HomeMy WebLinkAboutContract 46451-A6CSC No. 46451-A6 AMENDMENT No . 6 TO CITY SECRETARY CONTRACT No. 46451 WHEREAS, the City of Fort Worth (CITY) and Bridgefarmer and Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 46451, (the CONTRACT) which was authorized C-27147 on the 6th day of January, 2015 in the amount of $ 1,010,105.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $ 340,040.00 which was authorized by M&C C-28138 on March 7, 2017, Amendment Number 2 in the amount of $556,250.80 authorized by M&C C-28622 authorized by M&C C-28622 on March 20, 2018, Amendment No 3 in the amount of $180,870.00 authorized by M&C 20-0502 on August 4, 2020, Amendment No 4 in the amount of $98,770.00 which was administratively approved on November 9, 2021, Amendment No 5 in the amount of $207,240.00 authorized by M&C 22-0026 on January,ll, 2022; and WHEREAS, the CONTRACT involves engineering services for the following project: McCart Avenue from Risinger Road to Twin Leaf Drive and McPherson Boulevard from West Cleburne Road to McCart Avenue, CPN CO2505; and WHEREAS, it has become necessary to execute Amendment No. 6 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $18,030.00. (See Attached Funding Breakdown Sheet, Page -4-) OFFICIAL RECORD 2. CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas McCart Ave and McPherson Blvd. Prof Services Agreement Amendment Template CPN CO2505 Revision Date: November 23, 2021 Page 1 of 4 Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $2,411,305.00. 1911 All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as designated Assistant City Manager. APPROVED: City of Fort Worth William Johnson (M 17, 202314:41 CDT) William Johnson Assistant City Manager DATE: May 17, 2023 APPROVAL RECOMMENDED: of the date subscribed by the City's Bridgefarmer and Associates, Inc. M Mansoor Ahsan,PE Chief Executive Officer DATE: May 15, 2023 Lauren Prieur Director, Transportation and Public Works Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Bradley M Radovich, PE Senior Project Manager City of Fort Worth, Texas cCart A and McPherson Blvd. Prof Services Agreement Amendment Template CPN CO2505 Revision Date: November 23, 2021 Page 2 of 4 APPROVED AS TO FORM AND LEGALITY: 1 DBlack (May 17, 202311:50 CDT) Douglas W. Black Sr. Assistant City Attorney ATTEST: Jannette Goodall City Secretary M&C: N/A Date: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas cCart A and McPherson Blvd. Prof Services Agreement Amendment Template CPN CO2505 Revision Date: November 23, 2021 Page 3 of 4 FUNDING BREAKDOWN SHEET City Secretary No. 46451 Amendment No. 6 Department Fund -Account -Center TPW 34014-0200431-5330500-0O2505-0O2330-2016-14010199 Water 56002-0600430-5330500-0O2505-001730-9999 Amount $17,220.00 $810.00 Total: $18,030.00 City of Fort Worth, Texas McCart Ave and McPherson Blvd. Prof Services Agreement Amendment Template CPN CO2505 Revision Date: November 23, 2021 Page 4 of 4 "160 BRIDGEFARMER & /�40r //1► ASSOCIATES, INC. April 5, 2022 B&A Job No. 155-04-01 Mr. Leon Wilson, PE TPW/City of Fort Worth 200 Texas Street Fort Worth, TX 76102 Reference: McCart Avenue from Risinger Road to Twin Leaf Drive and McPherson Boulevard from West Cleburne Road to McCart Avenue City Project No. 02505, City Secretary No. 46451 Subject: Amendment No. 6 Dear Mr. Wilson, Please accept this letter proposal for additional engineering services that are necessary to complete the McCart Avenue and McPherson Boulevard project. Additional scope of work items are for design and plan revisions to accommodate development of the Cohix tract. Revisions will be made to the following plan sheets and corresponding designs: Roadway Plan & Profile, Contour Plan, Drainage Maps, Storm Sewer Computations, Storm Drain Plan & Profile, Ditch Plan & Profile, Erosion Control, Illumination, and Water Plan & Profile, as described in Attachment "A". The fee requested for this work is $18,030.00. The original contract amount for this project was $1,010,105.00. With approval of Engineering Amendment No. 1, the contract was increased to $1,350,145.00. With the approval of Engineering Amendment No. 2, the contract was increased to $1,906,395.00. With approval of Engineering Amendment No. 3, the contract was increased to $2,087,265.00. With approval of Engineering Amendment No. 4, the contract was increased to $2,186,035.00. With approval of Engineering Amendment No. 5, the contract will be increased to $2,393,275.00. With approval of Engineering Amendment No. 6, the contract will be increased to $2,411,305.00. The original SBE fee for this project was $212,047.85 (20.99%). With approval of Engineering Amendment No. 1, the SBE fee was increased to $337,339.85 (24.99%). With approval of Engineering Amendment No. 2, the SBE fee was increased to $469,439.85 (24.62%). With approval of Engineering Amendment No. 3, the SBE fee was increased to $479,439.85 (22.97%). With approval of Engineering Amendment No. 4, the SBE fee was increased to $485,639.85 (22.22%). With approval of Engineering Amendment No. 5, the SBE fee will be increased to $506,439.85 (21.16%). With approval of Engineering Amendment No. 6, the SBE fee will be increased to $509,139.85 (21.11 %). If you have any questions, please call me at 972-231-8800. Very truly yours, BRIDgFARR&IASSOCIATES,MEINC. M. Mansoor Ahsan, P.E. �— Chief Executive Officer M MA: bg Attachments Bridgefarmer & Associates, Inc. THUNDERING HERD www.bridaefarmer.com Headquarters: 2350 Valley View Lane Dallas, Texas 75234 Offices In: Little Rock, Arkansas Denver, Colorado Austin, Texas Phone Number: Toll Free: 1-855-222-4845 Headquarters: (972) 231-8800 Fax: (972)231-5900 ATTACHMENT "A" Scope for Enaineerina Design Related Services for Street Improvements The scope set forth herein defines the work to be performed by the ENGINEER in completing Final Design (100%) for the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. OBJECTIVE The additional work included as part of this amendment includes plan revisions to accommodate development of the Cohix Tract, South of the proposed McPherson Boulevard and West of the proposed McCart Avenue. The design and plan revisions will be made to accommodate proposed residential roadways to be constructed as part of the Cohix development. These roadways will require revisions to paving sheets to accommodate the roadway intersections, relocation of stormdrain inlets, resizing of stormdrain mains, additional water line stubouts, relocation of illumination poles, revisions to SWPPP, grading, drainage calculations and other miscellaneous sheets. Services to be provided for this project Amendment are as described below. WORK TO BE PERFORMED TASK 4. FINAL DESIGN (100 PERCENT) CONSTRUCTION DOCUMENTS. ENGINEER will revise construction plans in coordination with the design of the proposed Cohix Subdivision and to accommodate their designs. Revisions will include changes to the following plan sheets • Roadway Plan -Profile Sheets • Jointing Plans • Contour Plans • Drainage Area Maps • Storm Sewer Computations • Storm Drain Plan & Profile • Ditch Plan & Profile • Erosion Control Sheets • Illumination Plans • Water Plan & Profile DELIVERABLES A. Final iSWM Checklist B. 100% construction plans and specifications. C. Detailed estimates of probable construction costs including summaries of bid items and quantities using the CITY's standard bid items and format. D. Original cover mylar for the signatures of authorized CITY officials. City of Fort Worth, Texas McCart & McPherson Blvd CPN CO2505 CSC 46451 Attachment A Amendment #6 PMO Release Date: 07.23.2012 Page 1 of 1 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for McCart Ave., from Risinger Road to Just North of Twinleaf Drive & McPherson Blvd., from West of Cleburne Road to the Future McCart Ave. McCart Ave. Phase 1 & Phase 2 Roadway and Water Revisions City Project No. CO2505 TPW CIP / WATER DEPARTMENT Task No. Task Description Rate Project Manager $225 Labor I Project I Design Engineer Engineer $18r $140 (hours) EIT CADD Administrative Total Labor Cost Ex Subconsultant MWBE Non-MWBE ense Travel Reproduction Total Expense Task Sub Total Cost $120 $90 $80 'rPW 29 2 18 0 $14,385 $2,700 $0 $0 $0 $2,700 $17,085 1 1.0 1.1 1.1.1 1.1.2 1.2 1.2.3 1.2.4 1.2.6 1.2.7 Project Management Managing the team Internal Team Meetings QA/QC Communications and Reporting bes gn Aevlew Meetings Prepare Baseline Schedule Prepare Monthly MBE/SBE Reports Invoicing 8 0 0 0 0 $1,800 $0 $0 $0 $0 $0 $1,800 S 1 1 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 4.0 4.1 Final Design Final Draft (100 %) Construction Plans and Specifications Paving KeyMap Horizontal Control Data typical Sections Right -of -Way Map Demoliton Plan tree Indentification Chart Roadway Plan -Profile Sheets Roadway Cross Sections Roundabout Design Driveway Plan -Pro Iles Jointing Pans Contour Plans Drainage Area Maps Storm Sewer Computations Storm Drain Plan & Profile Ditch Plan & Protile Erosion Control Sheets Signin_q& Pavement Marking Sheets Illuminalion Design Estimate & Quantities 21 0 0 52 18 0 $12,585 $2,700 $0 $0 $0 $2,700 $15,285 1 1 1 1 1 1 1 1 1 1 1 4 1 4 1 6 1 4 1 24 16 1 4 2 1 1 1 1 1 4 $0 $2,706 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $6 2 $570 $0 $570 $0 $0 $0 $0 $0 $0 $0 $0 $0 1 $705 $0 $705 2 $930 $0 $930 2 $1,170 $0 $1,170 3 $1,155 $0 $1,155 4 $5,220 $0 $5,220 1 $885 $0 $885 1 $345 $0 $345 $0 $0 $0 3 $675 $2,700 $3,375 2 $930 $0 $930 $0 $0 $0 City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09.2012 McCart & McPherson Blvd CPN CO2505 CSC 46451 Annendnnent#6 1 of 3 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for McCart Ave., from Risinger Road to Just North of Twinleaf Drive & McPherson Blvd., from West of Cleburne Road to the Future McCart Ave. McCart Ave. Phase 1 & Phase 2 Roadway and Water Revisions City Project No. CO2505 TPW CIP / WATER DEPARTMENT Labor (hours) Ex ense Task No. Task Description Project I Project I Design EIT CADD Administrative Total Labor Subconsultant Total Expense Task Sub Total Manager Engineer Engineer Cost Travel Reproduction Cost Rate $225 $180 $140 $120 $90 $60 MWBE Non-MWBE 5.0 Bid Phase 0 0 0 01 01 0 $0 $0 $0 $0 $01 $0 $( 5.1 Bid Support 5.1.1 Sell Contract Documents and Maintain Plan Holders List 5.1.2 Issue Addenda 1 5.1.3 Attend Pre -bid Conference 1 5.1.4 Attend Bid Opening 1 5.1.5 Tabulate Bids and Recommend Award 1 5.1.6 Issue Conformed Contract Documents I 7.0 ROW/Easement Services 01 0 01 01 01 0 $0 $01 $01 $01 $0 $0 $0 7.1 Right -of -Way Research 7.2 Right-of-Way/Easement Preparation and Submittal 7.3 temporary Right of Entry Submittal Reimburslbles (Filing Fees) Not to Exceed 1 City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09.2012 W rt & McPherson Blvd CPN CO2505 CSC 46451 Amendment #6 2of3 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for McCart Ave., from Risinger Road to Just North of Twinleaf Drive & McPherson Blvd., from West of Cleburne Road to the Future McCart Ave. McCart Ave. Phase 1 & Phase 2 Roadway and Water Revisions City Project No. CO2505 TPW CIP / WATER DEPARTMENT Labor (hours) Expense Task No. Task Description Project Manager Project Design Engineer Engineer I I EIT CADD Administrative Total Labor Cost Subconsultant Travel Reproduction Total Expense Cost I Task Sub Total Rate $225 $180 $140 MWBE Non-MWBE $120 $90 $60 Water 2 0 0 3 0 0 $810 $0 $0 $0 $0 $0 $810 0 01 0 01 0 $0 2.0 Conceptual Design (30%) 01 Data Collection $0 Conceptual Design Package Construction Estimate 1 1 $0 $0 4.0 Final Desin 2 0 0 3 0 0 $810 $0 Final Draftt90%) Plans & Specifications $465 Final (100%) Plans & Specifications 1 2 Construction Estimates (90 % & 100%) 1 1 $345 6.2 Record Drawings $0 Totals 31 0 0 551 181 0 $15,1951 $2,700 $0 $0 $0 $2,7001 $17,895 Total TPW + Water Summary TPW CIP Summary Total Hours 104 Total Hours 99 Total Labor $15,195 Total Labor $14,385 Total Expense $2,700 Total Expense $2,700 MBE/SBE Subconsultant $2,700 MBE/SBE Subconsultant $2,700 Non-MBE/SBE Subconsultant $0 Non-MBE/SBE Subconsultant $0 5% Sub Markup $135.00 5% Sub Markup $135.00 MBE/SBE Participation 15.0 % MBE/SBE Participation 15.7 Total Project Cost $18,030 Total Project Cost $17,220 Water Summary Total Hours 5 Total Labor $810 Total Expense $0 MBE/SBE Subconsultant) $0 Non-MBE/SBE Subconsultan $0 5% Sub Markup $0.00 MBE/SBE Participation 0.0% Total Project Cost $810 TOTAL $18,030.00 City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09.2012 McCart & McPherson Blvd CPN CO2505 CSC 46451 Amendment #6 3of3 ATTACHMENT B COMPENSATION Design Services for McCart Avenue from Risinger Road to Twin Leaf Drive and McPherson Boulevard from West Cleburne Road to McCart Avenue City Project No. CO2505 Time and Materials with Rate Schedule Project Compensation A. The ENGINEER shall be compensated for personnel time, non -labor expenses, and subcontract expenses in performing services enumerated in Attachment A as follows: i. Personnel Time. Personnel time shall be compensated based upon hours worked directly in performing the PROJECT multiplied by the appropriate Labor Cateaory Rate for the ENGINEER's team member performing the work. Labor Cateaory Rate as presented in the rate schedule table below is the rate for each labor category performing the work and includes all direct salaries, overhead, and profit. Labor Category 2023 Rate 2024 Rate ($/hour) ($/hour) Project Manager $225 $225 Project Engineer $180 $180 Design Engineer $140 $140 EIT $120 $120 CADD $90 $90 Administrative $60 $60 Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct Expenses at invoice or internal office cost. Direct Expenses (non -labor) include, but are not limited to, mileage, travel and lodging expenses, mail, supplies, printing and reproduction services, other direct expenses associated with delivery of the work; plus applicable sales, use, value added, business transfer, gross receipts, or other similar taxes. iii. Subcontract Expenses. Subcontract expenses and outside services shall be reimbursed at cost to ENGINEER plus a markup of ten percent (10%). iv. Budgets. ENGINEER will make reasonable efforts to complete the work within the budget and will keep the City informed of progress toward that end so that the budget or work effort can be adjusted if found necessary. ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be adjusted, nor is the City obligated to pay ENGINEER beyond these limits. City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 1 of 4 McCart & McPherson Blvd CPN CO2505 CSC 46451 Amendment#6 LIM ATTACHMENT B COMPENSATION If ENGINEER projects, in the course of providing the necessary services, that the PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether by change in scope of the project, increased costs or other conditions, the ENGINEER shall immediately report such fact to the City and, if so instructed by the City, shall suspend all work hereunder. When any budget has been increased, ENGINEER's excess costs expended prior to such increase will be allowable to the same extent as if such costs had been incurred after the approved increase. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. Method of Payment A. The ENGINEER shall be paid by the City based upon an invoice created on the basis of statements prepared from the books and records of account of the ENGINEER, based on the actual hours and costs expended by the ENGINEER in performing the work. B. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. C. ENGINEER shall prepare and submit invoices in the format and including content as presented in Exhibit B-1. D. Payment of invoices will be subject to certification by the City that such work has been performed. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Transportation and Public Works Department monthly progress reports and schedules in the format required by the City. City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 2 of 4 McCart & McPherson Blvd CPN CO2505 CSC 46451 Amendment #6 ATTACHMENT B COMPENSATION IV. Summary of Total Project Fees Firm Primary Responsibility Prime Consultant Bridgefarmer & Roadway/Storm Drainage Associates, Inc. Design & Project Management Proposed MWBE Sub -Consultants Lee Engineering, LLC Roundabout & Illumination Non-MWBE Consultants Project Number & Name Amendment No. 6 City MWBE Goal = 20% City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 3 of 4 Fee Amount % $15,330.00 85% $2,700.00 TOTAL $18,030.00 15% 100% Total Fee MWBE Fee MWBE % $18,030.00 $2,700.00 15% Consultant Committed Goal = 20% McCart & McPherson Blvd CPN CO2505 CSC 46451 Amendment #6 JIM EXHIBIT "13-1" ENGINEER INVOICE (Supplement to Attachment B) Insert required invoice format following this page, including negotiated total budget and allocations of budgets across desired work types and work phases. City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 4 of 4 McCart & McPherson Blvd CPN CO2505 CSC 46451 Amendment #6 B-4 CFW - Design Services CO2505 - McCart Avenue and McPherson �rlf"' Task Name Duration I Stan Finish 1 02505 McCart Avenue and McPherson Blvd. 2245 daysl Mon 2123115 Fri 94 2 3 4 5 6 Issue Design Notice to Proceed Design 30 % Conceptual Design Prepare 30 % Conceptual Plans 30 % Conceptual Plan Submittal 1 dayl 2194 days 150 days 125 days 0 days Mon 2123115 Tue 4/7115 Tue 417115 Tue 417/15 Mon 9128115 Mon 2/f Fri 9 Mon 11 Mon 9/, Mon 9/f 7 Review 30 % Conceptual Plan (CFW) 25 days Tue 9/29/15 Mon 11 6 Hold Project Meeting 0 days Mon 1112115 Mon 11 9 60% Preliminary Design Prepare 60% Preliminary Plans & Specs 177 days Tue 1113115 Tue 1113/15 Thu 7 Tue 4/: 10 126 days 11 60% Preliminary Plans & Specs Submittal Submit Plans & Specs to Utility Companies 0 days Tue 4/26/16 Tue 4/26116 Tue 41, Tue 4/, 12 0 days 13 14 Review 60% Preliminary Plans & Specs (CFW) Hold Proiect Meetino 35 days Wed 4/27116 Tue 6/1 0 daysl Thu 717/16 Thu 7 Attachment D: Consultant Baseline Schedule 2015 2016 2017 H1 H2 H1 H2 I H1 H2 e Baseline Date: Thu 4/13/23 2018 2019 2020 2021 2-2 2123 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 I H2 16 Stonnwater Group Completes Review of H&H Models 1 dayl Wed 1015/16 Wed 1015/16 1015 5/15 1/z 319 4113 4116 6/6 sn 3n1 M,6116 7/14 814 s/1 17 Prepare 90% Final Plans & Specs 158 days Thu 1016116 Mon 5/15/17 16 90% Final Plans & Specs Submittal 0 days Mon 5115/17 Mon 5/15/17 19 Delay due to environmental mitigation issues 166 days Tue 5/16/17 Tue 1/2/18 20 Redesign plan for revised alignment (30% level) 48 days Wed 113/18 Review Revised Alignment (CFW) 25 days Mon 3112/18 Hold Project Meeting 1 day, Mon 4116/18 Prepare 90% Plans & Specs 37 daysl Tue 4/17/18 Fri 3/9/18 21 Fri 4113/18 22 Mon 4116/18 23 Wed 6/6/18 24 90% Final Plans & Specs Submittal Review 90% Plans & Specs (CFW) 1 day Thu 6f1/18 Thu 6/7/18 25 197 days Fri 6018 Mon 3/11/19 26 Hold Project Meeting 1 day Tue 3112/19 Tue 3112/19 27 Incorporate Final Comments & Submit 100% Plans & Specs 30 days Mon 5/8123 Fri 6/16/23 28 Review 100% Plans & Specs (CFW) 20 days Mon 6/19/23 Fri 7114/23 29 100%Sign & Seal Plans Submittal 15 days Mon 7117/23 Fri 8/4/23 30 Approve Final Plans & Specs (CFW) 20 days Mon 817/23 Fri 9/1/23 31 Desian Comnlete 0 days Fri 9/1/23 Fri 9/l/23 32 ROW/Land 1315 daysl Tue 4117/18 Mon 511123 33 Prepare ROW documents 30 daysl Tue 4/17/18 Mon 5/28/18 34 ROW Acquisitions 1285 daysl Tue 5/29/18 Mon 511/23 35 Survey 850 days Tue 2124/15 Mon 5/28118 _ 36 Design Survey 30 days Tue 2124/15 Mon 416115 4 6 37 Additional Design Survey 30 days Wed 113/18 Tue 2/13118 38 SUE Level "B" 30 days Tue 2124/15 Mon 416115 416 39 Additional SUE 30 days Tue 4/17/18 Mon 5/28/18 40 SUE Level "A" (12 locations) 54 days Tue 3/22/16 Fri 6/3116 EM 613 41 SUE Level "A" (Add'I locations) 42 Permitting 43 Floodplain Services 44 Environmental Services 45 TDLR 5/28 s/1 h& 21t 5128 MM 417 mom 1119 3/8 Task Rolled Up CrBical Task Project Summary Inactive Summary .............. ...... Start -only Critical Task Rolled Up Mlleatone O Group By Summary Manual Task O Finish -only Legend Milestone ♦ Rolled Up Progress Inactive Task Duration -only .............. I ...... External Tasks O Summary SPIN ............... ..... Inactive Milestone Manual Summary Rollup ♦ External Milestone Rolled Up Task External Tasks Inactive Milestone Manual Summary ♦ Progress Baseline Schedule 02505 - McCart Avenue and McPherson Blvd. - Phase 2 Deadline b McCart & McPherson Blvd CPN CO2505 CSC 46451 Amendment #6 9129 Page 1 of 1 FORT WORTH., Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: Amendment No 6 - Bridgefarmer &Associates M&C: NA CPN: CO2505 CSO: 46451 DOC#: Date: To: Name Department Initials Date Out 1. Jaylyn Harrelson TPW - initial 2L May 16, 2023 2. M Mansoor Ahsan CEO ** Bridgefarmer - Signatured May 15, 2023 3. Brad Radovich - PM TPW - Signature B R May 15, 2023 4. Raul Lopez TPW -initial May 16, 2023 5. Lissette Acevedo TPW -initial Glv May 16, 2023 6. TPW AD (Interim: Michael Owen) TPW - initial May 16, 2023 7. Lauren Prieur TPW - signature May 16, 2023 8. Doug Black Legal - signature d May 17, 2023 9. William Johnson CMO - signature May 17, 2023 10. Jannette Goodall CSO - signatures May 18, 2023 11. TPW Contracts TPW DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. **email Ahsan@bridgefanner.com NEEDS TO BE NOTARIZED: []YES ®No RUSH: []YES ®No SAME DAY: []YES []No NEXT DAY: ❑YES ❑No ROUTING TO CSO: ❑YES ❑No Action Required: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return To: TPWContracts(&FortWorthTexas.2ov at ext. 7233 or 8363, for pick up when completed. Thank you! Updated 03.29.2023 mdhm