HomeMy WebLinkAboutContract 50627-CO4CSC No. 50627-CO4 FORT' WoR'TH City of Fort Worth —""W"`` Change Order Request Project Name: Northslde II 30-Inch Water Transmission Main Clly Sec No,: 60627 Project No.(s):1 590106004301001400 f DOE No, .) N/A Clty Prcj. No,:1 100261 Project Description: The Installation of a 30-Inch Water Transmission Main alon SH170 from North Beach to US377 Contractor[ William J. Schullz, Inc, dba Circle C Construction Co. I Change Order It 4 Dale L 10/l/2020 City Project Mgr. John Kasavlch City Inspector: Paul Gleger Phone Number817-392-8480 Phone Number] 817-392.8371 Dept, Water Phase I Water Phase it Totals Contract Time (Calender days) Original Contract Amount $2,122,350,00 $3,787,905.00 $5,910,255.00 350 Extras to Dale $221.375.00 $221,375.00 02,20 Credits to Date -0.20 -0.20 Pending Change Orders (In M&C Process) Contract Cost to Date $2,122 350.00 $4 009 279.80 $6.131.629.80 570 JAmotrnt of Proposed Change Order $G,00 6U60.00 g8.390.00 120 Revised Contract Amount $2,122,350.00 $4,097,669.80 $6 220,019 80 690 Original Funds Available for Change Orders $177,308.00 J177,308.00 Remaining Funds Available for this CO Additional Funding (If necessary) $88,390.00 $88,390.00 CHANGE ORDERS to DATE (INCLUDING THiS ONE) AS % OF ORIGINAL CONTRACT 5,43% MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $7,387,818.75 JUSTIFICATION (REASONS) 'ROR (HANGErQ D R. Subsequent to beginning of construction, Union Pacific Railroad and RailPros Field Services required full time on - site railroad flagmen during construction of the project water main at the Westport Parkway/Union Pacific Railroad crossing. Staff recommends the approval of 120 calendar days for the delay resulting from waiting for the Town of Westlake to grant permission to connect the water main to their pump station. It Is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment In full (both time and money) for all costs arising out of, or Incidental to, the above Change Order. Contractor's Company Name I Contractor Name _ Concto_r $Ippalt g I TDINIIIIIIIIIIIIIIII Willlam J. Schullz, Inc. dba Clrclo C ConsWcllon Co. Teri Skelly Ul Inspao r pale Project Manager Dale ,Asslslant'Dlreolor (Water De `b' ate Co ruction Supervisor (Water Dept) a e n„ oR(pyrla,4ar T S Oct 2, 2020 Asslslant City Attorney Date , Assistant City Manager Date Oct 2, 2020 pwd& 2qa� Oct 2, 2020 Council Action (If Required) M&C Number N/A ( M&C Date Approved NIA OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX F'ol],T WoP,-Fm City of Fort Worth Change Order Additions Project Name I Northside II 30-Inch Water Transmission Main City Sec No.: 1 50627 Project No.(s): 1 59601/0600430/001480 DOE No.1 N/A City Proj. No.: 1 100261 Project I Description The Installation of a 30-Inch Water Transmission Main alon SH170 from North Beach to US377 I I Contractor William J. Schultz, Inc. dba Circle C Construction Co. I Change Order: ® Date:1 10/1/2020 City Project Mgr, John Kasavich I City Inspector Paul Gieger ADDITIONS I I tM DESCHIPI IUN DEPT Qty Unit Unit Cost Total 51 Union Pacific Railroad Flagmen Water Phase II 1.00 LS $88,390.00 $88,390.00 Page 2 of 4 Water Phase I Water Phase II '$88,390.00 1 Additions Sub Total 1$88,390.00 Fo�P,-r WoP,- m City of Fort Worth Change Order Deletions Project Name Northside II 30-Inch Water Transmission Main City Sec No.: 50627 Project No.(s): 59601/0600430/001480 DOE No, I N/A City Pro), No,: 100261 Project Description I The Installation of a 30-Inch Water Transmission Main alon SH170 from North Beach to US377 I Contractor William J. Schultz, Inc. dba Circle C Construction Co. Change Order: ® Date I 10/1/2020 City Project Mgr. John l<asavich City Inspector: Paul Gieger DELETIONS ITEM DESCRIPTION DEPT Qty JUnit Unit Cost Total I I I Water Phase I Water Phase II Page 3 of 4 Deletions Sub Total MMBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Page 4 of 4 Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensm•ing all petfommnce and reporting requirements, Signature r Name of Bmployee 1 Title �4 FORT �II I.g OVo 0=4 ATTEST: oP� °° a��p rEXA`�o4� irW RdnAld P. tza%ev �nnoaoo 'for Ron ald P. Gonzales (Oct 5, 202008:53 CDT) Mary J. Kayser City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX r'