Loading...
HomeMy WebLinkAboutContract 58611-A1CSC No. 58611-A1 AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 58611 WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 58611, (the CONTRACT) which was authorized by M&C 22-0944 on the 29th day of November, 2022 in the amount of $ 638,532; and WHEREAS, the CONTRACT involves engineering services for the following project: Bomber Spur Trail Phase 1, CPN 104345; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by ENGINEER totals $45,273. (See Attached Funding Breakdown Sheet, Page -4-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to ENGINEER for all work and services performed under the CONTRACT, as amended, so that the total fee paid by the City for all work and services shall be an amount of $683,805. 3. All other provisions of the CONTRACT, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Bomber Phase Trail Phase 1 Prof Services Agreement Amendment Template 104345 Revision Date: November 23, 2021 Page 1 of 4 APPROVED: City of Fort Worth cp W� Jesica McEachern Assistant City Manager DATE: May 23, 2023 APPROVAL RECOMMENDED: )gw fe-, Dave Lewis ENGINEER Kimley-Horn and Associates, Inc. —)1tow 4wd Scott R. Arnold, P.E. Vice President DATE: May 9, 2023 5S J� Interim Director, Park & Recreation Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Jing Yang Landscape Architecture Manager, Park & Recreation Department City of Fort Worth, Texas Bomber Phase Trail Phase 1 Prof Services Agreement Amendment Template 104345 Revision Date: November 23, 2021 Page 2 of 4 APPROVED AS TO FORM AND LEGALITY: M&C: N/A A, Jeremy Anato-Mensah Assistant City Attorney ATTEST: Jannette Goodall City Secretary Date: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Bomber Phase Trail Phase 1 Prof Services Agreement Amendment Template 104345 Revision Date: November 23, 2021 Page 3 of 4 FUNDING BREAKDOWN SHEET City Secretary No. 58611 Amendment No. 1 Department Fund -Account -Center Amount 0800450 34027-5330500-0800450-104345-5030 $45,273 Total: $45,273 City of Fort Worth, Texas Bomber Phase Trail Phase 1 Prof Services Agreement Amendment Template 104345 Revision Date: November 23, 2021 Page 4 of 4 FORT WORTH® ATTACHMENT "A" Bomber Spur Phase II Boundary Survev and Acauisition Assistance PART 1 — OVERAL PROJECT DESCRIPTION The goal of this project is to perform the boundary survey and meets and property/easement acquisition metes and bounds survey maps for Phase II of the Bomber Spur Trail. Phase 11 is from the end of Phase I to Vickery Boulevard for approximately 1.3 miles. PART 2 - SCOPE OF SERVICES Task 1 — Boundary Survev A) ENGINEER will, via a subconsultant: a. Survey Coordination. The ENGINEER will coordinate with the City and Streams and Valleys to develop a concept exhibit for each potential acquisition. b. Research the subject property and all adjoining properties and obtain copies of plats, easements, and deeds. Prepare a working sketch to locate property corners and establish existing boundary/right-of-way/easement lines. c. Deliverables will consist of a digital file in dwg format containing existing boundary/right-ofway/easement lines. Other deliverables will consist of a copy of all field notes and drawings, and an ascii point file of all points located in the survey. d. Prepare 11 "x17" sheets summarizing property/easement/ownership data indicating location and property boundary/easement limits for all subject properties within the Phase II corridor. Task 2 — Acquisition Assistance Engineer will prepare various metes and bounds description with exhibit for properties that are mapped on Page 3 of Attachment A and described below: A) Prepare a metes and bounds description with exhibit for the USA Right -of -Way Easement described as Tract No. 6., to be conveyed to the City of Fort Worth. All property corners will be marked with 5/8 inch iron rods with caps stamped with surveyors name. B) Prepare a metes and bounds description with exhibit for the USA Right -of -Way Easement described as Tract No. 5., to be conveyed to the City of Fort Worth. All property corners will be marked with 5/8 inch iron rods with caps stamped with surveyors name. C) Prepare a metes and bounds description with exhibit for the USA Right -of -Way Easements described as Tract No. 2, 3 and 4, to be conveyed to the City of Fort Worth. All property corners will be marked with 5/8 inch iron rods with caps stamped with surveyors name. ATTACHMENT A SCOPE OF SERVICES Bomber Spur Trail Phase II Date: 05.1.2023 PAGE 1 OF 3 FORT WORTH. D) Prepare a metes and bounds description with exhibit for Parcel No. TH-1 and Parcel No. P1, as shown on Exhibits T" and "G", to be conveyed to the City of Fort Worth. All property corners will be marked with 5/8 inch iron rods with caps stamped with surveyors name. CITY of Fort Worth, Texas Page 2 of 3 Attachment A PMO Release Date: 02.06.2015 Page 2 of 3 CD 00 w X = 0 CD 3 CD -n > CD O o CD m BOMBER SPUR TRAIL PHASE 2 - ROW & EASEMENT EXHIBIT - EXHIBIT C N 9 190 2W '90 -ll?� IC WRF ILE 11 1111 499 kme!!%mmm� I rnkysftn �—� Attachment B Compensation The services of Bomber Spur Phase I Amendment 1 described in Attachment A Scope of Services shall be provided for a total lump sum fee of $45,273. The ENGINEER reserves the right to reallocate budgets amongst tasks. The overall fee total shown shall not be exceeded without prior written authorization from the CITY. All permitting, application, and similar project fees will be paid directly by the CITY. Payment for the services of Phase I described in Attachment A Scope of Services shall be invoiced to the CITY on a monthly basis, based upon percentage completed for each task. ENGINEER shall provide the CITY a one -page project status report along with the submittal of monthly invoice throughout the design and construction of the project Below is a fee breakdown by task for the services of Bomber Spur Phase I Amendment 1 described in Attachment A Scope of Services: Task Task 1 - Boundary Survey Fee $ 24,773 Task 2 - Acquisition Assistance $ 20,500 Total Lump Sum Fee Attachment B Compensation Bomber Spur Trail Phase I Date: 07.20.2022 Page 1 of 1 $ 45,273