NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: DHL Alliance C
City Project No: 104636
Improvement Type(s): Water x❑ Sewer ❑
Original Contract Price:
Amount of Approved Change Order(s):
Revised Contract Amount:
Total Cost of Work Complete:
wes Lancaster
Wes Lancaster (Jun 12, 2023 15:48 CDT)
Contractor
Project Manager
Title
North Texas Contracting
Company Name
Jaysa rAvis (Jun 12. 202315.52 CDT)
Project Inspector
Ci, Ari", P�.
Project Manager
4Re.hecca D ane Owen (Jun 13. 202309:10 CDT)
CFA Manager
A.., a._
Lauren Prieur (Jun 13, 202309:33 CDT)
TPW Director
William Johnso�Ju 3. 202310:34 CDT)
Asst. City Manager
$58,945.00
$58,945.00
Jun 12, 2023
Date
Jun 12, 2023
Date
Jun 13, 2023
Date
Jun 13, 2023
Date
Jun 13, 2023
Date
Jun 13, 2023
Date
OFFICIAL RECORD
CITY SECRETARY Page 1 of 2
FT. WORTH, TX
Notice of Project Completion
Project Name: DHL Alliance C
City Project No.: 104636
City's Attachments
Final Pay Estimate x❑
Change Order(s): ❑ Yes ❑x N/A
Pipe Report: x❑ Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety H
Statement of Contract Time
Contract Time 20 WD
Days Charged: 14
Work Start Date: 5/8/2023 Work Complete Date: 6/2/2023
Soil Lab Number of Tests: 4
Water Number of Tests: 4
Page 2of2
FoRTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name DHL ALLIANCE C
Contract Limits
Project Type WATER IMPROVEMENTS
City Project Numbers 104636
DOE Number 4636
Estimate Number 1 Payment Number 1
City Secretary Contract Number
Contract Date
Project Manager NA
Contractor NORTH TEXAS CONTRACTING, INC.
P.O. BOX 468
For Period Ending
KELLER , TX 76244
Inspectors M. GLOVER / J. DAVIS
Contract Time
Days Charged to Date
Contract is 100.00
6/2/2023
WD
2WD
14
Complete
Friday, June 2, 2023 Page 1 of 4
City Project Numbers 104636 DOE Number 4636
Contract Name DHL ALLIANCE C Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER IMPROVEMENTS For Period Ending 6/2/2023
Project Funding
UNIT I: WATER IMPROVEMENTS
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
4" - 12" PRESSURE PLUG
1 EA
$3,500.00
$3,500.00
1
$3,500.00
2
4" - 12" WATER ABANDONMENT PLUG
I EA
$3,500.00
$3,500.00
1
$3,500.00
3
SALVAGE FIRE HYDRANT
1 EA
$1,375.00
$1,375.00
1
$1,375.00
4
TRENCH SAFETY
28.5 LF
$48.00
$1,368.00
28.5
$1,368.00
5
DUCTILE IRON WATER FITTINGS W/
1 TN
$200.00
$200.00
1
$200.00
RESTRAINT
6
4" WATER PIPE
10.5 LF
$110.00
$1,155.00
10.5
$1,155.00
7
6" PVC WATER PIPE
5 LF
$197.00
$985.00
5
$985.00
8
12" WATER PIPE
7 LF
$350.00
$2,450.00
7
$2,450.00
9
FIRE HYDRANT
1 EA
$6,550.00
$6,550.00
1
$6,550.00
10
2" WATER SERVICE
1 EA
$1,200.00
$1,200.00
1
$1,200.00
11
2" PRIVATE WATER SERVICE
6 LF
$72.00
$432.00
6
$432.00
12
3" WATER METER & VAULT
1 EA
$24,890.00
$24,890.00
1
$24,890.00
13
12" GATE VALVE
1 EA
$7,500.00
$7,500.00
1
$7,500.00
14
12" X 6" TAPPING SLEEVE & VALVE
1 EA
$2,500.00
$2,500.00
1
$2,500.00
15
SILT FENCE W/ REMOVAL
108 LF
$5.00
$540.00
108
$540.00
16
INLET PROTECTION W/ REMOVAL
2 EA
$400.00
$800.00
2
$800.00
Sub -Total of Previous Unit
$58,945.00
$58,945.00
Friday, June 2, 2023 Page 2 of 4
City Project Numbers 104636
Contract Name DHL ALLIANCE C
Contract Limits
Project Type WATER IMPROVEMENTS
Project Funding
Contract Information Summary
Original Contract Amount
Change Orders
Total Contract Price
DOE Number 4636
Estimate Number 1
Payment Number 1
For Period Ending 6/2/2023
$58,945.00
$58,945.00
Total Cost of Work Completed $58,945.00
Less % Retained $0.00
Net Earned $58,945.00
Earned This Period $58,945.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$58,945.00
Friday, June 2, 2023 Page 3 of 4
City Project Numbers 104636 DOE Number 4636
Contract Name DHL ALLIANCE C Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER IMPROVEMENTS For Period Ending 6/2/2023
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors M. GLOVER / J. DAVIS Contract Date
Contractor NORTH TEXAS CONTRACTING, INC. Contract Time 20 WD
P.O. BOX 468 Days Charged to Date 14 WD
KELLER , TX 76244 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $58,945.00
Less % Retained $0.00
Net Earned $58,945.00
Earned This Period $58,945.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$58,945.00
Friday, June 2, 2023 Page 4 of 4
FORT WORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: DHL Alliance C
PROJECT NUMBER: 104636
DOE NUMBER: N/A
WATER
PIPE LAID SIZE TYPE OF PIPE LF
WATER 12" C900 7
WATER 6" C900 5
WATER 4" C900 10.5
FIRE HYDRANTS: 1 VALVES (16" OR LARGER) N/A
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Yes, All Passed
NEW SERVICES: 2" Copper 1 EA
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES:
�� TRANSPORTATION AND PUBLIC WORKS
FORTWORTH.
TRANSPORTATION AND PUBLIC WORKS
June 2, 2023
North Texas Contracting
4999 Keller -Haslet Road
Keller, Texas 76244
RE: Acceptance Letter
Project Name: DHL Alliance C
Project Type: Water
City Project No.: 104636
To Whom It May Concern:
On May 31, 2023 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on June 2, 2023. The final inspection and
the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is
therefore accepted by the City. The warranty period will start on June 2, 2023, which is the date of the
punch list completion and will extend of two (2) years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-6251.
Sincerely,
C'J" A"t, P. �.
Andrew Goodman, Project Manager
Cc: Jesse Davis, Inspector
Mike Glover, Inspection Supervisor
Randy Horton, Senior Inspector
Victor Tornero, Program Manager
Halff Associates, Inc., Consultant
North Texas Contracting, Contractor
Excel Inc., D/B/A DHL Supply Chain (USA), Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
CONTRACTOR'S AFFIDAVIT OF FINAL PAYMENT AND RELEASE
THE STATE OF TEXAS
COUNTY OF Tarrant
KNOW ALL MEN BY THESE PRESENTS:
BEFORE ME, the undersigned authority, on this day personally appeared Wes Lancaster
("Affidant"), who after being by me duly sworn, deposes, and says that it is North Texas Contracting, Inc _ a
Corporation (corporation, partnership, trade name) of Tarrant County
State of Texas , (the "CONTRACTOR"), which said CONTRACTOR was awarded the
Contract dated the 191h day of April , 20 23 , for the construction project
of DHLAlliance CCPN 104636 at DAVE ADDITION, LOT 1, BLOCK 1 (the "Work"),
for a total considerationof Fifty Eight Thousand Nine Hundred Forty Five and No/100 ($58,945.00) Dollars
to be paid to the said CONTRACTOR (the "Contract"), and that Affidant has full power of authority to make this
affidavit.
That Excel Inc., D/B/A DHL Supply Chain (USA) (the "OWNER") has approved the final
estimate on said Work, and that the said CONTRACTOR has fully satisfied and paid any and all claims that may
be covered by Texas Government Code, Chapter 2253, as amended, or any other applicable statutes or charter
provisions and that all just bills for labor and materials have been paid and discharged by said CONTRACTOR
insofar as they pertain to the Work in question.
That in addition to any funds which may have been previously paid by the OWNER, the CONTRACTOR
hereby accepts the amount of TWe Thousand Nine Hundred Forty seen and 251100 ($2947.25) Dollars as FULL AND FINAL
PAYMENT under the aforementioned Contract, and hereby waives and releases any right Affidant and/or the
CONTRACTOR may have to pursue claims of any nature against the OWNER arising out of or in any manner
connected with the performance of the Work and/or the Contract, including but not limited to claims of third
parties that supplied material and/or labor for the Work for or through the CONTRACTOR ("Subcontractors"), as
well as claims for delay, additional compensation or for recovery of liquidated damages which may have been
withheld by the OWNER. The CONTRACTOR shall defend, hold harmless and indemnify the OWNER from
any such claims of such Subcontractors. The CONTRACTOR further releases the OWNER from any claim or
liability arising from any act or neglect of the OWNER related to or connected with the Contract. This affidavit
is given pursuant to the final payment provisions of the Contract and shall not be deemed to alter or modify the
terms of provisions of said Contract.
North Texas Contracting, Inc
(Co any
By:
(Af dant)
Was Lancaster
SUBSCRIBED AND SWORN TO BEFORE ME, this 12th
[Notary Seal]
`�rrrrr a ti���
``�� G�p•S MO/y,9F�i,��
`��JQ\pPV PUBCiC' ql
—
s ti wry: ev
i �?9T qTr of you: . Q
ID
O0 • ....••••
By:
(Printed Name)
da of May A.D. 20 23
�*6 rry Public in and for the State of Texas)
� "t �v/Ii c . A .ifitoivtfi IYL
(Printed Name of Notary)
My commission expires: ����
CONSENT OF
SURETY COMPANY
TO FINAL PAYMENT
Conforms with the American Institute of
Architects, AIA Document G707
PROJECT: DHL Alliance
(name, address) Fort Worth, TX
TO (Owner)
OWNER
❑
ARCHITECT
❑
CONTRACTOR
❑
SURETY
❑
OTHER
EXCEL INC., A MASSACHUSETTS CORPORATION,
D1BIA DHL SUPPLY CHAIN (USA) AND THE CITY OF
FnRT WORTH
570 Polaris Parkway
Bond No SU1194247
ARCHITECT'S PROJECT NO: CFA No. 22-0190
CONTRACT FOR: Water Improvements for DHL Alliance
IWestervilfe OH 43082 --J CONTRACT DATE:
CONTRACTOR: NORTH TEXAS CONTRACTING, INC.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
(here insert name and address of Surety Company)
ARCH INSURANCE COMPANY
Harborside 3, 210 Hudson Street, Suite 300
Jersey City NJ 07311-1107 , SURETY COMPANY
on bond of (here insert name and address of Contractor)
NORTH TEXAS CONTRACTING. INC.
4999 Keller Haslet Rd.
Keller TX 76248
,CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (here insert name and address of Owner)
EXCEL INC., A MASSACHUSETTS CORPORATION, DlBIA DHL SUPPLY CHAIN (USA) AND THE CITY OF FORT
WORTH
570 Polaris Parkway
Westerville OH 43082 , OWNER,
as set forth in the said Surety Company's bond,
IN WITNESS, WHEREOF,
the Surety Company has hereunto set its hand this
Attest:
{Seal}:
30th day of May, 2023
ARCH INSURANCE COMPANY
Surety Company
Signature of Authorized Representative
Rabbi Morales
Title
Attorney -in -Fact
NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS.
Current Edition
ONE PAGE
00456
This Power of Aavrnel' limits the acts of those named herein, and they have no authorit), to bind the Company except in the manner and to the extent herein .crated.
:Vol valid for Note, Loan, Letter of Credit, Currency Rate, Interest Rate or Residential Value Guarantees.
POWER OF ATTORNEY
Know All Persons By These Presents:
That the Arch Insurance Company, a corporation organized and existi ng under the laws of the State of Missouri, having its principal administrative office in Jersey City,
New Jersey (hereinafter referred to as the "Company") does hereby appoint:
Dan E. Cornell. Joshua Saunders, Kelly A. Westbrook, Mikae[a Peppers, Ricardo J. Reyna, Robbi Morales, Sophinic Hunter, Tina McEwan and Tonic
Petranek of Dallas, TX (EACH)
its true and lawful Auorney(s)in-Fact, to make, execute, seat, and deliver from the date of issuance of this power for and on its behalfas surety, and as its act and deed:
Any and all bonds, undertakings. recognizances and other surety obligations. in the penal sum not exceeding One Hundred Fiftv Million Dollars ($150.000.000.00).
This authority does not permit the same obligation to be split into two or more bonds In order to bring each such bond within the dollar limit of authority as set forth
herein.
The execution of such bonds, undertakings, recognizances and other surety obligations in pursuance of these presents shall be as binding upon the said Company as
fully and amply to all intents and purposes. as if the same had been duly executed and acknowledged by its regularly elected officers at its principal administrative
office in Jersey City, New Jersey.
This Power of Attorney is executed by authority of resolutions adopted by unanimous consent of the Board of Directors of the Company on August 31. 2022, true and
accurate copies of which are hereinafter set forth and are hereby certified to by the undersigned Secretary as being in full force and effect:
"VOTED, That the Chairman of the Board, the President, or the Executive Vice President, or any Senior Vice President, of the Surety Business Division, or their
appointees designated in writing and filed with the Secretary, or the Secretary shall have the power and authority to appoint agents and attorneys -in -fact, and to
authorize them subject to the limitations set forth in their respective powers of attorney, to execute on behalf of the Company. and attach the seal of the Company
thereto, bonds, undertakings. recognizances and other surety obligations obligatory in the nature thereof, and any such officers of the Company may appoint agents for
acceptance of process."
This Power of Anorney is signed, sealed and certified by facsimile under and by authority of the following resolution adopted by the unanimous consent of the Board of
Directors of the Company on August 31, 2022:
VOTED, That the signature of the Chairman of the Board, the President, or the Executive Vice President, or any Senior Vice President, of the Surety Business
Division, or their appointees designated in writing and filed with the Secretary, and the signature of the Secretary, the seal of the Company, and certifications by the
Secretary, may be affixed by facsimile on any power of attorney or bond executed pursuant to the resolution adopted by the Board of Directors on August 31, 2022, and
any such power so executed, scaled and certified with respect to any bond or undertaking to which it is attached, shall continue to be valid and binding upon the
Company. In Testimony Whereof, the Company has caused this instrument to be signed and its corporate seal to be affixed by their authorized officers, this 23r° day
of March, 2023. J(alh� C
Attested and Certified `Cg 03 Arch Insurance Company
O wxrvrc �r t
IL.P�•. i tut
t �n
Regan`X. Shulman, Secretary Stephen C. Ruschak, Executive Vice President
STATE OF PENNSYLVANIA SS
COUNTY OF PHiLADELPHIA SS
1, Michele Tripodi, a Notary Public, do hereby certify that Regan A. Shulman and Stephen C. Ruschak personally known to me to be the same persons whose names
are respectively as Secretary and Executive Vice President of the Arch Insurance Company, a Corporation organized and existing under the laws of the State of
Missouri, subscribed to the foregoing instrument, appeared before me this day in person and severally acknowledged that they being thereunto duly authorized signed,
sealed with the corporate seal and delivered the said instrument as the free and voluntary_ act of. iid corporation and as their own free and voluntary acts for the uses and
purposes therein set forth. /f
Cemrtnrn,MLh o! ptnnsyiranla - notary icvA `
AYCHUE TRtPM, ltotaryPublfc
P1ttlon xpzei y Mich e odi, Nota b]ic
My Gartmh w wwdw I ysub22 Ms My commission expires 07/31/2025
CERTIFICATION
I, Regan A. Shulman, Secretary of the Arch Insurance Company, do hereby certify that the attached Power of Attorney dated March 23. 2023 on behalf of the
person(s) as listed above is a true and correct copy and that the same has been in full force and cffect since the date thereofand is in full force and effect on the date of
this certificate; and l do further certify that the said Stephen C. Ruschak, who executed the Power of Attorney as Executive Vice President, was on the date of execution
of the attached Power of Attorney the duly elected Executive Vice President of the Arch Insurance Company.
IN TESTIMONY WHEREOF. I have hereunto subscribed my name and affixed the corporate seal of the Arch insurance Company on this 30t^ day of May
2023 '
Re .A. Shulman, Secretary
This Power of Attorney I imits the acts of those named therein to the bonds and undertakings specifically named therein and they have no authority to bind the Company
except in the manner and to the extent herein stated. vra11C�
PLEASE SEND ALL CLAIM INQUIRIES RELATING TO THIS BOND TO THE FOLLOWING ADDRESS: Cg COA
Arch Insurance —Surety Division 9
3 Parkway, Suite 1500 wa+srutrf
Philadelphia, PA I9102 Q stet
a t sn
M�f341iI�
To verify the authenticity of this Power ofAttornev, please contact Arch Insurance Company at SuretvAuthentic . archinsurence.com
Please refer to the above named Attorney -in -Fact and the details of the bond to which the power is attached.
AICPOA040120 Printed in U.S.A.