Loading...
HomeMy WebLinkAboutContract 57679-CO1CSC No. 57679-COI FORT WORTH® City of Fort Worth or-� Change Order Request Project Namel Altamesa and Crowley Intersection Improvements I City Sec # 1 57679 Client Project #(s)1 101579 Project Addition of two additional Left Turn lanes using existing median space, installation of new signals and new ADA compliant curb ramps. Description Contractorl McClendon Construction l Change Order#I 1 I Datel 4/25/2023 City Project Mgr.1 Bradley Radovich Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO TPW $635,155.95 City Inspectorl Kevin Jackson Contract Time Totals (CD) $635,155.95 120 $635,155.95 120 $7,450.00 67 $642,605.95 187 Additional Funding (if necessary) $7,450.00 $7,450.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1.17% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $793,944.94 JUSTIFICATION (REASONS) FOR CHANGE ORDER M6 This change order includes three items. The first item is powder coating of the new traffic signal poles and mast arms in accordance with current City specifications and the requirements of the Transportation Management Department. This project was originally bid with a previous version of the traffic signal specifications that did not include powder coating. The second item is joint filling of a large gap between the back of curb and a new concrete median constructed as part of the project. This work was not included in the original plans and was requested by the City of Fort Worth after observing the large joint gap during the final punch list inspection. The third item is the addition of 67 days of contract time that was the result of a longer than expected delivery time of traffic signal equipment for the project. Neither of the two cost items described in this change order were included in the original bid. Unit prices for these items not included in the original bid were evaluated by City staff and the design consultant. The prices included in this change order have been compared to unit prices for similar items from recent bids by TXDOT and the City of Fort Worth and were found to be reasonable and comparable. The price evaluation is available in the project files. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Contractor's Company Namell Contractor (Name Contract Signature ate McClendon Construction Co, Inc. Justin Blair tea, May 12, 2023 Inspector/Inspection Su ervisor Date Project and CTontract Compliance Manager Date �^ May 11, 2023 May 11, 2023 o ram Manager Date Senior Capital Project Officer Date �4or Dept) May 15, 2023 May 16, 2023 AL Date Director, Contracting Department (Dept) Date ?��N �r�t.►�� May 16, 2023 May 16, 2023 Assistant City Attorney Date Assistant City Manager Date I May 17, 2023 � `� w G0--c., May 17, 2023 ann M&C Number °Da ATTEST: aF FORT . .�. PoQ� Jannette Goodall, City Secretary O,l�... x' ...... pan E 46 44ga I M&C Date Approved OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORT WORTH City of Fort Worth .T., Change Order Additions Project Name I Altamesa and Crowley Intersection Improvements I City Sec # I 57679 I Client Project # 1 101579 1 Contractorl McClendon Construction I PMI Bradley Radovich Inspectorl Kevin Jackson Change Order Submittal # Date 1 4/25/2023 1 ADDITIONS I I LM UtSUKIP I IUN ULV I 1 34 41 10 Powder Coating for Trafic Signals TPW 2 32 13 73 Crack Sealing for Concrete Paving TPW TPW Uty unit unrtuost Iota) I I I 1.00000000 LS $5,250.00 $5,250.001 550.00000000 LF $4.00 $2,200.001 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Tk $7,450.001 1 1 Sub Total Additions $7,450.001 Change Order Additions Page 2 of 4 I I tM FORTWORTH City of Fort Worth IV--- Change Order Deletions Project Name I Altamesa and Crowley Intersection Improvements I City Sec # 1 57679 1 Client Project # 1 101579 1 Contractorl McClendon Construction PMI Bradley Radovich Inspectorl Kevin Jackson Change Order Submittal # 0 Date 1 4/25/2023 1 DELETIONS UtJUKll'I IUN ULFI Uly Unit Unit Uost total 1 I NVV wuul Tk $0.001 I I I Sub Total Deletions $0.001 Change Order Deletions Page 3 of 4 M/SBE for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO # DATE I AMOUNT Total I $0.00 I FORT WORTH. Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: Change order No I McClendon Constr. Altamesa and Crowley M&C: 23-0346 Date: CPN: 101579 CSO: DOC#: To: Name Jaylyn Harrelson Department?L Initials Date Out 1. jblair@mcclendonconstruction.com Contractor -Signature g a May 12, 2023 2. Kevin Jackson TPW Signature cu' May 11, 2023 3. Brad Radovich TPW - Signature K; B May 11, 2023 4. Chad Allen TPW -Signature A- May 15, 2023 5. Lissette Acevedo TPW -Signature CN May 16, 2023 6. Michael Owen TPW - Signature MO May 16, 2023 7. Lauren Prieur TPW - signature May 16, 2023 8. Doug Black Legal - signature May 17, 2023 9. William Johnson ACM - signature W`�— May 17, 2023 10. 11. DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: []YES ®No SAME DAY: ❑YES []No NEXT DAY: ❑YES ❑No ROUTING TO CSO: ®YES ❑No Action Required: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return To: TPWContracts(a4FortWorthTexas.sov at ext. 7233 or 8363, for pick up when completed. Thank you! Updated 03.29.2023 mdhm