HomeMy WebLinkAboutResolution 5745-06-2023Resolution
NO.5745-06-2023
A RESOLUTION AUTHORIZING EXECUTION OF AN ADVANCE FUNDING
AGREEMENT (AFA) BETWEEN THE STATE OF TEXAS, ACTING BY AND
THROUGH TEXAS DEPARTMENT OF TRANSPORTATION, AND THE CITY OF
FORT WORTH IN THE ESTIMATED AMOUNT OF $835,595.00, WITH CITY
PARTICIPATION ESTIMATED TO BE $116,428.00, FOR IMPROVEMENTS TO
TRAFFIC SIGNALS ON NORTH BEACH STREET FROM TIMBERLAND
BOULEVARD TO IH 30 HIGHWAY SAFETY IMPROVEMENT PROJECT
WHEREAS, federal law establishes federally funded programs for transportation improvements
to implement its public purposes, and
WHEREAS, the Texas Transportation Code, Section 201.103 establishes that the State shall
design, construct and operate a system of highways in cooperation with local governments, and Section
222.052 authorizes the Texas Transportation Commission to accept contributions from political
subdivisions for development and construction of public roads and the state highway system within the
political subdivision, and
WHEREAS, federal and state laws require local governments to meet certain contract standards
relating to the management and administration of State and federal funds, and
WHEREAS, the Texas Transportation Commission has codified 43 TAC, Rules 15.50-15.56 that
describe federal, state, and local responsibilities for cost participation in highway improvement and other
transportation projects, and
WHEREAS, the Texas Transportation Commission passed Minute Orders Numbered 116292 and
116073 authorizing the State to undertake and complete a highway improvement or other transportation
project generally described as Off System Signal System Upgrades; and
WHEREAS, the City of Fort Worth identified the need to improve existing traffic signals, install
flashing yellow arrows and detection upgrades at 30 traffic signals along North Beach Street from
Timberland Boulevard to IH 30; and
WHEREAS, the City of Fort Worth and Texas Department of Transportation have negotiated
terms in the amount of $835,595.00, with federal participation in the amount of $683,525.00, state
participation in the amount of $35,642.00 and local participation in the estimated amount of $116,428.00,
for engineering and construction of signals on North Beach Street.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF FORT WORTH, TEXAS, THAT:
The City Manager is hereby authorized to execute an Advance Funding Agreement
(CSJ: 0902-90-239) with the Texas Department of Transportation in the amount of
$835,595.00, with federal participation in the amount of $683,525.00, state participation in
the amount of $35,642.00 and local participation in the estimated amount of $116,428.00,
for engineering and construction of signals on North Beach Street from Timberland
Boulevard to IH 30. All cost overruns will be the responsibility of the City of Fort Worth.
Adopted this 13th day of June 2023.
Ar
ATTEST: a°o°o 0000�
00�0
duo o°♦d
B y : U o o° _�
--------------------------------
°oo°O0000°°o° *`c
Janette S. Goodall City Secretary �aa�%.xAs 4,p
ti DT,. �OQ4
Project Location Map
Project Name: North Beach Street Corridor
Project Limit: Temberland Blvd To lH 30 East
Council District 7A8
CSJ 0902-90-239
List of Intersections
North/South Street
East/West Street
Alta Vista Road
Timberland Blvd
Alta Vista Road
Funnel Street
Alta Vista Road
Keller Hicks Road
North Beach Street
Golden Triangle Blvd
North Beach Street
Alta Vista Road
North Beach Street
Heritage Trace Blvd
North Beach Street
Shiver Road
North Beach Street
Thompson Street
North Beach Street
Summerfields Blvd
North Beach Street
Crabapple Street
North Beach Street
Basswood Blvd
North Beach Street
Longstraw Drive
North Beach Street
Fossil Creek Blvd
North Beach Street
Fossil Vista Drive
North Beach Street
Sandshell Drive
North Beach Street
IH 820 West
North Beach Street
lH 820 East
North Beach Street
Northern Cross Blvd
North Beach Street
Clay Ave
North Beach Street
Stanley Keller Road
North Beach Street
East Long Ave
North Beach Street
Chesser Boyer Road
North Beach Street
Springdale Road
North Beach Street
Belknap Street
North Beach Street
West Beach Street
North Beach Street
SH 121 West
North Beach Street
SH 121 East
North Beach Street
East 1st Street
North Beach Street
lH 30 West
North Beach Street
lH 30 East
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 06/13/23 M&C FILE NUMBER: M&C 23-0471
LOG NAME: 2023 TRINITY BOULEVARD AND N BEACH STREET CORRIDORS AFA
SUBJECT
(CD 5, CD10, CD 4, CD 2, CD 11 and CD 8) Adopt a Resolution Authorizing Execution of an Advance Funding Agreement with the Texas
Department of Transportation for Improvements of Traffic Signals on Trinity Boulevard Corridor in the Amount of $973,909.00 with the City's
Participation Amount an Estimated $124,253.00; Adopt a Resolution Authorizing Execution of an Advance Funding Agreement with the Texas
Department of Transportation for Improvements of Traffic Signals on North Beach Street Corridor in the Amount of $835,595.00 with the City's
Participation Amount an Estimated $116,428.00; Adopt Appropriation Ordinance and Amend the Fiscal Years 2023-2027 Capital Improvement
Program (2022 Bond Program)
RECOMMENDATION:
It is recommended that the City Council:
1. Adopt the attached resolution authorizing execution of an Advance Funding Agreement with the Texas Department of Transportation for
improvements of traffic signals on Trinity Boulevard from Greenbelt Road to Amon Carter Boulevard in the amount of $973,909.00 with the
City"s participation amount an estimated $124,253.00 (TxDOT Control Section Job No. 0902-90-238);
2. Adopt the attached resolution authorizing execution of an Advance Funding Agreement with the Texas Department of Transportation for
improvements of traffic signals on North Beach Street from Timberland Boulevard to Interstate Highway 30 in the amount of $835,595.00 with
the City"s participation amount an estimated $116,428.00 (TxDOT Control Section Job No. 0902-90-239);
3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Grants Capital Projects Federal Fund,
in an amount totaling up to $1,491,646.00, subject to receipt of the grant, in the amount up to $808,121.00 for traffic signal improvements on
Trinity Boulevard from Greenbelt Road to Amon Carter Boulevard project (City Project No. 104846) and in the amount up to $683,525.00 for
traffic signal improvements on North Beach Street from Timberland Boulevard to Interstate Highhway 30 project (City Project No. 104847);
4. Adopt the attached appropriation ordinance adjusting appropriations in the 2022 Bond Program Fund in the amount totaling $240,681.00
by increasing estimated appropriations in the amount of $116,428.00 for the HSIP 2021- N Beach St. corridor signal project (city project no.
104847), and $124,253.00 in the HSIP 2021- Trinity Blvd, corridor signal project (city project no. 104846) and by decreasing appropriations
in the Traffic Signals programmable project (City Project No. P130006) by the same amount, for the purpose of funding project costs; and
5. Amend the Fiscal Years 2023-2027 Capital Improvement Program.
DISCUSSION:
The purpose of this Mayor and Council Communication is to adopt resolutions authorizing the execution of Advance Funding Agreements (AFA)
for two off -system systemic Highway Safety Improvement Program (HSIP) projects with the Texas Department of Transportation (TXDOT) and
accept the federal grant funds in the amount of $808,121.00 for the construction for the Trinity Boulevard corridor and $683,525.00 for the
construction for the North Beach Street corridor. The City's participation: $124,253.00 for Trinity Boulevard and $116,428.00 for North Beach
Street includes engineering costs in the amounts of $70,000 and $70,000, respectively. The signal improvement project applications were
submitted for HSIP funds and after evaluation, funds were awarded through the federal HSIP program.
The project includes improvement of existing traffic signals, install flashing yellow arrows and detection upgrade to bring the signals along the
selected corridors to current standards and make the intersections safer for vehicles, pedestrian and bicyclists. The Trinity Boulevard corridor
project includes 14 traffic signals from Greenbelt Road to Amon Carter Boulevard and the North Beach Street corridor project includes 30 traffic
signals from Timberland Boulevard to Interstate Highway 30.
Since this is a HSIP project, TxDOT will lead the construction and will absorb the indirect cost for providing statewide support services. Both
projects letting date is March 2025. The State will be responsible for securing the federal and local share of the funding required for the
construction of the projects. City funds appropriated for these projects include design services and state construction direct costs. An advanced
payment to TxDOT is required in the amount of $54,253.00 for Trinity Boulevard Corridor project and $46,428.00 for North Beach Street Corridor
project. The final payment to TxDOT for local participation will be based on actual costs. The City bears the responsibility to pay for cost overruns.
At the end of the project, the asset will remain with the City of Fort Worth. The table below summarizes funding for the project:
cription Federal State Local (Appropriation
Amount
Trinity Boulevard Corridor
$808,121.001 $0.001 $0.001 $808,121.
Federal Grant
Unappropriated
$0.00
$41,535.00
$0.00
$0.00
Indirect State Cost
Appropriated
$0.00
$0.00
$54,253.00
$0.00
Local Advance
Payment
Appropriated
$0.00
$0.00
$70,000.00
$0.00
Local Cost
SUBTOTAL
$808,121.00
$41,535.00
$124,253.00
$808,121.00
North Beach Street Corridor
Appropriated
$683,525.00
$0.00
$0.00
$683,525.00
Federal Grant
Unappropriated
$0.00
$35,642.00
$0.00
$0.00
Indirect State Cost
Appropriated
$0.00
$0.00
$46,428.00
$0.00
Local Advance
Payment
Appropriated
$0.00
$0.00
$70,000.00
$0.00
Local Cost
SUBTOTAL
$683,525.00
$35,642.00
$116,428.00
$683,525.00
TOTAL
$1,491,646.00
$77,177.00
$240,681.00
$1,491,646.00
This project is included in the 2022 Bond Program. The City's Extendable Commercial Paper (ECP) (M&C 22-0607; Ordinance 25675-08-2022)
provides liquidity to support the appropriation. Available resources will be used to actually make any interim progress payments until debt is
issued. Once debt associated with a project is sold, debt proceeds will reimburse the interim financing source in accordance with the statement
expressing official Intent to Reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance 25515-05-2022).
Funding is budgeted in the TPW Dept Highway & Streets Department's 2022 Bond Program Fund for the purpose of funding the HSIP 2021-Trinty
Blvd Corr Sig and HSIP 2021-N Beach St. Corr Sig projects.
The project on Trinity Boulevard Corridor is in Council District 5.
The project on North Beach Street Corridor is in Council Districts 10, 4, 2, 11 and 8.
A Form 1295 is not required because: This contract will be with a governmental entity, state agency or public institution of higher education: Texas
Department of Transportation
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds
will be available in the current capital budgets, as appropriated, in the Grants Cap Projects Federal Fund and the 2022 Bond Program Fund for the
HSIP 2021-Trinty Blvd Corr Sig and HSIP 2021-N Beach St. Corr Sig projects. The Transportation and Public Works Department (and Financial
Management Services) will be responsible for the collection and deposit of funds due to the City. Prior to expenditure being incurred, the
Transportation and Public Works Department has the responsibility to validate the availability of funds. This is an advance grant.
Submitted for City Manager's Office by: William Johnson 5806
Originating Business Unit Head: Lauren Prieur 6035
Additional Information Contact: Martin Phillips 7861