HomeMy WebLinkAboutContract 53393-CO1CSC No. 53393-COI
Fox_ T� rtM
Project Name HMAC Surface Overlay 2019-6
Client Project #(s)I 102098
Project Description)
Contractorl
City Project Mgr.I
Peachtree Construction Ltd
Tariqul Islam
Dept
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
lGo to ADD & DEL Tabs to Enter CO Backup
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
City of Fort Worth
Change Order Request
City Sec # I 53393
Pulverization of existing street and 3 inch asphalt overlay at various locations
TPW
$1,079,975.00
Change Order #I
Date 6/12/2023
City Inspector Brian McGill
$1,079,975.00
$0.00
$1,079,975.00
$0.00
Contract Time
Totals (CD)
$1,079,975.00 175
$1,079,975.00 175
310
$1,079,975.00 485
$0.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 0.00%
MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) 1 $1,349,968.75
JUSTIFICATION (REASONS) FOR CHANGE ORDE
This change order is to add 310 additional days to the project contract time due to water line conflict, water main break, gas line conflict and rain delays. Here is breakdown of
delays: 1. Water main break on 5th Ave (97 days): Due to the shallow depth of the existing water line, the contractor broke it during construction and had to mobilize out of the
site until Water Department replaced it under a different contract. Atmos had to work on their gas line relocation work on this street at the same time. The work was stopped on
5th Ave from 06117/2020 until 10/10/2020. The total 97 days of delay deemed reasonable to be granted for the critical path of the work activities on this street. ,
2. Waterer main replacement on Lagonda Ave and Denver Ave (91 days): After construction started, the Contractor couldn't perform the 11" pavement pulverization due to the
water main being cast iron and too shallow and need to be replaced. The work was stopped from 11It 1/2020 until 2/10/2021 for the water department to complete the water main
replacement. The total 91 days of delay deemed reasonable to be granted for the critical path of the work activities on this street. ,
3.The tying in of Lagonda Ave and Denver Ave (94 days): The tying in of Lagonda Ave and Denver Ave to NE 28th St required a mill and overlay at the intersection instead of
pulverization for the existing concrete base. The work was stopped from 3/11/2021 until 6/13/2021 to finalize an alternate work approach, receive a quote from the contractor, and
price negotiation. Construction allowance #2 was executed for this work on 06/02/2021. The total 94 days of delay deemed reasonable to be granted for the critical path of the
work for this purpose on this street. 4. Rain/Weather delays (28 days): Experienced more than average yearly rain days and couldn't do any work on the following days:
3/4/2020, 3/13/2020 — 3/16/2020, 3/18/2020 — 3/20/2020, 3/23/2020 — 3/27/2020, 3/31/2020, [March 2020 had 19 days with measurable rainfall and set an all-time record for
days with consecutive rainfall] 10/23/2020— 10/27/2020, 12/11/2020, 12/30/2020, 2/11/2021— 2/21/2021, 2/25/2021 [February 2021was the month of the historical winter event/
snow storm in Texas]. 5. The inspector's log, email communications, and weather report pertaining to these delays have been documented. A memo to TPW Director regarding
this delay is attached with the change order.
it Is understood and agreed that the acceptance of tins change order by the contractor constitutes an accord and satlstaction and represents payment In tun
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Name 06Contractor (Name) §11VIontract Signatur
Peachtree Construciton Ltd. Brendan Taylor „o o,,Jun 15, 2023
Inspector/Inspection Supervi
Date
Project and Contract Compliance Manager
Date
Jun 15, 2023
tip
Jun 15, 2023
anager
Date
Senior Capital Project Officer
Date
Jun 15, 2023
>-
Jun 15, 2023
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
1 1" —" —
Jun 16, 2023
Jun 16, 2023
Assistant City Attorney
Date
Assistant City Manager
Date
Jun 20, 2023
Jun 22, 2023
Council Ac d)
M&C Number
ATTEST:
�_ a &—
Jannette Goodall, City Secretary
4,�p4UU4��
°� FORro9dd
0!`8 orld
Ovo oo
os0
Pia* oo o*a
0
Q�a� nEXA?o4p
M&C Date Approved
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORTWORTH City of Fort Worth
Change Order Additions
Project Name HMAC Surface Overlay 2019-6
Client Project # 102098
Contractorl Pulverization and asphalt overlay at various locations l
I I tM UESCHIN I ION
City Sec # 53393 ###
I
PMl Tariqul Islam Inspectorl Brian McGill l
Peachtree Construction Ltd 0 Date 1 6/12/2023 1 4/1/2022
ADDITIONS
UI:P I Oty Unit Unit Cost I otal
I
I
I
I
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
I
TPW $0.001
I
I
I
Sub Total Additions $0.001
Change Order Additions Page 2 of 4
FORTWORTH City of Fort Worth
Change Order Deletions
Project Name I HMAC Surface Overlay 2019-6
Client Project # 1 102098
Contractorl rurvencauun anu aspnan Wendy It vanuus
—.it—
ITEM DESCRIPTION
City Sec # 1 53393 ###
I
PMl Tariqul Islam l Inspectorl Brian McGill l
Peachtree Construction Ltd =1 Date 1 6/12/2023 1 4/1/2022
DELETIONS
DEPT Oty Unit Unit Cost Total
I
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
TF W $0.00I
I I
I I
Sub Total Deletions $0.00I
Change Order Deletions Page 3 of 4
M/SBE for this Change Order
M/SBE Sub Tvpe of Service Amount for this CO
Total $0.00
Previous Change Orders
CO # DATE I AMOUNT
Total 1 $0.00 I
FORTWORTH.
Memorandum
Date June 12, 2023
To Lauren Prieur
Director, Transportation, and Public Works
From Tariqul Islam
Project Manager, Transportation, and Public Works
Subject HMAC Surface Overlay (City Project Number 102098)
Excessive delay in project completion
This project was advertised to bid on September 12, 2019, after coordination with Water
Department, and it was cleared by them to rehabilitate the asphalt pavement. Construction started
on March 02, 2020, with a total of 175 calendar days.
During construction, the Contractor had to stop working and mobilize out of the project until
several conflicts were resolved, as stated below:
1. 5t' Ave: A section of 5t' Ave was included in the project for pulverization and overlay. Due
to the shallow depth of the existing water line, the contractor broke it during construction
and had to mobilize out of the site until Water Department replaced it under a different
contract. Atmos had to work on their gas line relocation work on this street at the same
time. The work was stopped on 5t' Ave from 06/17/2020 until 10/10/2020. The total 97 days
of delay deemed reasonable to be granted for the critical path of the work activities on this
street.
Update: A change order will be processed to add 97 days to the contract.
2. Lagonda Ave and Denver Ave: After construction started, the Contractor couldn't perform
the 11" pavement pulverization due to the water main being cast iron and too shallow and
need to be replaced. The work was stopped from 11/11/2020 until 2/10/2021 for the water
department to complete the water main replacement. The total 91 days of delay deemed
reasonable to be granted for the critical path of the work activities on this street.
Update: A change order will be processed to add 91 days to the contract.
3. Lagonda Ave and Denver Ave: The tying in of Lagonda Ave and Denver Ave to NE 28th St
required a mill and overlay at the intersection instead of pulverization for the existing
concrete base. The work was stopped from 3/11/2021 until 6/13/2021 to finalize an alternate
work approach, receive a quote from the contractor, and price negotiation. Construction
allowance #2 was executed for this work on 06/02/2021. The total 94 days of delay deemed
reasonable to be granted for the critical path of the work for this purpose on this street.
Update: A change order will be processed to add 94 days to the contract.
4. Rain/Weather Delays: Experienced more than average yearly rain days and couldn't do any
work on the following days: 3/4/2020, 3/13/2020 — 3/16/2020, 3/18/2020 — 3/20/2020,
3/23/2020 — 3/27/2020, 3/31/2020, [March 2020 had 19 days with measurable rainfall and
set an all-time record for days with consecutive rainfall] 10/23/2020 — 10/27/2020,
12/11/2020, 12/30/2020, 2/11/2021 — 2/21/2021, 2/25/2021 [February 2021was the month of
the historical winter event/snow storm in Texas].
TRANSPORTATION PUBLIC WORKS DEPARTMENT
CAPITAL DELIVERY DIVISION
THE CITY OF FORT WORTH * 200 TEXAS STREET * FORT WORTH, TExAs 76102
*Tel 817-392-8363* * Fax 817-392-8092*
HMAC Surface Overlay (CPN 102098)
Excessive delay in project completion
Page 2 of 2
Memorandum
Update: A change order will be processed to add 28 days to the contract.
The inspector's log, email communications, and weather report pertaining to these delays have been
documented.
This project was completed almost two years ago, but due to the type of contract being calendar
days, this necessitated the need to execute a change order for additional time after the project was
accepted. The project was managed by multiple PMs, some no longer with the City. Due to the staff
turnover and lack of proper documentation of the changes, the change order was not processed
timely. Measures are being taken to ensure that similar situations do not occur in the future. The
Project Manager will diligently adhere to City policy by promptly initiating change orders following
any project delays, and saving all the project documentation on BIM360 or any future document
management system.
Conclusion: A change order of 310 additional days of contract time will be routed for execution.
The final payment to the contractor and project reconciliation will be followed.
TRANSPORTATION PUBLIC WORKS DEPARTMENT
CAPITAL DELIVERY DIVISION
THE CITY OF FORT WORTH * 200 TEXAS STREET * FORT WORTH, TExAs 76102
*Tel 817-392-8363* * Fax 817-392-8092*
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: CO 1, HMAC Surface Overlay 2019-6
M&C: N/A CPN: 102098 CSO: 53393 DOC#:
Date: 6-15-2023
To: Name
Department
Initials
Date Out
1. Valentina Riera
TPW - initial
-�Z—
Jun 15, 2023
2. Brendan Taylor
Vendor - signature
1
Jun 15, 2023
3. Brian McGill
TPW - signatures
Jun 15, 2023
4. Tariqul Islam
TPW - signature
�—
Jun 15, 2023
5. Omar Elbagalati
TPW - signatures
Jun 15, 2023
6. Mary Hanna
TPW - initialer
Jun 15, 2023
7. Michael Owen
TPW - signatures
Jun 16, 2023
8. Lauren Prieur
TPW - signature
Jun 16, 2023
9. Doug Black
Legal - signatures
Jun 20, 2023
10. William Johnson
CMO - signature
W
Jun 22, 2023
11. Jannette Goodall
CSO - signature
Jun 22, 2023
12. TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE:
All documents
received from any
and all City Departments requesting City Manager's signature for approval MUST BE ROUTED
TO THE APPROPRIATE
ACM for approval first. Once the ACM has signed the routing slip,
David will review and take the next steps.
NEEDS TO BE NOTARIZED:
❑YES ®No
RUSH: ❑YES ®No
SAME DAY: ❑YES ❑No
NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContractsaFortWorthTexas.2ov at ext. 7233 for pick up when completed.