HomeMy WebLinkAboutContract 59651Received Date: 6/23/2023
Received Time:
Developer and Project Information Cover Sheet:
Developer Company Name: HMH Deer Creek Land, LLC
Address, State, Zip Code: 1038 Texas Trail, Grapevine TX 76051
Phone & Email: 817-849-5244 Nelson.Mitchell(cr�,historvmaker.com
Authorized Signatory, Title:
Project Name:
Brief Description:
Project Location:
Plat Case Number:
Mapsco:
CFA Number:
None provided
117E&F
23-0049
B. Nelson Mitchell, Jr., CEO
Deer Creek Meadows Phase 1
Water, Sewer, Paving, Storm Drain, and Street Lights
North Crowley Rd and West Risinger Rd
Plat Name: I None provided
Council District:
City Project Number: CPN104026 1 IPRC22-0054
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Page 1 of 16
Standard Community Facilities Agreement
Rev. 9/21
City Contract Number: 59651
STANDARD COMMUNITY FACILITIES AGREEMENT
This COMMUNITY FACILITIES AGREEMENT ("Agreement") is made and entered into by
and between the City of Fort Worth ("City"), a home -rule municipal corporation of the State of Texas,
acting by and through its duly authorized Assistant City Manager, and HMH Deer Creek Land, LLC , a
Texas limited liability company ("Developer"), acting by and through its duly authorized representative.
City and Developer are referred to herein individually as a "party" and collectively as the "parties."
WHEREAS, Developer is constructing private improvements or subdividing land within the
corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as Deer Creek
Meadows Phase 1 ("Project"); and
WHEREAS, the City desires to ensure that all developments are adequately served by public
infrastructure and that the public infrastructure is constructed according to City standards; and
WHEREAS, as a condition of approval of the Project, Developer is required to bear a portion of
the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as
described in this Agreement ("Community Facilities" or "Improvements"); and
WHEREAS, as a condition of approval of the Project, Developer is required to meet the additional
obligations contained in this Agreement, and Developer may be required to make dedications of land, pay
fees or construction costs, or meet other obligations that are not a part of this Agreement; and
WHEREAS, the City is not participating in the cost of the Improvements or Project; and
WHEREAS, the Developer and the City desire to enter into this Agreement in connection with
the collective Improvements for the Project;
NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein,
the City and the Developer do hereby agree as follows:
1.
CFA Ordinance
The Community Facilities Agreements Ordinance ("CFA Ordinance"), as amended, is incorporated
into this Agreement by reference, as if it was fully set out herein. Developer agrees to comply with all
provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this
Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in
connection with the work performed by the contractors. If a conflict exists between the terms and conditions
of this Agreement and the CFA Ordinance, the CFA Ordinance shall control.
City of Fort Worth, Texas Page 2 of 16
Standard Community Facilities Agreement OFFICIAL RECORD
Rev. 9/21 CITY SECRETARY
FT. WORTH, TX
2.
Incorporation of Engineering Plans
The engineering plans for the Improvements that have been approved by the City ("Engineering
Plans") are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide
at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to
construct the Improvements required by this Agreement.
3.
Description of Improvements; Exhibits and Attachments
The following exhibits describe the general location, nature and extent of the Improvements that
are the subject of this Agreement and are attached hereto and incorporated herein by reference:
E
Exhibit A: Water
E
Exhibit A-1: Sewer
E
Exhibit B: Paving
E
Exhibit 13-1: Storm Drain
E
Exhibit C: Street Lights & Signs
The Location Map and Cost Estimates are also attached hereto and incorporated herein by
reference. To the extent that Exhibits A, A-1, B, B-1, C, the Location Map, or the Cost Estimates
conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1 —
Changes to Standard Community Facilities Agreement, Attachment 2 — Phased CFA Provisions, and
Attachment 3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all
purposes.
4.
Construction of Improvements
Developer agrees to cause the construction of the Improvements contemplated by this Agreement
and that said construction shall be completed in a good and workmanlike manner and in accordance with
all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the
Improvements, and this Agreement. Developer acknowledges that City will not accept the Improvements
until the City receives affidavits and lien releases signed by Developer's contractors verifying that the
contractors, and all subcontractors and material suppliers, have been paid in full for constructing the
Improvements, and consent of the surety on payment and performance bonds provided for the
Improvements.
5.
Financial Guarantee
Developer has provided the City with a financial guarantee in the form and amounts set forth in
this Agreement which guarantees the construction of the Improvements and payment by Developer of
all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee").
Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall
not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the
CFA Ordinance.
City of Fort Worth, Texas Page 3 of 16
Standard Community Facilities Agreement
Rev. 9/21
6.
Completion Deadline; Extension Periods
This Agreement shall be effective on the date this Agreement is executed by the City's Assistant
City Manager ("Effective Date"). Developer shall complete construction of the Improvements and
obtain the City's acceptance of the Improvements within two (2) years of the Effective Date ("Term").
If construction of the Improvements has started during the Term, the Developer may request that this
Agreement be extended for an additional period of time ("Extension Period"). All Extension Periods shall
be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement.
In no event shall the Term of this Agreement plus any Extension Periods be for more than three years.
7.
Failure to Construct the Improvements
(a) The City may utilize the Developer's Financial Guarantee to cause the completion of the
construction of the Improvements if at the end of the Term, and any Extension Periods, the
Improvements have not been completed and accepted by the City.
(b) The City may utilize the Developer's Financial Guarantee to cause the completion of the
construction of the Improvements or to cause the payment of costs for construction of the
Improvements before the expiration of the Term, and any Extension Period, if the Developer
breaches this Agreement, becomes insolvent, or fails to pay costs of construction.
(c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers
are not paid for construction costs or materials supplied for the Improvements the contractors and
suppliers may place a lien upon any property which the City does not have an ownership interest
that is the subject of the Completion Agreement.
(d) Nothing contained herein is intended to limit the Developer's obligations under the CFA
Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's
contractors, or other related agreements.
8.
Termination
If Developer desires to terminate this Agreement before Developer's contractors begin
constructing the Improvements, Developer agrees to the following:
(a) that Developer and City must execute a termination of this Agreement in writing;
(b) that Developer will vacate any final plats that have been filed with the county where the Project
is located; and
(c) to pay to the City all costs incurred by the City in connection with this Agreement, including
time spent by the City's inspectors at preconstruction meetings.
9.
Award of Construction Contracts
City of Fort Worth, Texas Page 4 of 16
Standard Community Facilities Agreement
Rev. 9/21
(a) Developer will award all contracts for the construction of the Improvements and cause the
Improvements to be constructed in accordance with the CFA Ordinance.
(b) Developer will employ construction contractors who meet the requirements of the City to construct
the Improvements including, but not limited, to being prequalified, insured, licensed and bonded to
construct the Improvements in the City.
(c) Developer will require Developer's contractors to provide the City with payment and performance
bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent
(100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and
performance bonds shall guarantee construction of the Improvements and payment of all
subcontractors and material suppliers. Developer agrees to require Developer's contractors to
provide the City with a maintenance bond naming the City as an obligee, in the amount of one
hundred percent (100%) of the cost of the Improvements, that guarantees correction of defects in
materials and workmanship for the Improvements by the contractor and surety for a period of two
(2) years after completion and final acceptance of the Improvements by the City. All bonds must
be provided to the City before construction begins and must meet the requirements of the City's
Standard Conditions, Chapter 2253 of the Texas Government Code, and the Texas Insurance Code.
(d) Developer will require Developer's contractors to provide the City with insurance equal to or in
excess of the amounts required by the City's standard specifications and contract documents for
developer -awarded infrastructure construction contracts. The City must be named as an additional
insured on all insurance policies. The Developer must provide the City with a Certificate of
Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's
insurance provider, which shall be made a part of the Project Manual.
(e) Developer will require the Developer's contractors to give forty-eight (48) hours' advance notice
of their intent to commence construction of the Improvements to the City's Construction Services
Division so that City inspection personnel will be available. Developer will require Developer's
contractors to allow construction of the Improvements to be subject to inspection at any and all
times by the City's inspectors. Developer will require Developer's contractors to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives
consent to proceed, and to allow such laboratory tests as may be required by the City.
M Developer will not allow Developer's contractors to begin construction of the Improvements until
a notice to proceed to construction is issued by the City.
(g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and
water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and
service lines have been completed to the satisfaction of the City.
10.
Utilities
Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project;
and (2) to construct the Improvements required herein. City shall not be responsible for payment of any
costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with
any of the Improvements to be constructed pursuant to this Agreement.
City of Fort Worth, Texas Page 5 of 16
Standard Community Facilities Agreement
Rev. 9/21
11.
Easements and Rights -of -Way
Developer agrees to provide, at its expense, all necessary rights -of -way and easements required for
the construction and dedication to the City of the Improvements provided for by this Agreement.
12.
Liability and Indemnification
(a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND
HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY
PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES
SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT.
(b) THE DEVELOPER COVENANTS AND AGREES TO, AND BY THESE PRESENTS DOES
HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS
OFFICERS, AGENTS AND EMPLOYEES FROM ALL SUITS, ACTIONS OR CLAIMS OF
ANY CHARACTER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ONACCOUNT
OFANYINJURIES OR DAMAGES SUSTAINED BYANYPERSONS, INCLUDING DEATH,
OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE
CONSTRUCTION, DESIGN, PERFORMANCE OR COMPLETION OF ANY WORK TO BE
PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS,
OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO
PROPERLY SAFEGUARD THE WORK, OR ONACCOUNT OFANYACT, INTENTIONAL
OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS
CONTRACTORS, SUB -CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES,
WHETHER OR NOT SUCHINJURIES, DEATH OR DAMAGESARE CAUSED, IN WHOLE
OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS
OFFICERS, SERVANTS, OR EMPLOYEES.
(c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND
HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM
AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY
NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON
ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY,
INCLUDING DEATH, RESULTING FROM, OR INANY WAY CONNECTED WITH, THE
CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER
OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN
PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS
OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE
ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY
FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR
CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE
WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE
MANNER, FREE FROM DEFECTS, IN CONFORMANCE WITH THE CFA ORDINANCE,
AND INACCORDANCE WITH ALL PLANS AND SPECIFICATIONS.
13.
Right to Enforce Contracts
City of Fort Worth, Texas Page 6 of 16
Standard Community Facilities Agreement
Rev. 9/21
Upon completion of all work associated with the construction of the Improvements, Developer will
assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its
contractors, along with an assignment of all warranties given by the contractors, whether express or implied.
Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City
the right to enforce such contracts as an express intended third party beneficiary of such contracts.
14.
Estimated Fees Paid by Developer; Reconciliation
Prior to execution of this Agreement, Developer has paid to the City the estimated cost of
administrative material testing service fees, construction inspection service fees, and water testing lab fees
in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the
construction of the Improvements, the City will reconcile the actual cost of administrative material testing
service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid
by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer,
the Developer must pay the difference to the City before the Improvements will be accepted by the City. If
the actual costs of the fees are less than the estimated payments made by the Developer, the City will refund
the difference to the Developer. If the difference between the actual costs and the estimated payments made
by the Developer is less than fifty dollars ($50.00), the City will not issue a refund and the Developer will
not be responsible for paying the difference. The financial guarantee will not be released by the City or
returned to the Developer until reconciliation has been completed by the City and any fees owed to the City
have been paid by the Developer.
15.
Material Testing
The City maintains a list of pre -approved material testing laboratories. The Developer must
contract with material testing laboratories on the City's list. Material testing laboratories will provide copies
of all test results directly to the City and the Developer. If the Improvements being constructed fail a test,
the Developer must correct or replace the Improvements until the Improvements pass all retests. The
Developer must pay the material testing laboratories directly for all material testing and retesting. The City
will obtain proof from the material testing laboratories that the material testing laboratories have been
paid in full by the Developer before the City will accept the Improvements.
16.
Notices
All notices required or permitted under this Agreement may be given to a party by hand -
delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be
deemed to have been received when deposited in the United States mail so addressed with postage
prepaid:
CITY:
Development Coordination Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
With copies to:
City of Fort Worth, Texas
Standard Community Facilities Agreement
Rev. 9/21
DEVELOPER:
HMH Deer Creek Land, LLC
1038 Texas Trail,
Grapevine, Texas 76051
Page 7 of 16
City Attorney's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
and
City Manager's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
Or to such other address one party may hereafter designate by notice in writing addressed and
mailed or delivered to the other party hereto.
17.
Right to Audit
Developer agrees that, until the expiration of three (3) years after acceptance by the City of the
Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to
examine any directly pertinent books, documents, papers and records of the Developer involving
transactions relating to this Agreement. Developer agrees that the City shall have access during normal
working hours to all necessary Developer facilities and shall be provided adequate and appropriate
workspace in order to conduct audits in compliance with the provisions of this section. The City shall give
Developer reasonable advance notice of intended audits.
Developer further agrees to include in all contracts with Developer's contractors for the
Improvements a provision to the effect that the contractor agrees that the City shall, until the expiration of
three (3) years after final payment under the contract, have access to and the right to examine any directly
pertinent books, documents, papers and records of such contractor, involving transactions to the contract,
and further, that City shall have access during normal working hours to all of the contractor's facilities, and
shall be provided adequate and appropriate work space in order to conduct audits in compliance with the
provisions of this section. City shall give Developer's contractors reasonable advance notice of intended
audits.
18.
Independent Contractor
It is expressly understood and agreed that Developer and its employees, representative, agents,
servants, officers, contractors, subcontractors, and volunteers shall operate as independent contractors as to
all rights and privileges and work performed under this Agreement, and not as agents, representatives or
employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement,
Developer shall have the exclusive right to control the details of its operations and activities and be solely
responsible for the acts and omissions of its employees, representatives, agents, servants, officers,
contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat
superior shall not apply as between the City and its officers, representatives, agents, servants and
employees, and Developer and its employees, representatives, agents, servants, officers, contractors,
subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the
City of Fort Worth, Texas Page 8 of 16
Standard Community Facilities Agreement
Rev. 9/21
creation of a partnership or joint enterprise between City and Developer. It is further understood that the
City shall in no way be considered a co -employer or a joint employer of Developer or any employees,
representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer.
Neither Developer, nor any officers, agents, servants, employees or subcontractors of Developer shall be
entitled to any employment benefits from the City. Developer shall be responsible and liable for any and
all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents,
servants, officers, contractors, subcontractors, and volunteers.
The City, through its authorized representatives and employees, shall have the sole and exclusive
right to exercise jurisdiction and control over City employees.
19.
Applicable Law; Venue
This Agreement shall be construed under and in accordance with Texas law. Venue shall be in
the state courts located in Tarrant County, Texas or the United States District Court for the Northern
District of Texas, Fort Worth Division.
20.
Non -Waiver
The failure of the City to insist upon the performance of any term or provision of this Agreement
or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent
of City's right to assert or rely on any such term or right on any future occasion.
21.
Governmental Powers and Immunities.
It is understood that by execution of this Agreement, the City does not waive or surrender
any of its governmental powers or immunities.
22.
Headings
The paragraph headings contained herein are for the convenience in reference and are not intended
to define or limit the scope of any provision of this Agreement.
23.
Severability
In the event that any clause or provision of this Agreement shall be held to be invalid by any
court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the
remaining provisions hereof.
24.
Review of Counsel
City and Developer, and if they so choose, their attorneys, have had the opportunity to review
and comment on this document; therefore any rule of contract construction or interpretation that would
City of Fort Worth, Texas Page 9 of 16
Standard Community Facilities Agreement
Rev. 9/21
normally call for the document to be interpreted as against the drafting party shall not apply in
interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be
construed solely on the basis of the language contained therein, regardless of who authored such
language.
25.
Prohibition on Boycotting Israel
Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code,
the City is prohibited from entering into a contract with a company with 10 or more full-time employees
that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City for
goods or services unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel"
and "company" have the meanings ascribed to those terms by Chapter 2271 of the Texas Government Code.
To the extent that Chapter 2271 of the Government Code is applicable to this Agreement, by signing this
Agreement, Developer certifies that Developer's signature provides written verification to the City that
Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of this Agreement.
26.
Prohibition on Boycotting Energy Companies
Developer acknowledges that in accordance with Chapter 2274 of the Texas Government Code, as
added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2, the City is prohibited from entering into a contract for
goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds
of the City with a company with 10 or more full-time employees unless the contract contains a written
verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott
energy companies during the term of the contract. The terms "boycott energy company" and "company"
have the meanings ascribed to those terms by Chapter 2274 of the Texas Government Code, as added by
Acts 2021, 87th Leg., R.S., S.B. 13, § 2. To the extent that Chapter 2274 of the Government Code is
applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature
provides written verification to the City that Developer: (1) does not boycott energy companies; and (2)
will not boycott energy companies during the term of this Agreement.
27.
Prohibition on Discrimination Against Firearm and Ammunition Industries
Developer acknowledges that except as otherwise provided by Chapter 2274 of the Texas
Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1, the City is prohibited from entering
into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly
from public funds of the City with a company with 10 or more full-time employees unless the contract
contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or
directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate
during the term of the contract against a firearm entity or firearm trade association. The terms
"discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms
by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1. To
the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this
Agreement, Developer certifies that Developer's signature provides written verification to the City that
Developer: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm
entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade
association during the term of this Agreement.
City of Fort Worth, Texas Page 10 of 16
Standard Community Facilities Agreement
Rev. 9/21
28.
Immigration and Nationality Act
Developer shall verify the identity and employment eligibility of its employees who perform work
under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon
request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility
documentation for each employee who performs work under this Agreement. Developer shall adhere to all
Federal and State laws as well as establish appropriate procedures and controls so that no services will be
performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER
SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER,
DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written
notice to Developer, shall have the right to immediately terminate this Agreement for violations of this
provision by Developer.
29.
Amendment
No amendment, modification, or alteration of the terms of this Agreement shall be binding unless
the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer.
30.
Assignment and Successors
Developer shall not assign or subcontract all or any part of its rights, privileges, or duties under this
Agreement without the prior written consent of City. Any attempted assignment or subcontract without the
City's prior written approval shall be void and constitute a breach of this Agreement.
31.
No Third -Party Beneficiaries
The provisions and conditions of this Agreement are solely for the benefit of the City and
Developer, and any lawful assign or successor of Developer, and are not intended to create any rights,
contractual or otherwise, to any other person or entity.
32.
Compliance with Laws, Ordinances, Rules and Regulations
Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply
with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed
and understood that, if City calls to the attention of Developer any such violation on the part of Developer
or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately
desist from and correct such violation.
33.
Signature Authority
City of Fort Worth, Texas Page 11 of 16
Standard Community Facilities Agreement
Rev. 9/21
The person signing this Agreement on behalf of Developer warrants that he or she has the legal
authority to execute this Agreement on behalf of the Developer, and that such binding authority has been
granted by proper order, resolution, ordinance or other authorization of the entity. The City is fully entitled
to rely on this warranty and representation in entering into this Agreement.
34.
Counterparts
This Agreement may be executed in multiple counterparts, each of which will be deemed an
original, but which together will constitute one instrument.
35.
Entire Agreement
This written instrument, together with any attachments, exhibits, and appendices, constitutes the
entire understanding between the City and Developer concerning the work to be performed hereunder, and
any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall
be void.
[REMAINDER OF PAGE INTENTIONALLY BLANK]
City of Fort Worth, Texas Page 12 of 16
Standard Community Facilities Agreement
Rev. 9/21
36.
Cost Summary Sheet
Project Name: Deer Creek Meadows Phase 1
CFA No.: 23-0049
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sevier Construction Total
City Project No.: 104026
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
4. Signals
TPW Construction Cost Total
Total Construction Cost (excluding the fees)
Estimated Construction Fees:
C. Construction Inspection Service Fee
D. Administrative Material Testing Service Fee
E. Water Testing Lab Fee
Total Estimated Construction Fees:
Financial Guarantee Options, choose one
Bond = 100%
Completion Aqreement = 100% / Holds Plat
Cash Escrow Water/Sanitary Sewer= 125%
Cash Escrow Pavinq/Storm Drain = 125%
Letter of Credit = 125%
Escrow Pledqe Aqreement = 125%
Developer's Cost
$ 1,619,297.70
$ 1,290,050.00
$ 2,909,347.70
$ 3,123,651.35
$ 1,769,963.50
$ 260,437.52
$ 5,154,052.37
$ 8,063,400.07
$81,250.00
$23,765.00
$1,500.00
$ 106,515.00
IPRC No.: 22-0054
Choice
Amount (Mark one
$ 8,063,400.07
X
$ 8,063,400.07
$ 3,636,684.63
$ 6,442,565.46
$ 10,079,250.09
$ 10,079,250.09
City of Fort Worth, Texas Page 13 of 16
Standard Community Facilities Agreement
Rev. 9/21
IN WITNESS WHEREOF, the City and Developer have each executed this Agreement by their
duly authorized signatories to be effective on the date executed by the City's Assistant City Manager.
CITY OF FORT WORTH
Dana Burghdoff (JA 23, 20 :07 CDT)
Dana Burghdoff
Assistant City Manager
Date:
Recommended by:
Dwayne Hollars/Bichson Nguyen
Contract Compliance Specialist
Development Services
Approved as to Form & Legality:
Thomas Royce Hansen
Assistant City Attorney II
M&C No. n/a
Date: J u n 22, 2023
Form 1295: n/a
4d44Upnq�
ORt
a4 0
A�`o ogN�d
ATTEST:
°ap°s o=a°
aaa rEZA5a4b
/�
Obunu444
Jannette S. Goodall
City Secretary
City of Fort Worth, Texas
Standard Community Facilities Agreement
Rev. 9/21
DEVELOPER
HMH Deer Creek Land, LLC
A Texas limited liability company
By: BNMJR, Inc.
a Texas corporation
its Manager
A�IIAAIP 3e
B. Nelson Mitchell, Jr.
CEO
Date: Jun 22, 2023
Contract Compliance Manager:
By signing, I acknowledge that I am the person
responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
Rebecca Diane Owen (Jun 22, 202316:30 CDT)
Rebecca Diane Owen
Development Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page 14 of 16
The following attachments are incorporated into this Agreement. To the extent a
conflict exists between the main body of this Agreement and the following attachments, the
language in the main body of this Agreement shall be controlling.
Included Attachment
❑X Attachment 1 - Changes to Standard Community Facilities Agreement
❑ Attachment 2 — Phased CFA Provisions
❑ Attachment 3 — Concurrent CFA Provisions
® Location Map
® Exhibit A: Water Improvements
® Exhibit A-1: Sewer Improvements
® Exhibit B: Paving Improvements
® Exhibit B-1: Storm Drain Improvements
® Exhibit C: Street Lights and Signs Improvements
® Cost Estimates
(Remainder of Page Intentionally Left Blank)
City of Fort Worth, Texas Page 15 of 16
Standard Community Facilities Agreement
Rev. 9/21
ATTACHMENT "I"
Changes to Standard Community Facilities Agreement
City Project No. 104026
None
City of Fort Worth, Texas Page 16 of 16
Standard Community Facilities Agreement
Rev. 9/21
(O
N
O
N
ro
O
T
0
N
01
3
Q
L�
U
I
I
2
U
0
I
uj
O
00
O
I
2
C1_
Q
U
/
0
CL
3
0
-0
0
a>
a�
a>
U
L
0
I
O
00
O
/
LiJ
yner Rarrh Rd
;r�
Lincolnshire %01 l
YcAstdse St
W—dhau Way
ingharn St
ter Ct
Soutrview Or
Old .lwy nail
o
Grerh.11 Trail
.�
� � N
5- Putttda)e Dr
C
4
d
� a
W Kisinger Rd
o-SITE
3
z
eeF
Clair Rd
N
N� Palletti
4 �
9
� 1:�
W Risingor Rd E Rising
DEER CREEK NORTH
L-y Crest Dr Rustic View Rd
Rtdden Dale Dr oc
Noble Cvcve Ln F
�Nn1n Park C
Deer Lake Dr
Fsvrn meadow Dr
en ;roo.e Ln
2
u
THE PARKS Of
DEER CREEK
THE PARKS OF DEER CREEK
EN Run Dr x
Fairhrnoktn $ o G
Pirvw+ew In -1 f
=' O
SCALE 1"= 2000'
DEED CREEK MEADOWS
PHASE I
LOCATED IN
CITY
OF FORT WORTH, TEXAS
C]PN o 104026
MAPSC® ITT®.: 117 E & ]F
13RLPARLD FOR:
esL 1949
1038 Texan Trail, Grapevine, Texas
76051 (866) 409 - 1949
PREPARED BY:
GMcivil
Engineering & Surveying
2559 S W Grapevine Pkwy, Grapevine, Texas 76051
817 -329-4373
TxEng Firm k F-2944 1 TxS— Firm # 10021700
DEER CREEK
MEADOWS PHASE I, �y
WATER EXHIBIT
1"A"
���° ��A
CPN : 104025 �+ SCALE: 1"=
EX. INFRASTRUCTURE
1 2 26X
0, l/3TQ C R 7 8 9C0 Y
/ F
oGy�Fsr 23 4 5 0"
36CG 9 25X
35
/V 34 33
~ 12" W.L.
4 5 32
EX. INFRASTRUCTURE
(X-15455)
No,
0/9
28
5 4
5 27 1
14 K 6 7 8 ... -��26 16
13 13 12 11 0�25 17
12 4 10 9 Q�24 18
I1 3 5 O23 19 .,
10
9 2 C6 7 22 20
8
T8 ' 16 15 K 9 10
� 7 - ¢14 13 12 . c 0
5 6 1 @,
4 R7VF / 1 1 \ 12
8 +\ 10
4 3 5 6 7 0 13 9
3 - 2 B( C 7 8 9 6 14 8
2 1 20 10 b 11i 7
1 21 19� 11 4 16 Q
6
18 12 3 17 �5 oc
•. Q17 13 7 18 ~4
2 Q
3 �� 16 14 3
?0�
4 5e9jZ 15 2
7 c� 14 16
�F� 9 17 �TFF(
PROPOSED WATER LINE
(12" & 8" TYPICAL)
W
EXISTING WATER LINE
W
12" W.L. PREPARED FOR:
ast 1949
1030 T—n Trail, Grapevine, Texas
76051 (866) 409 -1999
PREPARED BY:
o n 12 90 4
e7U34' 3 U GMcivit
\\ Engineering & Surveying
2559 SW Grapevine Pkwy, Grapevine, Texas 76051
8173 9-4373
-,,F, F,, X F-2944 1 Tx5— Fm 4 1,7021700
E:\10805 — Deer Creek Meadow\Plans\CFA\PH-1\10805—DCM—PH1—CFA.dwg Wed May 03 2023 16:58
DEER CREEK
MEADOWS PHASE I
SEWER EXHIBIT "A-1"
CPN : 104026
PROPOSED SEWER LINE
(8" S.S. TYPICAL)
S
EXISTING SEWER LINE
c
7
b >�
r\
V
1 26X
8" S. 2 3
4 5 at
EX. INFRASTRUCTURE r� c R ' 8 9 �KN
(X-20368) 3 F 0
8" S.
2 4 5 11
39 38 B< C 25X
( 37 G 9
q36
35 34 33 \
1
3 4 S 32 ��
S40, K- 6 10 12
16 15
7S 14 13
F 7 8 ` 31 11 11 [�
q F12 11 10 'Co. 30 12 14
9 29 13 15
z 1 3 28 • 14 516
75 4 5 27 IS 17 O
4
5
16
7 8 26 6 18
13 12 e25 17 - 19
10 9 'Z�24 18 20
�23 19 �., 21
't 22 20 22
24
�10
9
SCALE: I" = 400'
PREPARED FOR:
asL 1949
1030 T—n Trail, Grapevine, Texas
76051 (866) 409 -1949
PREPARES) BY:
GMcivit
Engineering & Surveying
25595W Grapevine Pkwy, Grapevine, Texas]6051
817-329
SHEET I OF 2
TxEng Frm # F-2817 1 -x_— Frm # 10021 700
E:\10805 — Deer Creek Meadow\Plans\CFA\PH-1\10805—DCM—PH1—CFA.dwg Wed May 03 2023 16:58
SEWER EXHIBIT "A -I"
CPN : 104026
PROPOSED SEWER LINE
(8" S.S. TYPICAL)
s
EXISTING SEWER LINE
(X-20368)
8" S.S.
U)
& BEGIN 10" S.S.
SCA LL: P = 400'
J['REPARED FOR:
gist. 1949
1036 Texan hail, Grapevine, Texas
76051(666) 409-1949
PREPARED BY:
GMcivil
Engineering & Surveying
25595W Grapevine Pk, Grapevine, Texas 76051
2973
SHEET 2 OF 2 1xen9 Finn # F-29144 1 T S— Frm # 10021700
E:\10805 — Deer Creek Meadow\Plans\CFA\PH-1\10805—DCM—PH1—CFA.dwg Wed May 03 2023 17:11
DEER CREEK
MEADOWS PHASE I
WAVING FXHIBI 11B"
b�
b >�
NMK4T
2�
3 y
SCALE: P _ 4001
PROPOSED 2-23' B-B ROADWAY
w/ 1 10' R.O. W.
10" PCC PAVEMENT
w/ 8" LIME -STABILIZED SUBGRADE
PROPOSED 37B-B ROADWAY
w/60'R.O.W.
i
7.5" PCC PAVEMENT
w/ 8" LIME -STABILIZED SUBGRADE
PROPOSED 29' B-B ROADWAY
A w/ 50' R.O. W.
° < ° 6" PCC PAVEMENT
w/ 6" LIME -STABILIZED SUBGRADE
SIDEWALK BY HOMEBUILDER
EXISITNG SIDEWALK
— SIDEWALK PER THIS CONTRACT
OADA RAMPS PER THIS CONTRACT
PREPARED FOR:
n
1030 Texan hail, Grapevine, Texas
76051 (866) 409 -1949
PREPARED BY:
GMcivil
m
1
Engineering & Surveying
2559 SW Grapevine Pkwy, Grapevine, Texas 76051
817-329-4373
T,,Eng F,- # F-2944 1 TxS— F— # 10021700
E:\10805 — Deer Creek Meadow\Plans\CFA\PH-1\10805—DCM—PH1—CFA.dwg Wed May 03 2023 16:59
MEADOWS PHASE I
STORM DR-AIN EXHIBIT "]B-1"
b�
b >�
7\
V
b Rg44R0
Nk",�
3 .' \ 26X
SCALE: I" = 400'
PROPOSED STORM DRAIN
EXISTING STORM DRAIN
PREPARED FOR:
n
1030 Ire— hail, Grapevine, Texas
76051 (866) 409 -1949
PREPARED BY:
19
pF� e`°°�e 20 23�y GMcivit
a Engineering & Surveying
2559 SW Grapevine Pkwy, GrppeArre. Texas 76051
817-329-4373
TxEng Firm B F-2944 I Tx$ury Firm 8 10021700
E:\10805 — Deer Creek Meadow\Plans\CFA\PH-1\10805—DCM—PH1—CFA.dwg Wed May 03 2023 17:00
DEER CREEK
MEADOWS PHASE I
STREET LIGHTS & SIGNS DGMIT "C"
CPN :104026
��7
a,
SCALE 1" = 400'
2 26X
3 4
i0 MUHT✓4 5.6:7 61�'rH
i 3 F
. 5 6 O,p7V. 8 910 11 M
2 4
O� 1 39 B( 8 0 25X
✓ 3736
G 9
OO UpgyQ�7� 35
F 34 33
1 2 3 " - 40X
Q� 76 4 5 6 are 32 10 • 12-
lkL 14 13 12 7 8 31 13 j' PROPOSED STREET LIGHT
L9&,- " 70 30 12 '' 14 •
dj 9 29 3 15
15,2 .. ' � 3 28 74 16,1x
14 e oQKF 6 7 ,A ' 26' ! 165 B7mU EXISTING STREET LIGHT
13 - 12 O 25 17 19-e 19
12 4 t 1 10 9 O4�24 18 20
101' 3 5 - . 01 23 19 21 PROPOSED STREET
9 66/7 /$ 2z � � j� , 22 NAME SIGN
U� 8 I 16 K0 9 10 21. 23
O 7 16 15 14 10 1 24
4 i U0Ri�F 12 11 9 11 � PREPARED FOR:
/ z o
45 � 3 5 6 780 3 9 if 7�
3 2 B 7 8 9 6m 14 ,O8
2 .�1 20 10 5 15 19 �7 �.
1 21 11 4 16 O
q ,17 �,`` 56�
� 18 12 3 �149
•a. . e 17 13 2 18 hq
\\ 3 19 3 yr 109e Texan hall, Gnparlm, Texas
\ f 20 2 7fi0511eM400-1se9
4 5@q� 15
6 Fyn, 15 1
y 7 8�T' 14 16
1, 7 PREPARED BY:
9 10 13 18 5 sleez
B1 12 19 r' 34.
F� �e 20 2 m GMcivit
Engineering & Surveying
2559 SW Grapevine Pl-y, GmpaVna. Texas 76051
817-3294373
TxEng Firm B F2944 I TxSum Fim N 10021700
E:\10805 — Deer Creek Meadow\Plans\CFA\PH-1\10805—DCM—PHI—CFA.dwg Wed May 03 2023 17:00
UNIT PRICE BID
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Deer Creek Meadows Phase 1, City Project #104026
Project Item Informatu n
Bidlist
Item
Description
Water Facilities
I 1
0241.1118 4"-12" Pressure Plug
I 2
3305.0109 Trench Safely
I 3
3311.0001 Ductile Iron Water Fittings w/ Restraint
1 4
3311.0061 4" PVC Water Pipe
I 5
3311.0161 6" PVC Water Pipe
6
3311.0241 8" PVC Water Pipe
7
3311.0241 8" PVC Water Pipe, CSS Backfill
8
3311.0461 12" PVC Water Pipe
9
3311.0462 12" PVC Water Pipe, CSS Backfill
Bidder's Proposal
Specification Unit of Bid Unit Price Bid Value
Section No. Measure Ouannty
0241 14
EA
11
$210.00
$2,310.001
330510
LF
10,717
$0.10
$1,071.70
331111
TON
2.8
$27,000.00
$75,600.00
331112
LF
16
$4800
$76800
331112
LF
148
$4100
$6,660:00
331110,
LF
7,381
$68.00
$501,908.00
3311 12
331110,
LF
295
$78.00
$23,010.00
3311 12
331110,
LF
2,728
$113.00
$308,264.00
3311 12
331110,
LF
149
$130.00
$19,370.00
3311 12
I 10
3312.0001
Std. Fire Hydrant Assembly w/ 6" Gate Valve & Valve Box
33 12 40
EA
7
$7,620.00
$53,340.00
I 11
3312:20031"Water
Services
331210
EA
201
$1,410.00
$283,410.00-
1 12
3312210311/2"Water
Service
331210
EA
3
$2,050.00
$6,150.00
I 13
3312.2801
3" Water Meter and Vault
33 12 11
EA
2
$32,00000
$64,00000
1 14
3312.2802
4" Water Meter and Vault
33 12 11
EA
2
$36,000:00
$72.000:00
6" Gate Valve
34 12 11
EA
8
$1 400.00
$11 200.0U
H3312.3002
3312.3003
8" Gate Valve & Valve Box
33 12 20
EA
25
$2,500.00
$62,500.00
17
:3312.3005
12" Gate Valve & Valve Box
33 12 20
EA
11
$4 400.00
$48 400.00
18
:3312.4112
16" x 8" Tapping Sleeve & Valve
33 12 25
EA
1
$7,100.00
$7,100.00
H24
23 � 3999.0004 4" Irrigation Sleeves 00 00 00 LF 420 $25.00 $10 500.00
i3999.00053"PVC Water Pipe 000000 LF 52 $28.00 $1,456.001
Water Subtotal $1,619,297.701
31
3331.4108
6" Sewer Pipe
31 12,
LF
26
$64.00
$1,664.00
333120
4 11 10, 33
32
3331.4109
6" Sewer Pipe, CSS Backfill
31 12,
LF
19
$72.00
$1,368.00
333120
3311 10,
33
3331.4115
8" SDR-26 PVC Sewer Pipe
3331 12,
LF
8816
$61.00
$537,776.00
33 31 20
34
3331.4116
8" PVC Sanitary Sewer Pipe w/ CSS Backfill
3311 10,
LF
607
$80.00
$48,560.00
3311 12
3311 10,
35
3331.4201
10" Sewer Pipe
333112,
LF
1342
$71.00
$95,282 00
333120
3311 10,
36
:3331.4203
10" Sewer Pipe, Select Backfill
33 31 12,
LF
30
$100.00
$3,000.00
333120
37
:3339.1001
4' Std. Dia. Manhole
3 393 39 10' 3333
EA
51
$4,400.00
$224,400.00
39 20
38
3339.1003
4' Extra Depth Manhole
3 393 39 103333
VF
139
$185.00
$25,715.00
3926
39
9999.0001
Connect to Existing 4' S.S.M.H.
00 00 00
EA
2
$1,500.00
$3,000.00
Sanitary Sewer Subtotal
$1,290,050.00
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Deer Creek Meadows Phase 1, City Project #104026
UNIT PRICE BID
Project Item Information Bidder's Proposal
Descnption
Bidlist Specrficatron I Unit of Bid Unrt Btd Value
Item Section No. Measure puantity Price
Stone Drain
Facilities
I 40
3137.0104
Medium Riprap, dry
31 3700
SY 1
225
$90.001
$20,250001
I 41
3305.0109
Trench Safety
33 05 10
LF 1
6,942
$0.501
$3,471:001
I 42
33050112
Concrete Collar
3305 17
EA 1
6
$400,001
$2,400.001
I 43
3341:0201
21" RCP, Class III
3341 10
LF 1
714
$87.001
$62,118.001
I 44
33410205
24 RCP, Class III
3341 10
LF 1
1,426
$98.501
$140,461001
I 45
3341:0208
27" RCP, Class III
354110
LF
751
$107.001
$80,351001
I 46
3341.0309
36" RCP, Class III
3541 10
LF 1
1,401
$162.001
$226,962.001
1 47
3341.0402
42" RCP, Class III
3541 10
LF
984
$205.001
$201,720.001
1 48
3341.0409
48' RCP, Class III
354110
LF
220
$249.00
$54,780.001
1 49
3341.1102
4x3 Box Culvert
3341 10
LF
1,253
$309.001
$387,177.001
I 50
3341.1103
4x4 Box Culvert
334110
LF
193
$347.001
$66,971.001
I 51
3349.0001
4' Storm Junction Box
33 49 10
EA 1
12
$5,500.001
$66,000.001
I 52
3349.0002
5' Storm Junction Box
33 49 10
EA
5
$5,800.001
$29,000.001
I 53
3349.0003
6' Slone Junction Box
33 49 10
EA 1
1
$6,700.001
$6,700.001
I 54
3349.4109
36" SET, 1 pipe
33 49 40
EA 1
1
$3,800.001
$3,800.001
I 55
3349.5001
10' Curb Inlet
334920
EA 1
23
$5,500.001
$126,500.001
I 56
3349.5002
15' Curb Inlet
33 49 20
EA 1
9
$7,500.001
$67,500.001
I 57
3349.5003
20' Curb Inlet
33 49 20
EA 1
1
$9,600.001
$9,600.001
I 58
3349.7001
4' Drop Inlet
33 49 20
EA 1
2
$5,700.001
$11,400.001
I 59
9999.0001
11 x6 Junction Box
00 00 00
EA 1
1
25,200.001
$25,200.001
I 60
9999.0002
2-42" Flared Headwall
00 00 00
EA 1
1
$6,400.001
$6,400.001
I 61
9999.0003
3-4'x3' Straikt Headwall
00 00 00
EA 1
1
16,500.001
$16,500.001
I 62
9999.0004
4" Concrete (Detention Pond Pilot Channels)
00 00 00
SY
993
$80.501
$79,936.501
I 63
9999.0005
Concrete De entien Pond Outfall Structure
00 00 00
EA 1
1
62,850.001
$62,850.001
1 64
9999.0006
Access Manhole
00 00 00
EA 1
3
$3,970.001
$11.910.001
Storm Drain Subtotal
1
$11,769,963.50'
Water/Sanitary Sewer/Storm Drain
Facilities Subtotal
1
$4,679,311.201
Bid Summar�`(
1
Water/Sanitary SewerlStorm Drain
Facilities Subtotal
$4,679,311.201
1
Total Bid
$4,679,311.20I
1
Performance/Payment and 2-year
Maintenance Bonds *
I
$ 58,500.00
1
Grand Total
$4,737,8101.20
*Bonds
are not a
bid item*
This bid is submitted by the entity listed below:
Company: Bumsco Construction By:
Street Address: 6331 Southwest Blvd.
City, State, Zip Code: Benbrook, TX 76132
Phone: 817-738-3200 Signature
TitleVice Presdent
Date' April 5, 2023
Contractor agrees to eomplete WORK for FINAL ACCEPTANCE within 115 working days after the date wheo the
CONTRACT commences to run as provided in the General Cooditioas.
END OF SECTION
UNIT PRICE BID
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Deer Creek Meadows Phase 1, City Project #104026
Project Item Information
Bidlist
Description
Item
Paving Facilities
I 65 '0241.1100 Remove Asphalt Pvmt
I 66 0241.1300 Remove Conic Curb & Gutter
1 67 3211:0400 Hydrated Lime 9 30 lbs./S.Y. (Residential)
1 68 3211.0400 ydrated Lime a 36 lbs./S.Y. Arterial)
1 69 3211.0501 6" Lime Treated Subyrade (Residential)
1 70 3211.0502 8" Lime Treated Subgrade (Collector)
1 71 3211.0502 8" Lime Treated Subgrade (Arterial)
1 72 3213.0101 6" Concrete Pavement (Residential)
1 73 3213.0104 7.5" Concrete Pavement (Collector)
1 74 3213.0104 10" Concrete Pavement (Arterial)
1 75 3213.0301 5' Conc Sidewalk
1 76 3213.050, R-1 Ramp
I 77 3213.0506 P-1 Ramp
I 78 3217.0001 4" SLD Pvmt Marking HAS (W)
1 79 3217.0002 4" SLID Pvmt Markin HAS ( )
1 80 3217.0003 4" BRK Pvmt Marklnq HAS y )
8 3217.0202 8" SLID Pvmt Marking HAS Y)
82 291.0100 Topsoil
83 1292.0400 Seeoi e,, Hydmmulch
I 84 :3441.4003 Fumisfi/insfall Alum Sign Ground Mount City Std.
Bidder's Proposal
Specification
Unit of
Bid
Unit Price
Bid Value
I
Section No.
Measure
Ouanuty
024115
SY
223
$32.00
$7,136.001
024115
LF
73
$15.00
$1,095.00
321129
TON
467.0
$291.95
$136,340.65
321129
TON
224.0
$291.99
$65,396.80
321313
SY
31,095
$3.25
$101,058.75
321129
SY
7,337
$3.2�
$23,845.25
321129
SY
5,089
$3.25
$16,539.25
321313
SY
29,088
$51.tg
$1,505,304.00
321313
SY
6,960
$60.65
$422,124.00
321313
SY
4,681
$80.80
$378,224.80
311320
LF
4,133
$40.40
$166,973.20
321320
EA
20
$3,300.00
$66,000.00
32 13 20
EA
24
$2,250.00
$54,000.00
321723
LF
260
$1.3e
$351.00
321723
LF
946
$1.39
$1,277.10
321723
LF
1,393
$1.39
$1,880.55
321723
LF
717
$2.70
$1,935.90
3291 19
SY
3,816
$8.54
$32 436.00
32 92 13
SY
3,816
$2.0
$7,.22.80
344130
EA
27
$265.00
$7, 155.00
Bid Summary
I Paving Facilities Subtotal $3,123,651.351
1 Total Bid $3,123,651.351
1 Performance/Payment and 2-year Maintenance Bonds * $32,000.00
1 Grand Total $3,155,651.351
*Bids are not a bid item*
This bid is submitted by the entity listed below:
Company:ress: Contracting, Inc. By.��� I ,� ^�/��
Street Address: ode Southwest Blvd //'t to
City, State, Zip Code: Benbrook, TX 76132
Phone: 817-735-1600 Signature
TitleVP Operations
Date' 4-5.23
Contractor agrees w complete WORK for FINAL ACCEPTANCE within 115 working days aacr the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Deer Creek Meadows Phase 1, City Project #104026
UNIT PRICE BID
Project Item Information
Bidder's
Proposal
Bidlist Description
Specification
Unit of
Bid
Unit Price
Bid Value
Item
Section No.
Measure
Ouantrtv
Street tiro Facilities
1 100 2605.3 11 CONDT PVC SCH 40 (T)
26 05 33
LF
4,528
$17.01
$77,021.281
1 101 3441.1405 NO 21nsulated Elec Condr
344110
LF
3,144
$4.16
$13,079.041
1 102 3441.1408 NO 6 Insulated Elec Condr
34 41 10
LF
10,440
$2.13
$22,237.201
I 103 3441.1637 Install Tyyp 33A Arm
I 104 3441.1633 TyQ� 339 Arm
34 41 20
3441 20
EA
EA
4
35
$235.00
$235.00
$940.001
$8,225.001
I 105 3441.3201 LED L�) r 'Inp Fixture (R-2)
34 41 20
EA
34
$351.00
$11,934.001
I 106 3441.3201 LED L) rtigg Fixture IRA
34 41 20
EA
5
$351.00
$1,755.001
I 107 3441.3342 Rdwy Ilum N 18 Pole
34 41 20
EA
3
$2,181.00
$6,543.001
I 108 3441.3341 Rdwy Ilium TY 11 Pole
3441 20
EA
35
$2,049.00
$71,715.001
I 109 3441.1701 TY 1 S)/¢nal Foundation
3441 10
EA
35
$1,222.00
$42,770.001
I 110 3441.1703 TY 3 Swal Foundation
3441 10
EA
3
$1,406.0
$4,218.001
street Lighting Subtotal
$260,437.521
Bid Summary
I Street Lighting Facilities Subtotal
$260,437.521
I
Total Bid
$260,437.
I Performance/Payment and 2-year Maintenance Bonds *
$3,400. 01
1
Grand Total
$263,837.521
Bonds are not a bid item*
This bid is submitted by the entity listed below:
Company: Independent Utility Construction, Inc. 6 and Wolfe
Street Address: 5109 Sun Valley Dr.
City, State, Zip Cade: Ft. Worth, TX 76119
Phone: 817-478-44", office@iuctx.com ignat '
Title. President
Data. 04/05/2023
Contractor agrees to complete WORK for FINAL ACCEPTANCE within 30 workivg days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION