Loading...
HomeMy WebLinkAboutContract 59229-PM1CSC No. 59229-PMI as PROJECT MANUAL FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, DRAINAGE AND STREET LIGHT IMPROVEMENTS FOR BELTMILL PHASE 2 IPRC Record No. 22-0184 City Project No. 104381 FID No.30114-0200431-104381-EO7685 File No. W-2885 X File No. X-27526 Mattie Parker Mayor Christopher P. Harder, P.E. Director, Water Department David Cooke City Manager Lauren Prieur Interim Director, Transportation and Public Works Department Prepared for The City of Fort Worth April 2023 PELOTON LAND SOLUTIONS, INC 100 HILLWOOD PARKWAY, SUITE 250 FORT WORTH, TX 76177 817-562-3350 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 5 SECTION 00 00 10 TABLE OF CONTENTS DEVELOPER AWARDED PROJECTS Division 00 - General Conditions 1001113 im4tation to Bidders Last Revised 03/20/2020 1002113 00 41 00 00 42 43 0043 3 lastFuetiefis to Bidders Bid Fefm Proposal Form Unit Price Bid Bond 03/20/2020 04 in 4 05/22/2019 04 in 4 Prequalification Statement 09/01/2015 0045 12 00 45 26 Contractor Compliance with Workers' Compensation Law 04/02/2014 00 4540 00 52 43 Mine.;,-, Business Enterprise Geal Agreement 04i a 06/16/2016 00 61 25 Certificate of Insurance 07/01/2011 00 62 13 Performance Bond 01/31/2012 00 62 14 Payment Bond 01/31/2012 00 62 19 00 7200 Maintenance Bond Genef.,i Conditions 01/31/2012 i ii i ii T 007300 0073 10 c,,,.,.ie e„t y Ceadi4ienp Standard City Conditions of the Construction Contract for Developer n7inm�z 01/10/2013 Awarded Projects Division 01- General Requirements Last Revised 01 1100 Summary of Work 12/20/2012 01 25 00 Substitution Procedures 08/30/2013 01 31 19 nip Preconstruction Meeting D-ejeetMeefing-R 08/30/2013 n7/nm7vi/2 01 3233 Preconstruction Video 08/30/2013 01 33 00 Submittals 08/30/2013 01 35 13 Special Project Procedures 08/30/2013 01 45 23 Testing and Inspection Services 03/20/2020 01 5000 Temporary Facilities and Controls 07/01/2011 01 5526 Street Use Permit and Modifications to Traffic Control 07/01/2011 01 57 13 Storm Water Pollution Prevention Plan 07/01/2011 01 60 00 Product Requirements 03/20/2020 01 66 00 Product Storage and Handling Requirements 04/07/2014 01 70 00 Mobilization and Remobilization 04/07/2014 01 71 23 Construction Staking 04/07/2014 01 74 23 Cleaning 04/07/2014 01 77 19 Closeout Requirements 04/07/2014 01 78 23 Operation and Maintenance Data 04/07/2014 01 78 39 Project Record Documents 04/07/2014 CITY OF FORT WORTH BELTIVHLL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 5 Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: httD://fortworthtexas.2ov/tvw/contractors/ or httns://aDDs.fortworthtexas.gov/Proi ectResources/ Division 02 - Existing Conditions 0241 13 Selective Site Demolition 0241 14 Utility Removal/Abandonment 0241 15 Paving Removal Division 03 - Concrete 03 30 00 Cast -In -Place Concrete 0334 13 Controlled Low Strength Material (CLSM) 03 34 16 Concrete Base Material for Trench Repair 03 80 00 Modifications to Existing Concrete Structures Division 26 - Electrical 26 05 00 Common Work Results for Electrical 26 05 33 Raceways and Boxes for Electrical Systems 26 05 43 Underground Ducts and Raceways for Electrical Systems Division 31- Earthwork 31 1000 Site Clearing 31 3124 00 bur.km--nts 31 25 00 Erosion and Sediment Control 1 31 37 00 Riprap Division 32 - Exterior Improvements 32-0i i7 �Azdr..W=t:,:fxxxg Repaii D e,-.ai Tempe,-ary 32 0 i i 8 32 01 29 27� Asphalt Paving Concrete Paving Repair F exible Base /'oiffses 32 1129 Z7�3 Lime Treated Base Courses r,,,,,.�e� 32 ii 7 27� Ce,....en4 Treated -Base liquid Trail ft'hi.liz--f Asphalt Paving 32 Q 73Asphalt 32 13 13 D.,-,;ng l4..,ek Se.,l., is Concrete Paving 32 1320 Concrete Sidewalks, Driveways and Barrier Free Ramps 32 1373 Concrete Paving Joint Sealants Date Modified CITY OF FORT WORTH BELTIVHLL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised March 20, 2020 32 14 166 32 1613 32 1723 32 5 3231 13 3231 266 3231 29 3232 13 3291 19 32 92 13 3 7�3 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 5 Br.V17JT,.\t 1%vixg Concrete Curb and Gutters and Valley Gutters Pavement Markings (''1,ai >;enees and Gates Wir-e Fenees and Gates Wee,l Fe,,ees and Gates Cast in Ulaee Cene .ete Retaining W,.11., Topsoil Placement and Finishing of Parkways Hydro -Mulching, Seeding, and Sodding Trees and Shizubs Division 33 - Utilities 33 01 30 Sewer and Manhole Testing 33 0131 Closed Circuit Television (CCTV) Inspection Ts-v�v 2Z� Byp?JG PLt12'li:lrl^^ >rleetf e, l isel..tie,, 7eipA Bending 22� Z2�= a -ad Cef fes:.,,., Gentfel Test 9i&tiort r TiT.,gf esitff , Anode !`ached a D.-eteeti.,,-, ZZ�v System, TztyTC,' ,, W +e, �� 33 04 40 Cleaning and Acceptance Testing of Water Mains 33 04 50 Cleaning of Sewer Mains 3305 10 Utility Trench Excavation, Embedment, and Backfill 3305 12 Water Line Lowering 3305 13 Frame, Cover and Grade Rings - Cast Iron 3305 13.10 Frame, Cover and Grade Rings - Composite 3305 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade Co 110 3305 17 e,.ete Water- Vaufts Concrete Collars 330520 330521 Z2�z 3 Z�3 TuNrewl Liff.e Steel !`.,sing N e 33 4 33 05 30 T,,,,.,,.el 7 ; - Inst lla4ion Caf -ie - Pipe i r.,.,ing of of e Location of Existing Utilities 33 1105 Z 2�o Bolts, Nuts, and Gaskets l 7,-e 33 11 11 D eti e Npe Ductile Iron Fittings 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 33 11 13 Concrete Pressure Pipe, Bar -Wrapped, Steel Cylinder Type 33 11 14T � Buf::e,l Ste a1 ?lr o aril 33 11 15 Pre -Stressed Concrete Cylinder Pipe 33 1210 2Z� Water Services 1-inch to 2-inch xx 33 1220 ZZ�T Large e a4ef Meters Resilient Seated Gate Valve 33 1225 AWW-A Rubber- Seated Butte -tqy Valves Connection to Existing Water Mains CITY OF FORT WORTH BELTIVHLL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 5 33 1230 f ,.-Petable W.,tef: Systo � 33 1240 Fire Hydrants 33 1250 33 0 Water Sample Stations St... dar-,1 Blew off Valve Asso.,,t,l., Z2�3 Fibei-zgl ss Ueinf .-ee Pipe for- Cffevi , EanitZry-Se, -wer-s Z2�5 High Dens;t., Pelyethylefte 7 PE D',�, pp (LD_ �) � 1�..��7 Lan1tarj 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 33 3i N E�tcrir;er Pipe 12 1 �� z e.,r;t.,,.., Se ay e r mar Slip .�i."NX, lig 33 31 50 Sanitary Sewer Service Connections and Service Line 333170 Coxi i�J,zom Air- - Valve for- Sanitary Sewer- FE)Fee TiT.,;,.� 3339 10 Cast -in -Place Concrete Manholes 33 39 20 333930 Precast Concrete Manholes Fiber -glass Manholes 33 3940 33 39 60 Waste.. a4e A eeess Chamber- (W A C4 Epoxy Liners for Sanitary Sewer Structures 3341 10 Reinforced Concrete Storm Sewer Pipe/Culverts 32 11 11 33 41 12 High Density Pelyetl..,leae (HDP ) Pipe for- Star Dmin Reinfer-eed Pelyetl.le a (SRP ) Pipe 33 4600 33 4601 Stilac worm DY-xn.-- 33 4602 Tr —en. i Dsroa/.-.q- 33 49 10 Cast -in -Place Manholes and Junction Boxes 33 49 20 Curb and Drop Inlets 33 49 40 Storm Drainage Headwalls and Wingwalls Division 34 - Transportation 34 41 10 T,-., ff; S: ,.,. 3n n�oi e a i�tta�ileMillt r i+tmfelle. Gabif e n �7' �D ll 134 41 10.02 �vr 34 41 10.03 Spe��1: a-rttatllxix�lit-H �ati6a€ivpct*iiC-i}ti6a C n f rrtt&E�lii�2i4�-C�6�h� .c ��0� i9i1 311 11 11 To,v...e f f., Tr..ff e Signals T,-.. 34 41 13 ?i1 11 15 Removing ffie Signals ReetapigU.lar Roo d FL\ahit ZA�v Readw IIlumimtie n &&o,,.b4e- 34 41 20.01 Arterial LED Roadway Luminaires 34 4120.02 Freeway LED D.....1..,.,., .T..Iwjiinairrs 34 41 20.03 Residential LED Roadway Luminaires 34 41 30 Aluminum Signs 3471 13 Traffic Control CITY OF FORT WORTH BELTIVHLL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Appendix F�-4.01 A��i�allib �s GG 4.91 Un Page 5 of 5 FG-6.04—D Mine f;h, and Women Owaea B°' inc1 —. Ento,....ise Co pl;a*ee GC-6.07 lvff .e nW� GG-6. 1 Nandizcvii- l tign GR-01 60 00 Product Requirements END OF SECTION CITY OF FORT WORTH BELTIVHLL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised March 20, 2020 WRIGHT CONSTRUCTION COMPANY, INC 00 42 43 DAP-BIDPROPOSAL Page I of4 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Proiect Item Information Bidder's Proposal Bidlist Item) Description I Specification I Unit of ( Bid Unit Price I Bid Value No. Section No. Measure Quantity UNIT I: WATER IMPROVEMENTS 1 '3311.0241 8" Water Pipe 3311 12 LF 5328 $53.00 $282,384.00 2 3311.0441 12" Water Pipe 3311 10,33 LF 3431 $98.00 $336,238.00 3 3312.3003 8" Gate Valve 33 12 20 EA 18 $2,408.00 $43,344.00 4 3312.3005 12" Gate Valve 33 12 20 EA 8 $4,779.00 $38,232.00 5 9999.0001 CSS Encasement for Utility Pipes 00 00 00 LF 320 $72.00 $23,040.00 6 0241.1118 4"-12" Pressure Plug 0241 14 EA 9 $1,437.00 $12,933.00 7 3312.2003 1" Water Service 33 12 10 EA 186 $1,958.00 $364,188.00 8 3312.2103 1 1/2" Water Service 33 12 10 EA 12 $2,560.00 $30,720.00 9 3311.0001 Ductile Iron Water Fittings w/ Restraint 3311 11 TON 8.759 $10,089.00 $88,369.55 10 3312.0001 Fire Hydrant 33 12 40 EA 13 $7,860.00 $102,180.00 11 9999.0002 Remove Fire Hydrant Assembly 00 00 00 EA 4 $1,418.00 $5,672.00 12 0241.1015 Remove 12" Water Line 0241 14 LF 75 $27.00 $2,025.00 13 0241.1303 Remove 8" Water Valve 0241 14 EA 3 $27.00 $81.00 14 0241.1305 Remove 12" Water Valve 0241 14 EA 1 $350.00 $350.00 15 3312.0117 Connection to Existing 4"-12" Water Main 33 12 25 EA 4 $2,897.00 $11,588.00 16 3312.011 Connection to Existing 36" Water Main 33 12 25 EA 1 $15,359.00 $15,359.00 17 9999.0003 12" and Smaller Ring Connection 00 00 00 EA 1 $19,938.00 $19,938.00 18 3305.0109 Trench Safety 33 05 10 LF 8759 $1.00 $8,759.00 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 TOTA _ UNIT I: WATER IMPROVEMENTS $1,385,400.55 CITY OF FORT WORTH STANDARD CONSTRUCTION SPEC'IFIC'ATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 00 42 43_ Bid Fonusls 00 42 43 DAP•BIDPROPOSAL Page 2 of 4 UNIT PRICE BID SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information Bidder's Application Bidlist Iteutl Description I Specification I Unit of I Bid No. Section No. Measure Quantity UNIT II: SANITARY SEWER IMPROVEMENTS 1 3331.4115 8" Sewer Pipe 3331 20 LF 7175 2 3331.4201 10" Sewer Pipe 33 11 10,33 LF 363 3 3339.1001 4' Manhole 33 39 20 EA 46 4 3339.1002 4' Drop Manhole 33 39 10, 33 EA 2 5 3339.1003 4' Extra Depth Manhole 33 39 10, 33 VF 226 6 3339.0001 Epoxy Manhole Liner 33 39 60 VF 76 7 9999.0004 CSS Encasement for Utility Pipes 00 00 00 LF 660 8 3331.3101 4" Sewer Service 3331 50 EA 158 9 9999.0005 Connect to Existing Sanitary Sewer 00 00 00 EA 4 10 3305.0109 Trench Safety 33 05 10 LF 7538 11 3301,0002 Post -CCTV Inspection 3301 31 LF 15076 12 3301.0101 Manhole Vacuum Testing 3301 30 EA 48 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 Bidder's- Proposal Unit Price I Bid Value $63.00 $452,025.00 $105.00 $38,115.00 $3,742.00 $172,132.00 $4,729.00 $9,458.00 $215.00 $48,590.00 $605.00 $45,980.00 $72.00 $47,520.00 $2,051.00 $324,058.00 $2,757.00 $11,028.00 $1.00 $7,538.00 $1.00 $15,076.00 $132.00 $6,336.00 $1,177,856.00 00 42 43 Bid Fomi.sls 00 42 43 DAP-BIDPROPOSAL Page 3 of 4 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's• • • Project Item Information Bidder's Proposal Bidlist Item) Description I Specification I Unit of I Bid Unit Price Bid Value No. Section No. Measure Quantity UNIT III: STORM DRAIN IMPROVEMENTS 1 3341.0201 21" RCP, Class III 3341 10 LF 1215 $77.00 $93,555.00 2 3341.0202 21" RCP, Class IV 3441 10 LF 302 $83.00 $25,066.00 3 3341.0205 24" RCP, Class III 3341 10 LF 1072 $92.00 $98,624.00 4 3341.0206 24" RCP, Class IV 3341 10 LF 560 $101.00 $56,560.00 5 3341.0302 30" RCP, Class 111 3341 10 LF 474 $116.00 $54,984.00 6 3341.0303 30" RCP, Class IV 3341 10 LF 368 $127.00 $46,736.00 7 3341.0309 36" RCP, Class 111 3341 10 LF 1031 $148.00 $152,588.00 8 3341.0402 42" RCP, Class III 3341 10 LF 324 $191.00 $61,884.00 9 3341.0409 48" RCP, Class III 3341 10 LF 154 $228.00 $35,112.00 10 3341.0502 54" RCP, Class III 3341 10 LF 393 $298.00 $117,114.00 11 0241.3103 21" Storm Abandonment Plug 0241 14 EA 1 $1,500.00 $1,500.00 12 3341.1304 6x5 Box Culvert 3341 10 LF 248 $466.00 $115,568.00 13 3341.1403 7x5 Box Culvert 3341 10 LF 132 $566.00 $74,712.00 14 9999.0016 24" Sloping Headwall 00 00 00 EA 2 $2,926.00 $5,852.00 15 9999.0017 30" Sloping Headwall 00 00 00 EA 1 $3,751.00 $3,751.00 16 9999.0018 36" Sloping Headwall 00 00 00 EA 2 $5,964.00 $11,928.00 17 9999.0019 42" Sloping Headwall 00 00 00 EA 1 $6,450.00 $6,450.00 18 9999.002 48" Sloping Headwall 00 00 00 EA 1 $6,844.00 $6,844.00 19 9999.0021 TxDOT Winged Headwall FW-S 15' Scew 00 00 00 EA 1 $25,544.00 $25,544.00 20 9999.0022 TxDOT Winged Headwall for (2) 7'x5' Box 00 00 00 EA 1 $33,319.00 $33,319.00 21 9999.0023 TxDOT Winged Headwall for (2) 7'x5' Box, 00 00 00 EA 1 $34,069.00 $34,069.00 22 9999.0024 25'x8' Concrete Riser Box Structure 00 00 00 EA 1 $63,219.00 $63,219.00 23 3349.5001 10' Curb Inlet 33 49 20 EA 39 $7,083.00 $276,237.00 24 3349.6001 10' Recessed Inlet 33 49 20 EA 9 $8,138.00 $73,242.00 25 3349.7001 4' Drop Inlet 33 49 20 EA 1 $5,938.00 $5,938.00 26 3349.7002 5' Drop Inlet 33 49 20 EA 1 $8,138.00 $8,138.00 27 3349.0001 4' Storm Junction Box 33 49 10 EA 15 $5,223.00 $78,345.00 28 3349.0002 5' Storm Junction Box 33 49 10 EA 2 $6,103.00 $12,206.00 29 3349.0003 6' Storm Junction Box 33 49 10 EA 1 $9,801.00 $9,801.00 30 3349.0106 Manhole Steps 33 49 10 EA 29 $55.00 $1,595.00 31 9999.0025 Remove 24" Sloping Headwall 00 00 00 EA 7 $600.00 $4,200.00 32 9999.0026 Remove 24" RCP, Class III 00 00 00 LF 80 $25.00 $2,000.00 33 9999.0027 Remove 30" RCP, Class III 00 00 00 LF 140 $25.00 ® $3,500.00 34 9999.0028 Connect to Existing 00 00 00 EA 1 $3,819.00 $3,819.00 35 3137.0102 Large Stone Riprap, dry 31 3700 SY 1440 $138.00 $198,720.00 36 3305.0109 Trench Safety 33 05 10 LF 6274 $1.00 $6,274.00 37 9999.0029 Filter Diaphram 00 00 00 LS 1 $8,911.00 $8,911.00 38 39 40 41 42 43 44 45 TOTAL UNIT It: STORM DRAIN IMPROVEMENTS $1,817,905.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Veisioa May 22, 2019 00 42 43_ Sid Fom�.�ds 00 42 43 DAP - BIDPROPOSAL Page 4 of 4 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item) I Specification I Unit of I Bid No. Description Section No. Measure Quantity Unit Price Bid Value Bid Summary UNIT I: WATER IMPROVEMENTS $1,385,400.55 UNIT II: SANITARY SEWER IMPROVEMENTS $1,177,856.00 UNIT III: STORM DRAIN IMPROVEMENTS $1,817,905.00 Total Construction Bid $4,381,161.65 This Bid is submitted by the entity named below: BIDDER: Wright Construction Company, Inc 601 W Wall St Grapevine, TX 76051 817481-2594 Contractor agrees to complete WORT{ for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. BY: J-rH� DJi� Eric Dayp'o=;y TITLE: 1"11 oI Projeo llnnx re nsi it DATE: 3Q0 2023 197 working days after the date when the END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Foram Version May 22, 2019 00 42 43_ Bid Fomi.xds 0045 12 DAP PREQIIALIPICATION S"rATEMENT Page I of I SECTION 00 45 12 DAP — PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Maior Work Tvve" box provide the complete maior work tvpe and actual description as provided by the Water Department for water and sewer and TPW for paving. Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Water and wastewater new Wright Construction Company, Inc 4/30/2024 development Open Cut The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. Wright Construction Company, Inc BY:(�c�/ 601 W Wall St Grapevine, TX 76051 (Signature) TITLE: DATE: t4 / Z 6, /T END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT— DEVELOPER AWARDED PROJECTS 0045 12_Prequalification Statement 2015_DAP Form Version September 1, 2015 00 45 26 - 1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1of1 1 SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 4 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it 5 provides worker's compensation insurance coverage for all of its employees employed on City 6 Project No. 104381. Contractor further certifies that, pursuant to Texas Labor Code, Section 7 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with 8 worker's compensation coverage. 9 CONTRACTOR: 10 11 Wrieht Construction Company, Inc 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 Company 601 W Wail St Address Grapevine, TX 76051 City/State/Zip THE STATE OF TEXAS § COUNTY OF TARRANT § By: Eric Day (Please Print) ' Signature: "iG Day Title: VP of Project Manaqement (Please Print) BEFORE ME,,the undersigned authority, on this day personally appeared , known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of V #') (}g;i': i,& (,.t" 1tC',., ;C:' for the purposes and consideration therein expressed and in the capacity therein stated. r\\ i GIVEN UNDER MY HAND AND SEAL OF OFFICE this. -)U- day of ( 1",}' i, .', 20.) s, ��aaY_pU�/ DES D0NALDS0N * * MYCOMMISSIONEXPIRES �. 01/24/2025 Notary Public in and for the State of Texas �a3 NOTARY ID: 1197098 1 „ .. JD OF SECTION CITY OF FORT WORTH SELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 104381 Revised April 2, 2014 005243-1 Developer Awarded Project Agreement Page 1 of 5 1 SECTION 00 52 43 2 AGREEMENT 3 THIS AGREEMENT, authorized on VIM9112 is made by and between the Developer, D.R. 4 Horton -Texas. LTD„ authorized to do business in Texas ("Developer"), and Wright Construction 5 Companv, Inc., authorized to do business in Texas, acting by and through its duly authorized 6 representative, ("Contractor"). 7 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree 8 as follows: 9 Article 1. WORK 10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 11 Project identified herein. 12 Article 2. PROJECT 13 The project for which the Work under the Contract Documents may be the whole or only a part 14 is generally described as follows: 15 BELTMILL PHASE 2 16 City Project No. 104381 17 Article 3. CONTRACT TIME 18 3.1 Time is of the essence. 19 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 20 Documents are of the essence to this Contract. 21 3.2 Final Acceptance. 22 The Work will be complete for Final Acceptance within {197) working days after the date 23 when the Contract Time commences to run as provided in Paragraph 12.04 of the 24 Standard City Conditions of the Construction Contract for Developer Awarded Projects. 25 26 3.3 Liquidated idated darnagess s d t,`-,-t Peve r 27 will suffer frFlaneial less if the-WGFI( irnor-i'vliprccca OVIClflff che tirr, _pae,,;e--in 28 Aarag,-aph 3.2 above, plus any extension theFeef allowed in aeceFdance with AFtiele 10 e 29 the S+tin expense and diffieUltieS invOlved in 30 , CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised June 16, 2016 005243-2 Developer Awarded Project Agreement Page 2 of 5 31 legal pr-eseedingthe actual less suffelFed by the n,,,,,,i,,pelF if the WE)Fi.: net 32 n time. AceeFdingIVL, 33 that as liquidated of ars a p2nalty), GentFa,.+ F shall pay 34 9eueleper 9 s-f$ ) Ear each day that expiFes 35 after —the -time -died in Para—gmph 3.2 f^' Final AGeeptance un};I the !; i✓.Lnc tl4e C � 37 Article 4. CONTRACT PRICE 38 Developer agrees to pay Contractor for performance of the Work in accordance with the 39 Contract Documents an amount in current funds of Four Million Three Hundred eiehty one 40 Thousand One Hundred Sixtv-One and Fiftv Five Cents ($4,381,161.55). 41 Article 5. CONTRACT DOCUMENTS 42 5.1 CONTENTS: 43 A. The Contract Documents which comprise the entire agreement between Developer 44 and Contractor concerning the Work consist of the following: 45 1. This Agreement. 46 2. Attachments to this Agreement: 47 a. Bid Form (As provided by Developer) 48 1) Proposal Form (DAP Version) 49 2) Prequalification Statement 50 3) State and Federal documents (project specific) 51 b. Insurance ACORD Form(s) 52 c. Payment Bond (DAP Version) 53 d. Performance Bond (DAP Version) 54 e. Maintenance Bond (DAP Version) 55 f. Power of Attorney for the Bonds 56 g. Worker's Compensation Affidavit 57 h. MBE and/or SBE Commitment Form (If required) 58 3. Standard City General Conditions of the Construction Contract for Developer 59 Awarded Projects. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised June 16, 2016 005243-3 Developer Awarded Project Agreement Page 3 of 5 60 4. Supplementary Conditions. 61 S. Specifications specifically made a part of the Contract Documents by attachment 62 or, if not attached, as incorporated by reference and described in the Table of 63 Contents of the Project's Contract Documents. 64 6. Drawings. 65 7. Addenda. 66 8. Documentation submitted by Contractor prior to Notice of Award. 67 9. The following which may be delivered or issued after the Effective Date of the 68 Agreement and, if issued, become an incorporated part of the Contract 69 Documents: 70 a. Notice to Proceed. 71 b. Field Orders. 72 c. Change Orders. 73 d. Letter of Final Acceptance. 74 Article 6. INDEMNIFICATION 75 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 76 expense, the city, its officers, servants and employees, from and against any and all 77 claims arising out of, or alleged to arise out of, the work and services to be performed by 78 the contractor, its officers, agents, employees, subcontractors, licenses or invitees under 79 this contract. This indemnification provision is specifically intended to operate and be, 80 effective even if it is alleged or proven that all or some of the damaees being sought 81 were caused. in whole or in part, by anv act, omission or negligence of the citv. This 82 indemnity provision is intended to include, without limitation, indemnity for costs, 83 expenses and legal fees incurred by the city in defending against such claims and causes 84 of actions. 85 86 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 87 the city, its officers, servants and employees, from and against any and all loss, damage 88 or destruction of property of the city, arising out of, or alleged to arise out of, the work 89 and services to be performed by the contractor, its officers, agents, employees, 90 subcontractors, licensees or invitees under this contract. This indemnification provision. 91 is specifically intended to operate and be effective even if it is alleged or proven that all CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised June 16, 2016 005243-4 Developer Awarded Project Agreement Page 4 of 5 92 or some of the damages being sought were caused, in whole or in part, by anv act„ 93 omission or negligence of the city. 94 95 Article 7. MISCELLANEOUS 96 7.1 Terms. 97 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of 98 the Construction Contract for Developer Awarded Projects. 99 7.2 Assignment of Contract. 100 This Agreement, including all of the Contract Documents may not be assigned by the 101 Contractor without the advanced express written consent of the Developer. 102 7.3 Successors and Assigns. 103 Developer and Contractor each binds itself, its partners, successors, assigns and legal 104 representatives to the other party hereto, in respect to all covenants, agreements and 105 obligations contained in the Contract Documents. 106 7.4 Severability. 107 Any provision or part of the Contract Documents held to be unconstitutional, void or 108 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 109 remaining provisions shall continue to be valid and binding upon DEVELOPER and 110 CONTRACTOR. 111 7.5 Governing Law and Venue. 112 This Agreement, including all of the Contract Documents is performable in the State of 113 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 114 Northern District of Texas, Fort Worth Division. 115 116 7.6 Authority to Sign. 117 Contractor shall attach evidence of authority to sign Agreement, if other than duly 118 authorized signatory of the Contractor. 119 CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised June 16, 2016 120 121 122 123 124 125 005243-5 Developer Awarded Project Agreement Page 5 of 5 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple counterparts. This Agreement is effective as of the last date signed by the Parties ("Effective Date") Contractor: Wright Construction Company, Inc By: (S' nature) (Printed Name) Title: () ✓�AN.A(aC-� C nr� Company Name: Wright Construction Company, Inc Address: 601 W Wall St City/State/Zip: Grapevine, TX 76051 Date Developer: D.R. Horton -TEXAS, LTD (Signature) (Printed Name) Title: r Company name: D.R. HORTON-TEXAS, LTD Address: 6751 NORTH FREEWAY City/State/Zip: FORT WORTH, TX 76131 Date �12(0/Z CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised June 16, 2016 BELTMILL PHASE 2 City Project No. 104381 © POLICY NUMBER: TB5-Z91 -473677-022 COMMERCIAL GENERAL LIABILITY CG 2417 10 01 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CONTRACTU_P_L LIABILITY - RAILROADS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART With respect to operations performed for, or affecting, a Scheduled Railroad at a Designated Job Site, the definition of "insured contract" in the Definitions sec- tion is replaced by the following: 9. "Insured Contract" means: A contract for a lease of premises. However, that portion of the contract for a lease of prem- ises that indemnifies any person or organiza- tion for damage by fire to premises while rented to you or temporarily occupied by you with permission of the owner is not an "insured con- tract"; b. A sidetrack agreement; c. Any easement or license agreement; d. An obligation, as required by ordinance, to indemnify a municipality, except in connection with work for a municipality; e. An elevator maintenance agreement; f. That part of any other contract or agreement pertaining to your business (including an in- demnification of a municipality in connection with work performed for a municipality) under which you assume the tort liability of another •;7W.9T1 party to pay for "bodily injury" or "property dam- age" to a third person or organization. Tort li- ability means a liability that would be imposed by law in the absence of any contract or agreement. Paragraph f. does not include that part of any contract or agreement: (1) That indemnifies an architect, engineer or surveyor for injury or damage arising out of: (a) Preparing, approving or failing to pre- pare or approve maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifi- cations; or (b) Giving directions or instructions, or fail- ing to give them, if that is the primary cause of the injury or damage; (2) Under which the insured, if an architect, engineer or surveyor, assumes liability for an injury or damage arising out of the in- sured's rendering or failure to render pro- fessional services, including those listed in Paragraph (1) above and supervisory, in- spection, architectural or engineering activi- ties. Scheduled Railroad: Designated Job Site: Any railroad for which you are performing operations All jobsites. and for which no Railroad Protective Liability Policy has been purchased for the railroad by you, or any railroad for which "your work" has been completed or put to its intended use. (If no entry appears above, information required to complete this endorsement will be shown in the Declarations as applicable to this endorsement.) CG 2417 10 01 © ISO Properties, Inc., 2000 Page 1 of 1 Policy Number: TB5-Z91-473677-022 COMMERCIAL GENERAL LIABILITY 11/29/2022-11/29/20223 CG 20 10 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s) Location(s) Of Covered Operations Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II - Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional insured(s) at the location(s) designated above. However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following additional exclusions apply: This insurance does not apply to "bodily injury" or "property damage" occurring after: 1. All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or 2. That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. C. With respect to the insurance afforded to these additional insureds, the following is added to Section III - Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable limits of insurance; whichever is less. This endorsement shall not increase the applicable limits of insurance. © Insurance Services Office, Inc. ©Insurance Services Office, Inc. Policy Number: TB5-Z91-473677-022 11 /29/2022-11 /29/2023 COMMERCIAL GENERAL LIABILITY CG20371219 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s) Location And Description Of Completed Operations Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II - Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury" or "property damage" caused, in whole or in part, by "your work" at the location designated and described in the Schedule of this endorsement performed for that additional insured and included in the "products -completed operations hazard". However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following is added to Section III - Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable limits of insurance; whichever is less. This endorsement shall not increase the applicable limits of insurance. © Insurance Services Office. Inc. ©Insurance Services Office. Inc. Policy Number: TB5-Z91-473677-022 11 /29/2022-11 /29/2023 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. COMMERCIAL GENERAL LIABILITY ADDITIONAL INSURED ENHANCEMENT FOR CONTRACTORS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART Index of modified items: Item 1. Blanket Additional Insured Where Required By Written Agreement Lessors of Leased Equipment Managers or Lessors of Premises Mortgagees, Assignees or Receivers Owners, Lessees or Contractors Architects, Engineers or Surveyors Any Person or Organization Item 2. Blanket Additional Insured — Grantor Of Permits Item 3. Other Insurance Amendment Item 1. Blanket Additional Insured Where Required By Written Agreement Paragraph 2. of Section II — Who Is An Insured is amended to add the following: Additional Insured By Written Agreement The following are insureds under the Policy when you have agreed in a written agreement to provide them coverage as additional insureds under your policy: 1. Lessors of Leased Equipment: The person(s) or organization(s) from whom you lease equipment, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by your maintenance, operation or use of equipment leased to you by such person(s) or organization(s). This insurance does not apply to any "occurrence" which takes place after the equipment lease expires. 2. Managers or Lessors of Premises: Any manager(s) or lessor(s) of premises leased to you in which the written lease agreement obligates you to procure additional insured coverage. The coverage afforded to the additional insured is limited to liability in connection with the ownership, maintenance or use of the premises leased to you and caused, in whole or in part, by some negligent act(s) or omission(s) of you, your "employees", your agents or your subcontractors. There is no coverage for the additional insured for liability arising out of the sole negligence of the additional insured or those acting on behalf of the additional insured, except as provided below. If the written agreement obligates you to procure additional insured coverage for the additional insured's sole negligence, then the coverage for the additional insured shall conform to the agreement, but only if the applicable law would allow you to indemnify the additional insured for liability arising out of the additional insured's sole negligence. LC 20 58 11 18 © 2018 Liberty Mutual Insurance Page 1 of 4 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy NumberTB5-Z91-473677-022 11 /29/2022-11 /29/2023 This insurance does not apply to: a. Any "occurrence" which takes place after you cease to be a tenant in that premises or to lease that land; b. Structural alterations, new construction or demolition operations performed by or on behalf of that manager or lessor; or c. Any premises for which coverage is excluded by endorsement. 3. Mortgagees, Assignees or Receivers: Any person(s) or organization(s) with respect to their liability as mortgagee, assignee or receiver and arising out of your ownership, maintenance or use of the premises. This insurance does not apply to structural alterations, new construction and demolition operations performed by or on behalf of such person(s) or organization(s). 4. Owners, Lessees or Contractors: Any person(s) or organization(s) to whom you are obligated to procure additional insured coverage, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by your act(s) or omission(s) or the act(s) or omission(s) of your "employees", your agents, or your subcontractors, in the performance of your ongoing operations. This insurance does not apply to "bodily injury", "property damage", or "personal and advertising injury" arising out of "your work" included in the "products -completed operations hazard" unless you are required to provide such coverage for the additional insured by the written agreement, and then only for the period of time required by the written agreement and only for liability caused, in whole or in part, by your act(s) or omission(s) or the act(s) or omission(s) of your "employees", your agents, or your subcontractors. There is no coverage for the additional insured for liability arising out of the sole negligence of the additional insured or those acting on behalf of the additional insured, except as provided below. If the written agreement obligates you to procure additional insured coverage for the additional insured's sole negligence, then the coverage for the additional insured shall conform to the agreement, but only if the applicable law would allow you to indemnify the additional insured for liability arising out the additional insured's sole negligence. This insurance does not apply to "bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of, or failure to render, any professional architectural, engineering or surveying services, including: a. The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or b. Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the "occurrence" which caused the "bodily injury" or "property damage", or the offense which caused the "personal and advertising injury", involved the rendering of or failure to render any professional services. 5. Architects, Engineers or Surveyors: Any architect, engineer, or surveyor engaged by you but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by your act(s) or omission(s) or the act(s) or omission(s) of those acting on your behalf: a. In connection with your premises; or b. In the performance of your ongoing operations. This insurance does not apply to "bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of or failure to render any professional services by or for you, including: LC 20 58 11 18 © 2018 Liberty Mutual Insurance Page 2 of 4 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy NumberTB5-Z91-473677-022 11 /29/2022-11 /29/2023 a. The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or b. Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the 'occurrence" which caused the "bodily injury" or "property damage", or the offense which caused the "personal and advertising injury", involved the rendering of or failure to render any professional services by or for you. 6. Any Person or Organization Other Than a Joint Venture: Any person(s) or organization(s) (other than a joint venture of which you are a member) for whom you are obligated to procure additional insured coverage, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by your act(s) or omission(s) or the act(s) or omission(s) of those acting on your behalf: a. In the performance of your ongoing operations; or b. In connection with premises owned by or rented to you. This insurance does not apply to: a. Any person(s) or organization(s) more specifically covered in Paragraphs 1. through 5. above; b. Any construction, renovation, demolition or installation operations performed by or on behalf of you, or those operating on your behalf; or c. Any person(s) or organization(s) whose profession, business or occupation is that of an architect, surveyor or engineer with respect to liability arising out of the rendering of, or failure to render, any professional architectural, engineering or surveying services, including: (1) The preparing, approving or failing to prepare or approve, maps, drawings, opinions, reports, surveys, field orders, change orders, designs and specifications; or (2) Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the 'occurrence" which caused the "bodily injury" or "property damage", or the offense which caused the "personal and advertising injury", involved the rendering of or failure to render any professional services by or on behalf of you, or those operating on your behalf. The insurance afforded to any person(s) or organization(s) as an insured under this Item 1.: 1. Applies to the extent permitted by law; 2. Applies only to the scope of coverage and the minimum limits of insurance required by the written agreement, but in no event exceeds either the scope of coverage or the limits of insurance provided by this Policy; 3. Does not apply to any person(s) or organization(s) for any "bodily injury", "property damage" or "personal and advertising injury" if any other additional insured endorsement attached to this Policy applies to such person(s) or organization(s) with regard to the "bodily injury", "property damage" or "personal and advertising injury"; 4. Applies only if the "bodily injury" or "property damage" occurs, or the offense giving rise to the "personal and advertising injury" is committed, subsequent to the execution of the written agreement; and 5. Applies only if the written agreement is in effect at the time the "bodily injury" or "property damage" occurs, or at the time the offense giving rise to the "personal and advertising injury" is committed. LC 20 58 11 18 © 2018 Liberty Mutual Insurance Page 3 of 4 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy NumberTB5-Z91-473677-022 11 /29/2022-11 /29/2023 Item 2. Blanket Additional Insured — Grantor Of Permits Paragraph 2. of Section II — Who Is An Insured is amended to add the following: Any state, municipality or political subdivision that has issued you a permit in connection with any operations performed by you or on your behalf, or in connection with premises you own, rent or control, and to which this insurance applies, but only to the extent that you are required to provide additional insured status to the state, municipality or political subdivision as a condition of receiving and maintaining the permit. Such state, municipality or political subdivision that has issued you a permit is an insured only with respect to their liability as grantor of such permit to you. However, with respect to the state, municipality or political subdivision: 1. Coverage will be no broader than required; and 2. Limits of insurance will not exceed the minimum limits of insurance required as a condition for receiving or maintaining the permit; but neither the scope of coverage nor the limits of insurance will exceed those provided by this Policy. This insurance does not apply to: 1. "Bodily injury", "property damage" or "personal and advertising injury" arising out of operations performed for the state, municipality or political subdivision; 2. Any "bodily injury" or "property damage" included within the "products -completed operations hazard", except when required by written agreement initiated prior to loss; or 3. "Bodily injury", "property damage" or "personal and advertising injury", unless negligently caused, in whole or in part, by you or those acting on your behalf. Item 3. Other Insurance Amendment If you are obligated under a written agreement to provide liability insurance on a primary, excess, contingent, or any other basis for any person(s) or organization(s) that qualifies as an additional insured on this Policy, this Policy will apply solely on the basis required by such written agreement and Paragraph 4. Other Insurance of Section IV — Commercial General Liability Conditions will not apply. Where the applicable written agreement does not specify on what basis the liability insurance will apply, the provisions of Paragraph 4. Other Insurance of Section IV — Commercial General Liability Conditions will apply. However, this insurance is excess over any other insurance available to the additional insured for which it is also covered as an additional insured for the same 'occurrence", claim or "suit". LC 20 58 11 18 © 2018 Liberty Mutual Insurance Page 4 of 4 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy NumberTB5-Z91-473677-022 11 /29/2022-11 /29/2023 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. COMMERCIAL GENERAL LIABILITY ENHANCEMENT FOR CONTRACTORS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART Index of modified items: Item 1. Reasonable Force Item 2. Non -Owned Watercraft Extension Item 3. Damage To Premises Rented To You — Expanded Coverage Item 4. Bodily Injury To Co -Employees Item 5. Health Care Professionals As Insureds Item 6. Knowledge Of Occurrence Or Offense Item 7. Notice Of Occurrence Or Offense Item 8. Unintentional Failure To Disclose Item 9. Bodily Injury Redefined Item 10. Supplementary Payments — Increased Limits Item 11. Property In Your Care, Custody Or Control Item 12. Mobile Equipment Redefined Item 13. Newly Formed Or Acquired Entities Item 14. Waiver Of Right Of Recovery By Written Contract Or Agreement Item 1. Reasonable Force Exclusion a. of Section I — Coverage A — Bodily Injury And Property Damage Liability is replaced by the following: a. Expected Or Intended Injury "Bodily injury" or "property damage" expected or intended from the standpoint of the insured. This exclusion does not apply to "bodily injury" or "property damage" resulting from the use of reasonable force to protect persons or property. Item 2. Non -Owned Watercraft Extension Paragraph (2) of Exclusion g. of Section I — Coverage A — Bodily Injury And Property Damage Liability is replaced by the following: (2) A watercraft you do not own that is: (a) Less than 55 feet long; and (b) Not being used to carry persons or property for a charge; Item 3. Damage To Premises Rented To You — Expanded Coverage A. The final paragraph of 2. Exclusions of Section I — Coverage A — Bodily Injury And Property Damage Liability is replaced by the following: LC 32 199 11 18 © 2018 Liberty Mutual Insurance Page 1 of 5 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy NumberTB5-Z91-473677-022 11 /29/2022-11 /29/2023 Exclusions c. through n. do not apply to damage by fire, lightning or explosion or subsequent damages resulting from such fire, lightning or explosion including water damage to premises while rented to you or temporarily occupied by you with permission of the owner. A separate limit of insurance applies to this coverage as described in Section III — Limits Of Insurance. B. Paragraph 6. of Section III — Limits Of Insurance is replaced by the following: 6. Subject to Paragraph 5. above, the Damage To Premises Rented To You Limit is the most we will pay under Coverage A for damages because of "property damage" to any one premises, while rented to you, or in the case of damage by fire, lightning, explosion or subsequent damages resulting from such fire, lightning or explosion including water damage to premises while rented to you or temporarily occupied by you with permission of the owner. The Damage To Premises Rented To You Limit is the greater of: a. $300,000; or b. The Damage To Premises Rented To You Limit shown on the Declarations. C. Paragraph 9.a. of the definition of "insured contract" in Section V — Definitions is replaced by the following: a. A contract for a lease of premises. However, that portion of the contract for a lease of premises that indemnifies any person or organization for damage by fire, lightning, explosion or subsequent damages resulting from such fire, lightning or explosion including water damage to premises while rented to you or temporarily occupied by you with permission of the owner is not an "insured contract'; D. The paragraph immediately following Paragraph (6) of Exclusion j. of Section I — Coverage A — Bodily Injury And Property Damage Liability is replaced by the following: Paragraphs (1), (3) and (4) of this exclusion do not apply to "property damage" (other than damage by fire, lightning or explosion or subsequent damages resulting from such fire, lightning or explosion including water damage) to premises, including the contents of such premises, rented to you for a period of seven or fewer consecutive days. A separate limit of insurance applies to Damage To Premises Rented To You as described in Section III — Limits of Insurance. Item 4. Bodily Injury To Co -Employees A. Paragraph 2. of Section II —Who Is An Insured is amended to include: Each of the following is also an insured Your "employees" (other than either your "executive officers" (if you are an organization other than a partnership, joint venture or limited liability company) or your managers (if you are a limited liability company)) or "volunteer workers" are insureds while in the course of their employment or while performing duties related to the conduct of your business with respect to "bodily injury": (1) To you; (2) To your partners or members (if you are a partnership or joint venture); (3) To your members (if you are a limited liability company); or (4) To a co -"employee" or "volunteer worker" while that co -"employee" or "volunteer worker" is either in the course of his or her employment by you or while performing duties related to the conduct of your business (including participation in any recreational activities sponsored by you). Paragraph 2.a.(1)(a) of Section II — Who Is An Insured does not apply to "bodily injury" for which insurance is provided by this paragraph. LC 32 199 11 18 © 2018 Liberty Mutual Insurance Page 2 of 5 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy NumberTB5-Z91-473677-022 11 /29/2022-11 /29/2023 B. The insurance provided by this Item 4. for "bodily injury" to a co -"employee" or "volunteer worker" will not apply if the injured co -"employee's" or "volunteer worker's" sole remedy for such injury is provided under a workers' compensation law or any similar law. C. Other Insurance The insurance provided by this Item 4. is excess over any other valid and collectible insurance available to the insured, whether primary, excess, contingent or on any other basis. Item 5. Health Care Professionals As Insureds A. Paragraph 2.a.(1)(d) of Section II — Who Is An Insured is replaced by the following: (d) Arising out of his or her providing or failure to provide professional health care services. However, any "employee" or "volunteer worker" of the Named Insured who is acting as a Good Samaritan in response to a public or medical emergency or who is a "designated health care provider" is an insured with respect to "bodily injury" and "personal and advertising injury" that: (i) Arises out of the providing of or failure to provide professional health care services; and (ii) Occurs in the course of and within the scope of such "employee's" or "volunteer worker's" employment by the Named Insured. B. With respect to "employees" and "volunteer workers" providing professional healthcare services, the following exclusions are added to Paragraph 2. Exclusions of Section I — Coverage A — Bodily Injury And Property Damage Liability and Paragraph 2. Exclusions of Section I — Coverage B — Personal And Advertising Injury Liability: This insurance does not apply to: (1) Liability assumed under an "insured contract" or any other contract or agreement; (2) Liability arising out of the providing of professional health care services in violation of law; (3) Liability arising out of the providing of any professional health care services while in any degree under the influence of intoxicants or narcotics; (4) Liability arising out of any dishonest, fraudulent, malicious or knowingly wrongful act or failure to act; or (5) Punitive or exemplary damages, fines or penalties. C. The following definition is added to Section V — Definitions: "Designated health care provider" means any "employee" or "volunteer worker" of the Named Insured whose duties include providing professional health care services, including but not limited to doctors, nurses, emergency medical technicians or designated first aid personnel. D. Other Insurance The insurance provided by this Item 5. is excess over any other valid and collectible insurance available to the insured, whether primary, excess, contingent or on any other basis. Item 6. Knowledge Of Occurrence Or Offense Knowledge of an "occurrence" or offense by your agent, servant or "employee" will not in itself constitute knowledge by you unless your "executive officer" or "employee" designated by you to notify us of an "occurrence" or offense has knowledge of the "occurrence" or offense. LC 32 199 11 18 © 2018 Liberty Mutual Insurance Page 3 of 5 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy NumberTB5-Z91-473677-022 11 /29/2022-11 /29/2023 Item 7. Notice Of Occurrence Or Offense For purposes of Paragraph 2.a. of Section IV — Commercial General Liability Conditions, you refers to your "executive officer" or "employee" that you have designated to give us notice. Item 8. Unintentional Failure To Disclose Unintentional failure of the Named Insured to disclose all hazards existing at the inception of this Policy shall not be a basis for denial of any coverage afforded by this Policy. However, you must report such an error or omission to us as soon as practicable after its discovery. This provision does not affect our right to collect additional premium or exercise our right of cancellation or non - renewal. Item 9. Bodily Injury Redefined The definition of "bodily injury" in Section V — Definitions is replaced by the following: "Bodily injury" means: a. Bodily injury, sickness or disease sustained by a person, including death resulting from any of these at any time; and b. Mental anguish, shock or humiliation arising out of injury as defined in Paragraph a. above. Mental anguish means any type of mental or emotional illness or distress. Item 10. Supplementary Payments — Increased Limits Paragraphs 1.b. and 1.d. of Section I — Supplementary Payments — Coverages A And B are replaced by the following: b. Up to $3,000 for the cost of bail bonds required because of accidents or traffic law violations arising out of the use of any vehicle to which Bodily Injury Liability Coverage applies. We do not have to furnish these bonds. d. All reasonable expenses incurred by the insured at our request to assist in the investigation or defense of the claim or "suit", including actual loss of earnings up to $500 a day because of time off from work. Item 11. Property In Your Care, Custody Or Control A. Paragraphs (3) and (4) of Exclusion j. of Section I — Coverage A — Bodily Injury And Property Damage Liability are deleted. B. Additional Exclusion Coverage provided by this endorsement does not apply to "property damage" to property while in transit. C. Limits of Insurance Subject to Paragraphs 2., 3., and 5. of Section III — Limits Of Insurance, the most we will pay for insurance provided by Paragraph A. above is: $10,000 Each Occurrence Limit $75,000 Aggregate Limit The Each Occurrence Limit for this coverage applies to all damages as a result of any one 'occurrence" regardless of the number of persons or organizations who sustain damage because of that "occurrence". The Aggregate Limit is the most we will pay for the sum of all damages under this Item 11. LC 32 199 11 18 © 2018 Liberty Mutual Insurance Page 4 of 5 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy NumberTB5-Z91-473677-022 11 /29/2022-11 /29/2023 D. Other Insurance This insurance does not apply to any portion of a loss for which the insured has available any other valid and collectible insurance, whether primary, excess, contingent, or on any other basis, unless such other insurance was specifically purchased by the insured to apply in excess of this Policy. Item 12. Mobile Equipment Redefined The definition of "mobile equipment" in Section V — Definitions is amended to include self-propelled vehicles with permanently attached equipment less than 1000 pounds gross vehicle weight that are primarily designed for: (1) Snow removal; (2) Road maintenance, but not construction or resurfacing; or (3) Street cleaning. However, "mobile equipment' does not include land vehicles that are subject to a compulsory or financial responsibility law or other motor vehicle insurance law where such vehicles are licensed or principally garaged. Land vehicles subject to a compulsory or financial responsibility law or other motor vehicle insurance law are considered "autos". Item 13. Newly Formed Or Acquired Entities A. Paragraph 3. of Section II — Who Is An Insured is replaced by the following: 3. Any organization you newly acquire or form, other than a partnership or joint venture, and over which you maintain majority ownership or majority interest, will qualify as a Named Insured if there is no other similar insurance available to that organization. However: a. Coverage under this provision is afforded only until: (1) The 180th day after you acquire or form the organization; (2) Separate coverage is purchased for the organization; or (3) The end of the policy period whichever is earlier; b. Section I — Coverage A — Bodily Injury And Property Damage Liability does not apply to "bodily injury" or "property damage" that occurred before you acquired or formed the organization; and c. Section I — Coverage B — Personal And Advertising Injury Liability does not apply to "personal and advertising injury" arising out of an offense committed before you acquired or formed the organization. B. The insurance afforded to any organization as a Named Insured under this Item 13. does not apply if a Broad Form Named Insured endorsement attached to this Policy applies to that organization. Item 14. Waiver Of Right Of Recovery By Written Contract Or Agreement The following is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us of Section IV — Commercial General Liability Conditions: We waive any right of recovery because of payments we make under this Policy for injury or damage arising out of your ongoing operations or "your work" included in the "products -completed operations hazard" that we may have against any person or organization with whom you have agreed in a written contract or agreement to waive your rights of recovery but only if the "bodily injury" or "property damage" occurs, or offense giving rise to "personal and advertising injury" is committed subsequent to the execution of the written contract or agreement. LC 32 199 11 18 © 2018 Liberty Mutual Insurance Page 5 of 5 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Term: 11 /29/2022-11 /29/2023 Policy Number TB5-Z91-473677-022 Issued by LM INSURANCE CORPORATION THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. NOTICE OF CANCELLATION TO THIRD PARTIES This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE PART MOTOR CARRIER COVERAGE PART GARAGE COVERAGE PART TRUCKERS COVERAGE PART EXCESS AUTOMOBILE LIABILITY INDEMNITY COVERAGE PART SELF -INSURED TRUCKER EXCESS LIABILITY COVERAGE PART COMMERCIAL GENERAL LIABILITY COVERAGE PART EXCESS COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART COMMERCIAL LIABILITY — UMBRELLA COVERAGE FORM Schedule Name of Other Person(s) / Email Address or mailing address: Number Days Notice: Organization(s): Per schedule on file with Per schedule on file with company 30 company A. If we cancel this policy for any reason other than nonpayment of premium, we will notify the persons or organizations shown in the Schedule above. We will send notice to the email or mailing address listed above at least 10 days, or the number of days listed above, if any, before the cancellation becomes effective. In no event does the notice to the third party exceed the notice to the first named insured. B. This advance notification of a pending cancellation of coverage is intended as a courtesy only. Our failure to provide such advance notification will not extend the policy cancellation date nor negate cancellation of the policy. All other terms and conditions of this policy remain unchanged. LIM 99 01 05 11 © 2011 Liberty Mutual Group of Companies. All rights reserved. Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Term: 11 /29/2022-11 /29/2023 Policy Number TB5-Z91-473677-022 Issued by LM Insurance Corporation THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED CONSTRUCTION PROJECT OR DESIGNATED LOCATION COMBINED AGGREGATE LIMITS — WITH TOTAL AGGREGATE LIMIT FOR ALL PROJECTS AND LOCATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART Schedule Designated Construction Project(s) or Designated Location(s): All `locations' and all construction projects at which you are performing ongoing operations. Total Aggregate Limit for all Projects and Locations: $ 15,000,000 A. For all sums which the insured becomes legally obligated to pay as damages caused by "occurrences" under Section I — Coverage A, and for all medical expenses caused by accidents under Section I - Coverage C, which can be attributed only to ongoing operations at a single designated construction project or a single designated "location": 1. A separate Designated General Aggregate Limit applies to each designated construction project and to each designated "location", and that limit is equal to the amount of the General Aggregate Limit shown in the Declarations. 2. The Designated General Aggregate Limit is the most we will pay for the sum of all damages under Section I - Coverage A, except damages because of "bodily injury" or "property damage" included in the "products - completed operations hazard", and for medical expenses under Section I - Coverage C regardless of the number of: a. Insureds; b. Claims made or "suits" brought; or c. Persons or organizations making claims or bringing "suits". 3. Any payments made under Coverage A for damages or under Coverage C for medical expenses shall reduce the Designated General Aggregate Limit for that designated construction project or designated "location". Such payments shall not reduce the General Aggregate Limit shown in the Declarations nor shall they reduce any other Designated General Aggregate Limit for any other designated construction project or designated "location". 4. The limits shown in the Declarations for Each Occurrence, Damage to Premises Rented to You and Medical Expense continue to apply. However, instead of being subject to the General Aggregate Limit shown in the Declarations, such limits will be subject to the applicable Designated General Aggregate Limit and the Total Aggregate Limit for all Projects and Locations. LC 25 19 01 15 © 2014 Liberty Mutual Insurance Page 1 of 2 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy NumberTB5-Z91-473677-022 11 /29/2022-11 /29/2023 5. The Total Aggregate Limit for all Projects and Locations shown in the Schedule of this endorsement is the most we will pay for the sum of all damages caused by "occurrences" under Section I — Coverage A and all medical expenses caused by accidents under Section I — Coverage C which can be attributed only to ongoing operations at a designated construction project or designated "location" shown in the Schedule of this endorsement, regardless of the number of construction projects, "locations", 'occurrences" or accidents. 6. Each Designated General Aggregate Limit is subject to the Total Aggregate Limit for all Projects and Locations shown in the Schedule of this endorsement. B. For all sums which the insured becomes legally obligated to pay as damages caused by 'occurrences" under Section I — Coverage A, and for all medical expenses caused by accidents under Section I - Coverage C, which cannot be attributed only to ongoing operations at a single designated construction project or single designated "location": 1. Any payments made under Coverage A for damages or under Coverage C for medical expenses shall reduce the amount available under the General Aggregate Limit or the Products -Completed Operations Aggregate Limit, whichever is applicable; and 2. Such payments shall not reduce any Designated General Aggregate Limit. C. When coverage for liability arising out of the "products -completed operations hazard" is provided, any payments for damages because of "bodily injury" or "property damage" included in the "products -completed operations hazard" will reduce the Products -Completed Operations Aggregate Limit, and not reduce the General Aggregate Limit nor the Designated General Aggregate Limit. D. If the applicable construction project has been abandoned, delayed, or abandoned and then restarted, or if the authorized contracting parties deviate from plans, blueprints, designs, specifications or timetables, the project will still be deemed to be the same construction project. E. For the purposes of this endorsement, the Definitions Section is amended by the addition of the following definition: "Location" means any premise that you occupy for permanent operations as part of your business, but does not include any premises at which you are performing operations as part of a construction project. All premises involving the same or connecting lots, or premises whose connection is interrupted only by a street, roadway, waterway or right-of-way of a railroad shall be considered a single "location". F. The provisions of Section III - Limits Of Insurance not otherwise modified by this endorsement shall continue to apply as stipulated. LC 25 19 01 15 © 2014 Liberty Mutual Insurance Page 2 of 2 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy Number: QT-630-2F251181-TLC-22 11 /29/2022-11 /29/2023 COMMERCIAL INLAND MARINE THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BLANKET LOSS PAYEES This endorsement modifies insurance provided under the IM PAK COVERAGE FORM. The following is added to Section E — ADDITIONAL COVERAGE CONDITIONS: Loss Payable Provision In the event of a Covered Cause of Loss to Covered Property in which both you and a Loss Payee share an insurable interest, we will: a. Adjust the loss or damage with you; and b. Pay any claim for loss or damage jointly to you and the Loss Payee as your interests may ap- pear. This endorsement applies to all Covered Property for which a Loss Payee is on file with us or your insur- ance agent or insurance broker. CM T5 60 01 10 © 2009 The Travelers Indemnity Company Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc. with its permission. POLICY NUMBER: AS5-Z91-473677-012 COMMERCIAL AUTO CA20481013 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED INSURED FOR COVERED AUTOS LIABILITY COVERAGE This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement. This endorsement identifies person(s) or organization(s) who are "insureds" for Covered Autos Liability Coverage under the Who Is An Insured provision of the Coverage Form. This endorsement does not alter coverage provided in the Coverage Form. SCHEDULE Name Of Person(s) Or Organization(s): Any person or organization where the named insured has agreed by written contract to include such person or organization as a designated insured. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. Each person or organization shown in the Schedule is an "insured" for Covered Autos Liability Coverage, but only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured provision contained in Paragraph A.1. of Section II — Covered Autos Liability Coverage in the Business Auto and Motor Carrier Coverage Forms and Paragraph D.2. of Section I — Covered Autos Coverages of the Auto Dealers Coverage Form. CA 20 48 10 13 © Insurance Services Office, Inc., 2011 Page 1 of 1 POLICY NUMBER: AS5-Z91-473677-012 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. AUTO ENHANCEMENT ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM I. Newly Acquired or Formed Organizations II. Employees as Insureds III. Lessor - Additional Insured and Loss Payee IV. Supplementary Payments - Increased Limits V. Fellow Employee Coverage VI. Personal Property of Others VII. Additional Transportation Expense and Cost to Recover Stolen Auto VIII. Airbag Coverage IX. Tapes, Records and Discs Coverage X. Physical Damage Deductible - Single Deductible XI. Physical Damage Deductible - Glass XII. Physical Damage Deductible - Vehicle Tracking System XIII. Duties in Event of Accident, Claim, Suit or Loss XIV. Unintentional Failure to Disclose Hazards XV. Worldwide Liability Coverage - Hired and Nonowned Autos XVI. Hired Auto Physical Damage XVII. Auto Medical Payments Coverage Increased Limits XVIII. Drive Other Car Coverage - Broadened Coverage for Designated Individuals XIX. Rental Reimbursement Coverage XX. Notice of Cancellation or Nonrenewal XXI. Loan/Lease Payoff Coverage XXI I. Limited Mexico Coverage XXIII. Waiver of Subrogation NEWLY ACQUIRED OR FORMED ORGANIZATIONS Throughout this policy, the words "you" and "your" also refer to any organization you newly acquire or form, other than a partnership or joint venture, and over which you maintain ownership of more than 50 percent interest, provided: A. There is no similar insurance available to that organization; B. Unless you notify us to add coverage to your policy, the coverage under this provision is afforded only until: 1. The 90th day after you acquire or form the organization; or 2. The end of the policy period, whichever is earlier; and C. The coverage does not apply to an "accident" which occurred before you acquired or formed the organization. AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 1 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. POLICY NUMBER: AS5-Z91-473677-012 II. EMPLOYEES AS INSUREDS Paragraph A.1. Who Is An Insured of SECTION II - COVERED AUTOS LIABILITY COVERAGE is amended to add the following: Your "employee" is an "insured" while using with your permission a covered "auto" you do not own, hire or borrow in your business or your personal affairs. III. LESSOR - ADDITIONAL INSURED AND LOSS PAYEE A. Any "leased auto" will be considered an "auto" you own and not an "auto" you hire or borrow. The coverages provided under this section apply to any 'leased auto" until the expiration date of this policy or until the lessor or his or her agent takes possession of the "leased auto" whichever occurs first. B. For any 'leased auto" that is a covered "auto" under SECTION II - COVERED AUTOS LIABILITY COVERAGE, Paragraph A.1. Who Is An Insured provision is changed to include as an "insured" the lessor of the "leased auto". However, the lessor is an "insured" only for "bodily injury" or "property damage" resulting from the acts or omissions by: 1. You. 2. Any of your "employees" or agents; or 3. Any person, except the lessor or any "employee" or agent of the lessor, operating a "leased auto" with the permission of any of the above. C. Loss Payee Clause 1. We will pay, as interests may appear, you and the lessor of the 'leased auto" for 'loss" to the covered "leased auto". 2. The insurance covers the interest of the lessor of the 'leased auto" unless the "loss" results from fraudulent acts or omissions on your part. 3. If we make any payment to the lessor of a 'leased auto", we will obtain his or her rights against any other party. D. Cancellation 1. If we cancel the policy, we will mail notice to the lessor in accordance with the Cancellation Common Policy Condition. 2. If you cancel the policy, we will mail notice to the lessor. 3. Cancellation ends this agreement. E. The lessor is not liable for payment of your premiums. F. For purposes of this endorsement, the following definitions apply: "Leased auto" means an "auto" which you lease for a period of six months or longer for use in your business, including any "temporary substitute" of such "leased auto". "Temporary substitute" means an "auto" that is furnished as a substitute for a covered "auto" when the covered "auto" is out of service because of its breakdown, repair, servicing, 'loss" or destruction. AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 2 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. POLICY NUMBER: AS5-Z91-473677-012 IV. SUPPLEMENTARY PAYMENTS - INCREASED LIMITS Subparagraphs A.2.a.(2) and A.2.a.(4) of SECTION II - COVERED AUTOS LIABILITY COVERAGE are deleted and replaced by the following: (2) Up to $3,000 for cost of bail bonds (including bonds for related traffic law violations) required because of an "accident" we cover. We do not have to furnish these bonds. (4) All reasonable expenses incurred by the "insured" at our request, including actual loss of earnings up to $500 a day because of time off from work. V. FELLOW EMPLOYEE COVERAGE A. Exclusion B.5. of SECTION II - COVERED AUTOS LIABILITY COVERAGE does not apply. B. For the purpose of Fellow Employee Coverage only, Paragraph B.5. of SECTION IV - BUSINESS AUTO CONDITIONS is changed as follows: This Fellow Employee Coverage is excess over any other collectible insurance. VI. PERSONAL PROPERTY OF OTHERS Exclusion 6. in SECTION II - COVERED AUTOS LIABILITY COVERAGE for a covered "auto" is amended to add the following: This exclusion does not apply to "property damage" or "covered pollution cost or expense" involving "personal property" of your "employees" or others while such property is carried by the covered "auto". The Limit of Insurance for this coverage is $5,000 per "accident". Payment under this coverage does not increase the Limit of Insurance. For the purpose of this section of this endorsement, "personal property" is defined as any property that is not used in the individual's trade or business or held for the production or collection of income. VII. ADDITIONAL TRANSPORTATION EXPENSE AND COST TO RECOVER STOLEN AUTO A. Paragraph AA.a. of SECTION III - PHYSICAL DAMAGE COVERAGE is amended as follows: The amount we will pay is increased to $50 per day and to a maximum limit of $1,000. B. Paragraph AA.a. of SECTION III - PHYSICAL DAMAGE COVERAGE is amended to add the following: If your business is shown in the Declarations as something other than an auto dealership, we will also pay up to $1,000 for reasonable and necessary costs incurred by you to return a stolen covered "auto" from the place where it is recovered to its usual garaging location. VIII. AIRBAG COVERAGE Exclusion B.3.a. in SECTION III - PHYSICAL DAMAGE COVERAGE is amended to add the following: This exclusion does not apply to the accidental discharge of an airbag. IX. TAPES, RECORDS AND DISCS COVERAGE Exclusion B.4.a. of SECTION III - PHYSICAL DAMAGE COVERAGE is deleted and replaced by the following: a. Tapes, records, discs or other similar audio, visual or data electronic devices designed for use with audio, visual or data electronic equipment except when the tapes, records, discs or other similar audio, visual or data electronic devices: AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 3 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. POLICY NUMBER: AS5-Z91-473677-012 (1) Are your property or that of a family member; and (2) Are in a covered "auto" at the time of "loss". The most we will pay for "loss" is $200. No Physical Damage Coverage deductible applies to this coverage. X. PHYSICAL DAMAGE DEDUCTIBLE - SINGLE DEDUCTIBLE Paragraph D. in SECTION III - PHYSICAL DAMAGE COVERAGE is deleted and replaced by the following: D. Deductible For each covered "auto", our obligation to pay for, repair, return or replace damaged or stolen property will be reduced by the applicable deductible shown in the Declarations. Any Comprehensive Coverage deductible shown in the Declarations does not apply to "loss" caused by fire or lightning. When two or more covered "autos" sustain "loss" in the same collision, the total of all the "loss" for all the involved covered "autos" will be reduced by a single deductible, which will be the largest of all the deductibles applying to all such covered "autos". XI. PHYSICAL DAMAGE DEDUCTIBLE — GLASS Paragraph D. in SECTION III - PHYSICAL DAMAGE COVERAGE is amended to add the following: No deductible applies to "loss" to glass if you elect to patch or repair it rather than replace it. XII. PHYSICAL DAMAGE DEDUCTIBLE - VEHICLE TRACKING SYSTEM Paragraph D. in SECTION III - PHYSICAL DAMAGE COVERAGE is amended to add: Any Comprehensive Coverage Deductible shown in the Declarations will be reduced by 50% for any "loss" caused by theft if the vehicle is equipped with a vehicle tracking device such as a radio tracking device or a global positioning device and that device was the method of recovery of the vehicle. XIII. DUTIES IN EVENT OF ACCIDENT, CLAIM, SUIT OR LOSS Subparagraphs A.2.a. and A.2.b. of SECTION IV- BUSINESS AUTO CONDITIONS are changed to: a. In the event of "accident", claim, "suit" or "loss", your insurance manager or any other person you designate must notify us as soon as reasonably possible of such "accident", claim, "suit" or "loss". Such notice must include: (1) How, when and where the "accident" or "loss" occurred; (2) The "insured's" name and address; and (3) To the extent possible, the names and addresses of any injured persons and witnesses. Knowledge of an "accident", claim, "suit" or "loss" by your agent, servant or "employee" shall not be considered knowledge by you unless you, your insurance manager or any other person you designate has received notice of the "accident", claim, "suit" or "loss" from your agent, servant or "employee". b. Additionally, you and any other involved "insured" must: (1) Assume no obligation, make no payment or incur no expense without our consent, except at the "insured's" own cost. AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 4 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. POLICY NUMBER: AS5-Z91-473677-012 (2) Immediately send us copies of any request, demand, order, notice, summons or legal paper received concerning the claim or "suit'. (3) Cooperate with us in the investigation or settlement of the claim or defense against the "suit'. (4) Authorize us to obtain medical records or other pertinent information. (5) Submit to examination, at our expense, by physicians of our choice, as often as we reasonably require. XIV. UNINTENTIONAL FAILURE TO DISCLOSE HAZARDS Paragraph B.2. in SECTION IV - BUSINESS AUTO CONDITIONS is amended to add the following: Any unintentional failure to disclose all exposures or hazards existing as of the effective date of the Business Auto Coverage Form or at any time during the policy period will not invalidate or adversely affect the coverage for such exposure or hazard. However, you must report the undisclosed exposure or hazard to us as soon as reasonably possible after its discovery. XV. WORLDWIDE LIABILITY COVERAGE - HIRED AND NONOWNED AUTOS Condition B.7. in SECTION IV - BUSINESS AUTO CONDITIONS is amended to add the following: For "accidents" resulting from the use or operation of covered "autos" you do not own, the coverage territory means all parts of the world subject to the following provisions: a. If claim is made or "suit' is brought against an "insured" outside of the United States of America, its territories and possessions, Puerto Rico and Canada, we shall have the right, but not the duty to investigate, negotiate, and settle or defend such claim or "suit'. If we do not exercise that right, the "insured" shall have the duty to investigate, negotiate, and settle or defend the claim or "suit' and we will reimburse the "insured" for the expenses reasonably incurred in connection with the investigation, settlement or defense. Reimbursement will be paid in the currency of the United States of America at the rate of exchange prevailing on the date of reimbursement. The "insured" shall provide us with such information we shall reasonably request regarding such claim or "suit" and its investigation, negotiation, and settlement or defense. The "insured" shall not agree to any settlement of the claim or "suit' without our consent. We shall not unreasonably withhold consent. b. We are not licensed to write insurance outside of the United States of America, its territories or possessions, Puerto Rico and Canada. We will not furnish certificates of insurance or other evidence of insurance you may need for the purpose of complying with the laws of other countries relating to auto insurance. Failure to comply with the auto insurance laws of other countries may result in fines or penalties. This insurance does not apply to such fines or penalties. XVI. HIRED AUTO PHYSICAL DAMAGE If no deductibles are shown in the Declarations for Physical Damage Coverage for Hired or Borrowed Autos, the following will apply: A. We will pay for "loss" under Comprehensive and Collision coverages to a covered "auto" of the private passenger type hired without an operator for use in your business: AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 5 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. POLICY NUMBER: AS5-Z91-473677-012 1. The most we will pay for coverage afforded by this endorsement is the lesser of: a. The actual cost to repair or replace such covered "auto" with other property of like kind and quality; or b. The actual cash value of such covered "auto" at the time of the "loss". 2. An adjustment for depreciation and physical condition will be made in determining actual cash value in the event of a total "loss". 3. If a repair or replacement results in better than like kind or quality, we will not pay for the amount of the betterment. B. For each covered "auto", our obligation to pay for, repair, return or replace the covered "auto" will be reduced by any deductible shown in the Declarations that applies to private passenger "autos" that you own. If no applicable deductible is shown in the Declarations, the deductible will be $250. If the Declarations show other deductibles for Physical Damage Coverages for Hired or Borrowed Autos, this Section XVI of this endorsement does not apply. C. Paragraph AA.b. of SECTION III - PHYSICAL DAMAGE COVERAGE is replaced by the following: b. Loss of Use Expenses For Hired Auto Physical Damage provided by this endorsement, we will pay expenses for which an "insured" becomes legally responsible to pay for loss of use of a private passenger vehicle rented or hired without a driver, under a written rental contract or agreement. We will pay for loss of use expenses caused by: (1) Other than collision only if the Declarations indicate that Comprehensive Coverage is provided for any covered "auto"; (2) Specified Causes of Loss only if the Declarations indicate that Specified Causes of Loss Coverage is provided for any covered "auto"; or (3) Collision only if the Declarations indicate that Collision Coverage is provided for any covered "auto". However, the most we will pay under this coverage is $30 per day, subject to a maximum of $900. XVII. AUTO MEDICAL PAYMENTS COVERAGE - INCREASED LIMITS For any covered "loss", the Limit of Insurance for Auto Medical Payments will be double the limit shown in the Declarations if the "insured" was wearing a seat belt at the time of the "accident". This is the maximum amount we will pay for all covered medical expenses, regardless of the number of covered "autos", "insureds", premiums paid, claims made, or vehicles involved in the "accident". If no limit of insurance for Auto Medical Payments is shown on the Declarations, this paragraph Section XVII of this endorsement does not apply. XVIII. DRIVE OTHER CAR COVERAGE - BROADENED COVERAGE FOR DESIGNATED INDIVIDUALS A. This endorsement amends only those coverages indicated with an "X" in the Drive Other Car section of the Schedule to this endorsement. B. SECTION II - COVERED AUTOS LIABILITY COVERAGE is amended as follows: 1. Any "auto" you don't own, hire or borrow is a covered "auto" for Liability Coverage while being used by any individual named in the Drive Other Car section of the Schedule to this endorsement or by his or her spouse while a resident of the same household except: AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 6 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. POLICY NUMBER: AS5-Z91-473677-012 a. Any "auto" owned by that individual or by any member of his or her household; or b. Any "auto" used by that individual or his or her spouse while working in a business of selling, servicing, repairing or parking "autos". 2. The following is added to Who Is An Insured: Any individual named in the Drive Other Car section of the Schedule to this endorsement and his or her spouse, while a resident of the same household, are "insureds" while using any covered "auto" described in Paragraph B.1. of this endorsement. C. Auto Medical Payments, Uninsured Motorist, and Underinsured Motorist Coverages are amended as follows: The following is added to Who Is An Insured: Any individual named in the Drive Other Car section of the Schedule to this endorsement and his or her "family members" are "insured" while "occupying" or while a pedestrian when struck by any "auto" you don't own except: Any "auto" owned by that individual or by any "family member". D. SECTION III - PHYSICAL DAMAGE COVERAGE is changed as follows: Any private passenger type "auto" you don't own, hire or borrow is a covered "auto" while in the care, custody or control of any individual named in the Drive Other Car section of the Schedule to this endorsement or his or her spouse while a resident of the same household except: 1. Any "auto" owned by that individual or by any member of his or her household; or 2. Any "auto" used by that individual or his or her spouse while working in a business of selling, servicing, repairing or parking "autos". E. For purposes of this endorsement, SECTION V - DEFINITIONS is amended to add the following: "Family member" means a person related to the individual named in the Drive Other Car section of the Schedule to this endorsement by blood, marriage or adoption who is a resident of the individual's household, including a ward or foster child. XIX. RENTAL REIMBURSEMENT COVERAGE A. For any owned covered "auto" for which Collision and Comprehensive Coverages are provided, we will pay for rental reimbursement expenses incurred by you for the rental of an "auto" because of a covered physical damage "loss" to an owned covered "auto". Such payment applies in addition to the otherwise applicable amount of physical damage coverage you have on a covered "auto". No deductibles apply to this coverage. B. We will pay only for those expenses incurred during the policy period beginning 24 hours after the "loss" and ending with the earlier of the return or repair of the covered "auto", or the exhaustion of the coverage limit. C. Our payment is limited to the lesser of the following amounts: 1. Necessary and actual expenses incurred; or 2. $30 per day with a maximum of $900 in any one period. AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 7 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. POLICY NUMBER: AS5-Z91-473677-012 D. This coverage does not apply: 1. While there are spare or reserve "autos" available to you for your operations; or 2. If coverage is provided by another endorsement attached to this policy. E. If a covered 'loss" results from the total theft of a covered "auto" of the private passenger type, we will pay under this coverage only that amount of your rental reimbursement expenses which is not already provided for under Paragraph A.4. Coverage Extensions of SECTION III — PHYSICAL DAMAGE COVERAGE of the Business Auto Coverage Form or Section VII of this endorsement. XX. NOTICE OF CANCELLATION OR NONRENEWAL A. Paragraph A.2. of the COMMON POLICY CONDITIONS is changed to: 2. We may cancel or non -renew this policy by mailing written notice of cancellation or non -renewal to the Named Insured, and to any name(s) and address(es) shown in the Cancellation and Non -renewal Schedule: a. For reasons of non-payment, the greater of: (1) 10 days; or (2) The number of days specified in any other Cancellation Condition attached to this policy; or b. For reasons other than non-payment, the greater of: (1) 60 days; (2) The number of days shown in the Cancellation and Non -renewal Schedule; or (3) The number of days specified in any other Cancellation Condition attached to this policy, prior to the effective date of the cancellation or non -renewal. B. All other terms of Paragraph A. of the COMMON POLICY CONDITIONS, and any amendments thereto, remain in full force and effect. XXI. LOAN/LEASE PAYOFF COVERAGE The following is added to Paragraph C. Limits Of Insurance of SECTION III - PHYSICAL DAMAGE COVERAGE: In the event of a total 'loss" to a covered "auto" of the private passenger type shown in the schedule or declarations for which Collision and Comprehensive Coverage apply, we will pay any unpaid amount due on the lease or loan for that covered "auto", less: 1. The amount paid under the PHYSICAL DAMAGE COVERAGE SECTION of the policy; and 2. Any: a. Overdue lease/loan payments at the time of the 'loss"; b. Financial penalties imposed under a lease for excessive use, abnormal wear and tear or high mileage; c. Security deposits not returned by the lessor; d. Costs for extended warranties, Credit Life Insurance, Health, Accident or Disability Insurance purchased with the loan or lease; and AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 8 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. POLICY NUMBER: AS5-Z91-473677-012 e. Carry-over balances from previous loans or leases. This coverage is limited to a maximum of $1,500 for each covered "auto". XXII. LIMITED MEXICO COVERAGE WARNING AUTO ACCIDENTS IN MEXICO ARE SUBJECT TO THE LAWS OF MEXICO ONLY - NOT THE LAWS OF THE UNITED STATES OF AMERICA. THE REPUBLIC OF MEXICO CONSIDERS ANY AUTO ACCIDENT A CRIMINAL OFFENSE AS WELL AS A CIVIL MATTER. IN SOME CASES THE COVERAGE PROVIDED UNDER THIS ENDORSEMENT MAY NOT BE RECOGNIZED BY THE MEXICAN AUTHORITIES AND WE MAY NOT BE ALLOWED TO IMPLEMENT THIS COVERAGE AT ALL IN MEXICO. YOU SHOULD CONSIDER PURCHASING AUTO COVERAGE FROM A LICENSED MEXICAN INSURANCE COMPANY BEFORE DRIVING INTO MEXICO. THIS ENDORSEMENT DOES NOT APPLY TO ACCIDENTS OR LOSSES WHICH OCCUR BEYOND 25 MILES FROM THE BOUNDARY OF THE UNITED STATES OF AMERICA. A. Coverage 1. Paragraph B.7. of SECTION IV - BUSINESS AUTO CONDITIONS is amended by the addition of the following: The coverage territory is extended to include Mexico but only if all of the following criteria are met: a. The "accidents" or "loss" occurs within 25 miles of the United States border; and b. While on a trip into Mexico for 10 days or less. 2. For coverage provided by this section of the endorsement, Paragraph B.5. Other Insurance in SECTION IV - BUSINESS AUTO CONDITIONS is replaced by the following: The insurance provided by this endorsement will be excess over any other collectible insurance. B. Physical Damage Coverage is amended by the addition of the following: If a "loss" to a covered "auto" occurs in Mexico, we will pay for such "loss" in the United States. If the covered "auto" must be repaired in Mexico in order to be driven, we will not pay more than the actual cash value of such 'loss" at the nearest United States point where the repairs can be made. C. Additional Exclusions The following additional exclusions are added: This insurance does not apply: 1. If the covered "auto" is not principally garaged and principally used in the United States. 2. To any "insured" who is not a resident of the United States. XXIII. WAIVER OF SUBROGATION Paragraph A.5. in SECTION IV - BUSINESS AUTO CONDITIONS does not apply to any person or organization where the Named Insured has agreed, by written contract executed prior to the date of "accident", to waive rights of recovery against such person or organization. AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 9 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. POLICY NUMBER: AS5-Z91-473677-012 Schedule Premium Liability Physical Damage Total Premium XVIII. Drive Other Car LIAB MP UM UIM Name of Individual XX. Notice of Cancellation or Nonrenewal Name and Address COMP COLL Number of Days AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 10 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy Number AS5-Z91-473677-012 Issued by LM INSURANCE CORPORATION THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. NOTICE OF CANCELLATION TO THIRD PARTIES This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE PART MOTOR CARRIER COVERAGE PART GARAGE COVERAGE PART TRUCKERS COVERAGE PART EXCESS AUTOMOBILE LIABILITY INDEMNITY COVERAGE PART SELF -INSURED TRUCKER EXCESS LIABILITY COVERAGE PART COMMERCIAL GENERAL LIABILITY COVERAGE PART EXCESS COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART COMMERCIAL LIABILITY — UMBRELLA COVERAGE FORM Schedule Name of Other Person(s) / Email Address or mailing address: Number Days Notice: Organization(s): Per Schedule On File With the Per Schedule On File With The 30 Company Company A. If we cancel this policy for any reason other than nonpayment of premium, we will notify the persons or organizations shown in the Schedule above. We will send notice to the email or mailing address listed above at least 10 days, or the number of days listed above, if any, before the cancellation becomes effective. In no event does the notice to the third party exceed the notice to the first named insured. B. This advance notification of a pending cancellation of coverage is intended as a courtesy only. Our failure to provide such advance notification will not extend the policy cancellation date nor negate cancellation of the policy. All other terms and conditions of this policy remain unchanged. LIM 99 01 05 11 © 2011 Liberty Mutual Group of Companies. All rights reserved. Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy Number: AS5-Z91-473677-012 Issued by: LM Insurance Corporation THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED INSURED - NONCONTRIBUTING This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM GARAGE COVERAGE FORM MOTOR CARRIERS COVERGE FORM TRUCKERS COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement. This endorsement identifies person(s) or organization(s) who are "insureds" under the Who Is An Insured Provision of the Coverage Form. This endorsement does not alter coverage provided in the Coverage form. Schedule Name of Person(s) or Organizations(s): Any person or organization whom you have agreed in writing to add as an additional insured, but only to coverage and minimum limits of insurance required by the written agreement, and in no event to exceed either the scope of coverage or the limits of insurance provided in this policy. Regarding Designated Contract or Project: Any contract or project where you have agreed in writing to add as an additional insured, on a noncontributing basis, but only to coverage and minimum limits of insurance required by the written agreement, and in no event to exceed either the scope of coverage or the limits of insurance provided in this policy Each person or organization shown in the Schedule of this endorsement is an "insured" for Liability Coverage, but only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured Provision contained in Section II of the Coverage Form. The following is added to the Other Insurance Condition: If you have agreed that this policy will be primary and without right of contribution from any insurance in force for an Additional Insured for liability arising out of your operations and the agreement was executed prior to the "bodily injury" or "property damage", then this insurance will be primary and we will not seek contribution from such insurance. AC 84 23 08 11 © 2010, Liberty Mutual Group of Companies. All rights reserved. Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc. with its permission. __-.eX,qSMutuar WORKERS' COMPENSATION INSURANCE WORKERS' COMPENSATION AND WC 42 03 04 B EMPLOYERS LIABILITY POLICY Insured copy TEXAS WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in item 3.A. of the Information Page. We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule, but this waiver applies only with respect to bodily injury arising out of the operations described in the schedule where you are required by a written contract to obtain this waiver from us. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. The premium for this endorsement is shown in the Schedule. Schedule 1. ( ) Specific Waiver Name of person or organization (X) Blanket Waiver Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. 2. Operations: All Texas operations 3. Premium: The premium charge for this endorsement shall be 2.00 percent of the premium developed on payroll in connection with work performed for the above person(s) or organization(s) arising out of the operations described. 4. Advance Premium: Included, see Information Page This endorsement changes the policy to which it is attached effective on the inception date of the policy unless a different date is indicated below. (The following "attaching clause" need be completed only when this endorsement is issued subsequent to preparation of the policy.) This endorsement, effective on 11/29/22 at 12:01 a.m. standard time, forms a part of: Policy no. 0002006571 of Texas Mutual Insurance Company effective on 11/29/22 Issued to: WRIGHT CONSTRUCTION COMPANY INC This is not a bill Authorized representative NCCI Carrier Code: 29939 11/11/22 PO Box 12058, Austin, TX 78711-2058 1 of 1 texasmutual.com 1 (800) 859-5995 1 Fax (800) 359-0650 WC 42 03 04 B -eXaSMutuar WORKERS' COMPENSATION INSURANCE WORKERS' COMPENSATION AND WC 42 06 01 EMPLOYERS LIABILITY POLICY Insured copy TEXAS NOTICE OF MATERIAL CHANGE ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in Item 3.A. of the Information Page. In the event of cancellation or other material change of the policy, we will mail advance notice to the person or organization named in the Schedule. The number of days advance notice is shown in the Schedule. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. 1. Number of days advance notice: 2. Notice will be mailed to: Schedule 30 PER LIST ON FILE This endorsement changes the policy to which it is attached effective on the inception date of the policy unless a different date is indicated below. (The following "attaching clause" need be completed only when this endorsement is issued subsequent to preparation of the policy.) This endorsement, effective on 11/29/22 at 12:01 a.m. standard time, forms a part of: Policy no. 0002006571 of Texas Mutual Insurance Company effective on 11/29/22 Issued to: WRIGHT CONSTRUCTION COMPANY INC This is not a bill NCCI Carrier Code: 29939 Authorized representative PO Box 12058, Austin, TX 78711-2058 1 of 1 texasmutual.com 1 (800) 859-5995 1 Fax (800) 359-0650 11/11/22 WC420601 -eXaSMutuar WORKERS' COMPENSATION INSURANCE WORKERS' COMPENSATION AND WC 42 06 01 EMPLOYERS LIABILITY POLICY Insured copy TEXAS NOTICE OF MATERIAL CHANGE ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in Item 3.A. of the Information Page. In the event of cancellation or other material change of the policy, we will mail advance notice to the person or organization named in the Schedule. The number of days advance notice is shown in the Schedule. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. 1. Number of days advance notice: 2. Notice will be mailed to: Schedule CITY OF WYLIE 300 COUNTRY CLUB RD. WYLIE, TX 75098 US This endorsement changes the policy to which it is attached effective on the inception date of the policy unless a different date is indicated below. (The following "attaching clause" need be completed only when this endorsement is issued subsequent to preparation of the policy.) This endorsement, effective on 11/29/22 at 12:01 a.m. standard time, forms a part of: Policy no. 0002006571 of Texas Mutual Insurance Company effective on 11/29/22 Issued to: WRIGHT CONSTRUCTION COMPANY INC This is not a bill NCCI Carrier Code: 29939 Authorized representative PO Box 12058, Austin, TX 78711-2058 1 of 1 texasmutual.com 1 (800) 859-5995 1 Fax (800) 359-0650 11/11/22 WC420601 COMMERCIAL LIABILITY - UMBRELLA DECLARATIONS Issued by: Liberty Insurance Corporation Policy Number: TH7-Z91-473677-032 Renewal of: New Business Item 1. Named Insured and Mailing Address: WRIGHT CONSTRUCTION CO., INC. 601 W. WALL ST. GRAPEVINE, TX 76051 Producer: BOX INSURANCE AGENCY 1200 S MAIN ST STE 1600 GRAPEVINE, TX 76051-7529 The Named Insured is: Corporation Item 2. Policy Period: 11/29/2022 to 11/29/2023 at 12:01 A.M. standard time at above mailing address. Item 3. Limits of Insurance: Each Occurrence Limit $ 5,000,000 General Aggregate Limit $ 5,000,000 Products -Completed Operations Aggregate Limit $ 5,000,000 Item 4. Self -Insured Retention - Each Occurrence: $ 0 Item 5. Premium: Premium Basis Audit Basis Estimated Exposure Rate Flat Charge 0 Issued Code Number Account Number WD 11/22/22 99935 9-473677 Sub -Account Number 0000 LCU 00 02 0118 © 2017 Liberty Mutual Insurance Page 1 of 2 Item 6. Underlying Insurance: Coverage Insurer Policy Period Policy Number Employers Liability* Texas Mutual Insurance Company. 11 /29/2022 to 11 /29/2023 0009006571 Auto Liability LM Insurance Corporation 11 /29/2022 to 11 /29/2023 AS5-Z91-473677-012 General Liability LM Insurance Corporation 11 /29/2022 to 11 /29/2023 TB5-Z91-473677-022 Employee Benefits LM Insurance Corporation Liability 11/29/2022 to 11/29/2023 TB5-Z91-473677-022 Limits of Insurance $1,000,000 By Accident Each Accident $1,000,000 By Disease Policy Limit $1,000,000 By Disease Each Employee $1,000,000 CSL $1,000,000 Each Occurrence $2,000,000 General Aggregate $2,000,000 Products/Completed Ops Aggregate $1.000.000 Pers & Adv Iniury Limit $1,000,000 Each Employee $2,000,000 Aggregate * In any jurisdiction, state or province where the amount of Employers Liability Insurance provided by the underlying insurer(s) is by law unlimited, the underlying Employers Liability limits shown in the above schedule do not apply and no coverage for Employers Liability shall be provided by this policy. These Declarations and any Declarations Extension Schedules, together with the Coverage Form and any Endorsement(s) complete this policy. Forms and Endorsements attached to this policy: See Attached Schedule Countersigned by: Authorized Company Representative LCU 00 02 0118 © 2017 Liberty Mutual Insurance Page 2 of 2 Pollution Policy #0312-1244 11 /29/2022 to 11 /29/2023 b. To sue us on this policy unless all of its terms have been fully complied with. A person or organization may sue us to recover on an agreed settlement or on a final judgment against an insured; but we will not be liable for damages that are not payable under the terms of this policy or that are in excess of the applicable limit of insurance. An agreed settlement means a settlement and release of liability signed by us, the insured and the claimant or the claimant's legal representative. 12. Other Insurance If other valid and collectible insurance is available to the insured for a loss we cover under this policy, our obligations are limited as follows: a. Primary Insurance This insurance is primary except when Paragraph b. below applies. If this insurance is primary, our obligations are not affected unless any of the other insurance is also primary. Then, we will share with all that other insurance by the method described in Paragraph b. below. However, in the event that a written contract or written agreement requires this insurance to be primary for any person or organization with whom you agreed to insure and such person or organization is an insured under this policy, we will not seek contributions from any such other insurance issued to such person or organization. b. Method of Sharing If all of the other insurance permits contribution by equal shares, we will also follow this method. Under this approach, each insurer contributes equal amounts until it has paid its applicable limit of insurance or none of the loss remains, whichever comes first. If any of the other insurance does not permit contribution by equal shares, we will contribute by limits. Under this method, each insurer's share is based on the ratio of its applicable limit of insurance to the total applicable limits of insurance of all insurers. c. Project Specific Insurance Policy Notwithstanding Paragraphs a. and b. above, if a project covered under this policy is insured under a policy specifically purchased to apply to such project, this policy will apply excess of such policy. 13. Premiums and Deductible The first Named Insured shown in the Declarations: a. Is responsible for the payment of all premiums; b. Will be the payee for any return premiums we pay; and c. Is responsible for the payment of all deductibles. 14. Representations a. By accepting this policy, you agree: ENV-CPL 00003 00 (02/12) Page 14 of 22 Includes copyrighted material of Insurance Services Offices, Inc. with its permission. Pollution Policy #0312-1244 11 /29/2022 to 11 /29/2023 (1) The statements and information in any Application and/or Questionnaire and other supplemental materials submitted to us are accurate and complete and are material to our underwriting of this policy; (2) Those statements and the information provided are based upon representations you made to us; and (3) We have issued this policy in reliance upon your representations. b. Misrepresentation, concealment, breach of a term or condition, or violation of any duty under this policy by one insured shall not prejudice the interest of coverage for another insured under this policy. Provided, however, that this condition shall not apply to any insured who is a parent, subsidiary or affiliate of the first Named Insured. 15. Separation of Insureds Except with respect to the Limits of Insurance, and any rights or duties specifically assigned in this policy to the first Named Insured, this insurance applies: a. As if each Named Insured were the only Named Insured; and b. Separately to each insured against whom claim is made or suit is brought. 16. Service of Suit In the event of our failure to pay any amount claimed to be due hereunder, we, at your request, will submit to the jurisdiction of a court of competent jurisdiction within the United States. Nothing in this condition constitutes or should be understood to constitute a waiver of our rights to commence an action in any court of competent jurisdiction in the United States, to remove an action to a United States District Court, or to seek transfer of a case to another court as permitted by the laws of the United States or of any state in the United States. It is further agreed that service of process in such suit may be made upon counsel, Legal Department, Allied World Assurance Company (U.S.) Inc., 199 Water Street, 24" Floor, New York, NY 10038 or his or her representative, and that in any suit instituted against us upon this policy, we will abide by the final decision of such court or of any appellate court in the event of an appeal. Further, pursuant to any statute of any state, territory, or district of the United States which makes provision therefore, we hereby designate the Superintendent, Commissioner or Director of Insurance, or other officer specified for that purpose in the statute, or his or her successors in office, as its true and lawful agent upon whom may be served any lawful process in any action, suit, or proceeding instituted by or on your behalf or any beneficiary hereunder arising out of this policy of insurance and hereby designates the above named as the person to whom the said officer is authorized to mail such process or a true copy thereof. 17. Transfer of Rights of Recovery Against Others to Us If you have rights to recover all or part of any payment we have made under this policy, those rights are transferred to us. You must do nothing after loss to impair them. At our request, you will bring suit or transfer those rights to us and help us enforce them. However, we waive our right(s) of recovery against any person or organization if and to the extent you have agreed to waive your right(s) of recovery against such person or organization in a written contract signed by you prior to the first commencement of a pollution incident out of which the claim or request for emergency response expense arises under Section I — Coverages, 1. Insuring Agreement. ENV-CPL 00003 00 (02/12) Page 15 of 22 Includes copyrighted material of Insurance Services Offices, Inc. with its permission. Pollution Policy #0312-1244 11 /29/2022 to 11 /29/2023 Any recovery as a result of subrogation proceedings arising out of the payment of loss covered under this policy shall accrue first to us to the extent of our payment under the policy, and then to you to the extent of your deductible. Expenses incurred in such subrogation proceedings shall be apportioned among the interested parties in the recovery in the proportion that each interested party's share in the recovery bears to the total recovery. 18. Transfer of Your Rights and Duties Under This Policy Your rights and duties under this policy may not be transferred without our written consent, which shall not be unreasonably withheld, except in the case of death of an individual Named Insured. If you die, your rights and duties will be transferred to your legal representative but only while acting within the scope of duties as your legal representative. Until your legal representative is appointed, anyone having proper temporary custody of your property will have your rights and duties but only with respect to that property. 19. When We Do Not Renew If we decide not to renew, we will mail or deliver to the first Named Insured shown in the Declarations written notice of the nonrenewal not less than ninety (90) days before the expiration date. If notice is mailed, proof of mailing will be sufficient proof of notice. SECTION VI — DEFINITIONS 1. Auto means: a. A land motor vehicle, trailer or semitrailer designed for travel on public roads, including any attached machinery or equipment. b. Any other land vehicle that is subject to a compulsory or financial responsibility law in the state where it is licensed or principally garaged. However, auto does not include mobile equipment. 2. Bodily injury means bodily injury, physical injury, sickness, building -related illness, mental anguish, shock or emotional distress or disease sustained by a person, including death resulting from any of these at any time. Bodily injury damages shall include monetary awards or settlements of compensatory damages and where allowable by law, punitive, exemplary, or multiple damages, and civil fines, penalties, or assessments for bodily injury. 3. Claim means a demand seeking a remedy and alleging liability or responsibility on the part of the insured. 4. Clean-up costs means reasonable and necessary expenses, including restoration costs and legal expenses incurred with our prior written consent, which consent shall not be unreasonably withheld or delayed, to investigate, abate, contain, treat, remove, remediate, monitor, or dispose of soil, surfacewater, groundwater or other contaminated media but only: a. To the extent required by environmental laws; b. For those costs that have been incurred by the government or any political subdivision of the United States of America (including its territories and possessions), Puerto Rico and Canada or by third parties; or c. In the absence of a. above, to the extent recommended by an environmental professional. ENV-CPL 00003 00 (02/12) Page 16 of 22 Includes copyrighted material of Insurance Services Offices, Inc. with its permission. Pollution Policy #0312-1244 iv. Cooperate with us with respect to coordinating other applicable insurance available to the indemnitee; and (b) Provides us with written authorization to: Obtain records and other information related to the suit; and ii. Conduct and control the defense of the indemnitee in such suit. So long as the above conditions are met, attorneys' fees incurred by us in the defense of that indemnitee, necessary litigation expenses incurred by us and necessary litigation expenses incurred by the indemnitee at our request will be paid as Supplementary Payments as provided under Paragraph 2. Supplementary Payments of SECTION I — COVERAGES of this policy. Notwithstanding the provisions of Paragraph 1. Contractual Liability of SECTION III — EXCLUSIONS of this policy, such payments will not be deemed to be damages for bodily injury, property damage, environmental damage and emergency response expense and will not reduce the limits of insurance. Our obligation to defend an insured's indemnitee and to pay for attorneys' fees and necessary litigation expenses as Supplementary Payments, as provided under Paragraph 2. Supplementary Payments of SECTION I — COVERAGES of this policy, ends when we have used up the applicable limit of insurance in the payment of judgments or settlements; or the conditions set forth above, or the terms of the agreement described in paragraph (6) above, are no longer met. SECTION II — WHO IS AN INSURED 1. If you are designated in the Declarations as: a. An individual, you and your spouse are insureds, but only with respect to the conduct of a business of which you are the sole owner. b. A partnership or joint venture, you are an insured. Your members, your partners, and their spouses are also insureds, but only with respect to the conduct of your business. A limited liability company, you are an insured. Your members are also insureds, but only with respect to the conduct of your business. Your managers are insureds, but only with respect to their duties as your managers. d. An organization other than a partnership, joint venture or limited liability company, you are an insured. Your executive officers and directors are insureds, but only with respect to their duties as your officers or directors. Your stockholders are also insureds, but only with respect to their liability as stockholders. e. A trust, you are an insured. Your trustees are also insureds, but only with respect to their duties as trustees. 2. Each of the following is also an insured: a. Your volunteer workers only while performing duties related to the conduct of your business, or your employees, other than either your executive officers (if you are an organization other than a partnership, joint venture or limited liability company) or your managers (if you are a limited liability company), but only for acts within the scope of their employment by you or while performing duties related to the conduct of your business. However, none of these employees or volunteer workers are insureds for: ENV-CPL 00003 00 (02/12) Page 5 of 22 Includes copyrighted material of Insurance Services Offices, Inc. with its permission. Pollution Policy #0312-1244 (1) Bodily injury: (a) To you, to your partners or members (if you are a partnership or joint venture), to your members (if you are a limited liability company), to a co -employee while in the course of his or her employment or performing duties related to the conduct of your business, or to your other volunteer workers while performing duties related to the conduct of your business; (b) To the spouse, child, parent, brother or sister of that co -employee or volunteer worker as a consequence of Paragraph (1)(a) above; (c) For which there is any obligation to share damages with or repay someone else who must pay damages because of the injury described in Paragraphs (1)(a) or (1)(b) above; or (d) Arising out of his or her providing or failing to provide professional health care services. (2) Property damage to property: (a) Owned, occupied or used by, (b) Rented to, in the care, custody or control of, or over which physical control is being exercised for any purpose by you, any of your employees, volunteer workers, any partner or member (if you are a partnership or joint venture), or any member (if you are a limited liability company). b. Any person (other than your employee or volunteer worker), or any organization while acting as your real estate manager. c. Any person or organization having proper temporary custody of your property if you die, but only: (1) With respect to liability arising out of the maintenance or use of that property; and (2) Until your legal representative has been appointed. d. Your legal representative if you die, but only with respect to duties as such. That representative will have all your rights and duties under this policy. e. Any subsidiary, associated, affiliated or allied company or corporation, including subsidiaries thereof, of which you have more than 50% ownership interest at the inception of the policy period. 3. Any organization you newly acquire or form, other than a partnership, joint venture or limited liability company, and over which you maintain ownership or majority interest, will qualify as a Named Insured if there is no other similar insurance available to that organization. However: a. Coverage under this provision is afforded only until the 90th day after you acquire or form the organization or the end of the policy period, whichever is earlier; and b. Coverage under this policy does not apply to bodily injury, property damage, environmental damage or emergency response expense that took place before you acquired or formed the organization; ENV-CPL 00003 00 (02/12) Page 6 of 22 Includes copyrighted material of Insurance Services Offices, Inc. with its permission. Pollution Policy #0312-1244 4. Any person or organization with whom you agree to include as an insured in a written contract or written agreement, but only with respect to bodily injury, property damage, environmental damage or emergency response expense arising out of your work. 5. Any person or organization that has at least a 50% controlling interest in you but only with respect to bodily injury, property damage, environmental damage or emergency response expense arising out of their financial control of you. No person or organization is an insured with respect to the conduct of any current or past partnership, joint venture or limited liability company that is not shown as a Named Insured in the Declarations. SECTION III — EXCLUSIONS This insurance does not apply to: 1. Contractual Liability Bodily injury, property damage, environmental damage or emergency response expense for which the insured is obligated to pay damages by reason of the assumption of liability in a contract or agreement. This exclusion does not apply to liability for damages: a. That the insured would have in the absence of the contract or agreement; or b. Assumed in a contract or agreement that is an insured contract, provided the bodily injury, property damage, environmental damage or emergency response expense occurs subsequent to the execution of the contract or agreement. Solely for the purposes of liability assumed in an insured contract, reasonable attorneys' fees and necessary litigation expenses incurred by or for a party other than an insured are deemed to be damages because of bodily injury, property damage, environmental damage or emergency response expense, provided: (1) Liability to such party for, or for the cost of, that party's defense has also been assumed in the same insured contract; and (2) Such attorneys' fees and litigation expenses are for defense of that party against a civil or alternative dispute resolution proceeding in which damages to which this insurance applies are alleged. 2. Criminal Fines, Penalties and Assessments Any criminal fines, criminal penalties or criminal assessments. 3. Damage to Conveyance Property damage to any conveyance utilized during transportation. This exclusion does not apply to claims made by third -party carriers for such property damage arising from the insured's negligence. 4. Damage to Property Property damage or environmental damage to: a. Property you own, rent, or occupy including any costs or expenses incurred by you, or any other person, organization or entity, for repair, replacement, enhancement, restoration or maintenance ENV-CPL 00003 00 (02/12) Page 7 of 22 Includes copyrighted material of Insurance Services Offices, Inc. with its permission. AGENCY CUSTOMER ID: Wnm��1 u)c#: L> ADDITIONAL REMARKS SCHEDULE AGENCY NAMED INSURED Box Insurance Agency WrightConstruction oo`Inc. sn1vv,Wall St. POLICY NUMBER Grapevine Txrxuo1 Page 1 of 1 w^muma C^nme } j EFFECTIVE DATE: / ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM |sASCHEDULE ToxoonoFORM, FORM NUMBER: —_��— FORM TITLE: 7 ���lFuCA[E OF LIABILITY —' — — ----------- ----------------- -- ---' ---------- --------- ----'----- 1lie General Liability and Auto Liability policies include a blanket automatic additionalinared tthat provides Such status mthe certificate holder only when there is a written contract between the narned insured and the certificate holder that requires Such Status. I he General Liabiliand Auto Liability policies contain a blanket Primary and Non-ContribUtory endorsement that provides this coverage only when there is a written wnuovtbetween the n*neuinsured and the comovoteholder that mq"inmSuch. The General Liability, Auto Liability, and Workors CO(fll.)OnSation policies Include a Blanket WaiVOr Of SLibrogation [)rovisioii/(,,iidors(,rrioiittlmt provide this covorage to the Certificate holden, only when there is a written contract between the narned insured and the ceitificale, holder that re(JUil0y such Status, The General Liability, Auto Liability, and mm*or,;Compensation policies Contain anEndorsement that provides ouoDay Notice ofCanvoxauon.except 1ou=p for Non -Payment to the certificate I iolder whon required in a written contract between the Narned Insured arid the certificate holder. Project: Beltmill Phase 2 Acono1n1<z000N1> @zounAConoCORPORATION. All rights reserved. The xcoRoname and logo are registered marks mxnnRo POLICY NUMBER: TBS-Z9'1-4'73677-022 COMMERCIAL GENERAL LIABILITY CG 24 17 10 01 THIS ENDORSE MENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY, TRACT ILIA ILIT - RAILROADS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART With respect to operations performed for, or affecting, a Scheduled Railroad at a Designated Job Site, the definition of "insured contract" in the Definitions sec- tion is replaced by the following: 0. "Insured Contract" rneans: a. A contract for a lease of premises, However, that portion of the contract for a lease of prem- ises that indemnifies any person or organiza- tion for damage by fire to premises while rented to you or temporarily occupied by you with permission of the owner is not an "insured con- tract"; b. A sidetrack agreement; c:. Any easernent or license agreement; d. An obligation, as required by ordinance, to indemnify a municipality, except in connection with work for a municipality; e. An elevator maintenance agreement; f. That part of any other contract or agreement pertaining to your business (including an in-. dernnification of a municipality in connection with work performed for a municipality) under which you assume the tort liability of another SCHEDULE party to pay for "bodily injury" or "property dam- age" to a third person or organization. Tort li- ability means a liability that would be imposed by law in the absence of any contract or agreement. Paragraph f, does not include that part of any contract or agreement: (1) That indemnifies an architect, engineer or surveyor for injury or damage arising out of: (a) Preparing, approving or failing to pre- pare or approve maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifi- cations; or (b) Giving directions or instructions, or fail- ing to give them, if that is the primary cause of the injury or damage; (2) Under which the insured, if an architect, engineer or surveyor, assumes liability for an injury or damage arising out of the in- sured's rendering or failure to render pro- fessional services, including those listed in Paragraph (1) above and supervisory, in- spection, architectural or engineering activi- ties. Scheduled Railroad: Designated Job Site: Any railroad for which you are performing operations All jobsites. and for which no Railroad Protective Liability Policy has been purchased for the railroad by you, or any railroad for which "your work" has been completed or put to its intended use. (If no entry appears above, information required to complete this endorsement will be shown in the Declarations as applicable to this endorsement) C.G 24 17 10 01 C0 ISO Properties, Inc., 2000 Page 1 of 1 Policy Number: TB5-Z91-473677-022 COMMERCIAL GENERAL LIABILITY 11/29/2022-11/29/20223 CG 20 10 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. i o U .0 M • ` This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Ol' Additional Insured Person(s) Or Organization(s) tmcation(s) 01' Covered Operations Information required to complete. this SC1lldltle, if not shown above., will be shown in the Declnralions. A. Section II - Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf, in the performance of your ongoing operations for the additional insureds) at the location(s) designated above. However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following additional exclusions apply: This insurance does not apply to "bodily injury" or "property damage" occurring after: 1. All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or 2. That portion of "your work" out of which the injury or damage arises has been pt.lt to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. C. With respect to the insurance afforded to these additional insureds, the following is added to Section III - Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available tinder the applicable limits of insurance; whichever is less. This endorsement shall not increase the applicable limits of insurance. Insurance Services Office, Inc. ��Insurancc> SE�rvicE;s_C7Cfice.,_Inc. Policy Number: TB5-Z91-473677-022 11 /29/2022-11 /29/2023 COMMERCIAL GENERAL LIABILITY CG 20 37 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL_ LIABILITY COVERAGE_ PART PRODUCTS/COMPLEI ED OPERATIONS LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s) location And Description Of Completed Operations luformalion nxluil-Cd to cxxnhlete [Iris sclictlule, il'not shown ubovc. t,vill be shuwu in the Declarations. A. Section II - Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury" or "property damage" caused, in whole or in part, by "your work" at the location designated and described in the Schedule of this endorsement performed for that additional insured and included in the "products -completed operations hazard". However: 1. The Insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following is added to Section Ill - Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable limits of insurance-, whichever is less. This endorsement shall not increase the applicable limits of insurance. (C) Insurance Services Office, Inc,. �Ulnsurarice Services Office, Irrc. Policy Number: TB5-Z91-473677-022 11 /29/2022-'11 /29/2023 THIS ENDORSEMENT CHANGES THE POLICY, PLEASE READ IT CAREFULLY. COMMERCIAL GENERAL LIABILITY ADDITIONAL INSURED ENHANCEMENT FOR CONTRACTORS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART Index of modified items: Item 1. Blanket Additional Insured Where Required By Written Agreement Lessors of Leased Equipment Managers or Lessors of Premises Mortgagees, Assignees or Receivers Owners, Lessees or Contractors Architects, Engineers or Surveyors Any Person or Organization Item 2. Blanket Additional Insured — Grantor Of Permits Item 3. Other Insurance Amendment Item 1. Blanket Additional Insured Where Required By Written Agreement Paragraph 2. of Section II — Who Is An Insured is amended to add the following: Additional Insured By Written Agreement The following are insureds under the Policy when you have agreed in a written agreement to provide there coverage as additional insureds under your policy: 1. Lessors of Leased Equipment: The person(s) or organization(s) from whom you lease equipment, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by your maintenance, operation or use of equipment leased to you by such person(s) or organization(s). This insurance does not apply to any "occurrence" which takes place after the equipment lease expires. 2. Managers or Lessors of Premises: Any manager(s) or lessor(s) of premises leased to you in which the written lease agreement obligates YOU to procure additional insured coverage. The coverage afforded to the additional insured is limited to liability in connection with the ownership, maintenance or use of the premises leased to you and caused, in whole or in part, by some negligent act(s) or omission(s) of you, your "employees", your agents or your subcontractors. There is no coverage for the additional insured for liability arising out of the sole negligence of the additional insured or those acting on behalf of the additional insured, except as provided below. If the written agreement obligates you to procure additional insured coverage for the additional insured's sole negligence, then the coverage for the additional insured shall confonn to the agreement, but only if the applicable law would allow you to indemnify the additional insured for liability arising out of the additional insured's sole negligence. LC 20 58 11 18 © 2018 Liberty Mutual Insurance Page 1 of 4 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy NurnberT135-Z91-473677-022 11 /29/2.022-11 /29/2023 This insurance does not apply lo: a. Any "occurrence" which takes place after you cease to be a tenant in that premises or to lease that land; b. Structural alterations, new construction or demolition operations performed by or on behalf of that manager or lessor; or c. Any premises for which coverage is exclr.rded by endorsement. 3. Mortgagees, Assignees or Receivers: Any persons) or organization(s) with respect to their liability as mortgagee, assignee or receiver and arising out of your ownership, maintenance or use of the premises. This insurance does not apply to structural alterations, new construction and demolition operations performed by or on behalf of such person(s) or organization(s). 4. Owners, Lessees or Contractors: Any person(s) or organization(s) to whom you are obligated to procure additional insured coverage, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" Caused, in whole or in part, by your act(s) or omission(s) or the act(s) or omission(s) of your "employees", your agents, or your subcontractors, in the performance of your ongoing operations. This insurance does not apply to "bodily injury", "property damage", or "personal and advertising injury" arising out of "your work" Included in the "products -completed operations hazard" unless you are required to provide such coverage for the additional insured by the written agreement, and then only for the period of time required by the written agreement and only for liability caused, in whole or in part, by your act(s) or orission(s) or the act(s) or omission(s) of your "employees", your agents, or your subcontractors. There is no coverage for the additional insured for liability arising out of the sole negligence of the additional insured or those acting on behalf of the additional insured, except as provided below. If the written agreement obligates you to procure additional insured coverage for the additional insured's sole negligence, then the coverage for the additional insured shall conform to the agreement, but only if the applicable law would allow YOU to indernnify the additional insured for liability arising out the additional insured's sole negligence. This insurance does not apply to "bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of, or failure to render, any professional architectural, engineering or surveying services, including: a. The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or b. Supervisory, inspection, architectural or engineering activities This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the "occurrence" which caused the "bodily injury" or "property damage", or the offense which caused the "personal and advertising injury", involved the rendering of or failure to render any professional services. 5. Architects, Engineers or Surveyors: Any architect, engineer, or surveyor engaged by you but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by your act(s) or omission(s) or the act(s) or omission(s) of those acting on your behalf: a. In connection with your premises; or b. In the performance of your ongoing operations. This insurance does not apply to "bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of or failr.rre to render any professional services by or for you, including: LC 20 58 11 18 () 2018 Liberty Mutual Insurance Page 2 of 4 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy Number 1135-Z91A73677-022 1 '1 /29/2022-11 /29/2023 a. The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or b. Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the "occurrence" which caused the "bodily injury" or "property damage", or the offense which caused the "personal and advertising injury", involved the rendering of or failure to render any professional services by or for you. 6. Any Person or Organization Other Than a Joint Venture: Any person(s) or organization(s) (other than a joint venture of which you are a member) for whom you are obligated to procure additional insured coverage, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by your act(s) or omission(s) or the act(s) or omission(s) of those acting on your behalf: a. In the performance of your ongoing operations; or b. In connection with premises owned by or rented to you. This insurance does not apply to: a. Any person(s) or organization(s) more specifically covered in Paragraphs 1. through 5. above; b. Any construction, renovation, demolition or installation operations performed by or on behalf of you, or those operating on your behalf; or c. Any person(s) or organization(s) whose profession, business or occupation is that of an architect, surveyor or engineer with respect to liability arising out of the rendering of, or failure to render, any professional architectural, engineering or surveying services, including: (1) The preparing, approving or failing to prepare or approve, maps, drawings, opinions, reports, surveys, field orders, change orders, designs and specifications; or (2) Supervisory, inspection, architectural or engineering activities, This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the 'Occurrence" which caused the "bodily injury" or "property damage", or the offense which caused the "personal and advertising injury", involved the rendering of or failure to render any professional services by or on behalf of you, or those operating on your behalf. The insurance afforded to any person(s) or organization(s) as an insured under this Item 1.: 1. Applies to the extent permitted by law; 2. Applies only to the scope of coverage and the minimum limits of insurance required by the written agreement, but in no event exceeds either the scope of coverage or the limits of insurance provided by this Policy; 3. Does not apply to any person(s) or organization(s) for any "bodily injury", "property damage" or "personal and advertising injury" if any other additional insured endorsement attached to this Policy applies to such persons) or organization(s) with regard to the "bodily injury", "property damage" or "personal and advertising injury"; 4. Applies only if the "bodily injury" or "property damage" occurs, or the offense giving rise to the "personal and advertising injury" is committed, subsequent to the execution of the written agreement; and 5. Applies only if the written agreement is in effect at the time the "bodily injury" or "property damage" occurs, or at the time the offense giving rise to the "personal and advertising injury" is committed. LC 20 58 11 18 (D 2018 Liberty Mutuol Insurance Page 3 of 4 Includes copyrighted irraterial of Insurance Services Office, Inc., with its permission. Policy NumberT135-7_91-473671-022 '11 /29/2022-11 /29/2023 Item 2. Blanket Additional Insured -- Grantor Of Permits Paragraph 2, of Section II — Who Is An Insured is amended to add the following Any state, municipality or political subdivision that has issued you a permit in connection with any operations performed by you or on your behalf, or in connection with prernises you own, rent or control, and to which this insurance applies, but only to the extent that you are required to provide additional insured status to the state, municipality or political subdivision as a condition of receiving and maintaining the permit. Such state, municipality or political subdivision that has issued YOU a permit is an insured only with respect to their liability as grantor of such permit to yor.r. However, with respect to the state, mt.unicipality or political subdivision: 1. Coverage will be no broader than required; and 2. Limits of insurance will not exceed the minimum limits of insurance required as a condition for receiving or maintaining the permit; but neither the scope of coverage nor the limits of insurance will exceed those provided by this Policy. This insurance does not apply to: 1. "Bodily injury", "property damage" or "personal and advertising injury" arising out of operations performed for the state, municipality or political subdivision; 2. Any "bodily injury" or "property damage" included within the "products -completed operations hazard", except when required by written agreement initiated prior to loss; or 3. "Bodily injury", "property damage" or "personal and advertising Injury", unless negligently caused, in whole or in part, by you or those acting on your behalf. Item 3. Other Insurance Amendment If you are obligated under a written agreement to provide liability insurance on a primary, excess, contingent, or any other basis for any persons) or organization(s) that qualifies as an additional insured on this Policy, this Policy will apply solely on the basis required by such written agreement and Paragraph 4. Other Insurance of Section IV — Commercial General Liability Conditions will not apply. Where the applicable written agreement does not specify on what basis the liability insurance will apply, the provisions of Paragraph 4. Other Insurance of Section IV — Commercial General Liability Conditions will apply. However, this insurance is excess over any other insurance available to the additional insured for which it is also covered as an additional insured for the same 'occurrence", claim or "suit'. LC 20 58 11 18 © 2018 Liberty Mutual Insurance Page 4 of 4 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy NUrnberTB5-7_91-473677-022 11 /29/2022-11 /29/2023 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. COMMERCIAL GENERAL LIABILITY ENHANCEMENT FOR CONTRACTORS This endorsernent modifies insurance provided under the following: COMMERCIAL_ GENERAL LIABILITY COVERAGE PART Index of modified items: Item 1. Reasonable Force Item 2. Non -Owned Watercraft Extension Item 3. Damage To Premises Rented To You — Expanded Coverage Item 4. Bodily Injury To Co -Employees Item 5. Health Care Professionals As Insureds Item 6. Knowledge Of Occurrence Or Offense Item 7. Notice Of Occurrence Or Offense Item 8. Unintentional Failure To Disclose Item 9. Bodily Injury Redefined Item 10. Supplementary Payments — Increased Limits Item 11. Property In Your Care, Custody Or Control Item 12. Mobile Equipment Redefined Item 13. Newly Formed Or Acquired Entities Item 14. Waiver Of Right Of Recovery By Written Contract Or Agreement Item 1. Reasonable Force Exclusion a. of Section I — Coverage A — Bodily Injury And Property Damage Liability is replaced by the following: a. Expected Or Intended Injury "Bodily injury" or "property damage" expected or intended from the standpoint of the insured. This exclusion does not apply to "bodily injury° or "property damage" resulting from the use of reasonable force to protect persons or property. Item 2. Non -Owned Watercraft Extension Paragraph (2) of Exclusion g. of Section I — Coverage A — Bodily Injury And Property Damage Liability is replaced by the following: (2) A watercraft you do not own that is: (a) Less than 55 feet long; and (b) Not being used to carry persons or property for a charge; Item 3. Damage To Premises Rented To You — Expanded Coverage A. The final paragraph of 2. Exclusions of Section I — Coverage A — Bodily Injury And Property Damage Liability is replaced by the following: LC 32 199 11 18 © 2018 Liberty MLltual Insurance Page 1 of 5 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy Nr.rmberTB5-7.91-473677-022 11 /29/2022-11 /2.9/2023 Exclusions c. through n. do not apply to carriage by fire, lightning or explosion or subsequent damages resulting from such fire, lightning or explosion including water damage to premises while rented to you or temporarily occupied by you with permission of the owner. A separate limit of insurance applies to this coverage as described in Section III — Limits Of Insurance, B. Paragraph 6. of Section III — Limits Of Insurance is replaced by the following: 6. Subject to Paragraph 5. above, the Darnage To Premises Rented To You Limit is the most we will pay under Coverage A for damages because of "property damage" to any one premises, while rented to you, or in the case of damage by fire, lightning, explosion or subsequent damages resulting from such fire, lightning or explosion including water damage to prernises while rented to you or temporarily occupied by You with permission of the owner. The Damage To Premises Rented To You Limit is the greater of: a. $300,000; or b. The Damage To Premises Rented To You Limit shown on the Declarations. C. Paragraph 9.a. of the definition of "insured contract" in Section V — Definitions is replaced by the following: a. A contract for a lease of premises. However, that portion of the contract for a lease of premises that indemnifies any person or organization for damage by fire, lightning, explosion or subsequent damages resulting from such fire, lightning or explosion including water damage to premises while rented to you or temporarily occupied by you with permission of the owner is not an "insured contract"; D. The paragraph immediately following Paragraph (6) of Exclusion j. of Section I — Coverage A — Bodily Injury And Property Damage Liability is replaced by the following: Paragraphs (1), (3) and (4) of this exclusion do not apply to "property damage" (other than damage by fire, lightning or explosion or subsequent damages resulting from such fire, lightning or explosion including water damage) to premises, including the contents of such premises, rented to you for a period of seven or fewer consecutive days. A separate limit of insurance applies to Darnage To Premises Rented To You as described in Section III — Limits of Insurance. Item 4. Bodily Injury To Co -Employees A. Paragraph 2. of Section II — Who Is An Insured is amended to include: Each of the following is also an insured: Your "employees" (other than either your "executive officers" (if you are an organization other than a partnership, joint venture or limited liability company) or your managers (if you are a limited liability company)) or "volunteer workers" are insureds while in the course of their employment or while performing duties related to the conduct of your business with respect to "bodily injury": (1) To you; (2) To your partners or members (if you are a partnership or joint venture); (3) To your members (if YOU are a limited liability company); or (4) To a co -"employee" or "volunteer worker" while that co-"ernployee" or "volunteer worker" is either in the course of his or her employment by you or' while performing duties related to the conduct of your business (inclr.rding participation in any recreational activities sponsored by you). Paragraph 2.a.(1)(a) of Section II — Who Is An Insured does not apply to "bodily injury" for which insurance is provided by this paragraph. LC 32 199 11 18 © 2018 Liberty Mutual Insurance Page 2 of 5 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy Numberl-135-Z91-473677-022 11 /29/2022.-11 /29/2023 B. The insurance provided by this Item 4. for "bodily injury" to a co -"employee" or "volunteer worker" will not apply if the injured co -"employee's" or "volunteer worker's" sole remedy for such injury is provided under a workers' compensation law or any similar law. C. Other Insurance The insurance provided by this Item 4. is excess over any other valid and collectible insurance available to the insured, whether primary, excess, contingent or on any other basis. Item 5. Health Care Professionals As Insureds A. Paragraph 2.a.(1)(d) of Section II — Who Is An Insured is replaced by the following: (d) Arising out of his or her providing or failure to provide professional health care services. However, any "employee" or "volunteer worker" of the Named Insured who is acting as a Good Samaritan in response to a public or medical emergency or who is a "designated health care provider" is an insured with respect to "bodily injury" and "personal and advertising injury" that: (i) Arises out of the providing of or failure to provide professional health care services; and (h) Occurs in the course of and within the scope of such "employee's" or "volunteer worker's" employment by the Named Insured. B. With respect to "employees" and "volunteer workers" providing professional health care services, the following exclusions are added to Paragraph 2. Exclusions of Section I — Coverage A — Bodily Injury And Property Damage Liability and Paragraph 2. Exclusions of Section I — Coverage B — Personal And Advertising Injury Liability: This insurance does not apply to: (1) Liability assumed under an "insc.rred contract" or any other contract or agreernent; (2) Liability arising out of the providing of professional health care services in violation of law; (3) Liability arising out of the providing of any professional health care services while in any degree under the influence of intoxicants or narcotics; (4) Liability arising out of any dishonest, fraudulent, malicious or knowingly wrongful act or failure to act; or (5) Punitive or exemplary darnages, fines or penalties. C. The following definition is added to Section V — Definitions: "Designated health care provider" means any "employee" or "volunteer worker" of the Named Insured whose duties include providing professional health care services, including but not limited to doctors, nurses, erergency medical technicians or designated first aid personnel. D. Other Insurance The insurance provided by this Item 5. is excess over any other valid and collectible insurance available to the insured, whether primary, Excess, contingent or on any other basis. Item 6. Knowledge Of Occurrence Or Offense Knowledge of an "occurrence" or offense by your agent, servant or "employee" will not in itself constitute knowledge by you unless your "executive officer" or "employee" designated by you to notify us of an "occurrence" or offense has knowledge of the "occurrence" or offense. LC 32 199 11 18 © 2018 Liberty Mutual Insurance Page 3 of 5 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy NurnberT135-Z91-473677-022 11 /29/2022-11 /29/2023 stern 7. Notice Of Occurrence Or Offense For purposes of Paragraph 2.a. of Section IV — Commercial General Liability Conditions, you refers to your °executive officer" or "employee" that you have designated to give (,.Is notice. Item 8. Unintentional Failure To Disclose Unintentional failure of the Named Insured to disclose all hazards existing at the inception of this Policy shall not be a basis for denial of any coverage afforded by this Policy. However, you must report such an error or ornission to us as soon as practicable after its discovery. This provision does not affect our right to collect additional premium or exercise our right of cancellation or non - renewal. Item 9. Bodily Injury Redefined The definition of "bodily injury" in Section V — Definitions is replaced by the following: "Bodily injury" means: a. Bodily injury, sickness or disease sustained by a person, including death resulting from any of these at any time; and b. Mental anguish, shock or humiliation arising out of injury as defined in Paragraph a. above. Mental anguish means any type of mental or emotional illness or distress. Item 10. Supplementary Payments — Increased Limits Paragraphs 1.b. and 1.d. of Section I — Supplementary Payments — Coverages A And B are replaced by the following: b. Up to $3,000 for the cost of bail bonds required because of accidents or traffic law violations arising out of the use of any vehicle to which Bodily Injury Liability Coverage applies. We do not have to furnish these bonds. d. All reasonable expenses incurred by the insured at our request to assist in the investigation or defense of the claim or "suit", including actual loss of earnings up to $500 a day because of time off from work. Item 11. Property In Your Care, Custody Or Control A. Paragraphs (3) and (4) of Exclusion j. of Section I — Coverage A — Bodily Injury And Property Damage Liability are deleted. B. Additional Exclusion Coverage provided by this endorsement does not apply to "property damage" to property while in transit. C. Limits of Insurance Subject to Paragraphs 2., 3., and 5. of Section III — Limits Of Insurance, the most we will pay for insurance provided by Paragraph A. above is: $10,000 Each Occurrence Limit $75,000 Aggregate Limit The Each Occurrence Limit for this coverage applies to all damages as a result of any one 'occurrence" regardless of the number of persons or organizations who sustain damage because of that 'occurrence". The Aggregate Limit is the most we will pay for the sum of all damages under this Item 11. LC 32 199 11 18 C) 2018 Liberty Mutual Insurance Page 4 of 5 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy Numberl-135-191-473677-022 '11 /29/2022-11 /29/2023 D. Other' Insurance This insurance does not apply to any portion of a loss for which the insured has available any other valid and collectible insurance, whether primary, excess, contingent, or on any other basis, unless such other insurance was specifically purchased by the insured to apply in excess of this Policy. Item 12. Mobile Equipment Redefined The definition of "mobile equipment" in Section V — Definitions is amended to include self-propelled vehicles with permanently attached equipment less than 1000 pounds gross vehicle weight that are primarily designed for: (1) Snow removal; (2) Road maintenance, but not construction or resurfacing; or (3) Street cleaning. However, "mobile equipment" does not include land vehicles that are subject to a compulsory or financial responsibility law or other motor vehicle insurance law where such vehicles are licensed or principally garaged. Land vehicles subject to a compulsory or financial responsibility law or other motor vehicle insurance law are considered "autos". Item 13. (Newly Formed Or Acquired Entities A. Paragraph 3. of Section 11 — Who Is An Insured is replaced by the following: 3. Any organization you newly acquire or form, other than a partnership or joint venture, and over which you maintain majority ownership or majority interest, will qualify as a Named Insured if there is no other similar insurance available to that organization. However: a. Coverage under this provision is afforded only until: (1) The 180th day after you acquire or form the organization; (2) Separate coverage is purchased for the organization; or (3) The end of the policy period whichever is earlier; b. Section I — Coverage A — Bodily Injury And Property Damage Liability does not apply to "bodily injury" or "property damage" that occurred before you acquired or formed the organization; and c. Section I — Coverage B — Personal And Advertising Injury Liability does not apply to "personal and advertising injury" arising out of an offense committed before you acquired or formed the organization. B. The insurance afforded to any organization as a Named Insured under this Item 13. does not apply if a Broad Form Named Insured endorsement attached to this Policy applies to that organization. Item 14. Waiver Of Right Of Recovery By Written Contract Or Agreement -f he following is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us of Section IV — Commercial General Liability Conditions: We waive any right of recovery because of payments we make cinder this Policy for injury or damage arising out of your ongoing operations or "your work" included in the "prod r.rcts-completed operations hazard" that we may have against any person or organization with whom you have agreed in a written contract or agreement to waive your rights of recovery but only if the "bodily injury" or "properly damage" occurs, or offense giving rise to "personal and advertising injury" is committed subsequent to the execution of the written contract or agreement. LC 32 199 11 18 @ 2018 Liberty Mutual Insurance Page 5 of 5 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Terns: 11 /29/ 2022-11 /29/202,3 Policy Number TB5-Z91-473677-022 Issued by LM INSURANCE CORPORATION THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. NOTICE OF CANCELLATION TO THIRD PARTIES This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE PART MOTOR CARRIER COVERAGE PART GARAGE COVERAGE PART TRUCKERS COVERAGE PART EXCESS AUTOMOBILE LIABILITY INDEMNITY COVERAGE PART SELF -INSURED TRUCKER EXCESS LIABILITY COVERAGE PART COMMERCIAL GENERAL LIABILITY COVERAGE PART EXCESS COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART COMMERCIAL LIABILITY — UMBRELLA COVERAGE FORM Schedule A. If we cancel this policy for any reason other than nonpayment of premium, we will notify the persons or organizations shown in the Schedule above. We will send notice to the email or mailing address listed above at least 10 days, or the number of days listed above, if any, before the cancellation becomes effective. In no event does the notice to the third party exceed the notice to the first named insured. B. This advance notification of a pending cancellation of coverage is intended as a courtesy only. Our failure to provide such advance notification will not extend the policy cancellation date nor negate cancellation of the policy. All other terms and conditions of this policy remain unchanged. LIM 99 01 05 11 O 2011 Liberty Mutual Group of Companies. All rights reserved. Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Term: 11 /29/2022-1 '1 /29/2023 Policy Number -1-135-Z91-473677-022 Issued by LM Insurance Corporation THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED CONSTRUCTION PROJECT OR DESIGNATED LOCATION COMBINED AGGREGATE LIMITS — WITH TOTAL AGGREGATE LIMIT FOR ALL PROJECTS AND LOCATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART Schedule Designated Construction Project(s) or Designated Location(s): All `locations' and all construction projects at which you are performing ongoing operations. Total Aggregate Limit for all Projects and Locations: $ 15,000,000 A. For all sums which the insured becomes legally obligated to pay as damages caused by "occurrences" under Section I — Coverage A, and for all medical expenses caused by accidents under Section I - Coverage C, which can be attributed only to ongoing operations at a single designated construction project or a single designated "location": 1. A separate Designated General Aggregate Limit applies to each designated construction project and to each designated "location", and that limit is equal to the amount of the General Aggregate Limit shown in the Declarations. 2. The Designated General Aggregate Limit is the most we will pay for the sum of all damages under Section I - Coverage A, except damages because of "bodily injury" or "property damage" included in the "products - completed operations hazard", and for medical expenses under Section I - Coverage C regardless of the number of: a. Insureds-, b. Claims made or "suits" brought-, or c. Persons or organizations making claims or bringing "suits". 3. Any payments made under Coverage A for damages or under Coverage C for medical expenses shall reduce the Designated General Aggregate Limit for that designated construction project or designated "location". Such payments shall not reduce the General Aggregate Limit shown in the Declarations nor shall they reduce any other Designated General Aggregate Limit for any other designated construction project or designated "location". 4. The limits shown in the Declarations for Each Occurrence, Damage to Premises Rented to You and Medical Expense continue to apply. However, instead of being subject to the General Aggregate Limit shown in the Declarations, such limits will be subject to the applicable Designated General Aggregate Limit and the Total Aggregate Limit for all Projects and Locations. LC 25 19 01 15 C<) 2014 Liberty Mutual Insurance Page 1 of 2 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy WimberT135-Z91-473677-022 11 /29/2022-11 /2.9/2023 5. The dotal Aggregate Limit for all Projects and Locations shown in the Schedule of this endorsement is the most we will pay for the sum of all damages caused by "occurrences" under Section I -- Coverage A and all medical expenses caused by accidents under Section I -- Coverage C which can be attributed only to ongoing operations at a designated construction project or designated "location" shown in the Schedule of this endorsement, regardless of the number of construction projects, "locations", 'occurrences" or accidents. 6. Each Designated General Aggregate Limit is subject to the Total Aggregate Limit for all Projects and Locations shown in the Schedule of this endorsement. B. For all sums which the insured becomes legally obligated to pay as damages caused by "occurrences" under Section I — Coverage A, and for all medical expenses caused by accidents under Section I - Coverage C, which cannot be attributed only to ongoing operations at a single designated construction project or single designated "location": 1. Any payments made under Coverage A for damages or under Coverage C for medical expenses shall reduce the amount available under the General Aggregate Limit or the Products -Completed Operations Aggregate Limit, whichever is applicable; and 2. Such payments shall not reduce any Designated General Aggregate Limit. C. When coverage for liability arising out of the "products -completed operations hazard" is provided, any payments for darnages because of "bodily injury" or "property damage" included in the "products -completed operations hazard" will reduce the Products -Completed Operations Aggregate Limit, and not reduce the General Aggregate Limit nor the Designated General Aggregate Limit. D. If the applicable construction project has been abandoned, delayed, or abandoned and then restarted, or if the authorized contracting parties deviate from plans, blueprints, designs, specifications or timetables, the project will still be deemed to be the same construction project. E. For the purposes of this endorsement, the Definitions Section is amended by the addition of the following definition: "Location" means any premise that you occupy for permanent operations as part of your business, but does not include any premises at which you are performing operations as part of a construction project. All premises involving the same or connecting lots, or premises whose connection is interrupted only by a street, roadway, waterway or right-of-way of a railroad shall be considered a single "location". F. The provisions of Section III - Limits Of Insurance not otherwise modified by this endorsement shall continue to apply as stipulated. LC 25 19 01 15 0 2014 Liberty Mutual Insurance Page 2 of 2 Includes copyrighted material of Insurance Services Office, Inc., with its permission. PoicyNumbor: 0T�330-"'F251181-TL[-22 COMMERCIAL INLAND MARINE [his endmsunnent modifies insuonce provided under the |K4 PAK COVERAGE FORM, The following is added to Section E —NDD|T0NAL COVERAGE CONDITIONS: Loss Payable Provision In the event ofaCovered Cause o[Loss tu Covered Property in which both you and a Loss Payee share an insurable in\erest, we will: m. Adjust the loss ordamagewi(hyou: and b. Pay any claim for loss or damage jointly to you and the Loss Payee as your interests may ap- pear. This endorsement applies to all Covered Property for which a Loss Payee is on file with us oryour insur- enceagentorinsumncebroker. CMlB6OO110 (Dz00oThe, Travelers Indemnity Company Page 1of1 POLICY NUMBER: AS5-Z9'1-473677-012 COMMERCIAL AUTO CA20481013 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement. This endorsement identifies person(s) or organization(s) who are "insureds" for Covered Autos Liability Coverage under the Who Is An Insured provision of the Coverage Form. This endorsement does not alter coverage provided in the Coverage Form. SCHEDULE Name Of Person(s) Or Organization(s): Any person or organization where the named insured has agreed by written contract to include such person or organization as a designated insured. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. Each person or organization shown in the Schedule is an "insured" for Covered Autos Liability Coverage, but only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured provision contained in Paragraph A.I. of Section II — Covered Autos Liability Coverage in the Business Auto and Motor Carrier Coverage Forms and Paragraph D.2. of Section I — Covered Autos Coverages of the Auto Dealers Coverage Form, CA 20 48 10 13 O Insurance Services Office, Inc., 2011 Page 1 of 1 POLICY NUMBER: AS5-7.91-.473677-012 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. AUTO ENHANCEMENT ENDORSEMENT `f his endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM I. Newly Acquired or Formed Organizations II. Employees as Insureds III. Lessor - Additional Insured and Loss Payee 1V. Supplementary Payments - Increased Limits V. Fellow Employee Coverage VI. Personal Property of Others VII. Additional Transportation Expense and Cost to Recover Stolen Auto VIII, Airbag Coverage IX. Tapes, Records and Discs Coverage X. Physical Damage Deductible - Single Deductible XI. Physical Damage Deductible - Glass XII. Physical Damage Deductible - Vehicle Tracking System XIII. Duties in Event of Accident, Claim, Suit or Loss XIV. Unintentional Failure to Disclose Hazards XV. Worldwide Liability Coverage - Hired and Nonowned Autos XVI. Hired Auto Physical Daniage XVII. Auto Medical Payments Coverage Increased Limits XVIII. Drive Other Car Coverage - Broadened Coverage for Designated Individuals XIX. Rental Reirnbursement Coverage XX. Notice of Cancellation or Nonrenewal XXI. Loan/Lease Payoff Coverage XXII. Limited Mexico Coverage XXIII. Waiver of Subrogation I. NEWLY ACQUIRED OR FORMED ORGANIZATIONS Throughout this policy, the words "you" and "your" also refer to any organization you newly acquire or form, other than a partnership or joint venture, and over which you maintain ownership of more than 50 percent interest, provided: A. There is no similar insurance available to that organization; B. Unless you notify us to add coverage to your policy, the coverage under this provision is afforded only until: 1. The 90th day after you acquire or form the organization; or 2. The end of the policy period, whichever is earlier; and C. The coverage does not apply to an "accident" which occurred before you acquired or formed the organization. AC 84 07 11 17 (0 2017 Liberty Mutual Insurance Page: 1 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. POLICY NUMBER: AS5-Z91-4173677-012 II. EMPLOYEES AS INSUREDS Paragraph A.1. Who Is An Insured of SECTION II - COVERED AUTOS LIABILITY COVERAGE is amended to add the following: Your "employee" is an "insured" while using with your permission a covered "auto" you do not own, hire or' borrow in your business or your personal affairs. III. LESSOR - ADDITIONAL INSURED AND LOSS PAYEE A. Any "leased auto" will be considered an "auto" you own and not an "auto" you hire or borrow. The coverages provided under this section apply to any "leased auto" until the expiration date of this policy or until the lessor or his or her agent takes possession of the "leased auto" whichever occurs first. B. For any "leased auto" that is a covered "auto" under SECTION II - COVERED AUTOS LIABILITY COVERAGE, Paragraph A.1. Who Is An Insured provision is changed to include as an "insured" the lessor of the "leased auto". However, the lessor is an "insured" only for "bodily injury" or "property damage" resulting from the acts or omissions by: 1. You. 2. Any of your "employees" or agents; or 3. Any person, except the lessor or any "employee" or agent of the lessor, operating a "leased auto" with the permission of any of the above. C. Loss Payee Clause 1. We will pay, as interests may appear, you and the lessor of the "leased auto" for "loss" to the covered "leased auto". 2. The insurance covers the interest of the lessor of the "leased auto" unless the 'loss" results from fraudulent acts or omissions on your part. 3. If we make any payment to the lessor of a 'leased auto", we will obtain his or her rights against any other party. D. Cancellation 1. If we cancel the policy, we will mail notice to the lessor in accordance with the Cancellation Common Policy Condition. 2. If you cancel the policy, we will rnail notice to the lessor. 3. Cancellation ends this agreement. E. The lessor is not liable for payment of your premiums. F. For purposes of this endorsement, the following definitions apply: "Leased auto" means an "auto" which you lease for a period of six rnonths or longer for Use in your business, including any "temporary substitute" of such "leased auto". "Temporary substitute" ineans an "auto" that is furnished as a substitute for a covered "auto" when the covered "auto" is Out of service because of its breakdown, repair, servicing, "loss" or destruction. AC 84 07 11 17 C) 2017 Liberty Mutual Insurance Page 2 of 10 Includes copyrightecl material of Insurance Services Office, Inc., with its permission. POLICY NUMBER: AS5-Z_91-473677-012 IV. SUPPLEMENTARY PAYMENTS - INCREASED LIMITS Subparagraphs A.2.a.(2) and A.2.a.(4) of SECTION II - COVERED AUTOS LIABILITY COVERAGE are deleted and replaced by the following: (2) Up to $3,000 for cost of bail bonds (including bonds for related traffic law violations) required because of an "accident" we cover. We do not have to furnish these bonds. (4) All reasonable expenses incurred by the "insured" at our request, including actual loss of earnings up to $500 a day because of time off from work. V. FELLOW EMPLOYEE COVERAGE A. Exclusion B.5, of SECTION 11 - COVERED AUTOS LIABILITY COVERAGE does not apply. B. For the purpose of Fellow Employee Coverage only, Paragraph B.5, of SECTION IV - BUSINESS AUTO CONDITIONS is changed as follows: This Fellow Employee Coverage is excess over any other collectible insurance. VI. PERSONAL PROPERTY OF OTHERS Exclusion 6. in SECTION 11 - COVERED AUTOS LIABILITY COVERAGE for a covered "auto" is amended to add the following: This exclusion does not apply to "property damage" or "covered pollution cost or expense" involving "personal property" of your "employees" or others while such property is carried by the covered "auto". The Limit of Insurance for this coverage is $5,000 per "accident". Payment under this coverage does not increase the Limit of Insurance. For the purpose of this section of this endorsement, "personal property" is defined as any property that is not used in the individual's trade or business or held for the production or collection of income. VII. ADDITIONAL TRANSPORTATION EXPENSE AND COST TO RECOVER STOLEN AUTO A. Paragraph A.4.a. of SECTION III - PHYSICAL.. DAMAGE COVERAGE is amended as follows: The amount we will pay is increased to $50 per day and to a maximum limit of $1,000. B. Paragraph A.4.a. of SECTION III - PHYSICAL DAMAGE COVERAGE is amended to add the following: If your business is shown in the Declarations as something other than an auto dealership, we will also pay up to $1,000 for reasonable and necessary costs incurred by you to return a stolen covered "auto" from the place where it is recovered to its usual garaging location. VII1. AIRBAG COVERAGE Exclusion B.3.a. in SECTION III - PHYSICAL DAMAGE COVERAGE is amended to add the following: This exclusion does not apply to the accidental discharge of an airbag. IX. TAPES, RECORDS AND DISCS COVERAGE Exclusion B.4.a. of SECTION III - PHYSICAL DAMAGE COVERAGE is deleted and replaced by the following: a. Tapes, records, discs or other similar audio, visual or data electronic devices designed for use with audio, visual or data electronic equipment except when the tapes, records, discs or other similar audio, visual or data electronic devices: AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 3 of 10 Includes copyrighted material of Insurance Services Office, Inc„ with its permission. POLICY NLJM13ER: AS5-791-•473677--012 (1) Are your property or that of a family member; and (2) Are in a covered "auto" at the time of "loss". The most we will pay for "loss" is $200. No Physical Damage Coverage deductible applies to this coverage. X. PHYSICAL DAMAGE DEDUCTIBLE - SINGLE DEDUCTIBLE Paragraph D. in SECTION III - PHYSICAL DAMAGE COVERAGE is deleted and replaced by the following: D. Deductible For each covered "auto", our obligation to pay for, repair, return or replace damaged or stolen property will be reduced by the applicable deductible shown in the Declarations. Any Comprehensive Coverage deductible shown in the Declarations does not apply to "loss" caused by fire or lightning. When two or more covered "autos" sustain "loss" in the same collision, the total of all the "loss" for all the involved covered "autos" will be reduced by a single deductible, which will be the largest of all the deductibles applying to all such covered "autos". XI. PHYSICAL DAMAGE DEDUCTIBLE — GLASS Paragraph D. in SECTION III - PHYSICAL DAMAGE COVERAGE is amended to add the following: No deductible applies to "loss" to glass if you elect to patch or repair it rather than replace it. XII. PHYSICAL DAMAGE DEDUCTIBLE - VEHICLE TRACKING SYSTEM Paragraph D. in SECTION III - PHYSICAL DAMAGE COVERAGE is amended to add: Any Comprehensive Coverage Deductible shown in the Declarations will be reduced by 50% for any "loss" caused by theft if the vehicle is equipped with a vehicle tracking device such as a radio tracking device or a global positioning device and that device was the method of recovery of the vehicle. XIII. DUTIES IN EVENT OF ACCIDENT, CLAIM, SUIT OR LOSS Subparagraphs A.2.a. and A.2.b. of SECTION IV- BUSINESS AUTO CONDITIONS are changed to: a. In the event of "accident", claim, "suit" or "loss", your insurance manager or any other person you designate niust notify us as soon as reasonably possible of such "accident", claim, "suit" or "loss". Such notice must include: (1) How, when and where the "accident" or "loss" occurred; (2) The "insured's" name and address; and (3) To the extent possible, the names and addresses of any injured persons and witnesses. Knowledge of an "accident", claim, "suit" or "loss" by your agent, servant or "employee" shall not be considered knowledge by YOU unless you, your insurance manager or any other person you designate has received notice of the "accident", claim, "suit" or "loss" from your agent, servant or "employee". b. Additionally, YOU and any other involved "insured" must: (1) Assume no obligation, make no payment or incur no expense without our consent, except at the "insured's" own cost. AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 4 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. POLICY NUMBER: AS5-Z91--473677-012 (2) Immediately send us copies of any request, demand, order, notice, summons or legal paper received concerning the claim or "suit". (3) Cooperate with us in the investigation or settlement of the claim or defense against the "suit". (4) Authorize us to obtain medical records or other pertinent information. (5) Submit to examination, at our expense, by physicians of our choice, as often as we reasonably require. XIV. UNINTENTIONAL FAILURE TO DISCLOSE HAZARDS Paragraph B.2. in SECTION IV - BUSINESS AUTO CONDITIONS is amended to add the following: Any unintentional failure to disclose all exposures or hazards existing as of the effective date of the Business Auto Coverage Form or at any time during the policy period will not invalidate or adversely affect the coverage for such exposure or hazard. However, you must report the undisclosed exposure or hazard to us as soon as reasonably possible after its discovery. XV. WORLDWIDE LIABILITY COVERAGE - HIRED AND NONOWNED AUTOS Condition B.7. in SECTION IV - BUSINESS AUTO CONDITIONS is amended to add the following: For "accidents" resulting from the use or operation of covered "autos" you do not own, the coverage territory means all parts of the world subject. to the following provisions: a. If claim is made or "sc.iit" is brought against an "insured" outside of the United States of America, its territories and possessions, Puerto Rico and Canada, we shall have the right, but not the duty to investigate, negotiate, and settle or defend such claim or "suit". If we do not exercise that right, the "insured" shall have the duty to investigate, negotiate, and settle or defend the claim or "suit" and we will reimburse the "insured" for the expenses reasonably incurred in connection with the investigation, settlement or defense, Reimbursement will be paid in the currency of the United States of America at the rate of exchange prevailing on the date of reimbursement. The "insured" shall provide us with such information we shall reasonably request regarding such claim or "suit" and its investigation, negotiation, and settlement or defense. The "insured" shall not agree to any settlement of the claim or "suit" without our consent. We shall not unreasonably withhold consent. b. We are not licensed to write insurance outside of the United States of America, its territories or possessions, Puerto Rico and Canada. We will not furnish certificates of insurance or other evidence of insurance you may need for the purpose of complying with the laws of other countries relating to auto insurance. Failure to comply with the auto insurance laws of other countries may result in fines or penalties. This insurance does not apply to such fines or penalties. XVI. HIRED AUTO PHYSICAL DAMAGE If no deductibles are shown in the Declarations for Physical Damage Coverage for Hired or Borrowed Autos, the following will apply: A. We will pay for "loss" under Comprehensive and Collision coverages to a covered "auto" of the private passenger type hired without an operator for use in your business: AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 5 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. POLICY NUMBER: AS5-Z91-473677-012 1. The most we will pay for coverage afforded by this endorsement is the lesser of: The actual cost to repair or replace such covered "auto" with other property of like kind and quality; or b. The actual cash value of such covered "auto" at the time of the "loss 2. An adjustment for depreciation and physical condition will be made in determining actual cash value in the event of a total "loss". 3. If a repair or replacernent results in better than like kind or quality, we will not pay for the amount of the betterment. B. For each covered "auto", our obligation to pay for, repair, return or replace the covered "auto" will be reduced by any deductible shown in the Declarations that applies to private passenger "autos" that you own. If no applicable deductible is shown in the Declarations, the deductible will be $250. If the Declarations show other deductibles for Physical Damage Coverages for Hired or Borrowed Autos, this Section XVI of this endorsernent does not apply. C. Paragraph A.4.b. of SECTION III - PHYSICAL DAMAGE COVERAGE is replaced by the following: b. Loss of Use Expenses For Hired Auto Physical Damage provided by this endorsement, we will pay expenses for which an "insured" becomes legally responsible to pay for loss of use of a private passenger vehicle rented or hired without a driver, under a written rental contract or agreement. We will pay for loss of use expenses caused by: (1) Other than collision only if the Declarations indicate that Comprehensive Coverage is provided for any covered "auto"; (2) Specified Causes of Loss only if the Declarations indicate that Specified Causes of Loss Coverage is provided for any covered "auto"; or (3) Collision only if the Declarations indicate that Collision Coverage is provided for any covered "auto" However, the most we will pay under this coverage is $30 per day, subject to a maximum of $900. XVII. AUTO MEDICAL PAYMENTS COVERAGE - INCREASED LIMITS For any covered "loss", the Limit of Insurance for Auto Medical Payments will be double the limit shown in the Declarations if the "insured" was wearing a seat belt at the time of the "accident". This is the maximurn amount we will pay for all covered medical expenses, regardless of the number of covered "autos", "insureds" premiums paid, claims made, or vehicles involved in the "accident". If no limit of insurance for Auto Medical Payments is shown on the Declarations, this paragraph Section XVII of this endorsement does not apply. XVIII. DRIVE OTHER CAR COVERAGE - BROADENED COVERAGE FOR DESIGNATED INDIVIDUALS A. This endorsement amends only those coverages indicated with an "X" in the Drive Other Car section of the Schedule to this endorsement. B. SECTION II - COVERED AUTOS LIABILITY COVERAGE is amended as follows: 1. Any "auto" you don't own, hire or borrow is a covered "auto" for Liability Coverage while being used by any individual named in the Drive Other Car section of the Schedule to this endorsement or by his or her spouse while a resident of the same household except: AC 84 07 11 17 U 2017 Liberty Mutual Insurance; Page 6 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. POLICY NUMBER: AS5-Z91-473677-012 a. Any "auto" owned by that. individual or by any member of his or her hoUSehOld; or b. Any "auto" used by that individual or his or her spouse while working in a business of selling, servicing, repairing or parking "autos". 2. The following is added to Who Is An Insured: Any individual named in the Drive Other Car section of the Schedule to this endorsement and his or her spouse, while a resident of the same household, are "insureds" while using any covered "auto" described in Paragraph B.I. of this endorsement. C. Auto Medical Payments, Uninsured Motorist, and Underinsured Motorist Coverages are amended as follows: The following is added to Who Is An Insured: Any individual named in the Drive Other Car section of the Schedule to this endorsement and his or her "family members" are "insured" while "occupying" or while a pedestrian when struck by any "auto" you don't own except: Any "auto" owned by that individual or by any "family member". D. SECTION III - PHYSICAL DAMAGE COVERAGE is changed as follows: Any private passenger type "auto" you don't own, hire or borrow is a covered "auto" while in the care, custody or control of any individual named in the Drive Other Car section of the Schedule to this endorsement or his or her spouse while a resident of the same household except: 1. Any "auto" owned by that individual or by any member of his or her household; or 2. Any "auto" used by that individual or his or her spouse while working in a business of selling, servicing, repairing or parking "autos". E. For purposes of this endorsement, SECTION V - DEFINITIONS is amended to add the following: "Family member" means a person related to the individual named in the Drive Other Car section of the Schedule to this endorsement by blood, marriage or adoption who is a resident of the individual's household, including a ward or foster child. XIX. RENTAL REIMBURSEMENT COVERAGE A. For any owned covered "auto" for which Collision and Comprehensive Coverages are provided, we will pay for rental reimbursement expenses incurred by you for the rental of an "auto" because of a covered physical damage "loss" to an owned covered "auto". Such payment applies in addition to the otherwise applicable amount of physical damage coverage you have on a covered "auto". No deductibles apply to this coverage. B. We will pay only for those; expenses incurred during the policy period beginning 24 hours after the "loss" and ending with the earlier of the return or repair of the covered "auto", or the exhaustion of the coverage limit. C. Our payment is limited to the lesser of the following amounts: 1. Necessary and actual expenses incurred; or 2. $30 per day with a maximum of $900 in any one period. AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 7 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. POLICY NUMBER: ASE5-Z91-473677-012 D. This coverage does not apply: 1. While there are spare or reserve "autos" available to you for your operations; or 2. If coverage is provided by another endorsement attached to this policy. E. If a covered "loss" results from the total theft of a covered "auto" of the private passenger type, we will pay under this coverage only that amount of your rental reimbursement expenses which is not already provided for under Paragraph A.4. Coverage Extensions of SECTION III — PHYSICAL DAMAGE COVERAGE of the Business Auto Coverage Form or Section VII of this endorsement. XX. NOTICE OF CANCELLATION OR NONRENEWAL A. Paragraph A.2. of the COMMON POLICY CONDITIONS is changed to: 2. We may cancel or non -renew this policy by mailing written notice of cancellation or non -renewal to the Named Insured, and to any narrne(s) and address(es) shown in the Cancellation and Non -renewal Schedule: a. For reasons of non-payment, the greater of: (1) 10 days; or (2) The number of days specified in any other Cancellation Condition attached to this policy; or b, For reasons other than non-payment, the greater of: (1) 60 days; (2) The number of days shown in the Cancellation and Non -renewal Schedule; or (3) The number of days specified in any other Cancellation Condition attached to this policy, prior to the effective date of the cancellation or non -renewal. B. All other terms of Paragraph A. of the COMMON POLICY CONDITIONS, and any amendments thereto, remain in full force and effect. XXI. LOAN/LEASE PAYOFF COVERAGE The following is added to Paragraph C. Limits Of Insurance of SECTION III - PHYSICAL DAMAGE COVERAGE: In the event of a total "loss" to a covered "auto" of the private passenger type shown in the schedule or declarations for which Collision and Comprehensive Coverage apply, we will pay any unpaid amount due on the lease or loan for that covered "auto", less: 1. The arnount paid under the PHYSICAL DAMAGE COVERAGE SECTION of the policy; and 2. Any: a. Overdue lease/loan payments at the time of the "loss"; b. Financial penalties imposed under a lease for excessive use, abnormal wear and tear or high mileage; c. Secr.rrity deposits not returned by the lessor; d. Costs for extended warranties, Credit Life Insurance, Health, Accident or Disability Insurance purchased with the loan or lease; and AC 84 07 11 17 O 2017 Liberty Mutual Insurance Page 8 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. POLICY NUMBF=R: AS5-Z91-413617-012. e. Carry-over balances from previous loans or leases. This coverage is limited to a maxirnum of $1,500 for each covered "auto". XXII. LIMITED MEXICO COVERAGE WARNING AUTO ACCIDENTS IN MEXICO ARE SUBJECT TO THE LAWS OF MEXICO ONLY - NOT THE LAWS OF THE UNITED STATES OF AMERICA. THE. REPUBLIC OF MEXICO CONSIDERS ANY AUTO ACCIDENT A CRIMINAL OFFENSE AS WELL AS A CIVIL MATTER. i IN SOME CASES THE COVERAGE PROVIDED UNDER THIS ENDORSEMENT MAY NOT BE RECOGNIZED BY THE MEXICAN AUTHORITIES AND WE MAY NOT BE ALLOWED TO IMPLEMENT THIS COVERAGE AT ALL IN MEXICO. YOU SHOULD CONSIDER PURCHASING AUTO COVERAGE FROM A LICENSED MEXICAN INSURANCE COMPANY BEFORE DRIVING INTO MEXICO. j THIS ENDORSEMENT DOES NOT APPLY TO ACCIDENTS OR LOSSES WHICH OCCUR BEYOND 25 MILES FROM THE BOUNDARY OF THE UNITED STATES OF AMERICA. A. Coverage 'I. Paragraph B.7. of SECTION IV - BUSINESS AUTO CONDITIONS is amended by the addition of the following: The coverage territory is extended to include Mexico but only if all of the following criteria are met: a. The "accidents" or "loss" occurs within 25 miles of the United States border; and b. While on a trip into Mexico for 10 days or less. 2. For coverage provided by this section of the endorsement, Paragraph B.5, Other Insurance in SECTION IV - BUSINESS AUTO CONDITIONS is replaced by the following: The insurance provided by this endorsement will be excess over any other collectible insurance. B. Physical Damage Coverage is amended by the addition of the following: If a "loss" to a covered "auto" occurs in Mexico, we will pay for such "loss" in the United States, If the covered "auto" must be repaired in Mexico in order to be driven, we will not pay more than the actual cash value of such "loss" at the nearest United States point where the repairs can be made. C. Additional Exclusions The following additional exclusions are added: This insurance does not apply: 1. If the covered "auto" is not principally garaged and principally used in the United States, 2. To any "insured" who is not a resident of the United States. XXIII. WAIVER OF SUBROGATION Paragraph A.5. in SECTION IV - BUSINESS AUTO CONDITIONS does not apply to any person or organization where the Named Insured has agreed, by written contract executed prior to the date of "accident", to waive rights of recovery against such person or organization. AC 84 07 11 17 (D 2017 1_iberty Mutual Insurance Page 9 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. POLICY NUMBER: AS5-Z01-473677-012 Premium Liability Physical Damage Total Premium XVIII. Drive Other Car LIAR Name of Individual XX. Notice of Cancellation or Nonrenewal Name and Address Schedule MP UM UIM COMP COLL Number of Days AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 10 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy Number ASS-Z91-473677-012 Issued by LM INSURANCE' C01001ZATION THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY, NOTICE OF CANCELLATION TO THIRD PARTIES This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE. PART MOTOR CARRIER COVERAGE PART GARAGE COVERAGE PART TRUCKERS COVERAGE PART EXCESS AUTOMOBILE LIABILITY INDEMNITY COVERAGE PART SELF -INSURED TRUCKER EXCESS LIABILITY COVERAGE PART COMMERCIAL GENERAL LIABILITY COVERAGE PART EXCESS COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART COMMERCIAL LIABILITY - UMBRELLA COVERAGE FORM Schedule Name of Other Person(s) / Email Address or mailing address: Number Days Notice: Or_ganization(s): Per Schedule On File With the Per Schedule On File With The 30 Company- -_ ._..._. Company_ _..._ ._ .. A. If we cancel this policy for any reason other than nonpayment of premium, we will notify the persons or organizations shown in the Schedule above. We will send notice to the email or mailing address listed above at least 10 days, or the number of days listed above, if any, before the cancellation becomes effective. In no event does the notice to the third party exceed the notice to the first named insured. B. This advance notification of a pending cancellation of coverage is intended as a courtesy only. Our failure to provide such advance notification will not extend the policy cancellation date nor negate cancellation of the policy. All other teens and conditions of this policy remain unchanged. LIM 99 01 05 11 © 2011 Liberty Mutual Group of Companies. All rights reserved. Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy Number: AS5-Z91-473677-012 Issued by: LM Insurance Corporation THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED INSURED - NONCONTRIBUTING This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM GARAGE COVERAGE FORM MOTOR CARRIERS COVERGE FORM TRUCKERS COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement. This endorsement identifies person(s) or organization(s) who are "insureds" under the Who Is An Insured Provision of the Coverage Form. This endorsement does not alter coverage provided in the Coverage form. Schedule Name of Person(s) or Organizations(s): Any person or organization whom you have agreed in writing to add as an additional insured, but only to coverage and minimum limits of insurance required by the written agreement, and in no event to exceed either the scope of coverage or the limits of insurance provided in this policy. Regarding Designated Contract or Project: Any contract or project where you have agreed in writing to add as an additional insured, on a noncontributing basis, but only to coverage and minimum limits of insurance required by the written agreement, and in no event to exceed either the scope of coverage or the limits of insurance provided in this policy Each person or organization shown in the Schedule of this endorsement is an "insured" for Liability Coverage, but only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured Provision contained in Section II of the Coverage Form. The following is added to the Other Insurance Condition: If you have agreed that this policy will be primary and without right of contribution from any insurance in force for an Additional Insured for liability arising out of your operations and the agreement was executed prior to the "bodily injury" or "property damage", then this insUrance will be primary and we will not seek contribution from such insurance. AC 84 23 08 11 © 2010, Liberty Mutual Group of Companies. All rights reserved. Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc. with its permission. WORKERS' C OMIIFNSATION INSURANCE vuOfaKER ' COMiPE NSMION AND WC 42 03 0 tzMPLOYERS LIABILITY POLICY Insured copy TEXAS WAIVER OF OUR RIGHT T TO RECOVER OV ROM OTHERS ENDORSEMENT This endorsement applies only to the insurance provided by the policy because -1-exas is shown in item 3.A, of the Information Page. We have the right to recover, our payments from anyone liable for an injlary covered by this policy. We will riot enforce our right against the person or organization named in the Schedule, but this Waiver applies only with respect to bodily injury arising out of the operations described in the schedule; where you are required by a written contract to obtain this waiver from us. This endorsement shall riot operate directly or indirectly to benefit anyone not named in the Schedule. flue prerniurn for this endorsement is shown in the Schedule. mzzmm O Specific Waiver Name of person or organization (X) Blanket Waiver Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. Operations: All Texas operations 3. Premium: The premium charge for this endoiser-nent shall be 2.00 percent Of the prerrriUrn developed on payroll in connection with work performed for the above person(s) or organization(s) arising out of the operations described. 4. Advance Premium: Included, see; Information Page 1 his endorsement changes [lie policy to which it is attached effective on the inception date of the policy unless a different date is indicated below, (The following "attaching clause" need be completed only when this endorsement is issued subsequent to preparation of the policy.) This endorsement, effective on 11/29/22 at 12:01 a.m. standard time, forms a part of: Policy no. 0002006571 of "texas Mutual Insurance Company effective on 11/29/22 Issued to: WRIGHT CONSTRUCTION COMPANY INC This is not a; bill NCCI C.arner Code: 29939 Authorized representative 11111 /22 f'O Box 12058, Austin, I X 787 11 -2058 1 of 1 texasnlutual.com 1 (800) 859-5995 1 Fax (800) 359-0650 WC 42 03 04 B rk ex,qSMLitual. �WORKERS' COMPENSATION INSURANCE WORKENS'COK8PEN sx[mAND WC 42 06 01 EMPLOYERS LIABILITY POLICY Insured copy TEXAS NOTICE OF MATERIAL CHANGE ENDORSEMENT ThiaendomemontappUeoon|ytotheinaunynoepnovidedbythepo|ioybeoaunoT-exnninohmwnin||em3.A.cftho Information Page. In the event of cancellation or other material change of the policy, we will mail advance notice to the- person or organization named in the Schedule. The number ofdays advance nndna is shown in the Schedule. This endorserrient shall riot operate, directly of- indirectly to benefit amyone not named in the Schedule. 1, NUmber of days advance notice 2. Notice will be mailed to: mmu��� 30 PER LIST UNFILE lhis endorsement mmngenmopmicymwmicmi/isaxaohouoVoctivvcwmomoopmmoumo/mopolicyonleo a different date mindicated below, (rxofollowing "attaching uuu=^omwuocompleted only when this °ouvmmnent/x`xxuouvuuwnuent*vmFmm0000rthe pm'n/) This nounoomen/.umotivoon11o9/uzatm;o'1am.standard time, forms npart of: Ism /odN: WRIGHT CONS ;[PU(,'T|0NCOMPANY INC NCC|Carrier Code: 20939 'This is not bill Authorized representative n/1mc POBox12O38.AuStin. [X70711-2050 fC'X,1,wSMutuar WORK[RS' COMPENSATION INSURANCE VVORKERS'COKOPENSATIONAND WC 42 06 01 EMPLOYERS LIABILITY POLICY Insured copy TEXAS NOTICE OF MATERIAL CHANGE ENDORSEMENT 'I his endorsement applies only to the insurance provided by the policy becauseTexas is shown in Itern 3.A. of the |n[ormobonPaAe. In the event of cancellation or other material change of the policy, we will mail advance notice to the person or orgunizaUonnamedinLheSohedu|a.ThanumbarofdayandvancwnoUnaioahmwnin|heSohedu|e. This endorsement shall not operate directly of- indirectly to benefit anyono no[ nained in the Schedule, 1. NUmber of days advance notice: 2. Notice will be mailed to: Schedule SU CITY OFVVYL|E 3OOCOUNTRY CLUB RD, VVYL|E.TX750Q8U3 I Ills endol'selment ckingos tho policy to whidi it js all,adied effoctive o(i the inception date of the policy unlessomnwmn/date windicated below. (rho |w|*moo^axavxmnuxuxo^ noauhwColl w|uxmonly when this onuoomnon//xwwmuxvy^ovoeotm»mpomoonmthe rm/r^} This o^uonmn`^ot.ox000voo^ 11/29o2a,12p1 ummstandard nmo'forms apart of: Policy t1u. 0002006571 of Texas Mutual 111SUrance Company offedive On '11/29/22 Issued to: WRIGHT CONSTRUCTION COMPANY INC 17`inisnot abill NCC|Can ic/Code: 29839 Authorized representative nmuz POBox 12058.Austin, TX78711-2058 1 of hOxasmokmiovm 1 (800)859-59951 Fax (80O)359'V650 mC42O001 COMMERCIAL. LIABILITY - UMBRELLA DECLARATIONS Issued by: Liberty Insurance Corporation Policy Number: TH7-Z91-473677-032 Renewal of: New Business Stern 9. Named Insured and Mailing Address: WRIGHT CONSTRUCTION CO., INC. 601 W. WALL ST. GRAPEVINE, TX 76051 Producer: BOX INSURANCE AGENCY 1200 S MAIN ST STE. 1600 GRAPEVINE, TX 76051-7529 The Named Insured is: Corporation Item 2. Policy Period: 11/29/2022 to 11/29/2023 at 12:01 A.M. standard time at above mailing address. Item 3. Limits of Insurance: Each Occurrence; Limit $ 5,000,000 General Aggregate Limit $ 5,000,000 Products -Completed Operations Aggregate Limit $ 5,000,000 Item 4. Self-Insurecl Retention - Each Occurrence: $ 0 Item 5. Premium: Premium Basis Audit Basis Estimated Exposure Rate Flat Charge 0 Issued Code Number Account Number WIC 11/22/22 99935 9-473677 Sub -Account Number 0000 LCU W 02 0118 (c� 2017 Liberty MutWll I ; irance Page 1 of 2 Itern 6, Underlying Insurance Coverage Insurer Policy Period Policy Number Employers L.iabilityk Texas Mutual Insurance Company. 11/29/2022 to 11/29/2023 Q.QQ2Q..Q '5..71...._...."..,......... (Auto I_.iability LM Insurance Corporation 11/29/2022 to 11/29/2023 AS5-Z91-4736 77-012 General Liability LM Insurance Corporation 11/29/2022 to 11 /29/2023 T135-•Z91-4 736 77-022 Employee Benefits Insurance Corporation li< bility '11/29/2022 to 11/29/2023 rB.5• Z9'1-47367 7-022 I Limits of Insurance $1,000,000 By Accident Each Accident $1,000,000 By Disease Policy limit $1,000,000 By Disease Each Employee $1,000,000 C,SL ------ .__.._ $1,000,000 Each Occurrence $2,000,000 General Aggregate $2,000,000 Products/Completed Ops Aggregate $1,000,,000 Pers„&Adv. In1Qry_UMt,_.._.___ _....... $1,000,000 Each Employee $2,000,000 Aggregate In any jurisdiction, state or province where the amount of Employers I...iability Insurance provided by the underlying insurei(s) Ls by law unlimited, the underlying E:rnployers liability limits shown in the above schedule do not apply and no coverage for Employers t. iability shall be provided by this policy. These Declarations and any Declarations Extension Schedules, together with the Coverage Form and any Endorsement(s) complete this policy. Forms and Endorsements attached to this policy: See Attached Schedule Countersigned by: Authorized Company Representative LCU 00 02 0118 (c) 2017 Liberty MUhKil In mrance Page 2 of 2 Pc8|uUonPolicy #U312'1244 11/2912022to11/29C2023 b. TO Sue LIS 01-1 this Policy LJnI(-_,ss all of its ternis have been fully complied with. A person or organization may ouo us to recover on on agreed settlement or on a final judgment against on insured; but we will not be liable for damages that are not payable under the terms of this policy or that are in excess of the applicable limit of insurance. An agreed settlement means a settlement and release ofliability signed by us, the insured and the claimant orthe claimant's |ago| representative. 12. Other Insurance If other valid and noUadib|o insurance is available to the insuoad for loss we cover Linder this po|icy, Our obligations are |innihedaofollows: a. Phmory!naunance This insurance is primary except when Paragraph b. below applies. If this insurance is phmary, our obligations are not o#edad unless any of the other insurance is also primary. Thon, we will share with all that other insurance by the method described in Paragraph b. below. However, in the event that a written contract or written agreement requires this insurance to be primary for any person or organization with whom you agreed to insure and such person or organization is on inaumd under- this po|iuy, we will not seek contributions hnm any such other insurance issued to Such person ororganization. b. Method ofSharing If all of the other insurance pennitu contribution by equal uhams, we will also follow this method. Under this approauh, each insurer contributes equal amounts until it has paid its applicable |in)ii of insurance or- none of the loss remains, whichever comes first. If any of the other insurance does not ponniiounhihuUon by equa| aharos, we will contribute by limits. Under (his method' each insuro/u share, is hosed on the na|io of its applicable limit of insurance W the ioin| app|ioab|u |imi(s of myu/ancu of all insurers. c. Project Specific InSUrance Policy Notwithstanding Paragraphs a. and b. mbuvo, if project covanad Linder this policy is insured underapoUoyopenifioaUypurnhaaadionpp|yiosuohpnojoot.ihinpo|icyvviUopp|yexoosoo[suoh 13. Premiums and Deductible The first Nomed |nsuredshown in the Declarations: a. Is responsible for the payment o(all premiums; b. Will bethe payee for any return pmmiumawmpay�and u. |snosponaib|efor (hapoyinen\ufall deductibles. 14. Representations a. 8yaccepting this policy, you agree: ENV­CPLO00030O(U2/12) Page 14of22 Includes copyrighted material o[kmumnoe Services Offices, In(,,, with its permission. Pollution Policy 40312-1244 11/29/2022 to 11/29/2023 (1) The statenleflts and information in any Application and/or Questionnaire and other supplemental materials submitted to us are accurate and complete and are material to our Underwriting of this policy; (2) Those statements and the information provided are based upon representations you made to us; and (3) We have issued this policy in reliance upon your representations. b. Misrepresentation, concealment, breach of a term or condition, or violation of any duty under this policy by one insured shall not prejudice the interest of coverage for another insured under this policy. 1='rovided, however, that this condition shall not apply to any insured who is a parent, subsidiary or affiliate of the first Narned Insured, 15, Separation of Insureds Except with respect to the Limits of Insurance, and any rights or duties specifically assigned in this policy to the first Named Insured, this inst.rrance applies: a. As if each Named Insured were the only Named Insured; and b. Separately to each insured against whom claim is made or suit is brought, 16. Service of Suit In the event of our frrilure to pay any anuaunt claimed to be due hereunder, we, at your request, will submit to lffe jurisdiction of a court of competent jurisdiction within the; United States. Nothing in this condition constitutes or should be understood to constitute a waiver of our rights to commence all action in any coc.rrt of competent jurisdiction in the United States, to remove an action to a United States District Court, or to seek transfer of a case to another court as permitted by the laws of the United States or of any state in the United States, It is further agreed that service of process in such suit may be made upon counsel, Legal Department, Allied World Assurance Company (U.S.) Inc., 199 Water Street, 24" Floor, New York, NY 10038 or his or her representative, and that in any suit instituted against us upon this policy, we will abide by the final decision of such court or of any appellate cor.u-t in the event of an appeal. Further, pursuant to any statute of any state, territory, or district of the United States which makes provision therefore, we hereby designate the Superintendent, Commissioner or Director of Insurance, or other officer specified for that purpose in the statute, or his or her successors in office, as its true and lawful agent upon whom may be served any lawful process in any action, suit, or proceeding instituted by or on your behalf or any beneficiary hereunder arising out of this policy of insurance and hereby designates the above named as the person to whom the said officer is authorized to mail such process or a true copy thereof. '17. Transfer of Right. of Recovery Against Others to Us If you have rights to recover all or part of any payment we have made under this policy, those rights are transferred to us. You n')ust do nothing after loss to impair thern, At our request, you will bring suit or transfer those rights to us and help us enforce there. However, we waive our right(s) of recovery against any person or organization if and to the extent you have agreed to waive yor.ir right(s) of recovery against such person or organization in a written contract signed by you prior to the; first commencement of a pollution incident out of which the claim or request for emergency response expense arises under Section I — Coverages, 1. Insuring Agreement, ENV -CPI. 00003 00 (02/12) Page 15 of 22 Includes copyrighted material of Insurance Services Offices, Inc. with its permission. Pollution Policy #0312 1244 1 i/29/2022 to 11/29/2023 Any recovery as a result of subrogation proceedings arising out of the payment of loss covered under this policy shall accrue first to us to the extent of our payment under the policy, and then to you to the extent of your deductible. Expenses incurred in such subrogation proceedings shall be apportioned among the interested parties in the recovc-ary in the proportion that each interested party's share in the recovery bears to the total recovery. 13. transfer of Your Rights and Duties Under 'This Policy Your rights and duties under this policy may not be transferred without our written consent, which shall not be unreasonably withheld, except in the case of death of an individual Named Insured. If you die, your rights and duties will be transferred to your legal representative but only while acting within the scope of duties as your legal representative. Until your legal representative is appointed, anyone having proper temporary custody of your property will have your rights and duties but only with respect to that property. 19. When We Do Not Renew If we decide not to renew, we will mail or deliver to the; first Named Insured shown in the Declarations written notice of the nonrenewal not loss than ninety (90) days before the expiration date. If notice is mailed, proof of mailing will be sufficient proof of notice. 1, auto means: A land motor vehicle, trailer or semitrailer designed for travel on public roads, including tarty attached rnachinery or equipment, b. Any other land vehicle that is subject to a compulsory or financial responsibility law in the state where it is licensed or principally garaged. However, auto does not include mobile equipment. 2. Bodily injury means bodily injury, physical injury, sickness, building -related illness, mental anguish, shock or emotional distress or disease sustained by a person, including death resulting From any of these at any time. Bodily injury damages shall include monetary awards or settlements of compensatory damages and where allowable by law, punitive, exe.rriplary, or multiple damages, and civil fines, penalties, or a ssessrnerits for bodily injury. Claim means a demand seeking a rernedy and alleging liability or responsibility on the part of the insured. 4. Clean-up costs means reasonable and necessary expenses, including restoration costs and legal expenses incurred with our prior written consent, which consent shall not be unreasonably withheld or delayed, to investigate, abate, contain, treat, remove, remediate, monitor, or dispose of soil, surfacewater, groundwater or other contaminated media but only: a. To the extent rerlt_iired by environmental laws; For, tho.7e costs thral have beery incurred by the government or any political subdivision of the United States of America (including its territories and possessions), Puerto Rico and Canada or by third parties, or c. In the absence of a, above, to the extent recommended by an environmental professional. ENV-CPL 00003 00 (02/12) Page 16 of 22 Includes copyrighted material of Insurance Services Offices, Inc, with its permission. Pollution Policy #0312-1244 iv. Cooperate with us with respect to coordinating other applicable insurance available to the indemnitee: and (b) Provides us with written authorization to: Obtain records and other information related to the suit; and ii. Conduct and control the defense of the indemnitee in such suit. So long as the above conditions are met, attorneys' fees incurred by us in the defense of that indemnitee, necessary litigation expenses incurred by us and necessary litigation expenses incurred by the indemnitee at our request will be paid as Supplementary Payments as provided under Paragraph 2. Supplementary Payments of SECTION I -- COVERAGES of this policy. Notwithstanding the; provisions of Paragraph 1. Contractual Liability of SECTION III EXCLUSIONS of this policy, such payrne:nts will not be deemed to be damages for bodily injury, property damage, environmental damage and emergency response expense and will not reduce the limits of insurance. Our obligation to defend an insured's indemnitee and to pay for attorneys' fees and necessary litigation expenses as Supplementary Payments, as provided under Paragraph 2. Supplerilentary Payments of SECTION I — COVERAGES of this policy, ends when we have used up the applicable limit of insurance in the payment of judgments or settlements; or the conditions set forth above, or the terms of the agreernent described in paragraph (6) above, are no longer met. SECTION 11 — WHO IS AN INSURED 1. If you are designated in the Declarations as: a. An individual, you and your spouse are insureds, but only with respect to tfae conduct of a business of which you are the sole owner. b. A partnership or joint venture, you are an insured. Your members, your partners, and their spouses are, also insureds, but only with respect to the conduct of your business. c. A limited liability company, you are an insured. Your members are also insureds, but only with respect to the conduct of your business, Your managers are insureds, but only with respect to their duties as your managers. d. An organization other than a partnership, joint venture or limited liability company, you are an insured. Your executive officers and directors are insureds, but only with respect to their duties as your officers or directors. Your stockholders are also insureds, but only with respect to their liability as stockholders. e. A trust, you are an insured. Your' trustees are also insureds, but only with respect to their duties as trustees. 2. Each of the following is also an insured: a. Your volunteer workers only while performing duties related to the conduct of your business, or your employees, other than either yoc.ir executive officers (if you are an organization other than a partnership, joint venture or limited liability company) or your managers (if you are a limited liability company), but only for acts within the scope of their employment by you or while performing dutie- , related to the conduct. of your busineSS. f lowever, none of these employees or volunteer workers are insureds for: ENV.-CPL 00003 00 (02/12) Page 5 of 22 Includes copyrighted material of Insurance, Services Offices, Inc. with its permission. Pollution Policy #0312-1244 (1) Bodily injury: (a) Toyou, to your partners ormembers (if you are epartnership orjoint venture), to your members (if you are a limited |iabi|i<yoompany). to a co -employee while in Uho ooume of his or her employment or performing duties related to the conduct of your business, or to Your other Volunteer workers vvhUa performing duties related to the conduct of your buaineos� (h) To the opmma, child, porenL brother o/ aiokar of that co -employee o/ vo!unbaer worker aaaconsequence ofParagraph (1)(a)above� (u) For which ihan* is any obligation to share damages with or repay someone else who must pay damages because o[the injury described inParagraphs (1)(a) or(1)(b)above; or (d) Arising out ofhis orhor providing Or failing W provide professional health mare services (2) Property damage to property: (u) {�vned, occupied or used by. (b) Rented to, in the caro, ouaiody or control of, or over which physical control is being exercised for any purpose by YOU, any Of your ennp|myees, volunteer v/orkers, any partner or member (if you are a partnership orjoint venture), or any rneniber (if you are a limited liability company). b, Any pemon (other Nun your amp|oyvn orvo\uoieervvorker). or any organization while acting as youru,ui osta(e manager. x_ Any person or organization having proper temporary Custody of your property it you die, but Only. (1) With respect to liability arising Out of the rnainteria rice Of use of that property-, and (2) Until your legal representative has been appointed. d. Your legal representative if you die, but only with respect to duties as such, That napnaaenhaUvo will have all yuurrights and duties under (hiapolicy. a. Any subsidiary, associated, affiliated or allied Company or coqpurabon, including oubsidiaheu ihoeo[ Of Which you hove mova than 50% ownership interest at the inception of the policy period. 3. Any organization you newly acquire or [oon, other than a partnership, joint venture or limited liability company, and over which you maintain ownership or majority interest, will qualify as a Named Insured if there is no other similar insurance available to that organization. However: o. Coverage undm this provision is aJonJed oo|y uoU| the 90ih day after you acquire or form the organization or- the end u[the policy period, whi',heverisoadiar,and b, Coverage under this policy does not apply io bodily injury, property damage, environmental damuQeoremergency veopnoye expense that took place before you acquired or formed the organization; ENV-CPLOO003O0(O2/12) Page 8o[22 Includes copyrighted material o{hmurunoaServices Offices, Inc. with its permission, Pollution Policy #O312'1244 Any person ororganization with whom you agree to include as an insured in awhtten contract or written agreement, but only with respect W bodily injury, property dama0o, environmental damage o/emergency response expense arising out ofyour work. 5. Any person or organization that has aileast a 50Y6 controlling inio/eui in you but only with respect to bodily injory, property damage, environmental damage or emergency response expense arising out o[|heirfinancial control o[you. No person or organization is on insured with respect to the conduct ofany cunnni or puoi partnership, ioin\venture orlimited liability company that ia not shown as a Named Insured in the Declarations. SECTION III --- EXCLUSIONS Thisinsurance does not apply to: 1 ContruCk/ai Liability Bodily in/ury, property dmmaUe, environmental damage o/ome,Qenoy response expense for which the insured is obligated W pay damages by reason of the assumption of liability in a contract or agreement. This exclusion does not apply Wliability for damages: e. That the insured would have inthe absence o(the contract orugnaemen1;or b. Axeumnd in a conbuc< oragreemen1that is an insured contract, provided the bodily injury, property dnmaQn, environmental damage or emergency response expense occurs yubsoqunni to the execution of the xon(mo( o/ agreement. Solely for the purposes o/ liability aouunned in an insured vonhac±, reasonable attorneys' fees and necessary litigation oxpana*a incurred by or for a party other than an insured are deemed to be damages because of bodily injury, property damaQe, environmental damage or emergency response expense, provided: (1) Liobi|ityto such party for, or for the cost of, (hokpady'o defense has also been assumed in the same insured contract� an(] (2) Such attorneys' fees and litigation expenses are for defense of that party against e civil or alternative dispute resolution proceeding in which damages to which this insurance applies are alleged. 2. Criminal Fines, Penalties and Assessments Any criminal fines, criminal penalties orcriminal assessments. 3. Damage to Conveyance Property damagnioany conveyance utilized during transportation This exclusion does, riot apply to claims nmde by Uhird-party oaniom for such property damage arising from the inuxed'x negligence. 4. Darnage to Property Property damage or environmental damage to: a. Property You mwn, nani, Or Occupy including any costs or expenses incurred by YOU, orany other pe/son, organization or entity, for repair, ep|aoement, enhonoement, restoration or maintenance Includes copyrighted material o[hnsumncoServices Officun. Inc. with its permission. SECTION 00 62 13 PERFORMANCE BOND THE STATE OF TEXAS KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT That we, _ Wright Construction Co., Inc. herein and Merchants_ Bonding Comoanv (Mutual) ,_ 0062 13- 1 PERFORMANCE BOND Page 1 of 3 Bond # TXC616879 , known as "Principal" _ , a corporate surety(sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, D.R. Horton-Texas,_LTD, authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum of, Four Million Three Hundred Ei.Rhty One Thousand One Hundred Sixty One and Fifty Five Cents (54,381.161.55), lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to be made jointly unto the Developer and the City as dual obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, Developer and City have entered into an Agreement for the construction of community facilities in the City of Fort Worth by and through a Community Facilities Agreement, CFA Number 23- 0006; and WHEREAS, the Principal has entered into a certain written contract with the Developer awarded the 26th day of _ APrii___ , 20 23 , which Contract is hereby referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and other accessories defined by law, in the prosecution of the Work, including any Change Orders, as provided for in said Contract designated as BELTMILL PHASE 2. NOW, THEREFORE, the condition of this obligation is such that if the said Principal shall faithfully perform it obligations under the Contract and shall in all respects duly and faithfully perform the Work, including Change Orders, under the Contract, according to the plans, specifications, and contract documents therein referred to, and as well during any period of extension of the Contract that may be granted on Lhe part of the Developer and/or City, then this obligation shall be and become null and void, otherwise to remain in full force and effect. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS City Project No, 104381 Revised January 31, 2012 006213-2 PERFORMANCE BOND Page 2 of 3 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statue. IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by duly authorized agents and officers on this the 26th ^day of April . 20 23 ATTEST: „ ( irincip 1) Secretary ILI, as to Principal PRINCIPAL: ,ht Co _..rUCti mpany Inc-- --- _ .. BY: _ Signature � 1 Name and Title Address: 601 W Wall St Gra4)evine .TX 76051 SURETY - Bonding Compaq iviut g r BY; Signature _CrystalLanahorn. Attorney-in-Fsact Name and Title Address: P.O. Box 14498 Des Moines.lA_50306_3.49B _. - - --v--_ 515-243-8171 � Witness as to Surety Kim Bracamonte Telephone Number: CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised January 31, 2012 0062 13- 1 PERFORMANCE BOND Page 3 of3 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised January 31, 2012 006214-1 PAYMENT BOND Page 1 of 3 Bond # TXC616879 1 SECTION 00 62 1.4 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, Wright Construction Co., Inc, known as 8 "Principal" herein, and Merchants Bonding Compa�Mutual)_i. a _---- 9 corporate surety ( or sureties if more than one), duly authorized to do business in the State of 10 Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the 11 Developer, D.R. Horton_TexaS LTD, authorized to do business in Texas "(Developer"), and the 12 City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum of Four Million 13 Three Hundred Eighty__One Thousand One Hundred _ Sixty One and Fifty Five Cents 1.4 (`, _ 8116155), lawful money of the United States, to be paid in Fort Worth, Tarrant County, 15 Texas, for the payment of which sum well and truly be made jointly unto the Developer and the 1.6 City as dual obligees, we bind ourselves, our heirs, executors, administrators, successors and 17 assigns, jointly and severally, firmly by these presents: 18 WHEREAS, Developer and City have entered into an Agreement for the construction of 19 community facilities in the City of Fort Worth, by and through a Community Facilities 20 Agreement, CFA Number23-0006; and 21 WHEREAS, Principal has entered into a certain written Contract with Developer, 22 awarded the 26th —day of _April _ 20 23 , which Contract is hereby 23 referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all 24 materials, equipment, labor and other accessories as defined by law, in the prosecution of the 25 Work as provided for in said Contract and designated as BELTMILL PHASE-2, 26 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if Principal shall 27 pay all monies owing to any (and all) payment bond beneficiary (as defined in Chapter 2253 of 28 the Texas Government Code, as amended) in the prosecution of the Work under the Contract, CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised January 31, 2012 006214-2 PAYMENT BOND Page 2 of 3 1 then this obligation shall be and become null and void; otherwise to remain in full force and 2 effect. 3 This bond is made and executed in compliance with the provisions of Chapter 2253 of 4 the Texas Government Code, as amended, and all liabilities on this bond shall be determined in 5 accordance with the provisions of said statute. 6 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED this 7 instrument by duly authorized agents and officers on this the 26th day of g April ___, 20 23 9 ATTEST: {Princip I) Secretary Witness as to Principal CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 PRINCIPAL: Name and Title Address: 601 W Wall St Grapevine, TX 76051 BELTMILL PHASE 2 City Project No. 104381 006214-3 PAYMENT BOND Page 3 of 3 SURETY: Merchants Bonding Company,(Mutual�_ ATTEST: BY: U %'A-lt&18- Signature N/A Crystal Langhorn, Attorney-inFact (Surety) Secretary Name and Title Witness as to Surety Kim Bracamonte Address: P.O. Box 14498 Des Moines, IA 50306-3498 Telephone Number: 515-243-8171 1 2 Note: If signed by an officer of the Surety, there must be on file a certified extract from the 3 bylaws showing that this person has authority to sign such obligation. If Surety's physical 4 address is different from its mailing address, both must be provided. S 6 The date of the bond shall not be prior to the date the Contract is awarded. 7 END OF SECTION F1 CITY OF FORT WORTH SELTMILL PHASE 2 STANDARD CITY CONDI I IONS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised January 31, 201.2 00 62 19 - 1 MAINTENANCE BOND Page 1 of 3 Bond # TXC616879 1 SECTION 00 62 19 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we Wright Construction,Co.. Inc. _. known as 8 "Principal" herein and Merchants Bonding Company (Mutual) _ a corporate surety 9 (sureties, if more than one) duly authorized to do business in the State of Texas, known as 10 "Surety" herein (whether one or more), are held and firmly bound unto the Developer, D.R. 11 Horton -Texas, LTD, authorized to do business in Texas ("Developer") and the City of Fort Worth, a 12 Texas municipal corporation ("City"), in the sum of Four Million Three Hundred Eighty One 13 Thousand One Hundred Sixty One and Fifty_ Five Cents ($4381,161.55), lawful money of the 14 United States, to be paid in Fort Worth, Tarrant County, Texas, for payment of which sum well 15 and truly be made jointly unto the Developer and the City as dual obligees and their successors, 16 we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and 17 severally, firmly by these presents. 0 19 WHEREAS, Developer and City have entered into an Agreement for the construction of 20 community facilities in the City of Fort Worth by and through a Community Facilities Agreement, 21 CFA Number 23-0006;and 22 WHEREAS, the Principal has entered into a certain written contract with the Developer 23 awarded the 26th day of April , 20 23 , which Contract is 24 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish 25 all materials, equipment labor and other accessories as defined by law, in the prosecution of the 26 Work, including any Work resulting from a duly authorized Change Order (collectively herein, the 27 "Work") as provided for in said Contract and designated as BELTMILL PHASE 2; and in CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised January 31, 2012 006219-2 MAINTENANCE BOND Page 2 of 3 1 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 2 accordance with the plans, specifications and Contract Documents that the Work is and will 3 remain free from defects in materials or workmanship for and during the period of two (2) years 4 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and 5 6 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon 7 receiving notice from the Developer and/or City of the need thereof at any time within the 8 Maintenance Period, 9 10 NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy 11 any defective Work, for which timely notice was provided by Developer or City, to a completion 12 satisfactory to the City, then this obligation shall become null and void; otherwise to remain in 13 full force and effect. 14 15 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely 16 noticed defective Work, it is agreed that the Developer or City may cause any and all such 17 defective Work to be repaired and/or reconstructed with all associated costs thereof being 18 borne by the Principal and the Surety under this Maintenance Bond; and 19 20 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 21 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 22 Worth Division; and 23 24 PROVIDED FURTHER, that this obligation shall be continuous in nature and successive 25 recoveries may be had hereon for successive breaches, m CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised January 31, 2012 006219-3 MAINTENANCE BOND Page 3 of 3 1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the. _ 26th day of Aril _._-__ 3 20 23 , 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 .21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 ATTEST: Pnnci al) Secretary Witness as to Principal Witness as to Surety Kim Bracamonte PRINCIPAL. Wright Constru 'on C nv, lc BY: _ - ignatur Name and Title Address: 601 W Wall St Grapevine, TX 76051 SURETY: Merchants Bonding Company (,,,,Autual) ---------- - _- rr Signature `� Y Crystal Langhorn. Att-orney_in-F_aca._.- Name and Title Address: P.O. Box 14498 _ _.--_Des Moines—IA.50306-3498 Telephone Number: ___ 51.5-243-8171 38 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 39 from the by-laws showing that this person has authority to sign such obligation. If 40 Surety's physical address is different from its mailing address, both must be provided. 41 42 The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CITY CONDITIONS— DEVELOPER AWARDED PROJECTS City Project No, 104381. Revised January 31, 2012 MERCHANTS'%�\ BONDING COMPANY - POWER OF ATTORNEY Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., both being corporations of the State of Iowa, d/b/a Merchants National Indemnity Company (in California only) (herein collectively called the "Companies") do hereby make, constitute and appoint, individually, Adam Syswerda; Crystal Langhorn; Dustin Parker; Elena Sells; Lanny Land; Steven W Lewis their true and lawful Attorney(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. This Power -of -Attorney is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Directors of Merchants National Bonding, Inc., on October 16, 2015. "The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof." "The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed." In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the Attorney -in -Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attorney -in -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner - Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 8th day of December 2022 .•'��(\ONq �''•. ." .. CQ •.• MERCHANTS BONDING COMPANY (MUTUAL) •. ,,, •. • MERCHANTS NATIONAL BONDING, INC. .O'� ; •O�' (�PQ 'Oq'. d/b/a MERCHANTS NATIONAL INDEMNITY COMPANY .,�y:�o q�;. y; , m.�o Rq;;.s,�: lie c� •ti fi: 2003 ; �p; y 1933 c: By .. �b d -• O� ''. ; ' 1.` •'. •. �' • • ' ' �1 .' President STATE OF IOWA .... Sol- •"•" • 'ii •..•• COUNTY OF DALLAS ss. On this 8th day of December 2022 before me appeared Larry Taylor, to me personally known, who being by me duly sworn did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. hF :' Kim Lee Commission Number 702737 fi F�i �fF. fly Commission Expires � April 14, 2024 Notary Public (Expiration of notary's commission does not invalidate this instrument) I, William Warner, Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. ' 1 In Witness Whereof, I have hereunto set my hand and affixed tl•na seal of the Companies on this �` day of �®23 �i'o • •.............. ..... .... �10N4�•. .• �0 y,y". C2 LP Of? �•. L%/' ?gi2G _p_ 2003 : �' +1933� Secretary -� .ti. POA 0018 (10/22)"'"" MERCHANTS BONDING COMPANY,,, MERCHANTS BONDING COMPANY (MUTUAL) • MERCHANTS NATIONAL BONDING, INC. P.O. BOX 14498 , DES MOINES, IOWA 50306-3498 (800) 678-8171 • (515) 243-3854 FAX IMPORTANT NOTICE Have a complaint or need help? If you have a problem with a claim or your premium, call your insurance company first. If you can't work out the issue, the Texas Department of Insurance may be able to help. Even if you file a complaint with the Texas Department of Insurance, you should also file a complaint or appeal through your insurance company. If you don't, you may lose your right to appeal. Merchants Bonding Company (Mutual) To get information or file a complaint with your insurance company: Call: Compliance Officer at 800-678-8171 Toll -free: 1-800-678-8171 Email: regulatory@merchantsbonding.com Mail: P.O. Box 14498, Des Moines, IA 50306-3498 To get insurance information you may also contact your agent: Steven W. Lewis - Box Bonding Agency Call: 817-865-1515 Mail: 1200 S. Main Street, #1600, Grapevine, TX 76051 The Texas Department of insurance To get help with an insurance question or file a complaint with the state: Call with a question: 1-800-252-3439 File a complaint: www.tdi.texas.gov Email: ConsumerProtection@tdi.texas.gov Mail: MC 111-1A, P.O. Box 149091, Austin, TX 78714-9091 SUP 0032 TX (11/19) GLENN THURMAN, INC UNIT PRICE BID Bidlist Item f No. k 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information Description 00 42 43_SPecaock Proposal Form DAP - 81D PROPOSAL Page 1 of 2 Bidder's Application Specification Unit of Bid Section No. I Measure Quantity UNIT IV: PAVING JIHPROVEMENTS 3213.0101 6" Conc Pvmt 321313 9999.0006 7.5" Conc Pvmt 00 00 00 3213.0105 10" Conc Pvmt 32 13 13 3213.0301 4" Conc Sidewalk 32 13 20 9999.0007 4" Conc. Sidewalk (6' Wide) 00 00 00 9999.0008 4" Conc. Sidewalk (10' Wide) 00 00 00 3211.0501 6" Lime Treatment 32 11 29 3211.0502 B" Lime Treatment 32 11 29 3211.04 Hydrated Lime 32 11 29 3213,0501 Barrier Free Ramp, Type R-1 32 13 20 3213.0506 Barrier Free Ramp, Type P-1 32 13 20 9999.6009 Barrier Free Ramp, Type P-1 (10' Wide) 00 00 00 9999.001 Truck Apron 00 00 00 9999,0011 End -of -Road Barricade 00 00 00 9999.0012 Remove End -of -Road Barricade 00 00 00 0241.1300 Remove Conc Pvmt 0241 15 0241,1100 Remove Asphalt Pvmt 0241 15 3471.0001 Traffic Control 3471 13 9999,0013 Sawcut Asphalt Pavement 00 00 00 9999 0014 Sawcut Concrete Curb & Gutter 00 00 00 3217.0002 4" SLD Pvm€ Marking HAS (Y) 32 17 23 32172103 REFL Raised Marker TY 11-A A 32 17 23 3217.1002 Lane Legend Arrow 32 17 23 3217.1004 Lane Legend Only 32 17 23 3217,0201 W SLD Pvmt Marking HAS (W) 32 172.3 3217.2104 REFL Raised Marker TY II-C-R 32 17 23 9999.0015 18" SLO Pvmt Marking HAS (Y) 00 00 00 3217.0101 6" SLD Pvmt Mal -King HAS (VV) 32 IT 23 3217 0102 6" SLO Pvrrt Marking HAS (Y)„ 32 17 23 3441.4006 install Alum Sign Ground Mount 3441 30 9999.003 Remove Alum Sign Ground Mount 00 00 00 Bidder's Proposal Unit Price I Bid Value SY 21152 $52.90 SY 8613 S58.85 SY 4234 $84.95 SF 9290 $7Y5 SF 6586 $7.75 SF 18928 $7.75 SY 22611 $5.20 SY 13562 $5A5 TN 584 $292.00 EA 12 $2.800.00 Ell, 12 $2, 300.00 EA 6 $2,900.00 SF 580 $26.75 EA 4 $1,100.00 EA 4 $350.00 SY 2124 $18.00 SY 3175 $12.00 MID 1 $2,500.00 LF 45 $30.00 LF 29 $20,00 LF 3850 $1.40 EA 58 $5.00 EA 2 $375.00 EA 1 $500.00 LF 222 $2.75 EA 11 $5.00 LF 130 $12.50 LF 72 %2.1 s LF 2026 $2.15 EA 23 $6W.00 EA 3 $125.00 TOTAL-UbffIV: PAVING_tMPROVEMMM, 1 $1,118,940.80 $489,649.05 $359,67B.30 $71,997.50 $51,041.50 $146,692.00 $117,577.20 $73,912.90 $170, 528.00 $33,600.00 $27,600-CO $17,400.00 $15,515.00 $4,400.00 $1,400,00 $38,232.00 $38,100.00 $2,500.00 $1,350.00 $580.00 $5,390.00 $290.00 $750.00 $500.00 $610.50 $55.00 $1,625 00 $154 00 $4,355.90 $11,500.00 $375.00 $21806T300.451 GI?Y OF FORT WORTH STANDAPD CONSTRUCTION SPFC[FICATION DOCUMENTS - GEVELOPFR AWARDED PRDJECTS Fc+€m Version Ap€il 2,21114 00 42 45_ Bid Form Paving 00 42 43_SpecBaak Proposal Fonn DAP - BID PROPOSAL Page 2 of 2 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL. FORM UNIT PRICE BID Bidder's Application Hid Summary UNIT IV: PAVING IMPROVEMENTS _ $2,506,300.45 Total Construction 8id� $2,806.300.45I This Sid is submitted by the entity named below: BIDDER: BY: GL N 1 HUTRMA . INC. Glenn Thurman, Inc % P.O. Box 850842 LC Mesquite, TX 75185-0842 TITi 817-534-1743 DATE: Contractor agrees to complete WORK for FINAL ACCEPTANCE within 75 calendar days after the date when the CONTRACT commences to run as provided in the General Conditions END OF SECTION CITY OF FORT WDRTH STANDARD CONSTRUCTION SPECi.TICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Pcrrn Vwsion Apd 2, 2C14 OL 42 43_ Sid Earth Paving QU 45 12 DAP PREQUALOC.AT[ON S'TA"TEMBN'r Page t of 1 SECTION 00 45 t2 DAP — PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Maior Work Type" box provide the complete major work tvDe and actual description as provided by the Water Denartment for water and sewer and TPW for oavine. Major Work Type Contractor/Subcontractor Company Name I Prequalification Expiration Date Concrete Con/Recon Unlimited Glenn Thurman, Inc 7/l/2023 Asphalt Con/Recon Unlimited The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: Glenn Thurman, Inc BY: P.O. Box 850842 Mesquite, TX 75185-0842 (Sig ture) TITLE: yONTRACI MMAW DATE: Y/Z X /?'bZ. ) END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION PREO[JALIFICATION STATEMENT — DEVELOPER AWARDED PROJECTS Form Version September 1, 2015 00 45 12_Prequalificatl.on Statement 2015_DAP 00 4s 26 - 1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 1 SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 4 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it 5 provides worker's compensation insurance coverage for all of its employees employed on City 6 Project No. 104381. Contractor further certifies that, pursuant to Texas Labor Code, Section 7 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with 8 worker's compensation coverage. 9 CONTRACTOR: 10 Glenn Thurman, Inc 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 By: CKA) S*PJ J-,4 L/ Company (PI se ri P.O. Box 850842 Signature: Address MesQUite,TX75185-0842 Title: VIGE—PRESIDENT City/State/Zip (Please Print) THE STATE OF TEXAS § COUNTY OF TAT § BEFORE ME, t e u ersign authority, on this day personally appeared elk ` =strumw�t , known to me to be the person whose name is subscribed to the foregoing nd acknowledged to me that he/she executed the same as the act and deed of �ff _ for the purposes and consideration therein expressed and in the capacity t t e GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of r 200X3' - _ __................ c. Trail A. Meek = Notary Public in and for the State of Te Notary Public, State of Texas IDIF 1064$144 =cND OF SECTION My Commission Expires 0610612024 CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 104381 Revised April 2, 2014 Deveicper A,%,3•ded ?rejec, Agreerne^t Page P ai S 1 SECTION 00 52 43 2 AGREEMENT 3 THIS AGREEMENT, authorized on Vii/p—,wis made by and between the Developer, D.R. d Horton -Texas. LTD,, authorized to do business in Texas ('Developer), and Glenn Thurman, Inc., 5 authorized to do business in Texas, acting by and through its duly authorized representative, 6 ("Contractor"). 7 Article 1. WORK 8 Contractor shall complete all !Mork as specified or indicated in the Contract Documents for the 9 Project identified herein. 10 Article 2. PROJECT The project for which the Work under the Contract Documents may be the whole or only a part 2 is generally described as follows: 13 BELTMiLL PHASE 2 14 C_ Lty Pro'e�ct_No. S043$1_ 15 Article 3. CONTRACT TIME 16 3.1 Time is of the essence. 17 All time Ilmits for Milestones, if any. and Final Acceptance as stated in the Contract :8 Documents are of the essence to this Contract. 19 3.2 Final Acceptance, 20 The Worts will be complete for Final Acceptance within JL51 working days after the date 21 when the Contract Time commences to run as provided in Paragraph 12.04 of the 22 Standard City Conditions of the Construction Contract for Developer Awarded Projects. 23 23.3 I:. •,, damages 24 25 vriji-sti #sr f'vi r a4 f f stc if t. 26"Ac-ewit �fzI-;— In 4 i 27 V t 1iZn1r%E 28 a..�Gr_ nt, V 0C L.fJ 29 3C eompleted-on-4ime. :nC t^, ra :If , V_MI1<aG%F agrees Z17Y OF FORT WORTH SELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Clpq Project No.104381 Revised line 16, 2016 005243-2 DevcAoper Awarded Project Agreement Page 2 of 5 31 i 32 welvelerv, C9 -4 ) ,fQF eaeh day that expims afteF the timei 33 soeRif ed Hi RaF e_-_..4. 3.2 fOF Pinal-Acceptance t"I . C4 issu..c-rtb 1 34 "EEePt-. RGe 35 Article 4. CONTRACT PRICE 36 Developer agrees to pay Contractor for performance of the Work in accordance With the 37 Contract documents an amount in current funds of Two Million Eieht Hundred Six Thousand 38 Three Hundred and Forty -Five Cents ($ 2,806.300.45). 39 Article S. CONTRACT DOCUMENTS 44 5.1 CONTENTS: 41 A. The Contract Documents which comprise the entire agreement between Developer 42 and Contractor concerning the Work consist of the following: 43 1. This Agreement. 44 2. Attachments to this Agreement: 45 a. Bid Form (As provided by Developer) 46 1) Proposal Form (DAP Version) 47 2) Prequalification Statement 48 31 State and Federal documents (project specific) 49 b. insurance ACORD Form(s) 50 c. Payment Bond (DAP Version) 51 d. Performance Bond (DAP Version) 52 e. Maintenance Bond (DAP Version) 53 f. Power of Attorney for the Bonds 54 g. Worker's Compensation Affidavit 55 h. MBE and/or SSE Commitment Form (If required) 56 3. Standard City General Conditions of the Construction Contract for Developer 57 Awarded Projects, 58 4, Supplementary Conditions. CrY OF FORT WORTH SELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS City Project No. IG4381 Aevfsed Tune 16, 2016 005243-3 Devefeper Awarded Project Agreement Page 3 of 5 59 5. Specifications specifically made a part of the Contract Documents by attachment 60 or, if not attached, as incorporated by reference and described in the Table of 61 Contents of the Project's Contract Documents. 62 6. Drawings. 63 7. Addenda. 64 8. Documentation submitted by Contractor prior to Notice of Award. 65 9. The following which may be delivered or issued after the Effective Date of the 66 Agreement and, if issued, become an incorporated part of the Contract 67 Documents: 68 a. Notice to Proceed. 69 b. Field Orders. 70 c. Change Orders. 71 d. Letter of Final Acceptance. 72 Article 6. INDEMNIFICATION 73 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 74 expense, the city, its officers, servants and employees, from and against any and all 75 claims arising out of, or alleged to arise out of, the work and services to be performed by 76 the contractor, Its officers, agents, employees, subcontractors, licenses or invitees under 77 this contract. This Indemnification Provision Is svecificaliv intended to overate and be 78 effective even If It Is alleged or Proven that all or some of the dama¢es being sought 79 were caused, in whole or in Part, by anv act. omission or negligence of the city. This 80 indemnity provision is intended to include, without limitation, indemnity for costs, 81 expenses and legal fees incurred by the city in defending against such claims and causes 82 of actions. 83 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 84 the city, its officers, servants and employees, from and against any and all loss, damage 85 or destruction of property of the city, arising out of, or alleged to arise out of, the work 86 and services to be performed by the contractor, its officers, agents, employees, 87 subcontractors, licensees or invitees under this contract. This indemnification Provision 88 is specifically Intended to overate and be effective even If it Is alleged or Proven that all 89 or some of the damaees being sought were caused. in whole or in part. by anv act, 90 omission or negligence of the city. 91 CITY OF FORT WORTH BELTIMiLL PRASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised June 16, 2016 005243-4 Developer Awarded Project Agreement Page 4 of 5 92 Article 7. MISCELLANEOUS 93 7.1 Terms. 94 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of 95 the Construction Contract for Developer Awarded Projects. 96 7.2 Assignment of Contract. 97 This Agreement, including all of the Contract Documents may not be assigned by the 98 Contractor without the advanced express written consent of the Developer. 99 7.3 Successors and Assigns. 100 Developer and Contractor each binds itself, its partners, successors, assigns and legal 101 representatives to the other party hereto, in respect to all covenants, agreements and 102 obligations contained in the Contract Documents. 103 7.4 Severability. 104 Any provision or part of the Contract Documents held to be unconstitutional, void or 105 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 106 remaining provisions shall continue to be valid and binding upon DEVELOPER and 107 CONTRACTOR. 108 7.5 Governing Law and Venue. 109 This Agreement, including all of the Contract Documents is performable in the State of 110 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 111 Northern District of Texas, Fort Worth Division. 112 7.6 Authority to Sign. 113 Contractor shall attach evidence of authority to sign Agreement, if other than duly 114 authorized signatory of the Contractor. 115 116 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple 117 counterparts. 118 119 This Agreement is effective as of the last date signed by the Parties ("Effective Date"). 120 CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised June 16, 2016 121 005243-5 Developer Awarded Project Agreement Page 5 of 5 Contractor: Developer: Glenn Thurman, Inc D.R. Horton -TEXAS, LTD By: By: nature) ��— gnature) C4*0 S4-Ad J u,�,� �i�✓ c��G (Printed Name) (Printed-lGame) Title: tri�Dp/�!T«„ ES�QEN 1� Title: Company Name: Glenn Thurman, Inc Company name: D.R. HORTON-TEXAS, LTD Address: Address: P.O. Box 850842 City/State/Zip: Mesquite, TX 75185-0842 Yl.,N/24,Z-3 Date 67S1 NORTH FREEWAY City/State/Zip: FORT WORTH, TX 76131 y�ZY /2�23 Date CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS Revised June 16, 2016 BELTMILL PHASE 2 City Project No. 104381 ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Illinois, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois (herein collectively called the "Companies"), by Robert D. Murray, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute, and appoint Ricardo J. REYNA, Tina MCEWAN, [ion E. CORNELL, Joshua SAUNDERS, Robbi MORALES, Sophinie HUNTER, Kelly A. WESTBROOK, Tonic PETRANEK, Mikaela PEPPERS of Dallas, Texas, EACH, its true and lawful agent and Attorney -in - Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: any and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their own proper persons. The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of the By -Laws of said Companies, and is now in force. IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this I Ith day of May, A.D. 2021. ATTEST: ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND By: Robert D. Vurray flee President By. Dawn E. Brown Secretary State of Maryland County of Baltimore On this I Ith day of May, A.D. 2021, before the subscriber; a Notary Public of the State of Maryland, duly commissioned and qualified, Robert D. Murray, Vice President and Dawn E. Brown, Secretary of the Companies, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and acknowledged the execution of same, and being by me duly swom, deposeth and saith, that he/she is the said officer of the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and that the said Corporate Seals and the signature as such officer werc duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seat the day and year first above written. fir, d:lr Constance A. Dunn, Notary Public My Commission Expires: July 9, 2023 �! NniLIL1 Authenticity of this bond can be confirmed at bon dvalidator.zurich na.com or 410-559-8790 Texas Important Notice IMPORTANT NOTICE To obtain information or make a complaint: You may call Zurich North America's toll -free telephone number for information or to make a complaint at: 1-800-382-2150 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights, or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P.O. Box 149104 Austin, TX 78714-9104 Fax: (512) 490-1007 Web: www.tdi.texas.gov E-mail: ConsumerProtection@tdi.texas.gov PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim, you should contact the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. 0 ZURICH AVISO IMPORTANTE Para obtener information o para presentar una queja: Usted puede Ilamar al numero de telefono gratuito de Zurich North America's para obtener information o para presentar una queja al: 1-800-382-2150 Usted puede comunicarse con el Departamento de Se- guros de Texas para obtener information sobre com- panias, coberturas, derechos, o quejas al: 1-800-252-3439 Usted puede escribir al Departamento de Seguros de Texas a: P.O. Box 149104 Austin, TX 78714-9104 Fax: (512) 490-1007 Sitio web: www.tdi.texas.gov E-mail: ConsumerProtection@tdi.texas.gov DISPUTAS POR PRIMAS DE SEGUROS O RECLAMACIONES: Si tiene una disputa relacionada con su prima de seguro o con una reclamation, usted debe comunicarse con la compania primero. Si Ia disputa no es resuelta, usted puede comunicarse con el Departamento de Seguros de Texas. ADJUNTE ESTE AVISO A SU POLIZA: Este aviso es solamente para propositos informativos y no se con- vierte en parte o en condition del documento adjunto. U-GU-296-E (06115) Page 1 of 1 Bond #9425909 C05214-1 PAYMENT 60ND Page 1 of 3 1 SECTION 00 6214 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, Glenn Thurman, Inc. known as Colonial American Casualty and Surety Company and 8 "Principal" herein, and Fidelity and Deposit Company of Maryland a 9 corporate surety ( or sureties if more than one), duly authorized to do business in the State of 10 Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the 11 Developer, D.R. Horton -Texas. LTD, authorized to do business in Texas "(Developer"), and the 12 City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum of Two Million Eight 13 Hundred Six Thousand Three Hundred and Fortv-Five Cents ($2,806.300.45), lawful money of the 14 United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum 15 well and truly be made jointly unto the Developer and the City as dual obligees, we bind 16 ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, 17 firmly by these presents: 18 WHEREAS, Developer and City have entered into an Agreement for the construction of 19 community facilities in the City of Fort Worth, by and through a Community Facilities 20 Agreement, CFA Number23-0006; and 21 WHEREAS, Principal has entered into a certain written Contract with Developer, 22 awarded the ;?q day of 1VT, 1 , 20 z)3 , which Contract is hereby 23 referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all 24 materials, equipment, labor and other accessories as defined by law, in the prosecution of the 25 Work as provided for in said Contract and designated as BELTMILL PHASE 2. 26 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if Principal shall 27 pay all monies owing to any (and all) payment bond beneficiary (as defined in Chapter 2253 of 28 the Texas Government Code, as amended) in the prosecution of the Work under the Contract, CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised January 31. 2012 006214-2 PAYMENT BOND Page 2of3 1 then this obligation shall be and become null and void; otherwise to remain in full force and 2 effect. 3 This bond is made and executed in compliance with the provisions of Chapter 2253 of 4 the Texas Government Code, as amended, and all liabilities on this bond shall be determined in 5 accordance with the provisions of said statute. 6 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED this 7 instrument by duly authorized agents and officers on this the a2`( day of 8 �I Prr) 20, 3_ 9 ATTEST: ,.- (Principal) Sec�etafy r Witness as to Principal CI 1 r OF FORT WORTH STANDARD CTY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 PRINCIPAL: Glenn Thurman. Inc r A By. Signature f VICE=PRESIDENT Name and Title Address: P.O. Box 850842 Mesquite. TX 75185-0842 BELTMILL PHASE 2 City Project No. 104381 1 2 3 4 5 6 7 8 00 62 14 - 3 PAYMENT BOND Page 3 of 3 SURETY: Colonial American Casualty and Surety Company and Fidelity and Deposit Company of Maryland ATTEST: BY: < WL 1Z 6 r Signature n I,�n jo'k 11 4,C, Sophinie Hunter, Attorney -In -Fact (Surety) Secretary Name and Title Address: 5005 LBJ Freeway, Suite 1500 Dallas, TX 75244 Witness as to Surety Telephone Number: 214-989-0000 Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. END OF SECTION CITY OF FORT WORTH SELTMILL PHASE 2 STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Clty Protect No. 104381 Revised January 31, 2012 Bond #9425909 006213-1 PERFORMANCE BOND Pagel of 3 SECTION 00 62 13 PERFORMANCE BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we, Glenn Thurman, Inc. known as "Principal' Colonial American Casualty and Surety Company and herein and Fidelity and Deposit Company of Maryland a corporate surety(sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, D.R. Horton -Texas, LTD, authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum of, Two Million Eieht Hundred Six Thousand Three Hundred and Fortv- Five Cents ($2.806.300.45), lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to be made jointly unto the Developer and the City as dual obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, Developer and City have entered into an Agreement for the construction of community facilities in the City of Fort Worth by and through a Community Facilities Agreement, CFA Number 23- 0006; and WHEREAS, the Principal has entered into a certain written contract with the Developer awarded the day of .46- ( 20,'/, which Contract is hereby referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and other accessories defined by law, in the prosecution of the Work, including any Change Orders, as provided for in said Contract designated as BELTMILL PHASE 2. NOW, THEREFORE, the condition of this obligation is such that if the said Principal shall faithfully perform it obligations under the Contract and shall in all respects duly and faithfully perform the Work, including Change Orders, under the Contract, according to the plans, specifications, and contract documents therein referred to, and as well during any period of extension of the Contract that may be granted on the part of the Developer and/or City, then this obligation shall be and become null and void, otherwise to remain in full force and effect. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised January 31, 2012 006213-2 PERFORMANCE BOND Page 2 of 3 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statue. IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by duly authorized agents and officers on this the _day of IVI" I , 20�3 ATTEST: (Principal) Seereterr Trti��✓S tie/ Il2 e .E Witness as to Principal, PRINCIPAL: Glean Thurmc BY: 2 �j// Signature GtoD SA.J Tu r#/J kAVICE PREWDENTi Name and Title Address: P.O. Box 850842 Mesauite. TX 75185-0842 SURETY: Colonial American Casualty and Surety Company and Fidelity and Deposit Company ^off Maryland *Sgture Sophinie Hunter, Attorney -in -Fact Name and Title Address: 5005 LBJ Freeway, Suite 1500 Dallas, TX 75244 Witness as to Surety Telephone Number: 214-989-0000 CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised January 31, 2012 0062 13 - 1 PERFORMANCE BOND Page 3 of 3 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CITY CONDITIONS -DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised January 31, 2012 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 THE STATE OF TEXAS § SECTION 00 6219 MAINTENANCE BOND § KNOW ALL BY THESE PRESENTS: Bond #9425909 006219-1 MAINTENANCE BOND Page 1 of 3 COUNTY OF TARRANT § That we Glenn Thurman, Inc. known as Colonial American Casualty and Surety Company and "Principal" herein and Fidelity and Deposit Company of Maryland a corporate surety (sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, D.R. Horton -Texas. LTD. authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in the sum of Two Million Eieht Hundred Six Thousand Three Hundred and Fortv-Five Cents (S2.806.300.45), lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment of which sum well and truly be made jointly unto the Developer and the City as dual obligees and their successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. 19 WHEREAS, Developer and City have entered into an Agreement for the construction of 20 community facilities in the City of Fort Worth by and through a Community Facilities Agreement, 21 CFA Number 23-0006;and 22 WHEREAS, the Principal has entered into a certain written contract with the Developer 23 awarded the )q day of Ofr 20�3 , which Contract is 24 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish 25 all materials, equipment labor and other accessories as defined by law, in the prosecution of the 26 Work, including any Work resulting from a duly authorized Change Order (collectively, herein, the 27 "Work') as provided for in said Contract and designated as BELTMILL PHASE 2; and 28 CITY CF FORT WORTH BELTMILL PHASE 2 STANDARD CITY CONDITICNS —DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised January 31, 2012 006219-2 MAINTENANCE BOND Page 2 of 3 1 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 2 accordance with the plans, specifications and Contract Documents that the Work is and will 3 remain free from defects in materials or workmanship for and during the period of two (2) years 4 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and 5 6 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon 7 receiving notice from the Developer and/or City of the need thereof at any time within the 8 Maintenance Period. 9 10 NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy 11 any defective Work, for which timely notice was provided by Developer or City, to a completion 12 satisfactory to the City, then this obligation shall become null and void; otherwise to remain in 13 full force and effect. 14 15 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely 16 noticed defective Work, it is agreed that the Developer or City may cause any and all such 17 defective Work to be repaired and/or reconstructed with all associated costs thereof being 18 borne by the Principal and the Surety under this Maintenance Bond; and 19 20 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 21 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 22 Worth Division; and 23 24 PROVIDED FURTHER, that this obligation shall be continuous in nature and successive 25 recoveries may be had hereon for successive breaches. 26 CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised January 31, 2012 006219-3 MAINTENANCE BOND Page 3 of 3 1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the q day of 3 2023. 4 S 6 7 8 9 10 ATTEST: ` it 12 13 (Principal)4eeretary —ry 14 / '�'' 15 16 17 18 19 Witness as to Principal 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Witness as to Surety t3i 36 37 PRINCIPAL: Glenn T TI , ,fin By: Signature C 1.440 Stw TU'f'J 410E-;;-PRES I DENT Name and Title Address: P.O. Box 858042 Mesquite. TX 7518S-0842 SURETY: Colonial American Casualty and Surety Company and Fidelity and Deposit Company of Maryland BY: AM Si nature Sophinie Hunter, Attorney -In -Fact Name and Title Address: 5005 LBJ freeway, Suite 1500 Dallas, TX 75244 Telephone Number: 214-989-0000 38 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 39 from the by-laws showing that this person has authority to sign such obligation. If 40 Surety's physical address is different from its mailing address, both must be provided. 41 42 The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH BELTMFLL PHASE 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised January 31, 2012 INDEPENDENT UTILITY CONSTRUCTION, INC UNIT PRICE BID 3idlist item No. 1 2 3 4 5 6 7 8 9 1a 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 36 39 40 41 42 43 44 45 SECTION 00 42 43 Developer awarded Projects - PROPOSAL FORM 00 42 43_3=800k P-POSA poem DAP - BID PROPOSAL Paps 1 of 2 Bidder's Application Prgeet Item Information udder's Proposal Descnptian SpeeiCtcatian 1 Section No Unit of Measure Bid Quantity Unit Price , Bid V ai�2 UNIT V: STREET LIGHTING 414PRQVEMOTS. 2605.3015 2" CONOT PVC SCH 30 M 26 65 33 LF 36M $17.14 $61,704.00 3441.305 Furnishflnstali LED Lighting Fixture (70 watt 3441 20 Ell 41 S313.00 $12,333.00 3441.3301 Rdwy Ilium Foundation TY 1,2, and 4 3441 20 EA 41 $1,233.00 S50.553.00 3441.3351 Fumishllnstail Rdway ilium TY 11 Pale 34 41 20 EA 40 $1,9219M $77.120.00 3441.1646 Fumishllnstali Type 3313 Arm 34 4120 EA 40 $236.00 $9,440.00 3441.141 NO 10 Insulated Elec Condr 3441 10 LF 11235 $114 $11931.40 3441,1403 NO 6 Tri*x OH insulated Elec Condr 3441 10 LF 1065 $7.00 $7.45&00 3441.3051 FurniWnstall LED Lightinq Fixture (137 watt 3441 20 EA 4 5550.00 $2,200.00 3441.3323 Furniahllnstait B' Wand Light Pale Arm 34 41 20 EA 4 $500-00 S2,000.00 3441 3502 Relocate Street Light Pole 34 41 20 EA 1 $5t1A.00 $500.00 3441.1501 FumishAnstah Ground Box Type 3 3441 20 EA 1 MOM $7110.00 TOTAL. UNITY:. STRt LtGHTiNG 1MPR0VFWJLNTS Did Summary UNIT V: STREET LIGHTING 1MPROVEMENTS CITY OF FOR? JyORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version Apr# 2. 2014 - $23$436.40 $238,436.401 L€g" contract term 2023-02-14 I- X 42 43_SpemAi Propose! Farts DAP - 81D PROPOSAL ?age 2 of 2 SECTION 00 42 43 Deve{oper Awa+ried Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Toni Constructlort Sidl $238,436.401, This Bid is submit by the entity named below ry BIDDER: gy; a.,- Independent Utility Construction, Inc 5109 Sun Valley On" Fort Worth, TX 76119 TITLE: Pr",dent `r / 617-4TS-4"4 DATE: 2,14 2f: 3 Contractor egress to complete WORK for FINAL. ACCEPTANCE within 45 wont€ng days after the daft when [he CONTRACT commences to run as provided in the Gerwrei Conditions. END OF SECTION CITY OF =CRT WORTH STANDARD CONSTRUCTQN SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version A;" 2, 20114 Lgh" m.10 iMm 2023-02-14 0045 12 DAP PREQUALIFICATTON STATEMENT Page I of I SECTION 00 45 12 DAP — PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the `'Maior Work Type" box provide the complete maior work tvDe and actual description as Drovided bv_ the Water Department for water and sewer and TPW for pavinc, Major Work Type Contractor/Subcontractor Company Name Street Lighting Independent Utility Construction, Inc Prequalification Expiration Date 2/27/2025 - The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: Independent Utility Construction, Inc 5109 Sun Valley Drive Fort Worth, TX 75119 BY: c Wolfe (Signature) TITLE: President DATE: 04/19/2023 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION PREQUAEI FICATION STATEMENT— DEVELOPER AWARDED PROJECTS Form Version September 1, 2015 00 45 12_Prequafillcarion Statement 2015_DAP 00 45 26 - 1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page lof 1 1 SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 4 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it 5 provides Worker's compensation insurance coverage for all of its employees employed on City 6 Project No. 104381. Contractor further certifies that, pursuant to Texas Labor Code, Section 7 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with 8 worker's compensation coverage. 9 CONTRACTOR: 10 11 Independent Utilitv Construction, Inc 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 Company 5109 Sun Vallev Drive Address Fort Worth, TX 76109 City/State/Zip THE STATE OF TEXAS § COUNTY OF TARRANT § By: Richard Wolfe Please Print) Signature: Title: President (Please Print) BEFORE ME, the undersigned authority, on this day personally appeared Richard Wolfe , known to me to be the person whose name is subscribed to the foregoing instrument. and acknowiedeed to me that he/she executed the same as the act and deed of Independent Utility Construction, Inc, for the purposes and consideration therein expressed and in the capacity therein stated. z GIVEN UNDER MY HAND AND SEAL OF OFFICE this y day of r1 J { t - "JUJi", CHRISTINA GARCIA �r ... Notary Public, State of Texas Z`P^i•'r,z Comm. Expires 12-20-2024 Notary Public in and for the State of Texas �',F.••�i� Notary ID 13©g60785 46 OF SECTION CITY OF FORT WORTH BELTM ILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.104381 Revised April 2, 2014 IMPORTANT NOTICE To obtain information or make a complaint: You may call Westfield Insurance Company's and/or Ohio Farmers Insurance Company's toll -free telephone number for information or to make a complaint at: 1-800-368-3597 You may also write to Westfield Insurance Company and/or Ohio Farmers insurance Company at: 555 Republic Drive, Suite 460 Plano, Texas 75074-8848 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: httA://www.tdi.state.tx.us E-mail: ConsumerProtection(a7tdi.state.tx_us. PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent or Westfield insurance Company and/or Ohio Farmers Insurance Comppny first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. AVISO IMPORTANTE Para obtener informacion o para someter una queja: Usted puede Ilamar al numero de telefono gratis de Westfield Insurance Company's I Ohio Farmers Insurance Company's para informacion o para someter una queja al: 1-800-368-3597 Listed tambien puede escribir a Westfield Insurance Company / Ohio Farmers Insurance Company: 556 Republic Drive, Suite 460 Plano, Texas 75074-8848 Puede comunicarse con el Departamento de Seguros de Texas para obtener informacion acerca de companias, coberturas, derechos o quejas al: 1-800-252-3439 Puede escribir al Departamento de Seguros de Texas: P. O. Sox 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: httr)://www.tdi.state.tx.us E-mail: Cons umerProtection(a7tdi.state. tx.us DISPUTES SOBRE PRIMAS O RECLAMOS: Si tiene una disputa concerniente a su prima o a un reclamo, debe comunicarse con el agente o Westfield Insurance Company I Ohio Farmers Insurance Company primero. Si no se resuelve la disputa, puede entonces comunicarse con el departamento (TDI). UNA ESTE AVISO A SU POLIZA: Este aviso es solo para proposito de informacion y no se convierte en parte o condic"son del documento adjunto. THIS POWER OF ATTORNEY SUPERCEDES ANY PREVIOUS POWER BEARING; ItliS SAMt POWER # AND ISSUED PRIOR TO 04120111. FOR ANY PERSON OR PERSONS NAMED BELOW. General POWER NO. 4220052 06 Power Westfield Insurance Co. of Attorney Westfield National Insurance Co. Ohio Farmers Insurance Co. CERTIFIED COPY Westfield Center, Ohio Know All Men by These Presents, That WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, corporations, hereinafter referred to individually as a -Company" and collectively as -Companies,- duly organized and existing under the laws of the State of Ohio, and having its principal office in Westfield Center, Medina County, Chic, do by these presents make, constitute and appoint CHARLES D. SWEENEY. MICHAEL A. SWEENEY. KYLE W. SWEENEY. ELIZABETH GRAY. JOINTLY OR SEVERALLY of FORT WORTH and State of TX its true and lawful Attorney(s)-in-Fact, with full power and authority nereby conferred in its name, place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings, or other instruments or contracts of suretyship- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - LIMITATION: THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE GUARANTEE, OR BANK DEPOSITORY BONDS. and to bind any of the Companies thereby as fully and to the same extent as if such bonds were signed by the President, sealed with the corporate seal or the applicable Company and duly attested by its Secretary, hereby ratifying and confirming ail that the said Attorney(s) -in -Fact may do in the premises- Said appointment is made under and by authority of the following resolution adopted by the Board of Directors of each of the WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY: 'Be It Resolved, that the President, any Senior Executive, any Secretary or any Fidelity & Surety Operations Executive or other Executive shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attorneys) -in -Fact to represent and act for and on behaff of the Company subject to the following provisions: The Attorney -in -Fact. may be given full power and authority for and in the name of and on behalf of the Company, to execute, acknowledge and deliver, any and all bonds, recognizances, contracts, agreements of indemnity and other conditional or obligatory undertakings and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attorney -in -Fact shall be as binding upon the Company as if signed by the President and sealed and attested by the Corporate Secretary.' Be it Further Resolved, that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signatures or facsimile seal shalt be valid and binding upon the Company with respect to any bond or undertaking to which it is attached." (Each adopted at a meeting held on February B, 2000). In Witness Whereof, WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY have caused these presents to be signed by their Senior Executive and their corporate seals to be hereto affixed this 20th day of APRIL A.D., 2011 . Corporate �,,.'"«. "'«.,, ...,..„<,..., ,,,«.k.,.,.•• Seals wd�yR'� c`�• , �p�� �at °4s - +Q�i1[5((��, WESTFIELD INSURANCE COMPANY Affixed ' .av=� p_• WESTFIELD NATIONAL INSURANCE COMPANY ' F z C f� T .�: OHIO FARMERS INSURANCE COMPANY 'k :•,rr1 1848 State of Ohio } ' "•"' By: Richard L. Kinnaird, Jr., National Surety Leader and County of Medina ss.: Senior Executive On this 20th day of APRIL A.D., 2011 , before me personally came Richard L. Kinnaird, Jr. to me known, who, being by me duty sworn, did depose and say, that he resides to Medina, Ohio; that he is Senior Exectftive of WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, the companies described in and which executed the. above instrument; that he knows the seats of said Companies; that the seals affixed to said instrument are such corporate seals; that they were so affixed by order of the Boards of Directors of said Companies; and that he signed his name thereto by like order - Notarial Seal Affixed ``p''�\u11•%i' F "t 1 • William J. Kaheiin, A rney at Law, Notary Public State of Ohio p My Commission Does Not Expire (Sec. 147.03 Ohio Revised Code) County of Medina ss.: z- q CO F 0' •••�'•w,nn„ 1, Frank A. Carrino, Secretary of WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said Companies, which is still in full force and effect; and furthermore, the resolutions of the Boards of Directors, set out in the Power of Attorney are in full force and effect. In Witness Whereof, [ have hereunto set my hand and affixed the seals of said Companies at Westfield Center, Ohio, this day of EALiF 'SEAL 1848 BPOAC2 (combined) (06-02) ,Secretary Sernztarp Frank A. Carrino, Se:.refary A,CCO CERTIFICATE OF LIABILITY INSURANCE °A E(M `°D"YYY' 0411412023 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLYAND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTERTHE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Joyce Womack I NAME. The Sweeney Company PHONE I . . _ I i_Ax_. (817) as7-724sEx,,:( ) -arCNo]: 1121 E. Loop 820 South MANoI Joyce@1hesweeneyco com I ADDRESS: P O BOX 8720 I INSURERISI AFFORDING COVERAGE NAIC C Fort Worth TX 718124-0720 INSURER A : Am Gas Co of Reading, PA 20427 INSURED .... .-..-....... ., Continental Casualty Co 20443 INSURER 6 : Independent Utility Construction, Ii €Nsui c : Travelers Property Casualty Company of America 25574 5109 Sun Vafiey Drive I INSURER D : Texas Mutual Insurance Company 22945 INSURER E : Fort Worth TX 76119-6411 I INSURER F : I 1 COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS iS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD iNDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT MATH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR 'Ai SUER' LTR I TYPE OF INSURANCE INSD WVD POLICY NUMBER POLICY EFF 1 POLICY FafP fMOLIC YEFF I IM_OLIC1_YYY_Y_4 I LIMITS X _ COMMERCIAL GENERAL LIABILITY CLAIMS-MAL3E ❑X OCCUR 0 1 EACH OCCURRENCE 1 DAMAGE TO RENTED - -- $ PREMiSES lEa g 1,000,004 $ 100,DOf] CONTRACTUAL acc,irre—) 15.000 A XI XCU 6076055350 NED EXP (Any orre person) �PERSONALBADVINJURY S 1013112022 10/3112023 S 1,000,000 GEN'LAGGREGATE DMI7 APPLIES PER. I GENERALAGGREGATE S 2,000,000 POLICY I JPECI ❑ LOC I PRODUCTS -COMPfOPAGG 5 2,000,000 OTHER. 1,000 Ded per PD Occ Lmtd Pollution"Sites" s 1,000,000 AUTOMOBILE LIABILITY ( COMBINED SINGLE LIMIT S 1.000,000 —�� XF ANY AUTO I (EaaccideMt I BODILY INJURY (Per person) s B --� OWNED AUTOS ONLY HIRED AUTOS ONLY SCHEDULED AUTOS NON -OWNED AUTOS ONLY 6076055364 111131121122 10/3112021 BOi INJURY (Per acadantl PROPERTY DAMAGE Per acddenl) S S X UMBRELLA LIAR iG OCCUR C EXCESSLIAR CLAIMS -MADE CUP-6S456123-22-NF ( CEO I XI RETENTIONS 10,000 WORKERS COMPENSATION AND EMPLOYERS' LIABILITY Y I N D ANY PR OPRIETORIPARTNERIEXECUi OFFICER/MEMBER EXCLUDE➢7 r NIA 0013713602 (Mandatory €n NH) If yes, describe under DESCRIPTION OF OPERATIONS bi I EACH OCCURRENCE S 3.000,000 10/31/2022 10/31/2023 I AGGREGATE S 3,000,000 rr Is X STATUTE I I ERA I E.L. EACHACCIDEN7 5 1.000000 10/31/2022 10l33l2023 I E.L. DISEASE-EAEMPLOYEE I S 1,000,000 E.L.DISEASE -POLICY LIMIT IS "000,000 i DESCRIPTION OF OPERATIONS 1 LOCATIONS! VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached it more space is required) City Project No. 104381 FID No. 30114-0200431-1 D4381-E07685 Beltmill Phs 2_ WC, GL & auto include a blanket automatic waiver of subrogation endorsement & the GL, auto include a bianket automatic additional insured endorsement providing additional insured & waiver of subrogation status to the certificate holder only when there is a written contract between the named insured & the certificate hoider that requires such status. The additional insured endorsements contains special primary & noncontributory wording. Umbrella follows form. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN City of Fart Worth ACCORDANCE WITH THE POLICY PROVISIONS. 20C Texas Si REPRESENTATIVE Ft Worth I TX 7fi102AUTHORIZEDATHORIZEO ©1888-2016 ACORD CORPORATION. All rights reserved. ACORD 25 (21 The ACORD name and logo are registered marks of ACORD aEC`71014 52 43 tt00 3 THIS AGREEMENT. ; o- y1���23 i ,raie by air: oewe :.it, Ho,-t3r--exas. Lr�-' 3u&_ i Zej :. :IC -?xas e,,eE ooe, ' 3CL+ exas, act:ve 5Y acid 'ti.-- .. 2.9--_ 3 as 9 Article 1. WORK 12 Article 2 Pft7iECT SEt'tbt ' If PHASE 2 C tv Proiect Vo. 104381 Ar"cle 3 CONTRACT TWE e `DJC:..-rers 3-e 1. --e asiE"C2 .. ;'ics 3.2 -af AccapLar-e- 2r --e Worx -*e 4 ;,e = m,o1ete ,r~r =:Rat Acceo*a"ce N tft: ? cwr c-iC -g lays after —e iate T-!ne :.or—ntnces 1�? as (3r7'.itie''v P13r3gr3oh 12.04 :,' >',e -e --?"9Sr *'orj -- 9;n 3- . ;.- J?ve,o t€'."-�Mt3:'^ar 25 _ 28 _ l 29 _seiays, _ sTAriCAR#J'w`+ST?•,:,.�•.�*a ��>_;F, ^0047+;•CiMEV'i-:;g+rs �)G£ AwARDE:?'RG)£c,s 1cv �'*m}err.f Mu. :4M3:1 ievrse� lure :5 ?J.S L-cl 5 43 ' Ceve{Cpe! AWG2d R,^�Ji@£t ?.�:'2$R12RE 3? 32 L ryt; r 33 zhak ai dawage6 �BF de'ay jhWA RF1 if V@Aalty�, GQPARewlo: 0d, 2�j 34 Leila 1Cj . 33 345 4EieptaPCE 37 Article 4. CONTRACT PRICE 38 Developer agrees to pay ontracter for performance of the Work in accordance with the 39 Contract Documents an amount in current funds of Two Hundred Thirtv F61ht Thousand Four 40 Hundred Thirty Sir, and ForTv Cents ;;5_238,436.40 j. 41 Article S. CONTRACT DOCUMENTS 42 5.1 CONTENT5: 43 A. T'le Contract Documents vhicn comprise the entire agreement between Develooer 44 and Contractor --orcerr"sng the Work corsist of the following: 45 1 T^is Agreement_ 46 2. Attachments to this Agreement: 47 a. Bid Fo►rn (As provided by Developer l 48 11 Proposal, Form (DAP Version) 49 2) P:equa4fication -Statement 50 31 State and Federai documents (project specific) 51 b_ Insurance .ACORD Forms? 52 c. Partnent Bond (DAP Version; 53 d. Performance Bond (DAP Version)' 54 a Maintenance Bond (DAP Version) 55 f. Power of Attorney for the Bonds 56 g. Worker's Compensation Affidavit 57 h. MBE and/or SSE Commitment Form (if required) 58 3_ Standard City General Conditions of the Construction Contract for Developer 59 Awarded Projects. MY OF FORT 'OVO TFI 3El.TIMFLL PWASE 2 3TANOARD COk5TRUC E ION SPECIRCADON `jOCW WNTS - NVELJPER AWAAEED PROJE(75 Zity PMPKI Mo. 104381 Revised>Li 16,2DI6 OOS243-3 Developer Awarded Project Agreement Page 3 of S 60 4. Supplementary Conditions. 61 5. Specifications specifically made a part of the Contract Documents by attachment 62 or, if not attached, as incorporated by reference and described in the Table of 63 Contents of the Project's Contract Documents. 64 6. Drawings, 65 7. Addenda. 66 8. Documentation submitted by Contractor prior to Notice of Award. 67 9. The following which may be delivered or issued after the Effective Date of the 68 Agreement and, if issued, become an incorporated part of the Contract 69 Documents: 70 a. Notice to Proceed. 71 b. Field Orders. 72 c. Change Orders. 73 d. Letter of Final Acceptance. 74 Article 6. INDEMNIFICATION 75 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 76 expense, the city, its officers, servants and employees, from and against any and all 77 claims arising out of, or alleged to arise out of, the work and services to be performed by 78 the contractor, its officers, agents, employees, subcontractors, licenses or invitees under 79 this contract. This indemnification provision is soecifical(v intended to operate and be 80 effective even if it is alleged or Proven that all or some of the damages being sought 81 were caused, in whole or in Part, by anv act, omission or neali>zence of the city. This 82 indemnity provision is intended to include, without limitation, indemnity for costs, 83 expenses and legal fees incurred by the city in defending against such claims and causes 84 of actions. 85 86 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 87 the city, its officers, servants and employees, from and against any and all loss, damage 88 or destruction of property of the city, arising out of, or alleged to arise out of, the work 89 and services to be performed by the contractor, its officers, agents, employees, 90 subcontractors, licensees or invitees under this contract. This indemnification provision 91 is specificaliv intended to operate and be effective even if it is alleged or proven that all CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCT[ON SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS City Project No. 104391 Revised June 16, 2016 00 52 43 - 4 Developer Awarded Project Agreement Page 4 of 5 92 or some of the damages being sought were caused, in whole or in cart, by anv act, 93 omission or negligence of the city. 94 95 Article 7. MISCELLANEOUS 96 7.1 Terms. 97 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of 98 the Construction Contract for Developer Awarded Projects. 99 7.2 Assignment of Contract. 100 This Agreement, including all of the Contract Documents may not be assigned by the 101 Contractor without the advanced express written consent of the Developer. 102 7.3 Successors and Assigns. 103 Developer and Contractor each binds itself, its partners, successors, assigns and legal 104 representatives to the other party hereto, in respect to all covenants, agreements and 105 obligations contained in the Contract Documents. 106 7.4 Severabiiity 107 Any provision or part of the Contract Documents held to be unconstitutional, void or 108 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 109 remaining provisions shad continue to be valid and binding upon DEVELOPER and 110 CONTRACTOR. 111 7.5 Governing Law and Venue. 112 This Agreement, including all of the Contract Documents is performable in the State of 113 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 114 Northern District of Texas, Fort Worth Division. 115 116 7.6 Authority to Sign. 117 Contractor shall attach evidence of authority to sign Agreement, if other than duly 118 authorized signatory of the Contractor. 119 CITY OF FORT WORTH BELTMLL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised June 16, 2016 120 121 122 123 124 125 0052i3-5 Developer Awarded Project Agreement Page 5 of 5 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple counterparts. This Agreement is effective as of the last date signed by the Parties ("Effective Date"). Contractor: Independent Utility Construction, Inc By: (Signature) Richard Wolfe (Printed Name) Title: President Company Name: Independent Utility Construction, Inc Address: 5109 Sun Valley Drive City/State/Zip: Fort Worth, TX 76119 Date `����� OONSTRU, C:TY OF FOR=1@ 1ITH ,� �� .1, STANDARD i4016CTION SPECIFIC:-JIBfV-FOCU Revised Junel.�j••.;97:.•�y,`�w rir1111 7_EXA1_11 Developer: D.R. Horton -TEXAS, LTD By: (Signature) (Printed Name) Title: Company name: D.R. HORTON-TEXAS, LTD Address: 6751 NORTH FREEWAY City/State/Zip: FORT WORTH, Tx.76131 l I �Zn 23 Date - r-- — — DEVELOPER AWARDED PROJECTS BELTMILL PHASE 2 City Project No. 104381 il0ol 131 PERI'ORMANCF BOND Page 1 c1 2 Bond No. 260825J 1 SECTION 00 62 13 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § That we, Independent Utilitv Construction. Inc. known as "Principal" herein and 8 Westfield Insurance Cpmpanv a corporate surety(sureties, if more than one) duly 9 authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), 10 are held and firmly bound unto the Developer, D.R. HORTON —Texas. LTD, authorized to do I 1 business in Texas ("Developer') and the City of Fort Worth, a Texas municipal corporation 12 ("City"), in the penal sum of, Two Hundred Thirty-Eieht Thousand. Four Hundred Thiu-ty-Six 13 Dollars & Forty Cents ($238,436.40) lawful money of the United States, to be paid in Fort Worth, 14 Tarrant County, Texas for the payment of which sum well and truly to be made, jointly unto the 15 Developer and the City as dual obliges, we bind ourselves, our heirs, executors, administrators, 16 successors and assigns, jointly and severally, firmly by these presents. 17 WHEREAS, Developer and City have entered into an Agreement for the construction of 18 community facilities in the City of Fort Worth by and through a Community Facilities Agreement, 19 CFA Number 23-0006 : and 20 WHEREAS, the Principal has entered into a certain written contract with the Developer 21 awarded the /Rday of Afrl I . 20L which Contract is hereby referred to and 22 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment 23 labor and other accessories defined by law; in the prosecution of the Work, including any Change 24 Orders, as provided for in said Contract designated as Street Liehtine Improvements to serve 25 Beltmill Phase 2. 26 NOW, THEREFORE, the condition of this obligation is such that if the said Principal 27 shall faithfully perform it obligations under the Contract and shall in all respects duly and faithfully 28 perform the Work, including Change Orders, under the Contract, according to the plans, 29 specifications, and contract documents therein referred to, and as well during any period of 30 extension of the Contract that may be granted on the part of the Developer and/or City, then this 31 obligation shall be and become null and void, otherwise to remain in full force and effect. 32 33 CITY OF FORT WORTH Beltmill Phase 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PRO)ECTS City Project No 104381 Revised January 31,2012 006113-2 PERFORMANCE aOND Page _ of-2 Bond No. 260825J I PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall tie in 2 . Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 3 Worth Division. 4 This bond is made and executed in compliance with the provisions of Chapter 2253 or the 5 Texas Government Code, as amended, and all liabilities on this bond shall he determined in 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 33 39 40 41 42 43 accordance with the provisions of said statue. PI WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by duly authorized agents and officers on this the /day of I/°r' I , 20V AT gj, ecretary Morgan Wolfe W'imess as to Principal Christina Garcia Witnes;Hs to Surety Elizabeth Gray PRINCIPAL: INDEPENDENT UTILITY CONSTR&TI ON. INC. BY: _ tore Richard Wolfe. President Nance and Title Address: 5109 Sun Vallev Drive Fort Worth, Texas 76119 SURETY: WESTFIELD INSURANCE COMPANY BY: a - Signature Kyle W_ Sweenev. Attorney -in -Fact Nance and Title Address: 555 Republic Drive. Suite 450 Plano, Texas 75074 Telephone Number: 972-516-2600 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. if Surety's physical address is different from its trailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH Beltmdi Phase 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104331 Revised January 31 2012 Ot;ill 14 PAYNILN 1 BOY_ Page I of 2 Bond No. 260825J I SECTION 00 62 14 2 PAYMENT BOND I ,I THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, Indeoendent Utility Construction. Inc. , known as "Principal" herein, 8 and Westfield Insurance Comoanv , a corporate surety (or sureties if more than 9 one), duly authorized to do business in the State of Texas, known as 'Surety" herein (whether one 10 or more), are held and firmly bound unto the Developer D.R. HORTON — Texas. LTD, t I authorized to do business in -['eras ("Developer"), and the City of Fort Worth.. a Texas municipal 12 corporation ("City"), in the penal sum of Two Hundred Thirty -Eight Thousand. Four Hundred 13 Thirty -Six Dollars & Forty Cents ($238.436.40) lawfiil money of the United States, to be paid in 14 Fort Worth, Tarrant County; Texas, foi- the payment of which sum well and truly be made jointly I unto the Developer and City as dual obligees, we bind ourselves. our heirs, executors, 16 administrators, successors and assigns, jointly and severally, firmly by these presents: 17 WHEREAS, Developer and City have entered into an Agreement for the construction of IS community facilities in the City of Fort Worth, by and through a Community Facilities 19 Agreement, CFA Number 23-0006 , and 20 WHEREAS, Principal has entered into a certain written Contract with Developer, 21 awarded the 19 day of #r' / , 24which Contract is hereby referred to and 22 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment. 23 labor and other accessories as defined by law, in the prosecution of the Work as provided for in 24 said Contract and designated as Street Litrhtina IMDrovements to serve Beltmill Phase 2. 25 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 26 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 2' Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 28 the Contract, then this obligation shall be and become null and void, otherwise to remain in full 29 force and effect. 30 31 CITY OF FORT WORTH Behmdl Phase 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Cii.- i'rolcct No !,A38i ReNrised .lanuary 31 . 2012 0061 la 2 PAYMEN r BOND Page 2 of 2 Bond No. 260825J 1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statute. 4 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED 5 this instrument by duly authorized agents and officers on this the/� day of A-�' 1 . 20;q 6 7 8 9 IQ I� 12 13 t1l"ice �: ( rinc )Secretary Moan Wolfe t�'d � Witness as to Principal Christina Garcia ATTEST: (Surety) Secretary Frank A. Carrino WitnessIgs to Surety Elizabeth PRINCIPAL: INDEPENDEVT UTILITY CONSTRA'1 ION. INC. BY: j w< Signature Richard Wolfe. President Name and Title Address: 5109 Sun Valley Drive Fort Worth. Texas 76119 SURETY: W'ESTFIELD INSURANCE COMPANY BY: ,(�! Si ature Kvle W. Sweeney. Attorney -in -Fact Name and Title Address: 555 ReDublic Drive. Suite 450 Plano, Texas 75074 Telephone Number: 972-516-2600 Note: if signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. END OF SECTION CITY OF FORT WORTtt 13c4hmN Phax STANDARD CrrY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104331 Revised Iatitrary 31, 2012 006219-3 MAINTENANCE BOND Page 3 of 3 Bond No. 260825J I IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the _ day of 20 3 4 5 6 7 8 9 !0 11 12 13 14 15 16 l7 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 ATT f ( r cip Secretary Morgan Wolfe n i'w Witness as to Principal Christina Garcia ATTEST_ (Surety) Secretary Frank A. C rino Witness& to Surety Elizabeth Gray PRINCIPAL: INDEPENDANT UTILITY CONSTR 10N,11 C.� BY: �( 5 ure Richard Wolfe. President Name and Title Address: 5109 Sun Valley Drive Fort Worth. Texas 761 19 SURETY: WESTFIELD INSURANCE COMPANY BY: /Kg?natu e Kyle W. Sweeney. Attornev-in-Fact Nance and Title Address: 555 ReDublic Drive, Suite 450 Plano, Texas 75074 Telephone Number: 972-516-2600 *Note: If signed by an officer of the Sudety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both trust be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF TORT WORTH Belhnill Please 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised January 31, 2012 006219-' MAINTENANCE BOND Page I or 3 Bond No. 260825.E SECTION 00 62 19 \/IAINTF,NANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 3 That we Independent Utility Construction. Inc. , known as "Principal' herein and 9 Westfield Insurance COInDany , a corporate surety (sureties, if more than one) duly 10 authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), 1 I are held and firmly bound unto the Developer, D.R. HORTON - Texas. LTD, authorized to do I business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation 13 ("City"), in the sum of Two Hundred Thirty-Eieht Thousand. Four Hundred Thirty -fix Dollars & 14 Forty Cents ($238.436.40) lawful money of the United States, to be paid in Fort Worth, Tarrant 15 County, Texas, for payment of which sum well and truly be made jointly unto the Developer and 16 the City as dual obligees and their successors, we bind ourselves, our heirs, executors, 17 administrators, successors and assigns, jointly and severally, firmly by these presents. 18 19 WHEREAS, Developer and City have entered into an Agreement for the construction of 20 community facilities in the City of Fort Worth by and through a Community Facilities 21 Agreement, CFA Number 23-0006 ; and 22 23 24 25 26 27 28 29 30 31 32 33 34 WHEREAS, the Princioal has entered into a certain written contract with the Developer awarded the /� day of %e� 20;2rwhich Contract is hereby referred to and a made part hereof for all purposes as if fully set fortis herein, to furnish all materials, equipment labor and other accessories as defined by law, in the prosecution of the Work, including any Work resulting from a duly authorized Change Order (collectively herein, the "Work") as provided for in said Contract and designated as Street Liehtine improvements to serve Beltmill Phase 2; and WHEREAS, Principal binds itself to use such materials and to so construct the Work in accordance with the plans, speci fications and Contract Documents that the Work is and will remain free from defects in materials or workmanship for and during the period of two (2) years after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and CITY OF FORT WORTH 130mi l Phase 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJFCTS City Project No I(M331 Revised January 31, 2012 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 00521c,-3 41AIN-ENANCF BOND Page 3 01,3 Bond No. 260825J IN WITNESS WHEREOF, the Principal and the SLUety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the R day of ATT r i t: r cip� Secretary Morgan Wolfe 4 Witness as to Principal Christina Garcia ATTEST: (Surety) Secretary Frank2rino _ uattwitness s to Surety Elizabeth Gray v PRINCIPAL: INDEPENDENT UTILITY CONSTRI-/V1710N. (NC. BY: &6t SW, tire — Richard Wolfe, President Name and Title Address 5109 Sun Valley Drive Fort Worth. Texas 76119 SURETY: WE TFIELD INSURANCE; COMPANY 8 Y : gnature ,�� Kyle W. Sweeney, Attorney -in -Fact Name and Title Address: 555 Reoublic Drive. Suite 450 Plano, Texas 75074 Telephone Number: 972 16-2600 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation- If Surety's physical address is different from its mailing address, both trust be provided_ The date of the bond shall not be prior to the date the Contract is awarded - CITY Of FOR I' WORTH s-rANDARD CITY CONDITIONS - DEVELOPFR AWARDED PROJECTS Revised Jaiwaty 31, 2012 Mundt Phase 2 City Protect No 104381 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS TABLE OF CONTENTS Page Article 1— Definitions and Terminology.......................................................................................................1 1.01 Defined Terms..........................................................................................................................1 1.02 Terminology.............................................................................................................................5 Article 2 — Preliminary Matters.....................................................................................................................6 2.01 Before Starting Construction.....................................................................................................6 2.02 Preconstruction Conference......................................................................................................6 2.03 Public Meeting..........................................................................................................................6 Article 3 — Contract Documents and Amending............................................................................................6 3.01 Reference Standards..................................................................................................................6 3.02 Amending and Supplementing Contract Documents................................................................ 6 Article4 — Bonds and Insurance....................................................................................................................7 4.01 Licensed Sureties and Insurers..................................................................................................7 4.02 Performance, Payment, and Maintenance Bonds...................................................................... 7 4.03 Certificates of Insurance............................................................................................................7 4.04 Contractor's Insurance..............................................................................................................9 4.05 Acceptance of Bonds and Insurance; Option to Replace........................................................ 12 Article 5 — Contractor's Responsibilities.....................................................................................................12 5.01 Supervision and Superintendent............................................................................................. 12 5.02 Labor; Working Hours........................................................................................................... 13 5.03 Services, Materials, and Equipment....................................................................................... 13 5.04 Project Schedule.................................................................................................................... 14 5.05 Substitutes and "Or-Equals"................................................................................................... 14 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors) ................................... 16 5.07 Concerning Subcontractors, Suppliers, and Others................................................................. 16 5.08 Wage Rates............................................................................................................................ 18 5.09 Patent Fees and Royalties....................................................................................................... 19 5.10 Laws and Regulations............................................................................................................ 19 5.11 Use of Site and Other Areas................................................................................................... 19 5.12 Record Documents................................................................................................................. 20 5.13 Safety and Protection............................................................................................................. 21 5.14 Safety Representative............................................................................................................. 21 5.15 Hazard Communication Programs......................................................................................... 22 5.16 Submittals.............................................................................................................................. 22 5.17 Contractor's General Warranty and Guarantee....................................................................... 23 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 5.18 Indemnification...................................................................................................................... 24 5.19 Delegation of Professional Design Services........................................................................... 24 5.20 Right to Audit: ....................................................................................................................... 25 5.21 Nondiscrimination.................................................................................................................25 Article 6 - Other Work at the Site...............................................................................................................26 6.01 Related Work at Site.............................................................................................................. 26 Article 7 - City's Responsibilities.............................................................................................................. 26 7.01 Inspections, Tests, and Approvals.......................................................................................... 26 7.02 Limitations on City's Responsibilities................................................................................... 26 7.03 Compliance with Safety Program........................................................................................... 27 Article 8 - City's Observation Status During Construction..........................................................................27 8.01 City's Project Representative................................................................................................. 27 8.02 Authorized Variations in Work.............................................................................................. 27 8.03 Rejecting Defective Work...................................................................................................... 27 8.04 Determinations for Work Performed...................................................................................... 28 Article9 - Changes in the Work................................................................................................................. 28 9.01 Authorized Changes in the Work........................................................................................... 28 9.02 Notification to Surety............................................................................................................. 28 Article 10 - Change of Contract Price; Change of Contract Time................................................................28 10.01 Change of Contract Price....................................................................................................... 28 10.02 Change of Contract Time....................................................................................................... 28 10.03 Delays.................................................................................................................................... 28 Article 11 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work ....................... 29 11.01 Notice of Defects................................................................................................................... 29 11.02 Access to Work...................................................................................................................... 29 11.03 Tests and Inspections............................................................................................................. 29 11.04 Uncovering Work................................................................................................................... 30 11.05 City May Stop the Work........................................................................................................ 30 11.06 Correction or Removal of Defective Work............................................................................. 30 11.07 Correction Period................................................................................................................... 30 11.08 City May Correct Defective Work......................................................................................... 31 Article12 - Completion............................................................................................................................. 32 12.01 Contractor's Warranty of Title............................................................................................... 32 12.02 Partial Utilization................................................................................................................... 32 12.03 Final Inspection..................................................................................................................... 32 12.04 Final Acceptance................................................................................................................... 33 Article13 - Suspension of Work.................................................................................................................33 13.01 City May Suspend Work........................................................................................................ 33 Article14 - Miscellaneous......................................................................................................................... 34 14.01 Giving Notice........................................................................................................................ 34 CITY OF FORT WORTH STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 14.02 Computation of Times................................................................. 14.03 Cumulative Remedies.................................................................. 14.04 Survival of Obligations................................................................ 14.05 Headings...................................................................................... CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 ....................................... 34 ....................................... 34 ....................................... 35 ....................................... 35 00 73 10-1 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Pagel of35 ARTICLE 1— DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Agreement - The written instrument which is evidence of the agreement between Developer and Contractor covering the Work 2. Asbestos —Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 3. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 4. Buzzsaw — City's on-line, electronic document management and collaboration system. 5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. 6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf. 7. Community Facilities Agreement (CFA) --A Contract between the Developer and the City for the Construction of one or more following public facilities within the City public right-of- way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs. A CFA may include private facilities within the right-of-way dedicated as private right-of- way or easement on a recorded plat. 8. Contract —The entire and integrated written document incorporating the Contract Documents between the Developer, Contractor, and/or City concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 9. Contract Documents —Those items that make up the contract and which must include the Agreement, and it's attachments such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: a. An Agreement CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 2 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 2 of 35 b. Attachments to the Agreement i. Bid Form ii. Vendor Compliance with State Law Non -Resident Bidder iii. Prequalification Statement C. Current Prevailing Wage Rates Table (if required by City) d. Insurance Accord Form e. Payment Bond f. Performance Bond g. Maintenance Bond h. Power of Attorney for Bonds i. Workers Compensation Affidavit j. MWBE Commitment Form( If required by City) k. General Conditions 1. Supplementary Conditions in. The Standard City Conditions n. Specifications specifically made part of the Contract Documents by attachment, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents O. Drawings p. Documentation submitted by contractor prior to Notice of Award. q. The following which may be delivered or issued after the effective date if the Agreement and, if issued become an incorporated part of the Contract Documents i. Notice to Proceed ii. Field Orders iii. Change Orders iv. Letters of Final Acceptance r. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 10. Contractor —The individual or entity with whom Developer has entered into the Agreement. 11. Day or day —A day, unless otherwise defined, shall mean a Calendar Day. 12. Developer — An individual or entity that desires to make certain improvements within the City of Fort Worth 13. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 14. Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the Developer. 15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 3 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 3 of35 16. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 17. General Requirements —A part of the Contract Documents between the Developer and a Contractor. 18. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 19. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 20. Milestone A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 21. Non -Participating Change Order —A document, which is prepared for and reviewed by the City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 22. Participating Change Order —A document, which is prepared for and approved by the City, which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 23. Plans — See definition of Drawings. 24. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 25. Project —The Work to be performed under the Contract Documents. 26. Project Representative —The authorized representative of the City who will be assigned to the Site. 27. Public Meeting — An announced meeting conducted by the Developer to facilitate public participation and to assist the public in gaining an informed view of the Project. 28. Regular Working Hours — Hours beginning at 7:00 a.m. and ending at 6: 00 p.m., Monday thru Friday (excluding legal holidays). 29. Samples Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 4 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 4 of 35 30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City or Developer which are designated for the use of Contractor. 32. Specifications —That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made apart of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 33. Standard City Conditions — That part of the Contract Documents setting forth requirements of the City. 34. Subcontractor An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of apart of the Work at the Site. 35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 36. Superintendent — The representative of the Contractor who is available at all times and able to receive instructions from the City and/or Developer and to act for the Contractor. 37. Supplementary Conditions —That part of the Contract Documents which amends or supplements the General Conditions. 38. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 40. Weekend Working Hours — Hours beginning at 9: 00 a.m. and ending at 5: 00 p. m., Saturday, Sunday or legal holiday, as approved in advance by the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 5 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 5 of35 41. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Participating Change Order, Non -Participating Change Order, or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p. m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.B through D are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. C. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 6 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 6 of 35 ARTICLE 2 — PRELIMINARY MATTERS 2.01 Before Starting Construction Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting the Work. New schedules will be submitted to City when Participating Change Orders or Non - Participating Change Orders occur. 2.02 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.03 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. ARTICLE 3 — CONTRACT DOCUMENTS AND AMENDING 3.01 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.02 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Participating Change Order or a Non -Participating Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 7 of 35 1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or 2. City's written interpretation or clarification. ARTICLE 4 — BONDS AND INSURANCE 4.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverage so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided Section 4.04. 4.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01 and 4.02.C. 4.03 Certificates of Insurance Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee identified in these Standard City Conditions certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 8 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 8 of 35 1. The certificate of insurance shall document the City, an as "Additional Insured" on all liability policies. 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in these Standard City Conditions. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 9 of 35 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 11. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 12. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 13. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 4.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. 3. The limits of liability for the insurance shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations a. Statutory limits b. Employer's liability CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10-10 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 10 of 35 1) $100,000 each accident/occurrence 2) $100,000 Disease - each employee 3) $500,000 Disease - policy limit B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. 1. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project 2. Contractor's Liability Insurance under this Section which shall be on a per project basis covering the Contractor with minimum limits of: a. $1,000,000 each occurrence b. $2,000,000 aggregate limit 3. The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. 4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. 1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in an amount not less than the following amounts: a. Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10-11 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 11 of35 1) $1, 000, 000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: 2) $250,000 Bodily Injury per person 3) $500,000 Bodily Injury per accident / 4) $100,000 Property Damage D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the following requirements: 1. The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by: 2. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. 3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: a. General Aggregate: b. Each Occurrence: 4. With respect to the above outlined insurance requirements, the following shall govern: a. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. b. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights -of - CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10-12 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 12 of 35 way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. c. If, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at -grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. d. If no grade separation is involved but other work is proposed on a railroad company's right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. 5. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. 6. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 4.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the Developer and City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 5 — CONTRACTOR'S RESPONSIBILITIES 5.01 Supervision and Superintendent A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10-13 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 13 of 35 Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 5.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 5.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10-14 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 14 of 35 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 5.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and the General Requirements) proposed adjustments in the Project Schedule. 2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 9. Adjustments in Contract Time for projects with City participation shall be made by participating change orders. 5.05 Substitutes and "Or -Equals" A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or -Equal " Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10-15 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 15 of 35 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 0125 00 and: 1) shall certify that the proposed substitute item will: i. perform adequately the functions and achieve the results called for by the general design; ii. be similar in substance to that specified; iii. be suited to the same use as that specified; and 2) will state: i. the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; ii. whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; iii. whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: i. all variations of the proposed substitute item from that specified; ii. available engineering, sales, maintenance, repair, and replacement services; and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10-16 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 16 of 35 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 5.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.13. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Participating Change Order. 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors) A. The Contractor and any subcontractors are required to be prequalified for the work types requiring pre -qualification 5.07 Concerning Subcontractors, Suppliers, and Others A. Minority and Women Owned Business Enterprise Compliance: CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10-17 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 17 of 35 ❑ Required for this Contract. El Not Required for this Contract. It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent of the City's MWBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MWBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. C. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10-18 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 18 of 35 Documents, Contractor shall provide City contract numbers and reference numbers to the Subcontractors and/or Suppliers. 5.08 Wage Rates ❑ Required for this Contract. ® Not Required for this Contract. A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 1 lth day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10-19 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 19 of 35 occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 5.09 Patent Fees and Royalties A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 5.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.01. 5.11 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 20 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 20 of 35 other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so. The City may withhold Final Acceptance until clean-up is complete and cost are recovered. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 5.12 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 21 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 21 of 35 Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 5.13 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who maybe affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 5.14 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 22 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 22 of 35 5.15 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 5.16 Submittals A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal will be identified as required by City. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 5.16.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 5.16.C. B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 23 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 23 of 35 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 5.17 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City or Developer of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 24 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 24 of 35 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 4.02.B. The City will give notice of observed defects with reasonable promptness. 5.18 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 5.19 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 25 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 25 of 35 C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 5.16.C. 5.20 Right to Audit: A. The City reserves the right to audit all projects utilizing City funds B. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 5.21 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 26 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 26 of 35 ARTICLE 6 — OTHER WORK AT THE SITE 6.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. ARTICLE 7 — CITY'S RESPONSIBILITIES 7.01 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 11.03. 7.02 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 27 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 27 of 35 7.03 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 5.13. ARTICLE 8 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 8.01 City's Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City's representative during construction are set forth in the Contract Documents. A. City's Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents. 8.02 Authorized Variations in Work City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City Developer, and also on Contractor, who shall perform the Work involved promptly. 8.03 Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or completed. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 28 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 28 of 35 8.04 Determinationsfor Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). ARTICLE 9 — CHANGES IN THE WORK 9.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Participating Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a project with City participation, a Field Order may be issued by the City. 9.02 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. ARTICLE 10 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 10.01 Change of Contract Price A. The Contract Price may only be changed by a Participating Change Order for projects with City participation. 10.02 Change of Contract Time A. The Contract Time may only be changed by a Participating Change Order for projects with City participation. 10.03 Delays A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 29 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 29 of 35 ARTICLE 11— TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.01 Notice ofDefects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 11.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 11.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations approved by City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 30 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 30 of 35 3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Developer/Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until the Testing Lab is Paid E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. 11.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. 11.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 11.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 11.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 31 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 31 of 35 Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor and Developer should such additional warranty coverage be required. Contractor's obligations under this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 11.08 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 32 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 32 of 35 stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 11.09. ARTICLE 12 — COMPLETION 12.01 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment will pass to City no later than the time of Final Acceptance and shall be free and clear of all Liens. 12.02 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 12.03 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 33 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 33 of 35 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 12.04 Final Acceptance A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of the following: 1. All documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; 2. consent of the surety, if any, to Final Acceptance; 3. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and 4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. 5. after all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. ARTICLE 13 — SUSPENSION OF WORK 13.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will stop contract time on City participation projects. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 34 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 34 of 35 available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. ARTICLE 14 — MISCELLANEOUS 14.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given i£ 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 14.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 14.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 35 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 35 of 35 14.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 14.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 01 11 00 SUMMARY OF WORK 011100-1 DAP SUMMARY OF WORK Paget of 3 5 A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 11 2. Division 1 - General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 A. Work Covered by Contract Documents 1. Work is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work 1. Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises 1. Coordinate uses of premises under direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. 3. Use and occupy only portions of the public streets and alleys, or other public places or other rights -of -way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. a. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects City Project No. 104381 Revised December 20, 2012 011100-2 DAP SUMMARY OF WORK Page 2 of 3 1 b. Excavated and waste materials shall be stored in such a way as not to interfere 2 with the use of spaces that may be designated to be left free and unobstructed 3 and so as not to inconvenience occupants of adjacent property. 4 c. If the street is occupied by railroad tracks, the Work shall be carried on in such 5 manner as not to interfere with the operation of the railroad. 6 1) All Work shall be in accordance with railroad requirements set forth in 7 Division 0 as well as the railroad permit. 8 D. Work within Easements 9 1. Do not enter upon private property for any purpose without having previously 10 obtained permission ftom the owner of such property. 11 2. Do not store equipment or material on private property unless and until the 12 specified approval of the property owner has been secured in writing by the 13 Contractor and a copy furnished to the City. 14 3. Unless specifically provided otherwise, clear all rights -of -way or easements of 15 obstructions which must be removed to make possible proper prosecution of the 16 Work as a part of the project construction operations. 17 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, 18 lawns, fences, culverts, curbing, and all other types of structures or improvements, 19 to all water, sewer, and gas lines, to all conduits, overhead pole lines, or 20 appurtenances thereof, including the construction of temporary fences and to all 21 other public or private property adjacent to the Work. 22 5. Notify the proper representatives of the owners or occupants of the public or private 23 lands of interest in lands which might be affected by the Work. 24 a. Such notice shall be made at least 48 hours in advance of the beginning of the 25 Work. 26 b. Notices shall be applicable to both public and private utility companies and any 27 corporation, company, individual, or other, either as owners or occupants, 28 whose land or interest in land might be affected by the Work. 29 c. Be responsible for all damage or injury to property of any character resulting 30 ftom any act, omission, neglect, or misconduct in the manner or method or 31 execution of the Work, or at any time due to defective work, material, or 32 equipment. 33 6. Fence 34 a. Restore all fences encountered and removed during construction of the Project 35 to the original or a better than original condition. 36 b. Erect temporary fencing in place of the fencing removed whenever the Work is 37 not in progress and when the site is vacated overnight, and/or at all times to 38 provide site security. 39 c. The cost for all fence work within easements, including removal, temporary 40 closures and replacement, shall be subsidiary to the various items bid in the 41 project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects City Project No. 104381 Revised December 20, 2012 011100-3 DAP SUMMARY OF WORK Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 12 13 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects City Project No. 104381 Revised December 20, 2012 012500-1 DAP SUBSTITUTION PROCEDURES SECTION 0125 00 SUBSTITUTION PROCEDURES PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 4 1. The procedure for requesting the approval of substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteria or defined by reference to 1 or more of the following: a. Name of manufacturer b. Name of vendor c. Trade name d. Catalog number 2. Substitutions are not "or -equals". B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or -equals," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or -equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, CITY OF FORT WORTH BETLMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104381 Revised August 30, 2013 012500-2 DAP SUBSTITUTION PROCEDURES Page 2 of 4 b. Contractor proposes a cost and/or time reduction incentive to the City. 1.5 SUBMITTALS A. See Request for Substitution Form (attached) B. Procedure for Requesting Substitution 1. Substitution shall be considered only: a. After award of Contract b. Under the conditions stated herein 2. Submit 3 copies of each written request for substitution, including: a. Documentation 1) Complete data substantiating compliance of proposed substitution with Contract Documents 2) Data relating to changes in construction schedule, when a reduction is proposed 3) Data relating to changes in cost b. For products 1) Product identification a) Manufacturer's name b) Telephone number and representative contact name c) Specification Section or Drawing reference of originally specified product, including discrete name or tag number assigned to original product in the Contract Documents 2) Manufacturer's literature clearly marked to show compliance of proposed product with Contract Documents 3) Itemized comparison of original and proposed product addressing product characteristics including, but not necessarily limited to: a) Size b) Composition or materials of construction c) Weight d) Electrical or mechanical requirements 4) Product experience a) Location of past projects utilizing product b) Name and telephone number of persons associated with referenced projects knowledgeable concerning proposed product c) Available field data and reports associated with proposed product 5) Samples a) Provide at request of City. b) Samples become the property of the City. c. For construction methods: 1) Detailed description of proposed method 2) Illustration drawings C. Approval or Rejection 1. Written approval or rejection of substitution given by the City 2. City reserves the right to require proposed product to comply with color and pattern of specified product if necessary to secure design intent. 3. In the event the substitution is approved, if a reduction in cost or time results, it will be documented by Change Order. CITY OF FORT WORTH BETLMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104381 Revised August 30, 2013 012500-3 DAP SUBSTITUTION PROCEDURES Page 3 of 4 4. Substitution will be rejected if: a. Submittal is not through the Contractor with his stamp of approval b. Request is not made in accordance with this Specification Section c. In the Developer's opinion, acceptance will require substantial revision of the original design d. In the City's or Developer's opinion, substitution will not perform adequately the function consistent with the design intent 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. In making request for substitution or in using an approved product, the Contractor represents that the Contractor: 1. Has investigated proposed product, and has determined that it is adequate or superior in all respects to that specified, and that it will perform function for which it is intended 2. Will provide same guarantee for substitute item as for product specified 3. Will coordinate installation of accepted substitution into Work, to include building modifications if necessary, making such changes as may be required for Work to be complete in all respects 4. Waives all claims for additional costs related to substitution which subsequently arise 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH BETLMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104381 Revised August 30, 2013 012500-4 DAP SUBSTITUTION PROCEDURES Page 4 of 4 EXHIBIT A REQUEST FOR SUBSTITUTION FORM: TO: PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature Recommended Recommended as noted Firm Not recommended Received late Address By Date Date Remarks Telephone For Use by City: Approved Rejected City Date CITY OF FORT WORTH BETLMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104381 Revised August 30, 2013 013119-1 DAP PRECONSTRUCTION MEETING SECTION 013119 PRECONSTRUCTION MEETING PART1- GENERAL 1.1 SUMMARY A. Section Includes: Pagel of 3 1. Provisions for the preconstruction meeting to be held prior to the start of Work to clarify construction contract administration procedures B. Deviations from this City of Fort Worth Standard Specification 1. No construction schedule required unless requested by the City. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the delivery of the distribution package to the City. a. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance shall include: a. Developer and Consultant b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised August 30, 2013 013119-2 DAP PRECONSTRUCTION MEETING Page 2 of 3 e. Other City representatives f. Others as appropriate 4. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals m. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. MBE/SBE procedures hh. Final Acceptance ii. Final Payment J. Questions or Comments CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised August 30, 2013 013119-3 DAP PRECONSTRUCTION MEETING Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log I DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised August 30, 2013 013233-1 DAP PRECONSTRUCTION VIDEO Page 1 of 2 SECTION 0132 33 PRECONSTRUCTION VIDEO PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative and procedural requirements for: a. Preconstruction Videos B. Deviations from this City of Fort Worth Standard Specification 1. Though not mandatory, it is highly recommended on infill developer projects. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Preconstruction Video 1. Produce a preconstruction video of the site/alignment, including all areas in the vicinity of and to be affected by construction. a. Provide digital copy of video upon request by the City. 2. Retain a copy of the preconstruction video until the end of the maintenance surety period. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised August 30, 2013 01 32 33 - 2 DAP PRECONSTRUCTION VIDEO Page 2 of 2 PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised August 30, 2013 SECTION 0133 00 DAP SUBMITTALS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 013300-1 DAP SUBMITTALS Pagel of 8 General methods and requirements of submissions applicable to the following Work -related submittals: a. Shop Drawings b. Product Data (including Standard Product List submittals) c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication f) Delivery g) Similar sequenced activities c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised August 30, 2013 013300-2 DAP SUBMITTALS Page 2 of 8 d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 03 30 00-08-B 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) `By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 '/2 inches x 11 inches to 8 '/z inches x 11 inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised August 30, 2013 013300-3 DAP SUBMITTALS Page 3 of 8 2. The Project title and number 3. Contractor identification 4. The names of: a. Contractor b. Supplier c. Manufacturer 5. Identification of the product, with the Specification Section number, page and paragraph(s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work or materials 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting of deviations from Contract Documents 10. Identification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps F. Shop Drawings 1. As specified in individual Work Sections includes, but is not necessarily limited to: a. Custom -prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f. Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements 1) Provide such measurements and note on the drawings prior to submitting for approval. G. Product Data 1. For submittals of product data for products included on the City's Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City's Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) 1) Such as the manufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing -in diagrams and templates 5) Catalog cuts 6) Product photographs CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised August 30, 2013 013300-4 DAP SUBMITTALS Page 4 of 8 7) Standard wiring diagrams 8) Printed performance curves and operational -range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare -parts listing and printed product warranties 12) As applicable to the Work H. Samples As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on -site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution 1. Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised August 30, 2013 013300-5 DAP SUBMITTALS Page 5 of 8 a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. 3. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN' is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised August 30, 2013 013300-6 DAP SUBMITTALS Page 6 of 8 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non -conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no more than twice at the City's expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the Developer at least 7 Calendar Days prior to release for manufacture. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised August 30, 2013 013300-7 DAP SUBMITTALS Page 7 of 8 9. When the shop drawings have been completed to the satisfaction of the City, the Contractor may carry out the construction in accordance therewith and no further changes therein except upon written instructions from the City. 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days following receipt of submittal by the City. L. Mock ups 1. Mock Up units as specified in individual Sections, include, but are not necessarily limited to, complete units of the standard of acceptance for that type of Work to be used on the Project. Remove at the completion of the Work or when directed. M. Qualifications 1. If specifically required in other Sections of these Specifications, submit a P.E. Certification for each item required. N. Request for Information (RFI) 1. Contractor Request for additional information a. Clarification or interpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. When the Contractor believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and request clarification 2. Sufficient information shall be attached to permit a written response without further information. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised August 30, 2013 013300-8 DAP SUBMITTALS Page 8 of 8 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised August 30, 2013 0135 13- 1 DAP SPECIAL PROJECT PROCEDURES Page 1 of 7 1 SECTION 01 3513 2 SPECIAL PROJECT PROCEDURES 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedures for special project circumstances that includes, but is not limited to: 7 a. Coordination with the Texas Department of Transportation 8 b. Work near High Voltage Lines 9 c. Confined Space Entry Program 10 d. Air Pollution Watch Days 11 e. Use of Explosives, Drop Weight, Etc. 12 £ Water Department Notification 13 g. Public Notification Prior to Beginning Construction 14 h. Coordination with United States Army Corps of Engineers 15 i. Coordination within Railroad permits areas 16 j. Dust Control 17 k. Employee Parking 18 B. Deviations from this City of Fort Worth Standard Specification 19 1. None. 20 C. Related Specification Sections include, but are not necessarily limited to: 21 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 22 2. Division 1 — General Requirements 23 3. Section 33 12 25 — Connection to Existing Water Mains 24 25 1.2 REFERENCES 26 A. Reference Standards 27 1. Reference standards cited in this Specification refer to the current reference 28 standard published at the time of the latest revision date logged at the end of this 29 Specification, unless a date is specifically cited. 30 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 31 High Voltage Overhead Lines. 32 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction 33 Specification 34 1.3 ADMINISTRATIVE REQUIREMENTS 35 A. Coordination with the Texas Department of Transportation 36 1. When work in the right-of-way which is under the jurisdiction of the Texas 37 Department of Transportation (TxDOT): 38 a. Notify the Texas Department of Transportation prior to commencing any work 39 therein in accordance with the provisions of the permit CITY OF FORT WORTH BELTMILL PH 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised August, 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 013513-2 DAP SPECIAL PROJECT PROCEDURES Page 2 of 7 b. All work performed in the TxDOT right-of-way shall be performed in compliance with and subject to approval from the Texas Department of Transportation B. Work near High Voltage Lines 1. Regulatory Requirements a. All Work near High Voltage Lines (more than 600 volts measured between conductors or between a conductor and the ground) shall be in accordance with Health and Safety Code, Title 9, Subtitle A, Chapter 752. 2. Warning sign a. Provide sign of sufficient size meeting all OSHA requirements. 3. Equipment operating within 10 feet of high voltage lines will require the following safety features a. Insulating cage -type of guard about the boom or arm b. Insulator links on the lift hook connections for back hoes or dippers c. Equipment must meet the safety requirements as set forth by OSHA and the safety requirements of the owner of the high voltage lines 4. Work within 6 feet of high voltage electric lines a. Notification shall be given to: 1) The power company (example: ONCOR) a) Maintain an accurate log of all such calls to power company and record action taken in each case. b. Coordination with power company 1) After notification coordinate with the power company to: a) Erect temporary mechanical barriers, de -energize the lines, or raise or lower the lines c. No personnel may work within 6 feet of a high voltage line before the above requirements have been met. C. Confined Space Entry Program 1. Provide and follow approved Confined Space Entry Program in accordance with OSHA requirements. 2. Confined Spaces include: a. Manholes b. All other confined spaces in accordance with OSHA's Permit Required for Confined Spaces D. Use of Explosives, Drop Weight, Etc. 1. When Contract Documents permit on the project the following will apply: a. Public Notification 1) Submit notice to City and proof of adequate insurance coverage, 24 hours prior to commencing. 2) Minimum 24 hour public notification in accordance with Section 01 31 13 E. Water Department Coordination 1. During the construction of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor shall be required to coordinate with the Water Department to determine the best times for deactivating and activating those lines. CITY OF FORT WORTH BELTMILL PH 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised August, 30, 2013 013513-3 DAP SPECIAL PROJECT PROCEDURES Page 3 of 7 1 2. Coordinate any event that will require connecting to or the operation of an existing 2 City water line system with the City's representative. 3 a. Coordination shall be in accordance with Section 33 12 25. 4 b. If needed, obtain a hydrant water meter from the Water Department for use 5 during the life of named project. 6 c. In the event that a water valve on an existing live system be turned off and on 7 to accommodate the construction of the project is required, coordinate this 8 activity through the appropriate City representative. 9 1) Do not operate water line valves of existing water system. 10 a) Failure to comply will render the Contractor in violation of Texas Penal 11 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor 12 will be prosecuted to the full extent of the law. 13 b) In addition, the Contractor will assume all liabilities and 14 responsibilities as a result of these actions. 15 F. Public Notification Prior to Beginning Construction 16 1. Prior to beginning construction on any block in the project, on a block by block 17 basis, prepare and deliver a notice or flyer of the pending construction to the front 18 door of each residence or business that will be impacted by construction. The notice 19 shall be prepared as follows: 20 a. Post notice or flyer 7 days prior to beginning any construction activity on each 21 block in the project area. 22 1) Prepare flyer on the Contractor's letterhead and include the following 23 information: 24 a) Name of Project 25 b) City Project No (CPN) 26 c) Scope of Project (i.e. type of construction activity) 27 d) Actual construction duration within the block 28 e) Name of the contractor's foreman and phone number 29 f) Name of the City's inspector and phone number 30 g) City's after-hours phone number 31 2) A sample of the `pre -construction notification' flyer is attached as Exhibit 32 A. 33 3) Submit schedule showing the construction start and finish time for each 34 block of the project to the inspector. 35 4) Deliver flyer to the City Inspector for review prior to distribution. 36 b. No construction will be allowed to begin on any block until the flyer is 37 delivered to all residents of the block. 38 G. Public Notification of Temporary Water Service Interruption during Construction 39 1. In the event it becomes necessary to temporarily shut down water service to 40 residents or businesses during construction, prepare and deliver a notice or flyer of 41 the pending interruption to the front door of each affected resident. 42 2. Prepared notice as follows: 43 a. The notification or flyer shall be posted 24 hours prior to the temporary 44 interruption. 45 b. Prepare flyer on the contractor's letterhead and include the following 46 information: 47 1) Name of the project 48 2) City Project Number CITY OF FORT WORTH BELTMILL PH 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised August, 30, 2013 1 2 3 4 5 6 7 8 9 10 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 01 35 13 - 4 DAP SPECIAL PROJECT PROCEDURES Page 4 of 7 3) Date of the interruption of service 4) Period the interruption will take place 5) Name of the contractor's foreman and phone number 6) Name of the City's inspector and phone number c. A sample of the temporary water service interruption notification is attached as Exhibit B. d. Deliver a copy of the temporary interruption notification to the City inspector for review prior to being distributed. e. No interruption of water service can occur until the flyer has been delivered to all affected residents and businesses. f. Electronic versions of the sample flyers can be obtained from the Project Construction Inspector. H. Coordination with United States Army Corps of Engineers (USACE) 1. At locations in the Project where construction activities occur in areas where USACE permits are required, meet all requirements set forth in each designated permit. I. Coordination within Railroad Permit Areas 1. At locations in the project where construction activities occur in areas where railroad permits are required, meet all requirements set forth in each designated railroad permit. This includes, but is not limited to, provisions for: a. Flagmen b. Inspectors c. Safety training d. Additional insurance e. Insurance certificates f. Other employees required to protect the right-of-way and property of the Railroad Company from damage arising out of and/or from the construction of the project. Proper utility clearance procedures shall be used in accordance with the permit guidelines. 2. Obtain any supplemental information needed to comply with the railroad's requirements. J. Dust Control 1. Use acceptable measures to control dust at the Site. a. If water is used to control dust, capture and properly dispose of waste water. b. If wet saw cutting is performed, capture and properly dispose of slurry. K. Employee Parking 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH BELTMILL PH 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised August, 30, 2013 013513-5 DAP SPECIAL PROJECT PROCEDURES Page 5 of 7 1 1.4 SUBMITTALS [NOT USED] 2 1.5 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 3 1.6 CLOSEOUT SUBMITTALS [NOT USED] 4 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.8 QUALITY ASSURANCE [NOT USED] 6 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.10 FIELD [SITE] CONDITIONS [NOT USED] 8 1.11 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 12 DATE NAME 8/31/2012 D.Johnson 13 END OF SECTION Revision Log SUMMARY OF CHANGE 1.3.13— Added requirement of compliance with Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. CITY OF FORT WORTH BELTMILL PH 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised August, 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 01 35 13 - 6 DAP SPECIAL PROJECT PROCEDURES Page 6 of 7 EXHIBIT A (To be printed on Contractor's Letterhead) Date: CPN No.: Project Name: Mapsco Location: Limits of Construction: THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH BELTMILL PH 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised August, 30, 2013 2 3 4 Date: EXHIBIT B FORT WORTH DOE NO. xxxx Project Name: 013513-7 DAP SPECIAL PROJECT PROCEDURES Page 7 of 7 NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, CONTRACTOR CITY OF FORT WORTH BELTMILL PH 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised August, 30, 2013 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 1 of 2 SECTION 0145 23 TESTING AND INSPECTION SERVICES PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Testing and inspection services procedures and coordination B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. b. City is responsible for performing and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. a) Final acceptance will not be issued by City until all required payments for testing by Contractor have been paid in full. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Testing 1. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, sufficiently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Confirm development of Project directory for electronic submittals to be uploaded to the City's document management system, or another form of distribution approved by the City. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised March 20, 2020 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 2 of 2 2) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute 1 hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City's Project Representative 4. Provide City's Project Representative with trip tickets for each delivered load of Concrete or Lime material including the following information: a. Name of pit b. Date of delivery c. Material delivered B. Inspection 1. Inspection or lack of inspection does not relieve the Contractor from obligation to perform work in accordance with the Contract Documents. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 03/20/2020 D.V. Magaiia Removed reference to Buzzsaw and noted that electronic submittals be uploaded through the City's document management system. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised March 20, 2020 01 50 00 - 1 DAP TEMPORARY FACILITIES AND CONTROLS Page 1 of 4 SECTION 0150 00 TEMPORARY FACILITIES AND CONTROLS PART1- GENERAL 1.1 SUMMARY A. Section Includes: Provide temporary facilities and controls needed for the Work including, but not necessarily limited to: a. Temporary utilities b. Sanitary facilities c. Storage Sheds and Buildings d. Dust control e. Temporary fencing of the construction site B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Temporary Utilities 1. Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor personnel and City's Project Representatives. c. Coordination 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104381 Revised JULY 1, 2011 01 50 00 - 2 DAP TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 d. Contractor Payment for Construction Water 1) Obtain construction water meter from City for payment as billed by City's established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. 1) Provide power for lighting, operation of equipment, or other use. b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. 4. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing work or furnishing services at Site. 5. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working conditions. B. Sanitary Facilities 1. Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem. d. Haul sewage and waste off -site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. D. Temporary Fencing 1. Provide and maintain for the duration or construction when required in contract documents E. Dust Control CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104381 Revised JULY 1, 2011 01 50 00 - 3 DAP TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1. Contractor is responsible for maintaining dust control through the duration of the project. a. Contractor remains on -call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Temporary Facilities 1. Maintain all temporary facilities for duration of construction activities as needed. 3.5 [REPAIR] / [RESTORATION] 3.6 RE -INSTALLATION 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES A. Temporary Facilities CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104381 Revised JULY 1, 2011 01 50 00 - 4 DAP TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1. Remove all temporary facilities and restore area after completion of the Work, to a condition equal to or better than prior to start of Work. 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104381 Revised JULY 1, 2011 015526-1 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Pagel of 3 SECTION 0155 26 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative procedures for: a. Street Use Permit b. Modification of approved traffic control c. Removal of Street Signs B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 3. Section 34 71 13 — Traffic Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this specification refer to the current reference standard published at the time of the latest revision date logged at the end of this specification, unless a date is specifically cited. 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 1.4 ADMINISTRATIVE REQUIREMENTS A. Traffic Control 1. General a. When traffic control plans are included in the Drawings, provide Traffic Control in accordance with Drawings and Section 34 71 13. b. When traffic control plans are not included in the Drawings, prepare traffic control plans in accordance with Section 34 71 13 and submit to City for review. 1) Allow minimum 10 working days for review of proposed Traffic Control. B. Street Use Permit 1. Prior to installation of Traffic Control, a City Street Use Permit is required. a. To obtain Street Use Permit, submit Traffic Control Plans to City Transportation and Public Works Department. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised July 1, 2011 01 55 26 - 2 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1) Allow a minimum of 5 working days for permit review. 2) Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. C. Modification to Approved Traffic Control 1. Prior to installation traffic control: a. Submit revised traffic control plans to City Department Transportation and Public Works Department. 1) Revise Traffic Control plans in accordance with Section 34 71 13. 2) Allow minimum 5 working days for review of revised Traffic Control. 3) It is the Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. D. Removal of Street Sign 1. If it is determined that a street sign must be removed for construction, then contact City Transportation and Public Works Department, Signs and Markings Division to remove the sign. E. Temporary Signage 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting requirements of the latest edition of the Texas Manual on Uniform Traffic Control Devices (MUTCD). 2. Install temporary sign before the removal of permanent sign. 3. When construction is complete, to the extent that the permanent sign can be reinstalled, contact the City Transportation and Public Works Department, Signs and Markings Division, to reinstall the permanent sign. F. Traffic Control Standards 1. Traffic Control Standards can be found on the City's Buzzsaw website. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised July 1, 2011 015526-3 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised July 1, 2011 015713-1 DAP STORM WATER POLLUTION PREVENTION Pagel of 3 SECTION 01 5713 STORM WATER POLLUTION PREVENTION PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for Storm Water Pollution Prevention Plans B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 3. Section 3125 00 — Erosion and Sediment Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Activities resulting in less than 1 acre of disturbance a. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 2. Construction Activities resulting in greater than 1 acre of disturbance a. Measurement and Payment shall be in accordance with Section 3125 00. 1.3 REFERENCES A. Abbreviations and Acronyms 1. Notice of Intent: NOI 2. Notice of Termination: NOT 3. Storm Water Pollution Prevention Plan: SWPPP 4. Texas Commission on Environmental Quality: TCEQ 5. Notice of Change: NOC A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Integrated Storm Management (iSWM) Technical Manual for Construction Controls 1.4 ADMINISTRATIVE REQUIREMENTS A. General 1. Contractor is responsible for resolution and payment of any fines issued associated with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised July 1, 2011 0157 13 - 2 DAP STORM WATER POLLUTION PREVENTION Page 2 of 3 B. Construction Activities resulting in: 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 3125 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 1.5 SUBMITTALS A. SWPPP Submit in accordance with Section 01 33 00, except as stated herein. a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department of Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised July 1, 2011 0157 13 - 3 DAP STORM WATER POLLUTION PREVENTION Page 3 of 3 B. Modified SWPPP 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City in accordance with Section 0133 00. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log I DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised July 1, 2011 SECTION 0160 00 PRODUCT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 01 60 00 DAP PRODUCT REQUIREMENTS Page 1 of 2 1. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A list of City approved products for use is available through the City's website at: https://apes.fortworthtexas.2ov/ProiectResources/ and following the directory path: 02 - Construction Documents\Standard Products List A. Only products specifically included on City's Standard Product List in these Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. B. Any specific product requirements in the Contract Documents supersede similar products included on the City's Standard Product List. 1. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City's Standard Product List. C. Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer's standard product. D. See Section 0133 00 for submittal requirements of Product Data included on City's Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised March 20, 2020 01 60 00 DAP PRODUCT REQUIREMENTS Page 2 of 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] DATE NAME END OF SECTION Revision Log SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City's Standard Product List 4/7/2014 M.Domenech Revised for DAP application 03/20/2020 D.V. Magaiia Removed reference to Buzzsaw and noted that the City approved products list is accessible through the City's website. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised March 20, 2020 01 66 00 - 1 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 1 of 4 SECTION 0166 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 016600-2 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 4. Deliver products or equipment in manufacturer's original unbroken cartons or other containers designed and constructed to protect the contents from physical or environmental damage. 5. Clearly and fully mark and identify as to manufacturer, item and installation location. 6. Provide manufacturer's instructions for storage and handling. B. Handling Requirements 1. Handle products or equipment in accordance with these Contract Documents and manufacturer's recommendations and instructions. C. Storage Requirements 1. Store materials in accordance with manufacturer's recommendations and requirements of these Specifications. 2. Make necessary provisions for safe storage of materials and equipment. a. Place loose soil materials and materials to be incorporated into Work to prevent damage to any part of Work or existing facilities and to maintain free access at all times to all parts of Work and to utility service company installations in vicinity of Work. 3. Keep materials and equipment neatly and compactly stored in locations that will cause minimum inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. a. Arrange storage to provide easy access for inspection. 4. Restrict storage to areas available on construction site for storage of material and equipment as shown on Drawings, or approved by City's Project Representative. 5. Provide off -site storage and protection when on -site storage is not adequate. a. Provide addresses of and access to off -site storage locations for inspection by City's Project Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written permission of owner or other person in possession or control of premises. 7. Store in manufacturers' unopened containers. 8. Neatly, safely and compactly stack materials delivered and stored along line of Work to avoid inconvenience and damage to property owners and general public and maintain at least 3 feet from fire hydrant. 9. Keep public and private driveways and street crossings open. 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to satisfaction of City's Project Representative. a. Total length which materials may be distributed along route of construction at one time is 1,000 linear feet, unless otherwise approved in writing by City's Project Representative. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 016600-3 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non -Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 016600-4 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 01 70 00 - 1 DAP MOBILIZATION AND REMOBILIZATION Page 1 of 4 SECTION 0170 00 MOBILIZATION AND REMOBILIZATION PART1- GENERAL 1.1 SUMMARY A. Section Includes: Mobilization and Demobilization a. Mobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies to the Site 2) Establishment of necessary general facilities for the Contractor's operation at the Site 3) Premiums paid for performance and payment bonds 4) Transportation of Contractor's personnel, equipment, and operating supplies to another location within the designated Site 5) Relocation of necessary general facilities for the Contractor's operation from 1 location to another location on the Site. b. Demobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies away from the Site including disassembly 2) Site Clean-up 3) Removal of all buildings and/or other facilities assembled at the Site for this Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. Remobilization a. Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1) Demobilization a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor's operation at the Site necessary to resume the Work. 3) No Payments will be made for: a) Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b) Stand-by or idle time c) Lost profits 3. Mobilizations and Demobilization for Miscellaneous Projects a. Mobilization and Demobilization CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 017000-2 DAP MOBILIZATION AND REMOBILIZATION Page 2 of 4 1) Mobilization shall consist of the activities and cost on a Work Order basis necessary for: a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site for the issued Work Order. b) Establishment of necessary general facilities for the Contractor's operation at the Site for the issued Work Order 2) Demobilization shall consist of the activities and cost necessary for: a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly for each issued Work Order b) Site Clean-up for each issued Work Order c) Removal of all buildings or other facilities assembled at the Site for each Work Oder b. Mobilization and Demobilization do not include activities for specific items of work for which payment is provided elsewhere in the contract. 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects a. A Mobilization for Miscellaneous Projects when directed by the City and the mobilization occurs within 24 hours of the issuance of the Work Order. B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Mobilization and Demobilization a. Measure 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2. Remobilization for suspension of Work as specifically required in the Contract Documents a. Measurement 1) Measurement for this Item shall be per each remobilization performed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Specified Remobilization" in accordance with Contract Documents. c. The price shall include: 1) Demobilization as described in Section 1.1.A.2.a.1) 2) Remobilization as described in Section 1.1.A.2.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 017000-3 DAP MOBILIZATION AND REMOBILIZATION Page 3 of 4 Remobilization for suspension of Work as required by City a. Measurement and Payment 1) This shall be submitted as a Contract Claim in accordance with Article 10 of Section 00 72 00. 2) No payments will be made for standby, idle time, or lost profits associated with this Item. 4. Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Work Order Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include: 1) Mobilization as described in Section 1.1.A.3.a.1) 2) Demobilization as described in Section 1.1.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. Emergency Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Work Order Emergency Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include 1) Mobilization as described in Section 1.1.A.4.a) 2) Demobilization as described in Section 1.1.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 017000-4 DAP MOBILIZATION AND REMOBILIZATION 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] DATE 4/7/2014 NAME M. Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP application Page 4 of 4 CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 017123-1 CONSTRUCTION STAKING AND SURVEY Page 1 of 8 1 SECTION 01 71 23 2 CONSTRUCTION STAKING AND SURVEY 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Requirements for construction staking and construction survey 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. See Changes (Highlighted in Yellow). 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1— General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Construction Staking 15 a. Measurement 16 1) This Item is considered subsidiary to the various Items bid. 17 b. Payment 18 1) The work performed and the materials furnished in accordance with this 19 Item are subsidiary to the various Items bid and no other compensation will 20 be allowed. 21 2. Construction Survey 22 a. Measurement 23 1) This Item is considered subsidiary to the various Items bid. 24 b. Payment 25 1) The work performed and the materials furnished in accordance with this 26 Item are subsidiary to the various Items bid and no other compensation will be 27 allowed. 28 3. As -Built Survey 29 a. Measurement 30 1) This Item is considered subsidiary to the various Items bid. 31 b. Payment 32 1) The work performed and the materials furnished in accordance with this 33 Item are subsidiary to the various Items bid and no other compensation will be 34 allowed. 35 1.3 REFERENCES 36 A. Definitions 37 1. Construction Survev - The survey measurements made prior to or while 38 construction is in progress to control elevation, horizontal position, dimensions and 39 configuration of structures/improvements included in the Project Drawings. BELTMILL PH 2 CITY OF FORT WORTH City Project No. 104381 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised February 14, 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 017123-2 CONSTRUCTION STAKING AND SURVEY Page 2 of 8 2. As -built Survev —The measurements made after the construction of the improvement features are complete to provide position coordinates for the features of a project. 3. Construction Staking — The placement of stakes and markings to provide offsets and elevations to cut and fill in order to locate on the ground the designed structures/improvements included in the Project Drawings. Construction staking shall include staking easements and/or right of way if indicated on the plans. 4. Survev "Field Checks" — Measurements made after construction staking is completed and before construction work begins to ensure that structures marked on the ground are accurately located per Project Drawings. B. Technical References 1. City of Fort Worth — Construction Staking Standards (available on City's Buzzsaw website) — 01 71 23.16.01— Attachment A Survey Staking Standards 2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available on City's Buzzsaw website). 3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision 4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice for Land Surveying in the State of Texas, Category 5 20 1.4 ADMINISTRATIVE REQUIREMENTS 21 A. The Contractor's selection of a surveyor must comply with Texas Government 22 Code 2254 (qualifications based selection) for this project. 23 1.5 SUBMITTALS 24 A. Submittals, if required, shall be in accordance with Section 0133 00. 25 B. All submittals shall be received and reviewed by the City prior to delivery of work. 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 27 A. Field Quality Control Submittals 28 1. Documentation verifying accuracy of field engineering work, including coordinate 29 conversions if plans do not indicate grid or ground coordinates. 30 2. Submit "Cut -Sheets" conforming to the standard template provided by the City 31 (refer to 01 71 23.16.01— Attachment A — Survey Staking Standards). 32 1.7 CLOSEOUT SUBMITTALS 33 B. As -built Redline Drawing Submittal 34 1. Submit As -Built Survey Redline Drawings documenting the locations/elevations of 35 constructed improvements signed and sealed by Registered Professional Land 36 Surveyor (RPLS) responsible for the work (refer to 01 71 23.16.01 — Attachment A 37 — Survey Staking Standards) . BELTMILL PH 2 CITY OF FORT WORTH City Project No. 104381 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised February 14, 2018 017123-3 CONSTRUCTION STAKING AND SURVEY Page 3 of 8 1 2. Contractor shall submit the proposed as -built and completed redline drawing 2 submittal one (1) week prior to scheduling the project final inspection for City 3 review and comment. Revisions, if necessary, shall be made to the as -built redline 4 drawings and resubmitted to the City prior to scheduling the construction final 5 inspection. 6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 7 1.9 QUALITY ASSURANCE 8 A. Construction Staking 9 1. Construction staking will be performed by the Contractor. 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 2. Coordination a. Contact City and Developer's Project Representative at least one week in advance notifying the City of when Construction Staking is scheduled. b. It is the Contractor's responsibility to coordinate staking such that construction activities are not delayed or negatively impacted. 3. General a. Contractor is responsible for preserving and maintaining stakes. If Developer's Project Representative is required to re -stake for any reason, the Contractor will be responsible for costs to perform staking. If in the opinion of the City, a sufficient number of stakes or markings have been lost, destroyed disturbed or omitted that the contracted Work cannot take place then the Contractor will be required to stake or re -stake the deficient areas. B. Construction Survey 1. Construction Survey will be performed by the Contractor. 2. Coordination a. Contractor to verify that horizontal and vertical control data established in the design survey and required for construction survey is available and in place. 3. General a. Construction survey will be performed in order to construct the work shown on the Construction Drawings and specified in the Contract Documents. b. For construction methods other than open cut, the Contractor shall perform construction survey and verify control data including, but not limited to, the following: 1) Verification that established benchmarks and control are accurate. 2) Use of Benchmarks to furnish and maintain all reference lines and grades for tunneling. 3) Use of line and grades to establish the location of the pipe. 4) Submit to the City copies of field notes used to establish all lines and grades, if requested, and allow the City to check guidance system setup prior to beginning each tunneling drive. 5) Provide access for the City, if requested, to verify the guidance system and the line and grade of the carrier pipe. 6) The Contractor remains fully responsible for the accuracy of the work and correction of it, as required. 7) Monitor line and grade continuously during construction. 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to the City. BELTMILL PH 2 CITY OF FORT WORTH City Project No. 104381 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised February 14, 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 01 71 23 - 4 CONSTRUCTION STAKING AND SURVEY Page 4 of 8 9) If the installation does not meet the specified tolerances (as outlined in Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct the installation in accordance with the Contract Documents. C. As -Built Survey 1. Required As -Built Survey will be performed by the Contractor. 2. Coordination a. Contractor is to coordinate with City to confirm which features require as - built surveying. b. It is the Contractor's responsibility to coordinate the as -built survey and required measurements for items that are to be buried such that construction activities are not delayed or negatively impacted. c. For sewer mains and water mains 12" and under in diameter, it is acceptable to physically measure depth and mark the location during the progress of construction and take as -built survey after the facility has been buried. The Contractor is responsible for the quality control needed to ensure accuracy. 3. General a. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features during the progress of the construction including the following: 1) Water Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Minimum every 250 linear feet, including (2) Horizontal and vertical points of inflection, curvature, etc. (3) Fire line tee (4) Plugs, stub -outs, dead-end lines (5) Casing pipe (each end) and all buried fittings 2) Sanitary Sewer a) Top of pipe elevations and coordinates for force mains and siphon sanitary sewer lines (non -gravity facilities) at the following locations: (1) Minimum every 250 linear feet and any buried fittings (2) Horizontal and vertical points of inflection, curvature, etc. 3) Stormwater — Not Applicable b. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features after the construction is completed including the following: 1) Manholes a) Rim and flowline elevations and coordinates for each manhole 2) Water Lines a) Cathodic protection test stations b) Sampling stations c) Meter boxes/vaults (All sizes) d) Fire hydrants e) Valves (gate, butterfly, etc.) f) Air Release valves (Manhole rim and vent pipe) g) Blow off valves (Manhole rim and valve lid) BELTMILL PH 2 CITY OF FORT WORTH City Project No. 104381 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised February 14, 2018 017123-5 CONSTRUCTION STAKING AND SURVEY Page 5 of 8 1 h) Pressure plane valves 2 i) Underground Vaults 3 (1) Rim and flowline elevations and coordinates for each 4 Underground Vault. 5 3) Sanitary Sewer 6 a) Cleanouts 7 (1) Rim and flowline elevations and coordinates for each 8 b) Manholes and Junction Structures 9 (1) Rim and flowline elevations and coordinates for each 10 manhole and junction structure. 11 4) Stormwater — Not Applicable 12 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 13 1.11 FIELD [SITE] CONDITIONS [NOT USED] 14 1.12 WARRANTY 15 PART 2 - PRODUCTS 16 A. A construction survey will produce, but will not be limited to: 17 1. Recovery of relevant control points, points of curvature and points of intersection. 18 2. Establish temporary horizontal and vertical control elevations (benchmarks) 19 sufficiently permanent and located in a manner to be used throughout construction. 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 3. The location of planned facilities, easements and improvements. a. Establishing final line and grade stakes for piers, floors, grade beams, parking areas, utilities, streets, highways, tunnels, and other construction. b. A record of revisions or corrections noted in an orderly manner for reference. c. A drawing, when required by the client, indicating the horizontal and vertical location of facilities, easements and improvements, as built. 4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all construction staking projects. These cut sheets shall be on the standard city template which can be obtained from the Survey Superintendent (817-392-7925). 5. Digital survey files in the following formats shall be acceptable: a. AutoCAD (.dwg) b. ESRI Shapefile (.shp) c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use standard templates, if available) 6. Survey files shall include vertical and horizontal data tied to original project control and benchmarks, and shall include feature descriptions 36 PART 3 - EXECUTION 37 3.1 INSTALLERS 38 A. Tolerances: BELTMILL PH 2 CITY OF FORT WORTH City Project No. 104381 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised February 14, 2018 017123-6 CONSTRUCTION STAKING AND SURVEY Page 6 of 8 1 1. The staked location of any improvement or facility should be as accurate as 2 practical and necessary. The degree of precision required is dependent on many 3 factors all of which must remain judgmental. The tolerances listed hereafter are 4 based on generalities and, under certain circumstances, shall yield to specific 5 requirements. The surveyor shall assess any situation by review of the overall plans 6 and through consultation with responsible parties as to the need for specific 7 tolerances. 8 a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical 9 tolerance. Horizontal alignment for earthwork and rough cut should not exceed 10 1.0 ft. tolerance. 11 b. Horizontal alignment on a structure shall be within .0.1ft tolerance. 12 c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and 13 walkways shall be located within the confines of the site boundaries and, 14 occasionally, along a boundary or any other restrictive line. Away from any 15 restrictive line, these facilities should be staked with an accuracy producing no 16 more than 0.05ft. tolerance from their specified locations. 17 d. Underground and overhead utilities, such as sewers, gas, water, telephone and 18 electric lines, shall be located horizontally within their prescribed areas or 19 easements. Within assigned areas, these utilities should be staked with an 20 accuracy producing no more than 0.1 ft tolerance from a specified location. 21 e. The accuracy required for the vertical location of utilities varies widely. Many 22 underground utilities require only a minimum cover and a tolerance of 0.1 ft. 23 should be maintained. Underground and overhead utilities on planned profile, 24 but not depending on gravity flow for performance, should not exceed 0.1 ft. 25 tolerance. 26 B. Surveying instruments shall be kept in close adjustment according to manufacturer's 27 specifications or in compliance to standards. The City reserves the right to request a 28 calibration report at any time and recommends regular maintenance schedule be 29 performed by a certified technician every 6 months. 30 1. Field measurements of angles and distances shall be done in such fashion as to 31 satisfy the closures and tolerances expressed in Part 3.1.A. 32 2. Vertical locations shall be established from a pre -established benchmark and 33 checked by closing to a different bench mark on the same datum. 34 3. Construction survey field work shall correspond to the client's plans. Irregularities 35 or conflicts found shall be reported promptly to the City. 36 4. Revisions, corrections and other pertinent data shall be logged for future reference. 37 38 3.2 EXAMINATION [NOT USED] 39 3.3 PREPARATION [NOT USED] 40 3.4 APPLICATION 41 3.5 REPAIR / RESTORATION 42 A. If the Contractor's work damages or destroys one or more of the control 43 monuments/points set by the Developer's Project Representative, the monuments shall be 44 adequately referenced for expedient restoration. BELTMILL PH 2 CITY OF FORT WORTH City Project No. 104381 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised February 14, 2018 017123-7 CONSTRUCTION STAKING AND SURVEY Page 7 of 8 1 1. Notify City or Developer's Project Representative if any control data needs to be 2 restored or replaced due to damage caused during construction operations. 3 a. Contractor shall perform replacements and/or restorations. 4 b. The City or Developer's Project Representative may require at anytime a 5 survey "Field Check" of any monument or benchmarks that are set be verified 6 by the Developer's Project Representative before further associated work can 7 move forward. 8 3.6 RE -INSTALLATION [NOT USED] 9 3.7 FIELD [OR] SITE QUALITY CONTROL 10 A. It is the Contractor's responsibility to maintain all stakes and control data placed by the 11 Developer's Project Representative in accordance with this Specification. This includes 12 easements and right of way, if noted on the plans. 13 B. Do not change or relocate stakes or control data without approval from the City. 14 3.8 SYSTEM STARTUP 15 A. Survey Checks 16 1. The City reserves the right to perform a Survey Check at any time deemed 17 necessary. 18 2. Checks by City personnel or 3' party contracted surveyor are not intended to 19 relieve the contractor of his/her responsibility for accuracy. 20 21 3.9 ADJUSTING [NOT USED] 22 3.10 CLEANING [NOT USED] 23 3.11 CLOSEOUT ACTIVITIES [NOT USED] 24 3.12 PROTECTION [NOT USED] 25 3.13 MAINTENANCE [NOT USED] 26 3.14 ATTACHMENTS [NOT USED] 27 END OF SECTION 28 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson Added instruction and modified measurement & payment under 1.2; added 8/31/2017 M. Owen definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal requirements; modified 1.9 Quality Assurance; added PART 2 — PRODUCTS; Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup. BELTMILL PH 2 CITY OF FORT WORTH City Project No. 104381 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised February 14, 2018 017123-8 CONSTRUCTION STAKING AND SURVEY Page 8 of 8 Removed "blue text'; revised measurement and payment sections for Construction Staking and As -Built Survey; added reference to selection compliance with TGC 2/14/2018 M Owen 2254; revised action and Closeout submittal requirements; added acceptable depth measurement criteria; revised list of items requiring as -built survey "during" and "after" construction; and revised acceptable digital survey file format BELTMILL PH 2 CITY OF FORT WORTH City Project No. 104381 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised February 14, 2018 SECTION 0174 23 CLEANING PART1- GENERAL 1.1 SUMMARY 017423-1 DAP CLEANING Page 1 of 4 A. Section Includes: 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fall on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 01 74 23 - 2 DAP CLEANING Page 2 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 01 74 23 - 3 DAP CLEANING Page 3 of 4 6. Handle materials in a controlled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on -site. B. Intermediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3. Confine construction debris daily in strategically located container(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. C. Exterior (Site or Right of Way) Final Cleaning 1. Remove trash and debris containers from site. a. Re -seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP application 01 74 23 - 4 DAP CLEANING Page 4 of 4 CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 017719-1 DAP CLOSEOUT REQUIREMENTS Pagel of 3 SECTION 01 7719 CLOSEOUT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. The procedure for closing out a contract B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Guarantees, Bonds and Affidavits 1. No application for final payment will be accepted until all guarantees, bonds, certificates, licenses and affidavits required for Work or equipment as specified are satisfactorily filed with the City. B. Release of Liens or Claims 1. No application for final payment will be accepted until satisfactory evidence of release of liens has been submitted to the City. 1.5 SUBMITTALS A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 017719-2 DAP CLOSEOUT REQUIREMENTS Page 2 of 3 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 CLOSEOUT PROCEDURE A. Prior to requesting Final Inspection, submit: 1. Project Record Documents in accordance with Section 0178 39 2. Operation and Maintenance Data, if required, in accordance with Section 0178 23 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 01 74 23. C. Final Inspection 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. 3. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. 4. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts b. Adequate oil and grease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses £ Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment D. Notice of Project Completion CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 017719-3 DAP CLOSEOUT REQUIREMENTS Page 3 of 3 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) f. Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP application CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 017823-1 DAP OPERATION AND MAINTENANCE DATA Page 1 of 5 SECTION 0178 23 OPERATION AND MAINTENANCE DATA PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limited to: a. Traffic Controllers b. Irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product shipment to the project site. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 0133 00. All submittals shall be approved by the City prior to delivery. 1.6 INFORMATIONAL SUBMITTALS A. Submittal Form 1. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: 8 %2 inches x 11 inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 01 78 23 - 2 DAP OPERATION AND MAINTENANCE DATA Page 2 of 5 d. Drawings 1) Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. e. Provide fly -leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. f. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manual Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content 1. Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information 3. Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diagrams b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. c. Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 01 78 23 - 3 DAP OPERATION AND MAINTENANCE DATA Page 3 of 5 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: 1) Proper procedures in event of failure 2) Instances which might affect validity of warranties or bonds C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual in final form. Content, for architectural products, applied materials and finishes: a. Manufacturer's data, giving full information on products 1) Catalog number, size, composition 2) Color and texture designations 3) Information required for reordering special manufactured products b. Instructions for care and maintenance 1) Manufacturer's recommendation for types of cleaning agents and methods 2) Cautions against cleaning agents and methods which are detrimental to product 3) Recommended schedule for cleaning and maintenance Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving full information on products 1) Applicable standards 2) Chemical composition 3) Details of installation b. Instructions for inspection, maintenance and repair D. Manual for Equipment and Systems 1. Submit 5 copies of complete manual in final form. 2. Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures 1) Start-up, break-in, routine and normal operating instructions 2) Regulation, control, stopping, shut -down and emergency instructions 3) Summer and winter operating instructions 4) Special operating instructions c. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Alignment, adjusting and checking d. Servicing and lubrication schedule 1) List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Description of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts g. As installed control diagrams by controls manufacturer h. Each contractor's coordination drawings 1) As installed color coded piping diagrams CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 01 78 23 - 4 DAP OPERATION AND MAINTENANCE DATA Page 4 of 5 i. Charts of valve tag numbers, with location and function of each valve j. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage k. Other data as required under pertinent Sections of Specifications 3. Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical service 2) Controls 3) Communications c. As installed color coded wiring diagrams d. Operating procedures 1) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions e. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking f. Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Provide operation and maintenance data by personnel with the following criteria: 1. Trained and experienced in maintenance and operation of described products 2. Skilled as technical writer to the extent required to communicate essential data 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 01 78 23 - 5 DAP OPERATION AND MAINTENANCE DATA Page 5 of 5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.5.A.1 — title of section removed 4/7/2014 M.Domenech Revised for DAP Application CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 017839-1 DAP PROJECT RECORD DOCUMENTS Page 1 of 4 SECTION 0178 39 I' ' 031K, dt] 1191 tl 11 0 6Z6l8 UDAZtV PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to City's Project Representative. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Accuracy of Records 1. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2. Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 017839-2 DAP PROJECT RECORD DOCUMENTS Page 2 of 4 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 1.10 STORAGE AND HANDLING A. Storage and Handling Requirements 1. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the final Project Record Documents. 2. In the event of loss of recorded data, use means necessary to again secure the data to the City's approval. a. In such case, provide replacements to the standards originally required by the Contract Documents. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2- PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED] i•I6�:7 �CK1 '71 1 �Z�ll>t��Y�f.� A. Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 complete set of all Documents comprising the Contract. B. Final Record Documents 1. At a time nearing the completion of the Work and prior to Final Inspection, provide the City 1 complete set of all Final Record Drawings in the Contract. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the job set, identify each of the Documents with the title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 017839-3 DAP PROJECT RECORD DOCUMENTS Page 3 of 4 2. Preservation a. Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c. Maintain the job set at the site of work. 3. Coordination with Construction Survey a. At a minimum clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c. Date all entries. d. Call attention to the entry by a "cloud" drawn around the area or areas affected. e. In the event of overlapping changes, use different colors for the overlapping changes. 5. Conversion of schematic layouts a. In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to within 1 inch, the centerline of each run of items. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3) Make all identification sufficiently descriptive that it may be related reliably to the Specifications. c. The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. B. Final Project Record Documents 1. Transfer of data to Drawings a. Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. c. Call attention to each entry by drawing a "cloud" around the area or areas affected. CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 017839-4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] DATE 4/7/2014 0 ►00 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP Application CITY OF FORT WORTH BELTMILL PHASE 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104381 Revised April 7, 2014 FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03/07/2023 Note: All water or sewer pipe larger than 1S inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding maybe required for some pipes. Approval IModel INational Water & Sewer - Manholes & Bases/Components 33-39-10 (Rev 2/3/16) ` 07/23/97 33 05 13 Urethane Hydrophilic Waterstop Asahi Kogyo K.K. Adeka Ultra -Seal P-201 ASTM D2240/D412/1)792 04/26/00 33 05 13 Offset Joint for 4' Diam. MH Hanson Concrete Products Drawing No. 35-0048-001 04/26/00 33 05 13 Profile Gasket for 4' Diam. MIR. Press -Seal Gasket Corp. 250-4G Gasket ASTM C-443/C-361 SS MH 1126199 33 05 13 HOPE Manhole Adjustment Rings Ladtech, Inc HDPE Adjustment Ring Traffic and Non -traffic area 5/13/05 33 05 13 Manhole External Wrap Canusa - CPS WrapidSeal Manhole Encapsulation System er - Manholes & Bases/Fiberelass 33-39-13 (1/8/13 1/26/99 33 39 13 Fiberglass Manhole Fluid Containment, Inc. Flowti[e ASTM 3153 Non -traffic area 08/30/06 33 39 13 Fiberglass Manhole L.F. Manufacturing Non -traffic area 1 j Water & Sewer - Manholes & Bases/Frames & Covers/Rectammlar 33-05-13 (Rev 2/3/16) 1 * 33 05 13 (Manholc Frames and Covers Western Iron Works, Bass & Hays Foundry 1001 24"x40" WE) Water & Sewer - Manholes & Bases/Frames & Covers/Standard Boundl 33-05-13 (Rev 2/3/16) 3305 13 Manhole Frames and Covers Western Iron Works, Bass & Hays Foundry 30024 24" Dia. * 3305 13 Manhole Frames and Covers McKinley Iron Works Inc. A 24 AM 24" Dia. 1 08/24/18 3305 13 Manhole Frames and Covers Neenah Foundry R-1272 ASTM A48 & AASHTO M306 24" Dia. 1 08/24/18 3305 13 Manhole Frames and Covers Neenah Foundry R- 165-LM (Hinged) ASTM A48 & AASHTO M306 24" Dia. 1 08/24/18 3305 13 Manhole Frames and Covers Neenah Foundry NF 1274 ASTM A48 & AASHTO M306 30" Dia. 1 08/24/18 3305 13 Manhole Frames and Covers Neenah Foundry R-1743-LM (Hinged) ASTM A48 & AASHTO M306 30" dia. 1 33 05 13 Manhole Frames and Covers Sigma Corporation MH-144N 1 33 05 13 Manhole Frames and Covers Sigma Corporation MH-143N 1 33 05 13 Manhole Frames and Covers Pont-A-Mousson GTS-STD 24" dia. 1 33 05 13 Manhole Frames and Covers Neenah Casting 24" dia. 1 10/31/06 33 05 13 Manhole Frames and Covers (Hinged) Powerseal Hinged Ductile Iron Manhole ASTM A536 24" Dia. 1 7/25/03 3305 13 Manhole Frames and Covers Saint-Gobain Pipelines (Pamrex/rexus) RE32-R8FS 30" Dia. 1 01/31/06 3305 13 30" Dia. MH Ring and Cover East Jordan Iron Works V1432-2 and V1483 Designs AASFITO M306-04 30" Dia. 11/02/10 3305 13 30" Dia. MH Ring and Cover Sigma Corporation MH165IFWN & MH16502 30" Dia 1 07/19/1 t 3305 13 30" Dia. MH Ring and Cover Star Pipe Products NIH32FTWSS-DC 30" Dia 1 08/10/11 3305 13 30" Dia. MH Ring and Cover Accucast 220700 Heavy Duty with Gasket Ring 30" Dia 30" ERGO XL Assembly 10/14/13 3305 13 30" Dia. MH Ring and Cover, (Hinged & Lockable) East Jordan Iron Works with Cam Lock/MPIC/T-Gasket ASSEITO MI 05 & ASTM A536 30" Dia 06/01/17 3405 13 30" Dia. MH Ring and Cover (Hinged & Lockable) CI SIP Industries 2280 (32") ASTM A 48 30" Dia. CAP-ONE-30-FTW, Composite, w/ Lack .111111 33 OS 13 30" Dia. MH Ring and Cover Composite Access Products, L.P. w/o Hmg 30" Dia. 10/07/21 3405 13 30" Dia. MH Ring and Cover Trumbull Manufacturing 32"(30") Frame and Cover 30" Dia. Water &der - Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight 33-05-13 (Rev 2/3/1� 33 05 13 Manhole Frames and Covers Pont-A-Mousson Pamtight 24" Dia. * 3305 13 Manhole Frames and Covers Neenah Casting 24" Dia. * 3305 13 Manhole Frames and Covers Western Iron Works,Bass & Hays Foundry 300-24P 24" Dia. * 3305 13 Manhole Frames and Covers McKinley Iron Works Inc. WPA24AM 24" Dia. 03/08/00 3305 13 Manhole Frames and Covers Accucast RC-2100 ASTM A 48 24" Dia. 04/20/01 3305 13 Manhole Frames and Covers (SIP)Serampore Industries Private Ltd. 300-24-23.75 Ring and Cover ASTM A 48 24" Dia. �Wr - Manholes & Bases/Precast Concrete l2ev 33 39 10 Manhole, Precast Concrete 1/8/13 Hydro Conduit Corp SPL Item 449 ASTM C 478 41" * 33 39 10 Manhole, Precast Concrete Wall Concrete Pipe Co. hic. ASTM C-443 48" 09/23/96 33 39 10 Manhole, Precast Concrete Concrete Product Inc. 48" I.D. Manhole w/ 32" Cone ASTM C 478 48" w/32" cone 05/08/18 33 39 10 Manhole, Precast Concrete The Turner Company 48", 60" I.D. Manhole w/ 32" Cone ASTM C 478 48", 60" 10/27/06 33 39 10 Manhole, Precast Concrete Oldeastle Precast Inc. 48" I.D. Manhole w/ 24" Cone ASTM C 478 48" Diam w 24" Ring 1 06/09/10 33 39 10 Manhole, Precast (Reinforced Polymer)Conaete US Composite Pipe Reinforced Polymer Concrete ASTM C-76 48" to 72" 1 09/06/19 33 3920 Manhole, Precast Concrete Forterra Pipe and Precast 60" & 72" I.D. Manhole w/32" Cone ASTM C-76 60" & 72" 10/07/21 32 39 20 Manhole, Precast Concrete Forterra Pipe and Precast 48" I.D. Manhole w/32" Cone ASTM C-77 48" 10/07/21 33 3920 Manhole, Precast (Reinforced Polymer) Concrete Armorock 48" & 60" I.D. Manhole w/32" Cone 48" & 60" 10/07/21 33 3920 Manhole, Precast (Hybrid) Polymer & PVC Predl Systems 48" & 60" I.D. Manhole w/32" Cone 48" & 60" Non Traffic Areas ASTM C-478; ASTM C-923; 03/07/23 33 3920 Manhole, Precast Concrete AmeriTex Pi a and Products, LLC 48" & 10" I.D. Manhole w/32" Cone ASTM C-443 03/07/23 33 3920 IManhole, Precast (Reinforced Pol er) Concrete P3 Polymers, RockHards 48" & 60" I.D. Manhole w/32" Cone 04/28/07 IManholc, Precast (Reinforced Polymcr) Concrete Amitech USA Meyer Polycrete Pipe Eater & Sewer - Manholes & Bases/Rehab Svstems/Cementitlous EI-14 Manhole Rehab Systems Quadex 04/23/01 EI-14 Manhole Rehab Systems Standard Cement Materials, Inc. Relmer MSP E1-14 Manhole Rehab Systems AP/M Permaform 4120101 E I-14 Manhole Rehab System Strong Company Strong Seal MS2A Rehab System 5/12/03 EI-14 Manhole Rehab System (Liner) Triplex Lining System MH repair product to stop infiltration ASTM D5813 08/30/06 General Concrete Repair FlexKrete Technologies Vinyl Polyester Repair Product Mise. Use * From Original Standard Products List CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03/07/2023 Note: All water or sewer pipe larger than 1S inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding maybe required for some pipes. Approv pec No./ IManufacturer Model1. National Spec Water &Sewer - an o es Bases/Rehab Svstems/NonCementitiousI mmmmw`Moir 05/ 00/96 E1-14 Manhole Rehab Systems Sprayroa, Spray Wall Polyurethane Coating ASTM D639/D790 I 12/14/01 Coating for Corrosion protection(Exterior) ERTECH Series 20230 and 2100 (Asphatic Emulsion) Structures Only I01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1BB, Sl, S2 Acid Resistance Test Sewer Applications I8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications » v�33 nu�pP�ooung i�P�ayolloull- x `Structures 03/19/18 I 39 20� Coating for Corrosion orotection(Exterim) Sherwin Williams Grade (Asohatic Emulsion) Only I 33 05 13 Manhole Insert ME Knutson Enterprises Made to Order - Plastic ASTM D 1248 For 24" dia. I * 33 05 13 Manhole Insert South Western Packaging Made to Order - Plastic ASTM D 1248 For 24" dia. I I * 3305 13 Manhole Insert Noflow-Inflow Made to Order - Plastic ASTM D 1248 For 24" dia. I I 09/23/96 3305 13 Manhole Insert Scuthwestcon Packing & Seals, Inc. Lifesaver - Stainless Steel For 24" dia. I I 09/23/96 3305 13 Manhole Insert Southwestern Packing & Seals, Inc. TetherLok - Stainless Steel For 24" dia I I 711111.72 ara e�Sewer - Pine Casim SDacers 33-05-24 (07/01/13) I Steel Band Casing Spacers Advanced Products and Systems, Inc. Carbon Steel Spacers, Model SI IO2/02/93 Stainless Steel Casing Spacer Advanced Products and Systems, Inc. Stainless Steel Spacer, Model SSI I04/22/87 Casing Spacers Cascade Waterworks Manufacturing Casing Spacers I09/14/10 Stainless Steel Casing Spacer Pipeline Seal and Insulator Stainless Steel Casing Spacer Up to 48" I09/14/10 Coated Steel Casin Spacers Pipeline Seal and Insulator Coated Steel Casin Spacers Up to 48" I 05/10/11 Stainless Steel Casing Spacer Powerseal 4810 Powerchock Up to 48" 03/19/18 Casing Spacers BWM SS-12 Casing Spacer(Stainleas Steel) 03/19/18 Casing Spacers BWM FB-12 Casing Spacer (Coated Carbon Steel) for Non_pressure Pipe and Grouted Casing 03/29/22 33 05 13 Casing Spacers CCI Pipeline Systems CSC12, CSS12 PEW I Water & Sewer - Pines/Ductile Iron 33-11-10(1/8/13) i I * 33 11 10 Ductile Iron Pipe Griffin Pipe Products, Co. Super Bell-Tite Ductile Iron Pressure Pipe, AW WA C150, C151 3" thrn 24" OS/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co. American Fastite Pipe (Bell Spigot) AW WA C150, C151 4" thrn 30" 08/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co. American Flex Ring (Restrained Joint) AW WA C150, C151 4" thin 30" * 33 11 10 Ductile Iron Pipe U.S. Pipe and Foundry Co. AW WA C150, C151 * 33 11 10 Ductile Iron Pipe McWane Cast Iron Pipe Co. AW WA C150, C151 I Water & Sewer - Utility Line Marker (08/24/2018) I I ewer - Coatinss/EDD -39-60 (01/08/13) I INEK 02/25/02 Epoxy Lining System Sauereisen, Inc SewerGard 21 ORS LA County 9210-1.33 I 12/14/01 Epmv Lmmg System Ertech Technical Coatings Ertcch 2030 and 2100 Series I I 04/14/05 Interim Ductile Iron Pipe Coating Induron Protecto 401 ASTM B-117 Ductile Iron Pipe Only I I01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1HB, Sl, S2 Acid Resistance Test Sewer Applications I I8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications I I INNE Sewer - Coatings/Polvurethane I I Sewer - Combination Air Valves I I 05/25/18 I 33-31-70 Air Release Valve A.R.I. USA, Inc. D121LTP02(Compwite Body) 2" I I Sewer - Pines/Concrete I * EI-04 C. Pipe, Reinforced Wall Concrete Pipe Co. Inc. ASTM C 76 I E I-04 Conc. Pipe, Reinforced Hydro Condun Corporation Class III T&G, SPL Item #77 ASTM C 76 I I E I-04 Conc. Pipe, Reinforced Hanson Concrete Products SPL item 495 hirsaliele, 998 Pipe ASTM C 76 I IE I-04 Conc. Pipe, Reinforced Concrete Pipe & Products Co. Inc. ASTM C 76 I I Sewer - Pine Enlargment Svstem (Method)33-31-23 (01/18/13). I Svstem PIM Corporation Polyethylene PIM Corp., Piscata Way, N.J. Approved Previously �Plm McConnell Systems McLat Construction Polyethylene Houston, Texas Approved Previously I TRS Systems Trenchless Replacement System Polyethylene Calgary, Canada Approved Previously I I Sewer - PiDe/Fibere as_ss Reinforced/ 33-31-13(1/8/13) I Hobas Pipe USA, Inc. Holies Pipe (Non -Pressure) ASTM D3262/D3754 I 7/21 /97 33 31 13 Cent. Cast Fiberglass (FRP) I 03/22/10 333 13 Fiberglass It,. (FRP) Ameroa Bondstmod RPMP Pipe AST- D3262-3154 I 04/09/21 33 31 13 Glass -Fiber Reinforced Polviner Pipe FRP Thompson Pie Group Thompson Pipe Flowtite ASTM D32621D3754 03/07/23 3331 13 lFiber.lass Pine (FRP) Future Pine Industries Fiberstron¢ FRP ASTM D3212. ASTM D3681. ASTM D4161. AW WA M45 Sewer - PiDe/Polvmer Pine 4/14/OS Polvmer Modified Concrete Pioe Amrtech USA Meyer Polycrete Pioe ASTM C33, A276, F477 8" tp 1112", Class V I06/09/10 El-9 Reinforced Polymer Concrete Pipe US Composite Pipe Reinforced Polymer Concrete Pioe ASTM C-76 I I I /HDPE 33-31-23(1/8/13) * From Original Standard Products List CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03/07/2023 Note: All water or sewer pipe larder than 1S inch diameter shall be approved for use by the Water Department on a proiect specific basis. Special bedding maybe required for some I ' hdsity polyethylene pipe Phillips Driswpipe, Inc. Opticore Ductile Polyethylene Pipe ASTM D 1248 8" I * gh-density polyethylene pipe �'Ih�gh_d_maitv PI- Inc. ASTM D 1248 8" * gh-density polyethylene pipe Polly Pipe, Inc. ASTM D 1248 8" polyethylene pipe CSR Hydro CondmUPioelme Systems McConnell Pipe Enlargement ASTM D 1248 Sewer - PiDes/PVC (Pressure Sewer) 33-11-12 (4/1/13) 12/02/11 33-11-1� DR -Id PVC Pressure Pipe Prpelife Jetstream PVC PressurePipe AWWA C900 4"[tiro 12" 10/22/14 33-11-12 DR-14 PVC Pressure Pipe Royal Building Products Royal Seal PVC Pressure Pipe AW WA C900 4" thru 12" 33-31-20 PVC Sewer Poe 12/23/97* 33-31-20 PVC Sewer Pipe * 33-31-20 PVC Sewer Pipe 01/18/18 33-31-20 PVC Sewer Pipe 11/11/98 33-31-20 PVC Sewer Pipe * 33-31-20 PVC Sewer Pipe 09/11/12 33-31-20 PVC Sewer 05/06/05 33-31-20 , PVC Sohd Wall Pipe 04/27/06 33-31-20 PVC Sewer Fittings * 33-31-20 PVC Sewer Fittings 1 3/19/2018 33 3120 PVC Sewer Pipe 1 3/19/2018 33 3120 PVC Sewer Pre 1 3/29/2019 33 3120 Gasketed Fittings (PVC) 1 10/21/2020 33 3120 PVC Sewer Pipe 1 10/22/2020 33 3120 PVC Sewer Pipe 1 10/21/2020 33 3120 PVC Sewer Pipe P 33-31-12 1 * Cured in Place Pipe 05/03/99 Cured in Place Ape 05/29/96 Cured in Place Pipe Sewer - Pipes/Rehab/Fold & Form Fold and Form Pi 11/03/98 Fold and Form Pipe Fold and Form Pipe 12/04/00 Fold and Form Pipe 06/09/03 Fold and Form Pipe 1-M Manufacturing Co., Inc. (JM Eagle) Diamond Plastics Corporation Lamson Vylon Pipe Vinyltech PVC Pipe Diamond Plastics Corporation J-M Manufacturing Co, Inc. (JM Eagle) P,qq life Jet Stream Diamond Plastics Corporation Harco Plastic Trends, Inc.(Westlak ) Pipelife Jet Stream Pipelife Jet Stream GPK Products, Inc. NAPCO(Westlake) Sanderson Pipe Corp. NAPCO(Westlake) Insimfrrm Texark, Inc National Envirotech Group Remolds Inc/Inliner Technolgy (Inliner USA) Cullum Pipe Systems, Inc. Insimfirm Technologies, Inc. American Pipe & Plastics, Inc. Ultralmer Miller Pipeline Corp. Sewer - PiDes/ODen Prot -de Laree Diameter i 09/26/91 E100-2 PVC Sewer Pipe, Ribbed Lamson Vvlon Pipe 09/26/91 E100-2 PVC Sewer Pipe, Ribbed Extmsim Technologies, Inc. E100-2 PVC Sewer Pipe, Ribbed Up -or ETI Company 11/10/10 (E100-2) Polypropylene (PP) Sewer Pipe, Double Wall Advanced Drainage Systems (ADS) 11/10/10 (E100-2) Polypropylene (PP) Sewer Pipe, Triple Wall Advanced Drainage Systems (ADS) 05/16/11 Steel Reinforced Polyethylene Pipe ConTech Construction Products SDR-26 SDR-26 Gravity Sewer "S" Gravity Sewer Pipe SDR 26/35 PS 115/46 SDR-26 and SDR-35 SDR 26/35 PS 115/46 SDR-26 and SDR-35 Gasket Fittings Gasketed PVC Sewer Main Finings SDR 35 SDR 26 SDR 26 SDR 26 SDR 26 SDR 26/35 PS 115/46 National Liner, (SPL) Item #27 Inliner Technology Insim "NuPIpe" Ultralmer PVC Alloy Pipelmer EX Method Carlon Vylon H.C. Closed Profile Pipe, Ultra -Rib Open Profile Sewer Pipe SaniTite HP Double Wall (Corrugated) SamTne HP Triple Wall Pipe Durmaxx ASTM D 3034 ASTM D 3034 ASTM F 789 ASTM D3034 ASTM F 679 ASTM F 679 ASTM F-679 ASTM F-679 ASTM D-3034, D-1784, etc ASTM D 3034 ASTM F679 ASTM D3034 ASTM D3034/F-679 ASTM D3034 ASTM D3034 ASTM F-679 ASTM F 1216 ASTM F-1216/D-5813 ASTM F 1216 ASTM F-1504 ASTM F-1504, 1871, 1867 ASTM F-1504, F-1947 ASTM F 679 ASTM F 679 ASTM F 2736 ASTM F 2764 ASTM F 2562 4" - 15" 4" thru 15" 4" thru 15" 4" thru 15" 18" to 27" 18" - 28" 18" 18" to 48" 4" - 11" 18"- 24" 4"- 15" 4"- 15" 4" - 15" 4"- 15" 18"- 36" Demo. Purpose Only Up to 18" diameter 18" to 48" 18" to 48" 24"-30" 30" to 60" 24" to 72" * From Original Standard Products List CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03/07/2023 Note: All water or sewer pipe larger than 1S inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding maybe required for some pipes. Approval Spec I on 1W Manufacturer Model1. National Spec Water - Aoour�enancesgig -10 (07/Ol/13) Ol/18/18 33-12-10 Double Strap Saddle Romac 202NS Nylon Coated AWWA C800 1"-2"SVC, no 124"Pipe 08/28/02 Double Strap Saddle Smith Blair 4317 Nylon Coated Double Strap Saddle 07/23/12 33-12-10 Double StrapService Saddle Mueller Company U-S Double SS Strap DI Saddle AWWA C800 1"-2" SVC, u to 24" Pi e 03/07/23 33-12-10 Double StrapService Saddle Powerseal 3450AS, Inc. Corp. Stop, ON Strap, Stainless NSF ANSI 372 1"-2" SVC, u to 24 Pi e 10/27/87 Curb Stops -Ball Meter Valves McDonald 6100M,6100MT & 610MT 3/4" and 1" 10/27/87 Curb Stops -Ball Meter Valves McDonald 4603B, 4604B, 610UM, 6100TM and 6101M 1 h" and 2" FB600-7NL, FB1600-7-NL, FV23-777-W-NL, 1/25/2018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. L22-77NL AWWA C800 2" FB600-6-NL, FB1600-6-NL, FV23-666-W- 1111018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. NL, L22-66NL AWWA C800 1-1/2" FB600-4-NL, FB1600-4-NL, B11-444-WR- 1111018 33-12-1. Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. NL, B22444-WR-NL, L28-44NL AWWA C800 I " 13-25000N, B-24277N-3, B-20200N-3, H- AWWA C800, ANSF 61, 1/25/2018 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15000N, , H-1552N, H142276N ANSI/NSF 372 _ B-25000N, B-20200N-3, B-24277N-3,H- AWWA C800, ANSF 61, 1111.1. 33-12-1. Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15000N, H-14276N, H-15525N ANSI/NSF 372 1-1/2" 5/25/2018 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15530N ANSI/NSF 372 V, 01/26/00 Coated Tapping Saddle with Double SS Straps 1CM Industries, Inc. #406 Double Band SS Saddle 1"-2" Taps on up to 12" 0/5/21/12 33-12-25 Tapping Sleeve (Coated Steel) 1CM Industries, Inc. 412 Tapping Sleeve ESS AWWA C-223 Up to 30" w/12" Out 03/29/22 33-12-25 Tapping Sleeve (Coated or Stainless Steel) 1CM Industries, Inc. 415 Tapping Sleeve AWWA C-223 Concrete Pipe Only 05/10/11 Tapping Sleeve (Stainless Steel) Powerseal 3490AS (Flange) & 3490MJ 4"-1" and 16" 02/29/12 33-12-25 Tapping Sleeve (Coated Steel) Romac FTS 420 AWWA C-223 U p to 42" w/24" Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) Romac SST Stainless Steel AWWA C-223 Up to 24" w/12" Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) Romac SST III Stainless Steel AWWA C-223 Up to 30" w/12" Out 05/10/11 Joint Repair Clamp Powerseal 3232 Bell Joint Repair Clamp 4" to 30" Plastic Meter Box w/Composite Lid DFW Plastics lnc. DFW37C-12-lEPAFFTW Plastic Meter Box w/Composite Lid DFW Plastics lnc. DFW39C-12-lEPAFFTW 08/30/06 Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW65C-14-lEPAF FTW Class "A" Concrete Meter Box Bass & Hays CMB37-B12 1118 LID-9 Concrete Meter Box Bass & Hays CMB-18-Dual 1416 LID-9 Concrete Meter Box Bass & Hays CMB65-B65 1527 LID-9 r Water - Combination Air Release 33-31-70 (01/08/13) 1 E I -I I Au Release Valve GA Industries, Inc. Empve Air and Vacuum Valve, Model 935 ASTM A 126 Class B, ASTM A 1" &W21' * EI-11 [oribriation ombmation Ar Release Valve Multiplex Manufacturing Co. Crispin Air and Vacuum Valves, Model No. 1/2", 1" & 2" EI-11 ombination Air Release Valve Valve and Primer Corp. APCO #143C, #145C and #147C 1", 2" & 3" Water Barrel Fire Hvdrants 10/Ol/87 E-1-12 Dry Barrel Fire Hydrant American -Darting Valve Drawing Nos. 90-18608, 94-18560 AWWA C-502 03/31/88 E-1-12 Dry Barrel Fire Hydrant American Darling Valve Shop Drawing No. 94-18791 AWWA C-502 09/30/87 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Shop Drawing No. D-19895 AWWA C-502 01/12/93 E-1-12 Dry Barrel Fire Hydrant American AVK Company Model 2700 AWWA C-502 08/24/88 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Drawings D20435, D20436, B20506 AWWA C-502 E-1-12 Dry Barrel Fire Hydrant ITT Kennedy Valve Shop Drawing No. D-80783FW AWWA C-502 0.1.7 E-1-12 Dry Barrel Fire Hydrant M&H Valve Company Shop Drawing No. 13476 AWWA C-502 Shop Drawings No. 6461 t0/14/87 E-1-12 Dry Barrel Fire Hydrant Mueller Company A-423 Centurion AW WA C-502 01/15/88 E1-12 Dry Barrel Fire Hydrant Mueller Company A-423 Super Centurion 200 AWWA C-502 10/09/87 E-1-12 Dry Barrel Fire Hydrant U.S. Pipe & Foundry Shop Drawing No. 960250 AWWA C-502 09/16/87 E-1-12 Dry Barrel Fire Hydrant American Flow Control (AFC) Waterous Pacer WB67 AWWA C-502 08/12/16 33-12-40 Dry Barrel Fire Hydrant EI (East Jordan Iron Works) WaterMaster 5CD250 I 02/05/93 E101-5 Detector Check Meter Ames Company Model 1000 Detector Check Valve AWWA C550 4" - 10" 08/05/04 Magnetic Drive Vertical Turbine Hersey Magnetic Drive Vertical AWWA C701, Class 1 3/4" - 6" * From Original Standard Products List CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03/07/2023 Note: All water or sewer pipe larger than 1S inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding maybe required for some pipes. Approval IModel INational Water -Pines/PVC(Pressure Waterl33-31-70(01/08/13) -W MEL M` —AL I 01/18/18 33-11-12 PVC Pressure Pipe Vinyltech PVC Pipe DR14 ASTM D1784 V-12" I I 3/19/2018 33 11 12 PVC Pressure Pipe Pipelife Jet Stream DR14 AWWA C900 4"-12" I I 3/19/2018 33 11 12 PVC Pressure Pipe Pipelife Jet Stream DR18 AWWA C900 16"-24" I I 5/25/2018 33 11 12 PVC Pressure Pipe Diamond Plastics Corporation DR 14 AWWA C900 4"-12" I 5/25/2018 3311 12 PVC Pressure Pipe Diamond Plastics Corporation DR 18 AWWA C900 16"-24" AWWA C900-16 UL 1285 12/6/2018 3311 12 PVC Pressure Pipe J-M Manufacnrring Co., Inc d/b/a JM Eagle DR 14 ANSI/NSF 61 4"-28" FM 1612 12/6/2018 33 11 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/b/a JM Eagle DR 18 ° 16"-24" 9/6/2019 33 11 12 PVC Pressure Pipe Underground Solutions Inc. DR14 Fusible PVC AWWA C900 4" - 8" 9/6/2019 33 11 12 PVC Pressure Pipe NAPCO(Westlake) DR18 AWWA C900 16"-24" 9/6/2019 33 11 12 PVC Pressure Pipe NAPCO(Westlake) DR14 AWWA C900 4"-12" 9/6/2019 33 11 12 PVC Pressure Pipe Sanderson Pipe Corp. DR14 AWWA C900 4"- 12" I Water - Pines/Valves & Fittin¢s/Ductile Iron Fittines 33--11 (01/08/13) I 07/23/92 EI-07 Ductile Iron Fittings Star Pipe Products, Inc. Mechanical Joint Finings AW WA C153 & C110 I EI-07 Ductile Iron Fittings Griffin Pipe Products, Co. Mechanical Joint Fittiq @ AWWA C 110 I * E1-07 Ductile Iron Fittings McWane/Tyler Pipe/ Union Utilmes Division Mechanical Joint Finings, SSB lass 350 AWWA C 153, C 110, C 111 I 08/11/98 E1-07 Ductile Iron Fittings Sigma, Co. Mechanical Joint Finings, SSB Class 351 AWWA C 153, C 110, C 112 I 02/26/14 E1-07 MJ Fittings Accucast Class 350 C-153 MJ Fittings AW WA C153 4"-12" I 05/14/98 E1-07 Ductile Iron Joint Restraints Ford Meter Box Co./Uni-Flange Uni-Flange Series 1400 AW WA C111/C153 4" to 36" I 05/14/98 E1-24 PVC Joint Restraints Ford Meter Box Co./Uni-Flange Uni-Flange Series 1500 Circle -Lock AW WA C111/C153 4" to 24" I 11/09/04 E1-07 Ductile Iron Joint Restraints One Bolt, Inc. One Bolt Restrained Joint Fitting AWWA C111/C116/C153 4" to 12" I I 02/29/12 33-11-11 Ductile Iron Pipe Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series 1100 (for DI Pipe) AWWA C111/C116/C153 4" to 42" I I 02/29/12 33-11-11 PVC Pipe Mechanical Joint Restraint EBAA Iron, hic. Megalug Series 2000 (for PVC Pipe) AWWA C111/C116/C153 4" to 24" I I 08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLC4 - SLC10 AW WA C111/C153 4" to 10" I I 03/06/19 33-11-11 Mechanical Joint Retainer GlandaFVC) Sigma, Co. Sigma One-Lok SLCS4 - SLCS12 AW WA C111/C153 4" to 12" I I 08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLCE AW WA C111/C153 12" to 24" I I 08/10/98 E1-07 MJ Fiffir IP) Sigma, Co. Sigma One-Lok SLDE AW WA C153 4" - 24" I I 10/12/10 E1-24 Interim Restrained Joint Svatem S & B Techncial Products Bulldog System ( Diamond Lok 21 & JM ASTM F-1624 4" to 12" I I 08/16/06 E1-07 Mechanical Joint Fittings SIP Ind-nies(Serampore) Mechanical Joint Fittings AW WA C153 4" to 24" I I 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. PVC Stargrip Series 4000 ASTM A536 AW WA CI I I I I 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. DIP Stmgrip Series 3000 ASTM A536 AW WA CI I I I EZ Grip Joint Restraint (EZD) Black For DIP 03/19/18 33-11-I1 Mechanical Joint Retainer Glands SIP Industries(Seramnore) ASTM A536 AW WA CI I I 3"-48" EZ Grip Joint Restraint (EZD) Red for C900 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Serampore) DRl4 PVC Ape ASTM A536 AW WA CI I I 4"-12" 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Sersmpore) �` vuP, V11i. nn, oa„ �,.t.�`VJ nGLL �V1 �J°✓ ASTM A536 AW WA CI11 16"-24" I Water - Pioes/Valves & Fittings/Resilient Seated Gate Valve* 33-12-20 (05/13/15). I Resilient Wedged Gate Valve w/no Gears American Flow Control Series 2500 Drawing # 94-20247 16" I 12/13/02 Resilient Wedge Gate Valve American Flow Control Series 2530 and Series 2536 AWWA C515 30" and 36" I I 08/31/99 Resilient Wedge Gate Valve American Flow Control Series 2520 & 2524 (SD 94-20255) AW WA C515 20" and 24" I I 05/18/99 Resilient Wedge Gate Valve American Flow Control Series 2516 (SD 94-20247) AWWA C515 16" I I 10/24/00 E1-26 Resilient Wedge Gate Valve American Flow Control Series 2500 (Ductile Iron) AWWA C515 4" to 12" I I 08/05/04 Resilient Wedge Gate Valve American Flow Control 42" and 48" AFC 2500 AWWA C515 42" and 48" I I 05/23/91 E1-26 Resilient Wedge Gate Valve American AVK Company American AVK Resilient Seeded GV AWWA C509 4" to 12" I I01/24/02 E1-26 Resilient Wedge Gate Valve American AVK Company 20" and smaller I I * E1-26 Resilient Seated Gate Valve Kennedy 4" - 12" I I E1-26 Resilient Seated Gate Valve M&H 4" - 12" I I * E1-26 Resilient Seated Gate Valve Mueller Co. 4" - 12" I I 11/08/99 Resilient Wedge Gate Valve Mueller Co. Series A2361 (SD 6647) AWWA C515 16" I I 01/23/03 Resilient Wedge Gate Valve Mueller Co. Series A2360 for 18"-24" (SD 6709) AWWA C515 24" and smaller I 05/13/05 Resilient Wedge Gate Valve Mueller Co. Mueller 30" & 36", C-515 AW WA C515 30" and 36" I 01/31/06 Resilient Wedge Gate Valve Mueller Co. Mueller 42" & 48", C-515 AW WA C515 42" and 48" I 01/28/88 EI-26 Resilient Wedge Gate Valve Clow Valve Co. AWWA C509 4" - 12" I 10/04/94 Resilient Wedge Gate Valve Clow Valve Co. 16" RS GV (SD D-20995) AW WA C515 16" I 11/08/99 EI-26 Resilient Wedge Gate Valve Clow Valve Co. Clow RW Valve (SD D-21652) AW WA C515 24" and smaller I 11/29/04 Resilient Wedge Gate Valve Clow Valve Co. Clow 30" & 36" C-515 AWWA C515 30" and 36" (Note 3) 11/30/12 Resilient We Crate Valve Clow Valve Co. Clow Valve Model 2638 AW WA C515 24" to 48" (Nora 3) 05/08/91 E1-26 Resilient Seat Gate Valve Stockham Valves & Fittings AWWA C 509, ANSI 420 - stem, 4" - 12" I E1-26 Resilient Seated Gate Valve U.S. Pipe and Foundry Co. Mcoesw1250, regwremerts SPL #74 3" to 16" 11/26/16 33-12-20 Resilient Seated Gate Valve EJ (East Jordan Iron Works) EJ Fluo Master Gat. Valve & Boxes 08/24/18 I Mateo Gate Valve Matco-Norca 225 MR AWWA/ANSI C115/An21.15 4" to 16" I * From Original Standard Products List FORT WORTH® Note: All water or CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST than 1S inch diameter shall be approved for use by the Water basis. for some Updated: 03/07/2023 I * E1-30 Rubber Seated Butterfly Valve Henry Pratt Co. AW WA C-504 24" I * E1-30 Rubber Seated ButterFly Valve Mueller Co. AW WA C-504 24"and smaller 1/11/99 E1-30 Rubber Seated Butterfly Valve De ik Valves Co. AW WA C-504 24" and larger 06/12/03 E1-30 Valmatm American Butterfly Valve Valmanc Valve and Manufacturing Cert. Valmatic American Butterfly Valve. AW WA C-504 Up to 84" diameter 04/06/07 E1-30 Rubber Seated ButterFly Valve M&H Valve M&H Style 4500 & 1450 AW WA C-504 24" to 48" 03/19/18 33 12 21 Rubber Seated Butterfly Valve G. A. Industries (Golden Anderson) AW WA C504 Butterfly Valve AW WA C-504 30"-54" Water�ne Encasement 33-11-10 (01/08/13) 05/12/OS EI-13 Polyethylene Encasment Flessol Packaging Fulton Enterprises AW WA C105 8 mil LLD 05/12/05 EI-13 Polyethylene Encasment Mountain States Plastics (MSP) and AEP Ind. Standard Hardware AW WA C105 8 mil LLD 05/12/05 E1-13 Polyethylene Encasment AEP Industries Bullstrong by Cowtown Bolt & Gasket AW WA C105 8 mil LLD 09/06/19 33-11-11 Polyethylene Encasment Northtown Products Inc. PE Encasement for DIP AW WA C105 8 mil LLD Water - Samnlint= Station 03/07/23 33 12 50 Water Sam lin Station I Eclipse Number 88 , 12-inch Depth of Bur As shown in spec. 33 12 50 00,1,-k Water - Automatic Flusher Automated Flushing System Mueller Hydrogaud HG2-A-IN-2-PVC-018-LPLG(Permanent) 04/09/21 Automated Flushing System Kupf le Foundry Company Eclipse #9800wc 04/09/21 Automated Flushing System Kupf le Foundry Company Eclipse 99700 (Portable) * From Original Standard Products List WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT dob-01— STANDARD PRODUCTS LIST AS OF 05/O1/2023 Concrete 9/9/2022 03 30 00 Mix Design American Concrete Company 30CAF029 3000 psi Concrete for Sidewalks & ADA Ramps 9/9/2022 03 30 00 Mix Design American Concrete Company 01JAF382 1000 psi Concrete Base Material for Trench Repair 9/9/2022 03 30 00 Mix Design American Concrete Company 40CNF065 4000 psi Concrete for Manholes & Utility Structures 9/9/2022 03 30 00 Mix Design American Concrete Company 45CAF076 4500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Argos D10000001737 4500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Argos D10000001 7914500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Argos D10000001793 4500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Argos D10000001103 4500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Argos D10000002107 4500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Argos D10000001273 4500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Argos D10000001617 3600 psi Concrete for Machine Placed Paving 9/9/2022 03 30 00 Mix Design Argos D10000008381 4500 psi Concrete for HES Paving 9/9/2022 03 30 00 Mix Design Argos D10000009857 50 psi Flowable Fill - CLSM 9/9/2022 03 30 00 Mix Design Argos D10000001055 3000 psi Concrete for Inlets, Junction Boxes, Manholes, Channel Liners, Sidewalks, Driveways, Curb & Gutter 9/9/2022 03 30 00 Mix Design Argos D1000001043S 3000 psi Concrete for Sidewalks, Curbs 9/9/2022 03 30 00 Mix Design Argos D1000001565S 3000 psi Concrete for Curbs, Curb & Gutters, Sidewalks, Driveways, ADA Ramps 9/9/2022 03 30 00 Mix Design Argos D1000001615 3600 psi Concrete for Inlets, Boxes, Encasement, Blocking 9/9/2022 03 30 00 Mix Design Argos D10000001 0613600 psi Concrete for Inlets, Boxes, Encasement, Blocking 9/9/2022 03 30 00 Mix Design Argos D10000001083S 4000 psi Concrete for Valve Pads, Inlets, Structures, Headwalls, Thrust Blocking 9/9/2022 03 30 00 Mix Design Argos D10000001083 4000 psi Concrete for Valve Pads, Inlets, Structures, Headwalls, Thrust Blocking 9/9/2022 03 30 00 Mix Design Argos D10000001685 4000 psi Concrete for Valve Pads 9/9/2022 03 30 00 Mix Design Argos D10000005751 750 Psi Concrete Base for Trench Repair 9/9/2022 03 30 00 Mix Design Argos D10000001 6814000 psi Concrete for Headwalls, Retaining Walls, Box Culverts, Valley Gutters 9/9/2022 03 30 00 Mix Design Big D Concrete 7SKGRT 3000 psi Concrete for Grouting 9/9/2022 03 30 00 Mix Design Big D Concrete 14500AE 4500 psi Concrete for High Early Strength Paving 5/2/2023 32 13 13 Mix Design Big D Concrete CM14520AE 4500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Big Town Concrete 452065-1 4500 psi hand placed paving 9/9/2022 03 30 00 Mix Design Big Town Concrete 450065-1 4500 psi hand placed paving 9/9/2022 03 30 00 Mix Design Burnco Texas 45U500BG 4500 psi Concrete Mix for Hand Placed Paving, Storm Structures 9/9/2022 03 30 00 Mix Design Burnco Texas 40U553BG 4000 psi Concrete Mix for Machine Placed Paving 9/9/2022 03 30 00 Mix Design Burnco Texas 55UI20AG 4000 psi Concrete Mix for High Early Strength Paving 9/9/2022 03 30 00 Mix Design Bumco Texas 30U100AG 3000 psi Concrete Mix for Pipe Collars, Inlets, Thrust Blocks, Sidewalks, ADA Ramps 9/9/2022 03 30 00 Mix Design Burnco Texas 30U1O1AG 3000 psi Concrete Mix for Flatwork 9/9/2022 03 30 00 Mix Design Burnco Texas 30U500BG 3000 psi Concrete Mix for Blocking, Driveways, Curb & Gutters, Sidewalks, ADA Ramps 9/9/2022 03 30 00 Mix Design Burnco Texas 40U500BG 4000 psi Concrete Mix for Storm Drain Structures, Driveways, Screen Walls 9/9/2022 03 30 00 Mix Design Burnco Texas 36U500BG 3600 psi Concrete Mix for Lighting and Traffic Signal Foundations 9/9/2022 03 30 00 Mix Design Burnco Texas 08Y450BA 800 psi Concrete Mix for Base for Trench Repair 9/9/2022 03 30 00 Mix Design Burnco Texas OIY690BF 100 psi Concrete Mix for Flowable Fill 4/l/2023 03 34 16 Mix Design Burnco Texas IOYH50BF 1000 psi Concrete Base Material for Trench Repair 9/9/2022 03 30 00 Mix Design Carder Concrete FWCC602021 4500 psi concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Carder Concrete FWCC552091 3600 psi for Machine Placed Paving 9/9/2022 03 30 00 Mix Design Carder Concrete FWCC602091 3600 psi for Machine Placed Paving 9/9/2022 03 30 00 Mix Design Carder Concrete FWCC359101 Flowable Fill - CLSM 9/9/2022 03 30 00 Mix Design Carder Concrete FWFF237501 Flowable Fill - CLSM 9/9/2022 03 30 00 Mix Design Carder Concrete FWCC602001 4000 psi Concrete for Storm Drain Structures, Manholes, Headwalls, Retaining Walls, Valley Gutters, Drive Approaches 9/9/2022 03 30 00 Mix Design Carder Concrete FWCC502021 3500 psi concrete for Sidewalks, Driveways, Ramps, Curb & Gutter 9/9/2022 03 30 00 Mix Design Carder Concrete FWCC502001 3000 psi for Sidewalks, Driveways, Ramps, Curb & Gutter, Flatwork 9/9/2022 03 30 00 Mix Design Charley's Concrete 4142 3600 psi Concrete for Curb Inlets, Junction Boxes 9/9/2022 03 30 00 Mix Design Charley's Concrete 4518 4000 psi Concrete for Headwalls, Wingwalls 9/9/2022 03 30 00 Mix Design Charley's Concrete 5167 3600 psi Concrete Mix for Machine Placed Paving 9/9/2022 03 30 00 Mix Design Charley's Concrete 4609 4500 psi Concrete Mix for Hand Placed Paving, Manholes 9/9/2022 03 30 00 Mix Design Charley's Concrete 6103 4500 psi Concrete Mix for Hand Placed Paving, Manholes 9/9/2022 03 30 00 Mix Design Charley's Concrete 4502 3000 psi Concrete Mix for Sidewalks 9/9/2022 03 30 00 Mix Design Charley's Concrete 3759 3000 psi Concrete Mix for Sidewalks 9/9/2022 03 30 00 Mix Design Charley's Concrete 1502 150 psi Concrete for Flowable Fill-CLSM 9/9/2022 03 30 00 Mix Design Charley's Concrete 1518 150 Psi Concrete for Flowable Fill-CLSM 9/9/2022 03 30 00 Mix Design Charley's Concrete 5642 4000 psi Concrete for Storm Drain Structures 9/9/2022 03 30 00 Mix Design Charley's Concrete 6595 5000 psi Concrete Mix for High Early Strength Paving 9/9/2022 03 30 00 Mix Design Charley's Concrete 6589 4500 psi Concrete Mix for High Early Strength Paving 9/9/2022 03 30 00 Mix Design Chisholm Trail Redi Mix C13020AE 3000 psi Concrete for Driveways, Curb & Gutter 9/9/2022 03 30 00 Mix Design City Concrete Company 11-350-FF 50-150 psi Concrete for Flowable Fill-CLSM FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT ApproN Spec No. STANDARD PRODUCTS LIST AS OF 05/01/2023 Classification Manufacturer Model No. at Concrete (Coi tinned) 9/9/2022 03 30 00 Mix Design City Concrete Company 30HA25II 3000 psi Concrete for Rip -Rap 9/9/2022 03 30 00 Mix Design City Concrete Company 30HA20II 3000 psi Concrete Mix for Blocking, Sidewalks, Flatwork, Pads 9/9/2022 03 30 00 Mix Design City Concrete Company 45NG25H 3600 psi Concrete Mix for Drilled Shafts 9/9/2022 03 30 00 Mix Design City Concrete Company 50QG25H 3600 psi Slurry Displaced Drilled Shaft 9/9/2022 03 30 00 Mix Design City Concrete Company 45NA20II 4500 psi Concrete Mix for Hand Placed Paving 9/9/2022 03 30 00 Mix Design City Concrete Company 36LA2011 3600 psi Concrete Mix for Machine Placed Paving 9/9/2022 03 30 00 Mix Design City Concrete Company 36JA001J 3600 psi Concrete Mix for Machine Placed Paving 9/9/2022 03 30 00 Mix Design City Concrete Company 40LA2011 4000 psi Concrete Mix for Stone Drain Structures 11/16/2022 03 30 00 Mix Design City Concrete Company CLNG25II 3600 psi Concrete for Drilled Shaft 5/5/2023 03 30 00 Mix Design City Concrete Company CCNA250AG 3600 psi Concrete for Drilled Shafts 5/5/2023 03 30 00 Mix Design City Concrete Company CSSQA250AG 3,600 psi Concrete for Slurry Displacement Shafts, Underwater Shafts 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 250 3000 psi Concrete Mix for Sidewalks, Driveways, ADA Ramps 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 350 3000 psi Concrete Mix for Sidewalks, Driveways, ADA Ramps 9/9/2022 0334 13 Mix Design Cow Town Redi Mix 9 70 psi Flowable Fill - CLSM 9/9/2022 0334 13 Mix Design Cow Town Redi Mix 9-5-2 70 psi Flowable Fill - CLSM 9/9/2022 0334 13 Mix Design Cow Town Redi Mix 220-8 50 psi Concrete Mix for Flowable Fill - CLSM 9/9/2022 0334 13 Mix Design Cow Town Redi Mix 320-8 50 psi Concrete Mix for Flowable Fill - CLSM 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 230-8 750 psi Concrete Base Material for Trench Repair 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 330-58 750 psi Concrete Base Material for Trench Repair 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 353 3000 psi Concrete Mix for Sidewalks, ADA Ramps, Driveways, Curb & Gutter, Safety End Treatments, Non-TxDOT Retaining Walls 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 253-W 3000 psi Concrete Mix Sidewalks, ADA Ramps, Driveways, Curb & Gutter, Safety End Treatments, Non-TxDOT Retaining Walls 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 260 4000 psi Concrete Mix for Bridge Slabs, Box Culverts, Headwalls 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 260-1 3600 psi Concrete Mix for Headwalls 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 260-2 3600 psi Concrete Mix for Box Culverts, Headwalls 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 360 4000 psi Concrete Mix for Bridge Slabs, Box Culverts, Headwalls 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 360-1 3600 psi Concrete Mix for Box Culverts, Headwalls, Wingwalls 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 264-N 4500 psi Concrete Mix for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 366 4500 psi Concrete Mix for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 265 4500 psi Concrete Mix for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 365 4500 psi Concrete Mix for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 370-NC 4500 psi Concrete for HES Paving 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 370-INC 5000 psi Concrete for HES Paving 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 375-NC 5000 psi Concrete for HES Paving 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 267 4200 psi Concrete Mix for Manholes and Drainage Structures 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 270 5000 psi Concrete Mix for Cast -in -Place Box Culverts 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 370 5000 psi Concrete Mix for Cast -in -Place Box Culverts 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 255-2 3000 psi Concrete Mix for Inlets, Thrust Blocking, Concrete Encasement 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 257 3600 psi Concrete mix for Valley Gutters 11/14/2022 32 13 13 Mix Design Cow Town Redi Mix 357-M 3600 psi Concrete Mix for Machine Placed Paving 9/9/2022 33 13 13 Mix Design Cow Town Redi Mix 257-M 3600 psi Concrete Mix for Machine Placed Paving 9/9/2022 34 13 13 Mix Design Cow Town Redi Mix 260-M 4000 psi Concrete Mix for Machine Placed Paving 9/9/2022 35 13 13 Mix Design Cow Town Redi Mix 360-M 4000 psi Concrete Mix for Machine Placed Paving 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 255-LP 3000 psi Concrete Mix for Curb & Gutter 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 355-LP 3000 psi Concrete Mix for Curb & Gutter 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 255 3500 psi Concrete Mix for Flatwork, Inlets, Thrust Blocking Concrete Encasement 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 355 3000 psi Concrete Mix for Inlets, Thrust Blocking, Concrete Encasement 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 365-STX 4000 psi Concrete for Bridge slabs, top slabs of direct traffic culverts, approach slabs 9/9/2022 03 30 00 Mix Design Cow Town Redi Mix 357 3600 psi Concrete Mix for Valley Gutters 1/18/2023 03 30 00 Mix Design Cow Town Redi Mix 380-NC 4500 psi Concrete for HES Paving 9/9/2022 03 30 00 Mix Design GCH Concrete Services GCH4000 4000 psi Concrete for for Sidewalks, Ramps, Headwalls, Inlets, and Storm Drain Structures 9/9/2022 03 30 00 Mix Design GCH Concrete Services GCHVS 4000 psi Concrete for Machine Placed Paving 9/9/2022 03 30 00 Mix Design GCH Concrete Services GCH4500 4500 psi Concrete Hand Placed Paving 9/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates C47PV5E5 3000 psi Concrete for Sidewalks, ADA Ramps 9/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates 2MWR-70J23504 3000 psi Concrete for Sidewalks, ADA Ramps 9/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates 2MWR-147QW5D5 3000 psi Concrete Mix for Sidewalks, ADA Ramps 9/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates 2MWR-056PS5D5 4000 psi Concrete Machine Placed Paving 9/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates 2MWR-161UV5DM 4500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates 2MWR-1 OMQS50N 4500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates 161PS5EM 4500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates C47PV5E5 3000 psi Concrete Mix for Sidewalks, ADA Ramps 4/7/2023 03 30 00 mix Design Ingram Concrete & Aggregates 1 OLQS50N 3,600 psi Concrete for Light Pole Bases M RTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT 0- STANDARD PRODUCTS LIST AS OF 05/01/2023 m No. Classification Manufacturer Model No. 3000 Mix Design Ingram Concrete & Aggregates 161PS5EM 4500 psi Concrete Mix for Hand Placed Paving 3000 Mix Design Holcim - SOR, Inc. 1551 3000 psi Concrete Mix for Blocking FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT ApproN Spec No. STANDARD PRODUCTS LIST AS OF 05/01/2023 Classification Manufacturer Model No. al Concrete(Con'inued) 9/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 5177 3000 psi Concrete Mix for Sidewalks 9/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 1261 3000 psi Concrete Mix for Sidewalks 9/9/2022 4 30 00 Mix Design Holcim - SOR, Inc. 2125 4500 psi Concrete for HES Paving 9/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 1701 4000 psi Concrete Mix for Storm Drain Structures, Sanitary Sewer Manholes, Junction Box 9/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 5409 4000 psi Concrete Mix for Sidewalks, Inlets 9/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 5507 4500 psi Concrete Mix for Hand Placed Paving 12/15/2022 3 30 00 Mix Design Holcim - SOR, Inc. 3741 100 psi concrete for flowable fill/CSLM 9/9/2022 04 30 00 Mix Design Holcim - SOR, Inc. 5017 200 psi Concrete for Base Material for Trench Repair 9/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 9600 3600 psi Concrete for Drill Shafts 9/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 1851 4500 psi Concrete for Storm Drain Structures, Hand Placed Paving 12/5/2022 4 30 00 Mix Design Holcim - SOR, Inc. 1822 3600 psi Concrete for Drilled Shafts 9/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 1859 4000 psi Concrete for Drilled Shafts 4/7/2023 03 30 00 Mix Design Liquid Stone C301D 3,000 psi Concrete for Sidewalks, Approaches, and Driveways. 4/27/2023 03 30 00 Mix Design Liquid Stone C361DNFA 3,600 psi Concrete for Retaining wall, driveway, junction box apron, approach 4/7/2023 03 30 00 Mix Design Liquid Stone C361DHR 3,600 psi Concrete for Light Pole Bases. 1/24/2023 03 30 00 Mix Design Liquid Stone C451DHR-A 4500psi Concrete for HES Paving 9/9/2022 03 30 00 Mix Design Martin Marietta R2132214 3,000 psi Concrete for Sidewalks & Ramps 9/9/2022 03 30 00 Mix Design Martin Marietta D9490SC 3,000 psi Concrete for Sidewalks & Ramps 9/9/2022 03 30 00 Mix Design Martin Marietta R2131214 3,000 psi Concrete for Sidewalks & Ramps 9/9/2022 03 30 00 Mix Design Martin Marietta R2131314 3,000 psi Concrete for Sidewalks & Ramps 9/9/2022 03 30 00 Mix Design Martin Marietta R2136014 3,000 psi Concrete for Sidewalks & Ramps 9/9/2022 03 30 00 Mix Design Martin Marietta R2136214 3,000 psi Concrete for Sidewalks & Ramps 9/9/2022 03 30 00 Mix Design Martin Marietta R2141224 4,000 psi Concrete for Sidewalks & Ramps 9/9/2022 03 30 00 Mix Design Martin Marietta R2141024 4,000 psi Concrete for Sidewalks & Ramps 9/9/2022 03 30 00 Mix Design Martin Marietta R2136224 3,600 psi Concrete for Curb Inlets 9/9/2022 03 30 00 Mix Design Martin Marietta R2141233 3,600 psi Concrete for Storm Structures, Inlets, Blocking & Encasement 9/9/2022 03 30 00 Mix Design Martin Marietta FLOW25A 50 psi Concrete for Flowable Fill/CLSM 9/9/2022 03 30 00 Mix Design Martin Marietta R2142233 3,600 psi Concrete for Manholes, Inlets & Headwalls 9/9/2022 03 30 00 Mix Design Martin Marietta R2146333 3,600 psi Concrete for Manholes, Inlets & Headwalls, Concrete Encasement 9/9/2022 03 30 00 Mix Design Martin Marietta R21412304,000 psi Concrete for Manholes, Inlets & Headwalls, Valve Pads 9/9/2022 03 30 00 Mix Design Martin Marietta R2146035 4,000 psi Concrete for Manholes, Inlets & Headwalls, Valve Pads 9/9/2022 03 30 00 Mix Design Martin Marietta R2146335 4,500 psi Concrete for Hand Placed Paving, Inlets, Storm Drain Structures 11/2/2022 32 13 13 Mix Design Martin Marietta Q214IN27 4,000 psi Concrete for Machine Placed paving 11/2/2022 32 13 13 Mix Design Martin Marietta Q214IK30 4,000 psi Concrete for Machine Placed Paving 11/2/2022 32 13 13 Mix Design Martin Marietta R2146N36 4,500 psi Concrete for Hand Placed Paving 11/15/2022 33 13 13 Mix Design Martin Marietta R2146K36 4,500 psi Concrete for Hand Placed Paving 11/15/2022 34 13 13 Mix Design Martin Marietta R2146P36 4,500 psi Concrete for Hand Placed Paving 11/2/2022 32 13 13 Mix Design Martin Marietta R2146K36 4,500 psi Concrete for Hand Placed Paving 11/2/2022 32 13 13 Mix Design Martin Marietta R2146N35 / 6.11 sacks / 4,500 psi concrete for Hand Place Paving, Inlets, Manholes, Headwalls 11/2/2022 32 13 13 Mix Design Martin Marietta R2146K34 4,000 psi Concrete for Inlets, Manholes, Headwalls 11/2/2022 32 13 13 Mix Design Martin Marietta R2141N24 4,000 psi Concrete for Sidewalks and Ramps 11/2/2022 32 13 13 Mix Design Martin Marietta R2141K24 4,000 psi Concrete for Sidewalks and Ramps 9/9/2022 03 30 00 Mix Design Martin Marietta R2146038 4,500 psi Concrete for Inlets, Storm Drain Structures 9/9/2022 03 30 00 Mix Design Martin Marietta R2146036 4,500 psi Concrete for Hand Placed Paving, Inlets 9/9/2022 03 30 00 Mix Design Martin Marietta R2146042 4,500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Martin Marietta R2146242 4,500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Martin Marietta R2146236 4,500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Martin Marietta D9493SC 4,500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Martin Marietta R2147241 4,500 psi Concrete for Hand Placed Paving 4/l/2023 32 1320 Mix Design Martin Marietta R2136N14 / 5.00 sacks / 3,000 psi concrete for Sidewalks 4/l/2023 03 30 00 Mix Design Martin Marietta R2146P33 / 6.01 sacks / 4,000 psi concrete for Bridge Deck 4/l/2023 03 30 00 Mix Design Martin Marietta R2146033 4,000 psi Concrete for Riprap 4/7/2023 32 1320 Mix Design Martin Marietta R2136K14 3,000 psi concrete for sidewalks and ramps 4/7/2023 32 13 13 Mix Design Martin Marietta R2161K70 6,000 psi (3,000 psi @ 24 hrs.) for HES Paving 4/l/2023 03 30 00 Mix Design Martin Marietta 310LBP 3,600 psi Concrete for Retaining Walls 4/l/2023 03 30 00 Mix Design Martin Marietta R2141030 4,000 psi Concrete for Riprap FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT ApproN Spec No. STANDARD PRODUCTS LIST AS OF 05/O1/2023 Classification Manufacturer Model No. at Concrete(Con'inued) 5/3/2023 32 1320 Mix Design Martin Marietta M7842344 4,000 psi Concrete for Bridge Deck 9/9/2022 32 1320 Mix Design NCS Redi Mix NCS5020A 3000 psi Concrete Mix for Curb & Gutter, Driveways, Sidewalks 9/9/2022 03 30 00 Mix Design NBR Ready Mix TX C-YY 3000 psi Concrete Mix for Curb Inlets 9/9/2022 03 30 00 Mix Design NBR Ready Mix TX C-NY 3000 psi Concrete Mix for Curb Inlets 1/24/2023 03 30 00 Mix Design Rapid Redi Mix RRM6320AHP 4500 psi Concrete for Hand Placed Paving 1/24/2023 03 30 00 Mix Design Rapid Redi Mix RRM5525A 3600 psi Concrete for Valley Gutters, Sidewalks, Approaches, ADA Ramps 1/18/2023 03 30 00 Mix Design Rapid Redi Mix RRM6020ASS 4000 psi Concrete for Strom Drain Structures 1/18/2023 03 30 00 Mix Design Rapid Redi Mix RRM5320A 3000 psi Concrete for Blocking 1/18/2023 03 30 00 Mix Design Rapid Redi Mix RRM5020A 3000 psi Concrete for Curb, Gutter, Driveways, Sidewalk, Ramps 9/9/2022 03 30 00 Mix Design Redi-Mix DCA2E554 3000 psi Concrete Mix for Rip Rap 9/9/2022 03 30 00 Mix Design Redi-Mix VOR 1524 3000 psi Concrete Mix for Curb & Gutter 9/9/2022 03 34 13 Mix Design Redi-Mix FOC10021 215 psi Flowable Fill - CLSM 9/9/2022 03 30 00 Mix Design Redi-Mix 10R 1524 3000 psi Concrete Mix for Driveways, Sidewalks, ADA Ramps 9/9/2022 03 30 00 Mix Design Redi-Mix 10R 1504 3000 psi Concrete Mix for Sidewalks 9/9/2022 03 30 00 Mix Design Redi-Mix 1 OL11504 3,600 psi Concrete Mix for Sidewalks, Curb & Gutter 9/9/2022 03 30 00 Mix Design Redi-Mix 1 OL11524 3600 psi Concrete Mix Manholes, Inlets, Junction Boxes, Headwalls 9/9/2022 03 30 00 Mix Design Redi-Mix 1RJ11524 3500 psi Concrete Mix for Thrust Blocks, Valve Pads 9/29/2022 03 30 00 Mix Design Redi-Mix 1 OL21524 4000 psi Concrete Mix for Manholes 9/9/2022 03 30 00 Mix Design Redi-Mix 15611524 4000 psi Concrete Mix for Cast -in -Place Storm Drain Structures 9/9/2022 03 30 00 Mix Design Redi-Mix 1 OL115E4 3600 psi Concrete Mix for Bridge substructures 9/9/2022 03 30 00 Mix Design Redi-Mix 156115D4 4000 psi Bridge Slabs 9/9/2022 0334 13 Mix Design Redi-Mix F35238VN 100 psi Flowable Fill - CLSM 9/9/2022 0334 13 Mix Design Redi-Mix FOD138VM 100 psi Flowable Fill - CLSM 9/9/2022 0334 13 Mix Design Redi-Mix I OR 1554 3000 psi Concrete Mix for Rip -Rap 9/9/2022 03 30 00 Mix Design Redi-Mix POG138K9 1000 psi Concrete Mix for Trench Repair Base Material 9/9/2022 03 30 00 Mix Design Redi-Mix 1 OK11524 3600 psi Concrete Mix for Encasement 9/9/2022 03 30 00 Mix Design Redi-Mix 1 ON11507 4500 psi (2600 psi @ 24 hrs.) Concrete Mix for HES Paving 9/9/2022 03 30 00 Mix Design Redi-Mix 1 ON11504 5000 psi (3600 psi @ 2 days) Concrete Mix for HES Paving 9/9/2022 03 30 00 Mix Design Redi-Mix 50K11524 3600 psi Concrete Mix for Machine Placed Paving 9/9/2022 03 30 00 Mix Design Redi-Mix 1 OM115D4 4500 psi Concrete Mix for Hand Placed Paving, Storm Drain Structures 9/9/2022 03 30 00 Mix Design Redi-Mix 1 OM11524 4500 psi Concrete Mix for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Redi-Mix 1 OM11504 4500 psi Concrete Mix for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Redi-Mix 145CD5P4 4500 psi Concrete Mix for Hand Placed Paving, Storm Drain Structures 11/2/2022 03 30 00 Mix Design Redi-Mix 145P25P4 4500 psi Concrete for Storm Drain Structures 12/5/2022 03 30 00 Mix Design Redi-Mix 1OK115C4 3500 psi Concrete for Thrust Blocks, Valve Pads 12/5/2022 03 30 00 Mix Design Redi-Mix 156115C4 4000 psi Concrete for CIP Storm Drain Structures 12/5/2022 03 30 00 Mix Design Redi-Mix 1OL115C4 3600 psi Concrete for Manhole, Inlet, Junction Box, Headwall 9/9/2022 0334 13 Mix Design SRM Concrete 30000 3,000 psi Concrete for Sidewalks and Ramps, Curb & Gutter 9/9/2022 0334 13 Mix Design SRM Concrete 40050 4,000 psi Concrete for Headwalls, Retaining Wall 9/9/2022 03 30 00 Mix Design SRM Concrete 35023 3,600 psi Concrete for Machine Placed Paving 9/9/2022 03 30 00 Mix Design SRM Concrete 40068 3,600 psi Concrete for Machine Placed Paving 9/9/2022 03 30 00 Mix Design SRM Concrete 45000 4,500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design SRM Concrete 45300 4,500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design SRM Concrete 40326 4,500 (3,00 @ 3-days) psi Concrete for HES Paving 10/10/2022 03 30 00 Mix Design SRM Concrete 35000 3600 psi Concrete for Sewer Manholes 10/10/2022 03 30 00 Mix Design SRM Concrete 35300 3600 psi Concrete for Swere Manholes 9/9/2022 03 30 00 Mix Design SRM Concrete 35022 3,600 psi Concrete for Junction Box 9/9/2022 03 30 00 Mix Design SRM Concrete 30050 3,000 psi Concrete for Sidewalks, Ramps, Inlets, Junction Boxes, Thrust Blocks, Curb and Gutter, Driveways, Barrier Ramp 2/10/2023 03 30 00 Mix Design SRM Concrete 50310 5,000 psi Concrete for HES Paving 1/13/2023 32 13 13 Mix Design SRM Concrete 45023 4,500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Tarrant Concrete FW6020AHP 4500 psi Concrete Mix for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Tarrant Concrete FW60AHP 4500 psi Concrete Mix for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Tarrant Concrete TCFW6020AEP 4500 psi Concrete Mix for Hand Placed Paving 9/9/2022 03 30 00 Mix Design Tarrant Concrete FW7520AMR 4500 (3000 psi @ 3-days) psi Concrete HES Paving 9/9/2022 03 30 00 Mix Design Tarrant Concrete FW6520AMR 4500 (3000 psi @ 3-days) psi HES Paving 9/9/2022 03 30 00 Mix Design Tarrant Concrete FW5520AMP 3600 psi Concrete for Machine Placed Paving 9/9/2022 03 30 00 Mix Design Tarrant Concrete FW5320A 3000 psi Concrete Mix for Blocking 9/9/2022 0334 13 Mix Design Tarrant Concrete FWFF150CLSM 50-150 psi Flowable Fill - CLSM 9/9/2022 0334 13 Mix Design Tarrant Concrete FWFF275 50-150 psi Flowable Fill - CLSM FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT ApproN Spec No. STANDARD PRODUCTS LIST AS OF 05/01/2023 Classification Manufacturer Model No. National Sp,- at Concrete(Con'inued) 9/9/2022 03 30 00 Mix Design Tarrant Concrete FW6020A2 4000 psi Concrete Mix for Storm Drain Structures 10/10/2022 03 30 00 Mix Design Tarrant Concrete TCFW6025A2 4000 psi Concrete for Manholes 10/10/2022 03 30 00 Mix Design Tarrant Concrete TCFW5020A 3000 psi Concrete for Sidewalks 9/9/2022 03 30 00 Mix Design Tarrant Concrete FW5025A 3000 psi Concrete Mix for Curb & Gutter, Driveways, Sidewalks, ADA Ramps 9/9/2022 03 30 00 Mix Design Titan Ready Mix 3020AE 3000 psi Concrete for Sidewalks 9/9/2022 03 30 00 Mix Design Tarrant Concrete CP5020A 3000 psi Concrete Mix for Curb and Gutter 9/9/2022 03 30 00 Mix Design Tarrant Concrete FW5525A2 3600 psi Concrete Mix for Sidewalks, Drive Approaches, ADA Ramp 9/9/2022 03 30 00 Mix Design Titan Ready Mix TRC4520 4500 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design True Grit Redi Mix 0250.230 3000 psi Concrete Mix for Flatwork, Curb & Gutter, Driveways, Sidewalks, ADA Ramps 9/9/2022 03 30 00 Mix Design True Grit Redi Mix 270.230 5000 psi Concrete for Hand Placed Paving 9/9/2022 03 30 00 Mix Design True Grit Redi Mix 0250.2301 3000 psi Concret Mix for Curb & Gutter, Driveways, Sidewalks, ADA Ramps 9/9/2022 03 30 00 Mix Design True Grit Redi Mix 0260.2302 4000 psi Concrete Mix for Machine Placed Paving 9/9/2022 03 30 00 Mix Design True Grit Redi Mix 0255.2301 3600 psi Concrete Mix for Machine Placed Paving 9/9/2022 03 30 00 Mix Design True Grit Redi Mix 0260.2301 4500 psi Concrete Mix for Hand Placed Paving 9/9/2022 03 30 00 Mix Design True Grit Redi Mix 0265.2301 4500 psi Concrete Mix for Valley Gutters, Hand Placed Paving 9/9/2022 03 30 00 Mix Design Wise Redi Mix 3678 3600 psi Concrete Mix for Lighting and Traffic Signal Foundations As halt Paviu�j 9/9/2022 322 16 Mix Design Austin Asphalt FT513137965 PG64-22 Type D Fine Surface 9/9/2022 32 12 16 IMixDesign Austin Asphalt DA513135965 PG64-22 Type D Fine Surface 9/9/2022 32 12 16 IMixDesign Austin Asphalt FT513117965 PG64-22 Type B Fine Base 9/9/2022 32 12 16 IMixDesign Austin Asphalt FTIBI39965 PG64-22 Type B Fine Base 9/9/2022 32 12 16 IMixDesign Austin Asphalt FTIB117.2 PG64-22 Type B Fine Base 9/9/2022 32 12 16 IMixDesign Reynolds Asphalt 1901D PG64-22 Type D Fine Surface 9/9/2022 32 12 16 IMixDesign Reynolds Asphalt It 12B PG64-22 Type B Fine Base 9/9/2022 32 12 16 IMixDesign Reynolds Asphalt 1612B PG64-22 Type B Fine Base 9/9/2022 32 12 16 IMixDesign Sunmount Paving 341DV6422 PG64-22 Type D Fine Surface 11/26/2022 32 12 16 IMixDesign Sunmount Paving 340DV6422 PG64-22 Type D Fine Surface 12/5/2022 33 12 16 IMixDesign Sunmount Paving 3076BV6422 PG62-22 Type B Fine Base 9/9/2022 32 12 16 IMixDesign Sunmount Paving 341-BRAP6422ERG PG64-22 Type B Fine Base 9/9/2022 32 12 16 jMix Design TXBIT 37-211305-20 PG64-22 Type B Fine Base 9/9/2022 32 12 16 jMix Design TXBIT 44-211305-17 PG64-22 Type B Fine Base 9/9/2022 32 12 16 jMix Design TXBIT 211305 (1757) PG64-22 Type B Fine Base 9/9/2022 32 12 16 jMix Design TXBIT 222475 (1857) PG64-22 Type D Fine Surface 9/9/2022 32 12 16 jMix Design TXBIT 29-222475-19 PG64-22 Type D Fine Surface 9/9/2022 32 12 16 IMixDesign TXBIT 1-222475-20 PG64-22 Type D Fine Surface 9/9/2022 32 12 16 IMixDesign TXBIT 64-224125-18 PG70-22 Type D Fine Surface 9/9/2022 32 12 16 IMixDesign TXBIT 12-222475-19 PG64-22 Type D Fine Surface Detectable Warnin� Surface 9/9/2022 32 1320 DWS - Pavers Pine Hall Brick (Winston Salem, NC) Tactile Pavers 9/9/2022 32 1320 DWS - Pavers Western Brick Co. (Houston, TX) Detectable Warning Pavers 9/9/2022 32 1320 DWS - Composite Engineered Plastics, Inc. Armor Tile (Williamsville, NY) 9/9/2022 32 1320 DWS - Composite ADA Solutions (Wilmington, MA) Heritage Brick CIP Composite Paver 4/7/2023 32 1320 DWS - Pavers ADA Solutions (Wilmington, MA) Detectable Warning Pavers Silicone Joint Sealant 9/9/2022 132 1373 Joint Sealant Dow 890SL - Cold Applied, Single Component, Silicone Joint Sealant ASTM D5893 9/9/2022 132 1373 Joint Sealant Tremco 900SL - Cold Applied, Single Component, Silicone Joint Sealant ASTM D5893 9/9/2022 132 1373 Joint Sealant Pecora 300SL - Cold Applied, Single Component, Silicone Joint Sealant ASTM D5893 9/9/2022 132 1373 Joint Sealant Crafco RoadSaver Silicone - Cold Applied, Single Component, Silicone Joint Sealant ASTM D5893 Utility Trench Embedment Sand 9/9/2022 3305 10 Embedment Sand Silver Creek Materials Utility Embedment Sand ASTM C33 9/9/2022 3305 10 Embedment Sand Crouch Materials Utility Embedment Sand ASTM C33 9/9/2022 3305 10 Embedment Sand F and L Dirt Movers Utility Embedment Sand ASTM C33 9/9/2022 3305 10 Embedment Sand F and L Dirt Movers Utility Embedment Sand ASTM C33 9/9/2022 3305 10 Embedment Sand Tin Top Martin Marietta Utility Embedment Sand ASTM C33 WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT dob-01— STANDARD PRODUCTS LIST AS OF 05/01/2023 Frame, Cover and Grade Rinds - Cast Iron** for Stormwater Structures 9/9/2022 3305 13 Manhole Frames and Covers Neena Foundry 32" Diameter Liftmate Water Manhole Gasketed Frame and Cover w/Longhorn Logo, Model No. NF-1743LT66 9/9/2022 3305 13 Manhole Frames and Covers Neena Foundry 32" Diameter Liftmate Sanitary Sewer Manhole Frame and Cover w/Longhom Logo, Model No. NF-1743LT69 9/9/2022 3305 13 Manhole Frames and Covers SIP Industries 32" Diameter Fort Worth Sanitary Sewer Manhole Frame and Cover, Item No. NF-2280 9/9/2022 3305 13 Manhole Frames and Covers EJCO Ergo XL Assembly 32" Diameter Sanitary Sewer Manhole Frame and Cover, Model No. 00148021LO10 9/9/2022 3305 13 Manhole Frames and Covers Neena Foundry 32" Diameter Liftmate Storm Sewer Junction Box and Manhole Frame and Cover w/Longhom Logo, Model No. NF-1743LTXX 9/9/2022 3305 13 Manhole Frames and Covers Neena Foundry 24" Diameter Liftmate Storm Sewer Inlet Manhole Frame and Cover w/Longhom Logo, Model No. NF-165OLT61 9/9/2022 3305 13 Manhole Frames and Covers AccuCast (Govind Steel Company, Ltd.) 24" Diameter MHRC #220605 ** ASTM A48 AASHTO M306 9/9/2022 3305 13 Manhole Cover Neena Foundry 32" Diameter NF-1274-T91 ASTM A48 AASHTO M306 9/9/2022 3305 13 Manhole Frames and Covers Neena Foundry 32" Diameter NF-1743-LM (Hinged) ASTM A48 AASHTO M306 9/9/2022 3305 13 Manhole Frame Neena Foundry 32.25" Diameter NF-1930-30 ASTM A48 AASHTO M306 9/9/2022 3305 13 Manhole Frames and Covers Neena Foundry 32" Diameter NF-1743-HV ASTM A48 AASHTO M306 9/9/2022 3305 13 Manhole Frames and Covers SIP Industries 24" Diameter 2279ST** ASTM A48 AASHTO M306 9/9/2022 3305 13 Manhole Frames and Covers SIP Industries 32" Diameter 2280ST ASTM A48 AASHTO M306 9/9/2022 3305 13 Manhole Frames and Covers EJCO 32.25" Diameter EJ1033 X2/A ASTM A48 AASHTO M306 "Note: All new development and new installation manhole lids sha i meet the minimum 30" opening requirement as specified in City Specification 33 0513. Any smaller opening sizes will only be allowed for existing manholes that require replacement frames and covers. Reinforced Concrete Storm Drain Pipe/Culverts 9/9/2022 3341 10 Precast Box Culverts Ferreira Precast Box Culverts 9/9/2022 3341 10 Concrete Pipe Wyes and Bends Ferreira RCP Wye and Bends 9/9/2022 3349 10 Precast Box Culverts Rinker Materials Rinker Materials Reinforced Concrete Box Culvert ASTM C789, C850 ASTM C789, C850 9/9/2022 3349 10 Concrete Pipe Rinker Materials Rinker Materials Reinforced Concrete Pipe Tongue and Groove Joint Pipe ASTM C76, C655 ASTM C76, C655 9/9/2022 3341 10 Concrete Pipe Forterra Reinforced Concrete Pipe - Tongue and Groove +D48 Polypropylene Storm Drain Pipe 9/9/2022 13341 13 Polypropylene Pipe Advanced Drainage Systems, Inc. HP Polypropylene Storm Drain Pipe Storm Drain Manholes and Junction Boxes 9/9/2022 3349 10 Stacked Manhole Oldcastle Precast 4' x 4' Stacked Manhole ASTM C478 9/9/2022 3349 10 Junction Box Oldcastle Precast 5' x 8' Storm Junction Box ASTM C478 9/9/2022 3349 10 Junction Box Oldcastle Precast 4' x 4' Storm Junction Box ASTM C478 9/9/2022 3349 10 Junction Box Oldcastle Precast 5' x 5' Storm Junction Box ASTM C478 9/9/2022 3349 10 Junction Box Oldcastle Precast 6' x 6' Storm Junction Box ASTM C478 9/9/2022 3349 10 Junction Box Oldcastle Precast 8' x 8' Storm Junction Box Base ASTM C478 9/9/2022 3349 10 Junction Box Oldcastle Precast 5' x 8' Storm Junction Box Base ASTM C478 9/9/2022 3349 10 Junction Box Cowtown Redi Mix No. 260-2 6 Sack 3600 psi Concrete for Concrete Collars ACI 318-14 9/9/2022 3349 10 Manhole Rinker Materials Rinker Materials Reinforced 48" Diameter Spread Footing Manhole ASTM C433 9/9/2022 3349 10 Manhole Connector Trelleborg Engineered Systems Kor-N-Seal 106/406 Series Pipe to Manhole Connector ASTM C923 9/9/2022 3349 10 Junction Box Forrerra 4' x 4' FRT-4x4-409-PRECAST-BASE ASTM C913 9/9/2022 3349 10 Junction Box Forrerra 5' x 5' FRT-5x5-409-PRECAST-TOP ASTM C913 9/9/2022 3349 10 Junction Box Forrerra 5' x 5' FRT-5x5-409-PRECAST-BASE ASTM C913 9/9/2022 3349 10 Junction Box Forrerra 6' x 6' FRT-6x6-409-PRECAST-TOP ASTM C913 9/9/2022 3349 10 Junction Box Forrerra 6' x 6' FRT-6x6-409-PRECAST-BASE ASTM C913 9/9/2022 3349 10 Junction Box Thompson Pipe Group 4 'x 4' TPG-4x4-409-PRECAST TOP ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 4 'x 4' TPG-4x4-409-PRECAST BASE ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 4 'x 4' TPG-4x4-412-PRECAST 4-FT RISER ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 5 'x 5' TPG-5x5-410-PRECAST TOP ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 5 'x 5' TPG-5x5-410-PRECAST BASE ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 5 'x 5' TPG-5x5-412-PRECAST 5-FT RISER ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 6 'x 6' TPG-6x6-411-PRECAST TOP ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 6 'x 6' TPG-6x6-411-PRECAST BASE ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 6 'x 6' TPG-6x6-412-PRECAST 6-FT RISER ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 7 'x 7' TPG-7x7-411-PRECAST TOP ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 7 'x 7' TPG-7x7-411-PRECAST BASE ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 7 'x 7' TPG-7x7-412-PRECAST 4-FT RISER ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 8 'x 8' TPG-8x8-411-PRECAST TOP ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 8 'x 8' TPG-8x8-411-PRECAST BASE ASTM C615 9/9/2022 3349 10 Junction Box Thompson Pipe Group 8 'x 8' TPG-8x8-412-PRECAST 5-FT RISER ASTM C615 WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT dob-01— STANDARD PRODUCTS LIST AS OF 05/O1/2023 Storm Drain Curb and Drop Inlets 9/9/2022 33 49 20 Curb Inlets Forterra 10' x 3' FRT-100-405-PRECAST ASTM C913 9/9/2022 33 49 20 Curb Inlets Forterra 10' x 3' FRT-IOx3-406-PRECAST ASTM C913 9/9/2022 33 49 20 Curb Inlets Forterra 10' x 4.5' FRT-lOx4-407-PRECAST ASTM C913 9/9/2022 33 49 20 Curb Inlets Forterra 10' x 4.5' FRT-lOx4-420-PRECAST ASTM C913 9/9/2022 33 49 20 Junction Box Forterra 4' x 4' FRT-4x4-409-PRECAST-TOP ASTM C913 9/9/2022 33 49 20 Curb Inlet Thompson Pipe Group 10' x 3' TPG-10x3-405-PRECAST INLET ASTM C615 9/9/2022 33 49 20 Curb Inlet Thompson Pipe Group 15' x 3' TPG-15x3-405-PRECAST INLET ASTM C615 9/9/2022 33 49 20 Curb Inlet Thompson Pipe Group 20' x 3' TPG-20X3-405-PRECAST INLET ASTM C615 9/9/2022 33 49 20 Drop Inlet Thompson Pipe Group 4' x 4' TPG-4X4-408-PRECAST INLET ASTM C615 9/9/2022 33 49 20 Drop Inlet Thompson Pipe Group 5' x 5' TPG-5X5-408-PRECAST INLET ASTM C615 9/9/2022 33 49 20 Drop Inlet Thompson Pipe Group 6' x 6' TPG-6X6-408-PRECAST INLET ASTM C615