Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 57682-CO1
CSC No. 57682-COI FORT WORTH. City of Fort Worth —V Change Order Request Project Name Intersection Improvements at 820 and Marine Creek Parkway - Phase 1 City Sec # 57682 Client Project #(s) 101585 Project Descriptions Construction of Intersection Improvements at Northwest Loop 820 and Marine Creek Parkway - Phase 1 Contractor McClendon Construction Company, Inc Change Order# 1 Date 5/15/2023 City Project Mgr I Iskal Shrestha P E City Inspector Habte Taezaz Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date TPW Totals Contract Time (CD) $1,359,87155 $1,359,87155 300 $1,359,87155 1 1 1 $1,359,87155 300 Amount of Proposed Change Order $17,045.29 $17,045.29 Revised Contract Amount $1,376,916 84 Original Funds Available for Change Orders $40,12845 Remaining Funds Available for this CO $40,12845 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $1,376,916 84 300 $40,12845 $40,12845 qF1 25% $1,699,839 44 JUSTIFICATION (REASONS) FOR CHANGE ORDER Ni- wo was regaraing ine proposea HyDria aeieciion system, wnicn wasm compaiiDie wain ine existing iramc comroi equipmem, wnicn per ine comraci supposea io remain RFI#7 was regarding continuous groundwater seepage from the bridge abutment to the pavement control joints The Response prepared by the Engineer of Record (EOR) to the Contractor's RFI(s) resulted in additional quantities of the existing bid item in the contract and required adding additional bid items to the contract to complete the construction, which resulted in executing this change order See the attachment in the Change Order document for a copy of the contractor RFI(s) and EOR's Response to the RFI(s) For TxDOT bid items in this change order, the average pricing was compiled from similar items from the Texas Department of Transportation Average Low Bid Unit Prices See the attachment for the detail about the price comparison Typically, TxDOT's bid quantity for its projects is higher than City's projects The bid price proposed by the contractor is directly proportional to the bid quantity It is typically normal for the bid price to be higher for smaller quantities if compared with the same items with higher quantities Keeping this in mind, the price proposed by the contractor for the TxDOT bid item is justifiable We used the price from the bid proposal for the existing bid items that are already on the contract We compared other bid items to other similar items and accepted the unit It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. lool-ntractors Company Namem 1kntractor (Name) M =Contract Signature McClendon Construction Company, Inc I Justin Blair ate; Date May 18, 2023 Inspector/Inspection Super v Date Project and Contract Compliance Manager ii May 18, 2023 May 18, 2023 Program Manager Date Senior Capital Project Officer Date May 23, 2023 0., May 23, 2023 Assistant Director (Dept) Date DirectoContracting Department (Dept) Date -,1 (& � May 25, 2023 May 25, 2023 Assistant City Attorney Date JAssistant City Manager Date May 26, 2023 15 May 27, 2023 Council Action (if required) M&C Number I NA M&C Date Approved NA ATTEST: 2= A -&— 9 Jannette Goodall, City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORTWORTH City of Fort Worth -�T--- Change Order Additions Project Name Intersection Improvements at 820 and Marine Creek Parkway- Phase 1 City Sec # 57682 ClientProlect# 101585 Contractor McClendon Construction Company, Inc PM Iskal Shrestha P E Inspector Habte Taezaz Change Order Submittal # = Date 5/15/2023 ADDITIONS �r11� DESCRIPTIOil�•7tli���'�-`I •• �� -111171169A ARD h1STA-L A;LE _ i�i t • �.yiP.{;ISQ REMOVING CONIC (RIPRAP) UNDERDRAIN CONNECT TO INLET Change Order Additions Page 2 of 5 FORT City of Fort Worth i Change Order Deletions Project Name Intersection Improvements at 820 and Marine Creek Parkway - Phase 1 City Sec # 57682 Client Project # 101585 Contracto McClendon Construction Company, Inc PM Iskal Shrestha P E Inspector Habte Taezaz Change Order Submittal # O1 Date 515/2023 Change Order Deletions Page 3 of 5 MISBE for this Change Order OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Request for Information — Initiation Form Form should be completed by Contractors Project Manager or Designated Representative Project Name: NW Loop 820 & marine Creek Parkway RFI #: 6 Intersection Impr. Phase 1 Project No. (CPN): C101582 Date Submitted: 3-20-23 Contractor: McClendon Construction Co., Inc. Response Needed by (NLT): 3-31-23 City Project Manager: Iskal Shrestha, PE Design Engineer: Kimley Horn RFI Title (Short Description): Traffic Signal Detection System Attachments Image ❑ Document ❑ RFI Reference Data (If Applicable): Specification Section No. Spec Page No. Paragraph No. Drawing Sheet No. C5.01 Drawing Detail Title: Other: RFI Question or Clarification Needed: (Describe the issue and clearly stat on. Prov de rRWata related to the issue, including street location, distance measurements and pictures if applicab . 1. The current plans show to install new Hybrid Detecti -2. Pe ans and submittals, the Vantage Next Sensor W/ Vector was purc d for nsta Sensor requires a Cat5e to be installed to run the Sensor. After furthe'Ligation it was current system in place is the old ITS sensor that is ran off a coaxial cable. 2 systems interconnect. The old camera was removed and the existing coaxial cable was rep ith Ca a plans. How do we need to proceed to have a fully functional detection syste . Contractors Recommendation: (Please do not leave blank. Provide the contractors recommended solution based on his knowledge of the project and existing conditions to assist with accelerating the response) 1. Option #1: Remove & replace the Cat5e cable with coaxial cable and re -install the old ITS sensor. 2. Option #2: Upgrade the entire system to the Vantage Next W/ Vector. Both options will have a cost impact associated with them. However, Option #2 will be considerably higher. Does the Contractors Recommended Solution require a Change Order? : Yes ® No ❑ Potential Impact to the City of Fort Worth (Schedule, Scope, Cost): To be determined Is This RFI Stopping ALL work on the project? Yes ❑ No If yes, why was this issue not foreseen and sufficient response time provided? Request for Information — Initiation Form Form should be completed by Contractors Project Manager or Designated Representative RFI Response: Does Response Require Change Order Proposal : Yes ❑ No Contractor's Response: Change Proposal (if Applicable): Construction Allowance to be used Work Item Description Unit Quantity Unit Price Total Total Proposal Amount: Total Additional Days: 0 City PM Status: Accepted ❑ Rejected ❑ City PM Comments: E Vantage Next° With Vantage Vector° An all -in -one hybrid detection ! fsystem with powerful performance beyond any GREEfI ONLY other detection solution Proposed / Submitted Sensor Existing Sensor T-1 Q \\ \\ `�-3 1 95 T-Z HYDETECTOR U)I. BRID 1 4 O OPTICOW DETECTOR \ \ 1 1 v FLU C) �_ VIVDS LUWINAIRE �------------ 3 W (n © ELECTRICAL SERVICE SIGNAL CABINET II INSTALL $1 ON ----------- '^- I T-1 (1 EA) Q STREET NAME SIGN 2 II I Q -- 1 ------ ---® ®�--- —-----------------�� LU LU a s.. s.. ss _ W p — R" ssSs — — MARINE CREEK PARKWAY Z nA — 09' \ ALL ON 2 (1 EA) — \ INSTALL DN Kimley>>> Horn \ T-2 (1 EA) SIDE w INSTALL O 6 m ELUSH WITH SIDEW INSTALL®ON b --- 1 -- --- W z J 80� Cnerry Siraal. Unit >> Suite �300. Fort W Orin T% T6�02 Pnane (e�T) »s-ss» To:: (aI TJ ]Ts 5oTo TBP[ Registro�ian na T-92a T-] (1 EA) 1 8 —------------------ ' \ �9------------- at_ I T I C � ID \ CP T-2 e.M �—T-3 ` o S "" PROJECT pro.sa5 47-0 `UE MAPSCO NO CTTY OF TORT WORTH, TEXAS TRANSPORTATION AND PUBLIC WORKS CAPITAL DELIVERY DIVISION IK PARKWAY &MIN RSEC IONCREEK AR EI\lY -P AEI $ MARTNE CREEK PARK W AY -PHASE 1 Y TiTf '� O I-- ,w,� '" b o \ � O O O TRAFFIC SIGNAL PLAN PROPOSED PLAN - 820 EBFR c EX ROW M \s" w is" IN ,s" w W , " 16" W s•' w Is" w is" w is" w Is" w Is" w is" w A� d„ DESIGNED IL DNwN IL cNECKED DLs SCALE: DATE NOVEIHIER 2U21 SHEET C7.03 Kimley>>> Horn Request for Information Response Form Project Name: NW Loop 820 & Marine Creek Parkway Intersection Improvements Phase 1 RFI #: 006 Version #: 1 Project No.: CPN 101585 Response Needed by (NLT): 4/28/2023 City Project Manager: Iskal Shrestha, PE Response Date: 4/20/2023 Design Firm: Kimley-Horn Response Author: Trenton Tidwell, P.E. RFI Title: #6 — Detection System Attachments: Revised C7.03, C7.05 Image ❑ Document RFI Response: The City agree to proceed with option 1 suggested by the contractor with following modifications. 1. Reinstall existing detection camera and install new coaxial cLbleortcamera since existing coaxiZwaremoved. 2. Do not remove the CATSE cable that is already installed&Zreused on next phase. PleaseCAT5e has enough length to connect to hybrid detector en installed on next phase to avoid remo installing this again on next phase. 3. Provide vantage next with vantage vector detector to the (�y. Does Response Require Change Order Proposal: Yes ® No ❑ Contractor's Response: Change Proposal (if Applicable): Spec Section # Work Item Description Unit Quantity Unit Price Total 3441 10 Furnish and Install Coaxial Cable j6LF Ai 845 $3.30 $2,788.50 Total Proposal Amount: $2,788.50 Total Additional Days: 0 City PM Status: Accepted ❑ Rejected ❑ City PM Comments: � J CONDUIT m G e a # w o = MINIMUM PEDESTRIAN TIMING RUN SIZE BORE (BI o #o 3 = O w w a FLASHING TOTAL NO LENGTH TRENCH IT) Z = w = U = F m tw- m < PHASE WALK DON'T WALK (LF) RIGID METAL (RM) O U U 2 15 22 H eN as C9c aLro a OO OO U 02 7 PROP. EXIST. 1 1 7 39 46 04 20 1 E 5 E 1 1 fb6 7 13 36 2 E 95 E 1 1 1 08 7 29 3 E 15 E ; ; 2 1 1 1 1 1 E 90 E 5 3 10 T 1 1 1 1 1 1 1 8 E 245 E 1 1 1 1 1 1 1 8 E 110 E 1 1 1 1 1 1 1 8 E 185 E 1 1 1 1 1 1 1 9 E 140 1 E 1 1 1 1 10 3 10 T 1 1 1 CABLE TOTALS (LF) 795 115 910 20 880 1 880 795 795 79 PROPOSED CONDUIT TOTALS (LF) Notes: E = EXISTING 3" TRENCH 20 ONLY PROPOSED CABLESANIRES ARE SHOWN. N CABLEMIRE INSIDE POLE (FEET) DETECTOR pCABLE 0 POLE 12CNDR2AWG 14AWG BCNOR N0H8 OPTICOM CABLE- CABLE C M NUMBER 12 AWG 19AWG to AWG XXXW CABLE 14YBRID J / L— T 1 5 10 100 BO 50 50 � � N 11 5 ,p B0 SO 0 N LY 0 TOTAL 10 20 100 80 BO M ONLY PROPOSED CAHLESMIRES ARE SHOWN A990jkL3 -9 2 19,3"6.3 STATUS: E = EXISTING, I = INSTALL -RELOCATED ONLY PROPOSED POLES ARE SHOWN. GROUND BOX SUMMARY Radius, 0.5 der, White on, Green; 1WltviewHwy-3-W; �S F_p�RTyWORTH 1 XX 7�4� FBSS_36x3 I" REdlus. 0.8" der, 0.5" Indent, Black on, White;I' REdii,sr W h=19.1251 s=2.�; ONLY", D; _1 "ONLY", D; ek Pkwy XXXX ♦ �� M V 0.3-614.3-�6.2 41 6.914�7- - 120 LS° Radius. 0. ord hire on, Green; Zectanglc 2.0' adius; "Marine Creek Pkwy B 70 % spacing: brow Custo .0" X 3.7" 180'; "XXXX", B; "XXXX", B; arrow Custom 7.0" X 3.7" 0'; 1, IFiE CONTRACTOR SHALL COORDINATE BLOCK WKI.-S WITH THE CITY PRIOR TO GTO 1ABTION. 2. lHE CONTRACTOR SHALL SUBMIT SICN PROOF TO THE CITY FOR APPROVAL PRIOR TO ABRICAPBN. .....r ; .4y Kimley)>)Horn ona�len) 335-6611 Faes(01l)1335-50TONo18PE Re91s4atlOn No. F-920 11 PROJECT /I01585 AdAP5O0 NO.: `7 Tp $ CITY OF FORT WORTH, TEXAS TRANSPORTATION AND PUBLIC WORKS CAPITAL DELIVERY DIVISION INTERSECTION IMPROVEMENTS AT 820 & MARINE CREEK PARK WAY-PHASEI TRAFFIC SIGNAL PLAN SUMMARY CHARTS DEspNEp a SCALE 'ATE sHEEf. BRAWH. IL NOVEMBER2021 C7.05 GHECKED DIS EXISTING SIGNAL HEADS - 1 CO SHALL VERIFY ALL EXISTING UTILITIES IN THE AREA AND INFORM THE ENGINEER OF ANY TYPE V3L TYPE V3 TYPE P GJN ANY CPLA7ONTRACTOR ARISE C THE FIELD. ANY DAMAGE INCURRED TO ANY EXISTING FACILITIES AS > RESULT o- aIN c ITHAl QU AcnT P SHALL RE REPAIRED BY THE PROP—DNTRACTOR AT HIS EXPENSE O Mir, O SIGNAL POLE LOCATIONS R FXIE ST SINAI EQUIPMENT TD REMAIN ARE SHD'NN IN GRAY PROPOSED/RFI Qf.ATFD SIDNAI EQUIPMENT Irv, ARE OSED IN BLACK A PRCPDS N SIGNAL EQUIPMENT LAYOUT IS DIAGRHMV ATIC AND MAY BE ADJUSTED BASED ON FIELD O \\ 4 CD TRACTOR SHALL STAKE POLE LOCATIONS FOR APPROVAL BY CITY Ew PusH HUTTawc DR PEDESTRIAN SIGNAI H ARE REQo1REn E CONTRACTOR THA1 R REACT sH a,i*,Ian T-1 \\ ❑ EXISTING EODIPMDIN TO AND FOLLOW LDCATIDNS PUSH DBTON RE SHALL BE REINSTALLED 1MTHIN EREAGHEDF OG \ 'DSTINI3LE LANDINGS L R FQLLD'.V ALL ADH PUSH BUTTON REQUIREMENTS \ 6 EXISTING PHASING SHALL REMAIN O � \ SIT 1 SIT 2,3, 51, II \ "RELOCATED SIGNAL HEADS MARINE CREEK PKVVY 1\ GRAPHIC SCALE IN FEE14. \ ° 0 1D� \ \ I IF SHEET IS 11X11, SCALE 15 1-40', T-1 A\AL S T-z i a _ I \ — o o I INSTALL ON 7-1 Lt EA) 2 - f _�_ — ` — — — — G — — — — — — \V --— — — — —� — — — — — —— — — — i [ _ ss „e �_ _ __ _ o INSTALL ®D MARIN= CREEK PARKWAY L INSTALL T-= \ [ 'm —INSTALL v — s 51 DN EA ___ t ( ) w INSTALL GROUND BOX FLUSH WITH SIDEWALK DN s _ — — — ----- 8 L , �— -- _ �1 ,D F �Y� \ ®3 \ 10 A T-2 o0 \ b"9[ Go, EX ROw/ \ I �W I M M M M \ �� eMrc „91 \\N „9l col „9l „Dl A, LEGEND F-1 SIGNAL POLE NO 1 H SIGNAL HEAD & NO 2 RED SIGNAL & No / v RED PUSH BUTTON — — — CONDUIT RUN & NO p GROUND Box HYBRID DETECTOR OPTICOM DETECTOR LUMINAIRE Q ELECTRICAL SERVICE ® SIGNAL CABINET Tr STREET NAME SIGN orA1,,szo21 a . Kim_ ley»)Horn ,rna ,, ,._ N 5(91T� 'EDB T T F _ s a inn ,.Fs* ,grolsAs ,wXnsrr. 7- mg ar CITY OF FORT WORTH, TEXAS TRANSPORTATION AND PUBLIC WORKS CAPITAL DELIVERY DIVISION IN 1 ERSEC 1ION IMPROVEMEN 1 S Al 82U K MARINE CREEK PARKWAY- PHASE 1 TRAFFIC SIGNAL PLAN PROPOSED PLAN - 820 EBFR DESIGN D IL A -LE DATE SHEET 'HE-1 DLs NONTMEPR 21121 C% 03 Request for Information — Initiation Form Form should be completed by Contractors Project Manager or Designated Representative Project Name: NW Loop 820 & marine Creek Parkway RFI #: 7 Intersection Impr. Phase 1 Project No. (CPN): C101582 Date Submitted: 4-4-23 Contractor: McClendon Construction Co., Inc. Response Needed by (NLT): 4-11-23 City Project Manager: Iskal Shrestha, PE Design Engineer: Kimley Horn RFI Title (Short Description): Water Under the Bridge Attachments Image ❑ Document ❑ RFI Reference Data (If Applicable): Specification Section No. Spec Page No. Paragraph No. N/A Drawing Sheet No. C5.01 Or C 6.08 Drawing Detail Title: Other: AN/A RFI Question or Clarification Needed: (Describe the issue and clearly state the question. P'dfield data d to the issue, including street location, distance measurements and pictures if applicable.) 1. The existing rip rap on the west side of Marine Creek under the bridge has water seeping out between the joint of the new rip rap we poured and even seeping through the joints in the pavement form approximately station 604+75 to 606+10. Contractors Recommendation: (Please do not leave blank. Provide the contractors recommended solution based on his knowledge of the project and existing conditions to assist with accelerating the response) 1. Remove newly places concrete rip rap, install a subdrain connected to the inlet at 606+10. All concrete work is currently complete. We have a crew onsite preforming backfill and cleanup that could also perform the recommendation, if the resolution is provide in approximately 1 week. This would avoid a remobilization charge for the concrete crew. Does the Contractors Recommended Solution require a Change Order? : Yes ® No ❑ Potential Impact to the City of Fort Worth (Schedule, Scope, Cost): To be determined Is This RFI Stopping ALL work on the project? Yes ❑ No If yes, why was this issue not foreseen and sufficient response time provided? Request for Information — Initiation Form Form should be completed by Contractors Project Manager or Designated Representative RFI Response: Does Response Require Change Order Proposal : Yes ❑ No ❑ Contractor's Response: Change Proposal (if Applicable): Construction Allowance to be used Work Item Description Unit Quantity Unit Price Total Total Proposal Amount: Total Additional Days: 0 City PM Status: Accepted ❑ Rejected ❑ City PM Comments: Kimley>>> Horn Request for Information Response Form Project Name: NW Loop 820 & Marine Creek Parkway Intersection Improvements Phase 1 RFI #: 007 Version #: 1 Project No.: CPN 101585 Response Needed by (NLT): 1/10/2023 City Project Manager: Iskal Shrestha, PE Response Date: 4/18/2023 Design Firm: Kimley-Horn Response Author: Trenton Tidwell, P.E. RFI Title: #7 — Water Under the Bridge Attachments: C6.08, Spec 556 Image ❑ Document ❑ RFI Response: 1. Please see revised sheet C6.08 (attached) an D T Spec 556 for pipe underdrains. Does Response Require Change Order Proposal: Yes ® No ❑ Contractor's Response: Change Proposal (if Applicable): Spec Section # Work Item Description Unit Quantity Unit Price Total TXDOT 104 REMOVING CONC (RIPRAP) SY 41.31 $9.00 $371.79 TXDOT 432 RIPRAP (CONC)(CL B) CY 7.1 $600.00 $4,260.00 TXDOT 556 PIPE UNDERDRAINS (TY 6) (T) LF 115 $75.00 $8,625.00 PLANS UNDERDRAIN CONNECT TO INLET EA 1 $1,000.00 $1,000.00 Total Proposal Amount: $14,256.79 Total Additional Days: 7 City PM Status: Accepted ❑ cted AU City PM Comments: EB JIM WRIGHT FRONTAGE - STA:201+29.J0, LT 37.70' LT DITCH PI ELEV: 6B9.72 PROPOSED EB JIM WRIGHT FRONTAGE CONCRETE STA 200+1973, LT 3329' CHANNEL LT DITCH PI PGL ELEV. 591.68 RE. THIS SHEET FOR EB JIM WRIGHT FRONTAGE DETAIL_3.90R EB JIM LT 32.13' -2.06R -3.BOR O BEGIN LT DITCH ELEV: 692 64 A w ..L.A:' W Z Q -._.______ 0 F zoo+DO 201+OD 202+00 2p W N _ Z JIM WRIGHT FRONTAGE ROAD J H- = Q O y7 _ a PROP EB JIM F— WRIGHT Q �/ FRONTAGE CA ---�r�-----------�c, WE UTLRN s-A. a'DO- --L, LT 'I OG' Ll U H YI ELEV. 682. se WB —RN 5 A'.50G+5/.89, LT 11 OG' LT D'CH PI 1— 681.11 V,D UTURN STA 6-8378, LT ll.D1' 4V UM LT DI5TFPI V ELEV ', S43 �Ae 31- PSG �\FR02 P013 PROP 4'X4' AREA INLET ROPE $ \ CPR H�NNECONCRETE \ \•,$ ` RE: THIS SHEET r FOR DETAIL F' WE UTURN WE UT 2+1115, LT tt cU' oV.a 3 ITURN PROP WE FRONT\ \\ 304, LT 11.00' \\ BEGIN RTT DIDICH EL- 68358 PROP 3k3' '� AREA INLET PROP WESTBDUND U TURN BA EX BRIDGE PROP 115 LF OF e" TYPE 6 UNDERORAIN REMOVE AND REPLACE EX BRIDGE CLASS B CONC RIPRAP h RT DITCH PI COLUMN (TYP.) RE C202 \ ELEN 68021 CONNECT 6" TYPE 6 \ \e -2 Jfi% ' " UNDERDRAIN INTO INLET DD3 PROPOSED CONCRETE sea CURB '. w DD PROPOSED U-TURN CONCRETE sei CHANNEL LINING SECTION B B -Nzz i _ °a s - I, s3tt/p GRAPHIC SCALE IN FEET O2 0 20 40 80 a S IF SHEET IS 11X11, SCALE IS 1"=80'. GENERAL NODE L1T o_t, L_.vrlu _LTo t\ LEGEND \ PROPOSED CONCRETE RIPRAP,®'. �o Z� TR \-D,1 _ -0.02%. 602+00 15 -065% 60' OU DX 504 CO 5+0 606+00 1� No\ -------------- ------ _ _ _ -__- _______--_ EX DROP INLET TOP r C \ oo PROP MARINE CREEK TO BE REMOVED o Z EX DROP INLET TOP AND REPLACED WITH y TO BE REMOVED PARKWAY C/L 1 T AND REPLACED WITH ` MANHOLE (1R }1 MANHOLE --� — — — — — 2p O 1 8 00 — 1pJ+00 _ 1 T o B g ss „9� sss Qm MARINE CREEK PAFK WAY c v _s+op 6+0 EX 8" 2+00"- _ _ - - i SEWER SANITARY _____ 1 \ T EX SIGNAL POLE v \ Yy� PROP CLASS %' B CONCRETE EX GROUNDI RIPRAP 1/2" EXPANSION JOINT WITH JOINT SEALANT V8 UTURN 31 (TYP) PAVEMENT SECTION 2' NOTES 1. &4 AT 12 IN. DC. BOTH DIRECTION MIN. PROP CONCRETE TOE 4' 2 THCKNESS OF RIPRAP SHALL BE 5" SEE NOTE 3 FORJJJJ//// 3 TO OF RIPRAP SHALL BE 1' IN DEPTH AND 6" DIMENSIONS TYPICAL CONCRETE CHANNEL THICK. y DITCH PGL 4. SLOPES OF THE CHANNEL SHALL BE 3:1 MAX E SCALE -LhhQo 1TA5' 5. SEE CALCULATIONS THIS SHEET FOR DEPTH OF WATER IN SECTION. 'AL g/L C• PROP RIPRAP f PROP TRAIL B/L J .TA 4 26.12, RT iS 35 DITC+ PI DITCH STA:6+10.96, RT 19.64 RE: THIS PITCH PI SHEETDETAIL tLLv- 565.)� ELEV: 89121 NCTE UNLCSS CT CRWISE APPPOVED ALL RIPRAP DI'CFES ARE TO BE PLACED r cALL� nl I+ No 1/2" EXPANSION JOINT WITH JOINT SEALANT / �CN v TS. U'T N NE OF DITCH�J /\ 1 `EX GROUND 4" SIDEWALK 5" CLASS B CONC RIPRAP #3 BARS ® 18" O.0 IN BOTH DIRECTIONS SFDTIDN RPRAP SCALE SCALE = 1":5' 1j11j, \ ff e D 6+62 Kimley>>)Horn \ \ Ph.— 817)8335 6511 1F— 817)1336 5070 TBPE R300. e , IF > R_ 1 1111 CI1Y PROJECT /101585 NAPSCO N^.. ,J , FID / i r CITY OF FORT WORTH, TEXAS TRANSPORTATION AND PUBLIC WORKS w D CAPITAL DELIVERY DIVISION INTERSECTION IMPROVEMENTS AT 820 & MARINE CREEK PARKWAY - PHASE I SECTION C-C PROPOSED CHANNEL —=u 1. n. NTMA En/9 60DESIGNED IL SCALE DATE SHEET s = Mesh/Ht DRAWN. JBB CHECKED MDC I:40 NOVEMBER202I C6.08 556 Item 556 Texas Pipe U n de rd rai n s Department of Transportation 1. DESCRIPTION Install pipe underdrains. 2. MATERIALS Pipe. Furnish the types and sizes of pipe specified on the plans. Use only one type of pipe for any underdrain system on the project. Use perforated pipe in areas to be drained, and use non -perforated pipe between the perforated pipe and the outfall. Type 1. Corrugated steel pipe (CSP) conforming to any type specified in AASHTO M 36, fabricated from corrugated galvanized sheet. Type 2. Corrugated aluminum pipe conforming to AASHTO M 196, Type I or IA, fabricated from corrugated sheet. Type 3. Bituminous -coated corrugated steel pipe conforming to the requirements of Type 1 and uniformly coated inside and out with a minimum thickness of 0.05 in. of bituminous material meeting the requirements of Table 1 when tested in accordance with ASTM A849, Material Class A or Material Class PA. Table 1 Requirements of Bituminous Material Test Requirements Solubility, %by wt., in trichloroeth lene 99.5 Min Brittleness Pass Flow, in. 0.25 Max Type 4. Bituminous -coated corrugated aluminum pipe conforming to the requirement of Type 2 and uniformly coated inside and out with a minimum thickness of 0.05 in. of bituminous material meeting the requirements of Table 1 when tested in accordance with ASTM A849, Material Class A or Material Class PA. Type 5. Acrylonitrile-butadiene-styrene (ABS) pipe conforming to ASTM D2751, SDR-35. Perforations must meet the requirements of AASHTO M 278. Type 6. Corrugated polyethylene plastic tubing conforming to AASHTO M 252. 2.1.7. Type 7 2.1.8. Corrugated polyvolchloride {PVQ#JiW conforming to ASTM F949. 114 wall P` r0p' onfor g to AASHTO M 278, Class PS 46. 2.1.9. TyNIF P 2.2. Filter Mai gradation free of 4 limestone project. the plans. ;h hard, durable, and clean sand, gravel, crushed stone, or crushed shell meeting the veight specified in Table 2 unless otherwise shown on the plans. Filter material must be ter organic or deleterious matter as determined by Tex-413-A. Do not furnish crushed vn on the plans. Use only one type of filter material for any underdrain system on a 556 Table 2 Percent Retained on Sieve /Tex-401-Al Sieve Size Type A Type B Type C Type D 1-1/2" — — 0-10 3/4" — 0-10 20-40 3/8" — 15-35 — — #4 0-10 35-55 40-60 0-5 #8 0-20 #16 15-50 #20 35-651 35-651 35-651 #30 40-75 #50 75-1001 75-1001 75-1001 70-90 #100 90-100 1. Of the portion finer than No. 4 sieve. Loss by decantation as determined by Tex - sieve or 4% of the material passing a No. 4 underdrains unless otherwise shown on the of perforations. IL Filter Fabric. Meet DMS-6200, " Riprap. Provide con exceed 1 % of the material retained on a No. 4 B or Type C filter material around the lace Type A or Type D filter material within 6 in. CONSTRUCTIP Begin excavation of the tr ch at the outfall and proceed toward its upper end, shown on the plans or � cted. Hold the minimum horizontal limits of exca� dimensions shown in r e 3 or as shown on the plans. Table 3 II)lIIIIIIIIIIIIiiam Horizontal Limits of Excavation for Filler Ma" Depth of Trench Distance Outside Neat Lines of n ains (ft.) 0 to 6 1.00 (!Malmo In 1.50 Ove 2.00 Over 15 Place filter fabric in the bottom ar material, as shown in Figure 1. P perforated pipe in the excavated appropriate couplers if required. Do not use tarpaper strips. Obtaii Place filter material at least 12 in material to displace the pipe. -W -NWW- in areas to be drained before placing pipe or filter f fabric t erlap on top of the filter material. Center he horizontal axis. Join the pipe with Kweiththe manufacturer's recommendations. Icfore placing filter material. the pipe or as shown on the plans. Do not allow filter Lap filter fabric over the top of the filter material after placing pipe and filter material according to the manufacturer's recommendation or as shown on the plans. 2 556 Filter Material �i Filter Fabric CV Trench Figure 1 nstaWation Proce Install non -per ated pipe -sections etween the perforated pipe and the o perforated pipe do not require filter fabric or filter material. Perforations Ls of467 Place approved plugs in the upper ends of all pipe. Cover exposed outfall enlWh 1/2-in. gaTv—anized hardware cloth as directed. Provide Class B concrete riprap, wheUdglialLin MWance with Item 432, "Riprap," and details shown on the plans. Place the riprap to th tour ade of the embankment slope. Cut the pipe to the slope of the riprap. Backfill the remainder of the trench with suitable m 4. MEASUREMENT 5. 6 in. � W This Item will be measured by the foot along the top of the pipe and will include the length of elbows, Y's, T's, and other branches. r _ Inow- PAYMENT If The work performed and materd i cordance with this Item and measured as provided under "Measurement" will be paid forprice bid for "Pipe Underdrains" of the pipe type and size specified. This price is full compeMrj uplers, plugs, screens, filter material, filter fabric, riprap, excavation, backfill, equiperials, tools, and incidentals. Protection methods for excavations deeper than 5 ft. will be measured and paid for in accordance with Item 402, "Trench Excavation Protection." 3 Filters: Adjust filters to refine your analysis of bid item average Use City Filter: Standard Specification costs. `D Code SSG BID ITEM BID ITEM DESCRIPTION UNIT OF Min. Bid Item Max. Bi MEASURE City Qt Bid Item 556-3006 556.6006 APE UN DERDRAINS (TY 6);6') LF 425.0 Actual Let Date Range 3/1/202312 10 00 AM Bidder Rank L— Bidder District all County all Project Classification al Vendors (Select to Exclude) Datc Date 5/15/2OL 3 15 CS PM d Item Avg. Unit Price Min. Unit Price Max.UnitPrice Std. dev. of Unit Median Unit y Price Price 2.622.0 $41.53 $27.00 $50.00 $12.72 $47.90 The bid price for this item proposed by the contractor is higher than the average Unit Price shown in the data because the bid quantity needed for changer order#1 is four (4) times less than the minimum bid quantity of the above data. The bid price proposed by the contractor is directly proportional to the bid quantity. It is typically normal for the bid price to be higher for smaller quantities than for higher quantities. Therefore, the bid price proposed by the contractor for this item 556-6006 is reasonable and justifiable. FORT WORTH. << Back Export Detail Data Collapse All 101585 NW Loop 820 & Marine Creek Pkw. 30100 General Capital Projects 39001 2007 Critical Capital Projects Total Revenue: Bond Program New Capital Project Funds Old Capital Project Funds Total Expenditure: Parameter Value GL0019-07 - Project Budget Summary RunTime: 05/17/2023 01:05 PM $1,000.000.00 $1.000.000.00 $0.00 100.00 $1,196,851.90 $1,196,851.90 $0.00 100.00 $2,196,851.90 $271967851.90 $0.00 100.00 Encumbrance Pro- Encumbrance E Actuals (LTD) Budget Remaining Budget % af Spent $2,080,000.00 $0.00 $445, $996,731.31 $637,311.09 69.36 $1,000,000.00 $0.00 $0.00 $1,000,000.00 0.00 $1,196,851.90 $0.00 $964,897.19 $147,470.02 87.68 $4,276,851.901 $0.00 $530,442.29 $1,961,628.50 $1,784,781.11 58.27 The Budget above is missing future federal Funds of $2.7M and Park Department FID of $232,000.00. For detailed Funding Information, see the next page. The resolution authorizing the execution of an Advance Funding Agreement with TxDOT was already adopted by the City Mayor and Council (M&C-22 0688, Resolution: 5610-09-2022). However, we are still waiting on TxDOT to send the AFA document to execute fully. The Park Fund is not shown in here, because it's from different Bond proposition. << Back FSCM 92 Production Page 1 of 1 -roject Budget Summary Total Project Budge Estimate (CPN101585) Project Phase Planning Level Schematic/Concept Design Level Preliminary Design Level Engineering's OPC Pre -Bid Estimate at Award Phase 1 $ 2,400,000.00 $ 2,400,000.00 $ 2,300,000.00 $ 2,200,000.00 $ 2,200,000.00 Phase 2 $ 3,700,000.00 $ 4,400,000.00 $ 4,400,000.00 $ 4,400,000.00 $ 3,400,000.00 Total $6,100,000.00 $ 6,800,000.00 $ 6,700,000.00 $6,600,000.00 $ 5,600,000.00 Note: Phase 2 is still under preliminary design the construction estimate is assumed to be the same for all future milestone for Phase 2 to estimate the budget Project Funding Summar (CPN101585) Funding Source Amount 2018 Bond Funds $ 1,800,000.00 2007 Critical Capital Projects $ 1,196,851.90 Expected Federal Fund $ 2,700,000.00 Pard Fund $ 232,000.00 30100 General Capital Projects $ 1,000,000.00 Total $ 6,928,851.90 CPN101585-Phase 1 :Construction Estimate at Pre -Bid and at Award Pre Bid Award Difference $ 1,400,000.00 $1,359,871.55 40,128.45 FORT WORTH., Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: Intersection Improvements at 820 and Marine Creek Parkway -Phase 1 — Change Order #1 M&C: N/A CPN: 101585 CSO: 57682 DOC#: 1 Date: 7/12/2021 To: Name Department Initials Date Out 1. Justin Blair McClendon Construction Co., Inc g May 18, 2023 2. Habte Taezaz TPW-signature May 18, 2023 3. Iskal Shrestha TPW - signatureL May 18, 2023 4. Alexandra Ripley TPW- review May 19, 2023 5. Chad Allen TPW - signature May 23, 2023 6. Lissette Acevedo TPW - signature May 23, 2023 7. Michael Owen TPW - signature May 25, 2023 8. Lauren Prieur TPW - signature May 25, 2023 9. Doug Black Legal - signature a)u / May 26, 2023 10. William Johnson CMO - signature May 27, 2023 11. Jannette Goodall CSO - signature May 30, 2023 12. TPW Contracts TPW DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: ❑YES ®No ROUTING TO CSO SAME DAY: ❑YES ®No ®YES ❑No Action Required: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File NEXT DAY: ❑YES ❑No ❑ Attach Signature, Initial and Notary Tabs Return To: TPWContracts(cr�,FortWorthTexas.gov at ext. 7233 for pick up when completed. Thank you! OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX