HomeMy WebLinkAboutContract 57777-FP2City Secretary -FP2 Contract No. 57777 FORT WORTH. Date Received 05/25/2023 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Walsh Ranch — Quail Valley Village Residential City Project No.: 103846 Improvement Type(s): x❑ Paving Original Contract Price: Amount of Approved Change Order(s): Revised Contract Amount: Total Cost of Work Complete: 7, h Gatnnrl W-14_ 10-108:03 CDTI Contractor Contractor Title Conatser Construction TX, LLP Company Name Liaw 2ore�t William Rodgers (May 2 , 02308:53 CDT) Project Inspector Sandio Ad kari. P.E.(Mav 25. 202315:07 CDT) Project Manager sr. Rebecca Diane Owen (Mav 25.202315:16 CDT) CFA Manager TPW Director WIIIIamInh--(M -�n�40714 FFiV Asst. City Manager ❑x Drainage ❑ Street Lights ❑ Traffic Signals $1,785,743.00 $4,584.00 $1,790,327.00 May 24, 2023 Date May 24, 2023 Date May 25, 2023 Date May 25, 2023 Date May 25, 2023 Date May 26, 2023 Date OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 of 2 Notice of Project Completion Project Name: Walsh Ranch — Quail Valley Village Residential City Project No.: 103846 City's Attachments Final Pay Estimate ❑x Change Order(s): ❑x Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time 140 WD Days Charged: 167 Work Start Date: 8/1/2022 Work Complete Date 5/22/2023 Completed number of Soil Lab Test: 445 Completed number of Water Test: 29 Page 2of2 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name WALSH RANCH -QUAIL VALLEY VILLAGE RESIDENTIAL Contract Limits Project Type DRAINAGE & PAVING IMPROVEMENTS City Project Numbers 103846 DOE Number 8460 Estimate Number 1 Payment Number 1 City Secretary Contract Number Contract Date 6/3/2022 For Period Ending 5/22/2023 WD Contract Time 14WD Days Charged to Date 167 Project Manager NA Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH, TX 76119 Inspectors GLOVER / RODGERS Contract is 100.00 Complete Monday, May 22, 2023 Page 1 of 5 City Project Numbers 103846 Contract Name WALSH RANCH -QUAIL VALLEY VILLAGE RESIDENTIAL Contract Limits Project Type DRAINAGE & PAVING IMPROVEMENTS Project Funding UNIT III DRAINAGE IMPROVEMENTS DOE Number 8460 Estimate Number 1 Payment Number 1 For Period Ending 5/22/2023 Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 2 1 " RCP, CLASS III (CO #3 & #4) 483 LF $65.00 $31,395.00 483 $31,395.00 2 24" RCP, CLASS III (CO #3 & #4) 145 LF $75.00 $10,875.00 145 $10,875.00 3 27" RCP, CLASS III (CO #3 & #4) 603 LF $85.00 $51,255.00 603 $51,255.00 4 30" RCP, CLASS III (CO #3 & #4) 616 LF $90.00 $55,440.00 616 $55,440.00 5 36" RCP, CLASS III (CO #3 & #4) 770 LF $125.00 $96,250.00 770 $96,250.00 6 4' STORM JUNCTION BOX (CO #3 & #4) 8 EA $6,500.00 $52,000.00 8 $52,000.00 7 36" FLARED HEADWALL, 1 PIPE (CO #3 & #4) 2 EA $5,000.00 $10,000.00 2 $10,000.00 8 10' CURB INLET (CO #3 & #4) 17 EA $4,000.00 $68,000.00 17 $68,000.00 9 4'DROPINLET 2 EA $6,000.00 $12,000.00 2 $12,000.00 10 MEDIUM STINE RIPRAP, DRY (CO #3 & #4) 133 SY $105.00 $13,965.00 133 $13,965.00 11 TRENCH SAFETY (CO #3 & #4) 2617 LF $1.00 $2,617.00 2617 $2,617.00 12 FACTORY STORM WYE CONNECTION (CO #3 11 EA $500.00 $5,500.00 11 $5,500.00 & #4) 13 POST -CCTV INSPECTION (CO #3) 0 LF $3.50 $0.00 0 $0.00 Sub -Total of Previous Unit $409,297.00 $409,297.00 UNIT IV PAVING IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 6" CONC PVMT (CO #3 & #4) 22353 SY $42.50 $950,002.50 22353 $950,002.50 2 6" LIME TREATMENT (CO #3 & #4) 24368 SY $3.50 $85,288.00 24368 $85,288.00 3 HYDRATED LIME(6"PAVE@36LBS/SY) (CO #3 439 TN $210.00 $92,190.00 439 $92,190.00 & #4) 4 5" CINC SIDEWALK (CO #3 & #4) 12662 SF $4.75 $60,144.50 12662 $60,144.50 5 BARRIER FREE RAMP, TYPE R-1 (CO #3 & #4) 11 EA $1,900.00 $20,900.00 11 $20,900.00 6 BARRIER FREE RAMP, TYPE P-1 (CO #3 & #4) 11 EA $1,900.00 $20,900.00 11 $20,900.00 7 FURNISH/INSTALL WALSH RANCH STYLE 5 EA $1,300.00 $6,500.00 5 $6,500.00 SIGN POST& FOUND. W/REG. (CO #3 & #4) 8 FURNISH/INSTALL WALSH RANCH STYLE 14 EA $1,700.00 $23,800.00 14 $23,800.00 SIGN POST& FOUND W/REG (CO #3 & #4) 9 TRAFFIC CONTROL 1 LS $2,500.00 $2,500.00 1 $2,500.00 10 REMOVE CONC PVMT (CO #3 & #4) 3870 SY $13.50 $52,245.00 3870 $52,245.00 11 REMOVE SIDEWALK (CO #3 & #4) 8138 SF $2.00 $16,276.00 8138 $16,276.00 Monday, May 22, 2023 Page 2 of 5 City Project Numbers 103846 Contract Name WALSH RANCH -QUAIL VALLEY VILLAGE RESIDENTIAL Contract Limits Project Type DRAINAGE & PAVING IMPROVEMENTS Project Funding 12 REMOVE CONC CURB & GUTTER 1568 LF 13 "NO PARKING" STRIPING (CO 93 & #4) 1370 LF 14 4" SLD PVMT MARING HAS (W) 268 LF 15 4" CONDT PVC SCH 40(T) (CO #3 & #4) ---------------------- 395 LF Sub-Total of Previous Unit ---------------------- DOE Number 8460 Estimate Number 1 Payment Number 1 For Period Ending 5/22/2023 $20.00 $31,360.00 $4.00 $5,480.00 $3.00 $804.00 $32.00 $12,640.00 $1,381,030.00 1568 $31,360.00 1370 $5,480.00 268 $804.00 395 $12,640.00 $1,381,030.00 Monday, May 22, 2023 Page 3 of 5 City Project Numbers 103846 Contract Name WALSH RANCH -QUAIL VALLEY VILLAGE RESIDENTIAL Contract Limits Project Type DRAINAGE & PAVING IMPROVEMENTS Project Funding Contract Information Summary Original Contract Amount Change Orders Change Order Number 3 Change Order Number 1 Change Order Number 3 Change Order Number 4 Change Order Number 4 DOE Number 8460 Estimate Number 1 Payment Number 1 For Period Ending 5/22/2023 $1,785,743.00 ($199,021.50) $13,743.50 ($663,655.75) $189,862.00 $663,655.75 Total Contract Price $1,790,327.00 Total Cost of Work Completed $1,790,327.00 Less % Retained $0.00 Net Earned $1,790,327.00 Earned This Period $1,790,327.00 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $1,790,327.00 Monday, May 22, 2023 Page 4 of 5 City Project Numbers 103846 Contract Name WALSH RANCH -QUAIL VALLEY VILLAGE RESIDENTIAL Contract Limits Project Type DRAINAGE & PAVING IMPROVEMENTS Project Funding Project Manager NA Inspectors GLOVER / RODGERS Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH, TX 76119 DOE Number 8460 Estimate Number 1 Payment Number 1 For Period Ending 5/22/2023 City Secretary Contract Number Contract Date 6/3/2022 Contract Time 140 WD Days Charged to Date 167 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $1,790,327.00 Less % Retained $0.00 Net Earned $1,790,327.00 Earned This Period $1,790,327.00 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $1,790,327.00 Monday, May 22, 2023 Page 5 of 5 Walsh Ranch - Village Residential PROJECT NAME: CONTRACT: CFA # CITY PROJECT # DOE # FID # FILE # INSPECTOR: PROJECT MANAGER: DEVELOPER -AWARDED -PROJECT CHANGE ORDER Walsh Ranch Village Residential CHANGE Water (A), Sewer (Al), Draina a (B1), Paving (B) ORDER No: 22-0020 CITY PARTICIPATION: No 103846 NIA 1 30114-0200431-103846-EO7685 X-27197, W-2811 Bill Rodgers Phone No: Sandip Adhikari Phone No: WATER Developer Cost City Cost ORIGINAL CONTRACT $616,815.00 EXTRAS TO DATE CREDITS TO DATE CONTRACT TO DATE $616,815.00 AMOUNT OF PROP. CHANGE ORDER REVISED CONTRACT AMOUNT $616,815.00 TOTAL REVISED CONTRACT AMOUNT PER UNIT $616,815.00 REVISED COST SHARE Dev. Cost: TOTAL REVISED CONTRACT SEWER Developer Cost City Cost $612,578.50 $612,578.50 $23,(.1, $635,626.50 $635,626.50 $3,051,928.00 (682)263-2418 (817)392-8424 CONTRACT UNIT DRAINAGE PAVING Developer Cost City Cost Developer Cost City Cost $418,456.50 $1,367,286.50 $418,456.50 $1,367,286.50 $13,743.50 $418,456.50 1 $1,381,030.00 $418,456.50 $1,381,030.00 City Cost: $3,051,928.00 REVIEWED By Sandip Adhikari at 9:33 am, Mar 30, 2023 STREET LIGHTS er Cost I City Cost I CONTRACT DAYS 120 120 120 Revised: 10-12-2011 Page 1 UUt,UJIyI I CI IVCIUPC: IU. I D I JOLOr-Uh110-'4ULM-FICL C-JL JF1 r Urr CJIiG Walsh Ranch - Village You are directed to make the following changes in the contract documents: PAY ITEM # I CITY BID ITEM #I QUANTITY I UNIT II-1 2-1 -17.00 LF II-12 NEW 12 1.00 EA II-13 NEW 13 1.00 EA II-14 NEW 14 1.00 EA SF IV - 1 I 4- 11 2,231.00 I SF 8 (SEWER) 3331.4115 8" Sewer Pipe 9999.0015 Dit;psal of MH Base 3339.1012 4' 1"ee Base Drop Manhole 3349.0102 4' Manhole Riser D (PAVINGI I3213.0302 5" Conc Sidewalk 0241.0100 Remove Sidewalk ITEM DESCRIPTION REASONS FOR CHANGE ORDER 1 11-1 RE-ROUTED SS WR CONNECTION POINT TO BE PERPENDICULAR WITH EXISTING LINE 2 11-12, 11-13, & 11-14 MH A02 NEEDS TO BE ADJUSTED FOR NEW CONNECTION POINT 3 IV-4 & IV-11 QUANTITIES WERE WRONG, ADJUSTED. UNIT PRICE I TOTAL $56.00 -$952.00 $2,500.00 $2,500.00 $17,000.001 $17.000.00 $4,500.001 $4,500.00 B (SEWERI TOTALI $23.048.00 I $4.751 $9.281.50 $2.00 $4\\4_62.00 D (PAVINGI TOTAL $13,743.50 NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100 % OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: APPROVED: APPROVED: _&qw§igpq.d by: Quail Valley De (' d1L%gnned�fby: • f Conatser Con st c lor)9 ukiglled by, By: By: .l � I A r Wi.� V By: Name: or a7i 6�'rl'eQ6,'jog 442- Name: 19291942B— Name: Brockugggr402291F44A... Title: Proiect Manager Title: Vice president Title: President REVIEWED By Sandip Adhikari at 9:33 am, Mar 30, 2023 Revised: 10-12-2011 Page 2 Walsh Ranch - Village Residential IPROJECT NAME: (CONTRACT: ICFA # CITY PROJECT # IDOE # IFID # FILE # INSPECTOR: PROJECT MANAGER: (ORIGINAL CONTRACT EXTRAS TO DATE ICREDITS TO DATE (CONTRACT TO DATE (AMOUNT OF PROP. CHANGE ORDER IREVISED CONTRACT AMOUNT TOTAL REVISED CONTRACT AMOUNT PER UNIT REVISED COST SHARE TOTAL REVISED CONTRACT DEVELOPER -AWARDED -PROJECT CHANGE ORDER Walsh Ranch Villaqe Residential CHANGE Water (A), Sewer (A1), Draina a (B1), Paving (B) ORDER No: 22-0020 CITY PARTICIPATION: No 103846 N/A 3 30114-0200431-103846-EO7685 X-27197. W-2811 Bill Rodgers Phone No: (682) 263-2418 Sandip Adhikari Phone No: (817) 392-8424 CONTRACT UNIT WATER SEWER DRAINAGE Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost $616,815.00 $612,578.50 $418,456.50 $6,984.00 $23,048.00 $623,799.00 $635,626.50 $418,456.50 ($199,021.50) $623,799.00 $635,626.50 $219,435.00 $623,799.00 $635,626.50 $219,435.00 Dev. Cost: $2,196,234.75 City Cost: $2,196,234.76 PAVING STREET LIGHTS Developer Cost City Cost Developer Cost City Cost $1,367,286.50 $13,743.50 $1,381,030.00 ($663,655.75) $717,374.25 $717,374.25 REVIEWED 1 lBy Sandip Adhikari at 9:34 am, Mar 30, 2023 J CONTRACT DAYS 120 120 120 Revised: 10-12-2011 Page 1 Walsh Ranch - Village Residential You are directed to make the following changes in the contract documents I PAY ITEM # I CITY BID ITEM # I QUANTITY I UNIT I ITEM DESCRIPTION I UNIT PRICE I TOTAL C (DRAINAGE) _ 1 3341.0201 -348.00 LF 3341.0201 21" RCP, Class III $65.00 -$22,620.00 2 3341.0205 -145.00 LF 3341.0206 24" RCP, Class III $75.00 -$10,875.00 3 3341.0208 -603.00 LF 3341.0208 27" RCP, Class III $85.00 -$51,255.00 4 3341.0302 -106.00 LF 3341.0302 30" RCP, Class III $90.00 -$9,540.00 5 3341.0309 -110.00 LF 3341.0309 36" RCP, Class III $125.00 -$13,750.00 6 3349.0001 -4.00 EA 3349.0001 4' Storm Junction Box $6,500.00 -$26,000.00 7 3349.1007 -1.00 EA 3349.1007 36" Flared Headwall, 1 pipe $5,000.00 -$5,000.00 8 3349.5001 -10.00 EA 3349.5001 10' Curb Inlet $4,000.00 -$40,000.00 10 3137.0104 -62.00 SY 3137.0104 Medium Stone Riprap, dry $105.00 -$6,510.00 11 3305.0109 -1,312.00 LF 3306.0109 Trench Safety $1.00 -$1,312.00 12 9999.0007 -6.00 EA 9999.0007 FactoYtrom Wye Connection $500.00 -$3,000.00 13 3301.0002 -2,617.00 LF 3301.0002 Post-CCT Inspection $3.50 -$9,159.50 C(DRAINAGE) TOTALI -$199.021.50 2 3211.0501 -11,071.00 SY 3211.0501 6" Lime Treatment $3.50 -$38,748.50 3 3211.0400 -200.00 TN 3211.0400 Hydrated Lime (\6\" Pave (?2,) 36 Ibs/sy) $210.00 -$42,000.00 4 3213.0302 -9,261.00 SF 3213.0302 5((Conc Sldeweik $4.75 -$43,989.75 5 3213.0501 -7.00 EA 3213.0501 Barrier Free Ramp, T�y(pe R-1 $1,900.00 -$13,300.00 7 BR Free 9999.0008 -4.00 EA 9999.0008 um sh I sttall e sh Rp nchlStvle S))n Post & Foundation w/Regulatory Sin $1,300.00 -$5,200.00 8 9999.0009 -9.00 EA 9999.0009 Furnish/Install Walsh Ranch Style Sign Post &Foundation w/Regulatory Sign & Name $1,700.00 -$15,300.00 10 0241.1000 -2,640.00 SY 0241.1000 Remove Cone Pvmt $13.50 -$35,640.00 11 0241.0100 -3,990.00 SF 0241.0100 Remove Sidewalk $2.00 -$7,980.00 13 9999.0010 -1,370.00 LF 9999.0010 "No Parkin g", Str��nQQ $4.00 -$5,480.00 15 2605.3031 -270.00 LF 2605.3031 4" CONDT PVC S 40 (T) $32.00 -$8,640.00 D (PAVING) TOTALI -$663,655.75 REVIEWED By Sandip Adhikari at 9:34 am, Mar 30, 2023 Revised: 10-12-2011 Page 2 DocuSign Envelope ID: C91781 Fl3-D302-4EFF-l3A69-39F6F74ED4DC Walsh Ranch - Village Residential REASONS FOR CHANGE ORDER 1 Walsh Village Residential development was split into two phases to accommodate developer commitment to their builders. Phase 1 includes all water and sewer proposed for entire Village Residential development. Phase 2 includes, drainage and paving improvements located west of phasing boundary and all street light improvements for Village Residential. Phase 2 has been added to WR - PA3W-A Plan set (CPN 103935). 2 NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100 % OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: APPROVED: APPROVED: DocuSigned by: Huitt-Z Ilars, Inc. ,.1 �bV �Adn, M DQ�c to d by: Quail Valle Devcos11 Su DOCUS- ed by Conatser['onruc , L.P' A lA 79666E03C412442... Name Jordan V. Marlia, P.E. 9308FEB1929942B... Name Seth Carpenter �_ 5D50600229CF44A... Name Brock Huqqins Title: Associate Title: Senior Vice President Title: President REVIEWED By Sandip Adhikari at 9:34 am, Mar 30, 2023 Revised: 10-12-2011 Page 3 DocuSign Envelope ID: D965827F-90FD-4D31-82C0-1C3197A3FBE0 Walsh Ranch - Village Residential DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: Walsh Ranch Village Residential CHANGE CONTRACT: Water (A), Sewer (A1), Drairtjge (B1), Paving (B) ORDER No: CFA # 22-0020 I CITY PARTICIPATION: No CITY PROJECT # 103846 DOE # N/A 4 FID # 30114-0200431-103846-EO7685 FILE # X-27197, W-2811 INSPECTOR: Bill Rodgers Phone No: (682) 263-2418 PROJECT MANAGER: Sandip Adhikari Phone No: (817) 392-8424 CONTRACT UNIT WATER SEWER DRAINAGE PAVING STREET LIGHTS CONTRACT 1 DAYS Developer Cost City Cost (Developer Cost City Cost (Developer Cost city Cost Developer Cost City Cost Developer Cost City Cost (ORIGINAL CONTRACT $616,815.00 $612,578.50 I $418,456.50 $1,367,286.50 I 120 EXTRAS TO DATE $6,984.00 $23.048.00 $13,743.50 I I 14 (CREDITS TO DATE I ($199,021.50) (S663,655.75) CONTRACT TO DATE $623,799.00 $635,626.50 I I $219,435.00 $717,374.25 I 134 IAMOUNT OF PROP. CHANGE ORDER I I $189,862.00 I $663,655.75 REY(WQ �ONTijf�F� f MOUNq� $623,799.00 $635,626.50 I $409,297.00 $1,381,030.00 134 TOTAL REV E L NYRA�T AMOUNT PER UNIT $623,799.00 $635,626.50 $409,297.00 $1,381.030.00 REVISED COST SHARE Dev. Cost: $3,049,752.50 City Cost: TOTAL REVISED CONTRACT $3,049,752.50 REVIEWED By Sandip Adhikari at 4:15 pm, May 08, 2023 Revised: 10-12-2011 Page 1 DocuSign Envelope ID: D965827F-90FD-4D31-82C0-1C3197A3FBE0 Walsh Ranch - Village Residential You are directed to make the following changes in the contract documents PAY ITEM # CITY BID ITEM # 1 QUANTITY I UNIT _ ITEM DESCRIPTION UNIT PRICE I TOTAL C (DRAINAGE) 1 3341.0201 348.00 LF 3341.0201 21" RCP, Class III $65.001 $22,620.00 2 3341.0205 145.00 LF 3341.0205 24" RCP, Class III $75.001 $10,875.00 3 3341.0208 603.00 LF 3341.0208 27" RCP, Class III $85.001 $51,255.00 4 3341.0302 106.00 1 LF 3341.0302 30" RCP, Class 111 $90.001 $9,540.00 5 3341.0309 110.00 1 LF 3341.0309 36" RCP, Class III $125.001 $13,750.00 6 3349.0001 4.00 1 EA 3349.0001 4' Storm Junction Box $6,500.001 $26,000.00 7 3349.1007 1.00 1 EA 13349.1007 36" Flared Headwall, 1 pipe $5,000.001 $5,000.00 8 3349.5001 10.00 1 EA 13349.5001 10' Curb Inlet $4,000.001 $40,000.00 10 3137.0104 62.00 1 BY 13137.0104 Medium Stone Riprap, dry $105.001 $6,510.00 11 3305.0109 1,31200 1 LF 13305.0109 Trench Safety $1.001 $1,312.00 12 9999.0007 6.00 1 EA 19999.0007 Factory Strom Wye Connection $500.001 $3,000.00 C(DR.JNAGE) TOTALI $189,862.001 D (PAVING) 1 3213.0101 10,303.00 BY 3213.0101 6" Cone Pvmt 1 $42.50 $437,877.50� 2 3211.0501 1 11,071.00 BY 3211.0501 6" Lime Treatment I $3.50 $38,748.501 3 3211.0400 1 200.00 TN 3211.0400 Hxdrated Lime (6" Pave @ 36lbs/sy) $210.001 $42,000.001 4 3213.0302 9,261.00 SF 3213.0302 5 Cone Sidewalk $4.751 $43,989.751 5 3213.0501 I 7.00 EA 32,3.0501 Barrier Free Ramp, Type R-1 $1,900-001 $13,300.001 6 3213.0506 I 5.00 EA 3213.0506 Barrier Free Ramq, Type P-1 $1,900.001 $9,500.001 7 9999.0008 4.00 EA 9999.0008 Furnish/Install Wash Ranch St�je Sign Post & Foundation w/Regulatory Sign 1 $1,300.001 $5,200.001 8 9999.0009 9.00 EA 9999.0009 Furnish/Install Walsh Ranch Style Siqn Post & Foundation w/Regulatory Siqn & Name) $1,700.001 $15,300.001 10 0241.1000 2,640.00 BY 0241.1000 Remove Cone Pvmt $13.501 $35,640.001 11 0241.0100 3,990.00 SF 0241.0100 Remove Sidewalk $2.001 $7,980.001 13 9999.0010 1,370.00 LF 9999.0010 "No Parking" Striping I $4.001 $5,480.001 15 2605.3031 1 270.00 LF 2605.3031 4" CONDT'NC C 40(T) $32.001 $8,640.001 D (PAVING) TOTALI $663,655.751 REVIEWED By Sandip Adhikari at 4:15 pm, May 08, 2023 Revised: 10-12-2011 Page 2 DocuSign Envelope ID: D965827F-90FD-4D31-82C0-1C3197A3FBE0 Walsh Ranch - Village Residential REASONS FOR CHANGE ORDER 1 Plan Revision 5 Phase 2 Storm & Paving is being added back into this project 2 NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100 % OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: APPROVED: wned tt-LoQFaYs,ied by: By: I .'IbVJAJA, k. YUA, D g by: Quail Valley D vt VLL� BY: (J Name: J�nv. Marl:aC�1�442... Name: Seth Carpenter 9428... Title: Associate Title: Senior Vice President REVIEWED By Sandip Adhikari at 4:15 pm, May 08, 2023 APPROVED: Conatser Cons ctionD Ji .ed by:- By. L<5D50600229CF44A... Name: Brock Huqqins Title: President Revised: 10-12-2011 Page 3 FORTWORTH. M, TRANSPORTATION AND PUBLIC WORKS May 22, 2023 Conatser Construction TX L.P. 5327 Wichita St. Fort Worth, Texas 76119 RE: Acceptance Letter Project Name: Walsh Ranch Quail -Valley Residential Project Type: Paving, Drainage City Project No.: 103846 To Whom It May Concern: On May 18, 2023 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on May 22, 2023. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on May 22, 2023, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-8424. Sincerely, 5- Sandip Ad ikari, P.E. (May 25, 2023 15:07 CDT) Sandip Adhikari, Project Manager Cc: William Rodgers, Inspector Mike Glover, Inspection Supervisor Randy Horton, Senior Inspector Victor Tornero, Program Manager Huitt-Zollars, Consultant Conatser Construction, Contractor Quail -Valley Devco VLO, LLC, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a Notary Public in the state and county aforesaid, on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc., general partner of Conatser Construction TX. LP, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said: That all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth, has been paid in full; and That there are no claims pending for personal injury and/or property damages; On Contract described as: WALSH RANCH — VILLAGE RESIDENTIAL WATER, SANITARY SEWER, DRAINAGE, AND PAVING IMPROVEMENTS CFA PRJ #: 22-0020 CITY PROJECT #: 103846 CITY OF FORT WORTH STATE OF TEXAS CONATSER CONSTRUCTION TX, LP ACAZ" Brock Huggint�� Subscribed and sworn to before me this 29th day of March, 2023. NOTARY PUBLIC 133467933 �., PgF Siate of Texas Notary Public in Tarrant County, Texas `gF` Comm. Exp.11.30.2025 GONSENT OF SURETY COMPANY TO FINAL PAYMENT Conforms with the American Institute of Architects, AIA Document G707 OWNER ❑ ARCHITECT ❑ CONTRACTOR ❑ SURETY ❑ OTHER PROJECT: (name, address)Walsh Ranch -Quail Valley -Village Residential Fort Worth, TX TO (Owner) Bond No 0243972 [QUAIL VALLEY DEVCO VLO, LLC AND THE CITY OF7 ARCHITECT'S PROJECT NO: CFA No. 22-0020 FORT WORTH CONTRACT FOR: 400 S. Record St., Suite 1200 Water, Sanitary Sewer, Drainage, and Paving Improvements for Walsh Ranch -Quail Valley - Village Residential Dallas TX 75202 _J CONTRACT DATE: CONTRACTOR: CONATSER CONSTRUCTION TX, L.P. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the (here insert name and address of Surety Company) BERKLEY INSURANCE COMPANY 475 Steamboat Road Greenwich CT 06830 , SURETY COMPANY on bond of (here insert name and address of Contractor) CONATSER CONSTRUCTION TX, L.P. 5327 Wichita St. Fort Worth TX 76119-6035 ,CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to (here insert name and address of Ownerl QUAIL VALLEY DEVCO VLO, LLC AND THE CITY OF FORT WORTH 400 S. Record St., Suite 1200 Dallas TX 75202 , OWNER, as set forth in the said Surety Company's bond. IN WITNESS, WHEREOF, the Surety Company has hereunto set its hand this Attest: (Seal): Q_ 28th day of March, 2023 BERKLEY INSURANCE COMPANY Surety Company Signature of Authorized Representative Robbi Morales Title Attorney -in -Fact NOTE; This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Current Edition ONE PAGE No. BI-7280k POWER OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON, DELAWARE NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully. KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly or and existing under the laws of the State of Delaware, having its principal office in Greenwich, CT, has made, constituted and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna; Don E Cornea; Sophinie Hunter, Robbi Morales; Kelly A.. Westbrook, Turn McEivan; Joshua Saunders; Tonie Petranek; or Mikaela Peppers of Aon Risk Services Southwest, Inc. of Dallas, TX its true and lawful Attorney -in -Fact, to sign its name as surety only as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S. Dollars (U.S.$50,000,000.00), to the same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons. This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware, without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January.25, 2010: RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney -in -fact named therein to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such attorney -in -fact and revoke any power of attorney previously granted; and further RESOLVED, that such. power of attorney limits the acts of those named therein to the bonds, undertakings, recogruzances, or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the manner and to the extent therein .stated; and further RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney -in -fact named; and further RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligation of the Company; and such signature and seal when so used shall have the same force and effect as though manually affixed. The Company may continue to use for the purposes herein stated the facsimile .signature of any person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have ceased to be such at the time when such instruments shall be issued. IN WITNESS 'WBEREOF, the Company has caused these presents to., be signed and attested by its appropriate officers and its corporate seal hereunto affii ed this lay of�' a �;'r30c� ram. Attest j Berkl Insurance Company {seal) By i3y Lr. "� I12191-1. denvan Je cr Executive Vice President Rs Secretary S I ice: -dent WARNING: TF11SPO'WER.IINVALID 1F NOT PRIItTED ON BLUE "Y" SECURITY PAPER STATE OF CONNECTICUT ) ) ss: COUNTY OF FATRFIGLD ) Sworn to before nte, a Notary Public in the State of Connecticut, this 1144' day of Mcz,4 , Q0a_D_ by Ira S. Lederman and Jeffrey M, Hafter who are sworn to :me to be the Executive Vice President Secretary, and tJASeinior ViCe .President, respectively, -of Berklefnsurance.Co PanY JAANIAc-RUNnR&kM n nioTrtsv I CONFJECTICUT MYCOMIWSSION EXPIRES AML30,2024 Aoiany.PiibliciState OfConnecticut CERT.iFICATE 1, the undersigned; Assistant Secretary of BERKLEY INSURANCE COMPANY, DO HEREBY CERTIFY that the foregoing is a true, correct and complete'copy of the original Power of Attorney; that said Power of Attorney has not Been revoked or rescinded and that the authority of the Attorney.-in-F act:sct forth therein, who executed the bond or undertaking to which. this Power of Attorney is attached; -is in fall force.and effect as of this date. Given under'iny haud:and seal of the Coinpany, this 2 8 th day of Mr c \ 2023 Of (Seal) • � J Vincent F. Forte- AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a Notary Public in the state and county aforesaid, on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc., general partner of Conatser Construction TX. LP, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said: That all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth, has been paid in full; and That there are no claims pending for personal injury and/or property damages; On Contract described as: WALSH RANCH — VILLAGE RESIDENTIAL WATER, SANITARY SEWER, DRAINAGE, AND PAVING IMPROVEMENTS CFA PRJ #: 22-0020 CITY PROJECT #: 103846 CITY OF FORT WORTH STATE OF TEXAS CONATSER CONSTRUCTION TX, LP ACAZ" Brock Huggint�� Subscribed and sworn to before me this 29th day of March, 2023. NOTARY PUBLIC 133467933 �., PgF Siate of Texas Notary Public in Tarrant County, Texas `gF` Comm. Exp.11.30.2025 GONSENT OF SURETY COMPANY TO FINAL PAYMENT Conforms with the American Institute of Architects, AIA Document G707 OWNER ❑ ARCHITECT ❑ CONTRACTOR ❑ SURETY ❑ OTHER PROJECT: (name, address)Walsh Ranch -Quail Valley -Village Residential Fort Worth, TX TO (Owner) Bond No 0243972 [QUAIL VALLEY DEVCO VLO, LLC AND THE CITY OF7 ARCHITECT'S PROJECT NO: CFA No. 22-0020 FORT WORTH CONTRACT FOR: 400 S. Record St., Suite 1200 Water, Sanitary Sewer, Drainage, and Paving Improvements for Walsh Ranch -Quail Valley - Village Residential Dallas TX 75202 _J CONTRACT DATE: CONTRACTOR: CONATSER CONSTRUCTION TX, L.P. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the (here insert name and address of Surety Company) BERKLEY INSURANCE COMPANY 475 Steamboat Road Greenwich CT 06830 , SURETY COMPANY on bond of (here insert name and address of Contractor) CONATSER CONSTRUCTION TX, L.P. 5327 Wichita St. Fort Worth TX 76119-6035 ,CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to (here insert name and address of Ownerl QUAIL VALLEY DEVCO VLO, LLC AND THE CITY OF FORT WORTH 400 S. Record St., Suite 1200 Dallas TX 75202 , OWNER, as set forth in the said Surety Company's bond. IN WITNESS, WHEREOF, the Surety Company has hereunto set its hand this Attest: (Seal): Q_ 28th day of March, 2023 BERKLEY INSURANCE COMPANY Surety Company Signature of Authorized Representative Robbi Morales Title Attorney -in -Fact NOTE; This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Current Edition ONE PAGE No. BI-7280k POWER OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON, DELAWARE NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully. KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly or and existing under the laws of the State of Delaware, having its principal office in Greenwich, CT, has made, constituted and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna; Don E Cornea; Sophinie Hunter, Robbi Morales; Kelly A.. Westbrook, Turn McEivan; Joshua Saunders; Tonie Petranek; or Mikaela Peppers of Aon Risk Services Southwest, Inc. of Dallas, TX its true and lawful Attorney -in -Fact, to sign its name as surety only as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S. Dollars (U.S.$50,000,000.00), to the same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons. This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware, without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January.25, 2010: RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney -in -fact named therein to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such attorney -in -fact and revoke any power of attorney previously granted; and further RESOLVED, that such. power of attorney limits the acts of those named therein to the bonds, undertakings, recogruzances, or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the manner and to the extent therein .stated; and further RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney -in -fact named; and further RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligation of the Company; and such signature and seal when so used shall have the same force and effect as though manually affixed. The Company may continue to use for the purposes herein stated the facsimile .signature of any person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have ceased to be such at the time when such instruments shall be issued. IN WITNESS 'WBEREOF, the Company has caused these presents to., be signed and attested by its appropriate officers and its corporate seal hereunto affii ed this lay of�' a �;'r30c� ram. Attest j Berkl Insurance Company {seal) By i3y Lr. "� I12191-1. denvan Je cr Executive Vice President Rs Secretary S I ice: -dent WARNING: TF11SPO'WER.IINVALID 1F NOT PRIItTED ON BLUE "Y" SECURITY PAPER STATE OF CONNECTICUT ) ) ss: COUNTY OF FATRFIGLD ) Sworn to before nte, a Notary Public in the State of Connecticut, this 1144' day of Mcz,4 , Q0a_D_ by Ira S. Lederman and Jeffrey M, Hafter who are sworn to :me to be the Executive Vice President Secretary, and tJASeinior ViCe .President, respectively, -of Berklefnsurance.Co PanY JAANIAc-RUNnR&kM n nioTrtsv I CONFJECTICUT MYCOMIWSSION EXPIRES AML30,2024 Aoiany.PiibliciState OfConnecticut CERT.iFICATE 1, the undersigned; Assistant Secretary of BERKLEY INSURANCE COMPANY, DO HEREBY CERTIFY that the foregoing is a true, correct and complete'copy of the original Power of Attorney; that said Power of Attorney has not Been revoked or rescinded and that the authority of the Attorney.-in-F act:sct forth therein, who executed the bond or undertaking to which. this Power of Attorney is attached; -is in fall force.and effect as of this date. Given under'iny haud:and seal of the Coinpany, this 2 8 th day of Mr c \ 2023 Of (Seal) • � J Vincent F. Forte-