager
City of Fort Worth — TPW\Capital Delivery Division
200 Texas Street
Fort Worth, Texas 76102
Reference: Second Additional Services for 2022 Bond Year 1 Contract 2, CPN 102927
Dear Greg:
Neel -Schaffer, Inc. offers additional Professional Engineering Services for this project. These
additional services include the following:
• Revisions to Thrall Street paving due to proposed Texas Wesleyan development
• Provide centerline elevation data for limited design streets (Avenues C, E and G)
• Calculate suggested longitudinal grades and cross slopes for Avenues C, E and G; and adjust
nine plan/profile sheets
• Prepare a Paving Layout Sheet
• Prepare a Tree Table and revise all 15 paving plan and profile sheets
• Revisions to Thrall Street water due to proposed Texas Wesleyan development
• Extend Holmes Street water line and add the Avenue G intersection
• Revise the Holmes Street sewer line
• Prepare mill and overlay for the Holmes Street and Avenue G intersection
• Update opinion of probable construction cost for water, sewer and paving revisions
• Additional project management time for the extended period of the contract (progress
reports, schedule, invoices and M/WBE reports)
The design will require approximately six weeks.
Neel -Schaffer, Inc. proposes to do the water and sewer additional services for $8,770. See
attached Level of Effort for backup. A small contract amendment will be required to fund this.
Neel -Schaffer, Inc. proposes to use the remaining $6,667.59 contingency for additional services
to fund part of the $36,150 of work for paving. See attached Level of Effort for backup. A small
contract amendment will be required to fund the rest ($29,482.41).
The total value of the amendment is $38,252.41. See summary table below. All additional
services will be performed in accordance with the original contract dated July 7th, 2021.
0:1Jobs\16474 - FW 2022 Year 1 Contract 2\Admin\Contract\Extras\Amendment 2 Letter.doc
ARLINGTON • DALLAS • FORT WORTH • HOUSTON
engineers • planners • surveyors • environmental scientists • landscape architects
515 Houston St., Ste. 651 • Fort Worth, TX 76102 • phone: 817-870-2422 • fax: 817-870-2489 • www.neel-sr-haffer.com
Mr. Greg Robbins, PE, PMP
April 24, 2023
Page 2
Summary Table
Water
Sewer
T/PW
Total
Original Contract Amount
$108,593
$16,314
$160,804
$285,711
Amendment No. 1
$3,678
$8,432.59
$12,110.59
Amendment No. 2
$8,386
$384
$29,482.41 *
$38,252.41
Contract Total Amount
$120,657
$16,698
$198,719
$336,074
* Total value of T/PW extra work in Amendment No. 2 is $36,150. Total value of extra work in
Amendment No. 2 is $44,920. T/PW remaining contingency of $6,667.59 is being used.
If you have any questions or we may be of further service, please call me at 817/909-2807.
Sincerely,
NEEL-SCHAFFER, INC.
James P. Amick, P.E.
Engineer Manager
TBPE Firm Reg. No. F-2697
TBPLS Firm Reg. No. 10027200
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Transportation & Public Works Department Design Services for
2022 BOND YEAR 1 CONTRACT 2; Extras from 90 % Review
City Project No. 102927
Labor(hours) I I Expense
Task Description Project Project Survey Survey SUE Total Labor Total Expense Remaining
Task No. Principal Manager Eggjneer EIT CADD RPLS Tech Crew Crew Administrative Cost Subconsultant Travel Reproduction Cos[ %Complete gudg¢t
1.2.4 Prepare Monthly Invoices (assumes 12 months) I 3
1.2.5 Prepare Baseline Schedule and Updates (assumes 12 months) 6
I Design
9.51
19.51
381
81 132
I Texas Wesleyan Paving Modifications
I Avenues C, E & G Design Centedlne Data
1
4
2
a
2
16
8
32
I Paving Layout Shoat
0.5
0.5
8
I Tree Tables
f
2
12
Avenues C, E & G Longitudinal and Cross Slope Calculations; and Adjustments to Nine
Plan/Profile Sheets
4
8
16
8 72
I
I
II
I Totals
Ro_ad v2 �-"
Rememin
y % Design Fee g
Lane Miles Complete Budget
Amend 2 2.09 100° $ 36,150 0 $ 36,150
1 TOTAL 2.0 1 100°01 $ 38,150 0 01 $ 36,150
Paving and Drainage Breakdown
Task Design Survey and SUE Total
Paving $36,150 $36,150
Drainage $0 $0
$36,150.00
0%
Project Summary
Total Hours
246
Total Labor
$35.925
Total Exinse
$225
MBE/SBE SubwnsultanJ
$0
Non-MBEISBE Subconsultant
$0
5% Sub Marku
$0
MBFJSBE P.l,c,patio
Total Project Cast
$36,150
III
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date: 8.09.2012 2022 Bond Year 1, contract 2
CPN 1.2921
1 of
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Water Department Design Services for
2022 Bond Year 1 Contract 2; Extras from 90 % Review
City Project No. 102927
Labor(hours) Subconsultant Expense I
Task Description Project Project Survey Survey Administ Total Expense Remaining
Task No. Principal EIT CADD RPLS Total Labor Cost Subconsultant Task Sub Total %Complete
Man49�er Egyjneer Tech Crew relive Reproduction Cost Budget
Rat I $260 $2 0 155 $125 $130 $90 MWBE INon-MWBE
11.0
Project Management
0
12
0
1.2
Iremparel Wr Repss"We
1.2.4
nZify
p epare f�.v�1�� fffihffy pprogress lSeports (assumes 12 months &Split with TPW)
J
1.2.6
Prepare Monthly Invoices ((assumes 12 months and split with TPW)
.{
1.2.6
Prepare Monthly MBE/Sd Reports (assumes 12 months)
3
design
1111—
31
3
6
Holmes Street Waterline Extension & Adjustment
1
1
2
Holmes Street Sewer Adjustment (Includes 2" Mill & Overlay of Portion of Ave. C)
4
Thrall Street Waterline Adjustments for Wesleyan
2
I
Totals
3
151
6
I
(Footage
% Foo ye Desi
t98E
nFee
Water)
5153
$ 8,3as
Sewer)
236
4°of $
384
Total!
538
100°0! $
8,770
City of Fort Worth, Texas
Attachment B - Leval of Effort Supplement
PMO Official Release Date: 8.09.2012
$1
12 0 0 0 24
$81580 $ $0
$190
$190 $8,7701 04.
$0
Water and Sewer Design Breakdown
Project Summary
Water Sanitary
FootT e % $ LF
Sewer Total Cost %Complete Remaining
%�
Budge) Total Hours
Total Labor
60
$8,580
Contract 5 53 96°/eJ $ 6,366 236
4 61 $ 384 $ 8,770
0 J $
8,770 Total Expense
$190
TOTAL 515' 1 96°01 $ 8,386 23 I
4°0 $ 384 $ 8.770
0°/al $
8,770 MBE/SBE Subconsultant
$0
Non-M12 BE S M rk p
$0.00
MBE/SBE Participation
Total Project Cod,
0.0%
$8,770,
2022 Bond Year 1, Contract 2
PN 102927
1 Of 1
FORT WORTH:,:
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: 2022 Bond Year 1 Contract 2 — Design Amendment #2
M&C: CPN: 102927 CSO: 55969 DOC#:
Date:
To:
Name
Department Initials
Date Out
l .
Filogonio Munoz
TPW - initial 4!L-
May 10, 2023
2.
Jim Amick
Consultant - signatures
May 10, 2023
3.
Greg Robbins
TPW - signatures
May 10, 2023
4.
Mary Hanna
TPW - initialer
May 10, 2023
5.
Brenda Oropeza
Water - initialer
May 11, 2023
6.
Tony Sholola
Water - initial
May 12, 2023
7.
Leon Wilson
TPW - initial
May 12, 2023
8.
Michael Owen
TPW - initialer
May 15, 2023
9.
Lauren Prieur
TPW - initial
May 15, 2023
9.
Doug Black
Legal - signature olwb
May 15, 2023
10.
William Johnson
CMO - signature WX
May 15, 2023
11.
Jannette Goodall
CSO - Signature .7-s6
JSG
May 15, 2023
12.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE
ACM for approval first. Once the ACM
has signed the routing slip, David will review and
take the next steps.
NEEDS TO BE NOTARIZED: [—]YES ®No
RUSH: DYES ®No SAME DAY:DYES ®No NEXT DAY: [—]YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
Return To: TPWContractsn,FortWorthTexas.eov at ext. 7233 for pick up when completed.
Thank you!