Loading...
HomeMy WebLinkAboutContract 59570THE STATE OF TEXAS CSC No. 59570 COUNTY OF TARRANT INTERLOCAL AGREEMENT Precinct 3 City Project Number 104319 This Interlocal Agreement is between Tarrant County, Texas ("COUNTY"), and the City of Fort Worth ("CITY"). WHEREAS, the CITY is requesting the COUNTY's assistance to: • Full Depth Reclamation for Old Denton Road (1) located within the city of Fort Worth From 270' north of Overlock Creek Dr to Westport Pkwy (Approximately 1,110 linear feet). • Full Depth Reclamation for Old Denton Road (2) located within the city of Fort Worth from Westport Pkwy to Day Rd (Approximately 6,860 linear feet). • Full Depth Reclamation for Elizabethtown Cemetery Road located within the city of Fort Worth from Day Dr to Eagle Pkwy (Approximately 3,410 linear feet). • Full Depth Reclamation for Keller Hicks Road located within the city of Fort Worth from Lacy Lane to Harmon Road (Approximately 1,400 linear feet). Collectively, hereinafter referred to as the "Project" WHEREAS, the Interlocal Cooperation Act contained in Chapter 791 of the Texas Government Code provides legal authority for the parties to enter into this Agreement; and WHEREAS, during the performance of the governmental functions and the payment for the performance of those governmental functions under this Agreement, the parties will make the performance and payment from current revenues legally available to that party; and WHEREAS, the Commissioners Court of the COUNTY and the City Council of the CITY each make the following findings: a. This Agreement serves the common interests of both parties; b. This Agreement will benefit the public; C. The division of costs fairly compensates both parties to this Agreement; and d. The CITY and the COUNTY have authorized their representatives to sign this Agreement. NOW, THEREFORE, the COUNTY and the CITY agree as follows: TERMS AND CONDITIONS OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 1. COUNTY RESPONSIBILITY The COUNTY will furnish the labor and equipment to assist the CITY in completing the Project: COUNTY will utilize CITY vendor to mill and remove excess materials, the COUNTY will reclaim and stabilize the exposed subgrade, regrade, shape, and prime the stabilized of 5 roadbed, place two inches of asphalt base, place two inches of asphalt surface, backfill pavement edges (materials must be stockpiled or available within close proximity to the project) and clean the project of excessive spoil materials. 11 CA:I *1111•1i6B1114110 2.1 The CITY will furnish and pay for the actual cost of the materials, including any delivery or freight cost, for the Project. The CITY will provide the COUNTY with a purchase order and will be billed directly by the material supplier. The COUNTY may accumulate and bill the CITY for incidental material cost. (Estimated Material Cost not to exceed: $1,196,565) 2.2 The CITY will pay one-half of the COUNTY'S fuel cost incurred for the Project. The COUNTY will invoice the CITY for one-half of the cost of the fuel consumed at the conclusion of the project. If the COUNTY has begun work on the Project but the work has not been completed at the termination of this Agreement, the CITY is still obligated to pay its share of the COUNTY'S fuel cost incurred for the Project up to the date of termination of this Agreement. (Estimated Fuel Cost not to exceed $18,893). 2.3 The CITY will be responsible for all traffic control necessary to safely construct the project. This responsibility includes all advance notices, signage, barricades, pilot vehicles, and flagmen necessary to control traffic in and around the construction site. The CITY will be responsible for and will provide portable message boards to supplement traffic control as needed. The CITY will supply the COUNTY with a purchase order for the appropriate traffic control vendor to cover project needs prior to mobilization of any equipment (Estimated Cost up to $74,604). 2.4 The CITY will be responsible for providing or reimbursing the COUNTY for all temporary and/or permanent striping required for the project (Estimated Cost up to $5,107). 2.5 The CITY will be responsible to provide the milling and removal of excess road base materials for the project (Estimated Cost up to $111,818). 2.6 The CITY will reimburse the COUNTY for actual cost of any overtime hours the CITY requires the COUNTY to provide watering the roadway for dust control after regular work hours. (Estimated Cost up to $3,300). 2.7 The CITY will adjust all utilities, manholes and valve boxes necessary to construct any and all parts of this Project. 2.8 The CITY will provide the COUNTY with a hydrant meter and all water necessary for construction of the Project at no cost to the COUNTY. 2.9 The CITY will furnish all rights of way, plan specifications, engineering drawings, survey, and laboratory testing required for construction of any and all parts of this Project. 2.10 CITY will notify and get clearance from other CITY utility departments and franchise utilities prior to entering into agreement. If any of the utilities are shallow and must be relocated, the CITY shall confirm the relocation is complete prior to scheduling the project. 2.11 The CITY will furnish a dump site within close proximity to the Project for the COUNTY to dump all spoils and waste materials generated during construction of this Project as needed. 2.12 The CITY shall remove or trim any overhanging limbs or brush that may interfere with COUNTY equipment or progress prior to the start of the project. 2 of 5 2.13 If a Storm Water Pollution Prevention Plan ("Plan") is required, the CITY will be responsible for the design and development of the Plan. CITY will pay for all cost (including subcontractor materials, labor and equipment) associated with the implementation and maintenance of the Plan. 3. CI 5. 6. 7. Compliance with Laws. In providing the services required by this Agreement, City must observe and comply with all applicable federal, state, and local statutes, ordinances, rules, and regulations, including, without limitation, workers' compensation laws, minimum and maximum salary and wage statutes and regulations, and non-discrimination laws and regulations. City shall be responsible for ensuring its compliance with any laws and regulations applicable to its business, including maintaining any necessary licenses and permits PROCEDURES DURING PROJECT 3.1 If the CITY has a complaint regarding the construction of the project, the CITY must complain in writing to the COUNTY no later than 30 days of the date of project completion. If the complaint is found credible, the COUNTY will make said repair and bear the cost of the repair. COUNTY will make said repair as soon as reasonably possible. 3.2 Upon expiration of 30 days after the project completion, the CITY will be solely responsible for the maintenance and repairs of the entire project. NO WAIVER OF IMMUNITY This Agreement does not waive COUNTY rights under a legal theory of sovereign immunity. This Agreement does not waive CITY rights under a legal theory of sovereign or governmental immunity. OPTIONAL SERVICES 5.1 If mutually agreed by the CITY and the COUNTY, the COUNTY will provide traffic control required for the Project. This responsibility includes all signage, barricades, pilot vehicles, and flagmen necessary to control traffic in and around the construction site with the exception of any portable changeable message boards which will be supplied by the CITY. Traffic control measures provided by the COUNTY will be billed at the actual labor cost plus 10% for use of the COUNTY traffic control devices. 5.2 If requested by the CITY, the COUNTY will apply permanent striping coordinated through the Transportation Department. Application of striping by the COUNTY is limited to Project roadways. If the CITY desires permanent striping applied to any roadways or portions of roadways not covered by this Agreement, the CITY will need to enter into a separate agreement with the COUNTY for the provision of those services. TIME PERIOD FOR COMPLETION The CITY will give the COUNTY notice to proceed at the appropriate time. However, the COUNTY is under no duty to commence construction at any particular time. There is no deadline for completion of the Project. THIRD PARTY This contract shall not be interpreted to inure to the benefit of a third party not a party to this contract. This contract may not be interpreted to waive any statutory or common law defense, immunity, including governmental and sovereign immunity, or any 3 of 5 limitation of liability, responsibility, or damage of any party to this contract, parry's agent, or party's employee, otherwise provided by law. 8. JOINT VENTURE & AGENCY The relationship between the parties to this Agreement does not create a partnership or joint venture between the parties. This Agreement does not appoint any party as agent for the other parry. 9. EFFECTIVE DATE This Agreement becomes effective when signed by the last party whose signing makes the Agreement fully executed. 10. TERMINATION OF AGREEMENT This Agreement will automatically terminate on December 31, 2023, or on the date the project is completed, whichever occurs first. Notwithstanding the foregoing, or any other language to the contrary, either party may terminate this Agreement without cause upon thirty (30) days' written notice to the other party prior to the intended date of termination. In the event of termination by either party, neither party shall have any further obligations to the other party under this Agreement, except that the CITY remains liable to the COUNTY for any outstanding invoice for materials that the COUNTY provides for the project, if any. This Agreement may be renewed prior to its expiration upon the mutual written consent of the parties. 11. DISCLOSURE The CITY acknowledges that it is a "governmental entity" and not a "business entity" as those terms are defined in Tex. Gov't Code § 2252.908, and therefore, no disclosure of interested parties pursuant to Tex. Gov't Code Section 2252.908 is required. TARRANT COUNTY, TEXAS r Tim O'Hare COUNTYJUDGE Date: _ c : n�, F� . 7()Z` ? Gar�Fickes COMMISSIONER, PRECINCT 3 Date: CITY OF FORT WORTH William Johnson ASSISTANT CITY MANAGER Date: May 2, 2023 .,9M-J7: Lauren Prieur (May 2, 2023 09:00 CDT) _ Lauren Prieur, P.E. DIRECTOR, T/PW DEPARTMENT Date: May 2, 2023 Attest: Jannette S. Goodall City Secretary OFFICIAL RECORD 4 of 5 CITY SECRETARY FT. WORTH, TX APPROVED AS TO FORM" Criminal District Attorney s Office* APPROVED AS TO FORM AND LEGALITY P y 2, 2021 15:13 CDT) Douglas W. Black Sr. Assistant City Attorney M&C No. 23-0318 M&C Date: 4/25/2023 * By law, the Criminal District Attorney's Office may only approve contracts for its clients. We reviewed this document as to form from our client's legal perspective. Other parties may not rely on this approval. Instead those parties should seek contract review from independent counsel. 5 of 5 2023 INTERLOCAL AGREEMENT WITH TARRANT COUNTY — PRECINCT 3 City Project Number 104319 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract for the City, including ensuring all performance and reporting requirements. ,'Qla9low" Riad Nusrallah Sr. Professional Engineer LV43 ILA rrecinci-3 Kenaminailon rrojeci (CD 7/Future CD 10) Block Street Limits Keller Hicks Road - 1400 feet south of Keller Hicks Road 11300 -11599 ZU23 ILA Precinct-3 Rehabilitation Project (CD 7/Future CD 10) jp� 00 Street Limits Block Road Day Road - Eagle Pkwy 14200 - 14899 Westport Pkwy - Day Road 260 ft north of Overlook Creek Drive - Westport Parkway 13500 - 14299 13250 - 13499 Official site of the City of Fort Worth, Texas 1' #' COUNCILCITY AGENDA Create New From This M$C DATE: 4/25/2023 REFERENCE **M&C 23- LOG NAME: NO.: 0318 CODE: C TYPE: CONSENT PUBLIC HEARING: 2023 INTERLOCAL AGREEMENT TARRANT COUNTY PRECINCT -3 NO SUBJECT: (CD 7 / Future CD 10) Authorize Execution of an Interlocal Agreement with Tarrant County with City Participation in the Amount of $1,416,886.00 for Street Rehabilitation at Four Locations RECOMMENDATION: It is recommended that the City Council authorize execution of an Interlocal Agreement with Tarrant County with City participation in the amount of $1,416,886.00 for street rehabilitation at four locations: Elizabeth Cemetery Road, two locations along Old Denton Road and Harmon Road (City Project No. 104319). DISCUSSION: In the Fiscal Year 2023 Pay -Go General Capital Projects Program, various types of street maintenance techniques are grouped into specific contract packages, including Interlocal Agreements with other governmental entities. This Mayor and Council Communication (M&C) will provide street rehabilitation for approximately six lane miles on four street segments. Tarrant County Precinct 3 has agreed to enter into an Interlocal Agreement for the rehabilitation of the streets shown in the table below. Under this agreement, Tarrant County will provide all necessary labor and equipment to perform this work and the City of Fort Worth (City) agrees to pay for the cost of materials and other incidentals in the amount shown in the table. Additionally, the City agrees to provide traffic control for the duration of the project or as deemed necessary by Tarrant County (City Project No. 104319). The locations covered under this agreement and the project budget information are in the tables below: Street Name Street Limits Block cost Elizabethtown Cemetery Road Day Road- Eagle Pkwy 14200-14899 $419,981.81 Old Denton Road Westport Pkwy- Day Road 13500-14299 $663,129.17 Old Denton Road 260ft. North of Overlook Creek Drive- Westport Pkwy 13250-13499 1$198,938.75 Harmon Road Keller Hicks Road- 1400ft. South of Keller Hicks Road 11300-11599 $134,836.27 Construction for this project is expected to start in May 2023 and be completed by December 2023. Upon completion of the project there will be no anticipated impact on the General Fund operating budget. Funding is budgeted in the TPW Highway & Streets Department's General Capital Projects Fund for the purpose of funding the 2023 Interlocal Agreement TC project, as appropriated. A Form 1295 is not required because: This contract will be with a governmental entity, state agency or public institution of higher education: Tarrant County The project is located in COUNCIL DISTRICT 7/FUTURE COUNCIL DISTRICT 10. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the General Capital Projects Fund for the 2023 Interlocal Agreement TC project to support approval of the above recommendation and execution of the agreement. Prior to any expenditure being incurred, the Transportation & Public Works Department has the responsibility to validate the availability of funds. TO Department Account Project Fund ID ID FROM Department Account Project Fund ID ID Submitted for Citv Manager's Office bv: Oriqinatinq Department Head: Additional Information Contact: Program Activity Budget Reference # Amount g y Year (Chartfield 2) Program Activity Budget Reference # Amount g Y Year (Chartfield 2) William Johnson (5806) Lauren Prieur (6035) Monty Hall (8662) ATTACHMENTS 2023 INTERLOCAL AGREEMENT TARRANT COUNTY PRECINCT-3 funds availabilitv.pdf (CFW lntemal) FID Table 104319(3).xlsx (CFW Internal) Haromn Rd Map.pdf (Public) Old Denton Rd Elizabethtown Center Rd Map.pdf (Public) 104319-EPIA-2023 Interlocal Agreement, Precinct 3 Final Audit Report Created: By: Status: Transaction ID 2023-04-29 Andrea Munoz(Andrea.Munoz@fortworthtexas.gov) Canceled / Declined CBJCHBCAABAADeGeF2yCXAAFHfP22RTPTTFogstx_Eqm 2023-05-02 "104319-EPIA-2023 Interlocal Agreement, Precinct 3" History Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2023-04-29 - 1:48:16 AM GMT- IP address: 204.10.90.100 Document emailed to Ilianisse.FigueroaAponte@fortworthtexas.gov for filling 2023-05-01 - 3:57:39 PM GMT Document emailed to Riad.Nusrallah@fortworthtexas.gov for filling 2023-05-01 - 3:57:39 PM GMT Email viewed by Ilianisse.FigueroaAponte@fortworthtexas.gov 2023-05-01 - 4:36:20 PM GMT- IP address: 204.10.90.100 Signer Ilianisse.FigueroaAponte@fortworthtexas.gov entered name at signing as Ilianisse Figueroa Aponte 2023-05-01 - 4:36:37 PM GMT- IP address: 204.10.90.100 Form filled by Ilianisse Figueroa Aponte (Ilianisse.FigueroaAponte@fortworthtexas.gov) Form filling Date: 2023-05-01 - 4:36:39 PM GMT - Time Source: server- IP address: 204.10.90.100 Email viewed by Riad.Nusrallah@fortworthtexas.gov 2023-05-01 - 9:37:03 PM GMT- IP address: 204.10.90.100 Signer Riad.Nusrallah@fortworthtexas.gov entered name at signing as Riad Nusrallah 2023-05-01 - 9:38:12 PM GMT- IP address: 204.10.91.100 Form filled by Riad Nusrallah (Riad.Nusrallah@fortworthtexas.gov) Form filling Date: 2023-06-01 - 9:38:14 PM GMT - Time Source: server- IP address: 204.10.91.100 Document emailed to omar.elbagalati@fortworthtexas.gov for filling 2023-05-01 - 9:38:16 PM GMT ORT WORTHti ( Powered by Adobe Acrobat Sign Email viewed by omar.elbagalati@fortworthtexas.gov 2023-05-01 - 9:40:30 PM GMT- IP address: 47.185.1.186 Signer omar.elbagalati@fortworthtexas.gov entered name at signing as Omar Elbagalati 2023-05-01 - 9:42:34 PM GMT- IP address: 47.185.1.186 Form filled by Omar Elbagalati (omar.elbagalati@fortworthtexas.gov) Form filling Date: 2023-05-01 - 9*42:36 PM GMT - Time Source: server- IP address: 47.185.1.186 Document emailed to Leon.Wilson@fortworthtexas.gov for filling 2023-05-01 - 9:42:37 PM GMT Email viewed by Leon.Wilson@fortworthtexas.gov 2023-05-01 - 9:59:32 PM GMT- IP address: 107.214.166.44 Signer Leon.Wilson@fortworthtexas.gov entered name at signing as Leon Wilson, Jr. 2023-05-02 - 12:41:48 PM GMT- IP address: 204.10.90.100 Form filled by Leon Wilson, Jr.(Leon.Wilson@fortworthtexas.gov) Form filling Date: 2023-05-02 - 12:41:50 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Michael.Owen@fortworthtexas.gov for filling 2023-05-02 - 12:41:51 PM GMT Email viewed by Michael.Owen@fortworthtexas.gov 2023-05-02 - 1:09:06 PM GMT- IP address: 204.10.90.100 Signer Michael.Owen@fortworthtexas.gov entered name at signing as Michael Owen 2023-05-02 - 1:10:33 PM GMT- IP address: 204.10.90.100 Form filled by Michael Owen(Michael.Owen@fortworthtexas.gov) Form filling Date: 2023-05-02 - 1:10:35 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Lauren.Prieur@fortworthtexas.gov for signature 2023-05-02 - 1:10:37 PM GMT Email viewed by Lauren.Prieur@fortworthtexas.gov 2023-05-02 - 2:00:22 PM GMT- IP address: 204.10.90.100 Signer Lauren.Prieur@fortworthtexas.gov entered name at signing as Lauren Prieur 2023-05-02 - 2:00:40 PM GMT- IP address: 204.10.90.100 Document e-signed by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov) Signature Date: 2023-05-02 - 2:00:42 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Priscilla.Ramirez@fortworthtexas.gov for approval 2023-05-02 - 2:00:44 PM GMT FORT H, Powered by Adobe Acrobat Sign Email viewed by Priscilla.Ramirez@fortworthtexas.gov 2023-05-02 - 4:09:56 PM GMT- IP address: 204.10.90.100 Signer Priscilla.Ramirez@fortworthtexas.gov entered name at signing as Priscilla Ramirez 2023-05-02 - 4:10:22 PM GMT- IP address: 204.10.90.100 Document approved by Priscilla Ramirez (Priscilla.Ram irez@fortworthtexas.gov) Approval Date: 2023-05-02 - 4:10:24 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Douglas.Black@fortworthtexas.gov for signature 2023-05-02 - 4:10:41 PM GMT Email viewed by Douglas.Black@fortworthtexas.gov 2023-05-02 - 5:46:36 PM GMT- IP address: 204.10.90.100 Document declined by Douglas.Black@fortworthtexas.gov Decline reason: we've lost the spaces for the M&C on the ILA form. Please write in the M&C number and date below my signature block. Thanks, Doug 2023-05-02 - 5:49:51 PM GMT- IP address: 204.10.90.100 FORT WORTH, I Powered by Adobe Acrobat Sign Approval of a Project for an Interlocal Agreement Between Tarrant Couny', Texas and City of Fort Worth Tarrant County, Texas, acting by and through the Tarrant County Commissioners Court, has been advised of the following described Project involving the construction, improvement, or repair of a building, road or other facility. In accordance with Texas Government Code § 791.014, Tarrant County hereby gives its specific written approval for the Project prior to the Project beginning. The Project information is as follows: PROJECT and LOCATION: • Full Depth Reclamation for Old Denton Road (1) located within the city of Fort Worth From 270' north of Overlock Creek Dr to Westport Pkwy (Approximately 1,110 linear feet). • Full Depth Reclamation for Old Denton Road (2) located within the city of Fort Worth from Westport Pkwy to Day Rd (Approximately 6,860 linear feet). • Full Depth Reclamation for Elizabethtown Cemetery Road located within the city of Fort Worth from Day Dr to Eagle Pkwy (Approximately 3,410 linear feet). • Full Depth Reclamation for Keller Hicks Road located within the city of Fort Worth from Lacy Lane to Harmon Road (Approximately 1,400 linear feet). The local governments that have requested the Project and with whom the Interlocal Agreement is by and between are Tarrant County, Texas, and the City of Fort Worth, Texas. By vote on the date below, the Tarrant County Commissioners Court has approved the Project identified above and authorized execution of this document by the presiding officer of the Tarrant County Commissioners Court. B c -' - Date: Y: - — Presiding Officer of the Tarrant County Commissioners Court