Loading...
HomeMy WebLinkAboutContract 15996 STATE OF TEXAS CITY-SECRETARY CONTRACT NO, COUNTY OF TARRANT WHEREAS, on the 11th day of August, 1986, the City of Fort Worth and Leonard's Technical Services, Inc. , made and entered into City Secretary Contract No. 15187, which was duly authorized by the City Council by M&C C-9779 on July 29, 1986; and WHEREAS, it has become necessary to expand the design services contract covering the widening of Bryant Irvin Road from Camp Bowie Boulevard to Calmont Avenue; and WHEREAS, the City of Fort Worth and Leonard's Technical Services, Inc., desire to amend said City Secretary Contract No. 15187, so as to include therein the necessary realignment of Bryant Irvin Road and other design changes; NOW, THEREFORE, KNOW ALL MEN BY THESE PRESENTS: That the City of Fort Worth, a municipal corporation situated in Tarrant County, Texas, acting herein by and through Douglas Harman, its duly authorized City Manager, hereinafter called "CITY", and Leonard's Technical Services, Inc., acting herein by and through Willie C. Leonard, its duly authorized President, hereinafter called "Consultant", hereby make and enter into the following agreement: 1. City Secretary Contract No. 15187, on file in the office of the City Secretary of the City of Fort Worth, is hereby amended by substituting the following in lieu of Section 1 of Article I, of 15187, and after such amendment, Section 1 of Article I, of said City Secretary Contract No. 15187 shall read as follows, to wit: "ARTICLE I "SERVICES "Section 1. For and in consideration of the covenants herein contained, Consultant hereby covenants and agrees as an independent contractor, to perform the services hereinafter described with diligence and in accordance with the highest professional standards customarily obtained for such services in the State of Texas. The services to be performed by Consultant hereunder shall include all necessary design and engineering work for improvements in connection with the following projects and locations: "Widening and repaving of Bryant Irvin Road (North) from Camp Bowie Boulevard to Calmont Avenue in the City of Fort Worth, Texas. The Consultant shall develop the City's preliminary drawing, File No. K-1015, to widen the street from 301 to 44' with k left-turn lane on the approach to Camp Bowie Boulevard, and to replace the existing HMAC pavement and concrete curb and gutter with a 7" reinforced concrete pavement, stabilized subgrade and 7" concrete curb. The Consultant shall include, in the design, adjustments to driveways, sidewalks, intersecting streets and such other features as set forth below. The Consultant's work shall be performed by, or under the direct supervision o , a Professional Engineer licensed in the State of Texas who will affix his seal to each drawing originating in the Consultant's offices. "The Consultant shall provide designs to modify the traffic island at the southwest corner of Camp Bowie Boulevard and Bryant Irvin Road and thi special curb inlet at the northeast corner of the same intersection. The Consultant shall also prepare a set of drawings showing a comparison of the alignment of the original plan (File-No. K-1015) with the alignment o an alternative plan proposed by the West Side Neighborhood Association. -1-- "After review of the alternative plan, the Consultant shall revise the drawings to align the proposed centerline and proposed curb lines of the widened Bryant Irvin Road two feet eastward. The Consultant shall modify the proposed drainage facilities, as necessary, and shall recess all new inlets on Bryant Irvin Road. The Consultant shall provide a 5-foot wide sidewalk along the east side of Bryant Irvin for its entire length except between Camp Bowie and Lovell Avenue where the sidewalk shall be the full width of the parkway. The Consultant shall check the grades of all driveways to ensure that they are workable; where the driveways are too steep to be workable, the Consultant shall change the vertical alignment of the street to correct the situation. The Consultant shall ensure proper surface drainage of cross streets at locations where the vertical alignment of Bryant Irvin Road is changed. The Consultant will revise the specifications and bidding documents as required, and will provide descriptions for the additional right-of-way and easements on the approach to Camp Bowie Boulevard." 2. City Secretary Contract too. 15187, on file in the office of the City Secretary of the City of Fort Worth is hereby amended by substituting the following in lieu of Article II thereof, and after such amendment, Article II of said City Secretary Contract No. 15187 shall read as follows, to wit: "ARTICLE II "COMPENSATION "For all engineering services performed hereunder, local travel, supplies and incidentals the City agrees to pay the Engineer a fee in the amount equal to 1.91 times the salary cost of its employees engaged on the project. Salary Cost shall be equal to the cost of salaries of employees' time directly chargeable to the project, plus 31.01 for social security contributions, unemployment, excise and payroll taxes, unemployment compensation insurance, retirement benefits, medical and insurance benefits, sick leave, vacation, and holiday pay applicable thereto. °The following hourly salary rates shall apply to this contract: Position Hourly Rate Project Manager $18.00/Hour Engineer $18.00/Hour Senior Technical Designer $14.00/flour Design Draftsperson $ 9.50/Hour Draftsperson $ 7.00/Hour Clerical $ 6.50/Hour "The City shall pay the Engineer for all subcontract work authorized by the City at the actual invoice cost talus ten percent ( 10%). The City shall pay the Engineer for reproduction work at the current commercial rates. "In no event shall the payment by the City for all work and services performed hereunder exceed the total sum of $$19,945.00. "Method of Payment "Partial payment shall be made monthly upon receipt of an invoice from the Engineer outlining the amount of hours worked by each employee and the employee's salary rate along with itemized charges for any reproduction and survey work performed during the period covered by said invoice. -2- "The aggregate of such monthly partial payments shall not exceed the following. "Until satisfactory completion of Phase 1 hereunder, a suns not to exceed 2514 of the maximum fee. "Until satisfactory completion of Phase 2 hereunder, a sum not to exceed 55% of the maximum fee, less previous payments. "Until satisfactory completion of Phase 3 hereunder, a sum not to exceed 70% of the maximum fee, less previous payments. "Until satisfactory completion of Phase 4 hereunder, a sum not to exceed 95% of the maximum fee, less previous payments. "Balance of earnings to be due and payable upon satisfactory completion of Phase 4." 3. All other provisions, covenants, recitals, terms and conditions of City Secretary Contract No. 15187, on file in the office of the City Secretary of the City of Fort Worth, which are not expressly amended herein, shall remain in full force and effect. IN ITNESS WHEREOF, the parties hereby have exe this agreem n tr'plicate originals on this date, the day of A.D. 1987. CITY OF FORT WORTH By: ZA=�- d-2:�Z AM ty Manager ATTEST: City Secretary APPROVAL RECOMMENDED: LEONARD'S TECHNICAL SERVICES, INC. to c Wor s ae o ar Director Pre id n APPROVED AS TO FORM AND LEGALITY Address: LEONARD TECHNICAL SERVICES, Inc. Seminary South Office Building Suite 319-D Fort North, Texas 76125 ---' ATTEST Cx.ty A torney A ecretary Coautraot Authorization -, to dd -3- °'� ,� �� f sac - >'.F <.. City of Fort Wor Mayor and Council Communication DATE REFERENCE FROPUSFU AMENDMENT - ftsfeN NUMBER ""7RYANT IRVIN ROAD (N) FROM CAMP BOW PAC E 2 10-13-87 **C-10582 BOULEVARD TO CALMONT STREET 1 Of RECOMMENDATION It is recommended that the City Council : 1. authorize the following bond fund transfer: FROM TO AMOUNT PURPOSE 30-095901-00 30-023188-00 $4,945 To provide funds Engineering Bryant Irvin for consultant's Unspecified Road (N) fee. 2. authorize the City Manager to execute an amendment to City Secretary Contract No. 15187 with Leonard' s Technical Services,--Inc. for additional drafting and design services in connection the widening and repaving of Bryant Irvin Road (N) from Camp Bowie Boulevard to Calmont Street, in- creasing the maximum allowable fee by $4,945, from $15,000 to $19,945. BACKGROUND The 1986-1988 Capital Improvement Program included a project to widen and n repave Bryant Irvin Road (N) between Camp Bowie Boulevard and Calmont Street. The City's staff completed the conceptual study and preliminary layout phases of the proposed work. On July 29, 1986 (M&C C-9779) , the City Council authorized the City Manager to execute a contract with Leonard's Technical Services, Inc. (LTS) to develop the City' s preliminary plan into final plans and specifications suitable for requesting bids. Owners of properties abutting Bryant Irvin Road (N) were invited to review the plan and to offer suggestions and comments. The plan was favorably received and right-of-way acquisition along the west side of the road was initiated. However, when Council approval was sought for the acquisition of the first parcels, the Westside Neighborhood Association, on behalf of the property owners on the west side of the street, interposed objections. The Association suggested an alternative plan which would require right-of-way only for the turn 'lane at the Camp Bowie end of the project. DISCUSSION The City's staff has reviewed the alternative plan suggested by the Westside Neighborhood Association and has verified that it is feasible. The owners of the abutting properties were again invited to review the new plan, but the results were inconclusive. After careful consideration, staff believes that the alternative plan which would widen the street equally on each side but which would provide for narrower-than-no , al parkways should be developed. DATE REFERENCE SUBJECT: PROPOSED AMENDMENT - DESIGN OF PAGE NUMBER BRYANT IRVIN ROAD (N) FROM CAMP BOWIE 2 P, 10-13-87 **C-10582 BOULEVARD TO CALMONT STREET LTS has agreed to revise the drawings so as to provide a new horizontal align- ment, change the vertical alignment so that all driveways are workable, and modify the storm drainage facilities as required for a contract price increase of $4,945. The staff considers this price increase to be fair and reasonable for the work involved. PROJECT FINANCING A bond fund transfer in the amount of $4,945 will be necessary from Street Improvements Fund 30, Account No. 095901-00, Engineering Unspecified, (in which sufficient funds are available) to Account No. 023188-00, Bryant-Irvin Road to finance the work. The expenditure will be made from Index Code 680397. DAI :dd APPROVED K CITY COUNCIL OCT 13 198T City$Gcrotmy of tba I 'Ciry Of 1100 wgab�mass SUB MITTED FOR THE WY MANAGER S WSPOSITION BY COUNCIL PROCESSED 8Y I OFFICE BY APPROVED OTHER (DESCRISE) ORIGINATING DEPARTMENT HEAD: Gary__5anterre. CITY SECRETARY FOR ADDITIONAL INFORMATION t CONTACT! Bierman 7923 DATE