AMENDMENT No . 6
TO CITY SECRETARY CONTRACT No. 46451
WHEREAS, the City of Fort Worth (CITY) and Bridgefarmer and
Associates, Inc., (ENGINEER) made and entered into City Secretary Contract
No. 46451, (the CONTRACT) which was authorized C-27147 on the 6th day of
January, 2015 in the amount of $ 1,010,105.00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in
the amount of $ 340,040.00 which was authorized by M&C C-28138 on March 7,
2017, Amendment Number 2 in the amount of $556,250.80 authorized by M&C
C-28622 authorized by M&C C-28622 on March 20, 2018, Amendment No 3 in the
amount of $180,870.00 authorized by M&C 20-0502 on August 4, 2020, Amendment
No 4 in the amount of $98,770.00 which was administratively approved on
November 9, 2021, Amendment No 5 in the amount of $207,240.00 authorized
by M&C 22-0026 on January,ll, 2022; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
McCart Avenue from Risinger Road to Twin Leaf Drive and
McPherson Boulevard from West Cleburne Road to McCart Avenue, CPN CO2505;
and
WHEREAS, it has become necessary to execute Amendment No. 6 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $18,030.00. (See Attached Funding Breakdown Sheet, Page
-4-)
OFFICIAL RECORD
2. CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas McCart Ave and McPherson Blvd.
Prof Services Agreement Amendment Template CPN CO2505
Revision Date: November 23, 2021
Page 1 of 4
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for
all work and services shall be an amount of $2,411,305.00.
1911
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as
designated Assistant City Manager.
APPROVED:
City of Fort Worth
William Johnson (M 17, 202314:41 CDT)
William Johnson
Assistant City Manager
DATE: May 17, 2023
APPROVAL RECOMMENDED:
of the date subscribed by the City's
Bridgefarmer and
Associates, Inc.
M Mansoor Ahsan,PE
Chief Executive Officer
DATE: May 15, 2023
Lauren Prieur
Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Bradley M Radovich, PE
Senior Project Manager
City of Fort Worth, Texas cCart A and McPherson Blvd.
Prof Services Agreement Amendment Template CPN CO2505
Revision Date: November 23, 2021
Page 2 of 4
APPROVED AS TO FORM AND LEGALITY:
1
DBlack (May 17, 202311:50 CDT)
Douglas W. Black
Sr. Assistant City Attorney
ATTEST:
Jannette Goodall
City Secretary
M&C: N/A
Date: N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas cCart A and McPherson Blvd.
Prof Services Agreement Amendment Template CPN CO2505
Revision Date: November 23, 2021
Page 3 of 4
FUNDING BREAKDOWN SHEET
City Secretary No. 46451
Amendment No. 6
Department Fund -Account -Center
TPW 34014-0200431-5330500-0O2505-0O2330-2016-14010199
Water 56002-0600430-5330500-0O2505-001730-9999
Amount
$17,220.00
$810.00
Total: $18,030.00
City of Fort Worth, Texas McCart Ave and McPherson Blvd.
Prof Services Agreement Amendment Template CPN CO2505
Revision Date: November 23, 2021
Page 4 of 4
"160 BRIDGEFARMER &
/�40r
//1► ASSOCIATES, INC.
April 5, 2022 B&A Job No. 155-04-01
Mr. Leon Wilson, PE
TPW/City of Fort Worth
200 Texas Street
Fort Worth, TX 76102
Reference: McCart Avenue from Risinger Road to Twin Leaf Drive and
McPherson Boulevard from West Cleburne Road to McCart Avenue
City Project No. 02505, City Secretary No. 46451
Subject: Amendment No. 6
Dear Mr. Wilson,
Please accept this letter proposal for additional engineering services that are necessary to complete
the McCart Avenue and McPherson Boulevard project. Additional scope of work items are for design
and plan revisions to accommodate development of the Cohix tract.
Revisions will be made to the following plan sheets and corresponding designs: Roadway Plan &
Profile, Contour Plan, Drainage Maps, Storm Sewer Computations, Storm Drain Plan & Profile, Ditch
Plan & Profile, Erosion Control, Illumination, and Water Plan & Profile, as described in Attachment
"A". The fee requested for this work is $18,030.00.
The original contract amount for this project was $1,010,105.00. With approval of Engineering
Amendment No. 1, the contract was increased to $1,350,145.00. With the approval of Engineering
Amendment No. 2, the contract was increased to $1,906,395.00. With approval of Engineering
Amendment No. 3, the contract was increased to $2,087,265.00. With approval of Engineering
Amendment No. 4, the contract was increased to $2,186,035.00. With approval of Engineering
Amendment No. 5, the contract will be increased to $2,393,275.00. With approval of Engineering
Amendment No. 6, the contract will be increased to $2,411,305.00. The original SBE fee for this
project was $212,047.85 (20.99%). With approval of Engineering Amendment No. 1, the SBE fee
was increased to $337,339.85 (24.99%). With approval of Engineering Amendment No. 2, the SBE
fee was increased to $469,439.85 (24.62%). With approval of Engineering Amendment No. 3, the
SBE fee was increased to $479,439.85 (22.97%). With approval of Engineering Amendment No. 4,
the SBE fee was increased to $485,639.85 (22.22%). With approval of Engineering Amendment No.
5, the SBE fee will be increased to $506,439.85 (21.16%). With approval of Engineering Amendment
No. 6, the SBE fee will be increased to $509,139.85 (21.11 %).
If you have any questions, please call me at 972-231-8800.
Very truly yours,
BRIDgFARR&IASSOCIATES,MEINC.
M. Mansoor Ahsan, P.E. �—
Chief Executive Officer
M MA: bg
Attachments
Bridgefarmer & Associates, Inc.
THUNDERING HERD
www.bridaefarmer.com
Headquarters:
2350 Valley View Lane
Dallas, Texas 75234
Offices In:
Little Rock, Arkansas
Denver, Colorado
Austin, Texas
Phone Number:
Toll Free: 1-855-222-4845
Headquarters: (972) 231-8800
Fax: (972)231-5900
ATTACHMENT "A"
Scope for Enaineerina Design Related Services for Street Improvements
The scope set forth herein defines the work to be performed by the ENGINEER in
completing Final Design (100%) for the project. Both the CITY and ENGINEER have
attempted to clearly define the work to be performed and address the needs of the Project.
OBJECTIVE
The additional work included as part of this amendment includes plan revisions to
accommodate development of the Cohix Tract, South of the proposed McPherson
Boulevard and West of the proposed McCart Avenue. The design and plan revisions will be
made to accommodate proposed residential roadways to be constructed as part of the
Cohix development. These roadways will require revisions to paving sheets to
accommodate the roadway intersections, relocation of stormdrain inlets, resizing of
stormdrain mains, additional water line stubouts, relocation of illumination poles, revisions to
SWPPP, grading, drainage calculations and other miscellaneous sheets.
Services to be provided for this project Amendment are as described below.
WORK TO BE PERFORMED
TASK 4. FINAL DESIGN (100 PERCENT) CONSTRUCTION DOCUMENTS.
ENGINEER will revise construction plans in coordination with the design of the proposed
Cohix Subdivision and to accommodate their designs. Revisions will include changes to the
following plan sheets
• Roadway Plan -Profile Sheets
• Jointing Plans
• Contour Plans
• Drainage Area Maps
• Storm Sewer Computations
• Storm Drain Plan & Profile
• Ditch Plan & Profile
• Erosion Control Sheets
• Illumination Plans
• Water Plan & Profile
DELIVERABLES
A. Final iSWM Checklist
B. 100% construction plans and specifications.
C. Detailed estimates of probable construction costs including summaries of bid items and
quantities using the CITY's standard bid items and format.
D. Original cover mylar for the signatures of authorized CITY officials.
City of Fort Worth, Texas McCart & McPherson Blvd CPN CO2505 CSC 46451
Attachment A Amendment #6
PMO Release Date: 07.23.2012
Page 1 of 1
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
McCart Ave., from Risinger Road to Just North of Twinleaf Drive & McPherson Blvd., from West of Cleburne Road to the Future McCart Ave.
McCart Ave. Phase 1 & Phase 2 Roadway and Water Revisions
City Project No. CO2505
TPW CIP / WATER DEPARTMENT
Task No.
Task Description
Rate
Project
Manager
$225
Labor
I Project I Design
Engineer Engineer
$18r $140
(hours)
EIT
CADD
Administrative
Total Labor
Cost
Ex
Subconsultant
MWBE Non-MWBE
ense
Travel
Reproduction
Total Expense Task Sub Total
Cost
$120
$90
$80
'rPW
29
2
18
0
$14,385
$2,700
$0
$0
$0
$2,700
$17,085
1
1.0
1.1
1.1.1
1.1.2
1.2
1.2.3
1.2.4
1.2.6
1.2.7
Project Management
Managing the team
Internal Team Meetings
QA/QC
Communications and Reporting
bes gn Aevlew Meetings
Prepare Baseline Schedule
Prepare Monthly MBE/SBE Reports
Invoicing
8
0
0
0
0
$1,800
$0
$0
$0
$0
$0
$1,800
S
1
1
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
4.0
4.1
Final Design
Final Draft (100 %) Construction Plans and Specifications
Paving KeyMap
Horizontal Control Data
typical Sections
Right -of -Way Map
Demoliton Plan
tree Indentification Chart
Roadway Plan -Profile Sheets
Roadway Cross Sections
Roundabout Design
Driveway Plan -Pro Iles
Jointing Pans
Contour Plans
Drainage Area Maps
Storm Sewer Computations
Storm Drain Plan & Profile
Ditch Plan & Protile
Erosion Control Sheets
Signin_q& Pavement Marking Sheets
Illuminalion Design
Estimate & Quantities
21
0
0 52
18
0
$12,585
$2,700 $0
$0
$0
$2,700
$15,285
1
1
1
1
1
1
1 1
1
1
1 4
1 4
1 6
1 4
1 24 16
1 4 2
1 1
1
1
1 4
$0
$2,706
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$6
2
$570
$0
$570
$0
$0
$0
$0
$0
$0
$0
$0
$0
1
$705
$0
$705
2
$930
$0
$930
2
$1,170
$0
$1,170
3
$1,155
$0
$1,155
4
$5,220
$0
$5,220
1
$885
$0
$885
1
$345
$0
$345
$0
$0
$0
3
$675
$2,700
$3,375
2
$930
$0
$930
$0
$0
$0
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date: 8.09.2012 McCart & McPherson Blvd CPN CO2505 CSC 46451
Annendnnent#6
1 of 3
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
McCart Ave., from Risinger Road to Just North of Twinleaf Drive & McPherson Blvd., from West of Cleburne Road to the Future McCart Ave.
McCart Ave. Phase 1 & Phase 2 Roadway and Water Revisions
City Project No. CO2505
TPW CIP / WATER DEPARTMENT
Labor (hours) Ex ense
Task No. Task Description Project I Project I Design EIT CADD Administrative Total Labor Subconsultant Total Expense Task Sub Total
Manager Engineer Engineer Cost Travel Reproduction Cost
Rate $225 $180 $140 $120 $90 $60 MWBE Non-MWBE
5.0 Bid Phase 0 0 0 01 01 0 $0 $0 $0 $0 $01 $0 $(
5.1 Bid Support
5.1.1 Sell Contract Documents and Maintain Plan Holders List
5.1.2 Issue Addenda 1
5.1.3 Attend Pre -bid Conference 1
5.1.4 Attend Bid Opening 1
5.1.5 Tabulate Bids and Recommend Award 1
5.1.6 Issue Conformed Contract Documents I
7.0 ROW/Easement Services 01 0 01 01 01 0 $0 $01 $01 $01 $0 $0 $0
7.1 Right -of -Way Research
7.2 Right-of-Way/Easement Preparation and Submittal
7.3 temporary Right of Entry Submittal
Reimburslbles (Filing Fees) Not to Exceed 1
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date: 8.09.2012
W rt & McPherson Blvd CPN CO2505 CSC 46451
Amendment #6
2of3
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
McCart Ave., from Risinger Road to Just North of Twinleaf Drive & McPherson Blvd., from West of Cleburne Road to the Future McCart Ave.
McCart Ave. Phase 1 & Phase 2 Roadway and Water Revisions
City Project No. CO2505
TPW CIP / WATER DEPARTMENT
Labor (hours) Expense
Task No.
Task Description
Project
Manager
Project Design
Engineer Engineer
I I
EIT
CADD
Administrative
Total Labor
Cost
Subconsultant
Travel
Reproduction
Total Expense
Cost
I Task Sub Total
Rate $225
$180 $140
MWBE Non-MWBE
$120
$90
$60
Water
2
0
0
3
0
0
$810
$0
$0
$0
$0
$0
$810
0 01
0
01
0
$0
2.0 Conceptual Design (30%) 01
Data Collection
$0
Conceptual Design Package
Construction Estimate
1
1
$0
$0
4.0
Final Desin
2
0
0
3
0
0
$810
$0
Final Draftt90%) Plans & Specifications
$465
Final (100%) Plans & Specifications 1
2
Construction Estimates (90 % & 100%)
1
1
$345
6.2
Record Drawings
$0
Totals 31
0 0
551
181
0 $15,1951
$2,700 $0
$0 $0 $2,7001
$17,895
Total TPW + Water Summary
TPW CIP Summary
Total Hours
104
Total Hours
99
Total Labor
$15,195
Total Labor
$14,385
Total Expense
$2,700
Total Expense
$2,700
MBE/SBE Subconsultant
$2,700
MBE/SBE Subconsultant
$2,700
Non-MBE/SBE Subconsultant
$0
Non-MBE/SBE Subconsultant
$0
5% Sub Markup
$135.00
5% Sub Markup
$135.00
MBE/SBE Participation
15.0 %
MBE/SBE Participation
15.7
Total Project Cost
$18,030
Total Project Cost
$17,220
Water Summary
Total Hours
5
Total Labor
$810
Total Expense
$0
MBE/SBE Subconsultant)
$0
Non-MBE/SBE Subconsultan
$0
5% Sub Markup
$0.00
MBE/SBE Participation
0.0%
Total Project Cost
$810
TOTAL
$18,030.00
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date: 8.09.2012
McCart & McPherson Blvd CPN CO2505 CSC 46451
Amendment #6
3of3
ATTACHMENT B
COMPENSATION
Design Services for
McCart Avenue from Risinger Road to Twin Leaf Drive and McPherson Boulevard from
West Cleburne Road to McCart Avenue
City Project No. CO2505
Time and Materials with Rate Schedule Project
Compensation
A. The ENGINEER shall be compensated for personnel time, non -labor expenses,
and subcontract expenses in performing services enumerated in Attachment A as
follows:
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Cateaory Rate for the ENGINEER's team member performing the work.
Labor Cateaory Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries, overhead,
and profit.
Labor Category
2023 Rate
2024 Rate
($/hour)
($/hour)
Project Manager
$225
$225
Project Engineer
$180
$180
Design Engineer
$140
$140
EIT
$120
$120
CADD
$90
$90
Administrative
$60
$60
Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non -labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
iii. Subcontract Expenses. Subcontract expenses and outside services shall be
reimbursed at cost to ENGINEER plus a markup of ten percent (10%).
iv. Budgets. ENGINEER will make reasonable efforts to complete the work within
the budget and will keep the City informed of progress toward that end so that
the budget or work effort can be adjusted if found necessary.
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be
adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 1 of 4
McCart & McPherson Blvd CPN CO2505 CSC 46451
Amendment#6
LIM
ATTACHMENT B
COMPENSATION
If ENGINEER projects, in the course of providing the necessary services, that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by the
City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended prior
to such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER in
performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 2 of 4
McCart & McPherson Blvd CPN CO2505 CSC 46451
Amendment #6
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm Primary Responsibility
Prime Consultant
Bridgefarmer & Roadway/Storm Drainage
Associates, Inc. Design & Project Management
Proposed MWBE Sub -Consultants
Lee Engineering, LLC Roundabout & Illumination
Non-MWBE Consultants
Project Number & Name
Amendment No. 6
City MWBE Goal = 20%
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 3 of 4
Fee Amount %
$15,330.00 85%
$2,700.00
TOTAL $18,030.00
15%
100%
Total Fee MWBE Fee MWBE %
$18,030.00 $2,700.00 15%
Consultant Committed Goal = 20%
McCart & McPherson Blvd CPN CO2505 CSC 46451
Amendment #6
JIM
EXHIBIT "13-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across desired work types and work phases.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 4 of 4
McCart & McPherson Blvd CPN CO2505 CSC 46451
Amendment #6
B-4
CFW - Design Services
CO2505 - McCart Avenue and McPherson
�rlf"' Task Name
Duration
I Stan
Finish
1
02505 McCart Avenue and McPherson Blvd.
2245 daysl
Mon 2123115
Fri 94
2
3
4
5
6
Issue Design Notice to Proceed
Design
30 % Conceptual Design
Prepare 30 % Conceptual Plans
30 % Conceptual Plan Submittal
1 dayl
2194 days
150 days
125 days
0 days
Mon 2123115
Tue 4/7115
Tue 417115
Tue 417/15
Mon 9128115
Mon 2/f
Fri 9
Mon 11
Mon 9/,
Mon 9/f
7
Review 30 % Conceptual Plan (CFW)
25 days
Tue 9/29/15
Mon 11
6
Hold Project Meeting
0 days
Mon 1112115
Mon 11
9
60% Preliminary Design
Prepare 60% Preliminary Plans & Specs
177 days
Tue 1113115
Tue 1113/15
Thu 7
Tue 4/:
10
126 days
11
60% Preliminary Plans & Specs Submittal
Submit Plans & Specs to Utility Companies
0 days
Tue 4/26/16
Tue 4/26116
Tue 41,
Tue 4/,
12
0 days
13
14
Review 60% Preliminary Plans & Specs (CFW)
Hold Proiect Meetino
35 days
Wed 4/27116
Tue 6/1
0 daysl
Thu 717/16
Thu 7
Attachment D: Consultant Baseline Schedule
2015 2016 2017
H1 H2 H1 H2 I H1 H2
e
Baseline Date: Thu 4/13/23
2018 2019 2020 2021 2-2 2123
H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 I H2
16
Stonnwater Group Completes Review of H&H Models
1 dayl
Wed 1015/16
Wed 1015/16
1015
5/15
1/z
319
4113
4116
6/6
sn
3n1
M,6116
7/14
814
s/1
17
Prepare 90% Final Plans & Specs
158 days
Thu 1016116
Mon 5/15/17
16
90% Final Plans & Specs Submittal
0 days
Mon 5115/17
Mon 5/15/17
19
Delay due to environmental mitigation issues
166 days
Tue 5/16/17
Tue 1/2/18
20
Redesign plan for revised alignment (30% level) 48 days Wed 113/18
Review Revised Alignment (CFW) 25 days Mon 3112/18
Hold Project Meeting 1 day, Mon 4116/18
Prepare 90% Plans & Specs 37 daysl Tue 4/17/18
Fri 3/9/18
21
Fri 4113/18
22
Mon 4116/18
23
Wed 6/6/18
24
90% Final Plans & Specs Submittal
Review 90% Plans & Specs (CFW)
1 day Thu 6f1/18
Thu 6/7/18
25
197 days Fri 6018
Mon 3/11/19
26
Hold Project Meeting
1 day
Tue 3112/19
Tue 3112/19
27
Incorporate Final Comments & Submit 100% Plans & Specs
30 days
Mon 5/8123
Fri 6/16/23
28
Review 100% Plans & Specs (CFW)
20 days
Mon 6/19/23
Fri 7114/23
29
100%Sign & Seal Plans Submittal
15 days
Mon 7117/23
Fri 8/4/23
30
Approve Final Plans & Specs (CFW)
20 days
Mon 817/23
Fri 9/1/23
31
Desian Comnlete
0 days
Fri 9/1/23
Fri 9/l/23
32
ROW/Land
1315 daysl
Tue 4117/18
Mon 511123
33
Prepare ROW documents
30 daysl
Tue 4/17/18
Mon 5/28/18
34
ROW Acquisitions
1285 daysl
Tue 5/29/18
Mon 511/23
35
Survey
850 days
Tue 2124/15
Mon 5/28118
_
36
Design Survey
30 days
Tue 2124/15
Mon 416115
4 6
37
Additional Design Survey
30 days
Wed 113/18
Tue 2/13118
38
SUE Level "B"
30 days
Tue 2124/15
Mon 416115
416
39
Additional SUE
30 days
Tue 4/17/18
Mon 5/28/18
40
SUE Level "A" (12 locations)
54 days
Tue 3/22/16
Fri 6/3116
EM 613
41 SUE Level "A" (Add'I locations)
42 Permitting
43 Floodplain Services
44 Environmental Services
45 TDLR
5/28
s/1
h& 21t
5128
MM 417
mom 1119
3/8
Task
Rolled Up CrBical Task
Project Summary Inactive Summary .............. ......
Start -only
Critical Task
Rolled Up Mlleatone O
Group By Summary Manual Task O
Finish -only
Legend Milestone ♦
Rolled Up Progress
Inactive Task Duration -only .............. I ......
External Tasks O
Summary
SPIN ...............
..... Inactive Milestone Manual Summary Rollup ♦
External Milestone
Rolled Up Task
External Tasks
Inactive Milestone Manual Summary ♦
Progress
Baseline Schedule
02505 - McCart Avenue and McPherson Blvd. - Phase 2
Deadline b
McCart & McPherson Blvd CPN CO2505 CSC 46451
Amendment #6
9129
Page 1 of 1
FORT WORTH.,
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Amendment No 6 - Bridgefarmer &Associates
M&C: NA CPN: CO2505 CSO: 46451 DOC#:
Date:
To:
Name
Department
Initials
Date Out
1.
Jaylyn Harrelson
TPW - initial
2L
May 16, 2023
2.
M Mansoor Ahsan CEO ** Bridgefarmer - Signatured
May 15, 2023
3.
Brad Radovich - PM
TPW - Signature
B R
May 15, 2023
4.
Raul Lopez
TPW -initial
May 16, 2023
5.
Lissette Acevedo
TPW -initial
Glv
May 16, 2023
6.
TPW AD (Interim: Michael Owen)
TPW - initial
May 16, 2023
7.
Lauren Prieur
TPW - signature
May 16, 2023
8.
Doug Black
Legal - signature
d
May 17, 2023
9.
William Johnson
CMO - signature
May 17, 2023
10.
Jannette Goodall
CSO - signatures
May 18, 2023
11.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE:
All documents received from any
and all City Departments requesting City Manager's signature for approval MUST BE ROUTED
TO THE APPROPRIATE ACM for approval
first. Once the ACM has signed
the routing slip,
David
will review and take the next steps.
**email Ahsan@bridgefanner.com
NEEDS TO BE NOTARIZED: []YES ®No
RUSH: []YES ®No SAME DAY: []YES []No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ❑YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts(&FortWorthTexas.2ov at ext. 7233 or 8363, for pick up when
completed. Thank you!
Updated 03.29.2023 mdhm