HomeMy WebLinkAboutContract 56582-CO7CSC No. 56582-007
FORT WORTH City of Fort Worth
Change Order Request
Project Name: Water and Sanitary Sewer replacement Contract 2011 WSM-D Part 2 City Sec No.: 56582
Project No.(s):l 1929-2 1 DOE No. I N/A City Proj. No.: 1929
Project Description:) Replacing water line, Sanitary Sewer lines, Flat works and Paving on various streets.
Contractor:1 Woody Contractors Inc. Change Order # 7 Date: 1 5/24/2023
City Project Mgr.1 Preeti KC City Inspector: Rodrick Wallace
Phone Number: (817) 392-5467 Phone Number: (817 350-3321
Dept. Water Sewer TPW Totals Contract Time
(Calender days)
Original Contract Amount $2,031,329.25 $914,697.25 $0.00 $2,946,026.50 365
Extras to Date $40,572.70 145,685,00 1236,012,01 $322,329.71 165
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $2,071,901.95 $960,382.25 $236,072.00 $3,268,356.20 530
Amount of Proposed Change Order $0.00 $0.00 $0.00 $0.00 30
Revised Contract Amount $2,071,901.95 $960,382.25 $236,072.00 $3,268,356.20 1560
Original Funds Available for Change Orders $101,566.75 $45,733.75 $0.00 $147,300.50
Remaining Funds Available for this CO $60,994.05 $48.75 $0.00 $61,042.80
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 10.94%
MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACTCOST+ 2591.) $3,682,533.13
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Change Order No. 7 will provide for the following items that are necessary to complete the project on Columbus
Avenue and Schadt Street:
■ 6-inch concrete driveway
■ 4-inch concrete sidewalk with retaining wall
■ Retaining wall
■ Relocate and adjust 2 additional water services and 1 sewer service that is in conflict with driveway lowerings.
Staff concurs with the contractr's request for 30 additional calendar days on the project for the change order.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order,
Contractor's Company Name
Contractor Name t
�; Cpptractor Signature
Date Ij
Woody Contractors Inc.
Troy Woody
Inspector
/-,
Date
Project Mana er . _
�i t
Date
� z6
5/26/23
/V%
5/25/20231
Director (Water Dept)
Date
Construction Supervisor (TPW)
Date
T, S
Jun 1, 2023
1Y4za �UZ4&
5/30/23
Senior Assistant City Attorney.
Date
Assistant City Manager
Date
(
Jun 2,2023
a—a-4624(L'
Jun 2,2023
Council Action (If Required)
M&C Number j N/A
M&C Date Approved j NIA
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
Change Order Additions
Project Name Water and Sanitary Sewer replacement Contract 2011 WSM-D Part 2 City Sec No.: 56582
Project No.(s): 1929-2 . DOE No.1 N/A City Proj. No.: 1929
Project Replacing water line, Sanitary Sewer lines, Flat works and Paving on various streets. I
Description
Contractor Woody Contractors Inc. j Change Order: Date: f 5124/2023
City Project Mgr. Preeti KC City Inspector I Rodrick Wallace
ADDITIONS
I I t=m
Uhbt;KlF I IUN
12 Remove Concrete Driveway
25 6-inch Concrete Driveway
6 4-inch Concrete Sidewalk with retaining wall
55 Mobilization
13 Install Retaining Wall
26 7-inch Concrete Curb and 18-inch Gutter
56 Relocate & Adjust Water Service
57 Relocate & Adjust Sewer Service
14 Remove Rock Drive
DEPT
Qty Unit
Unit Cost
Total
TPW
1400.00 SF
1$2.00
$2,800.00
Sewer
1,532,00 SF
J$10.00
$15,320.00
TPW
580.00 SF
$8.00
$4,640.00
Water
1.00 LS
$10,000.00
$10,000.00
TPW
225.00 SF
$110.00
$24,750.00
Sewer
51.00 LF
$38.00
$1,938.00
Water
2.00 EA
$2,250.00
$4,500.00
Sewer
1.00 EA
$6,300.00
$6,300,00
TPW
132.001SF
$2.00
$264.00
I
lWater $14, 500.00
�Sewer $23,558.00
f TPW $32,454,00
Page i of i (Additions Sub Total
FORT Won-rvi City of Fort Worth
Change Order Deletions
Project Name Water and Sanitary Sewer replacement Contract 2011 WSM-D Part 2 City Sec No.: I 56582
Project No.(s): 1929-2 1 DOE No. I N/A City Proj. No.: 1929
Project Description Replacing water line, Sanitary Sewer lines, Flat works and Paving on various streets.
Contractor Woody Contractors Inc. Change Order: 77 Date
City Project Mgr. Preeti KC City Inspector: I Rodrick Wallace
DELETIONS
5/24/2023 1
ITEM DESCRIPTION DEPT Qty Unit Unit Cost
Total
39
10-inch Pavement Pulverization
Water
497.235 SY
$6.15 $3,058.00
42
4-inch Concrete Sidewalk With Retaining Wall
Water
200.00 SF
$8.00 $1,600.00
43
Miscellaneous Adjustments sprinkler system
Water
1.00 LS
$7,000.00 $7,000.00
47
Cement Modification, 26lbs.lsy
Water
11.60 TN
$245.00 $2,842.00
4
8" DIP Sewer Pipe w/401 Protective Coating
Sewer
62.00 LF
$153.00 $9,486.00
7
Asphat Pvmt Repair Beyond Defined Width, Residential
Sewer
40.48 SY
$150.00 $6,072.00
18
4" Sewer Service
Sewer
4.00 EA
$2,000.00 $8�000.00
6
4" Concrete Sidewalk
TPW
2,956.75 SF
$8.00 $23,654.00
8
Barrier Ramp Type P1
TPW
220.00 SF
$40.00 $8,800.00
Water
$14,500.00
Sewer
$23,558.00
TPW
$32,454.00
page 1 of T
Deletions Sub Total
MMBE Breakdown for this Change Order
VV
$
Total,..:.;;...
Previous Change Orders
AM M. Q
Total $0.00
Page 1 of 1
5/24/2023
Water & Sanitary Sewer Replacement Contract 2011, WSM-D Part 2
CSC: 56582
CPN: 1929
Change Order 7 Notes
Staff has reviewed the requested days and considers them to be fair and reasonable.
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Preeti KC
Name of Employee
Sr. Professional Engineer
Title
ATTEST:
U
Jannette Goodall
City Secretary
4.04'6U0q��
00000,
GdaPpQ�vga* tbnanoS0o oo *0000
4444X4p 9
�1
d0d
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX