HomeMy WebLinkAboutContract 57532-FP1FORT WORTH. -FP1 City Secretary Contract No. 57532 Date Received 06/20/2023 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Madero Phase 3 City Project No.: 103480 Improvement Type(s): x❑ Paving ❑x Drainage x❑ Street Lights ❑ Traffic Signals Original Contract Price: $2,434,371.50 Amount of Approved Change Order(s): $21,112.00 Revised Contract Amount: Total Cost of Work Complete: $2,455,483.50 A &A, Jun 16, 2023 Jav Arndf(Jun 16. 202313,30 CD 11 Contractor Date Project manager Title Conatser Construction Company Name Jun 16, 2023 Project Inspector Date Sndip Jun 20, 2023 AAAAtri, aP.E. (Jun 20, 202310:2CDT) Project Manager Date sn Jun 20, 2023 Rebecca Diane Owen 20. 202310:35 CDT) CFA Manager Date � Jun 20 2023 Lauren Prieur Oun 20. 202311:27 CDT) TPW Director Date ��^ Jun 20 2023 yamam i�n��on (i� �n ems ia�ns cnn 7 Asst. City Manager Date OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 of 2 Notice of Project Completion Project Name: Madero Phase 3 City Project No.: 103480 City's Attachments Final Pay Estimate x❑ Change Order(s): ❑x Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time 200 WD Days Charged: 205 Work Start Date: 5/31/2022 Work Complete Date 6/12/2023 Completed number of Soil Lab Test: 542 Completed number of Water Test: 14 Page 2of2 FORT WORT 11 CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name MADERO PHASE 3 Contract Limits Project Type DRAINAGE, PAVING, LIGHTS City Project Numbers 103480 DOE Number 3480 Estimate Number 1 Payment Number 1 For Period Ending 3/12/2023 WI) City Secretary Contract Number Contract Time 20WD Contract Date 4/22/2022 Days Charged to Date 205 Project Manager NA Contract is 100.00 Complete Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH, TX 76119 Inspectors MILLER, W / FLUTE, M Monday, June 12, 2023 Page 1 of 6 City Project Numbers 103480 Contract Name MADERO PHASE 3 Contract Limits Project Type DRAINAGE, PAVING, LIGHTS Project Funding UNIT III: DRAINAGE IMPROVEMENTS DOE Number 3480 Estimate Number I Payment Number 1 For Period Ending 3/12/2023 Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 TRENCH SAFETY 4529 LF $1.00 $4,529.00 4529 $4,529.00 2 CONCRETE COLLAR 6 EA $750.00 $4,500.00 6 $4,500.00 3 21" RCP CLASS III 623 LF $60.00 $37,380.00 623 $37,380.00 4 24" RCP CLASS lII 1262 LF $70.00 $88,340.00 1262 $88,340.00 5 27" RCP CLASS lII 414 LF $80.00 $33,120.00 414 $33,120.00 6 30" RCP CLASS III 10 LF $95.00 $950.00 10 $950.00 7 33" RCP CLASS lII 379 LF $115.00 $43,585.00 379 $43,585.00 8 36" RCP CLASS lII 1105 LF $125.00 W8,125.00 1105 $138,125.00 9 3'X3' BOX CULVERT 34 LF $225.00 $7,650.00 34 $7,650.00 10 4'X2' BOX CULVERT 10 LF $245.00 $2,450.00 10 $2,450.00 11 4'X3' BOX CULVERT 235 LF $265.00 $62,275.00 235 $62,275.00 12 4' STORM JUNCTION BOX 10 EA $5,000.00 $50,000.00 10 $50,000.00 13 5' STORM JUNCTION BOX 3 EA $6,000.00 $18,000.00 3 $18,000.00 14 10' CURB INLET 31 EA $3,400.00 W5,400.00 31 $105,400.00 15 Y DROP INLET 1 EA $4,500.00 $4,500.00 1 $4,500.00 16 6' DROP INLET I EA $6,500.00 $6,500.00 1 $6,500.00 17 2-4'X3' MULTIPLE BOX CULVERT 457 LF $530.00 Q42,210.00 457 $242,210.00 18 POND OUTFALL STRUCTURE (7LF-VARYING 1 LS $11,500.00 $11,500.00 1 $11,500.00 SIZE MULTIPLE BOX CULVERT SEE PLANS 19 12" TUPE A' RIPRAP 34 SY $95.00 $3,230.00 34 $3,230.00 20 24" TYPE A' RIPRAP 78 SY $105.00 $8,190.00 78 $8,190.00 21 4'X3' TXDOT FW-0 HEADWALL I EA $5,500.00 $5,500.00 1 $5,500.00 22 TXDOT W-1 WINGWALL 2 EA $24,500.00 $49,000.00 2 $49,000.00 23 36" SLOPED END HEADWALL I EA $4,000.00 $4,000.00 1 $4,000.00 24 INLET PROTECTION 33 EA $150.00 $4,950.00 33 $4,950.00 25 CONNECT TO EXISTING 2-4'X3' MULTIPLE I EA $5,000.00 $5,000.00 1 $5,000.00 BOX CULVERT 26 CONNECT TO EXISTING 4'X3' BOX CULVERT 1 EA $2,500.00 $2,500.00 1 $2,500.00 Sub -Total of Previous Unit $943,384.00 $943,384.00 Monday, June 12, 2023 Page 2 of 6 City Project Numbers 103480 Contract Name MADERO PHASE 3 Contract Limits Project Type DRAINAGE, PAVING, LIGHTS Project Funding UNIT IV: PAVING IMPROVEMENTS Item Description of Items Estimated Unit No. Quanity I HYDRATED LIME (30 LBS/SY) 319 TN 2 HYDRATED LIME (36 LBS/SY) 69 TN 3 6" LIME TREATMENT 21232 SY 4 8" LIME TREATMENT 3789 SY 5 6" CONC PVMT 19910 SY 6 5' CONC SIDEWALK 8673 SF 7 6' CONC SIDEWALK 9015 SF 8 BARRIER FREE RAMP TYPE R-1 10 EA 9 BARRIRE FREE RAMP TYPE P-1 22 EA 10 TOPSOIL 306 CY 11 BLOCK SOD PLACEMENT 1835 SY 12 7.5" CONC PVMT 3583 SY 13 SAWCUT & REMOVE EXISTING CURB & 188 LF GUTTER 14 CONNECT TO EXISTING PAVMENT 2 EA 15 CONSTRUCT TYPE III BARRICADE 5 EA 16 CONSTRUCT TYPE C BARRICADE 1 EA 17 CONSTRUCT STD. PAVEMENT HEADER 182 LF 18 STOP SIGNS 17 EA 19 STREET NAME BLADE 68 EA 20 STREET SIGN POLE 13 EA Sub -Total of Previous Unit ------------------- UNIT V: LIGHTING IMPROVEMENTS DOE Number 3480 Estimate Number I Payment Number 1 For Period Ending 6/12/2023 Unit Cost Estimated Completed Completed Total Quanity Total $195.00 $62,205.00 319 $62,205.00 $195.00 $13,455.00 69 $13,455.00 $3.50 $74,312.00 21232 $74,312.00 $4.00 $15,156.00 3789 $15,156.00 $39.50 M6,445.00 19910 $786,445.00 $3.50 $30,355.50 8673 $30,355.50 $3.50 $31,552.50 9015 $31,552.50 $1,600.00 $16,000.00 10 $16,000.00 $1,500.00 $33,000.00 22 $33,000.00 $24.00 $7,344.00 306 $7,344.00 $8.00 $14,680.00 1835 $14,680.00 $47.50 W0,192.50 3583 $170,192.50 $20.00 $3,760.00 188 $3,760.00 $1,000.00 $2,000.00 2 $2,000.00 $500.00 $2,500.00 5 $2,500.00 $2,500.00 $2,500.00 1 $2,500.00 $20.00 $3,640.00 182 $3,640.00 $400.00 $6,800.00 17 $6,800.00 $250.00 $17,000.00 68 $17,000.00 $350.00 $4,550.00 13 $4,550.00 $1,297,447.50 $1,297,447.50 Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 1 2" CONDT PVC SCH 80 (T) (CO #2) 3289 LF $14.00 $46,046.00 3289 $46,046.00 2 RDWAY ILLUM ASSEMBLY TY 8,11,D-25 AND 31 EA $2,800.00 $86,800.00 31 $86,800.00 D-30 3 LED LIGHTING FIXTURE (50W) 31 EA $800.00 $24,800.00 31 $24,800.00 4 RDWY ILLUM FOUNDATION TY 1,2, AND 4 31 EA $1,200.00 $37,200.00 31 $37,200.00 5 3410 COPPER WIRE (CO #2) 3289 LF $4.00 $13,156.00 3289 $13,156.00 Monday, June 12, 2023 Page 3 of 6 City Project Numbers 103480 Contract Name MADERO PHASE 3 Contract Limits Project Type DRAINAGE, PAVING, LIGHTS Project Funding DOE Number 3480 Estimate Number I Payment Number 1 For Period Ending 6/12/2023 6 GROUND BOX (CO #2) 7 EA $950.00 $6,650.00 7 $6,650.00 Sub -Total of Previous Unit $214,652.00 $214,652.00 Monday, June 12, 2023 Page 4 of 6 City Project Numbers 103480 Contract Name MADERO PHASE 3 Contract Limits Project Type DRAINAGE, PAVING, LIGHTS Project Funding Contract Information Summary Original Contract Amount Change Orders Change Order Number 2 DOE Number 3480 Estimate Number I Payment Number 1 For Period Ending 6/12/2023 $2,434,371.50 $21,112.00 Total Contract Price $2,455,483.50 Total Cost of Work Completed $2,455,483.50 Less % Retained $0.00 Net Earned $2,455,483.50 Earned This Period $2,455,483.50 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $2,455,483.50 Monday, June 12, 2023 Page 5 of 6 City Project Numbers 103480 Contract Name MADERO PHASE 3 Contract Limits Project Type DRAINAGE, PAVING, LIGHTS Project Funding Project Manager NA Inspectors MILLER, W / FLUTE, M Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH, TX 76119 DOE Number 3480 Estimate Number I Payment Number 1 For Period Ending 6/12/2023 City Secretary Contract Number Contract Date 4/22/2022 Contract Time 200 WD Days Charged to Date 205 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $2,455,483.50 Less % Retained $0.00 Net Earned $2,455,483.50 Earned This Period $2,455,483.50 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $2,455,483.50 Monday, June 12, 2023 Page 6 of 6 DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: MADERO PHASE 3 (UNIT 1) WATER, (UNIT II) SEWER, (UNIT III) STORMWATER, (UNIT IV) PAVEMENT, & CHANGE CONTRACT: (UNIT Vf STREET LIGHTS ORDER No: CFA # 22-0001 CITY PARTICIPATION: NO CITY PROJECT # 103480 FID # FID # 30114-0200431-103480-EO7685 2 X-Number X-27126 FILE # W-2804 INSPECTOR: Eric Tinner Phone No: 817-647-2566 PROJECT MANAGER: Sandip Adhikari Phone No: 817-392-8424 CONTRACT UNIT WATER SEWER PAVING DRAINAGE Cost _City C-t ORIGINAL CONTRACT $787.045.00 $0.00 EXTRAS TO DATE ($250.00) CREDITS TO DATE CONTRACT TO DATE $787.695.00 50.00 —_--^--' OF PROP.CyHHAANGE ORDER RAMOUNT TOT���EVISE7D�OTNTRACTAMOUNT UNT $787,695.00 $0.00 PER UNIT $787,695.00 REVISED COST SHARE Dev. Cost: TOTAL REVISED CONTRACT $1,297,447.50 l $0.00 1 $943,384.00 60.00 1 WOO $1.297,447.50 _SO.00 $0.00 $0.00 I $1,297,447.50 $801.060.00 I $1,297,447.50 $4,044,238.50 City Cost: $4,D44,238.50 STREET LIGHTS CONTRA psr DAYS City Cost .540.00 1 $0.00 200 $943,384.00 $0.00 $193,540.00 $0.00 $ 21,112.00 $943,384.00 $0.00 $2147652.00 $0.00 REVIEWED By Sandip Adhikari at 4:26 pm, Apr 21, 2023 $0.00 200 Revised: 10-12-2011 Page 1 You are directed to make the following changes in the contract documents UNIT V: STREET LIGHTING IMPROVEMENTS CITY BID ITEM PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL 1 2605.3015 909 LF 2" CONDT PVC SCH 80 (T) $ 14.00 $12,726.00 5 9999.0027 909 LF 3-#10CogQerWire $ 4.00 $ 3636.00 I 6 9999.0028 5 EA Ground Box $ 950.00 $ 4h0.00 TOTAL 9 thEET LIGHT IMPROVEMENTS $21.112.00 Asterisk (*) indicates new Pay Item REASONS FOR CHANGE ORDER Additional conduit and ground boxes for the street lights are needed per the City streetlight inspector, as viewed in the field during construction. NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: LJA Engineering, Inc. By: Name: DANIEL BETTEN, P.E. Title: ASSISTANT PROJECT MANAGER APPROVED: Lennar H mesp8f`i�!R�"sr'Lfn' d & Construction, Ltd. BY: _ Vl(,tl,Vw' s ss4u2e4cec40A... Name: KYLE DICKERSON Title: DIRECTOR OF LAND DEVELOPMENT REVIEWED By Sandip Adhikari at 4:26 pm, Apr 21, 2023 APPROVED: Conatser Construction By: LJ Name: �y ,u } Title: Rj9AP*,ntA—" Revised: 10-12-2011 Page 2 FORTWORTH. TRANSPORTATION AND PUBLIC WORKS 6/12/2023 Conatser Construction TX L.P 5327 Witchita St. Fort Worth Tx 76119 RE: Acceptance Letter Project Name: Madero Phase 3 Project Type: 01,02,03,04 City Project No.: 103480 To Whom It May Concern: On May 10, 2023 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on June 12, 2023. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on June 12, 2023, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-8424. Sincerely, Sandi Adhikan, P.E. (Jun 20, 2023 10:23 CDT) Sandip Adhikari , Project Manager Cc: Eric Tinner, Inspector Wade Miller, Inspection Supervisor Ariel Duarte, Senior Inspector Victor Tornero, Program Manager LJA Engineering, Inc, Consultant Conatser Construction, Contractor Lenar Homes of Texas, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 STATt,- OF TEXAS Won rm, dw wK1crs gg d authKvdV. a NbLuy PUbEiv to Ux malt wd caunr 0d, On fWS d4y PWOWGy gpp=Vd RTrr. C I iW. PrctsidcM of CkNm Wr Miwugcmmt UFeup. Irw., geKTO f of C-maLw-LuaMu;Laa TX,Lf. knq%in w rc to bc a cmd PoIc Msun, who b&ig by rm duly m uFKln his -oolh x%i - rnd 3aid- -II'A1 2 E I WMM, flMO. &UWi:rtlwt, CLMP IU91% uE kAhfr t+rgdtier wr3% wmialwing laWr an&-Lw awerhas bave tvcn pmid in full, I1mI L�L- Wag OWC ciLa b s1bd1 by tlW City C OWMit in the U i!y Of j^dri W4 irlh_ haS laid in M11.ON 'DAL Khffc me no ti Inimr p"i-►g for pffumul m ry aim pru fway &lamges; Uirk Coo tracI ik scrttol w- bw ADF-R.0 Pt I_ I 'WALMII. ,%AN ITARY SEVuRp DRAFNA(-P?, P*VI NO, & -5TREUT L. GHT J MP$t0VF..Arl UNTS CPA PIU Ih 2Z4DO 1 UrY PROJECT N: IOM24 CITY OF PORT woml k STATE OP T KXAA MNAMSM I ON'STitUMON M I-P �vbserib�td tad s la befo t in- ghi1 15' day ofJwrt, 2023. • I Nam PUN ic Ln Tarra0L C0anty, 1'cx� CONSENT OF SugETY COMPANY TO R NAL PAYMENT con4mm Nm ON A --"R&n lgl;.Iaim PC wu. AW M 0 W PI#CT= �m V&n, TX TO Iowa] OWNER Q ARCHITECT L� Cop1'TIACT01; SU54E IV D QTHW r� a �•,� • %q w I�„f sue••.. W . a �i..l L �r 4 Tm rsm J COWRA97 DATrt'. C0NTRAC TOR. ATUIt +IP RVC TE!ar TX L P In awoNikm widi tk ti"L Of*4 CWMKC N30M n FM OuTict utd 6* CmcrWor m ifdWwo dam. der r wo Mam -m—p .-d rrE� mi Zw wto cf—i.• b. Ll& Wi f e wE CLAN Y -La* :A*g RON rabmdof a��mMwAmomarc"W"Wi TPR 00NOR14rM tM, IL P. , CONTRACTOR. �w f r #Mrowcs vif 1 w IWW Raytt>t w ftC*Pmmw F uA � ft k W Mwicm to Om Comrscw Wu1l we Min t CITX C* FOA 'r VKM, i AN13 L.EMM HCW& OF TUA-2 LAND ARD C6FWnLCTtWt, LrD 1707 Vmkoq5.jes SM, S&M 102 TX TOM m so fw& In rho mpd swey Compmy(f bow. rN. %TT ESS.IAIFIEM . Me 5 wct� Fora r* has here um to w im bm d I b, ii A twi L; 1cin dpy Nr. WKLpt RSMr1 F CI24P Sig Of Aviwtftd xr:or" OWNEn, MREtea. --n-F ad warn txr. .4r- z to hm W" me 46 i 4OREbmw d Ax boommw a". Mr R&thwl O+dwLym 00 FATFait *0ptm aw c6mm q%— Idow as pww