City of Fort Worth
Change Order Request
Project Name 2018 Bond Year 3 - Contract 8
I
City Sec # I 56639
Client Project #(s)l
Project Description) Combined Water and Sewer Replacement and
Pavement Rehabilitation Improvements on Craig Street, Louise
Street, Halbert Street, Major Street,
Cravens Road and Hightower Street
Contractorl McClendon Construction Company
Change Order #I 1
Datel 5/16/2023
City Project Mgr. l Greg Robbins
City Inspectorl
Travis Strang
Dept. Unit 1: Water
Unit 2: Sewer Unit 3: Paving Unit 4: Storm
Contract Time
Totals (CD
Original Contract Amount $2,565,836.00
$3,032,329.00 $2,464,904.50 $35,000.00
$8,098,069.50 85
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $2,565,836.00
$3,032,329.00 $2,464,904.50 $35,000.00
$8,098,069.50 485
Amount of Proposed Change Order $64,590.50
$0.00 $0.00 $0.00
$64,590.50 120
Revised Contract Amount $2,630,426.50
$3,032,329.00 $2,464,904.50 $35,000.00
$8, 62,660.00 605
Original Funds Available for Change Orders $128,292.00
$151,616.00 $123,245.00 $5,000.00
$408,153.00
Remaining Funds Available for this CO $128,292.00
$151,616.00 $123,245.00 $5,000.00
$408,153.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
0.80°/u
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
$10,122,586.88
IF JUSTIFICATION (REASONS) FOR CHANGE ORDER
IN ACCORDANCE WITH THIS CHANGE ORDER REQUEST, THE CONTRACTOR SHALL: Furnish all labor and material as per the attached proposed Change Order Request #1.
This Change Order will provide for the additional scope to replace the cast iron water main on Craig Street from Major Street to Mims Street and extend the pavement rehabilitation o i
Craig Street within these new limits. It also includes the additional items needed to install a new water line blow -off valve to relieve a conflict with the new sanitary sewer being installf d
at Craig Street and Louise Street, and additional concrete sidewalks and driveways replacement as part of the sewer line installation on Louise Street.
Cost - The City of Fort Worth has compared the unit prices which the contractor is proposing to recently -bid bond projects. The City finds that the prices that the contractor is
proposing are fair and reasonable.
Time - The change order will add additional days to the project contract time due to the utility and scope changes; the staff approves the addition of 120 days to the contract time.
Here's a breakdown of the delays:
-Craig St Scope Changes (45 days): The City added 455 LF of additional water line replacement on and 1000 SY of pavement rehabilitation.
-Major Street Scope Changes (30 days): The City added 170 LF of additional water line replacement on north Major Street.
-Louise St Scope changes (45 days from 03/02 to 04/15): These days include coordination with water department and franchise utilities and issuing new plans to resolve the conflict
between the new sewer line and other utilities.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges
that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Name
Contractor Name
Contract Signature
Date
McClendon Construction Company
Justin Blair
May 31, 2023
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
s
Jun 1, 2023
j
May 30, 2023
Program Manager
Date
Senior Capital Project Officer
Date
�-
Jun 6, 2023-�
Jun 6, 2023
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
f t Ir...�
Jun 6, 2023
A—R.—
Jun 6, 2023
Assistant City Attorney
Date
lAssistant City Manager
Date
t
Jun 7, 2023
Jun 7, 2023
Cou ired
4giFORTnnn M&C Number I M&C Date Approved
ATTEST:AP
(I
d
Jannette Goodall, City Secretary
c
F nnnnEzaA?o
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH
City of Fort Worth
Change Order Additions
Project Name 1 2018 Bond Year 3 - Contract 8
I City Sec # 1
56639 1
Client Project #
1
Contractorl McClendon Construction Company IPMI Greg Robbins I
Inspectorl Travis Strang
Change Order Submittal #
Date 1 5/3/2023
1
ADDITIONS
IIEM
UESURIPIIUN
UEPI
Uty
Unit UnitUost
total 1
3
3311.0241 8" Water Pipe
Unit 1: Water
455.000000011
LF $98.00
$44,590.001
7
3312.0117 Connection to Existing 4"-12" Water Main
Unit 1: Water
4.00000000
EA $6,300.00
$25,200.001
9
3312.2003 1" Water Service
Unit 1: Water
6.000000011
EA $1,925.00
$11,550.001
20
0241.1700 11" Pavement Pulverization
Unit 1: Water
1,000.00000000
SY $9.50
$9,500.001
26
3201.0400 Temporary Asphalt Paving Repair, 2" HMAC over 6" Flexbase Unit 1: Water
480.000000011
LF $25.00
$12,000.001
31
3212.0303 3" Asphalt Pvmt Type D
Unit 1: Water
1,000.00000000
SY $18.00
$18,000.001
48
3211.0601 CEMLIME " (@32lb/SY)
Unit 1: Water
10.0000000d
TN $235.00
$2,350.001
53
3312.6003 8" Blow Off Valve
Unit 1: Water
1.00000000
EA $20,050.50
$20,050.501
54
9999.0010 Additional Temporary Water
Unit 1: Water
1.00000000
LS $69,000.00
1
$69,000.001
66
0241.0100 Remove Sidewalk
Unit 2: Sewer
1,000.0000000d
SF $1.50
$1,500.001
67
3213.0301 4" Conc Sidewalk
Unit 2: Sewer
1,000.00000000
SF $10.00
$10,000.001
68
0241.0401 Remove Concrete Drive
Unit 2: Sewer
500.000000011
SF $1.50
$750.001
69
3213.0401 6" Concrete Driveway
Unit 2: Sewer
500.00000000
SF $13.00
$6,500.001
44
3212.0401 HMAC Transition
Unit 3: Paving
10.0000000d
TN $350.00
$3,500.001
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
Unit 1:Water
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
212,240.501
T8,750.001
Unit 2: Sewer
Unit 3: Paving
$3,500.001
Unit 4: Storm
$0.00
Sub Total Additions
$234,490.50
Change Order Additions Page 2 of 4
FORT WORTH
City of Fort Worth
it
Change Order Deletions
Project Name 1 2018 Bond Year 3 - Contract 8
City Sec # 1
56639
Client Project # I
I
Contractorl McClendon Construction Company I PMI Greg Robbins
I
Inspectorl Travis Strang l
Change Order Submittal # 0
Date 1 5/3/2023
DELETIONS
I I EM
UES(:RIP I IUN
DEP I
Uty
Unit Unit Cost
I otal 1
65
9999.0003 Construction Allowance
Unit 2: Sewer
0.23437500
LS $80,000.00
I
$18,750.001
43
9999.0009 Construction Allowance
Unit 3: Paving
0.03500000
LS $100,000.00
$3,500.001
21
0241.3013 Remove 18" Storm Line
Unit 1: Water
50.00000000
LF $35.00
$1,750.001
22
0241.3015 Remove 24" Storm Line
Unit 1: Water
50.00000000
LF $37.00
$1,850.001
23
0241.3019 Remove 36" Storm Line
Unit 1: Water
50.00000000
LF W.00
$2,300.001
24
0241.3021 Remove 42" Storm Line
Unit 1: Water
50.00000000
LF $57.00
$2,850.001
37
3305.0202Imported EmbedmentlBackfill, CSS
Unit 1: Water
300.00000000
CY $98.00
1
$29,400.001
38
3305.0203Imported EmbedmenttBackfll, CLSM
Unit 1: Water
500.00000000
CY $142.00
$71,000.001
39
3305.0207 Imported EmbedmentlBackfll, Select Fill
Unit 1: Water
50.00000000
CY $55.00
$2,750.001
41
3341.010318" RCP, Class III
Unit 1: Water
50.00000000
LF $125.00
$6,250.001
42
3341.0205 24" RCP, Class III
Unit 1: Water
50.00000000
LF $140.00
$7,000.001
43
3341.0309 36" RCP, Class III
Unit 1: Water
50.00000000
LF $200.00
$10,000.001
44
3341.0402 42" RCP, Class I I I
Unit 1: Water
50.00000000
LF $250.00
$12,500.001
1
I
I
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
Unit 1: Water
1
I
1
I
1
I
1
I
I
I
1
I
I
I
1
I
I
I
I
I
I
I
I
I
I
I
1
I
$147,650.001
Unit 2: Sewer
$18,750.001
Unit 3: Paving
$3,500.001
Unit 4:Storm
$0.001
Sub Total Deletions
$169,900.001
Change Order Deletions Page 3 of 4
MISBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co # DATE I AMOUNT
Total I $0.00 1
FORT WORTH.:;
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE• 2018 Bond Contract 8 — Change Order #1
M&C: CPN: 101472-1 CSO: 56639 DOC#:
Date:
To:
Name
Department Initials
Date Out
l .
Filogonio Munoz
TPW - initial 4
May 30, 2023
2.
Justin Blair
Contractor - signature 9,
May 31, 2023
3.
Travis Strang
TPW - signature T�
Jun 1, 2023
4.
Walter Norwood
Water - initial wnn
May 30, 2023
5.
Greg Robbins
TPW - signature J,&—'
May 30, 2023
6.
Mary Hanna
TPW - signature wy�'
Jun 6, 2023
7
Michael Owen
TPW - signature M
Jun 6, 2023
8
Lauren Prieur
TPW - signature ��
Jun 6, 2023
9
Doug Black
Legal - signature d
Jun 7, 2023
10.
William Johnson
LV
CMO - signature W,
Jun 7, 2023
11.
Jannette Goodall
CSO - signature J�
Jun 8, 2023
12.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments
requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval
first. Once the ACM has signed the routing slip,
David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ❑No
RUSH: DYES ®No SAME DAY: DYES ®No NEXT DAY: DYES ®No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs