Loading...
HomeMy WebLinkAboutContract 56809-FP2FORT WORTH. City Secretary Contract No. 56809 -FP2 Date Received 2/13/2023 NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Bar C Ranch Phase 10 City Project No.: 102444 Improvement Type(s): ❑x Paving Original Contract Price: Amount of Approved Change Order(s): Revised Contract Amount: Total Cost of Work Complete: '6'z� %ze2, Rob Tavlor (Feb 202315:37 CST) Contractor Accounts Receivable Title Gilco Contracting, Inc. Company Name c� U) Project Inspector Khal Jaafan P.E.(F b 10. 202316:36 CST) Project Manager Rebecca Diane Owen IFeb 12. 202308:57 CST) CFA Manager Lauren Pi eur (Feb 12. 2023 09:51 CST) Interim TPW Director william Johnson (Fe 13.202313:19 CSTI Asst. City Manager ❑ Drainage ❑ Street Lights ❑ Traffic Signals $1,030,672.35 -$31,661.05 $999,011.30 Feb 10, 2023 Date Feb 10, 2023 Date Feb 10, 2023 Date Feb 12, 2023 Date Feb 12, 2023 Date Feb 13, 2023 Date OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 of 2 Notice of Project Completion Project Name: Bar C Ranch Phase 10 City Project No.: 102444 City's Attachments Final Pay Estimate ❑x Change Order(s): ❑x Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time 255 WD Days Charged: 201 Work Start Date: 2/16/2022 Work Complete Date 02/20/2023 Completed number of Soil Lab Test: 502 Completed number of Water Test: 12 Page 2 of 2 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name BAR C RANCH PHASE 10 Contract Limits Project Type PAVING City Project Numbers 102444 DOE Number 2444 Estimate Number 1 Payment Number 1 For Period Ending 2/10/2023 WD City Secretary Contract Number Contract Time 5WD Contract Date Days Charged to Date 160 Project Manager NA Contract is 100.00 Complete Contractor GILCO CONTRACTING, INC. 6331 SOUTHWEST BLVD. BENBROOK, TX 76132-1063 Inspectors GLOVER / WALKER Friday, February 10, 2023 Page 1 of 4 City Project Numbers 102444 DOE Number 2444 Contract Name BAR C RANCH PHASE 10 Estimate Number 1 Contract Limits Payment Number 1 Project Type PAVING For Period Ending 2/10/2023 Project Funding PAVING Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 HYDRATED LIME (CO A2) 349.8 TN $170.00 $59,466.00 349.8 $59,466.00 2 6" LIME TREATMENT (CO A2) 21815 SY $2.65 $57,809.75 21815 $57,809.75 3 6" CONC PVMT (CO A2) 20464 SY $35.05 $717,263.20 20464 $717,263.20 4 4" SIDEWALK PVMT (CO A2) 10441 SF $5.75 $60,035.75 10441 $60,035.75 5 BARRIER FREE RAMP 4 EA $2,050.00 $8,200.00 4 $8,200.00 6 BARRIER FREE RAMP (CO A2) 20 EA $1,750.00 $35,000.00 20 $35,000.00 7 FURNISH/INSTALL ALUM SIGN GROUND 13 EA $250.00 $3,250.00 13 $3,250.00 MOUNT CITY STD 8 FURNISH/INSTALL ALUM SIGN GROUND 13 EA $190.00 $2,470.00 13 $2,470.00 MOUNT CITY STD 9 TRAFFIC CONTROL 1 LS $1,500.00 $1,500.00 1 $1,500.00 10 REMOVE TYPE III BARRICADE (CO A2) 2 EA $500.00 $1,000.00 2 $1,000.00 11 SWPPP MAINTENANCE 1 LS $500.00 $500.00 1 $500.00 12 CONCRETE FLUMES (CO C1) 452 LF $72.05 $32,566.60 452 $32,566.60 13 TOPSOIL 1165 CY $5.00 $5,825.00 1165 $5,825.00 14 BLOCK SOD PLACEMENT 10485 SY $1.00 $10,485.00 10485 $10,485.00 15 SAW CUT EXISITING CONCRETE PAVEMENT 91 LF $40.00 $3,640.00 91 $3,640.00 (CO A2) Sub -Total of Previous Unit $999,011.30 $999,011.30 Friday, February 10, 2023 Page 2 of 4 City Project Numbers 102444 Contract Name BAR C RANCH PHASE 10 Contract Limits Project Type PAVING Project Funding Contract Information Summary Original Contract Amount Change Orders Change Order Number A2 Change Order Number Al Total Contract Price DOE Number 2444 Estimate Number 1 Payment Number 1 For Period Ending 2/10/2023 $1,030,672.35 $15,027.35 ($46,688.40) $999,011.30 Total Cost of Work Completed $999,011.30 Less % Retained $0.00 Net Earned $999,011.30 Earned This Period $999,011.30 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $999,011.30 Friday, February 10, 2023 Page 3 of 4 City Project Numbers 102444 Contract Name BAR C RANCH PHASE 10 Contract Limits Project Type PAVING Project Funding Project Manager NA Inspectors GLOVER / WALKER Contractor GILCO CONTRACTING, INC. 6331 SOUTHWEST BLVD. BENBROOK, TX 76132-1063 DOE Number 2444 Estimate Number 1 Payment Number 1 For Period Ending 2/10/2023 City Secretary Contract Number Contract Date Contract Time 50 WD Days Charged to Date 160 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $999,011.30 Less % Retained $0.00 Net Earned $999,011.30 Earned This Period $999,011.30 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $999,011.30 Friday, February 10, 2023 Page 4 of 4 DocuSign Envelope ID: 7BE96E97-858C-43AB-9043-A8656BOF6484 DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: Bar C Ranch Phase 10 CONTRACT: (A) Paving CFA # CFA21-0065 I CITY PROJECT # 102444 DOE # N/A WATER PROJECT # FID No. 30114-0200431-102444-EO7685 SEWER PROJECT# IFID No. 30114-0200431-102444-EO7686 FILE # IW-2673 INSPECTOR: Eddie Walker PROJECT MANAGER: KHALJAAFARI CITY PARTICIPATION:I NO Phone No: (469) 658-5100 Phone No: (817) 392-7872 CHANGE ORDER No: A2 RECEIVED By Khal Jaafari at 2:48 pm, Feb 09, 2023 CONTRACT UNIT UNIT I: WATER UNIT IB: S COUNTY LINE RD UNIT II: SANITARY SEWER UNIT III: DRAINAGE UNIT IV: PAVING UNIT V: STREET LIGHTING CONTRACT WATER - DAYS Developer City Cost Developer City Cost Developer City CostCity Developer Cost Developer City CostCity Developer Cost Cost Cost Cost Cost Cost Cost ORIGINAL CONTRACT $1,030,672.35 EXTRAS TO DATE I I I CREDITS TO DATE I I I I I ($46,688.40) I ICONTRACT TO DATE I $0.00 $0.00 I $0.00 $0.00 I S0.00 S0.00 I S0.00 S0.00 I $983,983.95 $0.00 S0.00 $0.00 I 50 (AMOUNT OF PROP. CHANGE ORDER I I I I I $15,027.35 I 0 IREVISED CONTRACTAMOUNT I $0.00 I 50.00 S0.00 I S0.00 I $0.00 I $0.00 I S0.00 I $0.00 I $999,011.30 $0.00 $0.00 I 50.00 50 TOTAL REVIS CONTRACT AMOUNT PER UNIT I $0.00 $0.00 $0.00 I S0.00 I $999,011.30 $0.00 REVISED COST SHARE IDev. Cost: $999,011.30 City Cost: $0.00 TOTAL REVISED CONTRACT I $999,011.30 Revised: 1D-12-2011 Page 1 DocuSign Envelope ID: 7BE96E97-858C-43AB-9043-A8656BOF6484 You are directed to make the following changes in the contract documents CITY BID ITEM I PAY ITEM # I QUANTITY UNIT (UNIT IV: Paving 1 1 3211.0400 2.8 TON 1 2 3211.0501 173 SY 3 3213.0101 148 SY 1 4 3213.0506 394 SF 1 6 3213.0506 2 EA 1 10 N/A -1 EA 1 15 I I N/A 91 LF ITEM DESCRIPTION Hydrated Lime 6" Lime Treatment (32#/SY) 6" Conc. Pvmt. 4" Sidewalk Pvmt Barrier Free Ramp, Type P-1 Remove T pe III Barricade Sawcut ExistinSoncrete Pavement RECEIVED By Khal Jaafari at 2:49 pm, Feb 09, 2023 DEVELOPER UNIT PRICE COST $170.00 1 $476.00 $2.65 1 $458.45 $35.05 1 $5,187.40 $5.75 1 $2,265.50 $1,750.00 1 $3,500.00 $500.00 1-$500.00 $40.00 1 $3640.00 TOTALS $15,027.351 REASONS FOR CHANGE ORDER North intersection of Heritage Trace Parkway and Boulder Oak Boulevard not built with Phase B. Pavement and sidewalk addition required along with sawcut and BFRs. RECOMMENDED: DeeuSlgned by: LJA E gine.e rig a— Y By: wcossouea iaw... Name: Lauren Gilstrap Title: Sr. Protect Manager APPROVED: DocuSlgned by: Fore rtart(USA) Real Estate Group, Inc. t vuln, (,a�jaYt,S By: ucerAoucrai uaru... Name: Kevin Lazares Title: Vice President APPROVED: Gilco Contracting Inc. By: Leta McoJ gie;l Name: Leia McQuien Title: Drina Emsirient Olaaratin— CITY COST I TOTAL $0.00 $476.001 $0.00 $458.451 $0.00 $5,187.401 $0.00 $2,265.501 $0.00 $3,500.001 $0.00-$500.001 mu.uu $3,64u.oy $0.001 $15,027.351 Revised: 10-12-2011 Page 2 DocuSign Envelope ID: F9EE3C75-2226-49C4-9DF9-DAC7871900D3 DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: Bar C Ranch Phase 10 CHANGE CONTRACT: (A) Paving ORDER No: CFA # CFA21-0065 I CITY PARTICIPATION:( NO CITY PROJECT # 102444 I DOE # I N/A IWATER PROJECT# IFID No. 30114-0200431-102444-EO7685 Al ISEWER PROJECT# IFID No. 30114-0200431-102444-EO7685 FILE # I W-2673 RECEIVED INSPECTOR: Eddie Walker Phone No: (469) 658-5100 PROJECT MANAGER: Khal Jaafari Phone No: (817) 392-7872 By Khal Jaafari at 4:39 pm, Apr 29, 2022 ' CONTRACT UNIT WATER SEWER PAVING DRAINAGE STREET LIGHTS CONTRACT Developer Developer Developer Developer Developer I DAYS I Cost City Cost Cost City Cost Cost City Cost Cost City Cost Cost City Cost ORIGINAL CONTRACT $1,030,672.35 EXTRAS TO DATE (CREDITS TO DATE (CONTRACT TO DATE $0.00 $0.00 I $0.00 I $0.00 I $1,030,672.35I $0.00 I $0.00 $0.00 $0.00 $0.00 I 50 (AMOUNT OF PROP. CHANGE ORDER I I I$ (46,688.40)I I I 0 (REVISED CONTRACT AMOUNT I $0.00 I $0.00 I $0.00 I $0.00 I $983,983.95 I $0.00 I $0.00 1 $0.00 I $0.00 I $0.00 I 50 TOTAL REVIS CONTRACT AMOUNT PER UNIT I $0.00 $0.00 I $983,983.95 $0.00 $0.00 REVISED COST SHARE Dev. Cost: $983,983.95 City Cost: $0.00 TOTAL REVISED CONTRACT $983,983.95 Revised: 10-12-2011 Page 1 DocuSign Envelope ID: F9EE3C75-2226-49C4-9DF9-DAC7871900D3 You are directed to make the followinc changes in the contract documents: CITY BID ITEM PAY ITEM # # QUANTITY UNIT 1 12 N/A -648 LF I I I REASONS FOR CHANGE ORDER RECEIVED By Khal Jaafari at 4:39 pm, Apr 29, 2022 ITEM DESCRIPTION UNIT PRICE TOTAL Concrete Flume $ 72.05 $ (46,688.40)1 1 1 TOTAL $ (46,688.40)1 Pay Item 12 Shortened Concrete Flume at the northwest comer of the phase NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: Con°ouyfin yIN`AEenn�g^yXieeer ) ��/ / VD By: —rcucoeyoq iaw... Name: Lauren G1 strap Title: Sr. Project Manager APPROVED: DocuSigned by: (De eloe/r`)''1. .m Kevin Lazares Name: Title: vice President APPROVED: (C o Signed by: tra//c o�' �j�GLCt /•rGQwK.1L By boor444h.4M IAA,.... Name: Leia McQuien Title: vice President, operations Revised: 10-12-2011 Page 2 FORTWORTH. TRANSPORTATION AND PUBLIC WORKS February 10, 2023 Gilco Contracting Inc 6331 Southwest Boulevard Benbrool< TX. 76132 RE: Acceptance Letter Project Name: BAR C RANCH PHASE 10 Project Type: Paving City Project No.: 102444 To Whom It May Concern: On February 9, 2023 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on February 10, 2023. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on February 10, 2023, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-7872. Sincerely, KGu�G_9�� P. C-. Khal Jaafari P.E.( eh 10, 202316:36 CST) Khal Jaafari, Project Manager Cc: Eddie Walker, Inspector Mike Glover, Inspection Supervisor Daniel Roy, Senior Inspector VictorTornero, Program Manager UA ENGINEERING, INC., Consultant Gilco Contracting, Inc., Contractor Forestar(USA) Real Estate Group,lnc., Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Rob Taylor, Accounts Receivable of Gilco Contracting, Inc., known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth, Texas has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as Paving Improvements to serve: Bar C Ranch, Phase 10 �Y BY: Rob Tay or Subscribed and sworn before me on this 3rd of February , 2023. V P .,,, EMMA TURNER O P"........8� Notary Public, State of Texas •g My Commission Expires August 12, 2025 N01 APY 10 13326419 51winvi/` Notary Public Tarrant County, TX CONSENT OF SURETY COMPANY TO FINAL PAYMENT Conforms with the American Institute of Architects, AIA Document G707 OWNER ❑ ARCHITECT ❑ CONTRACTOR ❑ SURETY ❑ OTHER Bond No 022232639 PROJECT: (name, address)Bar C Ranch Phase 10 TO (Owner) Fort Worth TX FORESTAR (USA) REAL ESTATE GROUP, INC. AND ARCHITECT'S PROJECT NO: CITY OF FORT WORTH CONTRACT FOR: Building Two, Suite 500 Bar C Ranch Phase 10 Austin TX 78746 CONTRACT DATE: CONTRACTOR: GILCO CONTRACTING, INC. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the (here insert name and address of Surety Company) LIBERTY MUTUAL INSURANCE COMPANY 175 Berkeley Street Boston MA 02116 , SURETY COMPANY on bond of (here insert name and address of Contractor) GILCO CONTRACTING, INC. 6331 Southwest Boulevard Benbrook TX 76132 ,CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to (here insert name and address of Owner) FORESTAR (USA) REAL ESTATE GROUP, INC. AND CITY OF FORT WORTH Building Two, Suite 500 Austin TX 78746 OWNER, as set forth in the said Surety Company's bond. IN WITNESS, WHEREOF, the Surety Company has hereunto set its hand this Attest: (Seal): 3rd day of February, 2023 LIBERTY MUTUAL INSURANCE COMPANY Surety yCompany ) Signatufe of Authorized Representative Soohinie Hunter Title Attorney -in -Fact NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Current Edition ONE PAGE This Power of Attorney limits the acts of those named herein, and they have no authority to 10� bind the Company except in the manner and to the extent herein stated. Liberty Liberty Mutual Insurance Company Mutua.L The Ohio Casualty Insurance Company Certificate No: 8205467-022020 SURETY West American Insurance Company POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Don E. Cornell; Joshua Saunders; Kelly A. Westbrook; Mikaela Peppers; Ricardo J. Reyna; Robbi Morales; Sophinie Hunter; Tina McEwan; Tonie Petranek all of the city of Dallas state of TX each individually if there be more than one named, its true and lawful attorney -in -fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 23rd day of April 2021 Liberty Mutual Insurance Company P� iNSUR4 PyI`f INS( iy \NSURThe Ohio Casualty Insurance Company �J aoRPOR4TFyo �J aoReoaar 2 �6Pu.5L OR4qr 2� West American Insurance Company o R� vQ 3 o m w g Fo to ui Y�1912y0 o 1919 0 1991 �* ZOe) M * >`G.20 0j> By: m David M. Carey, Assistant Secretary 0- to State of PENNSYLVANIA ss S rn County of MONTGOMERY ;_ 0 o> On this 23rd day of April 2021 before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance � Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes _(D _ therein contained by signing on behalf of the corporations by himself as a duly authorized officer. m tJ N to c v IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at King of Prussia, Pennsylvania, on the day and year first above written. O00 N L �x^" iat�✓ ,vr Commonwealth of Pennsylvania -Notary Seal Qj O O 4? C fu Co rn� O E� oc}Lo � U Co c >4) o Z 0 Teresa Paslelfa, Notary Public Montgomery County � s z " My commission expires March 28, 20?b Commission number 1126044 By. Member, Pennsylvania Association of Notaries eresa Pastella, Notary Public This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows: >� °o O.Fu E O N Q `o 00 Mutual O N ARTICLE IV —OFFICERS: Section 12. Power of Attorney, a w Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the 0 o President may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety C° any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective powers of attorney, shall -o c have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such o a> instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney -in -fact under the m provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. g ARTICLE XIII — Execution of Contracts: Section 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. Certificate of Designation — The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attorneys -in - fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Authorization — By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed. 1, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 3rd day of February , 2023 . P� 1NsVQq PVTY INS& %NSMI 2GonP0 fro ycc^ Q 3OoaaoRyroyyc, \V °oRaop'. y0 1912 0 1919 u 1991� �V19s`SACHU`+��,aD yO 2t�NAMPS4 as '� �NDIANP a By � Fla s�M * Renee C. Llewellyn, Assistant Secretary LMS-12873 LMIC OCIC WAIC Multi Co 02/21 e i 4- Liberty- TSURETY TEXAS IMPORTANT NOTICE To obtain information or make a complaint: You may call toll -free for information or to make a complaint at 1-877-751-2640 You may also write to: 2200 Renaissance Blvd., Ste. 400 King of Prussia, PA 19406-2755 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at 1-800-252-3439 You may write the Texas Department of Insurance Consumer Protection (111-1A) P. O. Box 149091 Austin, TX 78714-9091 FAX: (512) 490-1007 Web: htta://www.tdi.texas.gov E-mail: ConsumerProtection c4.tdi.texas.gov PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should first contact the agent or call 1-800-843-6446. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. TEXAS AVISO IMPORTANTE Para obtener informacion o para someter una queja: Usted puede llamar al numero de telefono gratis para informacion o para someter una queja al 1-877-751-2640 Usted tambien puede escribir a: 2200 Renaissance Blvd., Ste. 400 King of Prussia, PA 19406-2755 Puede comunicarse con el Departamento de Seguros de Texas para obtener informacion acerca de companias, coberturas, derechos o quejas al 1-800-252-3439 Puede escribir al Departamento de Seguros de Texas Consumer Protection (I I I -1 A) P. O. Box 149091 Austin, TX 78714-9091 FAX # (512) 490-1007 Web: http://www.tdi.texas.aov E-mail: ConsumerProtection(,tdi.texas.izov. DISPUTAS SOBRE PRIMAS O RECLAMOS: Si tiena una disputa concerniente a su prima o a un reclamo, debe comunicarse con el agente o primero. Si no se resuelve la disputa, puede entonces comunicarse con el departamento (TDI) UNA ESTE AVISO A SU POLIZA: Este aviso es solo para proposito de informacion y no se convierte en parte o condicion del documento adjunto. NP70680901 LMS-15292 10/15