HomeMy WebLinkAboutContract 52207-CO5CSC No. 50627-005
FORT Wc3a-FH City of Fort Worth
. Change Order Request
Project Name:I Northside II 30-Inch Water Transmission Main
Project No.(s):1 59601106004301001480 1 DOE No. I N/A
City Sec No,: 50627
City Proj. No,: 100261
Project Description: I The Installation of a 30-Inch Water Transmission Main along SH170 from North Beach to US 377
Contractor: William J. Schultz, Inc. dba Circle C Construction Co, Change Order#
5 1 Date
City Project Mgr.1 John R. Kasavich
City Inspector:
Paul Gieger
Phone Number: 817-392-8480
Phone Number:
817-392-8371
Dept,
Water Phase I
Water Phase II
Totals
Original Contract Amount
$2,122,350.00
$3,787,905.00
$5,910,265.00
Extras to Date
$309,765.00
$309,765.00
Credits to Date
-$0.20
-$0.20
Pending Change Orders (in M&C Process)
Contract Cost to Date
$2,122,350.00
$4,097,670.20
$6,220,020.20
Amount of Proposed Change Order
ko.00
$38,421.00
$38,421,00
Revised Contract Amount
$2,122,350.00
$4,136,091.20
$6,258,441.20
Original Funds Available for Change Orders
$177,308.00
$177,308.00
$354,616.00
Remaining Funds Available for this CO
$177,308.00
$88,918.00
$266,226.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 5.89%
MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST + 25%) $7,387,818,75
JUSTIFICATION (REASONS) FOR CHANGE ORDER
4/27/2023 1
Contract Time
(Calender days)
350
0340
690
010
700
Change Order No. 5 provides for the following:
The Installation of a gate valve to minimize shutdown time at the Westlake Pump Station.
The Installation of a temporary water main to provide water to cattle on an adjacent property that would be affected by the water shut down.
Compensation for bore monitoring plan and truck monitoring by UPPR flagmen during by other than open cut installation underneath UPPR
right-of-way.
The installation of a temporary water line to maintain water service to the Westlake Pump Station,
Compensation for replacement of damaged sprinkler system during the installation of two bore pits to conduct BOTC installation.
The deletion of pay item quantities that are no longer needed on the project,
Staff recommends the addition of 10 additional days for the change order.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's,Company Name I Contractor Name I ` .Contractor Signature I Date
William J. Schultz, Inc. dba Circle C Construction Co. Teri Skelly Thu, r�„.A S ,3 — 2 3
I0s _ec or
Loll. �t J
Director (Water Dep
�rl�el-Itayo(el- JJJ��.
Senior Assistant City Attorney
19� I
I T IT
I
M&C Number 1 23-0339
Date Pro ect Manager
`I
o s-n.3�-� 3 �ti^ G
Date Conytruction Supervisor (Water Dept)
May 16, 2023
Date Assistant Cit Manager
May 17, 2023 g
Date
Date
S -7-)-3
Date
May 18, 2023
Councjl.ACtion '(If. Required)
( M&C Date Approved 4/25/2023 OFFICIALRECORD
111 CITY SECRETARY
FT. WORTH, TX
FORT wo1ZY V1 City of Fort Worth
Change Order Additions
Project Name Northside II 30-Inch Water Transmission Main City Sec No.: 1 50627
Project No.(s): 69601/0600430/001480 DOE No.1 N/A I City Proj. No.: 1 100261
Project I The Installation of a 30•Inch Water Transmission Main along SH170 from North Beach to US 377
Description ,
Contractor William J. Schultz, Inc. dba Circle C Construction Co. ! Change Order: 5 Date:1 4/27/2023
City Project Mgr. John R. Kasavich City Inspector I Paul Gieger
ADDITIONS
Il EM ' UESURIP] IUN
52 Installation of city supplied 30-Inch Gate Valve wlvault
53 PVC Service Line for Hillwood Property Cattle
54 Green Scaping Irrigation for bore pit in median
55 Track Monitoing during BOTOC under UPRR tracks
56 Production of Bore Monitoring plan as requested by Rail Pros
57 Temporary HDPE Line for Westlake Pump Station
DEPT
Qty Unit
Unit Cost
I Total
Water Phase II
1.00 EA
$18,000.00
$18,000.00
Water Phase II
1.00 LS
$19,240.00
$19,240.00
Water Phase II
1.00 LS
$22,609.00
$22,609.00
Water Phase II
1.00 LS
$13,682.00
$13,682.00
Water Phase II
1.00 LS
$1,200.00
$1,200.00
Water Phase II
1.00 LS
$19,240.00
$19,240.00
Water Phase I
Water Phase II $93,971.00
Page 2 of 4 Additions Sub Total $93,971.00
11
FC0R.T WORT)Fi
City of Fort Worth
Change Order Deletions
Project Name Norlhside II 30-Inch Water Transmission Main
City Sec No.: 50627
Project No,(s): 59601106004301001480
!
DOE No,
I N/A
City Proj. No,: 100261
Project Description
I The Installation of a 30-Inch Water Transmission Main along SH170 from
North Beach to US 377
!�
Contractor
William J. Schultz, Inc. dba
Circle C Construction Co. I Change Order:
F5_1
Date 4/27/2023
City Project Mgr. I John R, Kasavich
City Inspector:
I Paul Gieger
I
DELETIONS
ITEM DESCRIPTION
DEPT
Qty Unit
(Unit Cost Total
5 54" Tunnel Liner Plate BOTOC
Water Phase II
102.00 LF
$65.00 $6,630.00
6 48" Casing by Open Cut
Water Phase II
24.00 LF
$300.00 $7,200.00
18 Imported Embed ment/Backfill
Water Phase II
162.00 CY
$25.00 $4,050.00
19 imported EmbedmenYBackfill, Crushed
Water Phase II
200.00 CY
$25.00 $5,000,00
20 Imported EmbedmenYBackfill, CLSM
Water Phase II
119.00 CY
$180,00 $21,420.00
21 Cement Modification(13 Ibs/SY)
Water Phase II
75.00 TN
$150.00 $11,250.00
Water Phase I
Water Phase II $55,550.00
Page 3 of 4 Deletions Sub Total $55,550.00
MNVBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
Co# DATE AMOUNT
Total $0.00
Page 4 of 4
5/16/2023
Northside II 30-Inch Water Transmission
CSC: 50627
CPN: 100261
Change Order 5 Notes
Staff has reviewed the requested prices and considers them to be fair and reasonable.
The contract for this project was approved in April 3, 2018 without a Union Pacific / Burlington
Northern Railroad permit. 350 days were allotted for construction of the project. Another 350
days was added via change orders for a total of 700 days and NTP issued June 11, 2018. The
substantial completing date was February 4, 2021, after which the line was put into service. Due
to the almost two year time frame it took to obtain the Railroad permit and the time period
waiting for the City of Westlake to give the okay to connect to its pump station, staff recommends
that the project be closed out after approval of this change order so that the City can seek
reimbursement from TXDOT.
4/26/23, 11:33 AM M&C - Councll Agenda
City of Fort Worth, Texas
Mayor and Council Communication
DATE: Tuesday, April 25, 2023 REFERENCE NO.: **M&C 23-0339
LOG NAME: 60NSI]SH17030INWLC05-CIRCLEC
SUBJECT:
(CD 7 / Future CD 7) Authorize Execution of Change Order No. 5 in the Amount of $38,421.00, and the
Addition of 10 Calendar Days to a Contract with William J. Schultz, Inc. dba Circle C Construction
Company for Northside II 30-inch Water Transmission Main Along State Highway 170 from N. Beach Street
to US 377 Project for a Revised Contract Amount of $6,258,440.80 and to Effect a Portion of Water's
Contribution to the Fiscal Years 2023-2027 Capital Improvement Program
RECOMMENDATION:
It is recommended that the City Council authorize execution of Change Order No. 5 in the amount of
$38,421.00 and the addition of 10 calendar days to City Secretary Contract No. 50627 with William J.
Schultz, Inc. dba Circle C Construction Company for Northside 11 30-inch Water Transmission Main along
State Highway 170 from North Beach Street to United States Highway 377 project for a revised contract
amount of $6,258,440.80.
DISCUSSION:
On April 3, 2018, Mayor and Council Communication (M&C C-28653), the City Council authorized a
contract with William J. Schultz, Inc. dba Circle C Construction Company, (City Secretary Contract No.
50627) in the amount of $5,910,255.00 for construction of Northside II 30-inch Water Transmission Main
Along State Highway (SH) 170 from North (N.) Beach Street to United State Highway (US) 377. The
contract was subsequently revised by Change Order No. 1 in the amount of $97,175.00 authorized
administratively on March 1, 2019 that primarily provided for by other than open cut installation (in lieu of
open cut trench installation) in order to avoid disruption to numerous warehouses that were constructed
prior to the beginning of construction of the project, Change Order No. 2 in the amount of $124,200.00
authorized May 7, 2019 (M&C C-29110) provided compensation for the installation of 207 linear feet of the
project main along S.H. 170 by other than open cut as required by Texas Department Of Transportation
(TxDOT) in lieu of open cut installation, Change Order No. 3 administratively authorized May 12, 2020
with a net deduct amount of $0.20 that allowed a segment of the water main to be shifted to avoid conflict
with an existing 20-inch water main out of Westlake's Pump Station located on US 377 and Change Order
No. 4 in the amount of $88,390.00 administratively authorized October 1, 2020 at provided funding for full
time on -site railroad flagmen as required by Union Pacific Railroad for construction underneath the
Westport Parkway/ Union Pacific Railroad Crossing.
Change Order No. 5 with a net amount of $38,421.00 after deducts, provides for installation of a
temporary water line to provide water service to Westlake Pump Station, additional track monitoring under
Union Pacific tracks, installation of a gate valve to minimize shutdowns time at the Westlake Pump Station
and the of a temporary water main to provide water to cattle on adjacent property that would be affected
by water shut off.
Appropriations for Northside II 30-inch Water Transmission Main along State Highway 170 from N. Beach
Street to US 377 project are as depicted below:
Fund
W&S Capital
Projects —
Fund 56002
W&S Rev
Bonds Series
Existinq Additional project Total*
Appropriations Appropriations
$2,887,171.00
$5,398,659.00
$0.00 $2,887,171.00
$0.00 $5,398,659.00
apps.cfwnet.org/ecouncii/printmc.asp?id=30966&print=true&DoeType=Print 1/2
4/26/23, 11:33 AM
2022 —Fund
56020
Water Capital
- Fund 59601
Project Total
$7,455,479.00
$15,741,309.001
*Numbers rounded for presentation purposes.
M&C - Council Agenda
$0.00 $7,455,479.00
$0.00 $15,741,309.001
Funding is budgeted in the Water Department within the W&S Capital Projects Fund for the purpose of
funding the NSII Water Main Along SH170 project, as appropriated.
This project is located in COUNCIL DISTRICT 7/Future COUNCIL DISTRICT 7.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are available in the current capital budget, as previously
appropriated, in the W&S Capital Projects Fund for the NSII Water Main Along SH170 project to support
the approval of the above recommendation and execution of the change order. Prior to any expenditure
being incurred, the Water Department has the responsibility to validate the availability of funds.
FUND IDENTIFIERS (FIDs):
TO
Fund Department ccount Project JlPrograrn�ActivitY
t Reference # ) mount
I ID ID _Year . (Chartfield 2)
FROM
ru�l
Department (Account Protect JPrograI
Activty Budget
ID L - L-- ID I .- - Year
CERTIFICATIONS:
Submitted for Citv Manaqer's Office by:
Originating Department Head:
Additional Information Contact:
Dana Burghdoff (8018)
Chris Harder (5020)
John Kasavich (8480)
ATTACHMENTS
1. 60NSIISH170301NWLC05-CIRCLEC.docx (CFW Internal)
2.60NSIISH170301NWLC05-CIRCLEC 1295.,P9ff (CFW Internal)
3. EONSIISH17030INWLC05-CIRCLEC FID Table (WCF 03.17.23),xlsx
4. 60NSIISH170301NWLC05-CIRCLEC Map.aff (Public)
5. 60NSIISH170301NWLC05-CIRCLEC S�ILW (CFW Internal)
6. PBS CPN 100261.Ddf (CFW Internal)
Reference # AmOIJ1111
(Chartfield 2) -
(CFW Internal)
apps.cfwnet.org/ecouncil/printmc.asp?id=30966&print=true&DocType=Print 212
_ FIDs Bud et)
Rec# .Fund ;'Dept#^ jAccount Project ID Activity Budget iCF 2 Program Amount
Year
Purpose
FIDs (Actual)
Rec # Fund i Dept # Account Project ID,Activity Budget iCF 2 iProgram Amount Purpose
Year
FIDs (REVENUE or EXPENSE - No KK_or GL Entries Needed)
Rec# Fund jDept# jAccount .ProjectIDlActivity `Budget CF2 Program Amount I Purpose
JYear
�Xfer
Xfer
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
( -12-
Signature
John R. Kasavich
Name of Employee
Engineering Manager
Title
ATTEST:
Jannette Goodall
City Secretary