HomeMy WebLinkAboutContract 48662-A4CSC No. 48662-A4
AMENDMENT No . 4
TO CITY SECRETARY CONTRACT No. 48662
WHEREAS, the City of Fort Worth (CITY) and Peloton Land Solutions,
Inc., (ENGINEER) made and entered into City Secretary Contract No. 48662,
(the CONTRACT) which was authorized by M&C C-28092 on the 29th day of August,
2017, in the amount of $685,178; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in
the amount of $358,411 which was authorized by M&C #20-0433 on June 2,
2020,Amendment number 2 in the amount of $55,881.51 which was
administratively authorized on January 29,2022, Amendment Number 3 in the
amount of $95,370.33 which was approved by M&C 22-1039;and
WHEREAS, the CONTRACT involves engineering services for the following
project:
North Riverside Drive from Shiver Road to North Tarrant Parkway,
CPN 100453; and
WHEREAS, it has become necessary to execute Amendment No. 4 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $27,617.44. (See Attached Funding Breakdown Sheet, Page
-4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
City of Fort Worth, Texas North Riverside Dr (Shiver Rd to N Tarrant
Prof Services Agreement Amendment Template Pkwy) CPN 100453
Revision Date: November 23, 2021
Page 1 of 5
work and services shall be an amount of $1,222,458.28.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as
designated Assistant City Manager.
APPROVED:
City of Fort Worth
William Johnson (M 30,202313:57 CDT)
William Johnson
Assistant City Manager
DATE: May 30, 2023
APPROVAL RECOMMENDED:
of the date subscribed by the City's
Peloton Land Solutions, Inc.
Brian Haynes, PE
Vice President
DATE: May 19, 2023
Lauren Prieu r (May 30, 2023 08:18 CDT)
Lauren Prieur
Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Bradley M Radovich, PE
Senior Project Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas North Riverside Dr (Shiver Rd to N Tarrant
Prof Services Agreement Amendment Template Pkwy) CPN 100453
Revision Date: November 23, 2021
Page 2 of 5
APPROVED AS TO FORM AND LEGALITY:
l
D Black (May 30, 202312:18 CDT)
Douglas W. Black
Sr. Assistant City Attorney
ATTEST:
Jannette Goodall
City Secretary
a-
IFOR
yLLs o0�J�,�11
^6 O^�Y
!`O {
VO
O G Q —
�° ° *�
� _ O°°°o0° ,cr
M&C: N/A
Date: N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas North Riverside Dr (Shiver Rd to N Tarrant
Prof Services Agreement Amendment Template Pkwy) CPN 100453
Revision Date: November 23, 2021
Page 3 of 5
FUNDING BREAKDOWN SHEET
City Secretary No.48662
Amendment No. 4
Department I Fund -Account -Center
Amount
TPW 1 30104-0200431-5330500-100453-002330 1 $27, 617.44 1
Total:
$27,617.44
City of Fort Worth, Texas North Riverside Dr (Shiver Rd to N Tarrant
Prof Services Agreement Amendment Template Pkwy) CPN 100453
Revision Date: November 23, 2021
Page 5 of 5
ATTACHMENT "A"
Scope for Engineering Design Related Services for Street Improvements
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define
the work to be performed and address the needs of the Project.
OBJECTIVE
Revise the Construction Documents to provide final design documents and construction
administration support to provide a hooded left turn lane revision for the proposed new left
turn lane from N Riverside Dr into the Assisted Living facility approximately 600 feet north
of the intersection with N. Tarrant Parkway as requested by constituent and agreed to by
the City. Additionally, provide additional Construction Phase Services to support
construction of the project.
WORK TO BE PERFORMED
Tac�DesigR MaRagemeii
Trask 7 !`r, rinop4uaI rlocinri
TT6; k 2— RFR-limiRar"y Der,rgr;
Task 4. Final Design
Tack F.. Bid Phase SeNiGes
�v
Task 6. Construction Phase Services
n;r,k 7 DQ=F=;;comRAt C'oPiinoc
Tack 8S uNey girl S bs Ffa% Utility ERgiRee FiRg S., vinoc
;;;r,k 9 Perm ittop
T;;cL U) Dl;;p ;;Ad Q, -hmi44;;1 rhRrk10c4c
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 07.23.2012
Page 1 of 24
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 02.06.2015
Page 2 of 24
effr.r+s. to ebtaiR peki. ept ipfe-Hm..,+ie—p to -and OR rMe-e—rd-OR-AtieR of the p e d
PIFE�e..+ CAIL'IhICCDyVill 8I68i.d..r.+ify aR d seek +.-..- btaiR data fGF a -fir...
e
ra,.,�Qs�y Master mRs epeFty eWRership-as a ;��the—�a�
4cccccnr's nffirc
The data r..,lleGtOE)H r.ffr.r+c. yynii H dUGtOHg Gpep..Oal .,r.dinatieH
S8W8r rTr8-rvatFFt riq Ylane.
City of Fort Worth, Texas ' North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 02.06.2015
Page 3 of 24
_.
■_
■1 M W=Tiv
NO
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 02.06.2015
Page 4 of 24
■ - ■ -
■
BOM
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 02.06.2015
Page 5 of 24
ii�rsr_ s�n:� merit r■-YA-1 Mi
■
■_
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 02.06.2015
Page 6 of 24
ii�•P-M iilMfli+.r-,Efl 9 MET!
o
a■..,,e.:�,� e��..: ..J:..e.e
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 02.06.2015
Page 7 of 24
All sterrem water rnlni,Intiens nerd rdesip shall wafer m to the
s,,rrent CITY iCM4
G.Wpari' 44an,,n1 fer Site Dey ept ;;arm-vrnivtrir-tipp.
design.
p"•
cote size
be delivered fer the Lino
plans will
1 sets of snerifir AtiPns IM011 he delivered fer the 601/
rdesip.
0
nreiest fel,der in C21M 360
All s,,hmitte.d .des,,ments shesLGsts ..ill he , nlea deal
to the designated
used. h ENGINEER
and
st folder OR BIM 360
Thg_- CITITY''s freRt rd aR d to ni l sne�i��ns will he
F-Fi ei�-urrcTrc�rrr�rvpc T rr�-wTrrr�av
shells nlement the teshniGal s sifieatiens if needed
��
bythe CITY of the Dreliminnni necip nlnns
!"`e..teehRis..l r ..rt r sl.. r. e.d .,rt ..f
s Rtr..st by Alpha
a GFigiRal
he ,,send fer design reremmenrdatienc
Testing dated May 73, 2018 Q
will
A. Drelimipal: nesir.n rdr.�. 'Rgs aR d s sifiGatiens
. e
C2 Dreliminany OSVV A ('heAklist
G. Utility Gle-Ar.,n,.,, drawings
D. GeeteGhnieal Report
E. Estimates of r. ehahle s str,.stie., s st
C P, uhli.. 1NAeet0r... e..hihits
TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS
(100 PERCENT).
fe11Ems
ia
vpeGi{{iGa}ens shall be submitted
te CITY per the app`eved PrejeGt SGhed 'me.
114
AM
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 02.06.2015
Page 8 of 24
.. � .. � 21
4.5 PREPARE CONSTRUCTION PLANS FOR HOODED LEFT TURN LANE DESIGN
SERVICES
• Revise Paving Plans, Grading Plans, Signage & Pavement Markings, Cross
Sections, Traffic Control, and Street Light Plans on North Riverside Drive from STA
38+00 +/- to STA 41+00 +/- to incorporate the hooded left turn lane into the project.
QA/QC of TCP Plans
• Revise Quantities
ASSUMPTIONS
raw-%!:L'1I
10T7.F-9 97 .EMM _ . •
■ .•� ■_
■
• A DWG file for the 100 % Design will be created from design CAD drawings and will be
uploaded to the project folder in BIM 360.
,
e"
DELIVERABLES
A. 901% censtruc}inn glans and cnecific s.
[Z Cir,�l iC\A/AA ('`her.LGe-+
G. D/ 100constructie�n plans and specifieat.enc
G.
g,,aniiticc ,icing the GITV's standard bid items and format
E. igiRal �e mylaF for h sigRatyFes f aythorizorl (-'ITV offir.i �Ic
��y'I�,i�r�v�r�rr�rurrvrtti't.��urarc�-v,"c�umvrrcca
F. Revised 100% Traffic Control Plans. The submittal will include:
a. Sheets associated with Hooded Left Turn Lane (PDF)
b. Quantity Summary Sheet (PDF)
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 02.06.2015
Page 9 of 24
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 02.06.2015
Page 10 of 24
"
" wheFe
"
" is the
ass+gRed file RUmbeF ebtein
^'�the CITY, "_erg"
desigRatiegthe
file i-,,
of GIn eF,ig,iRal
" 47»
shall hot�t$t�l�„her
of�l sheets
On
this„ilo
p.IaR�set,
11 Water- and Qe4A;er�+le-eaeee
-
at ple "X
366 fi ..Fg36.pdf
" wheFe
"X
'2GGG7» +he
�FS�rr�&6S+gr,e��„wee,;,,�er
file h h
htaoned
f �Y,.
frAm
+he TV
the GIT
��
�'
d86igRatificg fill-B OraR
shoots in +his 4-
"36"
thp- tetal A.-Hn"r"'rtce
,
engn al PIGInrset,
Shaw -he
of
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 02.06.2015
Page 11 of 24
TASK 6. CONSTRUCTION PHASE SERVICES.
ENGINEER will support the construction phase of the project as follows.
6.1 Construction Support
• The ENGINEER shall visit the project site at requested intervals as construction
proceeds to observe and report on progress.
The ENGINEER shall review shop drawings, samples and other submittals
submitted by the contractor for general conformance with the design concepts and
general compliance with the requirements of the contract for construction. Such
review shall not relieve the Contractor from its responsibility for performance in
accordance with the contract for construction, nor is such review a guarantee that
the work covered by the shop drawings, samples and submittals is free of errors,
inconsistencies or omissions. The ENGINEER shall log and track all shop
drawings, samples and other submittals in BIM 360.
• As requested by the CITY, the ENGINEER shall provide necessary interpretations
and clarifications of contract documents, review change orders, and make
recommendations as to the acceptability of the work.
• The ENGINEER shall attend the "Final' project walk through and assist with
preparation of final punch list.
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 02.06.2015
Page 12 of 24
1 T17\A/ file name to
,. r, T.—�.r-�,�e�c—W=,�a��,�r—v�e��W=,tea
" !956 A7 df"
" �IA56"
is the
6166f(g;@d file HlzlFBb8F
the GI�I �_
' d8sigiciatiRg
the f l- i
of an original plan "
7
hallllbethe tet
berms n�Tco4�this
file.
set,
'2GCC7» the file h h frpp-, the TV '� »
vvvvr—�S�rr��SSfC,�; �r,��lmvel"�rstx�ii=r �� r�A%
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 02.06.2015
Page 13 of 24
E186igRa I r.f aR I IGI " » hall he the h f
cn.�Jr,zrt+R�t�FO�;rEI��,--crr,--vr';g;,icn-p.rn-raE.'t, ��,�crm-r�c-rrr�t9t �E.4'�r
Shoo+- ir, this file
ASSUMPTIONS
0 MORthly Site visits a assurned.
0s ihmittol re�iieleis ore ossi ime4.
RFI S ore ossumerl
3 GhaHge Qrrlers ore assumed
rcA . � �Dhlis m ih etmRg exhit-
B. Response to Contractor's Request for Information
C. Review of Change Orders
D. Review of shop drawings
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 02.06.2015
Page 14 of 24
Existing ROW is sufficient for proposed improvements.
NOTE: SUE SERVICES FOR THE NRD/NTP INTERSECTION ARE BEING PROVIDED
WITH "UNIT 1 ", WHICH IS THAT PORTION OF NRD FROM SHIVER ROAD TO A POINT
APPROXIMATELY 600' NORTH OF THE NTP INTERSECTION (STATION 42+00).
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 02.06.2015
Page 15 of 24
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 02.06.2015
Page 16 of 24
HE
.a
:
goarM
NO A-00"M IMMUNE
MM
Based a aH iHteFpFetati9H E)f data, a* the OR dir.-,+iEws Af --+ili+ier PH the g R d
r,iderChip fA��� .
m�rLirin of lines
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 02.06.2015
Page 17 of 24
edges of m,il4i_rnnrti ,if systems
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 02.06.2015
Page 18 of 24
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 02.06.2015
Page 19 of 24
�r"M r...w= 0 M M-M -I
-
is it is that
few be kReeked
above Hot exeeeded. expeeted
a stakes will E)yt
.0GIRYasepFejeE;,
p AN
uC-Ivorfy-vncrhP- FeSpvra''hrle ��II field-C�vrcmipatFerrf4iI cvC�ireFtatierT
Hellbldi!Rg fi8ld HEAeG, eU+ 6IR&„F fill r„A86 gFad„G "aG Staked" 04OFF ,atiGr et -
shall be r ,,,,red- to the GI��IT-iRspeEtar—aped shl a he le� d �i b"
a.,seaT � ead
s upyeyEw lironsed OR the State of Texas
b. The ChI('_IhIFEER's S FyeyE)F shall atte d the ., o_ IRStIFU 640GIR GE)RfeFeRGo
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 02.06.2015
Page 20 of 24
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 02.06.2015
Page 21 of 24
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 02.06.2015
Page 22 of 24
ii� u���.»rsr.�.ivin��3rri���.�.�.iv.T.�i�rr�■� rrirr��r��3r�CV!�ir.�r►I/�r/3�7i���1■
• ��IM
M
19—M
Tpa##Is
/SU PI
�%1
'StOFML
\AI 4..r
6@4
� Rim
�g
�°%
E
t;flo/ 1
C
!C„1vybmit All
��Q7
RtFA1
494
T-rR#ie
Q-ARtFel
494
T-rA##is
Q-ARttrAI
Otl'YO
RQW
dttCC't
X
X
X
X
X
14/.,44F CRww..-
X
X
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 02.06.2015
Page 23 of 24
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment A CPN 100453
PMO Release Date: 02.06.2015
Page 24 of 24
ATTACHMENT B
COMPENSATION
Design Services for
North Riverside Drive - Shiver Road to North Tarrant Parkway
City Project No. 100453
Time and Materials with Rate Schedule Project
I. Compensation
A. The ENGINEER shall be compensated for personnel time, non -labor expenses,
and subcontract expenses in performing services for enumerated in Attachment
A up to $27,617.44 unless amended.
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Category Rate for the ENGINEER's team member performing the work and
includes all direct salaries, overhead, and profit.
Labor Category Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries,
overhead, and profit.
Labor Category
2022 Rate
$/hour
2023 Rate
$/hour
Principal
265.00
275.00
Project Manager
225.00
230.00
Senior Engineer
180.00
190.00
Project Engineer
160.00
170.00
Junior Engineer / EIT
130.00
135.00
CAD Technician
110.00
115.00
QA/QC Support
125.00
130.00
Administrative Support
95.00
100.00
Sr. Survey RPLS
250.00
260.00
Survey RPLS
150.00
160.00
Sr. Survey Technician
145.00
155.00
Party Chief
130.00
140.00
Survey Technician
110.00
120.00
CADD Technician
110.00
120.00
Instrument Man
85.00
100.00
Administrative
90.00
100.00
Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non -labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 1 of 4
North Riverside Dr. Shiver to N Tarrant
CPN 100453
ATTACHMENT B
COMPENSATION
iii. Subcontract Expenses. Subcontract expenses and outside services shall be
reimbursed at cost to ENGINEER plus a markup of five percent (5%).
iv. Budgets. ENGINEER will make reasonable efforts to complete the work within
the budget and will keep the City informed of progress toward that end so that
the budget or work effort can be adjusted if found necessary.
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may
be adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services, that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded,
whether by change in scope of the project, increased costs or other conditions,
the ENGINEER shall immediately report such fact to the City and, if so instructed
by the City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended
prior to such increase will be allowable to the same extent as if such costs had
been incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER
in performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
City of Fort Worth, Texas North Riverside Dr. Shiver to N Tarrant
Attachment B CPN 100453
PMO Official Release Date: 8.09.2012
Page 2 of 4
B-2
ATTACHMENT B
COMPENSATION
IV. Summary of Task Order No. 2
Firm Primary Responsibility
Fee Amount
%
Prime Consultant
Peloton Land Solutions,
Inc.
Surveying, Roadway Design,
Project Management,
Construction Admin Support,
and Sub Markup
$25,867.44
93.66%
Proposed MBE/SBE Sub -Consultants
Non-MBE/SBE Consultants
Baird, Hampton, Brown
Street Lighting
$1,750.00
6.34%
TOTAL
$27,617.44
100%
Project Number & Name
Total Fee
MBE/SBE Fee
MBE/SBE
100453 N. Riverside Drive —
$27,617.44
0
0%
Shiver Rd to N. Tarrant Pkw .
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 3 of 4
North Riverside Dr. Shiver to N Tarrant
CPN 100453
FIM
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across desired work types and work phases. See following two pages for
sample invoice.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 4 of 4
North Riverside Dr. Shiver to N Tarrant
CPN 100453
Professional Services Payment Request Project Manager: Bradley Radovich P E
Project: NORTH RIVERSIDE DRIVE - PHASE 4
City Project #: 100453
City Sec Number:
Company Name: Peloton Land Soutions, Inc
Consultant's PM: Denny Peters, PE
Vendor Invoice #: TEMPLATE
Payment Request #:
From Date:
To Date:
Invoice Date:
Consultant Instructions:
Summary
Fill in green cells including Invoice Number, From and To Dates and the included worksheets.
When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Project's folder.
email: denny peters@pelotonland corn
Office Address 9800 Hillwood Pkwy, , Suite 250 Fort Worth, TX 76177
Telephone: (817) 562-3350
Fax: (no fax)
Remit Address'.
Agreement Amendment
Sheet FAC and Work Type Description Amount Amount
Agreement
Amount to
Date
Amount
Spent
Percent
Spent
($) Invoiced
Previously
Current
Invoice
Remaining
Balance
Work Type 1
30104 0200431 5330500 100453 CO2330
Work Type 2
30104 0200431 5330500 100453 CO2380
Work Type 3
Work Type 4
Work Type 5
Work Type 6
Totals This Payment Request
Overall Percentage Spent:
Peloton Land Soutlons, Inc.
9800 Hlllwood Pkwy., Suite 250
Fort Worth, TX 76177
CFW Project Manager Bradley Radovich P.E
Consultant's Project Manager: Denny Peters, PE
Consultant's email: dennV.Detersp_nelotonland.Com
Name of Project: NORTH RIVERSIDE DRIVE - PHASE 4
Lnhnr Cnteanry Name
Invoice
TEMPLATE
Consultant Project No.
Proj. Invoice No.
Invoice date:
Period From Date
To Date
City Secretary Contract #:
P.O. Number:
Hmrrs Rate (Whirl
Principal
Travis Clegg, PE
225.00
Project Manager
Denny Peters, PE
190.00
Senior Engineer
Tim Whitefield, PE
150.00
Engineer
Casey Stevenson, PE
135.00
Junior Engineer lEIT
Jesse Childers, EIT
110.00
CAD Technician
Tony Carcamo
95.00
QAIQC
Sue Kgowski, PE
100.00
Adminstrative Support
75.00
Amount
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total Labor 0.0
Subcontract Service
Burns & McDonnell
Baird, Ham ton & Bravn, Inc.
Hayden Consultants, Inc
Alpha Testing, Inc.
Barrier Free Texas, LLC
Subcontractor Subtotal $0.00
10 Percent Markup on Subcontract Services $0.00
Nonlabor Expenses
Indirect
Nonlabor Expense Subtotal $0.00
Total Expenses (Subcontract Services+Markup+Nonlabor Expenses)
$0.00
$0.00
TOTAL DUE THIS INVOICE $0.00
Exhibit B-2
Task Order No. 2
Level of Effort Spreadsheet
TASKMOUR BREAKDOWN
Design Services for
North Riverside Drive - Shiver to N Tarrant (Amendment #4)
City Project No. 100453
Task No.I Task Description Principal Sr. RPLS I Project I Seen^ it Preoj^ ct I Sr -Su rvey I Party EIT Survey I CADD I Administrative I Total Labor I Subconsultants I Total Expense Task Sub Total
Manager Engineer Engineer Techmcian Chief Technician Tech Cost Travel Reproduction Cost
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date 8.09.2012 North Riverside Dr. Shiver to N Tarrant
CPN 100453
1 of 4
Exhibit B-2
Task Order No. 2
Level of Effort Spreadsheet
TASKMOUR BREAKDOWN
Design Services for
North Riverside Drive - Shiver to N Tarrant (Amendment #4)
City Project No. 100453
Task No.I Task Description Principal Sr. RPLS I Project I Seen^ it Preoj^ ct I Sr -Su rvey I Party EIT Survey I CADD I Administrative I Total Labor I Subconsultants I Total Expense Task Sub Total
Manager Engineer Engineer Techmcian Chief Technician Tech Cost Travel Reproduction Cost
3.2
4.1 iSpecifications
Fina Oran (90%) and Final (100%)
4.2 Landscape Plans and Specifications
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date 8.09.2012 North Riverside Dr. Shiver to N Tarrant
CPN 100453
2 of4
Exhibit B-2
Task Order No. 2
Level of Effort Spreadsheet
TASKMOUR BREAKDOWN
Design Services for
North Riverside Drive - Shiver to N Tarrant (Amendment #4)
City Project No. 100453
Task No.I Task Description Principal Sr. RPLS I Project I Seen^ it Preoj^ ct I Sr -Su rvey I Party EIT Survey I CADD I Administrative I Total Labor I Subconsultants I Total Expense Task Sub Total
Manager Engineer Engineer Technician Chief Technician Tech Cost Travel Reproduction Cost
5.1.1 1 Plan Holders List
Tabulate Bids and Recommend Award
Issue Conformed Contract Documents
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date 8.09.2012 North Riverside Dr. Shiver to N Tarrant
CPN 100453
3 of
Exhibit B-2
Task Order No. 2
Level of Effort Spreadsheet
TASKMOUR BREAKDOWN
Design Services for
North Riverside Drive - Shiver to N Tarrant (Amendment #4)
City Project No. 100453
Task
®®®®®®®®®®®Submittal
Project Summary
Total Hours
156.00
Total Labor
25,780.00
Total Expense
1,750.00
MBE/SBE Subconsukant
0.00
Non-MBE/SBE Sub—itltant
1,750.00
5% Sub Markup
87.44
MBE/SBE Participation
0.00
Amendment Sub Total
27,617.44
TotalAmendment Cost
S27,617.44
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date 8.09.2012 North Riverside Dr. Shiver to N Tarrant
CPN 100453
4 of4
ATTACHMENT "C"
CHANGES AND AMENDMENTS TO STANDARD AGREEMENT
Design Services for
N. Riverside Dr., Shiver Rd to Tarrant Pkwy
City Project No. 100453
No changes to the Standard Agreement
City of Fort Worth, Texas
Attachment C
PMO Release Date: 05.19.2010
Page I of I
FORT WORTH
ATTACHMENT "D"
PROJECT SCHEDULE
A. ENGINEER Project Schedule Development
ENGINEER shall prepare a project schedule for the services to be provided in fulfilling
the requirements of the Agreement and encompassing the Scope of Work defined in
Attachment A to the Agreement.
ENGINEER shall prepare and maintain project schedule throughout the life of the project
as defined in the Agreement in compliance with the City's Specification 00 31 15 entitled
Engineer Project Schedule.
ENGINEER's project schedule will follow the Critical Path Methodology (CPM) for
planned sequencing of the work activity and timing of the work.
B. Schedule "Tier" Selection
City has identified three "Tier" levels for project schedules as defined in City's
Specification 00 31 15, to align with the size and complexity of the project as a basis for
schedule development. City's Project Manager will determine the "Tier" level for the
ENGINEER's project schedule as part of the negotiation of the Agreement.
C. Project Baseline Schedule
ENGINEER will produce an initial project schedule and submit as a "baseline" for review
and acceptance by City's Project Manager as defined in City's Specification 00 31 15
which will be referred to as the Project Baseline Schedule. Updates to the baseline
schedule follow the requirements of City's Specification 00 31 15.
D. Project Progress Schedule
ENGINEER will provide to the City, monthly updates to their project schedule indicating
progress of the Work in compliance with the requirements of City's Specification 00 31
15 and said schedule will be referred to as the Project Progress Schedule.
E. Master Project Schedule
City will develop and maintain a master project schedule for the overall project.
ENGINEER's project baseline and progress schedule submittals will be an integral part
of the development and updating process of City's Master Project Schedule.
City of Fart Worth, Texas
Attachment D
Revision Date: 07.20.2018
Page 1 of 1
Printed: Sun 4/16/23 North Riverside Drive Improvements - Unit I and Unit II Construction Plans is P E LOTO N
(Shiver Rd. to N. Tarrant PkWy.) jell �.,,o so�u,o ns
Project:100453
ID
1
Task Name
Design
(Duration (Start (Finish
220 days? Mon 6/8/20 Fri 3/26/21
June (July I August' Septen Octobe
B M E 6 M E B M E B M E B
Noveml DecemHanuaN Februa March Apfil May June July August Septe Octobe Novem Decem Janua Febru March A fil May June July August 5epte Octobe Novem Decem Janua Febfu March A
M E 6 M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B
fil May Jun
M E B M E B I
2
Unit I -100%Final Design
50 days?
Mon 6/8/20 Fri 8/14/20
�1
3
Additional Topo Survey
5days
Mon 5/8/20 Fri 6/12/20
4
SUE Survey
15 days
Mon 6/8/20 Fri 6/26/20
5
Final Roadway Construction Plans
21 days
Mon 5/8/20 Mon 7/6/20
6
Final Contract Specs. And Estimate
4 days
Toe 7/7/20 Fri 7/10/20
ir
7
Submit Final P.S. & E Docs.
30 days
Mon 7/13/20 Fri 7/24/20
8
City Review and Comment
7 days
Mon 7/27/20 Tue 8/4/20
9
Address City Comments
7 days
Wed 8/5/20 Thu 8/13/20
10
Final Design Complete
1 day?
Fri 8/14/20 Fri 8/14/20
11
Unit 11- 30% Design Schematic
28 days
Tue 7/7/20 Thu 8/13/20
r1
12
30%Intersection Schematic and OPC
21 days
Tue 7/7/20 Tue 8/4/20
IMOM
13
Address City Comments
7 days
Wed 8/5/20 Thu 8/13/20
14
51 days
Fri 8/14/20 Mon 8/24/20
15
Unit 11- 30%Full Plan Set
1 day?
Tue 8/25/20 Tue 8/25/20
16
30%Traffic Control Plans
21 days
Tue 8/25/20 Tue 9/22/20
17
30%Signal Design
21 days
Tue 8/25/20 Tue 9/22/20
18
30%Cost Estimate
10 days
Wed 9/23/20 Tue 10/5/20
19
Prepare Concept Design Report
4 days
Wed 10/7/20 Mon 10/12/20
20
Submit Conceptual Plans
1 day
Tue 10/13/2OTue 10/13/20
21
City Review and Comment
30 days
Wed 10/14/2�Tue 10/27/20
22
Review/Incorporate City Comments
5days
Wed 10/28/2�Tue 11/3/20
23
Unit 11- 90% Design
60 days
Mon 11/23/2 Fri 2/12/21
24
90%Intersection Plans
31 days
Fri 12/11/20 Fri 1/22/21
25
90% Traffic Control Plans
31 days
Fri 12/11/20 Fri 1/22/21
90%Signal Design
31 days
Fri 12/11/20 Fri 1/22/21
12826
27
Submitt 90% Plans
0 days
Fri 1/22/22 Fri 1/22/22
1/22
City Review and Comment
30 days
Mon 1/25/21 Fri 2/5/21
Task Summary External Milestone o Inactive Summary Ii F Manual Summary Rollup Finish -only 3 Manual Progress
Project: COFW NRD Phase 4 Proje
Date:Sun4/I6/23 Split ���.��. ��������........... Project Summary f�1 Inactive Task Manual Task Manual Summary r Deadline
Milestone ♦ External Tasks Inactive Milestone Duration -only 9i Start -only C Progress
Qm
Printed: Sun 4/16/23 North Riverside Drive Improvements - Unit I and Unit II Construction Plans is P E LOTO N
(Shiver Rd. to N. Tarrant Pkwy.)
Project:100453
Task Name
(Duration
(Stan Rnish
29
Unit II 200% Design
35 days
Mon 2/8/21 Fri 3/26/21
30
Unit II 100% Design
15 days
Mon 2/8/21 Fri 2/26/21
31
City Review and Comment
30 days
Mon 3/1/21 Fri 3/12/21
32 Address City Comments
30 days
Mon 3/15/21 Fri 3/26/21
33 Construction Support
690 days
Thu 10/8/20 Wed 5/31/23
34
Construction Bidding Unit I and Unit II 690 days
Thu 10/8/20 Wed 5/31/23
35
Advertisement Period
30 days
Thu 10/8/20 Wed 10/21/2(
36
19ay
PIG. a,TT20.,.o.-a,��
37
Provide Bidding Assistance & Addenda28
days
Thu 10/8/20 Mon 31/16/2(
38
Mandatory Prebid Meeting
1 day
Tue 11/17/20Tue 12/27/20
39
Bid Opening Meeting
Iday
Thu 11/19/20Thu 11/19/20
46
Tabulate Bids
2 days
Fri 11/20/20 Mon 11/23/2(
41
Issue Conformed Contract Documents
1 day
Fri 1/22/21 Fri 1/22/21
42
Award Project
1 day
Wed 3/17/21 Wed 3/17/21
43
NTP
1 day
Mon 7/26/21 Mon 7/26/21
44
Construction
345 days
Thu 2/3/22 Wed 5/31/23
11 Octobe Novem Decem Januar}�Februa March Apfil May (June July (August Septe Octobe Novem Decem Janua I
BM E BM E BM E BM E BME BM E BME BM E BME BM E BIM E BME BIM E BIMIEIBDZE BM' 1
t-1
Task � Summary �1 External Milestone O Inactive Summary Manual Summary Rollup Finish -only ] Manual Progress
.......,
Project COFW NRD Phase Proje Split Project Summary �� Inactive Task Manual Task Manual5ummary �� Deadline 8
Date: Sun 4/I6/23
Milestone ♦ External Tasks Inactive Milestone Duration -only A-_ Start -only C Progress
iETi2
Rd
PROJECT
LOCATION
Blue Mound
Fort Worth
Meacham
International
Ai,pn
Haltom City
PROJECT VICINITY MAP
Attachment E
r
"IT, f
0 SHIVER RD
WE
no
Lu 0)
g5 LZLI
XZ
LU 0
Q
C)
Z:0
F-0
W X:
0 W
Z 5
LU 00
::)LU
LL Z-
LIMITS OF PROPOSED NORTH
TARRANT PKWY IMPROVEMENTS
VIP'.
7'
Pp
Mz
uj
OLU
Z>
0 0
UJW
cn CL
02
0--
0 LU
n ry
mt'- IZ�
LLO
Oui
ui
.4
/vO&
(COAO,ZIN
clgt /v7-
C OA�P,Kvvy
100453-EPAM-Design Amend #4 Peloton Land
Solutions, N Riverside Drive Shiver Road to N.
Tarrant Parkway
Final Audit Report
Created:
2023-05-19
By:
Andrea Munoz (Andrea. M unoz@fortworthtexas.gov)
Status:
Canceled / Declined
Transaction ID:
CBJCHBCAABAAuXoc9QBcvo5PKLCTYdmXyev4-jeE9Wr0
2023-05-23
"100453-EPAM-Design Amend #4 Peloton Land Solutions, N Ri
verside Drive Shiver Road to N. Tarrant Parkway" History
Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2023-05-19 - 4:25:32 PM GMT- IP address: 204.10.90.100
Document emailed to jaylyn.harrelson@fortworthtexas.gov for filling
2023-05-19 - 4:38:03 PM GMT
Document emailed to Brian Haynes (brian.haynes@pelotonland.com) for signature
2023-05-19 - 4:38:03 PM GMT
Document emailed to Bradley.Radovich@fortworthtexas.gov for signature
2023-05-19 - 4:38:03 PM GMT
Email viewed by jaylyn.harrelson@fortworthtexas.gov
2023-05-19 - 4:40:11 PM GMT- IP address: 204.10.90.100
Email viewed by Bradley.Radovich@fortworthtexas.gov
2023-05-19 - 4:46:49 PM GMT- IP address: 108.247.245.135
&0 Signer Bradley.Radovich@fortworthtexas.gov entered name at signing as Bradley M Radovich
2023-05-19 - 4:47:32 PM GMT- IP address: 108.247.245.135
Document e-signed by Bradley M Radovich (Bradley.Radovich@fortworthtexas.gov)
Signature Date: 2023-05-19 - 4:47:34 PM GMT - Time Source: server- IP address: 108.247.245.135
Email viewed by Brian Haynes (brian.haynes@pelotonland.com)
2023-05-19 - 5:01:22 PM GMT- IP address: 107.213.254.1
FORTW❑RTH, PO`4 ev
Adobe
Acrobat Sign
Document e-signed by Brian Haynes (brian.haynes@pelotonland.com)
Signature Date: 2023-05-19 - 5:02:13 PM GMT - Time Source: server- IP address: 107.213.254.1
dp Signer jaylyn.harrelson@fortworthtexas.gov entered name at signing as Jaylyn Harrelson
2023-05-19 - 6:23:07 PM GMT- IP address: 204.10.90.100
&0 Form filled by Jaylyn Harrelson Qaylyn.harrelson@fortworthtexas.gov)
Form filling Date: 2023-05-19 - 6:23:09 PM GMT - Time Source: server- IP address: 204.10.90.100
C� Document emailed to Raul.LopezRoura@fortworthtexas.gov for filling
2023-05-19 - 6:23:11 PM GMT
Email viewed by Raul.LopezRoura@fortworthtexas.gov
2023-05-19 - 7:11:14 PM GMT- IP address: 204.10.90.100
Email viewed by Raul.LopezRoura@fortworthtexas.gov
2023-05-22 - 1:18:42 PM GMT- IP address: 166.205.58.6
Document canceled by Andrea Munoz (Andrea. M unoz@fortworthtexas.gov)
2023-05-23 - 6:30:47 PM GMT- IP address: 204.10.90.100
FORTW❑RTH, P0`4 ev
Adobe
Acrobat Sign
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE• Design Amend #4 Peloton Land Solutions, N Riverside Drive
M&C:
Shiver Road to N. Tarrant Parkway
CPN: 100453 CSO:
DOC#:
Date:
To:
Name
Department
Initials
Date Out
1.
Jaylyn Harrelson
TPW - initial
May 19, 2023
2
Brian.haynes@pelotonlansolutio
ns.com
Consultant VP -
Signature
LL
5j J ,
BH
May 19 2023
3.
Bradley Radovich
TPW - Signature
9MRBMR
May 19, 2023
4.
Raul Lopez
TPW -initial
cz
May 24, 2023
5.
Lissette Acevedo
TPW -initial
May 24, 2023
6.
TPW AD (Interim: Michael Owen)
TPW - initial
o
May 30, 2023
7.
Lauren Prieur
TPW - signature
P
May 30, 2023
8.
Doug Black
Legal - signature
wb
May 30, 2023
9.
William Johnson
CMO - signature
May 30, 2023
10.
Jannette Goodall
CSO - signatureJSG
TSG
May 30, 2023
11.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any
and all City Departments requesting City Manager's signature for approval MUST BE ROUTED
TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip,
David will review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No
ROUTING TO CSO
SAME DAY: []YES ❑No
®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
NEXT DAY: ❑YES ❑No
❑ Attach Signature, Initial and Notary Tabs
Updated 03.29.2023 mdhm
Return To: TPWContracts(kFortWorthTexas. oovv at ext. 7233 or 8363, for pickup when
completed. Thank you!