Loading...
HomeMy WebLinkAboutContract 43041-CO1 (3)�1TY SECRE'TARY. 6� - � FORT WOR'CH. Cit of Fort Worth CONTRACT NOo � � u� , _ Y Change Order Request Project Name North Beach Street from Timberland to Keller-Hicks City Sec # 43041 Client Project #(s) 01291 Project Descriptionl 4-lane divided arterial street from Timberlantl Blvtl. to Keller-Hicks Road I Contractor JLB Contracting, LLC Change Order #�1 Date 4/23/2012 City Project Mgr. Michael Weiss, P.E. City Inspector Joe Rogers Contract Time Dept. TPW Water Sewer Totals (CDl Original Contract Amount $4,719,507.16 $2,197,850.20 $110,783. Extras to Date Credits to Date Pentling Change Ortlers (in M&C Process) Contract Cost to Date $4,719,507.16 $2,197,850.20 $110,783. Amount of Proaosed Chanae Order 105.337.50 - 208,661.10' 3,488. Original Funds Available for Change Orders $280,492.84 Remaining Funds Available for this CO $280,492.84 $0.00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%J JUSTIFICATION (REASONS) FOR CHANGE .11 600 � $3,488.50 � -1.42% $8,785,176.50 For the safety of the children walking to school, TPW requested the construction of a temporary asphalt sitlewalk on the west side of N. Beach Street from Bray Birch to Keller-Hicks while the existing sitlewalk on the east side of N. Beach Street is under construction. The Water Dept. requestetl the tlownsizing of the proposetl 24" Ductile Iron Pipe to 16" PVC water pipe. JLB requesed the use of their own survey crews for ease of construction. .a,�p.b.�a�� �by • ,� � �,'��-�f.1L�t �� �7� �.�._ __=- �. ��y���, ��ty ; C� OFFIC�AL RE(:��[�.) CITY SECRETAR�7 FT. ilVORTH9 '�� - It is understood antl agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment �- in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. .p.'d � n ��°�� �� �°d�`�� �k�� o�� p v �°° o "'� F1 n� �� o�� � Contractor's Company Name � Contractor Name) � _ Contract Signature � Date � JLB Contractinp, LLC ��,..� 1�.;� „� �� �.�' I s� / r i, / �, I -, ,- , � u� . � .. , � .� � :�; - , �1�. �, � � �'��� ;` FORT �ORTH,. City of Fort Worth r���% ���' � Change Order Request Project Name North Beach Street from Timberlantl to Keller-Hicks City Sec # 43041 Client Project #(s) 01291 Project Description 4-lane divided arterial street from Timberlantl Blvtl. to Keller-Hicks Road Contractor JLB Contracting, LLC City Project Mgr. Michael Weiss, P.E. Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed Chanqe Order Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funtling (if necessary) 50 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) � $3,488.50 � -1.42°/a $8,785,176.50 .�� JUSTIFICATION (REASONS) FOR CHANGE ORDER For the safety of the children walking to school, TPW requested the construction of a temporary asphalt sidewalk on the west side of N. Beach Street from Bray Birch to Keller-Hicks while the existing sidewalk on the east sitle of N. Beach Street is under construction. The Water Dept. requested the downsizing of the proposed 24" Ductile Iron Pipe to 16" PVC water pipe. JLB requesetl the use of their own survey crews for ease of construction. �� � ,' ' ; � ,-� , � � � ���% i ��,�.:���.� . ���_,>>�, �� i�_ � It is untlerstood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Contractor Name Contract,Signature Date . JLB Contracting, LLC - � ' ` ` "'' :, Inspector/Inspection Supervisor. Date Project ManagerlProgram Manager Date , ;. , , � y � ASsistant Director (Dept Date Director, Contracting Department �Dept Date �; � � a � , � , _ ,� , � Assistant City Attomey Date Assistant��ity Manager i Date �� ' � ,,. , � , ,; ,: Council Action if requiretl M&C Number C-25689 M&C Date Approved 7� TPW 719, Water —�., Change Order # �1 Date 4/23/2012 City Inspector Joe Rogers Sewer Contract Time Totals CD) 1.20 $110,783.84 $7,028,141.20 600 , . � . . �. . '� . "'`y/ ` FORT WORTH, City of Fort Worth `� !�`�,' � � � �''� � � Change Order Request Project Name North Beach Street from Timberland to Keller-Hicks City Sec # 43041 Client Project #(s) 01291 Project Description 4-lane divided arterial street from Timberlantl Blvd. to Keller-Hicks Roatl Contractor JLB Contracting, LLC Change Order # 1� Date 4/23/2012 City Project Mgr. Michael Weiss, P.E. City Inspector Joe Rogers Dept. � TPW Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proaosed Chanae Order 719,507.16 Water ,197,850.20 ,197,850.20 Sewer Totals 110,783.84 $7,028,14 110,783.84 $7,028,14 Contract Time .11 .11 Revised ContractAmount $4,824,844.66 $1,989,189.10 $114,272.34 $6,928,306.10 600 Original Funds Available for Change Ortlers $280,492.84 $280,492.84 Remaining Funds Available for this CO $280,492.84 $0.00 $0.00 $280,492.84 Additional Funding (if necessary) $3,488.50 $3,488.50 CHANGE ORDERS to DATE (INCLUDING THIS ONEJ AS % OF ORIGINAL CONTRACT -1.42% MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%) $8,785,176.50 JUSTIFICATION (REASONS) FOR CHANGE ORDER For the safety of the children walking to school, TPW requestetl the construction of a temporary asphalt sidewalk on the west sitle of N. Beach Street from Bray Birch to Keller-Hicks while the existing sitlewalk on the east side of N. Beach Street is under construction. The Water Dept. requestetl the downsizing of the proposed 24" Ductile Iron Pipe to 16" PVC water pipe. JLB requesed the use of their own survey crews for ease of construction. It is understootl and agreed that the acceptance of this Change Ortler by the contractor constitutes an accord antl satisfaction antl represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Contractor (Name) . Contract Signature ate JLB Contracting, LLC • � ' � ' Inspector/lnspection Supervisor Date Project ManagerlProgram Manager Date Assistant Director (Dept Date Director, Contracting Department (Dept Date Assistant City Attorn�y Date Assistanf.City Manager Date . � . ;, �: , it Council Action if required) M&C Number C-25689 M&C Date Approvetl 7 2 �` FORT wORTH� City of Fort Worth ° '� , � Change Order Request Project Name North Beach Street from Timberland to Keller-Hicks City Sec # 43041 Client Project #(s) 01291 Project Descriptionl 4-lane divided arterial street from Timberlantl Blvtl. to Keller-Hicks Roatl I Contractor JLB Contracting, LLC Change Order #�1 Date 4/23/2012 City Project Mgr. Michael Weiss, P.E. City Inspector Joe Rogers Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Ortlers (in M&C Process) Contract Cost to Date Revisetl Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Adtlitional Funding (if necessary) TPW Water Sewer 19,507.16 $2,197,850.20 $110,783.84 19,507.16 $2,197,850.20 $110,783.84 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORI�INAL CONTRACT COST + 25%J JUSTIFICATION (REASONS) FOR CHANGE ORDER Contract Time Totals (CD) )28,141.20 600 )28,141.20 600 -1.42% $8,785,176.50 For the safety of the children walking to school, TPW requested the construction of a temporary asphalt sidewalk on the west side of N. Beach Street from Bray Birch to Keller-Hicks while the existing sidewalk on the east side of N. Beach Street is untler construction. The Water Dept. requested the tlownsizing of the proposed 24" Ductile Iron Pipe to 16" PVC water pipe. JLB requesetl the use of their own survey crews for ease of construction. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accortl antl satisfaction antl represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Contractor (Name) Contract Signature Date JLB Contracting, LLC Inspectorllnspection Supervisor Date Project ManagerlProgram Manager Date Assistant Director (Dept) Date Director, Contracting Department Dept Date Assistant City Attorney Date Assistant City Manager Date Council Action if required M&C Number C-25689 M&C Date Approvetl � - - - : - - - _ . . . . . . . � . . . . . . . � � � . � . . . • � . . . • � .. .. � � ,� � � ,� � � . '� ■ � � � . �� . � . � � ■ � � • • • • • i � � • : , . . . . . . ', � - - . �: . � � � � � � • � � � � � � � � � � � � � � � i • � • .� � _ _ . • -' -- -- • - - ' - • - � - •. • � • • � � � � � � � � c7 � -D 0 c� � � cn � c�' � m � cD cN� rn � f►l -o o .� n p � o � o N 'o � c � o Z C � -a' rn' � O � 3 7y � � � m �t � �. .P o z r ! -' o n � � � � � _ � � c�i fl- � O � � � a" m v � Q 0 � m m ? � � ou � o � � , o � z � � o � a �� 5 C) a v c�i cQ o � � O Q m o �* m 0 cn m -� � � n� n m - �� m c� .p � N W N O N � W O A n 3 � � 7 (G � �D Q �, Q. � �� �� n� ao a� 0 3 � y � � v � ao m O � � rn -, D � � �' o� � N � N Uq (D N O -r, N � _ � - ; _ • . � . . . .. . . . � � . . . � � • • � � • i �. • . � � � = . ', ', ', - . �. , . 7 � � � � � � • � . � _ � - •. • '- � � � • •. � v m r m -� a z � v C� o � � � � 0 o n o � � � � � � �. � o o' • � � � �' � � co � m y � � fll c� � 3 c� � � � v m � c� cn Q � O a c� o � � v m n <' o: m d tU � (D � � (D CD � � O � � � Q CD N � O_ W < Q 0 � � _ � � 0 � a � � cu m � N W N O N c� .� �� o_ � � 0 �� v �* � z 0 � W m v � � � (�D fD � O � � � Q CD � � Q O � CD (D S � � n � � m c� � �A W O �A O 7y � O � � x ♦I � � � � � � �D Q �+ a� �� v� �D o �� 0 3 � N c� � v � ao m O -� � m � 0 m ro � o' � � -D v oa m N O -�, N M/WBE Breakdown for this i ange Order ` Amount for this C0 Total I $0.00 PROJECT SUMMARY SHEET (Change Order Attachment) PROJECT NAME: N.Beach, Timberland to Keller Hicks Rd CS# 43041 Attachment to Change Order No.: 1 Today's Date: 8/23/2012 TOTAL TPW Water _ Original Contract Amount: $ 6,917,087.36 $ 4,719,507.16 $ 2,197,580.20 E�ras to Date: $ - $ - $ - $ Credits to Date: $ - $ - $ - � Contract Amount to Date: Amount of Proposed Change Order: Revised Contract Amount: Contingency Funds Avail. Remaining Funds Available Additional Funding (if necessary): Sewer 110,783.84 $ 6,917,087.36 $ 4,719,507.16 $ 2,197,580.20 $ 110,783.84 $ (103,323.60) $ 105,337.50 $ (208,661.10) 3,488.50 $ 6,813,763.76 $ 4,824,844.66 $ 1,988,919.10 114,272.34 $ $ $ 280,492.84 $ 280,492.84 $ 280,492.84 � 280,492.84 � - � - $ - $ - - $ - - $ 3,488.50 M&C Review � � �" � . �, _ ��� � Page 1 of 2 Official site of the City of Fort Worth, Texas FaRT �'��QRTH COUNCIL ACTION: Approved on 7/10/2012 DATE: 7/10/2012 REFERENCE NO.: **C-25689 LOG NAME: 20N BEACH CO 1 CODE: C TYPE: CONSENT PUBLIC HEARING: NO SUBJECT: Authorize Execution of Change Order No. 1 to City Secretary Contract No. 43041, a Construction Agreement with JLB Contracting, LLC, Resulting in a Decrease in the Contract Amount of $99,835.10 for the Construction of North Beach Street from Keller- Hicks Road to Timberland Boulevard, Thereby Revising the Total Contract Amount from $7,028,141.20 to $6,928,306.10 (COUNCIL DISTRICT 2) RECOMMENDATION: It is recommended that the City Council authorize execution of Change Order No. 1 to City Secretary Contract No. 43041, a construction Agreement with JLB Contracting, LLC, which results in a decrease in the amount of $99,835.10 for the construction of North Beach Street from Keller-Hicks Road to Timberland Boulevard, thereby revising the total contract amount from $7,028,141.20 to $6,928,306.10. DISCUSSION: On March 5, 2012, (M&C C-25477) the City Council authorized the execution of a contract in the amount of $7,028,141.20 with JLB Contracting, LLC, for the construction of North Beach Street from Keller-Hicks Road to Timberland Boulevard with water, sewer, paving, sidewalks, streetlights and storm drain improvements to complete a four lane divided arterial. �� This proposed Change Order is for ,the following: f5'rovide a temporary sidewalk and safety fencing for pedestrians and school children on the west side of North Beach Street whiie the east half of the roadway is under construction�, Allow the con`tractor to perform his own construction staking for the project; and Reduce the size of the new waterline from 24-inch to 16-inch diameter as directed by the Water Department. The effect of proposed Change Order No, 1 is as follows: � W � Water �ewer � Total inal Contract Amount � Order No. 1 d Contract Amount $4,719,507.16 �� $2,197,850.20 �� $110,783.84 $ 105,337.50 ($ 208,661.10) $ 3,488.50 $4,824,844.66 $1,989,189.10 �$114,272.34 FISCAL INFORMATION/CERTIFICATION: $7,028,141.20 ($ 99,835.10) $6,928,306.10 The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the 2008 Street Improvements Fund and the Sewer Capital Improvements Fund. TO Fund/Account/Centers FROM Fund/Account/Centers C204 541200 202230129183 $105,337.50 '�! mhtml;file://C:�Documents and Settings\weissm\My Documents\N. Beach St\Timberland to Keller-Hicks\C... 8/21/2012 M&C Review P258 541200 702170129183 3 488.50 Submitted for City Manager's Office b� Originating Department Head: Additional Information Contact: Fernando Costa (6122) Douglas W. Wiersig (7801) Mike Weiss (8485) ATTACHMENTS 20N BEACH C01 MAP .pdf Page 2 of 2 ' mhtml:file://C:\Documents and Settings\weissm\My Documents\N. Beach St\Timberland to Keller-Hicks\C... 8/21/2012