HomeMy WebLinkAboutContract 59548CSC No. 59548
CITY OF FORT WORTH, TEXAS
STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL
SERVICES
This AGREEMENT is between the City of Fort Worth, a Texas home -rule municipality
("CITY"), and Halff Associates, Inc., authorized to do business in Texas, ("ENGINEER"), for
a PROJECT generally described as: Linwood & West 7th Flood Mitigation — Project No.
104868.
Article I
Scope of Services
The Scope of Services is set forth in Attachment A. Negotiated changes to this
Agreement, if any, are included in Attachment C.
Article II
Compensation
The ENGINEER's compensation shall be in the amount up to $1,000,000 as set
forth in Attachment B. Payment shall be considered full compensation for all labor
(including all benefits, overhead and markups), materials, supplies, and equipment
necessary to complete the Services.
Engineer shall provide monthly invoices to City. The Engineer shall provide the City
sufficient documentation, including but not limited to meeting the requirements set forth in
Attachment D to this AGREEMENT, to reasonably substantiate the invoices.
Payments for services rendered shall be made in accordance with the Texas
Prompt Payment Act (Texas Government Code Ch. 2251).
Acceptance by Engineer of said payment shall release City from all claims or
liabilities under this Agreement for anything related to, performed, or furnished in
connection with the Services for which payment is made, including any act or omission of
City in connection with such Services.
Article III
Term
Time is of the essence. Unless otherwise terminated pursuant to Article VI. D.
herein, this Agreement shall be for a term beginning upon the effective date, as described
below, and shall continue until the expiration of the funds or completion of the subject
matter contemplated herein pursuant to the schedule, whichever occurs first. Unless
specifically otherwise amended, the original term shall not exceed five years from the
City of Fort Worth, Texas Project Number 104868
Standard Agreement for Engineering Related Design Services Linwood & West 7th Flood Mitigation
Revised Date: November 23, 2021
Page 1 of 15 OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
original effective date.
Article IV
Obligations of the Engineer
A. General
The ENGINEER will serve as the CITY's professional engineering
representative under this Agreement, providing professional engineering
consultation and advice and furnishing customary services incidental thereto.
B. Standard of Care
The ENGINEER shall perform its services:
(1) with the professional skill and care ordinarily provided by competent
engineers practicing under the same or similar circumstances and
professional license; and
(2) as expeditiously as is prudent considering the ordinary professional
skill and care of a competent engineer.
C. Subsurface Investigations
(1) The ENGINEER shall advise the CITY with regard to the necessity for
subcontract work such as special surveys, tests, test borings, or other
subsurface investigations in connection with design and engineering
work to be performed hereunder. The ENGINEER shall also advise the
CITY concerning the results of same. Such surveys, tests, and
investigations shall be furnished by the CITY, unless otherwise
specified in Attachment A.
(2) In soils, foundation, groundwater, and other subsurface investigations,
the actual characteristics may vary significantly between successive
test points and sample intervals and at locations other than where
observations, exploration, and investigations have been made.
Because of the inherent uncertainties in subsurface evaluations,
changed or unanticipated underground conditions may occur that could
affect the total PROJECT cost and/or execution. These conditions and
cost/execution effects are not the responsibility of the ENGINEER.
City of Fort Worth, Texas Project Number 104868
Standard Agreement for Engineering Related Design Services Linwood & West 7th Flood Mitigation
Revised Date: November 23, 2021
Page 2 of 15
D. Preparation of Engineering Drawings
The ENGINEER will provide to the CITY the original drawings of all plans in
ink on reproducible mylar sheets and electronic files in .pdf format, or as
otherwise approved by CITY, which shall become the property of the CITY.
CITY may use such drawings in any manner it desires; provided, however,
that the ENGINEER shall not be liable for the use of such drawings for any
project other than the PROJECT described herein.
E. Engineer's Personnel at Construction Site
(1) The presence or duties of the ENGINEER's personnel at a construction site,
whether as on -site representatives or otherwise, do not make the ENGINEER
or its personnel in any way responsible for those duties that belong to the
CITY and/or the CITY's construction contractors or other entities, and do not
relieve the construction contractors or any other entity of their obligations,
duties, and responsibilities, including, but not limited to, all construction
methods, means, techniques, sequences, and procedures necessary for
coordinating and completing all portions of the construction work in
accordance with the contract documents and any health or safety precautions
required by such construction work. The ENGINEER and its personnel have
no authority to exercise any control over any construction contractor or other
entity or their employees in connection with their work or any health or safety
precautions.
(2) Except to the extent of specific site visits expressly detailed and set forth in
Attachment A, the ENGINEER or its personnel shall have no obligation or
responsibility to visit the construction site to become familiar with the progress
or quality of the completed work on the PROJECT or to determine, in general,
if the work on the PROJECT is being performed in a manner indicating that
the PROJECT, when completed, will be in accordance with the contract
documents, nor shall anything in the contract documents or this
AGREEMENT between CITY and ENGINEER be construed as requiring
ENGINEER to make exhaustive or continuous on -site inspections to discover
latent defects in the work or otherwise check the quality or quantity of the work
on the PROJECT. If the ENGINEER makes on -site observation(s) of a
deviation from the contract documents, the ENGINEER shall inform the CITY.
(3) When professional certification of performance or characteristics of materials,
systems or equipment is reasonably required to perform the services set forth
in the Scope of Services, the ENGINEER shall be entitled to rely upon such
certification to establish materials, systems or equipment and performance
criteria to be required in the contract documents.
City of Fort Worth, Texas Project Number 104868
Standard Agreement for Engineering Related Design Services Linwood & West 7th Flood Mitigation
Revised Date: November 23, 2021
Page 3 of 15
F. Opinions of Probable Cost, Financial Considerations, and Schedules
(1) The ENGINEER shall provide opinions of probable costs based on the
current available information at the time of preparation, in accordance
with Attachment A.
(2) In providing opinions of cost, financial analyses, economic feasibility
projections, and schedules for the PROJECT, the ENGINEER has no
control over cost or price of labor and materials; unknown or latent
conditions of existing equipment or structures that may affect operation
or maintenance costs; competitive bidding procedures and market
conditions; time or quality of performance by third parties; quality, type,
management, or direction of operating personnel; and other economic
and operational factors that may materially affect the ultimate PROJECT
cost or schedule. Therefore, the ENGINEER makes no warranty that
the CITY's actual PROJECT costs, financial aspects, economic
feasibility, or schedules will not vary from the ENGINEER's opinions,
analyses, projections, or estimates.
G. Construction Progress Payments
Recommendations by the ENGINEER to the CITY for periodic construction
progress payments to the construction contractor will be based on the
ENGINEER's knowledge, information, and belief from selective sampling and
observation that the work has progressed to the point indicated. Such
recommendations do not represent that continuous or detailed examinations
have been made by the ENGINEER to ascertain that the construction
contractor has completed the work in exact accordance with the contract
documents; that the final work will be acceptable in all respects; that the
ENGINEER has made an examination to ascertain how or for what purpose
the construction contractor has used the moneys paid; that title to any of the
work, materials, or equipment has passed to the CITY free and clear of liens,
claims, security interests, or encumbrances; or that there are no other matters
at issue between the CITY and the construction contractor that affect the
amount that should be paid.
H. Record Drawings
Record drawings, if required, will be prepared, in part, on the basis of
information compiled and furnished by others, and may not always represent
the exact location, type of various components, or exact manner in which the
PROJECT was finally constructed. The ENGINEER is not responsible for any
errors or omissions in the information from others that is incorporated into the
record drawings.
City of Fort Worth, Texas Project Number 104868
Standard Agreement for Engineering Related Design Services Linwood & West 7th Flood Mitigation
Revised Date: November 23, 2021
Page 4 of 15
Business Equity Participation
City has goals for the full and equitable participation of minority business
and/or women business enterprises in City contracts greater than
$100,000. In accordance with the City's Business Equity Ordinance No.
25165-10-2021 (replacing Ordinance No. 24534-11-2020, as codified in
Chapter 20, Article X of the City's Code of Ordinances, as amended, and any
relevant policy or guidance documents), the City has goals for the full and
equitable participation of minority business and/or women business
enterprises in City contracts greater than $100,000. Engineer acknowledges
the MBE and WBE goals established for this contract and its execution of this
Agreement is Engineer's written commitment to meet the prescribed MBE and
WBE participation goals. Any misrepresentation of facts (other than a
negligent misrepresentation) and/or the commission of fraud by the Engineer
may result in the termination of this Agreement and debarment from
participating in City contracts for a period of time of not less than three (3)
years.
J. Right to Audit
(1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years
after final payment under this contract, have access to and the right to
examine and photocopy any directly pertinent books, documents, papers and
records of the ENGINEER involving transactions relating to this contract.
ENGINEER agrees that the CITY shall have access during normal working
hours to all necessary ENGINEER facilities and shall be provided adequate
and appropriate work space in order to conduct audits in compliance with the
provisions of this section. The CITY shall give ENGINEER reasonable
advance notice of intended audits.
(2) ENGINEER further agrees to include in all its subconsultant agreements
hereunder a provision to the effect that the subconsultant agrees that the CITY
shall, until the expiration of five (5) years after final payment under the
subcontract, have access to and the right to examine and photocopy any
directly pertinent books, documents, papers and records of such
subconsultant, involving transactions to the subcontract, and further, that the
CITY shall have access during normal working hours to all subconsultant
facilities, and shall be provided adequate and appropriate work space, in order
to conduct audits in compliance with the provisions of this article together with
subsection (3) hereof. CITY shall give subconsultant reasonable advance
notice of intended audits.
(3) ENGINEER and subconsultant agree to reproduce such documents as may
be requested by the CITY. The CITY agrees to reimburse ENGINEER for the
cost of hard copies at the rate published in the Texas Administrative Code in
City of Fort Worth, Texas Project Number 104868
Standard Agreement for Engineering Related Design Services Linwood & West 7th Flood Mitigation
Revised Date: November 23, 2021
Page 5 of 15
effect as of the time copying is performed.
K. INSURANCE
Engineer shall not commence work under this Agreement until it has
obtained all insurance required under Attachment F and City has approved
such insurance.
L. Independent Consultant
The ENGINEER agrees to perform all services as an independent consultant
and not as a subcontractor, agent, or employee of the CITY. The doctrine
of respondent superior shall not apply.
M. Disclosure
The ENGINEER acknowledges to the CITY that it has made full disclosure in
writing of any existing conflicts of interest or potential conflicts of interest,
including personal financial interest, direct or indirect, in property abutting the
proposed PROJECT and business relationships with abutting property cities.
The ENGINEER further acknowledges that it will make disclosure in writing of
any conflicts of interest that develop subsequent to the signing of this contract
and prior to final payment under the contract.
N. Asbestos or Hazardous Substances
(1) If asbestos or hazardous substances in any form are encountered or
suspected, the ENGINEER will stop its own work in the affected portions
of the PROJECT to permit testing and evaluation.
(2) If asbestos or other hazardous substances are suspected, the CITY may
request the ENGINEER to assist in obtaining the services of a qualified
subcontractor to manage the remediation activities of the PROJECT.
O. Permitting Authorities - Design Changes
If permitting authorities require design changes so as to comply with published
design criteria and/or current engineering practice standards which the
ENGINEER should have been aware of at the time this Agreement was
executed, the ENGINEER shall revise plans and specifications, as required,
at its own cost and expense. However, if design changes are required due to
the changes in the permitting authorities' published design criteria and/or
practice standards criteria which are published after the date of this
Agreement which the ENGINEER could not have been reasonably aware of,
the ENGINEER shall notify the CITY of such changes and an adjustment in
compensation will be made through an amendment to this AGREEMENT.
City of Fort Worth, Texas Project Number 104868
Standard Agreement for Engineering Related Design Services Linwood & West 7th Flood Mitigation
Revised Date: November 23, 2021
Page 6 of 15
P. Schedule
ENGINEER shall manage the PROJECT in accordance with the schedule
developed per Attachment D to this AGREEMENT.
Article V
Obligations of the City
A. City -Furnished Data
ENGINEER may rely upon the accuracy, timeliness, and completeness of the
information provided by the CITY.
B. Access to Facilities and Property
The CITY will make its facilities accessible to the ENGINEER as required for
the ENGINEER's performance of its services. The CITY will perform, at no
cost to the ENGINEER, such tests of equipment, machinery, pipelines, and
other components of the CITY's facilities as may be required in connection
with the ENGINEER's services. The CITY will be responsible for all acts of the
CITY's personnel.
C. Advertisements, Permits, and Access
Unless otherwise agreed to in the Scope of Services, the CITY will obtain,
arrange, and pay for all advertisements for bids; permits and licenses required
by local, state, or federal authorities; and land, easements, rights -of -way, and
access necessary for the ENGINEER's services or PROJECT construction.
D. Timely Review
The CITY will examine the ENGINEER's studies, reports, sketches, drawings,
specifications, proposals, and other documents; obtain advice of an attorney,
insurance counselor, accountant, auditor, bond and financial advisors, and
other consultants as the CITY deems appropriate; and render in writing
decisions required by the CITY in a timely manner in accordance with the
project schedule prepared in accordance with Attachment D.
E. Prompt Notice
The CITY will give prompt written notice to the ENGINEER whenever CITY
observes or becomes aware of any development that affects the scope or
timing of the ENGINEER's services or of any defect in the work of the
ENGINEER or construction contractors.
City of Fort Worth, Texas Project Number 104868
Standard Agreement for Engineering Related Design Services Linwood & West 7th Flood Mitigation
Revised Date: November 23, 2021
Page 7 of 15
F. Asbestos or Hazardous Substances Release.
(1) CITY acknowledges ENGINEER will perform part of the work at CITY's
facilities that may contain hazardous materials, including asbestos
containing materials, or conditions, and that ENGINEER had no prior
role in the generation, treatment, storage, or disposition of such
materials. In consideration of the associated risks that may give rise to
claims by third parties or employees of City, City hereby releases
ENGINEER from any damage or liability related to the presence of such
materials.
(2) The release required above shall not apply in the event the discharge,
release or escape of hazardous substances, contaminants, or asbestos is
a result of ENGINEER's negligence or if ENGINEER brings such
hazardous substance, contaminant or asbestos onto the project.
G. Contractor Indemnification
The CITY agrees to include in all construction contracts the provisions of
Article IV.E. regarding the ENGINEER's Personnel at the construction site,
and provisions providing for contractor indemnification of the CITY and the
ENGINEER for contractor's negligence.
H. Contractor Claims and Third -Party Beneficiaries
(1) The CITY agrees to include the following clause in all contracts with
construction contractors and equipment or materials suppliers:
"Contractors, subcontractors and equipment and materials
suppliers on the PROJECT, or their sureties, shall maintain
no direct action against the ENGINEER, its officers,
employees, and subcontractors, for any claim arising out of,
in connection with, or resulting from the engineering services
performed. Only the CITY will be the beneficiary of any
undertaking by the ENGINEER."
(2) This AGREEMENT gives no rights or benefits to anyone other than the CITY
and the ENGINEER and there are no third -party beneficiaries.
(3) The CITY will include in each agreement it enters into with any other entity or
person regarding the PROJECT a provision that such entity or person shall
have no third -party beneficiary rights under this Agreement.
(4) Nothing contained in this Section H. shall be construed as a waiver of any
right the CITY has to bring a claim against ENGINEER.
City of Fort Worth, Texas Project Number 104868
Standard Agreement for Engineering Related Design Services Linwood & West 7th Flood Mitigation
Revised Date: November 23, 2021
Page 8 of 15
I. Litigation Assistance
The Scope of Services does not include costs of the ENGINEER for required
or requested assistance to support, prepare, document, bring, defend, or
assist in litigation undertaken or defended by the CITY. In the event CITY
requests such services of the ENGINEER, this AGREEMENT shall be
amended or a separate agreement will be negotiated between the parties.
J. Changes
The CITY may make or approve changes within the general Scope of
Services in this AGREEMENT. If such changes affect the ENGINEER's cost
of or time required for performance of the services, an equitable adjustment
will be made through an amendment to this AGREEMENT with appropriate
CITY approval.
Article VI
General Legal Provisions
A. Authorization to Proceed
ENGINEER shall be authorized to proceed with this AGREEMENT upon
receipt of a written Notice to Proceed from the CITY.
B. Reuse of Project Documents
All designs, drawings, specifications, documents, and other work products of
the ENGINEER, whether in hard copy or in electronic form, are instruments
of service for this PROJECT, whether the PROJECT is completed or not.
Reuse, change, or alteration by the CITY or by others acting through or on
behalf of the CITY of any such instruments of service without the written
permission of the ENGINEER will be at the CITY's sole risk. The CITY shall
own the final designs, drawings, specifications and documents.
C. Force Majeure
CITY and ENGINEER shall exercise their best efforts to meet their
respective duties and obligations as set forth in this Agreement, but shall
not be held liable for any delay or omission in performance due to force
majeure or other causes beyond their reasonable control, including, but not
limited to: acts of the public enemy, fires, strikes, lockouts, natural disasters,
epidemics/pandemics, wars, riots, material or labor restrictions by any
governmental authority and/or any other similar causes.
City of Fort Worth, Texas Project Number 104868
Standard Agreement for Engineering Related Design Services Linwood & West 7th Flood Mitigation
Revised Date: November 23, 2021
Page 9 of 15
D. Termination
(1) This AGREEMENT may be terminated
a.) by the City for its convenience upon 30 days' written notice to
ENGINEER.
b.) by either the CITY or the ENGINEER for cause if either party fails
substantially to perform through no fault of the other and the
nonperforming party does not commence correction of such
nonperformance within 5 days' written notice or thereafter fails to
diligently complete the correction.
(2) If this AGREEMENT is terminated for the convenience of the City, the
ENGINEER will be paid for termination expenses as follows:
a.) Reasonable cost of reproduction or electronic storage of partial or
complete studies, plans, specifications or other forms of ENGINEER'S
work product;
b.) The reasonable time requirements for the ENGINEER'S personnel to
document the work underway at the time of the CITY'S termination for
convenience so that the work effort is suitable for long time storage.
(3) Prior to proceeding with termination services, the ENGINEER will
submit to the CITY an itemized statement of all projected termination
expenses. The CITY'S approval shall be obtained in writing prior to
proceeding with termination services.
E. Suspension, Delay, or Interruption to Work
The CITY may suspend, delay, or interrupt the services of the ENGINEER for
the convenience of the CITY. In the event of such suspension, delay, or
interruption, an equitable adjustment in the PROJECT's schedule,
commitment and cost of the ENGINEER's personnel and subcontractors, and
ENGINEER's compensation will be made.
F. Indemnification
The ENGINEER shall indemnify or hold harmless the CITY against
liability for any damage committed by the ENGINEER or ENGINEER's
agent, consultant under contract, or another entity over which the
ENGINEER exercises control to the extent that the damage is caused by
or resulting from an act of negligence, intentional tort, intellectual
City of Fort Worth, Texas Project Number 104868
Standard Agreement for Engineering Related Design Services Linwood & West 7th Flood Mitigation
Revised Date: November 23, 2021
Page 10 of 15
property infringement, or failure to pay a subcontractor or supplier. CITY
is entitled to recover its reasonable attorney's fees in proportion to the
ENGINEER's liability.
G. Assignment
ENGINEER shall not assign all or any part of this AGREEMENT without the
prior written consent of CITY.
H. Jurisdiction
The law of the State of Texas shall govern the validity of this AGREEMENT,
its interpretation and performance, and any other claims related to it. The
venue for any litigation related to this AGREEMENT shall be Tarrant County,
Texas.
Severability and Survival
If any of the provisions contained in this AGREEMENT are held for any reason
to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality,
or unenforceability will not affect any other provision, and this AGREEMENT
shall be construed as if such invalid, illegal, or unenforceable provision had
never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I.
shall survive termination of this AGREEMENT for any cause.
J. Observe and Comply
ENGINEER shall at all times observe and comply with all federal and State
laws and regulations and with all City ordinances and regulations which in any
way affect this AGREEMENT and the work hereunder, and shall observe and
comply with all orders, laws ordinances and regulations which may exist or
may be enacted later by governing bodies having jurisdiction or authority for
such enactment. No plea of misunderstanding or ignorance thereof shall be
considered. ENGINEER agrees to defend, indemnify and hold harmless
CITY and all of its officers, agents and employees from and against all
claims or liability arising out of the violation of any such order, law,
ordinance, or regulation, whether it be by itself or its employees.
K. Contract Construction/No Waiver
The parties acknowledge that each Party and, if it so chooses, its counsel,
have reviewed and revised Agreement and that the normal rule of contract
construction, to the effect that any ambiguities are to be resolved against
the drafting party, must not be employed in the interpretation of Agreement
or any amendments or exhibits hereto.
City of Fort Worth, Texas Project Number 104868
Standard Agreement for Engineering Related Design Services Linwood & West 7th Flood Mitigation
Revised Date: November 23, 2021
Page 11 of 15
The failure of CITY or ENGINEER to insist upon the performance of any
term or provision of this Agreement or to exercise any right granted herein
shall not constitute a waiver of CITY's or ENGINEER's respective right to
insist upon appropriate performance or to assert any such right on any
future occasion.
L. Immigration Nationality Act
ENGINEER shall verify the identity and employment eligibility of its
employees who perform work under this Agreement, including completing
the Employment Eligibility Verification Form (1-9). Upon request by CITY,
ENGINEER shall provide CITY with copies of all 1-9 forms and supporting
eligibility documentation for each employee who performs work under this
Agreement. ENGINEER shall adhere to all Federal and State laws as well
as establish appropriate procedures and controls so that no services will be
performed by any ENGINEER employee who is not legally eligible to
perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD
CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES
DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER,
ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR
LICENSEES. CITY, upon written notice to ENGINEER, shall have the right
to immediately terminate this Agreement for violations of this provision by
ENGINEER.
M. Prohibition On Contracts With Companies Boycotting Israel
ENGINEER unless a sole proprietor, acknowledges that in accordance with
Chapter 2271 of the Texas Government Code, if ENGINEER has 10 or
more full time -employees and the contract value is $100,000 or more, the
City is prohibited from entering into a contract with a company for goods or
services unless the contract contains a written verification from the
company that it: (1) does not boycott Israel; and (2) will not boycott Israel
during the term of the contract. The terms "boycott Israel" and "company"
shall have the meanings ascribed to those terms in Section 808.001 of the
Texas Government Code. By signing this contract, ENGINEER certifies
that ENGINEER'S signature provides written verification to the City
that if Chapter 2271, Texas Government Code applies, ENGINEER: (1)
does not boycott Israel; and (2) will not boycott Israel during the term
of the contract.
N. Prohibition on Boycotting Energy Companies
City of Fort Worth, Texas Project Number 104868
Standard Agreement for Engineering Related Design Services Linwood & West 7th Flood Mitigation
Revised Date: November 23, 2021
Page 12 of 15
ENGINEER acknowledges that in accordance with Chapter 2274 of the
Texas Government Code -(as added by Acts 2021, 87th Leg., R.S., S.B. 13,
§ 2), the CITY is prohibited from entering into a contract for goods or
services that has a value of $100,000 or more, which will be paid wholly or
partly from public funds of the City, with a company (with 10 or more full-
time employees) unless the contract contains a written verification from the
company that it: (1) does not boycott energy companies; and (2) will not
boycott energy companies during the term of the contract. The terms
"boycott energy company" and "company" have the meaning ascribed to
those terms by Chapter 2274 of the Texas Government Code (as added by
Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter 2274
of the Government Code is applicable to this Agreement, by signing
this Agreement, ENGINEER certifies that ENGINEER's signature
provides written verification to the CITY that ENGINEER: (1) does not
boycott energy companies; and (2) will not boycott energy companies
during the term of this Agreement.
O. Prohibition on Discrimination Against Firearm and Ammunition
Industries
ENGINEER acknowledges that except as otherwise provided by Chapter
2274 of the Texas Government Code (as added by Acts 2021, 87th Leg.,
R.S., S.B. 19, § 1), the CITY is prohibited from entering into a contract for
goods or services that has a value of $100,000 or more which will be paid
wholly or partly from public funds of the City, with a company (with 10 or
more full-time employees) unless the contract contains a written verification
from the company that it: (1) does not have a practice, policy, guidance, or
directive that discriminates against a firearm entity or firearm trade
association; and (2) will not discriminate during the term of the contract
against a firearm entity or firearm trade association. The terms
"discriminate," "firearm entity" and "firearm trade association" have the
meaning ascribed to those terms by Chapter 2274 of the Texas Government
Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1). To the extent
that Chapter 2274 of the Government Code is applicable to this
Agreement, by signing this Agreement, ENGINEER certifies that
ENGINEER's signature provides written verification to the CITY that
ENGINEER: (1) does not have a practice, policy, guidance, or directive
that discriminates against a firearm entity or firearm trade association;
and (2) will not discriminate against a firearm entity or firearm trade
association during the term of this Agreement.
This AGREEMENT, including its attachments and schedules, constitutes the entire
AGREEMENT, which supersedes all prior written or oral understandings, and may only be
changed by a written amendment executed by both parties. This AGREEMENT may be
executed in one or more counterparts and each counterpart shall, for all purposes, be
deemed an original, but all such counterparts shall together constitute but one and the
City of Fort Worth, Texas Project Number 104868
Standard Agreement for Engineering Related Design Services Linwood & West 7th Flood Mitigation
Revised Date: November 23, 2021
Page 13 of 15
same instrument.
The following attachments and schedules are hereby made a part of this AGREEMENT:
Attachment A -
Scope of Services
Attachment B -
Compensation
Attachment C
- Amendments to Standard Agreement for Engineering Services
Attachment D
- Project Schedule
Attachment E -
Location Map
Attachment F
— Insurance Requirements
Duly executed by each party's designated representative to be effective on the date
subscribed by the City's designated Assistant City Manager.
BY:
CITY OF FORT WORTH
William Johnson (JuJ 6, 202310:48 CDT)
William Johnson
Assistant City Manager
Date: Jun 6, 2023
ATTEST:
Jannette Goodall
City Secretary
APPROVAL RECOMMENDED:
By. Lauren Prieur(Jun 5, 202313:07 CDT)
Lauren Prieur
Director, Transportation & Public Works
APPROVED AS TO FORM AND LEGALITY
Y' DBlack (Jun 5, 2023 15:12 C
Douglas W Black
Sr. Assistant City Attorney
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
Revised Date: November 23, 2021
Page 14 of 15
BY:
ENGINEER
Halff Associates, Inc.
Ben Pylant
Water Resources Practice Leader
Date: Jun 5, 2023
Form 1295 No. 2023-1008122
M&C No.: 23-0432
M&C Date: Mav 23, 2023
Project Number 104868
Linwood & West 7th Flood Mitigation
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the monitoring and
administration of this contract, including ensuring all performance and reporting
requirements.
jwshw uayCor
Justin Naylor, P.E., CFM, PMP
Senior Professional Engineer
City of Fort Worth, Texas Project Number 104868
Standard Agreement for Engineering Related Design Services Linwood & West 7th Flood Mitigation
Revised Date: November 23, 2021
Page 15 of 15
ATTACHMENT "A"
Scope for Engineerinq Desiqn Related Services for Storm Water Improvements Proiects
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project. Under this scope, "ENGINEER"
is expanded to include any sub -consultant, including surveyor, employed or contracted by
the ENGINEER.
OBJECTIVE
The purpose of this project is to perform conceptual planning, project development and final
design services for the Linwood and West 7th Flood Mitigation Project. Conceptual planning
will include identifying potential improvements and an associated phasing approach to
mitigate the flood risk in the Linwood and West 7th areas. The goal of project development is
to identify acceptable, affordable and effective project phases for implementation. This
includes identifying, documenting and mitigating risks, engaging with internal and external
stakeholders and developing a schematic plan for implementation. The schematic plan
would include any potential phasing, and options for potential segments to be included.
Detailed OPCCs and schedules will be developed to accompany the schematic.
Additionally, coordination with Tarrant Regional Water District, United States Army Corps of
Engineers and other stakeholders will be required.
The final design phase will build upon the work done in the project development phase and
will result in a complete design. This phase will include the preparation of plans,
specifications and estimates and obtaining any necessary permits for the first phase of the
project.
WORK TO BE PERFORMED
Based on the complexity of project and the wide variety of tasks that may be needed to
advance this project, task orders will be issued for individual work tasks. Task orders will be
provided on a task authorization form and will be approved in writing by the project
manager.
These tasks may include but not limited to:
• Project Data Collection and Screening
• Geomorphologic Assessment
• Stakeholder Coordination and Meetings
• Structural Condition Assessments
• Hydrology and Hydraulic Studies
• Conceptual Planning and Project Identification
• Geotechnical Analysis
• Downstream Impact Analysis
• Schematic Design (25% level)
• Traffic Detour and Impact Analyses
• Topographic and Boundary Surveying
• Risk Analysis
• Subsurface Utility Engineering
• Permitting and Regulatory Assessments
City of Fort Worth, Texas Project Number 104868
Attachment A Linwood & West 7th Flood Mitigation
PMO Release Date: 07/23/2012
Page 1 of 22
• Cost Estimating
• iSWM Checklists
• FEMA CLOMR/LOMR
• Preliminary and Final Designs
• Construction Phase Services
• ROW and Easement Services
• Design and Construction Schedules
• Community Meetings
• Identification of Funding Sources
• Recommendations for Project Delivery Methods
City of Fort Worth, Texas Project Number 104868
Attachment A Linwood & West 7th Flood Mitigation
PMO Release Date: 07/23/2012
Page 2 of 2
ATTACHMENT B
COMPENSATION
Engineering Services for
Linwood and West 711 Flood Mitigation
City Project No. 104868
Time and Materials with Rate Schedule Project
Compensation
A. The ENGINEER shall be compensated for personnel time, non -labor expenses,
and subcontract expenses in performing services enumerated in Attachment A as
follows:
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Category Rate for the ENGINEER's team member performing the work.
Labor Cateaory Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries, overhead,
and profit.
Labor Category Minimum Rate Maximum Rate
($/hour) ($/hour)
Accounting
$85
$95
Contract Administrator
$80
$125
Principle in Charge
$290
$355
Project Manager
$225
$275
QAQC Manger
$270
$330
Special Project Advisor
$265
$325
PE Senior 12+
$200
$250
PE 7+
$150
$195
EIT II 4+
$126
$150
EIT 1
$110
$126
Senior Structural Engineer
$330
$405
Structural Engineer
$165
$205
CADD Senior
$135
$165
Senior Enviro
$140
$180
CADD Junior
$90
$115
GIS Senior Analyst
$125
$165
GIS Junior Analyst
$95
$125
Senior RPLS
$210
$260
Senior Survey Tech
$115
$140
Two -man Survey Crew
$160
$200
Three man Survey Crew
$210
$260
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 1 of 4
Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Project Number 104868
Linwood & West 7th Flood Mitigation).
95
ATTACHMENT B
COMPENSATION
Direct Expenses (non -labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
iii. Subcontract Expenses. Subcontract expenses and outside services shall be
reimbursed at cost to ENGINEER plus a markup of ten percent (10%).
iv. Budgets. ENGINEER will make reasonable efforts to complete the work within
the budget and will keep the City informed of progress toward that end so that
the budget or work effort can be adjusted if found necessary.
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be
adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services, that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by the
City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended prior
to such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER in
performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
III. Progress Reports
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 2 of 4
Project Number 104868
Linwood & West 7th Flood Mitigation).
B-2
ATTACHMENT B
COMPENSATION
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
IV. Summary of Total Project Fees
Firm Primary Responsibility Fee Amount %
Prime Consultant
Halff Associates, Inc. Management, Analysis, and $820,000 82%
Design
Proposed MWBE Sub -Consultants
Yellow Rose Mapping, SUE $50,000 5%
LLC
Construction Cost Cost estimating $30,000 3%
Management, Inc.
Non-MWBE Consultants
Baird, Hampton and Public works design $50,000 5%
Brown (BHB)
HNTB Geotech management, tunnel $50,000 5%
and pumping system
evaluation and design
Project Number & Name
PN 104868 Linwood and West 7th
Flood Mitigation
City MWBE Goal = 8 %
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 3 of 4
TOTAL $ 1,000,000 100%
Total Fee MWBE Fee MWBE %
$ 1,000,000 $ 80,000 8 %
Consultant Committed Goal = 8 %
Project Number 104868
Linwood & West 7th Flood Mitigation).
B-3
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across desired work types and work phases.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 4 of 4
Project Number 104868
Linwood & West 7th Flood Mitigation).
ENGINEER INVOICE
(Supplement to Attachment B)
Halff Associates, Inc. Itelephone
fax Invoice
office address remit address
Supplier Project No.
CFW Project Manager Proj. Invoice No.
Invoice date: )
Supplier's Project Manager:
Supplier's PM email: Period Service Date:Froml
Service Date:To�
Name of Project: City Secretary Contract #:
SW Project Development and Prioritization P.O. Number:
Labor Cateaory Name Hours Rate ($/hr)
Amount
Project Manager (example) I
$0.00
Senior Engineer (example) I
$0.00
Engineer (example) I
$0.00
(Junior Engineer (example) I
$0.00
CAD Technician (example) I
$0.00
IAdminstrative Support (example) I
$0.00
etc I
$0.00
I
$0.00
I
$0.00
I
$0.00
I
$0.00
I
$0.00
I
$0.00
I
$0.00
Total Labor 0.0
$0.00
Subcontract Service
I Subcontract Service - <1 example> I
I
I Subcontract Service - <2 example> I I
I
I etc I
I I I
I
I
Subcontractor Subtotal
$0.00
10 Percent Markup on Subcontract Services
$0.00
Nonlabor Expenses
Nonlabor Expense Subtotal
$0.00
Total Expenses (Subcontract Services+Markup+Nonlabor Expenses)
$0.00
TOTAL DUE THIS INVOICE $0.00
Project Number 100091
SW Project Development and Prioritization
ATTACHMENT "C"
CHANGES AND AMENDMENTS TO STANDARD AGREEMENT
Design Services for
Linwood & West 7th Flood Mitigation, City Project No. 104868
The Standard Agreement has not been changed.
City of Fort Worth, Texas Project Number 104868
Attachment C Linwood & West 7th Flood Mitigation
PMO Release Date: 05.19.2010
Page 1 of 1
ATTACHMENT "D"
PROJECT SCHEDULE
Engineering Services for
Linwood & West 7th Flood Mitigation, City Project No. 104868
Project schedules will be developed for individual task orders.
City of Fort Worth, Texas Project Number 104868
Attachment C Linwood & West 7th Flood Mitigation
PMO Release Date: 05.19.2010
Page 1 of 1
�I
3 I
m M,w
T
CD
a ti IL
l3 r Ira
00
rn t
00
I— ,J
O
o.
Ip
m
3 /
TI �
0cc
/t
CL
� ••j v i
E
°o
f (i�i1
�
•a•w'
a
va'
L
0
1■ry
N co
Ia
o
0
pa
• ( �� �' -!4� r ' � l '�Y "'jam' _
i Abe
White
�,..�
Nr Park 183 Arlin,'
i
♦� L •� • .� Aledo - � e' _
• � ,R 11 O ''(
� �+,4��\\�!`� '+'. _--�-�_�----- �� � f � a�,rate+• '
low
,,^ s!'T'' • ,ram,.., •j � fM� 11 , ��, � ��
r
I;E
�' , a. %� �� till _• � - ,-. ) r✓,��c
�. '� "�i • =fit' F, s' J
,.�� R_'�.. - . � r" rW, �, �.,,,,� ` t �- .��� ...� ia�-� M • J , f Study Limits
Service Layer Credits: Sources: Esri, HERE, Gamin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
Earl, HERE, Garmin, (c) OpenStreetMap contributors
EXHIBIT F
CITY OF FORT WORTH
STANDARD INSURANCE REQUIREMENTS
(1) INSURANCE LIMITS
a. Commercial General Liability — Insured shall maintain commercial general
liability (CGL) and, if necessary, commercial umbrella insurance as follows:
$1,000,000 each occurrence
$2,000,000 aggregate
If such Commercial General Liability insurance contains a general aggregate
limit, it shall apply separately to this Project or location.
City shall be included as an additional insured with all rights of defense
under the CGL, using ISO additional insured endorsement or a
substitute providing equivalent coverage, and under the commercial
umbrella, if any. This insurance shall apply as primary insurance with
respect to any other insurance or self-insurance programs afforded to
City. The Commercial General Liability insurance policy shall have no
exclusions or endorsements that would alter or nullify:
premises/operations, products/completed operations, contractual,
personal injury, or advertising injury, which are normally contained
within the policy, unless City specifically approves such exclusions in
writing.
ii. Insured waives all rights against City and its agents, officers, directors
and employees for recovery of damages to the extent these damages
are covered bythe commercial general liability or commercial umbrella
liability insurance maintained in accordance with Agreement.
b. Business Auto — Insured shall maintain business auto liability and, if
necessary, commercial umbrella liability insurance as follows:
$1,000,000 each accident (or reasonably equivalent limits
of coverage if written on a split limits basis).
Such insurance shall cover liability arising out of "any auto", including owned,
hired, and non -owned autos, when said vehicle is used in the course of Insured's
business and/or the Project. If Insured owns no vehicles, coverage for hired or
non -owned autos is acceptable.
Insured waives all rights against City and its agents, officers, directors and
employees for recovery of damages to the extent these damages are
covered by the business auto liability or commercial umbrella liability
insurance obtained by Insured pursuant to this Agreement or under any
applicable auto physical damage coverage.
CFW Standard Insurance Requirements Page 1 of 3
Rev. 5.04.21 Project Number 104868
Linwood & West 7th Flood Mitigation
c. Workers' Compensation — Insured shall maintain workers compensation and
employer's liability insurance and, if necessary, commercial umbrella liability
insurance as follows:
Coverage A: statutory limits
Coverage B: $100,000 each accident
$500,000 disease - policy limit
$100,000 disease - each employee
Insured waives all rights against City and its agents, officers, directors and
employees for recovery of damages to the extent these damages are
covered by workers compensation and employer's liability or commercial
umbrella insurance obtained by Insured pursuant to this Agreement.
d. Professional Liability (Errors & Omissions) — Insured shall maintain
professional liability insurance as follows:
$1,000,000 - Each Claim Limit
$2,000,000 - Aggregate Limit
Professional Liability coverage may be provided through an endorsement to
the Commercial General Liability policy, or a separate policy specific to
Professional E&O. Either is acceptable if coverage meets all other
requirements. Coverage shall be written on a claims -made basis, and
maintained for the duration of the contractual agreement and for five (5) years
following completion of services provided. The policy shall contain a retroactive
date prior or equal to the Effective Date of the Agreement or the first date of
services to be performed, whichever is earlier. An annual certificate of insurance
shall be submitted to City to evidence coverage.
(2) GENERAL INSURANCE REQUIREMENTS
a. Certificates of insurance evidencing that Insured has obtained all required
insurance shall be attached to Agreement concurrent with its execution. Any
failure to attach the required insurance documentation hereto shall not
constitute a waiver of the insurance requirements.
b. Applicable policies shall be endorsed to name City as an Additional Insured,
as its interests may appear, and must afford the City the benefit of any
defense provided by the policy. The term City shall include its employees,
officers, officials, and agents as respects the contracted services. Applicable
policies shall each be endorsed with a waiver of subrogation in favor of City
with respect to the Project.
c. Certificate(s) of insurance shall document that insurance coverage limits
specified in this Agreement are provided under applicable policies
documented thereon. Insured's insurance policy(s) shall be endorsed to
provide that said insurance is primary protection and any self -funded or
CFW Standard Insurance Requirements Page 2 of 3
Rev. 5.04.21 Project Number 104868
Linwood & West 7th Flood Mitigation
commercial coverage maintained by City shall not be called upon to
contribute to loss recovery. Insured's liability shall not be limited to the
specified amounts of insurance required herein.
d. Other than worker's compensation insurance, in lieu of traditional
insurance, City may consider alternative coverage or risk treatment
measures through insurance pools or risk retention groups. City must
approve in writing any alternative coverage for it to be accepted.
e. A minimum of thirty (30) days' notice of cancellation or material change in
coverage shall be provided to City. A ten (10) days' notice shall be acceptable
in the event of non-payment of premium.
f. Insurers must be authorized to do business in the State of Texas and have a
current A.M. Best rating of A:VII or equivalent measure of financial strength
and solvency as determined by the City's Risk Management division.
g. Any deductible or self -insured retention in excess of $25,000 that would
change or alter the requirements herein is subject to approval in writing by
City, if coverage is not provided on a first -dollar basis. City, at its sole
discretion, may consent to alternative coverage maintained through insurance
pools or risk retention groups. Dedicated financial resources or letters of credit
may also be acceptable to City.
h. In the course of the Agreement, Insured shall report, in a timely manner, to
City's Risk Management Department with additional notice to the Contract
Compliance Manager, any known loss or occurrence which could give rise
to a liability claim or lawsuit against City or which could result in a property
loss.
i. City shall be entitled, upon its request and without incurring expense, to
review Insured's insurance policies including endorsements thereto and, at
City's discretion, Insured may be required to provide proof of insurance
premium payments.
j. Lines of coverage, other than Professional Liability, underwritten on a claims -
made basis, shall contain a retroactive date coincident with or priorto the date
of this Agreement. The certificate of insurance shall state both the retroactive
date and that the coverage is claims -made.
k. Coverages, whether written on an occurrence or claims -made basis, shall be
maintained without interruption nor restrictive modification or changes from
date of commencement of the Project until final payment and termination of
any coverage required to be maintained after final payments.
I. City shall not be responsible for the direct payment of any insurance
premiums required by Agreement.
m. Subcontractors of Insured shall be required by Insured to maintain the same
or reasonably equivalent insurance coverage as required for Insured. Upon
City's request, Insured shall provide City with documentation thereof.
CFW Standard Insurance Requirements Page 3 of 3
Rev. 5.04.21 Project Number 104868
Linwood & West 7th Flood Mitigation
ENDORSEMENT
This endorsement, effective 12:01 A.M. 08/01/2022 forms a part of
Policy No. CA5717893 issued to Halff Associates, Inc.
by NATIONAL UNION FIRE INSURANCE COMPANY OF PITTSBURGH, PA
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
ADDITIONAL INSURED - WHERE REQUIRED UNDER CONTRACT OR AGREEMENT
This endorsement modifies insurance provided under the following:
GE BUSINESS A 0 COVERA FORM
SCHEDULE
ADDITIONAL INSURED:
ANY PERSON OR ORGANIZATION FOR WHOM YOU ARE CONTRACTUALLY BOUND
TO PROVIDE ADDITIONAL INSURED STATUS BUT ONLY TO THE EXTENT OF SUCH
PERSON'S OR ORGANIZATIONS LIABILITY ARISING OUT OF THE USE OF A
COVERED AUTO.
I. SECTION II - COVERED AUTOS LIABILITY COVERAGE, A. Coverage, 1. - Who Is Insured, is
amended to add:
d. Any person or organization, shown in the schedule above, to whom you become obligated
to include as an additional insured under this policy, as a result of any contract or agreement
you enter into which requires you to furnish insurance to that person or organization of the
type provided by this policy, but only with respect to liability arising out of use of a covered
"auto". However, the insurance provided will not exceed the lesser of:
11) The coverage and/or limits of this policy, or
(2) The coverage and/or limits required by said contract or agreement.
I AUTHORIZED REPRESENTATIVE
Project Number 104868
Linwood & West 7th Flood Mitigation
87950 (9/14) Includes copyrighted information of Insurance Services Office, Inc., Page 1 Of 1
with its permission.
ENDORSEMENT
This endorsement, effective 12:01 A.M. 08/01/2022 forms a part of
policy No. CA5717893 Issued to Halff Associates, Inc.
by NATIONAL UNION FIRE INSURANCE COMPANY OF PITTSBURGH, PA
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US
This endorsement modifies insurance provided under the following:
BUSINESS AUTO COVERAGE FORM
Section IV - Business Auto Conditions, A. - Loss Conditions, 5. - Transfer of Rights of Recovery
Against Others to Us, is amended to add:
However, we will waive any right of recover we have against any person or organization with whom you have
entered into a contract or agreement because of payments we make under this Coverage Form arising out of
an "accident' or "loss" if:
(1) The "accident' or "loss" is due to operations undertaken in accordance with the contract existing
between you and such person or organization; and
(2) The contract or agreement was entered into prior to any "accident' or "loss".
No waiver of the right of recovery will directly or indirectly apply to your employees or employees of the
person or organization, and we reserve our rights or lien to be reimbursed from any recovery funds obtained
by any injured employee.
f /AUT14ORIZED REPRESENTATIVE
Project Number 104868
Linwood & West 7th Flood Mitigation
62897 (6/95)
POLICY NUMBER: GL5856923
COMMERCIAL GENERAL LIABILITY
CG20100413
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
ADDITIONAL INSURED - OWNERS, LESSEES OR
CONTRACTORS - SCHEDULED PERSON OR
ORGANIZATION
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
Name Of Additional Insured Person(s)
Or Organization(s)
ANY PERSON OR ORGANIZATION WHOM YOU
BECOME OBLIGATED TO INCLUDE AS
AN ADDITIONAL INSURED AS A RESULT OF
ANY CONTRACT OR AGREEMENT YOU
HAVE ENTERED INTO.
SCHEDULE
Location(s) Of Covered Operations
PER THE CONTRACT OR AGREEMENT.
Information required to complete this Schedule, if not shown above, will be shown in the Declarations.
A. Section II - Who Is An Insured is amended to that which you are required by the contract
include as an additional insured the person(s) or or agreement to provide for such additional
organization(s) shown in the Schedule, but only insured.
with respect to liability for "bodily injury", B. With respect to the insurance afforded to these
"property damage" or "personal and advertising additional insureds, the following additional
injury" caused, in whole or in part, by: exclusions apply:
1. Your acts or omissions; or
2. The acts or omissions of those acting on
your behalf;
in the performance of your ongoing operations
for the additional insured(s) at the location(s)
designated above.
However:
1. The insurance afforded to such additional
insured only applies to the extent permitted
by law; and
2. If coverage provided to the additional
insured is required by a contract or
agreement, the insurance afforded to such
additional insured will not be broader than
This insurance does not apply to "bodily injury"
or "property damage" occurring after:
1. All work, including materials, parts or
equipment furnished in connection with such
work, on the project (other than service,
maintenance or repairs) to be performed by
or on behalf of the additional insured(s) at
the location of the covered operations has
been completed; or
2. That portion of "your work" out of which
the injury or damage arises has been put to
its intended use by any person or
organization other than another contractor or
subcontractor engaged in performing
operations for a principal as a part of the
same project.
Project Number 104868
Linwood & West 7th Flood Mitigation
CG 20 10 04 13 0 Insurance Services Office, Inc., 2012 Page 1 of 2 ❑
C. With respect to the insurance afforded to these
additional insureds, the following is added to
Section III - Limits Of Insurance:
If coverage provided to the additional insured is
required by a contract or agreement, the most
we will pay on behalf of the additional insured
is the amount of insurance:
1. Required by the contract or agreement; or
Page 2 of 2
2. Available under the applicable Limits of
Insurance shown in the Declarations;
whichever is less.
This endorsement shall not increase the
applicable Limits of Insurance shown in the
Declarations.
Project Number 104868
Linwood & West 7th Flood Mitigation
Insurance Services Office, Inc., 2012 CG 20 10 04 13 ❑
POLICY NUMBER: GL5856923
COMMERCIAL GENERAL LIABILITY
CG 20 01 04 13
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
PRIMARY AND NONCONTRIBUTORY - OTHER
INSURANCE CONDITION
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART
The following is added to the Other Insurance
Condition and supersedes any provision to the
contrary:
Primary And Noncontributory Insurance
This insurance is primary to and will not
seek contribution from any other insurance
available to an additional insured under your
CG 20 01 04 13
policy provided that:
(1) The additional insured is a Named Insured
under such other insurance; and
(2) You have agreed in writing in a contract
or agreement that this insurance would
be primary and would not seek contribu-
tion from any other insurance available to
the additional insured.
Project Number 104868
Linwood & West 7th Flood Mitigation
0 Insurance Services Office, Inc., 2012 Page 1 of 1
POLICY NUMBER: GL5856923
COMMERCIAL GENERAL LIABILITY
CG 24 04 05 09
WAIVER OF TRANSFER OF RIGHTS OF RECOVERY
AGAINST OTHERS TO US
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART
SCHEDULE
Name Of Person Or Organization:
PURSUANT TO APPLICABLE WRITTEN CONTRACT OR AGREEMENT YOU ENTER INTO.
Information required to complete this Schedule, if not shown above, will be shown in the Declarations.
The following is added to Paragraph 8. Transfer Of
Rights Of Recovery Against Others To Us of Sec-
tion IV - Conditions:
We waive any right of recovery we may have
against the person or organization shown in the
Schedule above because of payments we make for
injury or damage arising out of your ongoing opera-
tions or "your work" done under a contract with
that person or organization and included in the
"products -completed operations hazard". This
waiver applies only to the person or organization
shown in the Schedule above.
CG 24 04 05 09
Project Number 104868
Linwood & West 7th Flood Mitigation
0 Insurance Services Office, Inc., 2008 Page 1 of 1 ❑
WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT
This endorsement changes the policy to which it is attached effective on inception date of the policy unless a different
date is indicated below.
This endorsement, effective 12:01 AM08/01/2022 forms a part Of Policy No. WC014195843
Issued to Halff Associates, Inc.
By NEW HAMPSHIRE INSURANCE COMPANY
We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce
our right against the person or organization named in the Schedule. This agreement applies only to the extent that you
perform work under a written contract that requires you to obtain this agreement from us.
This agreement shall not operate directly or indirectly to benefit any one not named in the Schedule.
Schedule
ANY PERSON OR ORGANIZATION TO WHOM YOU BECOME
OBLIGATED TO WAIVE YOUR RIGHTS OF RECOVERY
AGAINST, UNDER ANY WRITTEN CONTRACT OR AGREEMENT
YOU ENTER INTO PRIOR TO THE OCCURRENCE OF LOSS.
This form is not applicable in Kansas for private construction contracts as defined in K.S.A. 16-1801 through K.S.A
16-1807 or public construction contracts as defined in K.S.A. 16-1901 through 16-1908, except where permitted by
statute or other applicable law, such as for use in wrap-up insurance programs.
Any person or organization for which the employer has agreed by written contract, executed prior to loss, may execute
a waiver of subrogation. However, for purposes of work performed by the employer in Missouri, this waiver of
subrogation does not apply to any construction group of classifications as designated by the waiver of right to recover
from others (subrogation) rule in our manual.
This form is not applicable in California, Kentucky, New Hampshire, New Jersey, Texas, or Utah.
WC 00 03 13 Countersigned by
(Ed. 04/84)
Authorized Representative
Project Number 104868
Linwood & West 7th Flood Mitigation
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 05/23/23 M&C FILE NUMBER: M&C 23-0432
LOG NAME: 20SWM LINWOOD ENGINEERING SERVICES
SUBJECT
(CD 9 / Future CD 9) Authorize Execution of an Engineering Agreement with Halff Associates, Inc. in the Amount of $1,000,000.00 for Conceptual
Planning, Program Development, and Design Services for the Linwood and West 7th Flood Mitigation Program
RECOMMENDATION:
It is recommended that the City Council authorize execution of an engineering agreement with Halff Associates, Inc. in the amount of
$1,000,000.00 for conceptual planning, project development and design services for the Linwood and West 7th Flood Mitigation project (City
Project No.104868).
11 &10111*4103 kqF
This Mayor and Council Communication (M&C) is to authorize execution of an engineering contract with Halff Associates, Inc. to perform
conceptual planning, program development and design services for the Linwood and West 7th Flood Mitigation Project.
The Linwood residential area and West 7th commercial area is a critical and high priority for flood mitigation. In the Linwood area, there is a
complex and interconnected system of undersized storm drains with a significant amount of stormwater runoff draining to the area resulting in
significant roadway, property and structure flooding during frequent storm events. Similarly, the West 7th area, which is adjacent and connected to
the Linwood area, has an undersized storm drain system resulting in flooding during frequent storm events. Both areas outfall into the Trinity River
through flap gates or sluice gates which impact the ability of the system to effectively drain into the river when the river is at flood stage. During the
August 21-22, 2022 storm event, 27 structures were reported as flooded in the Linwood residential area. Since the City began tracking reports of
flooding electronically in 2009, approximately 147 incidents of flooding, including structure, vehicle, road flooding, and high-water rescues have
been reported in these areas. The City has conducted multiple flood studies in the area indicating that possible solutions may exist but have a
cost of over $110,000,000.00 to implement.
The work in this engineering contract will further investigate potential solutions and develop a feasible overall plan for the area. The work will
include phases which, when constructed, would result in reductions in flood depths and mitigate flood risk. The contract is a task order contract,
and task orders will be issued as the work advances. The cost of each task order will be based on an agreed -upon scope and the hours worked at
agreed -upon hourly rates. Staff considers the proposed hourly rates to be fair and reasonable for the size and complexity of the contemplated
projects. The work will ultimately include conceptual planning, project development, defining the feasible project phases, preparing an overall
implementation plan and schedule, identifying and mitigating risks for each phase, preparing engineering plans for construction, and construction
phase services. This initial agreement will be amended as additional funds become available, and the project scope becomes more defined.
In January 2023, the Transportation and Public Works Department (TPW), Capital Delivery Division, published a Request for Qualifications (RFQ)
for Linwood and West 7th Flood Mitigation Engineering services. Six consultants responded to the RFQ for the Program Development and Design
Services with Statements of Qualifications (SOQ). An evaluation team of City staff subject matter experts from the Capital Delivery and Stormwater
Divisions of TPW scored the SOQ's based on company experience, project manager experience, prior projects, and work type and project
understanding. Respondents to the RFQ were scored and, based on this scoring, Halff Associates, Inc. was selected as the most qualified
consultant to perform conceptual planning, project development and design services for this project.
The 2023 Stormwater Revenue Bond will fund this engineering agreement. The Revenue Bond sale was approved by Mayor and Council on May
11, 2023, and funds are anticipated to be available on June 15th. Funds will not be encumbered or expended until they are available from the
bond sale.
This task order contract will serve current and future capital projects as -needed, and a funds availability verification will be performed by
Transportation & Public Works Contract Compliance Managers prior to task order assignment.
Funding will be available in the Large Flood Mitigation project within the Drainage Rev Bonds Series 2023 fund for the purpose of funding the
Linwood & W 7th Flood Mitigation projects after the sale of Stormwater Revenue bonds.
Funding for this project was not included in the FY2023-2027 Capital Improvement Program due to Linwood not being identified as a project at the
time. This action in this M&C will amend the FY 2023-2027 Capital Improvement Program as approved in connection with Ordinance 25773-09-
2022.
Business Equity Office: HALFF ASSOCIATES, INC. is in compliance with the City's Business Equity Ordinance by committing to 8% MWBE
participation on this project. The City's MWBE goal on this project is 8%.
This project is located in COUNCIL DISTRICT 9/FUTURE COUNCIL DISTRICT 9.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds will be available after the sale of Stormwater Revenue bonds in the Large Flood Mitigation
project within the Drainage Rev Bonds Series 2023 Fund and upon approval of the above recommendations and adoption of the attached
appropriation ordinance, funds will be available in the Linwood & W 7th Flood Mitigati project to support the approval of the above
recommendations and award of the agreement. Prior to an expenditure being incurred, the Transportation & Public Works Department has the
responsibility of verifying the availability of funds.
Submitted for Citv Manaaer's Office bv: William Johnson 5806
Oriainatina Business Unit Head: Lauren Prieur 6035
Additional Information Contact: Linda Young 2485
Expedited
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: Linwood and West 7th Flood Mitigation
M&C
Date:
To:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
23-0432 CPN: 104868 CSO:
06/01/2023
Name Department
Justin Naylor TPW
Ben Pylant (bPylant@half£ com)
Michael Owens
Lauren Prieur
Doug Black
William Johnson
Ronald Gonzales
Jannette Goodall
Allison Tidwell
TPW—SW—Contracts
Contractor
TPW
TPW
Legal
CMO
CSO
CSO
CSO
TPW—SW
DOC#:
Date Out
Jun 2, 2023
Jun 5, 2023
Jun 5, 2023
Jun 5, 2023
Jun 5, 2023
Jun 6, 2023
Jun 6, 2023
Jun 7, 2023
Jun 8, 2023
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return to: tow sw contracts(d4ortworthtexas.gov Call 817-229-3283 with questions. Thank you!