HomeMy WebLinkAboutContract 59451Date Received: 5/23/2023 Permit No.: SWFMA-23-0002 Time Received: 11:34 a.m. City Secretary No.: 59451 STORMWATER FACILITY MAINTENANCE AGREEMENT THIS AGREEMENT, made and entered into this 23rd day of May 2023, by and between STARLIGHT HOMES TEXAS L.L.C., a Delaware limited liability company, hereinafter referred to as "Developer", COBURN FARM LTD., a Texas limited partnership, hereinafter referred to as "Landowner", and the City of Fort Worth, hereinafter referred to as "City". Developer, Landowner and City are sometimes collectively referred to herein as the "Parties". WITNESSETH WHEREAS, the Landowner is the owner of certain real property described as a tract of land situated in the AS Roberts Survey, Abstract No. 1262, City of Fort Worth, Tarrant County, Texas; said tract being part of a called 99.218acre tract of land described in the Deed to Coburn Farms, LTD recorded in Instrument Nos. D203387533 and D203387542, Official Public Records, Tarrant County, Texas, hereinafter called the "Landowner's Property". WHEREAS, the Developer owns a lot adjacent to the Landowner's Property described, respectively, as a tract of land situated in the AS Roberts Survey, Abstract No. 1262, City of Fort Worth, Tarrant County, Texas; said tract being part of a called 86.314 acre tract of land described in Instrument No. D22080544 (hereinafter called the "Property" and reflected under Exhibit "B" herein) and is proceeding to build on and develop the Property according to the Site Plan"Subdivision Plan known as Ranch at Duck Creek Phase 2, hereinafter called the "Plan", which is expressly made a part hereof, as approved or to be approved by the City and; OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX STORMWATER FACILITY MAINTENANCE AGREEMENT Rev 03/01/2022 BN WHEREAS, the Landowner has conveyed a drainage easement to Developer on the Landowner's Property as recorded under Instrument No. D223086296 within the deed records of Tarrant County, Texas to allow for the construction of drainage facilities on the Landowner's Property ("Easement"); WHEREAS, City, Developer, and Landowner, and their successors and assigns, agree that the health, safety and welfare of the residents of the City of Fort Worth, Texas require that on -site Stormwater Management Facilities be constructed and maintained within a portion of the Landowner's Property identified within the Easement; and WHEREAS, the City requires that on -site Stormwater Management Facilities ("Facility") as shown on the Plan be constructed and adequately maintained by the Developer, its successors and assigns, the location and dimensions of which is shown and more particularly described by metes and bounds in the attached Exhibit "A" within the Easement ("Facility Property"); and NOW, THEREFORE, in consideration of the foregoing premises, the mutual covenants contained herein, and the following terms and conditions, the parties hereto agree as follows: 1. The Developer, its successors and assigns, shall adequately construct and maintain the Facility at no expense to the City of Fort Worth in accordance with the design specifications for the Facility, attached as Exhibit "A", and the current standards then in force and effect in the City of Fort Worth and with the Operations and Maintenance Plan attached to this Agreement as Exhibit "C". Additionally, the Landowner, through this Agreement approves the design and specifications for the Facility as outlined in Exhibit "A". The Facility includes all pipes, channels or other conveyances built to convey storm water to the Facility, as well as all structures, improvements, and vegetation provided to control the quantity and quality of the storm water. Adequate maintenance is herein defined as good working condition so that the Facility is performing its STORMWATER FAC L TY MAINTENANCE AGREEMENT Rev 03/01/2022 BN design function. The Stormwater Structural Control Maintenance Checklists, attached to this Agreement as Exhibit "D", are to be used to establish what good working condition is acceptable to the City. The Developer, its successors and assigns, shall inspect the Facility and submit an inspection report to the City annually. The purpose of the inspection is to assure safe and proper functioning of the Facility. The inspection shall cover the entire Facility, berms, outlet structure, pond areas, access roads, etc., that are contained in the Easement. Components of the Facility, which need maintenance or replacement to perform their design function, shall be noted in the inspection report along with the corrective actions to be taken. 2. The Landowner, its successors and assigns, hereby grant permission to the City, its authorized agents and employees, to enter upon the Landowner's Property for the purpose of inspecting the Facility Property whenever the City deems necessary. The purpose of inspection is to follow-up on reported deficiencies and/or to respond to citizen complaints. The City shall provide Developer, Landowner, and their respective successors and assigns, copies of the inspection findings and a directive to Developer, or its successors and assigns. to commence with the repairs if necessary. In no event shall Landowner have responsibility for repairs, maintenance, or replacement of the Facility. i, In the event the Developer, its successors and assigns, fails to maintain the Facility in good working condition as specified herein, the City shall provide written notice to Developer, its successors and assigns, describing with reasonable specificity the needed repairs or maintenance. Developer, its successors and assigns, shall have a period of thirty (30) days to complete such repairs or maintenance (or if such repairs or maintenance cannot reasonably be completed within thirty (30) days, Developer, its successors and assigns shall commence such repairs or maintenance and shall have such time thereafter as reasonably necessary, using reasonable diligence, to complete such repairs or maintenance). If Developer, its successors and assigns fail to complete such repairs or maintenance within the time set forth in the immediately preceding STORMWATER FACILITY MAINTENANCE AGREEMENT 3 Rev. 03/01/2022 BN sentence, then the landowner and Developer grant the City, its authorized agents and employees, permission to enter upon the Facility Property and take whatever steps necessary to correct deficiencies identified in the inspection report and to charge the costs of such repairs to the Developer, its successors and assigns. It is expressly understood and agreed that the City is under no obligation to routinely maintain or repair said Facility, and in no event shall this Agreement be construed to impose any such obligation on the City. 4. The Developer, its successors and assigns, will perform the work necessary to keep the Facility in good working order as appropriate. In the event the City pursuant to this Agreement, performs work of any nature, or expends any funds in performance of said work for labor, use of equipment, supplies, materials, and the like, the Developer, its successors and assigns, shall reimburse the City upon demand, within thirty (30) days of receipt thereof for all reasonable costs incurred by the City hereunder. In the event that Developer or its successors or assigns fail to pay the City for the costs incurred under this section, the City shall impress a lien for the costs of such work upon the Property. Such lien shall be perfected by filing in the office of the County Clerk of Tarrant County, Texas an affidavit identifying the property to be charged with such lien, stating the amount thereof, and making reference to this Agreement. 5, This Agreement imposes no liability of any kind whatsoever on the City. THE DEVELOPER, ITS SUCCESSORS AND ASSIGNS, AGREES TO HOLD THE CITY HARMLESS FROM ANY LIABILITY IN THE EVENT THE FACILITY FAILS TO OPERATE PROPERLY. DEVELOPER, ITS SUCCESSORS AND ASSIGNS, COVENANTS AND AGREES AND DOES HEREBY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY OF FORT WORTH, ITS AGENTS, SERVANTS AND EMPLOYEES FROM AND AGAINST ALL COSTS, EXPENSES, LOSSES, DAMAGES, CLAIMS OR CAUSES OF ACTION WHATSOEVER ARISING, OR WHICH MIGHT ARISE, FROM THE FAILURE OF DEVELOPER OR ANY FUTURE OWNERS OF THE STORMWATER FACILITY MAINTENANCE AGREEMENT 4 Rev 03/01/2022 BN ABOVE FACILITY PROPERTY TO MAINTAIN THE FACILITY, INCLUDING, BUT NOT LIMITED TO THE BED AND BANKS OF THE FACILITY; ANY DAMAGES CAUSED TO PERSON OR PROPERTY DUE TO (1) FLOODING OF THE POND AND ITS BANKS, (2) SLOPE FAILURE OF THE BANKS OF THE POND, OR (3) FAILURE OF THE FACILITY TO OPERATE IN A MANNER CONSISTENT WITH CITY OF FORT WORTH CRITERIA TO PERFORM ANY OTHER DUTIES OR OBLIGATIONS HEREUNDER. 6. Developer covenants and agrees that no habitable building shall be erected within the Facility Property outlined on Exhibit "A" but this paragraph shall not preclude construction of other improvements within the drainage easement, which do not impede drainage. Developer covenants and agrees that no habitable building shall be erected on the above Property abutting such Facility Property which shall have a finished floor at an elevation less than two feet above the maximum depth of water in the detention pond which would occur during a 100-year frequency flood. _ This Agreement shall be recorded among the land records of Tarrant County, Texas, shall constitute a covenant running with the Property, and shall be binding on the Developer, its successors and assigns, including any property owner's association. Notwithstanding anything to the contrary contained in this Agreement, neither Developer nor any future owner of the Property shall be liable under an indemnification of other obligations under this Agreement with respect to claims, losses, damages, events or occurrences other than those arising during or relating to the respective period of Developer's or a future owner's ownership of the Property herein. STORMWATER FACILITY MAINTENANCE AGREEMENT C Rev 03/01/2022 BN Executed this 23rd day of May 2023. CITY OF FORT WORTH BuieDana Bu rghdoff (M 23, 2 18 CDT) Dana Burghdoff Assistant City Manager City of Fort Worth Date: May 23, 2023 Approved as to Form and Legality: Thomas Royce Hansen, Assistant City Attorney H City Attorney's Office Date: May 22, 2023 n ATTEST: eF FORrpo Pvo o=o ,p _ paa4 nE4p54gd Jannette S. Goodall City Secretary Date: May 23, 2023 STORMWATER FACILITY MAINTENANCE AGREEMENT Rev 0310V2022 8N LANDOWNER COBURN FARM, LTD., By: Coburn Management, LLC, a Texas limited liability company, general pa k By: Name: R Title: O(� Date: -5, Z r DEVELOPER STARLIGHT HOMES TEXAS, L.L.C., a Delaware limited liability company B Name: DA-11 5 �Mfr4 Zf G>f}' Title: PIVI f'1 &/Af4W4 A0?. Contract C'ompliauce Nlanagel By sia ing. I acLiciviedgre that I aui the pel'son responsible for the nicnito17ng and admiulstration of this contract. including enstu7ng all performance and reFQ'T11T2 regtiirenients. —Zokjl\ Rebecca Diane Owen (May 22, 202315:12 CDT) Rebecca 0,,ven Developnitillt Mai -Lager Date, May 22, 2023 OFFICIAL RECORD 6 CITY SECRETARY FT. WORTH, TX STATE OF TEXAS § COUNTY OF TARRANT § This instrument was acknowledged before me on May 23rd, 2023 by Dana Burghdoff, Assistant City Manager of the City of Fort Worth, on behalf of the City of Fort Worth. o,�pRY P(/e� BROOKE BONNELL 10 o Notary Public i + + STATE OF TEXAS 9�P Notary I.D. 134009525 of My Comm. Exp. Oct. 11, 2026 LANDOWNER STATE OF-Ne*C� COUNTY OFOC-A(6 Digitally signed by Brooke Brooke Bonnell Bonnell Date: 2023.05.23 11:11:31-05'00' Notary Public, State of Texas § BEFORE ME, the undersigned authority, a Notary Public in and for the State of on this day personally appcarcdp�s (name), _� (title), known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same for the purposes and consideration therein expressed, as the act and deed of Coburn Farm, Ltd. and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this L a day of , 20 mom" caloway MY C11M11W E Dotai\�ry�661ic, State of 002M2028'°` r ID No 1"20M2 STORMWATER FACILITY MAINTENANCE AGREEMENT 8 Rev 03/01/2022 BN DEVELOPER STATE OF-Te)k � § COUNTY OF x.'�L § BEFORE ME, the undersigned authority, a Notary Public in and for the State of SA on this day personally appeared 0()l_0\6 (name), (title), known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he.'she executed the same for the purposes and consideration therein expressed, as the act and deed of Starlight homes Texas, LLC, and in the capacity therein stated. {� GIVEN UNDER MY HAND AND SEAL OF OFFICE this IJ day of 209J. { r C \ i Mysa Cak"y Comma Notary Pudic, State of �y D210WM2S Fp�1 ID No 129294002 STORMWATER FACILITY MAINTENANCE AGREEMENT Rev 03/01/2022 BN EXHIBIT "A" INSERT LEGAL DESCRIPTION DRAINAGE CHANNEL MAINTENANCE AGREEMENT Rev. 03/01/2022 BN EXHIBIT "A" LEGAL DESCRIPTION FOR 40' DRAINAGE AREA All that certain lot, tract, or parcel of land, situated in a portion of the A. S. Roberts Survey, Abstract No. 1262, City of Fort Worth, Tarrant County, Texas, being part of that certain called 99.218 acre tract described in a deed to Coburn Farm, LTD recorded in Instrument No. D203387542 of the Deed Records of Tarrant County, Texas (DRTCT), and being more completely described as follows, to -wit: COMMENCING at a 1 /2" capped iron rod found stamped "GOODWIN & MARSHALL" for the Southwest corner of a called 86.314 acre tract described in a deed to TFCC Coburn LLC recorded in Instrument No. D220280544 (DRTCT), the Southeast corner of a Drainage Easement recorded in Instrument No. 222284071 (DRTCT) and being in the North right-of-way line of W. J. Boaz Road (variable width right-of-way), from which a 3" metal fence corner found for the Southwest corner of said 99.218 acre tract bears North 89 deg. 51 min. 24 sec. West - 189.33 feet; THENCE North 00 deg. 00 min. 00 sec. East departing said North right-of-way line and continue along the East line of said Drainage Easement and the West line of said 86.314 acre tract, a distance of 32.44 feet to the Northeast corner of said Drainage Easement, said point being the TRUE POINT OF BEGINNING; THENCE North 90 deg. 00 min. 00 sec. West departing said West line and continue along the North line of said Drainage Easement, a distance of 40.00 feet; THENCE North 00 deg. 00 min. 00 sec. East departing said North line, a distance of 887.52 feet; THENCE North 90 deg. 00 min. 00 sec. East, a distance of 40.00 feet to the West line of said 86.314 acre tract; THENCE South 00 deg. 00 min. 00 sec. East, a distance of 887.52 feet to the POINT OF BEGINNING, containing 35,501 square feet or 0.815 acres of land, more or less. Bearings are referenced to Texas State Plane Coordinate System, North Central Zone (4202), North American Datum of 1983 as derived from GPS observation. Exhibit map attached and made a part hereof. P�EvF�-Fx--• g�,Z,-" ER ohs JOHN N. ROGERS q 6372 6. �qN O� . IAL _0 SURV�_ 1/5/2023 GMcivit 2559 SW Grapevine Pkwy I Grapevine, TX 76051 1 817.329.4373 Sheet 1 of 2 TxEng Firm # F-2944 I TxSury Firm # 10021700 January 5, 2023 Engineering & Surveying gmcivII.com 10874-DEIO.dwg 10 \ I 1 \ \ URVEY, \ \ OS S S OLD OCEAN FUEL COMPANY \ \ A S. R BERTCT l26z L 40' PIPELINE RIGHT-OF-WAY \ \ I ABS� VOL. 3424, PG. 559 \ \ D.R.T.C.T. \ \ LINE TABLE \ \ egSS O LINE # BEARING DISTANCE L4� \ I Ll N89051'24''W 189.33' % \ i L2 N00000'00"E 32.44' L3 N90000'00''W 40.00' % ; 1 L4 N90000'00''E 40.00' % \ \ REMAINDER OF CALLED 99.218 ACRES �� rn- COBURN FARM, LTD. a Q�oQ a� 911 I I INST. NO. D203387542 iv D. R. T. C. T. Lq Lo — — Go � � LLI J \ 40' DRAINAGE AREA - - 00 \ 35,501 SQ. FT. /0.815AC. `-�' `_.0 I m GADWELL DRIVE \ \ � o — I o p I CALLED 86.374 ACRES \ 1 REMAINDER OF CALLED c o _ TFCC COBURN LLC — 99.278 ACRES Z ; H INST. NO. D220280544 COBURN FARM, LTD.INST. NO. D203387 33 % I I R. I C. T. D.R.T.C.T. I % POINT OF - - -- DRAINAGE EASEMENT BEGINNING KNOB DRIVE INST. NO. 407 D2R 8 C Tl 3" METAL FENCE CORNER _ _ — _ L2 - W. J. BOAZ ROAD '- L1 L3 POINT OF BEARINGS ARE REFERENCED TO TEXAS STATE PLANE COORDINATE 0 200 COMMENCING SYSTEM, NORTH CENTRAL ZONE 1 /2" C.I.R.F. (4202), NORTH AMERICAN SCALE IN FEET I "GOODWIN & MARSHALL" DATUM OF 1983 AS DERIVED FROM GPS OBSERVATION. EXHIBIT "A" MAP SHOWING 40' DRAINAGE AREA, SITUATED IN A PORTION OF THE A. S. ROBERTS SURVEY, ABSTRACT NO. 1262 CITY OF FORT WORTH, TARRANT COUNTY, TEXAS E F STE Job No.: 10874 Scale: 1"=200' Sheet `'�q7* RFo s GMc I I Drafted: L.J.C. Checked: J.N.R. JOHN N. ROGERS 0 6372 Surveyed on the Ground: 1 /27/2021 4'°FEss�o�P Engineering & Surveying of `96 2559 SW Grapevine Pkwy, Grapevine, Texas 76051 �HQ SURV0 Vj 817-329-4373 Date Pre aredo 1 /4/2023 TxEng Firm # F2944 I Tx$ury Firm # 10021700 Revised: . I Revised: 2 Date Signed: 1/5/2023 r EXHIBIT "A" LEGAL DESCRIPTION FOR 45' DRAINAGE AREA All that certain lot, tract, or parcel of land, situated in a portion of the A. S. Roberts Survey, Abstract No. 1262, City of Fort Worth, Tarrant County, Texas, being part of that certain called 99.218 acre tract described in a deed to Coburn Farm, LTD recorded in Instrument No. D203387533 of the Deed Records of Tarrant County, Texas (DRTCT) and being part of a called 99.218 acre tract described in a deed to Coburn Farm, LTD recorded in Instrument No. D203387542 (DRTCT), and being more completely described as follows, to -wit: COMMENCING at a 1 /2" capped iron rod found stamped "GOODWIN & MARSHALL" for the Northwest corner of a called 86.314 acre tract described in a deed to TFCC Coburn LLC recorded in Instrument No. D220280544 (DRTCT) and being in the North line of said 99.218 acre tract described in Instrument No. D203387533, from which a 3/4" iron rod found for an ell corner in said 99.218 acre tract described in Instrument No. D203387533 bears South 89 deg. 40 min. 25 sec. West - 1,343.20 feet; THENCE South 00 deg. 00 min. 00 sec. East departing said North line and continue along the West line of said 86.314 acre tract, a distance of 215.00 feet to the TRUE POINT OF BEGINNING; THENCE South 00 deg. 00 min. 00 sec. East along said West line, a distance of 757.89 feet to the Northeast line of a 40' pipeline right-of-way easement recorded in Volume 3424, Page 559 (DRTCT); THENCE North 47 deg. 25 min. 06 sec. West along said Northeast line, a distance of 61.12 feet; THENCE North 00 deg. 00 min. 00 sec. East departing said Northwest line, a distance of 716.53 feet; THENCE North 90 deg. 00 min. 00 sec. East, a distance of 45.00 feet to the POINT OF BEGINNING, containing 33,174 square feet or 0.762 acres of land, more or less. Bearings are referenced to Texas State Plane Coordinate System, North Central Zone (4202), North American Datum of 1983 as derived from GPS observation. Exhibit map attached and made a part hereof. (J�OHN'N. �s� ROGERS 6372 SURV��I 1/5/2023 GMcivit 2559 SW Grapevine Pkwy I Grapevine, TX 76051 1 817.329.4373 Sheet 1 of 2 TxEng Firm # F-2944 I TxSury Firm # 10021700 January 5, 2023 Engineering & Surveying gmcivII.com 10874-DE11.dwg 10 REMAINDER OF CALLED 225.07 ACRES, PARCEL I LORIN ALBERT BOSWELL, JR. VOL. 6868, PG. 2233 D. R. T. C. T. 3/4" I.R.F. S 89040'25" W 1343.20' — — \ \ REMAINDER OF CALLED 99,278 ACRES \ \ COBURN FARM, LTD. \ \ INST. NO. D203387533 \ \ D. R. T. C. T. POINT OF COMMENCING 1 /2" C.I.R.F. "GOODWIN & MARSHALL" w 0 0 RED HED DRIVE L2-N — -- POINT OF pj BEGINNING \ \ 45' DRAINAGE AREA - \ \ 33,174 SQ. FT /0.762AC I W -- — 1>MCCOY DR.- -- 0 v v RTS SLrRVE�'Q— a o phi v A .5 KOB �Cj, No. 126Z W La�9Q�p I ABSrR \ c�"'�W �o J \ \ c c 16 WEYMOUTH DR. OLD OCEAN FUEL COMPANY \ \ Z % m 40' PIPELINE RIGHT-OF-WAY \ \ % N I CALLED 86.374 ACRES VOL. D D.R.T.C.T. PG. 559 \ \ % I TFCC COBURN LLC INST. D� R. D. C. T. D220280544 _ LINE TABLE \ \ j \ LINE # BEARING DISTANCE \ BASS DR� L1 N4702506"W 61.12' \ 0 200 \ PROPOSED DRAINAGE L2 N90000'00"E 45.00' L�— EASEMENT PER PHASE 2 PLAT SCALE IN FEET I I I REMAINDER OF CALLED 99.218 ACRES I BEARINGS ARE REFERENCED TO COBURN FARM, LTD. TEXAS STATE PLANE COORDINATE INST. NO. D203387542 SYSTEM, NORTH CENTRAL ZONE D.R.T.C.T. (4202), NORTH AMERICAN DATUM OF 1983 AS DERIVED FROM GPS OBSERVATION. EXHIBIT "A" MAP SHOWING 45' DRAINAGE AREA, SITUATED IN A PORTION OF THE A. S. ROBERTS SURVEY, ABSTRACT NO. 1262 CITY OF FORT WORTH, TARRANT COUNTY, TEXAS E F STE Job No.: 10874 Scale: 1"=200' Sheet 1.1-�"G\ lo�l RFo s GMcivi Drafted: L.J.C. Checked: J.N.R. JOHN N. ROGER; 0 6372 Surveyed on the Ground: 1 /27/2021 �'poFEss�G�P Engineering & Surveying of Q 2559 SW Gra Pcvinc PkwY, Gra Pcvinc, Texas 76051 q�O SURV O Vj 817-329-4373 Date Pre aredo 1 /4/2023 TxEng Rrn R F-2944 , bcSury Firm N 10021733 Revised: . I Revised: 2 Date Signed: 1/5/2023 r EXHIBIT "B" DESIGN PLAN AND SPECIFICATIONS /-___--v. .. f T / Wt �s455 \ REMAINDER OF U4FD 99.2)BACRFS ' - / l COBURN INs/ NO Oza,Be]3aa - -]RS - I9s I I DRarvnc ESMl IAw�oeNnAS F; ux oie _ _-- LOCK J {II' T^ -T� L _ -- n xvs„roFovrmsroa 2 3 4 - 6 e 9 10 I 13 13 • 2 9 3 \ d 10 I 12 13 14 / IS IB . '",]-- _ IB J -- 6 / 9 D I , \ o. +• os 1 xoDE .. BLOCK N _ ro ., _ \ - - - - - - DOR/lam � � � BUFFLENEgDDRIVE m..- 69 \ CA" ,GMhi%J0-NNAND —D G-FY G., O — -- DRAINAGEEASMENTJ AINAGEEASMEIT l/ ax,cr 3 / I -66 �1 1 62 lIV 1 BI Ili 6 ,y - 59J � II Il� _ II I v \ �= II / �� I Ili sp I - 1 F /r, LA � Z NO R-101 F Rl GRAPHIC SCALE =Io0' 0 100 ]W 300 f 8� 2 LEGEND e DRAINAGEAREA ACREAG � C 1=E a DRAINAGE DEAREA D LL rt gxsno uNoca SR &INLERAIN w/HEADWALL W OINLET NO ---- H_RFL000 aNNNs — — — — EEASEMErvi M U co U W N ~ y 2 a 3 Q Q 2 ° /Z li -28-� INTTIEW J. BIACIE 99366 <kFN5f0 exemewww J ma - "kellNAwml BEAD BKEEn° ],., 1 osDN/ORn sa 1 Mle 27 of 72 DRAINAGE AREA MAP \ioel4 .mm9m moms - ma. ,—\11a".\S-1.\PIN— 1\1. a--, En a"" zb 2Ge — HYDROLOGIC COMPUTATIONS - ULTIMATE CONDITIONS HYDROLOGIC COMPUTATIONS - PROPOSED CONDITIONS A-1 AREA C CA TIME D.,B B.8] 0.,3 J 11 01 15 05 1100 0100 PICK-UP POINT A-, AREA C CA ae1 G TIME It 01 15 05 IT00 0100 is PICK-UP POINT Ex.80 hle5 base, DRAINAGE DESIGN CRITERIA P ) A-2 9.15 o.6/f 2.11 t5 3.32 )Hot a.96 t0.2d ).� 16.83 Ex.S blob Phase ll 4 , �/ Sifnr\Ine�A-'lA$A-2B �A� a J 2 l s 332 �at es OM es 63 Sum[�ne,S A-?�8A-2B I A-3 A-0 405 0.6 2)1 t5 315 0.87 211 15 392 e0t 4m 13 t9 )93 9.32 TOt 4.88 10.2818.83hled NU Ui i,Ief3 A-3A8AJ6 A-0A8A-48 A-3 A-0 ztt 4315 05 a8 f ]t 315 Q8:/J 211 5 t5 3. 9011 332 ]Ot ee 319 IM a88 t026 ]98 161 t683 Sum[�1nlet3 A-3A$ A-3B IrvT[rvslTr roRaOGnc�HNICAL Mnnuu 6Umr�1nkls A-0A$AdB s[cnoNS iAaLes,s I Ab I Ab 4.48 0.67 $.m 15 2.42 o.g/f ,.82 15 3.32 886 486 14.58 ].50 3.32 5.b 486 EN ).88 D.86 12&i � hletS A-5A$A-5B 01��2de MIS A-6A&A-6 A3 �A-6 a6iJ d S�nlnlets ASA$A-SA On{ireOe In. ASA$ Ab8 STORM PECOUENc 1a EN-E. 1 B-1 zn 0 i tes s ssz s4s se ea se is zo �``R{ry'�]�11b1s 8-1A8B-18 B-, 08if t Sy�I Inleb B-1A8B-iB «smeers.HlcHror-wnr B-2 0 ze 0 s7 ale s 3.3z 0.m m 0 sa m t 5s OrIA.'f'a8e blob B-2A 8 B-28 B-2 J OnUr e Inlets B-2A $ B-2B B-3 C-1 566 O87 9.)I 15 0m 0m aza s 1S 3.32 12m 4.88 1043 ].60 33z .So 4IS aG ]se 1N m.25 z- Sy� loleh B3A8B-3. S et Flowb Creek BJ C-, Q6/ 3 J SW1�Inlets B3A&B-3B rwE CF corvcENmaTlory LET TIME rwEOF FLaw Iry 1 Sheet Flow 20 Creek INLET TIME TMIEETI�Me FOR -TER TO ELowo TIE C-2 0.4, OB) 0.2i 3.33 O81 4.86 1B0 2.18 OnGrade hleR C_2A8 C_2B O� 0.Blf o OIGII, Inlets C-2A&CIS InL ACEOF11'IEDUNIIITHE.ILI- RAN lFnaPUCAeL[I�D C3 C-0 325 08 1218 t5 115 O.Il J OSo '6 332 1.2S 496 10M 7m 20ti �.38 909 108 6M 1737 368 'uon\loletanC3M C-3B Aroa klblC-0 CJ Cd 0.8/ z Qe / Z IonsR[wsFsrtE Sum Inlets C-3A$C-3B �rea lnktC4 MINIMnLnME OF coNCENTawr,oN C5 Cb 3.e) iii II re s o.le o.m1 0.10 is sas .at a w tom E. <os o.42 s. o.m ].aa to ro o.)6 SI�r�111e5 C5A 8 C5B Area hlotCb C3 �b a J Sumglnlets CSA 8 C-58 TIME Area NletCb 2'1 111- I D-1 1.59 0.6 f 1.0) 15 1..32 3.54 4B6 5.18 ).90 B.m Sheet Flow to CRek D-, 08/ SMet Fbw2o Creek R[sIo[H�IAl IAS Lr I D-2 2.11 0.�/J 141 t5 3. am 4m 68] ).re ttM Seet Flow b Creek D-2 s7 Sheet Flow to Creek (lowul�oMELSMoUPLE�s AIARTMENTs) 10 Mlrvu)Es OS-1 re a, ze 15 3S2 zam . 35 a4 es 5su DroChie1C OS1 am DroftYIleIC =EMERS.LE I OS-2 11.80 0.6 1 ).B) 15 3.32 28A] 4.88 38.)6 ].50 m.58 Drop let OS-2 OS-2 m 0.m n is 33z tt n.17 Tee 284) Drop Net GS-2 DISTRICT SMINUTES "C'-VALUE CALCULATIONS - ULTIMATE CONDITIONS DREAD STREETS - OPENSPACE TOTAL AVG'C' C• 0.90 C• 0.87 0.30 AREA I At 000 019 0.00 0.19 Ob7 I A2 0.00 3.15 0.00 3.15 ob7 I A-3 0.00 4.05 0.00 4.05 0.87 I Ad Ob0 3.15 0.00 3.15 0.67 I 1 ALE I,w 4.48 0.00 4.48 0.87 I I Ab 0.00 2.42 0.00 2A2 0b7 I 1 6-1 0.00 2.47 0.D0 2A7 0.67 I 1 B-2 0.00 0.29 0.00 0.29 0.67 I &3 Ob0 HIM 0.Do 5.66 0.67 I 1 C-1 0.Is 0.19 0.06 OAO 0.70 I I C-2 0.00 0.41 0.00 0.41 0.67 1 I C-3 0.So 3.25 0.00 3.25 0.67 I 1 Cd 0.28 0.43 OA4 1.15 0.58 1 I CS 0.00 3.87 0.00 3.87 0.87 1 I Cb 006 0.04 0.08 0.Is OSB I I D-1 0b0 1.59 0.00 1.59 0.67 1 1 o-2 Ob0 2.11 0.00 2.11 0.67 1 1 0&1 1,00 "" 0.00 10.88 ob7 1 1 OS-2 0.00 1190 o.00 1L90 of I STREET CAPACITIES "C"-VALUE CALCULATIONS - PROPOSED CONDITIONS MEAD STREETS A5 OPENSPACE TOTAL AVG-C- C= 0.90 C= 0.67 C= 0.30 AREA A4 Ob0 0.19 0A0 0.ia 0.67 X2 0.00 3.15 0.00 3.15 0.67 A3 1,00 4.05 0.00 4.05 Ob7 A4 0.00 3.15 0.00 3.15 Ob] 15 0.00 4.48 0.00 4.48 ob7 Ab 0 w 2.42 0.00 2.42 0.87 B-1 0.go 2.47 0.00 2.47 ob7 B-2 0.00 0.29 0.D0 0.29 0.67 B-3 0.00 5.68 0.00 S66 0.67 C-1 0.Is 0.19 0.06 OAO 0.70 C-2 0.00 0.41 0.00 OAt ob7 0-3 0.00 3.25 0.00 3.25 017 Cd 0.28 0.43 O.M 1.15 0.58 _ C4i 0.00 3.87 0.00 3.87 0.67 Cb 0.06 0.04 0.08 0.Is 0.58 D-1 0.00 1.59 0.00 1, 0.67 o-2 Ob0 2.11 0.D0 2.11 0.67 OSi 0.00 000 'DHSS 10.88 0.30 OS-2 0.00 0.00 11.90 11.90 0.30 - ROCK RIP- 4P CALCULATIONS - BOX CULVERTS °.GN �wH"Ilfr�e'�?! ROCK RIP -RAP CALCULATIONS - CIRCULAR PIPES a I a I���al � I � I it I N I ",w° ' W=W-EAP =W WUXTW naeyen. sma `, .r6m e.r ROw o.n,n Ran Flow Raw Carryover Flew Ran Flow Rem S.-GpaNry CeMaclb DnlnaBa Ana R mm-YEAR gp.rm �m Ama GA ID IA°I IS Rma Inmwry In rib ID) 101 P ea V MI 101 Idg IoN mml mm] m 1-1 lNrO 9n1 A 0.13 1.- m ].83 O.m I.- Om 1.02 1, 8-8 .000m 90.18 a9 SA 1.To FA-2 2.11 15.00 e6 88 026 8S3 028 1.83 9B-B o- 31.42 5198 4R A3 I.]f 13.00 4INS ].8B 13.18 21.61 13.18 21.B4 MB-B 0.0075 9a73 SS.m 112 Ad 211 ism 465 ).8B K. 1989 1028 18.m 298-8 0.0065 91.42 51.98 4M I AS 3m 15m Ore ).98 11. 2S94 Om 031 14. 2S8-B O.00m 91.I2 5198 5A) FAb 5m am m zm ee m 9e-e 0.0ms 31. z st.se 34 B-1 t.m 'SHOD O.re ].88 5.04 13.20 Om O.m 8.04 13.20 2aB-B G= 31.42 51.88 O.T I B-2 60. 7 B3 .. I.2e Om2S 43..22 75115.90 S7 SI9 48 )So. IS 4S S0.5 m 31. 1 C-2 150m mre mn C059 m3 5.3 IS." A.m ]839 4]ss94 1 CSA 6) 2HE. 4) 4.86 THIS 12m 20.m IISG 20.60 29B-B nm71 SISE S4.32 SOB SUMP/DROP INLET DESIGN CALCULATIONS Inlet No. I allon Slope Slope of G So PvCmtrowGno I 1 A-2A&A-2B A-3A & A-3B A-0A&AdB A-5A $ A-5B 1 13-1A&B-1B C-3A & C311 C-SA $ C-5B C-0 Cb O OS-2 OUR) OUR) 2 3 0 0065 0.0200 0.0075 0.0200 00065 0.0200 00065 0.0200 00065 0.0200 0.0073 0.02DO 00071 002M 10 I-YR SUMP NLET DESIGN :ALCULATIO►S Gulbr DBp(h of Depth of Depth of Capacity of Length of Capacity of Carryover Percent O100 Flow Go Gutter Depression Flowal Inletper Foot Inlet Opening 1n1etO Into Over Captured by Inlet Flow Y. OpeningY of Length QIL Lo,P Flow (Gb) (R) (ft) Ift) (GbM) (ft) (Gb) (RRII 4 5 6 7 8 9 10 11 12 8A2 0.50 0.33 083 2.27 10 22.68 0.00 100.0% 10.82 0.50 0.33 0.83 227 10 22.68 0.00 100.0% 8.42� 0.60 0.33 083 2.27 10 22,11 0.GO 100.0% 1212 0.50 0.33 083 2,27 15 34.03 D00 100.0% 6.60 0.50 0.33 083 227 10 22.68 0.Do 100.0% 8.68 0.50 0.33 0.83 2.27 10 22.88 0.00 700.0% 10.34 0.50 0.33 0 83 2.27 10 22.68000 00 100.0% 02500 3.66 0.00 1.00 02500 076 0.00 1.10 250 00 26.03 01.0 .00 0 0.2500 MAT 0.00 1.00 Nobs 13 62 9% Cbgglrg Factor 52.3% Clogging Factor 62.9% Cbgging Factor 64.4% CIS Ong Fedor 70 9% Cbgglrg Factor _ 61.7%Clogging Factor 54.4% Clogging Fads, DROP INLET DESIGN CALCULATIONS 100 3.00 12 36.00 0.00 100.0 :1 1. Factor 100 300 12 Woo 000 100.0 9T8%C":ng Facor iDO 300 20 60.00 000 100.0 566%CIS ngFactor 1.00 3.00 20 60.00 0.00 100.0 52.5%Clogging Factor RULR"AWN u4w I r.w [iiff i rrr10 a rj GwACmeALCuuiRws Fwz8 11 ewe oPl>z<sev le0(snrz IS a-(,aeGao.O,$)(, 0.0e)Is)tn IO.S4T6p,3 a= J No 1 ' I 1 (sprz S"WIW4.. Ca, II.W GO 1 as ouS.D) He8aSn41� H (SHIM IC 3GRi = a- "),rz .6o cARR'mN^e(;a9r- Or aTREEr o ENrIRE -1 e]o(sju,rz� YY 8ENA8N6Ion mC G-3155Ce0 mnitrz w 9 . mdMM1LIN/'/ApFyhW'cAPAcmoEcomsweo srREEr �sfr - Se lsl,¢ �n reae) �m(Dorolm),rz ILL h - RGE(� )AT DESIGN POINT DOE TC 1; In -Per noun DRAwnGEAREAm slly Lu o.-LRE Lars = AMILIGo Sim U N ~ Cee CnmMERCInL (rvo PlanACRLOTS = W F to sroBKNMwslooll 9rtxcRmBMscl-Rox9 Q 'IT DEVEL-Ell AN. SITE a F FORM OF FOR MODIFIED EQUATION Q Q =srown ow, NAGE DIscHARFIICiE oss CRCOSS E.EP T 0 aAuev LMAN . cirGosrr (bn) _n T-'111 of FLow oR SPREn (1) U Qc's-AnNn pNFgRsrREETarvo wcHroF-wnv FILE. Z _ CO11IIC11Nr -CROSS SECTIONAL AREA (ft-ft) us( R) s - LONGITUDINAL SLOPE(bn) Li HE3 RETE PIPES PIPEC'T I41F7C4P40In�RRUGATED F..T�w.RTHs.swmcanERIAMArvuAL FOR SITE D-LOPMENTANDGON RaA.NSEPTEMSER2s20,s `�2 PER SEC"fIr1R'T:1.1'GFIW-aSwMHrDRAULGI S"TECHNICAL MANUAL Y W �e8 -BTnI pal NNLETINsuMP roRIFICE, rp Sd = 01 INrvo (n) 1�1 - ryoF INLET OPEN NG(n) - (a22nn-2) -RRt D NLAETINsuMRCE(rn) -28-� 0-STORM rvncE E-N. : L - neNcm OE wLEr w ENINc (a) . -P, (1EIIHOFFLow ATOPENING)(n) 4; ro-EPTHHOFcuTTSRFiow N(1) e=DEPTH OF INLET DEPREssroN(0) .l.:........................... NATTIEW J. BAACI@ ............................ p 99366 �5ryAB�xIIrr ��]7(I Jr {{pp L exrmesvvas J m�Na„F°E,(�Su:IM°, IDA1Fo CA-. 1 osarv/DIET nw - kazl/uv eel 1 aEVIEw Mee 28 of 72 ca„M�mFm umminronu �wa sf�0.�maan wJ. aPPs°anmxryo.s wsr o:sseeRe menu �w.l eon Ro, rw-a creex �mr�mro DRAINAGE lneeuyrnm mwe CRITERIA AND NOTES e\,oe]4 atanignt Homes - 5ooz roae\Plans\sneeu\Pnax 2\1Cs)a-dcALcs g ,Ien 1. 2022 n35n "Ph! MINH �� am g � �'—i �w � - ,_ - �v/ way l a 1��1 €��s �I ITT i u� .p — } B(/FF/EHEAD AP/VEif _ eoa I w LIMITS OF ROW _ T�u N a ^,S 9m I 44 V��Jjtj o w N ._ I _y/ 1— a 1 j u O r DE o IV Tex F —_ I r s sk '/60BKOR/VE n � .� I a l s x �mo u a o` / I — A ,u o D o , 1 1" ` — A : \ pT\ ROW \�\ /l I ,• (i"� m tiw' = K yR '9"VY�' ; m± zF a� � �T � �� _ R 7P db C o VV x Ilk o aL o� 0 77 ,5 0 I n2 I I � se a €h Oil @�o�amx � I, I I i8 S9 z es Max xs g; o� • a as ��' �" In 0)2 ag, a IS 3f /1 0°00TO a 0 9 o 3 —R,ms° 1 w C;OODWIN RANCH AT DUCK CREEK a w tAxsEIL+ IS A R L I G H T 5 o O A g m� °m.E.°.MEN a�,..Eaa_s=aras PHASE 2 FORT WORTH, TEXAS om� N 7;3— y�79 71 \- .. !j fFLENEAD Dn san.a area es'a/ 12 CENTERLINE iro ou I �- __uru o o Y I / a I ?G � s,w �n __.\ R/7CHFORKDR/VE Hr � r Fz d ed° aka II 8 ^ =s ega$ I sxeET m&°`o �w GOODWIN' a A zo O NAARSFTAL]Lv Y g�i� cm�Exx.xEE,r; auxxEas-suxr�oxs14 Ia.1Vi,w 'u, ,—s & 'VY 77 nsp—� _ o It r nv. 777 A° lA na' 1 IL � _ ■ 9 �pi RANCH AT DUCK CREEK ° PHASE2 + S T A R L I G H T FORT WORTH, TEXAS A H mo —795 o fig' �x�m�vjE- % — — --------- - - - - - - - - - - 8' L PaF 791 .9- 794 i er iox �... fvj�— 79A 121 F D F., .... j6, In 0 A. ..... . ...... fli 01 n1l, F Z-2 o c. Yl �4 D Al it Z3 tt A- gs A _SNIPTOitri FARIVE ev -77: j .... ....... o It IN 0!, I lo- L I v -- , -- A, Z M m �-780 0 0 ro -T-s 41- d// jg!�,J IT N � I A\ A o ALL s- - R I. C4 i GOODWIN' RANCH AT DUCK CREEK 'm oily.NAARSFIALL2 + IS T A R L I G H T > PHASE 0 ...... FORT WORTH, TEXAS 14 Exhibit "C" CITY OF FORT WORTH STORMWATER FACILITY OPERATION AND MAINTENANCE PLAN The only responsibility the City of Fort Worth has in the operation and maintenance of this Facility is inspection. General Maintenance Procedures The structural and functional integrity of the Facility shall be maintained at all times by removing and preventing drainage interference, obstructions, blockages, or other adverse effects into, through, or out of the system. Periodic silt removal shall occur when standing water conditions occur or the pond's storage volume is reduced by more than 10%. Silt shall be removed and the pond/basin returned to original lines and grades shown on the approved engineering plans. In addition, corrective measures are required any time a basin does not drain completely within 72 hours of cessation of inflow. NO STANDING WATER IS ALLOWED in basins designed for dry detention purposes. Accumulated litter, sediment, and debris shall be removed every 6 months or as necessary to maintain proper operation of the basin. Disposal shall be in accordance with federal, state and local regulations. Detention facilities shall be mowed monthly between the months of April and October or anytime vegetation exceeds 12-inches in height. To prevent debris from entering and clogging the downstream storm sewer system a wire mesh screen or similar screening device shall be installed over the outlet until final acceptance. 4. PREVENTIVE MAINTENANCE/INSPECTION • Visual inspections of all components will be conducted every 6 months. • A log shall be kept of maintenance actions, and inspections. The log should document the condition of the detention system's primary components, mowing, and silt, litter and debris removal dates. Document aeration of the basin bottoms and replanting to prevent the sealing of the basin bottom. • Written maintenance and repair records shall be maintained by the party or parties signing the attached Agreement and shall be provided to the City upon request. STORMWATER FACILITY MAINTENANCE AGREEMENT 10 Rev. 11/19/2020 JLE Exhibit "D" Drainage Channel Structural Maintenance CHECKLIST FREQUENT REPAIRS REPAIRS INSPECTION DATE REQUIRED MADE NOTES Mowing Remove Trash and debris Inspect irrigation system operation Remove grass clippings Violations Noted MINOR INSPECTION Condition of Channel Amount of silt in channel Amount of silt in flume Amount of ponded water Amount of wetland vegetation Location of Erosion Percent of vegetation Condition of trash guard Location of Erosion MAJOR INSPECTIONS Condition of Drainage Channel Quality Structure Type of Drainage Channel Quality Structure Structure type and Condition Condition of Rip -Rap Condition of filtration STORM WATER FACILITY MAINTENANCE AGREEMENT Rev. 11/19/2020 JLE