HomeMy WebLinkAboutContract 56956-CO1CSC No. 56956-COI
FORT WORTH® City of Fort Worth
— Change Order Request
Project Name AFW Taxiway Alpha Centerline Light Replacement City Sec # 56956
Client Project #(s) 103104 & 103669
Project Description Construction to replace the centerline lights on Taxiway Alpha, Taxiway Hotel, and the connecting taxiways between Taxiway Alpha and Runway 16L/34R at
Perot Field Fort Worth Alliance Airport
Contractor B-C Company, Inc Change Order # 1 Date 5/23/2023
City Project Mgr I Tyler Dale City Inspector
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Aviation
Totals
V (CD)
$1,169,12400
$1,169,12400
422
$0 00
$0 00
$0 00
$1,169,12400
$1,169,12400
422
Amount of Proposed Change Order
$88,555.56
$88,555.56
Revised Contract Amount $1,257,67956
Original Funds Available for Change Orders
Remaining Funds Available for this CO $0 00
Additional Funding (if necessary) $88,555 56
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
$1,257,67956
422
$0 00
1 $88,555 56
1 7 57%
1 $1,461,405 00
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Changes to this contract include
-Overrun and Underrun quantities for cable, conduit, shallow kerf conduit, demolition of fixtures and transformers, installation of fixtures and transformers, blank lid, and broken
bolt repair based on field conditions
-installation of pavement dams
-Addition of ground lugs to light cans
-Realignment of existing base can
•Spall repair
-Joint seal replacement
-install Stainless Steel Bolts in Lieu of Fluropolymer Coated Bolts
-Replacement of ALCMS Computers that were found to be inoperable
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
OEMontractor's Company Namew rontractor Name Contract Si nature
B-C Company, Inc Keith Bartholomew ae
Date
May 23, 2023
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager Er
Date
May 24, 2023
Program Manager
Date
Senior Capital Project Officer
Date
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
May 24, 2023
Assistant Cit Attorney
Date
Assistant City Manager
Date
(
May 26, 2023
May 28, 2023
Council Action if required)
M&C Number I N/A M&C Date Approved N/A
ATTEST: tp4c4aunn
`A w p4S FORTQQ
oeoa
Jannette Goodall, City Secretary p� . 0
Pvo o=A
P�Q 000 ooao *dda
QQ� aEn 4ggpo
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORTWORTH City of Fort Worth
!'--- Change Order Additions
Protect Name AFW Taxiway Alpha Centerline Light Replacement City Sec # 56956
Client Protect # 103104 & 103669
Contractor B-C Company, Inc PM Tyler Dale771 Inspector
Change Order Submittal # F--T—� Date 5/23/2023
ADDITIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
3
No. 8 L-824C 5kV Cabe Inst. in Duct or Conduit
Aviation
5,582 00000000
LF
1 75
9,768 50
4
No. 6 Solid CU Counterpoise InsL w/Ground Rods and Connectors
Aviation
28 00000000
LF
$3 00
7400
5
1.5' GRSC In Exist Rigid Pvmt., Incl. Sawcut, Trench and Backfill
Aviation
33 50000000
LF
$41 00
1,373 50
6
Removal of Exist. Shallow Saw Kerf Conduit and Backfill
Aviation
87 00000000
LF
$30 00
2,610 00
7
Demo Existing Fixture and Transformer
Aviation
100000000
EA
50 00
50 00
7
Demo Existing Fixture and Transformer
Aviation
200000000
EA
$50 00
100 00
8
Remove. Store, Reinstall Light Base Blank Lid
Aviation
100000000
EA
$240 00
9
Furnish L-852C(L) Bidirectional Twy Centerline Fixture and Transformer
Aviation
100000000
EA
$835 00
835 00
10
Furnish L-852D(L) Bidirectional Twy Centerline Fixture and Transformer
Aviation
200000000
EA
$835 00
1,670 00
11
Install Fixture and Transformer
Aviation
200000000
EA
$264 00
528 00
11
Install Fixture and Transformer
Aviation
1 00000000
EA
$264 00
264 00
12
Furnish and Install L-868 3/4" Blank Lid
Aviation
1 00000000
EA
$210 00
21 000
12
Furnish and Install L-868 31 " Blank Lid
Aviation
200000000
EA
210 00
13
Furnish and Install L-868 Shallow Light Base in Exist Rigid Pvmt
Aviation
200000000
EA
$1,38900
13
Furnish and Install L-868 Shallow Light Base in Exist Rigid Pvmt
Aviation
100000000
EA
$1,389 00
1,389 00
14
Core Removal of Existing Shallow Light Base in Exist Rigid Pvmt
Aviation
100000000
EA
804 00
14
Core Removal of Existing Shallow Light Base in Exist Rigid Pvmt
Aviation
600000000
EA
$804 00
4,824 00
16A
ALCMS Computer Replacement
Aviation
100000000
LS
$31,450 52
31,450 52
22A
Install Pavement Dam
Aviation
400000000
EA
6317
2,52572
22A
Install Pavement Dam
Aviation
100000000
EA
631 43
23A
Core and Raise Pavement Dam
Aviation
300000000
EA
$548 88
$1,64664
24A
Furnish and Install Grounding Lug
Aviation
486 00000000
EA
75 50
24A
Furnish and Install Grounding Lug
Aviation
19 00000000
EA
$75 50
1,434 50
25A
Realign Existing Base Can
Aviation
100000000
EA
$58715
58715
26A
Spall Repair
Aviation
13 25100000
CF
$805 00
10,667 06
27A
Joint Seal Replacement
Aviation
26 50000000
LF
$35 00
927 50
Avation
$114,51152
Sub Total Addition7_1
$114,511 52
Change Order Additions Page 2 of 3
FORCity of Fort Worth
Change Order Deletions
Project Name I AFW Taxiway Alpha Centerline Light Replacement City Sec # 56956
Client Project # F 103 004 & 103669
Contractor B-C Company, Inc PM Tyler Dale Inspector
Change Order Submittal # = Date 5 23/2023
UtLL11UNS
Change Order Deletions Page 3 of 3
FORT WORTH
Routing and Transmittal Slip
Aviation
Department
DOCUMENT TITLE: AFW Taxiway Alpha Centerline Light Replacement Change Order I
M & C N/A
CPN 103104 & 103669 CSO #
56956 DOC#
DATE: 5/24/2023
INITIALS
DATE OUT
TO:
May 24, 2023
1. Roger Venables
R,
1&b
2. DougBlack
May 26, 2023
3. Dana Bur hdoff
�
May 28, 2023
May 30, 2023
4. Jannette Goodall
5.
6.
DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑ Yes ❑x No
RUSH: ❑ Yes ❑X No SAME DAY: ❑ Yes ❑ No
ROUTING TO CSO: ❑x Yes ❑ No
Action Required:
❑ As Requested
❑ For Your Information
1 Signature/Routing and or Recording
❑ Comment
❑ File
NEXT DAY: ❑ Yes ❑ No
❑ Attach Signature, Initial and Notary Tabs
Return to: Please call Tyler Dale at ext. 5416 for pick up when completed. Thank you.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX