HomeMy WebLinkAboutContract 57559-A1Date Received: 6/1/2023
Time Received: 7 : 24 p.m.
City Secretary
Contract No.: 57559-A1
FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 57559
A COMMUNITY FACILITIES AGREEMENT BETWEEN
THE CITY OF FORT WORTH AND PR III/Crow Building E, F, G & L, LP
This FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 57559
("First Amendment") is made and entered into by and between the City of Fort Worth ("City"),
a home -rule municipal corporation of the state of Texas, and PR III/Crow Building E, F, G & L,
LP ("Developer"), a Delaware limited partnership.
WHEREAS, the City and Developer entered into a Community Facilities Agreement for
the construction of public infrastructure Improvements for a Project known as 35 Eagle Phase III
Industrial Development, City Project Number 103902 ("CFA"); and
WHEREAS, Developer provided the City with a development bond as the financial
guarantee for the Improvements in the CFA; and
WHEREAS, Developer has hired a new contractor to construct the Improvements
pursuant to the CFA and the construction costs have increased; and
WHEREAS, the City and Developer desire to amend the CFA to reflect the revised Cost
Estimates and Cost Summary Table, and the increase in the financial guarantee; and
WHEREAS, Developer has provided the City with a rider to the development bond to
increase the penal sum of the development bond to correspond with the new construction costs;
NOW THEREFORE, City and Developer, acting herein by and through their duly
authorized representatives, enter into the following agreement, which amends City Secretary
Contract Number 57559:
1.
Section 36 of the CFA is amended in its entirety to be and read as set forth in Exhibit A
of this First Amendment, which is attached hereto and incorporated herein by reference.
2.
The Cost Estimates in the CFA are amended in their entirety to be and read as set forth in
Exhibit B of this First Amendment, which is attached hereto and incorporated herein by reference.
3.
a. All other provisions of City Secretary Contract No. 57559 which are not expressly
amended herein, shall remain in full force and effect.
City of Fort Worth, Texas
First Amendment to City Secretary Contract No. 57559
Page I of 6
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
b. All terms in this First Amendment that are capitalized, but not defined, shall have the
meanings ascribed to those terms in City Secretary Contract No. 57559.
[SIGNATURES ON FOLLOWING PAGE]
City of Fort Worth, Texas
First Amendment to City Secretary Contract No. 57559
Page 2 of 6
IN TESTIMONY WHEREOF, the City and Developer have executed this First
Amendment to be effective on the date signed by the City's Assistant City Manager.
CITY OF FORT WORTH
oana Fara doff
Dana Burghdoff (May31, 2023 19:23 CDT)
Dana Burghdoff
Assistant City Manager
Date: May 31, 2023
Recommended by:
86;A UPI/ m61wmn,
Bichson Nguyen (M`y 2 , 2023 16:06 CDT)
Dwayne HollarsBichson Nguyen
Contract Compliance Specialist
Development Services
Approved as to Form & Legality:
Richard A. McCracken (May 30, 202311:02 CDT)
Richard A. McCracken
Sr. Assistant City Attorney
M&C No. N/A
Form 1295: N/A
Date: May 30, 2023
ATTEST:
4.pUvopq�Il
FORT�oa�d
o �o
OV8 °=d
tt �p
�UjP"m^"w"�
oaaIl
�XA544a
bbuaaa�
Jannette S. Goodall
City Secretary
Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including all
performance and reporting requirements.
Rebecca Diane Owen (May 28, 2023 16:46 CDT)
Name: Rebecca Owen
Title: Development Manager
DEVELOPER:
[Signature on following page]
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas
First Amendment to City Secretary Contract No. 57559
Page 3 of 6
DEVELOPER
PR III/Crow Building E, F, G & L, LP
By: PR III/Crow Building E, F, G & L GP, LLC
Its General Partner
By: PR III/Crow Building C, E, F, G & L Holdings, LLC
A Delaware limited liability company
Its sole member and manager
By: TC Eagle CEFGL Development, LLC
A Delaware limited liability company
Its authorized signatory
By: TCDFW Industrial Development Inc.,
A Delaware corporation
Its managing member
Jake Marks (May 26, 202316:26 MDT) May 26, 2023
Jake Marks
Senior Vice President
City of Fort Worth, Texas
First Amendment to City Secretary Contract No. 57559
Page 4 of 6
EXHIBIT A
36.
Cost Summary Sheet
Project Name: 35 Eagle Phase III Industrial Development
CFA No.: CFA22-0027
City Project No.: 103902
Items
Developer's Cost
A. Water and Sewer Construction
1. Water Construction
$
474,052.98
2. Sewer Construction
$
88,062.00
Water and Sewer Construction Total
$
562,114.98
B. TPW Construction
1. Street
$
530,544.04
2. Storm Drain
$
-
3. Street Lights Installed by Developer
$
34,277.03
4. Signals
$
-
TPW Construction Cost Total
$
564,821.07
Total Construction Cost (excluding the fees):
$
1,126,936.05
Estimated Construction Fees:
C. Construction Inspection Service Fee $23,500.00
D. Administrative Material Testing Service Fee $2,793.00
E. Water Testing Lab Fee $750.00
Total Estimated Construction Fees: $ 27,043.00
Choice
Financial Guarantee Options, choose one
Amount (Mark one
Bond = 100%
$
1,126,936.05 x
Completion Aqreement = 100%/ Holds Plat
$
1,126,936.05
Cash Escrow Water/Sanitary Sewer= 125%
$
702,643.73
Cash Escrow Pavinq/Storm Drain = 125%
$
706,026.34
Letter of Credit = 125%
$
1,408,670.06
City of Fort Worth, Texas
First Amendment to City Secretary Contract No. 57559
Page 5 of 6
EXHIBIT B
Cost Estimates
City of Fort Worth, Texas
First Amendment to City Secretary Contract No. 57559
Page 6 of 6
SECTION 00 42 43
Developer Awarded Projects • PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP - BED PROPOSAL
Page 1 of 5
Bidder's Application
Project Item Information
Bidders Proposal
Bidlistolteml
Description
I Speclllcatton Secuon No.
Unit Of
I
Bid
I
Unit Price
I
Bid Value
Measure
Quantity
UNIT I: WATER IMPROVEMENTR.
1
0241_1016 Remove 16" Water Line
0241 14
LF
235
$11.00
$2.585.00
2
0241.1106 16" Pressure Plug
0241 14
EA
1
$4,594.00
$4.584.00
3
0241.1109 24" Pressure Plug
0241 14
EA
1
$5,738.00
$5.738.00
4
0241.1118 4"-12" Pressure Plug
0241 14
EA
7
$2,798.00
$19.586.00
5
0241,1301 Remove 10" Water Valve
0241 14
EA
2
$1,111.00
$2.222.00
6
0241,1602 Remove 10" Concrete Water Vault
0241 14
EA
2
$3,020.00
$6.040.00
7
3305,0109 Trench Safety
3305 10
LF
450
$1.00
$450.00
8
3305.0203 Imported Embedment/Backfall. CLSM
3305 10
LF
140
$110.00
$15.400.00
9
3311.0001 Ductile Iron Water Fittinos w/Restraint
33 11 11
LS
1
$14.615.00
$14.615.00
10
3311.0251 8" DIP Water PiDe
33 11 10
LF
141
$175.00
$24.675.00
11
3311.0261 8"PVCWaterPine
33 11 10
LF
157
$120.00
$18.840.00
12
3312.3003 8" Gate Valve
33 1220
EA
3
$7,700.00
$23.100,00
13
3312.3006 16" Gate Valve w/ Vault
33 1220
EA
1
$31,537.00
$31.537.00
14
3312.2203 2" Water Service
33 1222
EA
11
$8.674.00
$95.414.00
15
3305.0111 Valve Box Adiustment
1305 14
EA
9
$1,373.00
$12,357.00
16
3312.0001 Fire Hvdrant
131240
EA
1
$11.060.00
$11.060.00
17
3312.0117 Connection to Existing 4" •12" Water Main
33 1225
EA
5
$6,987.60
$34.938.00
18
3312,0106 Connection to Existing 16" Water Main
13 1225
EA
5
$17,595.00
$87.975.00
19
3311.0451 12" DIP Water Pipe
33 11 10
LF
53
$168.00
$8.904.00
20
3311,0461 12" PVC Water Pine
33 11 12
LF
44
$156.00
$6.864.00
21
3312.3005 12" Gate Valve
33 12 20
EA
6
$7,768.83
$46.612.98
22
024 1, 1302 Remove 6" Gate Valve
EA
1
$556.00
$556.00
TOTAL UNIT I: WATER IMPROVEMENTS $474.052.98
CRY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Feint Vmion May 22 2019 42 43 Bid PmpoW DAP (EFGL)
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
cn 42 43
DAP BID PROPOSAL
Page 2 of 5
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist Item)
No.
Description
Specification Section No.
I
I Unit of I
Measure
Bid
Quantity
Unit Price
Bid Value
UNIT II: SANITEIRY SEWER IMPROVEF4ENTS
1
0241.2102 6" Sewer Abandonment Plug
0241 14
EA
4
$1,043.00
$4,172.00
2
3301.0002 Post -CCTV Inspection
33 01 31
LF
29
$20,00
$580.00
3
3301.0101 Manhole Vacuum Testin¢
33 01 30
EA
4
$220.00
$880.00
4
3305.0107 Manhole Adjustment. Minor
3305 14
EA
1
$6,716.00
$6.716.00
5
3305.0109 Trench Safety
3305 10
LF
29
$20.00
$580.00
6
3331.4108 6" SDR 26 PVC Sanitary Sewer Pine 33 11 10
LF
29
$202.00
$5,858.00
7
3339.0001 EDoxv Manhole Liner
33 39 60
VF
15
S424.00
$6.360,00
8
3339.1 DDl 4' Manhole
33 39 10.33 39 20
EA
3
$17,457.00
$52.371.00
9
3339.1003 4' Extra Depth Manhole
33 39 10, 33 39 20
VF
15
$703.00
$10,545.00
TOTAL. UNIT II. SANITARY SEWER IMPROVEMENTS
$88,062.00
CrrY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS
Form Vmioo May 22. 2019
42 43 Bid Pmpoaat DAP (EFOL)
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
004243
DAP BID PROPOSAL
Page 3 of S
Bidder's Application
Project Item loformation
Bidder's Proposal
BId1NoNeml
Description
I Specification Scetion No.
I re Unita ofI
QuBid
Unit Price
I
Bid Value
UNIT III: PWING IMPROVEMENTS
1
0241.0100 Remove Sidewalk
0241 13
SF
250
$7.50
$1.875.00
2
0241.0800 Remove Rip Ran
0241 13
SF
302
$6.00
$1.812.00
3
0241.1000 Remove Conc Pvmt
0241 15
SY
532
$11.00
$5.852.00
4
024 1. 1300 Remove Conc Curb&Gutter
0241 15
LF
636
$8.00
$5.088.00
5
3123.0101 Unclassified Excavation by Plan (Cut)
3123 16
CY
755
$51.00
$38.505.00
6
3125.0101 SWPPP i I acre
31 25 00
LS
1
$5,000.00
$5.000,00
7
3211.0400 Hvdrated Lime
32 11 29
TN
35
$525.00
$18.375.00
8
3211.0501 6" Lime Treatment
321129
SY
1349
$31.00
S41.819.00
9
3213.0104 9" Conc Pvmt
3213 13
SY
1349
$157.31
$212.211.19
10
3213.0301 4" Conc Sidewalk
32 13 20
SF
17420
$7.03
S122.462.60
11
3213.0504 Barrier Free Ramp. Tvpe M-2
32 13 20
EA
1
$1.200.00
S1.200.00
12
3213.0506 Barrier Free Ramp, Type P-I
32 13 20
EA
14
$1,200.00
$16.800.00
13
3216.0101 6" Conc Curb and Gutter
32 16 13
L.F
600
$37.47
$22.482.00
14
3291,0100 Topsoil
3291 19
CY
525
$3.81
$2.000.25
15
3292.0100 Block Sod Placement
3292 13
SY
3200
$2.50
$8.000.00
16
3471,0001 Traffic Control
3471 13
MO
3
$7,854.00
$23.562.00
17
9999.0001 Strivinc Replacement
99 99 01
LS
1
$3,500.00
$3.500.00
TOTAL UNIT III: PAVING IMPROVEMENTS $530,544.04
CRY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Fam Version May 22, 2M 42 43_Bid Pmpo W - DAP (EFOL)
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP BID PROPOSAL
Page 4 of $
Bidder's Application
Project Item Information
Bidders Proposal
BidIN Item)
Description I Specification Section No.
Unit of
I Measure
I Q�n Quantity Bid'
Unit Price I
Bid Value
UNIT IV: STREET LIGHTING IMPROVIYENTS,
1
2605.3015 2" CONDT PVC SCH 80 M 26 05 33
LF
85
$233.58
$19.854.30
2
3441.1405 NO 2 Insulated Elec Condr 3441 10
LF
255
$29.90
$7.624.50
3
3441.1502 Ground Box Tvoe B. w-ADron 3441 10
EA
2
$550.00
$1.100.00
4
3441.3003 Rdwv Ilium Assmbly TY 18.18A.19. and DAO 344120
EA
1
$4,523.23
$4.523.23
5
3441.3302 Rdwv Illum Foundation TY 3,5,6,. and 8 34 41 20
EA
1
$675.00
$675.00
6
9999.0001 Remove Roadway Illumination Foundation 99 99 05
EA
1
$500.00
$500.00
TnTAL UNIT IV - STREET LIGHTING IMPROVEMENT1
$34.277.03
CRY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Vmioe May 22, 2019 42 O Bid Proposal DAP (EFOL)
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP - BID PROPOSAL
Page 5 at 5
Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item) I I Unit of I Bid
No. Description Specification Section No. Measure Q�tttY Unit Price Did Value
Bid Summary
UNIT I: WATER IMPROVEMENTS $474 Q52.98
UNIT II: SANITARY SEWER IMPROVEMENTS $88,062.00
UNIT IV: PAVING IMPROVEMENTS $530.544.04
UNIT V: STREET LIGHTING IMPROVEMENTS $34,277.03
This Bid Is submitted by the entity named below:
BUDDER;
Wlldstonc Contructton, LLC
12950 Hwy 287
Fort Worth, Texas 76052
Contractor agrees to complete WORK for FINAL ACCEPTANCE within
CONTRACT commences to run as provided In the General Conditions.
END OF SECTION
T
1
Total Construction Bid $1,126,936.05
date when the
CrrV OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROTECTS
Fan Vmion May 22, 2019 42 43_Bd PnpmW, DAP (EFGL)