HomeMy WebLinkAboutContract 57679-FP1FORTWORTH,
TRANSPORTATION AND PUBLIC WORKS
NOTICE OF PROJECT COMPLETION
-FP1
City Secretary No:_57679
Date Received: 6/22/2023
City Project Ns:101579
Regarding contract 57679 2018 CIP Intersection Improvements Alta Mesa Boulevard & Crowley Road for as required by the
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on 5/10/2022 through M&C
22-0346 the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the recommendation
of the Assistant Director of the Transportation & Public Works Department has accepted the project as complete.
Original Contract Prices:
Amount of Approved Change Orders:
Revised Contract Amount:
Total Cost Work Completed:
Less Deductions:
Liquidated Damages:
Pavement Deficiencies:
Total Deduction Amount:
Total Cost Work Completed:
Less Previous Payments:
Final Payment Due
Recommended for Acceptance
Asst. Director, TPW - Capital Delivery
A. -
Lauren Prieur(Jun 22, 202315:39 CDT)
Accepted
Director, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
Client Department
William Johnson (Ju 22, 202315:47 CDT)
Asst. City Manager
$635,155.95
$7,450.00Ne 1
$642,605.95
$632,459.87
0 Days @ $650.00/ Day
$0.00
$632,459.87
$600,836.88
$31,622.99
J u n 22, 2023
Date
J u n 22, 2023
Date
J u n 22, 2023
Date
Comm tits:
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
C-620 Signature Page
Contractor's Application for Payment
To (Owner) City of Fort Worth Invoicing Period (From - To):
5/26/23-6/14/23
P. O. FW020-0000007928 From (Contractor):
Number: McClendon Construction Company
Project. 101579 Contractor's CFW Vendor No.:
0000007403
City Secretary Contract
Number:
Approved Change Orders
Number
1
2
3
4
5
6
7
8
TOTALS
NET CHANGE BY
CHANGE ORDERS
Contractor's Certification
57679
Application For Payment
Change Order Summary
Additions
$7,450.00
$7,450.00
Invoice No.
oice Date:
1 9 Final I
6/14/2023
to (If Not Automatic Deposit):
Contract Nam
e: : Altamesa Blvd & Crowley Rd Intersection Improvement
Nam
$7,450.00
1. ORIGINAL CONTRACT PRICE..........................................................
$ $635,155.95
Deletions 2. Net change by Change Orders.................................................................
$ $7,450.00
3. Current Contract Price (Line 1 + 2)........................................................
$ $642,605.95
4. TOTAL COMPLETED AND STORED TO DATE
(Progress Estimate, Construction Allowance and Change Orders).......
$ $632,459.87
5. RETAINAGE:
a. X $632,459.87 Work Completed..........
$
b. X Not Used
$
c. Total Retainage (Line 5a + Line 5b) ...............................
$
6. AMOUNT ELIGIBLE TO DATE (Line 4 - Line 5c).............................
$ $632,459.87
7. LESS PREVIOUS PAYMENTS (Line 6 from prior Application)........
$ $600,836.88
8. AMOUNT DUE THIS APPLICATION .................................................
$ $31,622.99
9. BALANCE TO FINISH, PLUS RETAINAGE
(Column G on Progress Estimate+ CA + Cos + Line 5 above) ..............
$ $10,146.09
The Contractor certifies with the submittal of this document and associated Payment Request
Submittal on the City of Fort Worth Buzzsaw system that to the best of their knowledge: (1) all
previous progress payments received from Owner on account of Work done under the Contract have
been applied on account to discharge Contractor's legitimate obligations incurred in connection with
Work covered by prior Applications for Payment; (2) title of all Work, materials and equipment
incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass
to Owner at time of payment free and clear of all Liens, security interests and encumbrances (except
such as are covered by a Bond acceptable to Owner indemnifying Owner against any such Liens,
security interest or encumbrances); and (3) all Work covered by this Application for Payment is in
accordance with the Contract Documents and is not defective.
Liquidated Damages $500.00 x day
10. CONTRACT TIME:
a, Days Awarded 120
b, Days Added by CO 67
C. Total Days 187
d, Days Charged 187
e, Days Remaining
Consent of Surety
Affidavit of Bills Paid
This document has been modified from its original form as an EJCDC document and the user did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
AV 89 BSSS 'SES88 8 8
k a -
S T a S- $88888y888888888S88g888Syg88 "8m S38 8888888888838888888888888888885888
e s� s
~^a^�✓r
y�
888888888888888888�m8rS8S88
888iu 888 8888%8888:r�8888888888888888888888888888
S "9�88Sp8SR988Sd�w,3 „5�3�88
88m SSo8�88SAS88% 888^<88S888r8R883888SS8R8888
8$»
SS 0000000000000000^mo�aoaoo
aoe00000 00000000^oar^0000000000000000000000000000
�
NS8e8�S«88:�me3rw8e��me3�88
««.»
88m^ 8«88eSmXm�8wR�8e�8m�m�^H- --- ----- 8
»»$�www8m-»w,�, ww»$»»»»p»«8»„»mow eo
.. 3 _
e
-
8888888888888s8888888888888
88888888 8888888888s888888888888888888888888888888
a
88888888885888888SSS8888888
8888888888888588888888x88 s e
58888885 88888885888888885888888885888888588888888 -
88888888 88888888885888888888888888888888888888888 -
-I
HY
SnoB
�
ova
8888888888888588888888S8S88
�88888888888%%%88�8en�88888888888888888888888888888 -
'^°8SS8®&®BSSm�mSP�rRBwSS
o-
,^.86CSSS8«SSSS�SSSAS^8%.'o8^8^SSSS8SR8RSS8S88SSSSSBSSS e
m
n
$
yy�
o 888 S888888888888888888885
�I
� ==888v8888888 8 88888888888888888880=08608 3
E
S
g�8 8 8 S 8 8 888
s 8 8 8 8ss
88 8888 8 888 88�
sas s
HI
8
88 8�
as_memomas8a' __
PHI
�;�a;�sassswas�;��s���;�y»s� ����sass��asasa�w���;��s�sasasas�asavaswssasa;�,�„
e" oya$OeRsB's8"s�8�e"s"s&=-�eeve��eeeeeegs_�r=vae"a�rNnnm�m��'s���"s_e����88g�a��'s"s8=esg`�=e
E
- � 8
all HUM
� s�y a�_���I'-
gLL���d��€ � s��ee v33a'���g`
E 8 ssgo$so�ossss� $�:a g9�s6-�, fo a��E®:„"_
a a���ps�a�a�!H UI �maz�ava -m' �'� e�_n�����.0
"u d
� m8«:NSN8FR88:;SnAS8mR8S:::S:::::8hG 8Ah8G8r8&SB388aSm���------a---
gym.«m
---------------
Progress Estimate 57679
Altamesa Blvd & Crowley Rd Intersection Improvement
r'°°uaOon Pena6 M&23.N14/23
n a c u
� �mm
Contractor's Application
rvrouw�n.e 6/14ao23
e r c
nM°�irwun.ev v.u.'tw e.roe Ic°mmti s• � Fl"^°
Progress Estimate 57679
Aftlao,sl Blvd & Crowley Rd T,ten,cflo, Improvement
M&23.614/23
Contractor's Application
9 F-I
C-620 Change Order
Progress Estimate Construction Allowance Usage
ADDITIONS
For (contiaa) 101579 Altamesa Blvd & Crowley Rd Intersection Improvement
Apphcafinn Panod 5/26/23-6/14/23
City Secretary 57679
Contract Num:
A B
Item
Item Number Deacvption spedfication Unit of Quantity to Add Una Valu P.. Addition e
S-om No Maae
C D
Esfiontwd Quantity Value
metalled
Contractor's Application
Application Number'
9 Final
Appli°anon Date 6/14/2023
E F
Previously Valued Md(Presently
Total Coroplatad / Balance to Finish
Installed Value Period Stood (oot m C) and Stored to Date (P) (B -P)
(D+B) B
Tbie document has been modified fiom it, orrgioal fumt ae an FJCDC document and the user did urn highlight the
modifica ims. You are encouraged to read the document croefully and consult Legal Counsel prior to its execution.
C-620 Change Order
Progress Estimate Construction Allowance Usage
For (contract)'
Appl—fion Penod'
I
Bid Item Number
CONSTRUCTION ALLOWANCE ITEMS TO BE REDUCED
101579 Altamesa Blvd & Crowley Rd Intersection Improvement
Item
D—pfion
Totals
5/26/23-6/14/23
A B
spedficafion Una of Qaanhly to Delete Umt Pnce Redaction Valae
Section No Measure
Tbie document has been mrMW 6om as onginnl fuvn es en HICDC docament and the user did urn highlight the
modificafions. You are encouraged to read the document cmefully and consult Legal Counsel pnor to its execution.
Contractor's Application
Applicanon Number'
9 Final
Applicatmn Date 6/14/2023
C-620 Change Order
Progress Estimate Change Order Number I 1
ADDITIONS
Contractor's Application
IF., (coatma)
101579 Altamesa Blvd & Crowley Rd Intersection
Improvement
City Secretary
57679
Application Numbar
9 Final
Contract Num:
IApplrratimiParrad
5/26/23-6/14/23
Applicati°°Data
6/14/2023
A
B
C
D
E
F
Imn
Addition
Total Completed
Change Order Imn
Spedficafion
Unit of CO Quantity Add
UUnitPrice Change
Estimated Quantity
Value
Previously
Value This
Materials Presently
and Stored to Date (F)
No.
Desaipnon
Seaton No
Measure
Value
is
Installed
Nstalled Value
Period
Stored (not m C)
(D I E) B
80
34 41 10 Powder Coating For Traffic Signals
TPW
LS 1.00000000
$5,250.00 $5,250.00
L00000000
$51250.00
$5,250.00I
$5,250.00 IWO%
81
32 13 73 Crack Sealing for Concrete Paving
TPW
LF 550.00000000
$4.00 $2,200.00
550.00000000 I
$2,200.00
$2,200.00
I $2,200.00 100.0
Tbie document has been modified from its origuml forin us un EJCDC document and the user did urn highlight tha
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
Balance to Finish
(B -F)
C-620 Change Order
Progress Estimate Change Order Number I I
DELETIONS
For (connact) 101579 Altamesa Blvd & Crowley Rd Intersection Improvement
Application Pevod 5/26/23-6/14/23
A B C
Item nh CO Qaaty to Dald
Change Order Item Descr i spedfication Una of Delete Unit Price Change Order Not Usad
Section
No. P No Measure Value
� Totals
Application Number
Applicatmn Dale'
D E
Na Used Not Used Not Used Na Used
Tbie documaut has beau modified fiom its origioul fovn as an EJCDC document and the user did urn highlight the
modifications. You are encouraged to read the document cazefully and consult L gal Counsel prior to its execution.
Contractor's Application
9 Final
6/14/2023
F
N. Used Not Used Not Used
C-620 Change Order
Progress Estimate
Change Order Number 1 2
I
Contractor's Application
ADDITIONS
For (aontiaa) 101579
Altamesa Blvd & Crowley Rd Intersection Improvement
Crty Secretary
57679
Applioat an Nambar
9 Final
Contract Num
Apphcztim Panod
5/26/23-6/14/23
Applioatton Date
6/14/2023
A
B
C
D E
F
Itcm
Balance to Finish
Change Order Item
Specification Umt of CO Quantity to Add
Addition Change
Unit Price
Estimated Quantity
Prevroady Was This Materials Presently
Value
Total Completed %
end Storod to Date (F) (B - P)
No.
Dcscnption Section No. Measure
Order Value
Lnstalled
L�stallad Was Panod Stored (not m C)
(1) � E) B
This document has bee. ma ltfied from its onginel form as an EJCDC document and the user did not highlight the
modifications. You are enwmaged to read the document carefully and consult Legal Counsel prior to its execution.
C-620 Change Order
Progress Estimate Change Order Number 1 2
DELETIONS
IFor (contrmot) 101579 Altamesa Blvd & Crowley Rd Intersection Improvement Applicmon Number
Apphcafinn Parma 5/26/23-6/14/23 Applicmhon Date
A 6 C D E
Item CO Qaanhty to Dalahou Change
Change Order Item Descrrpfion Spsaficafion Umt of Delete Unit Price Order Value Na Used Not Used Na Used Not Used Na Used
No. Sactmn No. Measure
Totals
This document has been modified from ns ongiml form as an EJCDC document and the user did not highlight the
modifications. You are enwuraged to read the document carefully and consult Legal Counsel pnor to its execution.
Contractor's Application
9 Final
6/14/2023
F
Not Used N. Used Not Used
C-620 Change Order
Progress Estimate Change Order Number 1 3
ADDITIONS
IF., (— mot) 101579 Altamesa Blvd & Crowley Rd Intersection Improvement
IApplication Penad 5/26/23-6/14/23
City Secretary 57679
Contract Nam:
A B
Item
Addition
Change Order Item Desorrption Specification Umt of CO Quantity to Add Unit Price Change Order
No. Section No Measure Value
C D
Estimated Quanhly Value
hatalled
Contractor's Application
Appl—tinv Number: 9 Final
Appl—tion Date; 6/14/2023
E F
Balance to Fmtah
Total Completed
Previously Value Thrs Materials Presently (B - F)
Installed Value Period Stored (not in C) and Stored to Date (F)
D+E) B
This document has bee. modified from na onginal form as an EJCDC document and the user did not highlight the
modifications. You are enwmaged to read the document carefully and consult Legal Counsel pnor to its execution.
C-620 Change Order
Progress Estimate Change Order Number 1 3
DELETIONS
IFor (contrea) 101579 Altamesa Blvd & Crowley Rd Intersection Improvement Apphoafion Numbec
Apphcafio. Fermd 5/26/23-6/14/23 Apphoafion Date:
A 6 C D E
Item CO Quantity to Deleti on
Chung. Order Item Desa non Spsaficsfion Umt of Delae Unit Price Chung. Order Not Used No[ Used N. Used Not Used Not Used
No. P Section No Measure Value
Totals
This document has bee. modtfied from ns onginol form as an EJCDC document and the user did no( highlight the
modifications. You are enwuraged to read the document carefully and consult Legal Counsel pnor to its execution.
Contractor's Application
9 Final
6/14/2023
F
Na Used Not Used Na Used
C-620 Change Order
Progress Estimate Change Order Number 1 4
ADDITIONS
Contractor's Application
IFor (comma) 101579 Altamesa Blvd & Crowley Rd Intersection Improvement City Secretary
57679
Appl—tiov Number
9 Final
Cnotract Nam:
Application Pan d 5/26/23-6/14/23
Application Date:
6/14/2023
A B
C
D E F
Item
Balance to Fmtsb
Additiov
Chavge Order Item Speafication Umt of CO Quantity to Add Unit Prica Chavge Order
Estimated Q.auhty
Total Completed
Prevtously ValuemMaterials Presently an
Valae d Storad to Data
(g _
(P)
No. Dcscrrption Seamn No Measure Value
Installed
Nstalled Value Period Stoted (notes C) (D+E)
B
This do—t has bee. modified from ns ongiml form as an EJCDC document and the user did not highlight the
modifications. You are enwmaged to read the document carefully and consult Legal Counsel pnor to its execution.
C-620 Change Order
Progress Estimate Change Order Number 1 4
DELETIONS
IFor (contrea) 101579 Altamesa Blvd & Crowley Rd Intersection Improvement Apphoafion Numbec
Apphcafio. Fermd 5/26/23-6/14/23 Apphoafion Date:
A 6 C D E
Item CO Quantity to Deleti on
Chung. Order Item Desa non Spsaficsfion Umt of Delae Unit Price Chung. Order Not Used No[ Used N. Used Not Used Not Used
No. P Section No Measure Value
Totals
This document has bee. modtfied from ns onginol form as an EJCDC document and the user did no( highlight the
modifications. You are enwuraged to read the document carefully and consult Legal Counsel pnor to its execution.
Contractor's Application
9 Final
6/14/2023
F
Na Used Not Used Na Used
C-620 Change Order
Progress Estimate Change Order Number 1 5
ADDITIONS
Contractor's Application
IFor (comma) 101579 Altamesa Blvd & Crowley Rd Intersection Improvement City Secretary
57679
Appl—tion Number
9 Final
Cnotract Nam:
Apphcmim Pan d 5/26/23-6/14/23
` ppl'eati°n Date:
6/14/2023
A B
C
D E F
Item
Balance to Fmtsb
Addition
Chevge Order Item Specification Umt of CO Quantity t-Add Unit Prica Change Order
Estimated Q-auhty
T-1 Complaed
Previously ValemMaterials Presently
Val -and Storad to Data
(g _
(P)
No. Description Seam -No. Measure Value
Installed
Nstalled Value Period Stored (na NC) (D+E)
B
This document has been modified from its ongiml form as an EJCDC document and the user did not highlight the
modifications. You are enwmaged to read the document carefully and consult Legal Counsel pnor to its execution.
C-620 Change Order
Progress Estimate Change Order Number 1 5
DELETIONS
IF.,( —tract) 101579 Altamesa Blvd & Crowley Rd Intersection Improvement Appl—tiou Numbec
Apphcafio. Pertod 5/26/23-6/14/23 Application Date:
A B C D E
Item CO Qaanhty to Del&
Change Order Item non
p D— Specification Umt of Delete Unit Price Change Order Not Used Not Used Not Used Not Used Not Used
No. Sectm. No. Measure Value
Totals
This do—t has bee. modified from ns ongiml form as an EJCDC document and the user did not highlight the
modifications. You are enwuraged to read the document carefully and consult Legal Counsel pnor to its execution.
Contractor's Application
9 Final
6/14/2023
F
N. Used Not Used Na Used
C-620 Change Order
Progress Estimate Change Order Number 1 6
ADDITIONS
Contractor's Application
IFor (comma)
101579 Altamesa Blvd & Crowley Rd Intersection Improvement City Secretary
57679
Apphoatiov Number
9 Final
Cnotract Num:
Application Pennd
5/26/23-6/14/23
Application Date:
6/14/2023
A B
C
D E F
Item
Balance to Frmsb
Addition
Qveonty
Total Completed
Previously Valueml M Preaeatry
%Psfimaled (B - F)
Change Order Item
No.
6peaficafion Uvn of CO Quanfiry W Add Unit Price Change Order
Desarphon Sea— No. Measure Value
Inetmled
Value and Stored W Date
Stated
Installed Valve Period Stored (vo[ m C) (D 7 E)
(P)
B
This document has been modified from ns onginal form as an EJCDC document and the user did not highlight the
modifications. You are enwmaged to read the document carefully and consult Legal Counsel pnor to its execution.
C-620 Change Order
Progress Estimate Change Order Number 1 6
DELETIONS
IFor (contrea) 101579 Altamesa Blvd & Crowley Rd Intersection Improvement Apphoafion Numbec
Apphcafio. Fermd 5/26/23-6/14/23 Apphoafion Date:
A 6 C D E
Item CO Quantity to Deleti on
Chung. Order Item Desa non Spsaficsfion Umt of Delae Unit Price Chung. Order Not Used No[ Used N. Used Not Used Not Used
No. P Section No Measure Value
Totals
This document has bee. modtfied from ns onginol form as an EJCDC document and the user did no( highlight the
modifications. You are enwuraged to read the document carefully and consult Legal Counsel pnor to its execution.
Contractor's Application
9 Final
6/14/2023
F
Na Used Not Used Na Used
C-620 Change Order
Progress Estimate
Change Order Number 1 7
I
Contractor's Application
ADDITIONS
For (comma) 101579
Altamesa Blvd & Crowley Rd Intersection Improvement
City Secretary
57679
Appl—tion Number 9 Final
Contract Num:
Apphcmim Parma
5/26/23-6/14/23
` ppl—ti°n Date: 6/14/2023
A
B
C
D E F
Item
Balance m Fm,sb
Change Order Item
Specification Umt of CO Quantity to Add
Addition
Unit Prica Change Order
Estimated Qnauhty
T-1 Complaed
Pravtously Vmue Thrs Materials Presently
Value and Stored m Data (F) (B - F)
No.
Dcscnption
Seclmn No Measure
Value
h stmled
Installed Value Period Stored (na in C)
(D+E) B
This document has bee. modified from its ongiml form as an EJCDC document and the user did not highlight the
modifications. You are enwmaged to read the document carefully and consult Legal Counsel pnor to its execution.
C-620 Change Order
Progress Estimate Change Order Number 1 7
DELETIONS
IFor (contrea) 101579 Altamesa Blvd & Crowley Rd Intersection Improvement Apphoafion Numbec
Apphcafio. Fermd 5/26/23-6/14/23 Apphoafion Date:
A 6 C D E
Item CO Quantity to Deleti on
Chung. Order Item Desa non Spsaficsfion Umt of Delae Unit Price Chung. Order Not Used No[ Used N. Used Not Used Not Used
No. P Section No Measure Value
Totals
This document has bee. modtfied from ns onginol form as an EJCDC document and the user did no( highlight the
modifications. You are enwuraged to read the document carefully and consult Legal Counsel pnor to its execution.
Contractor's Application
9 Final
6/14/2023
F
Na Used Not Used Na Used
C-620 Change Order
Progress Estimate Change Order Number 1 8
ADDITIONS
Contractor's Application
IFor (comma) 101579 Altamesa Blvd & Crowley Rd Intersection Improvement City Secretary
57679
Appl—tiov Number
9 Final
Cnotract Nam:
Application Pan d 5/26/23-6/14/23
Application Date:
6/14/2023
A B
C
D E F
Item
Balance to Fmtsb
Additiov
Chavge Order Item Speafication Umt of CO Quantity to Add Unit Prica Chavge Order
Estimated Q.auhty
Total Completed
Prevtously ValuemMaterials Presently an
Valae d Storad to Data
(g _
(P)
No. Dcscrrption Seamn No Measure Value
Installed
Nstalled Value Period Stoted (notes C) (D+E)
B
This do—t has bee. modified from ns ongiml form as an EJCDC document and the user did not highlight the
modifications. You are enwmaged to read the document carefully and consult Legal Counsel pnor to its execution.
C-620 Change Order
Progress Estimate Change Order Number 1 8
DELETIONS
IFor (contrea) 101579 Altamesa Blvd & Crowley Rd Intersection Improvement Apphoafion Numbec
Apphcafio. Fermd 5/26/23-6/14/23 Apphoafion Date:
A 6 C D E
Item CO Quantity to Deleti on
Chung. Order Item Desa non Spsaficsfion Umt of Delae Unit Price Chung. Order Not Used No[ Used N. Used Not Used Not Used
No. P Section No Measure Value
Totals
This document has bee. modtfied from ns onginol form as an EJCDC document and the user did no( highlight the
modifications. You are enwuraged to read the document carefully and consult Legal Counsel pnor to its execution.
Contractor's Application
9 Final
6/14/2023
F
Na Used Not Used Na Used
City of Fort Worth Summary of Charges
City secretary Contract Num: I 57679 I
Altamesa Blvd & Crowley Rd Intersection Improvement I P. 0.: FW020-0000007928
Application Period:
I 5/26/23-6/14/23 I Application I 9 Final
Number:
Funding Identification (FID)
Total Completed Amt Remaining Gross
Origq71 Contract
139008-0200431-5740010-101$-003980
$226,241.46 $3,672.69
130108-0200431-5740010-101579-003980
$398,768.40 $6,473.40
10
10
10
10
10
10
10
10
10
Change Order 1
1 39008-0200431-5740010-101579-003980 $7,450.00
1 30108-0200431-5740010-101579-003980
10
10
10
10
10
10
10
10
10
Change Order 2
1 39008-0200431-5740010-101579-003980
1 30108-0200431-5740010-101579-003980
10
10
10
10
10
10
10
10
10
Project Number: 101579
Application Date: 6/14/2023
Retainage Net
City of Fort Worth Summary of Charges
City secretary Contract Num: I 57679 I Altamesa Blvd & Crowley Rd Intersection Improvement I P. 0.: FW020-0000007928
Application Period: I 5/26/23-6/14/23 I Application I 9 Final
Number:
Funding Identification (FID)
Change Order 3
1 39008-0200431-5740010-101579-003980
1 30108-0200431-5740010-101579-003980
10
10
10
10
10
10
10
10
10
Change Order 4
1 39008-0200431-5740010-101579-003980
130108-0200431-5740010-101579-003980
10
10
10
10
10
10
10
10
10
Change Order 5
1 39008-0200431-5740010-101579-003980
1 30108-0200431-5740010-101579-003980
10
10
10
10
10
10
10
10
10
Total Completed Amt Remaining Gross
Project Number: 101579
Application Date: 6/14/2023
Retainage Net
City of Fort Worth Summary of Charges
City secretary Contract Num: I 57679 I Altamesa Blvd & Crowley Rd Intersection Improvement I P. 0.: FW020-0000007928
Application Period: I 5/26/23-6/14/23 I Application I 9 Final
Number:
Funding Identification (FID)
Change Order 6
1 39008-0200431-5740010-101579-003980
1 30108-0200431-5740010-101579-003980
10
10
10
10
10
10
10
10
10
Change Order 7
1 39008-0200431-5740010-101579-003980
130108-0200431-5740010-101579-003980
10
10
10
10
10
10
10
10
10
Change Order 8
1 39008-0200431-5740010-101579-003980
1 30108-0200431-5740010-101579-003980
10
10
10
10
10
10
10
10
10
Total Completed Amt Remaining Gross
Project Number: 101579
Application Date: 6/14/2023
Retainage Net
City of Fort Worth Summary of Charges
City Secretary Contract Num: I 57679 I Altamesa Blvd & Crowley Rd Intersection Improvement I P. O.: FW020-0000007928 Project Number: 101579
Application Period: I 5/26/23-6/14/23 I Application I 9 Final Application Date: 6/14/2023
Number:
Funding Identification (FID) Total Completed Amt Remaining Gross Retainage Net
Totals
1 39008-0200431-5740010-101579-003980
1 30108-0200431-5740010-101579-003980
10
10
10
10
10
10
10
10
10
$233,691.46 $3,672.69
$398,768.40 $6,473.40
Grand Total 1 1 $632,459.87 1 1 $10,146.09 1 1 $0.00 1 1 ($31,622.99)1 1 $31,622.99 1
FORT WORTU.,
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Change order No 1 McClendon Constr. Altamesa and Crowley
M&C: 23-0346
Date:
CPN: 101579 CSO:
DOC#:
To:
Name Jaylyn Harrelson
Department
?H Initials
Date Out
1.
jblair@mcclendonconstruction.com
Contractor -Signature gS
May 12, 2023
2.
Kevin Jackson
TPW Signature
K92*
May 11, 2023
3.
Brad Radovich
TPW - Signature
B
May 11, 2023
4.
Chad Allen
TPW -Signature
Ck
May 15, 2023
5.
Lissette Acevedo
TPW -Signature
May 16, 2023
6.
Michael Owen
TPW - Signature
May 16, 2023
7.
Lauren Prieur
TPW - signature
(/�/l.(�
May 16, 2023
8.
Doug Black
Legal - signature
d
May 17, 2023
9.
William Johnson
ACM - signature
LF
W,
May 17, 2023
10.
11.
DOCUMENTS FOR CITY MANAGER'S
SIGNATURE:
All documents received from any
and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED
TO THE APPROPRIATE ACM for approval first. Once the ACM has signed
the routing slip,
David
will review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: []YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts(a�FortWorthTexas.2ov at ext. 7233 or 8363, for pick up when
completed. Thank you!
Updated 03.29.2023 mdhm
CSC No. 57679-COl
FOR, _ TwORTH® City of Fort Worth
Change Order Request
Project Name Altamesa and Crowley Intersection Improvements I City Sec # 1 57679
Client Project #(s)l 101579
Project) Addition of two additional Left Turn lanes using existing median space, installation of new signals and new ADA compliant curb ramps.
Description
Contractorl McClendon Construction Change Order #1 1 1 Datel 4/25/2023
City Project Mgr.l Bradley Radovich City Inspectorl Kevin Jackson
Dept.
TPW
Contract Time
Totals
(CD)
Original Contract Amount
$635,155.95
$635,155.95
120
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
$635,155.95
$635,155.95
120
Amount of Proposed Change Order
$7,450.00
$7,450.00
67
Revised Contract Amount
$642,605.95
$642,605.95
187
Original Funds Available for Change Orders
$0.00
Remaining Funds Available for this CO
$0.00
Additional Funding (if necessary) $7,450.00 $7,450.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1.17%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $793,944.94
JUSTIFICATION (REASONS) FOR CHANGE ORDER M6
This change order includes three items. The first item is powder coating of the new traffic signal poles and mast arms in accordance with current City specifications and the
requirements of the Transportation Management Department. This project was originally bid with a previous version of the traffic signal specifications that did not include
powder coating. The second item is joint filling of a large gap between the back of curb and a new concrete median constructed as part of the project. This work was not
included in the original plans and was requested by the City of Fort Worth after observing the large joint gap during the final punch list inspection. The third item is the
addition of 67 days of contract time that was the result of a longer than expected delivery time of traffic signal equipment for the project.
Neither of the two cost items described in this change order were included in the original bid. Unit prices for these items not included in the original bid were evaluated by City
staff and the design consultant. The prices included in this change order have been compared to unit prices for similar items from recent bids by TXDOT and the City of Fort
Worth and were found to be reasonable and comparable. The price evaluation is available in the project files.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reporting requirements.
Contractor's Company Name Contractor Name Contract Signature Date
McClendon Construction Co, Inc. Justin Blair '— -- May 12, 2023
Ins ector/Ins ection Supervisor
and Contract Com liance Mana er
Date
May
a
May 11, 2023
ram Mana er
EDateProject
Senior Ca ital Project Officer
Date
May
May 16, 2023
r De t
Director, ContractingDepartment (Dept)
Date
-"41:- (9 ►+a►
May 16, 2023
�
May 16, 2023
Assistant City Attorney
Date
lAssistant Cit Manager
Date
t
May 17, 2023
1 w"^q�
May 17, 2023
M&C Number l l M&C Date Approved
ATTEST:
O.n— A A
Jannette Goodall, City Secretary
PORT WORTH City of Fort Worth
-T.,Change Order Additions
Project Name I Altamesa and Crowley Intersection Improvements City Sec # 57679
Client Project # I 101579 1
Contractorl McClendon Construction I PM1 Bradley Radovich I Inspectorl Kevin Jackson l
Change Order Submittal # O Date i 4/25/2023 j
ADDITIONS
IItM UtJUKIPIIUN UtNI Uty Unit Unit host total
1 34 41 10 Powder Coating for Trafic Signals TPW 1.00000000 LS $5,250.00 $5,250.00
2 3213 73 Crack Sealing for Concrete Paving TPW 550.00000000 LF $4.09 $2,200.00
TPW
TPVV $7,450.00
Sub Total Additions $7,450.00
Change Order Additions Page 2 of 4
I I tivi
FORT WORTH City of Fort worth
"r Change Order Deletions
Project Name I Altamesa and Crowley Intersection Improvements I City Sec # 1 57679
Client Project # 1 101579 1
Contractorl McClendon Construction PM1 Bradley Radovich Inspectorl Kevin Jackson
Change Order Submittal # 0 Date 1 4/25/2023
DELETIONS
UtbUKn'I IDIV utrI uty unit una Lost Iotai
I rvv $u.uu'
I
I
I
I
II
I
lI
II
I
1
1
1
lI
I
I
lI
I
I
I
1
I
I
lI
lI
I
I
�I
I
I
1
I
1
I
1
I
1
lI
I
1
I
1
I
I
I Pvv $0.00
Sub Total Deletions $0.00
Change Order Deletions Page 3 of 4
M/SBE for this Change Order
M/SBE Sub Type of Service T Amount for this CO
Total $0.00
Previous Change Orders
co # DATE I AMOUNT
Total I $0.00 1
FORTWORTH.
TRANSPORTATION AND PUBLIC WORKS
June 15, 2023
McClendon Construction Company, Inc.
P.O. Box 999
Burleson, Tx 76097
RE: Acceptance Letter
Project Name: 2018 CIP Intersection Improvements AltaMesa Boulevard and Crowley Road
Project Type: Paving/Street Lights
City Project No.: 101579
To Whom It May Concern:
On April 5, 2023 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on April 20, 2023. The final inspection and
the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is
therefore accepted by the City. The warranty period will start on April 20, 2023, which is the date of the
punch list completion and will extend of two (2) years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at Bradley
Radovich, PE Senior Project Manager 817-392-7817 1 Bradlev.RadovichWortworthtexas. gov .
Sincerely,
Brad Radovich, Project Manager
Cc: Kevin Jackson, Inspector
Gary Deyon, Inspection Supervisor
Troy Gardner, Senior Inspector
Chad Allen, Program Manager
AECOM, Consultant
McClendon Construction, Contractor
City Of Ft. Worth, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
CONSENT OF OWNER El
SURETY COMPANY ARCtIrruCT o
TO FINAL PAYMENT CONTRACTOR ❑
SURETY ❑
AIA DOCUMENT G707 OTHER
Bond No. TXC614184
PROJECT: 2018 CIP Intersection Improvements A1taMesa Blvd & Crowley Road
(name, address)
TO (Owner) [ City of Fort Worth, Texas ] ARCI-ITECT'S PROJECT NO:
200 Texas Street
Fort Worth, TX '76102 CONTRACT FOR:
[ ] CONTRACT DATE: May 10, 2022
CONTRACTOR: McClendon Construction Company, Inc.
548 Memorial Pima
Burleson, TX 76024
lit accordance with the provisions of the Contract between the Owner anti the Contractor as indicated abo ve. the
(here insert name turd address of Surety Company)
Merchants Bonding Company (Mutual)
P.O. Box 14498
Des Moines, IA 50306-3498 , SURETY COMPANY,
on bond of (here insert name and address O' Contractor)
McClendon Construction Company, Inc.
548 Memorial Plaza
Burleson, TX 76024 , CONTRACTOR,
hereby approves of the final payment to the Contractors, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its oblisations to (here insert name and address ofO%vner)
City of Fort Worth, Texas
200 Texas Street
Fort Worth, TX 76102 ,OWNER,
as set forth in the said Surety Company's bond.
IN WITNESS WHEREOF,
the Surety Company has hereunto set its hand this 15th day of June
Attest
(Seal).
2023
Merchants Bonding Company (Mutual)
St-ir�f Company
IgnaIWeAlt;;
Betty J. Reeh
Title
Representative
Attornev-In-Fact
NOTE: This Form is to he used as a wmpanion docsment it) AIA iX)('t]ME:N'T 6706. CONTRACTOR'S AFFIDAVIT OF 1'AYMI.NT OF DE13TS AND CLAIMS.
Current Edition
AEA DOCUMENT G707 ► CONSENT OF SURETY COMPANY 'rO 171NA1. PAYMENT • APRIL 1970 EDITION ■ AIAO
@ 1970 • Tl IE AMFRICAN INSTITUTE OF ARCHITECTS, 1735 New York Avc., NW, WAS[ IINGTON, D.C. 20006
ONF PAGF
`q
M E FCC HA,N T7�
BONDING COMPANY,
POWER OF ATTORNEY
Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.,
both being corporations of the Stale of Iowa, dlbla Merchants National Indemnity Company (in California only) (herein collectively called the
"Companies") do hereby make, constitute and appoint, individually,
Allyson W Dean: Ana Owens; Andrea Rose Crawford; Andrew Gareth Addison; Betty J Reeh; Bryan Kelly Moore; Clayton A Johnson; Colin E
Conly; Debra Lee Moon; Elizabeth Ortiz; Emily Allison Mikeska; John R Ward; Michael Donald Hendrickson; Monica Ruby Veazey: Patrick Thomas
Coyle; Sandra Lee Roney; Thomas Douglas Moore; Troy Russell Key
their true and lawful Attorneys) -in -Fact, Ic sign its name as surety(ies) and to execute, seat and acknowledge any and all bonds, undertakings,
contracts and other written instruments n the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of
persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions
or proceedings allowed by law.
This Power -of -Attorney is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board
of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adapted by the Board of Directors of
Merchants National Bonding, Inc., on OcW),-r 16, 2015.
"The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and
authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto,
bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof."
"The signature of any authorized officer an J the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney
or Certification thereof authorizing the Execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the
Company, and such signature and seal whr�n so used shall have the same force and effect as though manually fixed:'
In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the
Attorney -in -Fact includes any and all cnnsents for the release of retained percentages andfor final estimates on engineering and construction
contracts required by the State of Florida Department of Transportation, It is fully understood that consenting to the Stale of Florida Department
of Transportation making payment of the frnal estimate to the Contractor andfor its assignee, shall not relieve this surety company of any of
its obligations under its bond.
In connection with obligations in favor of thE! Kentucky Department of Highways only, it is agreed that the power and authority hereby given
to the Attorney -in -Fact cannot be modifi&d or revoked unless prior written personal notice of such intent has been given to the Commissioner -
Department of Highways of the Commonwi"llh of Kentucky at least thirty (30) days prior to the modification or revocation.
In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 15th day of March 2023
.+' ' .,........ MERCHANTS BONDING COMPANY (MUTUAL)
+`,�A���• q'i' •�Q\H....�4/jjA. MERCHANTS NATIONAL BONDING, INC.
RQaRy�pZ_ : m4,�gp�QOgg9��: d1b1aMERCHANTS NATIONAL INDEMNITYCOMPANY
ee
v . 2003 • d •` 1933 c: By
=J `r.
•. d :'� • d . 0•.
:,'�Ly '' '': r? : • . •'1d . 7ent
STATE OF IOWA Presi
COUNTY OFDALLASss.•"`•+•
On this 15th day of March 2023 before me appeared Larry Taylor, to me personally known, who being by we duly sworn
did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the
seats affixed to the foregoing instrument ire the Corporate Seals of the Companies; and that the said instrument was signed and sealed In behalf
of the Companies by authority of their respective Boards of Directors.
Kim Lee
Commis Number 702737
Af�yJiL�
• rmyCOmmi;cgn ExprrES
fy;ril 14, Z424 -
412
Public
of notary's commission does not invalidate this instrument}
I, Wiliam Warner, Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby
certify that the above and foregoing is a tr to and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is still in full
farce and effect and has not been amended or revoked.
In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this /�y of 1.l Z D
0.. ' mU•.4jk 0,99.
x • 20,)3 rcy� • �' 1933 e; Secretary
•yrj
� a.
r� •r-f
POA 0018 (10/22)
MERCHANTS k16
BONDING COMPANY
IMPORTANT NOTICE
To obtain information or make a complaint:
You may contact your insurance agent at the telephone number provided by your insurance
agent.
You may call Merchants Bonding Company's toll -free telephone number for information or to
make a complaint at:
1-800-678-8171
You may contact the Texas Department of Insurance to obtain information on companies,
coverages, rights or complaints at:
1-800-262-3439
You may write the Texas Department of Insurance at:
P. O. Box 149104
Austin, TX 78714-9104
Fax: (512) 475-1771
Web: http://www.tdi.state.tx.us
E-mail: ConsumerProtection@tdi.state.tx.us
PREMIUM AND CLAIM DISPUTES: Should you have a dispute concerning your premium or
about a claim you should contact the agent first. If the dispute is not resolved, you may contact
the Texas Department of Insurance.
ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not
become a part or condition of the attached document.
SUP 0032 TX (1/09)
MERCHANTS
BONDING COMPANY.
MERCHANTS BONDING I_ ClNWANY (M IUAI-) • 1'.0. BOX 1.1.198 • DES ,NWIN S, 10WA 5030b-3498
PHONE: (800) 678-8171 • FAX: (515) 243-3854
ADDENDUM TO BOND
T hi s A ddendum is i n reference to the bond(s) to which it i s attached.
Merchants B ondi r€; Company (Mutual) ('Merchants_) deems the digital or electronic image of
Merchants' corporate seal Lc4ow affixed to the bond(s) to the same extent as if a raised corporate seal was
physically stamped or i mpr{-,ssed upon the bond(s). T he digital or electroni c seal be] ow shall have the same
force and effect as though rnanualIy fixed to the bond(s),
A I I terms of the bogs) rerrai n the same.
Signed and effective March 23, 2020.
MERCHANTS BONDING COMPANY (MUTUAL)
By:------ -r-------------
L arry Taylor, President
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a Notary Public in the state and county
aforesaid, on this day personally appeared Justin Blair, Vice President of McClendon
Construction Company, Incorporated, known to me to be a credible person, who being
by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations or other organizations
furnishing labor and/or materials have been paid in full;
That there are no claims pending for personal injury and /or property damages;
On Contract described as;
Altamesa and Crowley Road Intersection Improvement (CPN 101579)
Subscribed and sworn before me on this
MISTY WEBB
pjtY PVe ii
2 _ "--'Notary Public, State of Texas
=� •°�� Comm. Expires 01-09-2026
Notary ID 126838467
Justin Blair
1y day of
20Z
otary P liifn Tarrant
C9t
Xty, Texas