HomeMy WebLinkAboutContract 56388-A1CSC No. 56388-A1 AMENDMENT No .1 TO CITY SECRETARY CONTRACT No. 56388 WHEREAS, the City of Fort Worth (CITY) and Halff Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 56388, (the CONTRACT) which was authorized on the 24u' day of August, 2021 by M&C 20- 0622 in the amount of $316,680.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Village Creek Water Reclamation Additional Gas Line for Biosolids Drying Facility; and WHEREAS, it has become necessary to execute Amendment No. I to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $248,775.00. 9 Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $565,455.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Prof Servlr_e.s Agreement Amendment Template Revision Date: November 23, 2021 CVCWAE additional Gas Line for Biosolids Drying racility) Page 1 of 3 [CM 1030111 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth 'Dva 591-ah AC Dana Burehdoff (Jun 7. 202310-'38 CDT) Dana Burghdoff Assistant City Manager DATE: Jun 7, 2023 APPROVAL RECOMMENDED: Christopher Hay -der Christonhar uar iPr! h,n ti.202316:16 CDT) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: ENGINEER Halff Associates, Inc. VJV40— Trey Moran, P.E. Director of Energy DATE: 06/06/2023 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Suzanne Ab e, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: 23-0410 05/23/2023 Date: DB[ack (Jun 7, 202315:56 CDT) Douglas f. Black Form 1295 2023-1013331 Senior Assistant City Attorney 4,dg4U�4�� �oRoo���d 1 � F ° O ATTEST: ~o dVo o Oda* lo °°° °° *d oa4 (� nEXAsaaa OFFICIAL RECORD Jannet to S . Goodall CITY SECRETARY City Secretary FT. WORTH, TX Prof Services Agreement AmendtrtenL Template Revision Date: November 23, 2021 [VCWRF Additional Gas Line for Biosolids Drying Facility] Page 2 of 2 [CPN 1030111 e h a Lff 4/25/2023 42617,001 Ms. Suzanne Abbe, PE Senior Engineer, Capital Projects Delivery - Facilities City of Fort Worth Water Department 200 Texas Street Fort Worth, Texas 76102 1201 N. Bowser Rd. Richardson, Texas 75M (214) 346-6200 RE: Amendment No. 1 — VCWRF Additional Gas Service for Proposed Bio-Solids Drying Facility City Project No. 103011 Dear Ms. Abbe: Halff Associates is pleased to present this Amendment No. 1 for additional services to City Project No. 103011. Amendment No. I includes the effort necessary to extend the alignment inside Village Creek Water Reclamation Facility (VCWRI j, design the electrical and instrumentation components needed for the proposed pipeline, additional SUE efforts spent acquiring subsurface utility information not previously scoped (including additional test holes inside the Village Creek facility) as well as additional construction management support and inspection services for the construction of the proposed gas line. To perform the E&I engineering, Halff will add a new team member to conduct those services: Gupta Associates, Inc. GAI is a qualified business equity (MBE/WBR) firm. GAI will provide Final Draft E&I (90%) Plans and Specifications, Final (100°/o) Signed and Sealed Plans and Specifications as well as provide support during the Construction Phase of the project. The additional SUE efforts will be performed by The Rios Group, which were already contracted to perform the subsurface utility investigation for the project. A summary of the proposed budget for this amendment is as follows: 2.0 Conceptual Design $15,630 3.0 Preliminary Design $37,480 4.0 Final Design Plans and Specifications --- Halff $18,880 • E&I — GAI, Inc. $27,962 e haLff 5.0 Bid Phase ■ E&I — GAI, Inc. $1,100 6.0 Construction Phase Services • Construction Management— Halff $98,700 ■ E&I ---- GAI, Inc. $13,768 8.0 SUE $35.255 TOTAL PROPOSED AMENDMENT NO.1 $248,775 Nip. Abbe City of Fun Wureh Winer DopnrtmenI Apol 23, 2023 Ng2 The additional business equity effort included in this amendment is $70,986, or 29% of the amendment total. Please review the enclosed information and do not hesitate to call me if you have any questions or require additional information regarding this proposal. Following is project fee summary: Original Contract $316,680 Amendment No. 1 9248.775 REVISED CONTRACT AMOUNT $565,455 Sincerely, HALFF ASSOCIATES, INC. Hugo Calderon, PE St. Project Manager TASK 2. CONCEPTUAL DESIGN (30 PERCENT). Conceptual design shall be submitted to CITY for the increase in footage (-2,200LF) to take the proposed gas line inside Village Creek and connect to the City owned biogas line in lieu of MAS Energy gas line as part of the overall project package, per the approved Project Schedule. ENGINEER will develop the conceptual design of the infrastructure as follows. 2.1. Additional Data Collection and Site Visits Due to Chanae in Alignment DELIVERABLES A. Conceptual Design Package including the additional footage added to the project. TASK 3. PRELIMINARY DESIGN (60 PERCENT). Preliminary plans and specifications shall be submitted to CITY per the approved Project Schedule. ENGINEER will develop the preliminary design of the infrastructure as follows. 3A , Development of Preliminary Design Drawings and Specifications shall include the following: • Plan and profile sheets which show the followina: additional pas line olanlorofile to extend the alignment (-2,200LF) inside the Viliaae Creek facility. DELIVERABLES A. Preliminary Design drawings and specifications for the proposed gas line including the additional - 2,200 LF needed to extend inside VCWRF facility will be included with the overall Preliminary Design package B. Additional Storm Water Pollution Prevention Plan sheets C. Engineer's Opinion Probable Construction Cost (EOPCC) TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as described in the original Engineering Agreement, and will include drawings and specifications follows: • Electrical, Instrumentation, and Control Pre -final design Following a 90% construction plan review meeting with the CITY, the ENGINEER shall submit Construction Documents (100%) to the CITY per the approved Project Schedule. Each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in State of Texas. The ENGINEER shall submit a final design estimate of probable construction cost with both the 90% and 100% design packages. This estimate shall use ONLY standard CITY bid items unless standard items do not cover proposed construction and installation. DELIVERABLES A. 90% E&I construction plans and specifications will be included with the overall Design Packaae. B. 100% E&I construction plans and specifications will be included with the overall Desian Dackaae. C. 100% construction DIans and specifications. ❑. 100% construction Plans and specifications — Submittal - 2 — Plans and Specifications - 12/26/2022 E. 100% construction glans and specifications — Submittal 3 - Plans and Specifications- Final IFC Set - 2023-01-11 TASK 5. BID PHASE SERVICES. ENGINEER will support the bid phase of the project as follows: 5.1 Bid Support for the electrical and instrumentation components will be included for the rp oJect. TASK 6. CONSTRUCTION PHASE SERVICES. ENGINEER wiii support the construction phase of the project as described in the original Engineering Agreement and as follows: 6.1.3. Site visits and oroaress meetinas 6.1.3.1. Make up to 12 site visits, aenerallv monthly, durina the construction of the Proposed pas line. The length of the proposed aas line construction is anticipated to be a period of up to 12 months. Throughout the construction phase of the PROJECT, the ENGINEER will attend monthly progress meetinas, provide suDoort for the CITY, observe the progress and the auality of work, and attempt to determine if the work is proceeding in accordance with the construction Contract Documents. The ENGINEER will provide meetina minutes, field notes, and supplemental instructions through BIM 360. Additional site visits may be considered as a SPECIAL SERVICE. 6.1.5. Electrical and Instrumentation Construction Phase Services 6.1.5.1. Respond to Contractor's requests for information (RFIs), review shot) drawing submittals, and provide record documents based upon red -line markups from the Contractor; 6.1.5.2. Visit the Droiect site once as construction proceeds to resolve discrepancies, observe and report on the Drogress/quality of the executed work as reauired by the oroaress of the work, and 6.1.5.3. Participate in one substantial completion inspection. 6.1.6. Review of Contractor's Submittals and Preparation of Field/Chance Orders 6.1.6.1. Review samples, catalog data, schedules, shop drawinos, modification reauests, and other submittals in accordance with the requirements of the construction Contract Documents for the PROJECT via BIM 360. Monitor the progress of the Contractor in sending and orocessino submittals to see that documentation is being processed in accordance with schedules. Produce monthly reports indicating the status of all submittals in the review Process. It is anticipated that the ENGINEER will review and respond to up to a total of 30 submittals. Documents received and filed as record data are not considered shop drawing submittals. Additional authorized shop drawing submittals may be considered as a SPECIAL SERVICE. 6.1.6.2. Review auality related documents provided by the Contractor such as laboratory, shop and mill tests of material and test equipment, equipment installation reports, and other data and documentation as required by the construction Contract Documents', 6.1.6.3. Maintain a document control system using BIM 360 to track the Contractor's Requests for Information (RR. Review the Contractor's RFIs and prepare a response in accordance with the construction Contract Documents. Provide interpretation and communicate intent if information is not addressed in the construction Contract Documents. It is anticipated that the ENGINEER will review and respond to up to a total of 15 RFls. Review of RFIs in excess of the specified number may be considered as a SPECIAL SERVICE: 6.1.6.4. Investigations, analvses, and studies reauested by the Contractor and approved by the Citv, for substitutions of equipment and/or materials or deviations from the plans and specifications may be considered as a SPECIAL SERVICE. and 6.1.6.5. Establish procedures for administering changes to the construction Contract Documents through BIM 360. Assist City in processing contract modifications and in the negotiations with the Contractor to determine the cost and time impacts of these chanaes. Review up to three Contract Modification Requests. Prepare up to three Change Orders for execution by the Citv. Additional authorized Contract Modification Requests review or Chance Order preparation in excess of the specified number may be considered as a SPECIAL SERVICE. Construction inspection and weld testing services are bevond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the CITY'S written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Proiect shall be agreed upon in writing by both parties before the services are performed. TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES. ENGINEER will provide additional Subsurface Utility Engineering services as described in the original Engineering Agreement and as follows: 8.2 Subsurface Utilitv Ennineerina Services fSUEI: SUE Qualitv Level B. This involves obtaining information throutah the application of aDDroDriate surface Qeophvsical methods to determine the existence and aDDroximate horizontal position of subsurface utilities. Qualitv Level B data should be reproducible by surface aeoDhvsics at anv Doint ❑f their depiction. This information is surveved t❑ aDDlicable tolerances defined by the Droiect and reduced onto Dian documents. It will also include elevations ❑f sanitary and adiacent storm sewers with rim/invert elevations. It is assumed aDDroximateiv 2,200 LF of Level B SUE will be Derformed for utilities. SUE Qualitv Level A. This involves precise horizontal and vertical location of utilities ❑btained by the actual exposure for verification of Dreviously exDosed and surveved utilities] and subseauent measurement of subsurface utilities, usuallv at a specific Doint. Minimallv intrusive excavation equipment is tvpically used to minimize the potential for utilitv damage. A precise horizontal and vertical location, as well as other utilitv attributes, as shown on Dian documents. It is assumed that 15 test holes will be performed for this protect at an average depth of up to 6 feet. yi}i m (itgnjsn.m..,TwsWnaun ARw�oawn Ls SERVICE FDII vRovoA[a m}.;000A On,e.O FR 1Ln'/ rnLvi°I'rn n iic�ny pelt m E(r u00 RA amr 9� u011n 'nm; Au4'nwllin RToOYctlan f4rnry t.,. o.ae+lebon mmin m.�G.� IsP.eMW+ I s.cn YeeIIIWon en oom r.m"m.n I mws �Rw.mwee � sm am 1 nre I me I e+ee I s+ee I na A,ra es000 nm e.n n� r. ��:cLlV1l'.oR:C..W..l I r.9e.elramrvE fC Sn...W. In . ,e cmn Plr* . I o R o 0 oaoo oada�a�e� r� � E� �s o>va�nQo>sa�ao�>s�r>���EM:= Iv�aroloo>o ooa=��s,ea�r�� os-'�ol©o>Qa�loAa�ars�".f,e s'�o�l� ,� I City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, May 23, 2023 REFERENCE NO.: **M&C 23-0410 LOG NAME: 60VCWRFADDITI0NAL GAS BIOSOLIDS — RCONST&HALFF tiY11 11X0N (CD 51 Future C❑ 5) Authorize Execution of a Contract with R Construction Civil, LLC in the Amount of $4,828,791.50 for the Village Creek Water Reclamation Additional Gas Line for Biosolids Drying Facility Project, Authorize Execution of Amendment No. 1 in the Amount of $248,775.00 to an Engineering Agreement with Halff Associates, Inc. for the Village Creek Water Reclamation Additional Gas Line for Biosolids Drying Facility Project, Provide for Total Project Costs in the Amount of $5,619,233.00, Adopt Resolution Expressing Official Intent to Reimburse Expenditures with Proceeds of Future Debt and Adopt Appropriation ❑rdinance to Effect a Portion of Water's Contribution to the Fiscal Years 2023-2027 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of a contract with R Construction Civil, LLC in the amount of $4,828,791.50 for the Village Creek Water Reclamation Additional Gas Line for Biosolids Drying Facility project (City Project No. 103011); 2. Authorize execution of Amendment No. 1 in the amount of $248,775.00 to an engineering agreement with Halff Associates, Inc. for construction phase services for the Village Creek Water Reclamation Additional Gas Line for Biosolids Drying Facility project (City Project No. 103011) for a revised contract amount of $565,455.00; 3. Adopt the attached resolution expressing official intent to reimburse expenditures with proceeds from future debt for the Village Creek Water Reclamation Additional Gas Line for Biosolids Drying Facility project; and 4. Adopt the attached appropriation ordinance adjusting appropriations in the W&S Commercial Paper Fund by increasing appropriations in the Village Creek Water Reclamation Additional Gas line for Biosolids Drying Facility project (City Project No. 103011) in the amount of $5,619,233.00 and decreasing appropriations in the W&S Commercial Paper project (City Project No. UCMLPR) by the same amount to effect a portion of Water's Contribution to the Fiscal Years 2023-2027 Capital Improvement Program. DISCUSSION: The purpose of this Mayor and Council Communication (M&C) is to authorize execution of a contract with R Construction Civil, LLC in the amount of $4,828,791.50 for the Village Creek Water Reclamation (VCWRF) Additional Gas Line for Biosolids Drying Facility project (City Project No. 103011 ) and authorize execution of Amendment No. 1 to City Secretary Contract No. 56388, an engineering agreement with Halff Associates, Inc., in the amount of $248,775.00 for construction support services for the VCWRF Additional Gas Line far Biosolids ❑rying Facility project (City Project No. 103011) for a revised contract amount of $565,455.00. On August 24, 2021, M&C 20-0622, the City Council authorized an engineering agreement with Halff Associates, Inc., (City Secretary Contract No, 56388), in the amount of $316,680.00 for the design of a biogas pipeline. The biogas pipeline will convey digester gas from VCWRF to the biosolids drying facility for use as a supplemental fuel source for the new biosolids dryer. Amendment No. 1, will provide compensation for additional design on the project as well as construction phase services consisting of contractor submittal review, technical assistance, and site visits. The project was advertised for bid on January 12, 2022 and January 19, 2022, in the Fort Worth Star - Telegram. On April 13, 2023 the following bids were received: Bidder �I Total Base Base Bid + Contract 1 Bid Alternate A Time R Construction $4,828,791.50 II $4,81 t7 791 50 365 Calendar Civil, LLC l _Days Driver Pipeline 11Company., Inc. I $6,590,354.951� $6,578,145.40i1-- - s *Staff recommends award of contract for the Base Bid. In addition to the contract cost, $348,514,00 is required for project management, inspection, and materials testing, and $193,152.00 is provided for project contingency. This project will have no impact on the Water Department's operating budget when complete, It is the practice of the Water Department to appropriate its CIP plan throughout the fiscal year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will amend the City of Fort Worth's Fiscal Year 2023- 2027 Capital Improvement Program as follows. 60VCWRF ADDITIONAL GAS BIOSOLIDS — RCONST&HALFF Capital project FY2023 CIP Budget Change Revised Fund Name Appropriations Authority (increase/Decrease) FY2023 Name Budget 1103011 56022 - —ADD. W&S VA Commercial Dryer Paper Facility Gas line $0.00 This M&C $5,619,233.00 $5,619,233.00 This project is anticipated to be included in a future revenue bond issue for the Water & Sewer Fund. Available cash within the Water and Sewer portfolio and the City's portfolio along with the appropriation authority authorized under the Callable Commercial Paper Program (CP) will be used to provide interim financing for this project until the debt is issued. Once debt associated with this project is sold, bond proceeds will be used to reimburse the Water and Sewer portfolio and the City's portfolio in accordance with the attached reimbursement resolution. Under federal law, debt must be issued within approximately three years in order for these expenses to be reimbursable. Adoption of the attached resolution does not obligate the City to sell bonds but preserves the ability of the City to reimburse itself from tax-exempt bond proceeds. Funding for the Additional Gas Line for Proposed Biosolids Facility project is depicted below: Fund Existing Additional Project Total* Appropriations Appropriations W&S Rev Bonds Series 2022 - $441,711.00 $0.00 $441,711.00 Fund 56020 W&S Commercial $0,00 $5,619,233.00 $5,619,233.00 Paper -Fund 56022 Project Total $441,711.0011 $5,619,233.00 f$6,060,944.00 *Numbers rounded for presentation purposes. Business Equity — R Construction Civil, LLC - R Construction Civil LLC is in compliance with the City's Business Equity Ordinance by committing to 5 percent participation on this project. The City's goal on this project is 5 percent. Business Equity — Haiff Associates, Inc, agrees to maintain its initial MIWBE commitment of 10 percent that it made on the original agreement and extend and maintain that same MIWBE commitment of 10 percent to all prior amendments up to and inclusive of this Amendment No, 1. Therefore Halff Associates, Inc. remains in compliance with the City's MIWBE ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its company The project is located in COUNCIL DISTRICT 5 and FUTURE COUNCIL DISTRICT 5. FISCAL INFORMATION ! CERTIFICATION: The Director of Finance certifies that funds will be available after the sale of the Water and Sewer bonds in the W&S Commercial Paper project within the W&S Commercial Paper Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Commercial Paper Fund for the ADD VC Dryer Facility Gasline project to support the approval of the above recommendations and execution of the contract and amendment to the agreement. Prior to an expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs).: TO Fund Department Accountl Project ctivity Budget Reference # ►mount ID �Program ID Year (Chartfield 2� FROM Department Account Project Program�Activity� Budget Reference # 1�4mount 1Fund � ID ID I Year (Chartfield 2) CERTIFICATIONS: Submitted for Cite Manager's Office b,r Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Suanne Abbe (8209) ATTACHMENTS 1.60ADDITIONALGASBIOSOLIDS-RCONSHALFF.pdf (Public) 2. 60VCWRF ADDITIONAL GAS BIOSOLIDS RCONSTHALFF FID Table (WCF 05.02.23).xlsx (CFW Internal) 3. 60VCWRF ADDITIONAL GAS BIOSOLIDS - RCONST&HALFF.docx (CFW internai) 4. 60VCWRF ADDITIONAL GAS BIOSOLIDS — HALFF APCF Form. pdf (CFW internal) 5. 60VCWRF ADDITIONAL GAS BIOSOLIDS — HALFF 1295.Ddf (CFW Inlernai) 6. 60VCWRF ADDITIONAL GAS BIOSOLIDS — RCONST 1295.edf (CFW Internal) 7. 60VCWRF ADDITIONAL GAS BIOSOLIDS — RCONST Compliance Memo.pdf (CFW Internal) 8. ❑RD.APP 60VCWRF ADDITIONAL GAS BIOSOLIDS — RCONST&HALFF 56022 A023(r4), .(3).docx (Public) 9. PBS CPN 103011.pdf (CFW Internal) 10. Res.60VCWRF ADDITIONAL GAS BIOSOLIDS — RCONST&HALFF.docx (Public) 11. SAM.gov _ R Construction Civil, LLC.pdf (CFW Internal) 12. SAM.gov Halff Associates, Inc,.pdf (CFW Internal) 60VCV4'RF ADDITIONAL GAS SIOSOLIDS—RCONST&HALFF FID Table 3&4 56022 0700430 5110101 103011 001485 3&4 56022 0700430 5550102 103011 001480 3&4 56022 0700430 5740010 103011 001480 2 56022 0700430 5330500 103011 001430 1 56022 0700430 5740010 I 103011 I 001480 3&4 56022 0700430 15310350 I 103011 I 001484 3&4 I 56022 0700430 15330500 I 103011 I 001484 56022 2060000 103011 RETAIN 9999 9999 9999 9999 9999 9999 9999 S5,619.233.00 $150,658.00 Staff Casts - Inspection $2,000.00 Public Outreach (Sally) $193,152.00 Project contingencies $248,775.00 To Pay Engineering Company $4,828,791.5o To pay contractor $25,110.00 Soil Lab -TPW Staff Costs $80,351.00 Soil Lab -Consultant Combo Code