HomeMy WebLinkAboutContract 59646CSC No. 59646
CITY OF FORT WORTH, TEXAS
STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL
SERVICES
This AGREEMENT is between the City of Fort Worth, a Texas home -rule municipality
("CITY"), and Halff Associates, Inc., authorized to do business in Texas, ("ENGINEER"), for
a PROJECT generally described as: 2022 Bond Year 3 Contract 13 — Project No. 104311.
Article I
Scope of Services
The Scope of Services is set forth in Attachment A. Negotiated changes to this
Agreement, if any, are included in Attachment C.
Article II
Compensation
The ENGINEER's compensation shall be in the amount up to $597,591.00 as set
forth in Attachment B. Payment shall be considered full compensation for all labor
(including all benefits, overhead and markups), materials, supplies, and equipment
necessary to complete the Services.
Engineer shall provide monthly invoices to City. The Engineer shall provide the City
sufficient documentation, including but not limited to meeting the requirements set forth in
Attachment D to this AGREEMENT, to reasonably substantiate the invoices.
Payments for services rendered shall be made in accordance with the Texas
Prompt Payment Act (Texas Government Code Ch. 2251).
Acceptance by Engineer of said payment shall release City from all claims or
liabilities under this Agreement for anything related to, performed, or furnished in
connection with the Services for which payment is made, including any act or omission of
City in connection with such Services.
Article III
Term
Time is of the essence. Unless otherwise terminated pursuant to Article VI. D.
herein, this Agreement shall be for a term beginning upon the effective date, as described
below, and shall continue until the expiration of the funds or completion of the subject
matter contemplated herein pursuant to the schedule, whichever occurs first. Unless
specifically otherwise amended, the original term shall not exceed five years from the
original effective date.
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Standard Agreement for Engineering Related Design Services CPN 104311
Revised Date: November 23, 2021
Page 1 of 15
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Article IV
Obligations of the Engineer
A. General
The ENGINEER will serve as the CITY's professional engineering
representative under this Agreement, providing professional engineering
consultation and advice and furnishing customary services incidental thereto.
B. Standard of Care
The ENGINEER shall perform its services:
(1) with the professional skill and care ordinarily provided by competent
engineers practicing under the same or similar circumstances and
professional license; and
(2) as expeditiously as is prudent considering the ordinary professional
skill and care of a competent engineer.
C. Subsurface Investigations
(1) The ENGINEER shall advise the CITY with regard to the necessity for
subcontract work such as special surveys, tests, test borings, or other
subsurface investigations in connection with design and engineering
work to be performed hereunder. The ENGINEER shall also advise the
CITY concerning the results of same. Such surveys, tests, and
investigations shall be furnished by the CITY, unless otherwise
specified in Attachment A.
(2) In soils, foundation, groundwater, and other subsurface investigations,
the actual characteristics may vary significantly between successive
test points and sample intervals and at locations other than where
observations, exploration, and investigations have been made.
Because of the inherent uncertainties in subsurface evaluations,
changed or unanticipated underground conditions may occur that could
affect the total PROJECT cost and/or execution. These conditions and
cost/execution effects are not the responsibility of the ENGINEER.
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Standard Agreement for Engineering Related Design Services CPN 104311
Revised Date: November 23, 2021
Page 2 of 15
D. Preparation of Engineering Drawings
The ENGINEER will provide to the CITY the original drawings of all plans in
ink on reproducible mylar sheets and electronic files in .pdf format, or as
otherwise approved by CITY, which shall become the property of the CITY.
CITY may use such drawings in any manner it desires; provided, however,
that the ENGINEER shall not be liable for the use of such drawings for any
project other than the PROJECT described herein.
E. Engineer's Personnel at Construction Site
(1) The presence or duties of the ENGINEER's personnel at a construction site,
whether as on -site representatives or otherwise, do not make the ENGINEER
or its personnel in any way responsible for those duties that belong to the
CITY and/or the CITY's construction contractors or other entities, and do not
relieve the construction contractors or any other entity of their obligations,
duties, and responsibilities, including, but not limited to, all construction
methods, means, techniques, sequences, and procedures necessary for
coordinating and completing all portions of the construction work in
accordance with the contract documents and any health or safety precautions
required by such construction work. The ENGINEER and its personnel have
no authority to exercise any control over any construction contractor or other
entity or their employees in connection with their work or any health or safety
precautions.
(2) Except to the extent of specific site visits expressly detailed and set forth in
Attachment A, the ENGINEER or its personnel shall have no obligation or
responsibility to visit the construction site to become familiar with the progress
or quality of the completed work on the PROJECT or to determine, in general,
if the work on the PROJECT is being performed in a manner indicating that
the PROJECT, when completed, will be in accordance with the contract
documents, nor shall anything in the contract documents or this
AGREEMENT between CITY and ENGINEER be construed as requiring
ENGINEER to make exhaustive or continuous on -site inspections to discover
latent defects in the work or otherwise check the quality or quantity of the work
on the PROJECT. If the ENGINEER makes on -site observation(s) of a
deviation from the contract documents, the ENGINEER shall inform the CITY.
(3) When professional certification of performance or characteristics of materials,
systems or equipment is reasonably required to perform the services set forth
in the Scope of Services, the ENGINEER shall be entitled to rely upon such
certification to establish materials, systems or equipment and performance
criteria to be required in the contract documents.
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Standard Agreement for Engineering Related Design Services CPN 104311
Revised Date: November 23, 2021
Page 3 of 15
F. Opinions of Probable Cost, Financial Considerations, and Schedules
(1) The ENGINEER shall provide opinions of probable costs based on the
current available information at the time of preparation, in accordance
with Attachment A.
(2) In providing opinions of cost, financial analyses, economic feasibility
projections, and schedules for the PROJECT, the ENGINEER has no
control over cost or price of labor and materials; unknown or latent
conditions of existing equipment or structures that may affect operation
or maintenance costs; competitive bidding procedures and market
conditions; time or quality of performance by third parties; quality, type,
management, or direction of operating personnel; and other economic
and operational factors that may materially affect the ultimate PROJECT
cost or schedule. Therefore, the ENGINEER makes no warranty that
the CITY's actual PROJECT costs, financial aspects, economic
feasibility, or schedules will not vary from the ENGINEER's opinions,
analyses, projections, or estimates.
G. Construction Progress Payments
Recommendations by the ENGINEER to the CITY for periodic construction
progress payments to the construction contractor will be based on the
ENGINEER's knowledge, information, and belief from selective sampling and
observation that the work has progressed to the point indicated. Such
recommendations do not represent that continuous or detailed examinations
have been made by the ENGINEER to ascertain that the construction
contractor has completed the work in exact accordance with the contract
documents; that the final work will be acceptable in all respects; that the
ENGINEER has made an examination to ascertain how or for what purpose
the construction contractor has used the moneys paid; that title to any of the
work, materials, or equipment has passed to the CITY free and clear of liens,
claims, security interests, or encumbrances; or that there are no other matters
at issue between the CITY and the construction contractor that affect the
amount that should be paid.
H. Record Drawings
Record drawings, if required, will be prepared, in part, on the basis of
information compiled and furnished by others, and may not always represent
the exact location, type of various components, or exact manner in which the
PROJECT was finally constructed. The ENGINEER is not responsible for any
errors or omissions in the information from others that is incorporated into the
record drawings.
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Standard Agreement for Engineering Related Design Services CPN 104311
Revised Date: November 23, 2021
Page 4 of 15
Business Equity Participation
City has goals for the full and equitable participation of minority business
and/or women business enterprises in City contracts greater than
$100,000. In accordance with the City's Business Equity Ordinance No.
25165-10-2021 (replacing Ordinance No. 24534-11-2020, as codified in
Chapter 20, Article X of the City's Code of Ordinances, as amended, and any
relevant policy or guidance documents), the City has goals for the full and
equitable participation of minority business and/or women business
enterprises in City contracts greater than $100,000. Engineer acknowledges
the MBE and WBE goals established for this contract and its execution of this
Agreement is Engineer's written commitment to meet the prescribed MBE and
WBE participation goals. Any misrepresentation of facts (other than a
negligent misrepresentation) and/or the commission of fraud by the Engineer
may result in the termination of this Agreement and debarment from
participating in City contracts for a period of time of not less than three (3)
years.
J. Right to Audit
(1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years
after final payment under this contract, have access to and the right to
examine and photocopy any directly pertinent books, documents, papers and
records of the ENGINEER involving transactions relating to this contract.
ENGINEER agrees that the CITY shall have access during normal working
hours to all necessary ENGINEER facilities and shall be provided adequate
and appropriate work space in order to conduct audits in compliance with the
provisions of this section. The CITY shall give ENGINEER reasonable
advance notice of intended audits.
(2) ENGINEER further agrees to include in all its subconsultant agreements
hereunder a provision to the effect that the subconsultant agrees that the CITY
shall, until the expiration of five (5) years after final payment under the
subcontract, have access to and the right to examine and photocopy any
directly pertinent books, documents, papers and records of such
subconsultant, involving transactions to the subcontract, and further, that the
CITY shall have access during normal working hours to all subconsultant
facilities, and shall be provided adequate and appropriate work space, in order
to conduct audits in compliance with the provisions of this article together with
subsection (3) hereof. CITY shall give subconsultant reasonable advance
notice of intended audits.
(3) ENGINEER and subconsultant agree to reproduce such documents as may
be requested by the CITY. The CITY agrees to reimburse ENGINEER for the
cost of hard copies at the rate published in the Texas Administrative Code in
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Standard Agreement for Engineering Related Design Services CPN 104311
Revised Date: November 23, 2021
Page 5 of 15
effect as of the time copying is performed.
K. INSURANCE
Engineer shall not commence work under this Agreement until it has
obtained all insurance required under Attachment F and City has approved
such insurance.
L. Independent Consultant
The ENGINEER agrees to perform all services as an independent consultant
and not as a subcontractor, agent, or employee of the CITY. The doctrine
of respondent superior shall not apply.
M. Disclosure
The ENGINEER acknowledges to the CITY that it has made full disclosure in
writing of any existing conflicts of interest or potential conflicts of interest,
including personal financial interest, direct or indirect, in property abutting the
proposed PROJECT and business relationships with abutting property cities.
The ENGINEER further acknowledges that it will make disclosure in writing of
any conflicts of interest that develop subsequent to the signing of this contract
and prior to final payment under the contract.
N. Asbestos or Hazardous Substances
(1) If asbestos or hazardous substances in any form are encountered or
suspected, the ENGINEER will stop its own work in the affected portions
of the PROJECT to permit testing and evaluation.
(2) If asbestos or other hazardous substances are suspected, the CITY may
request the ENGINEER to assist in obtaining the services of a qualified
subcontractor to manage the remediation activities of the PROJECT.
O. Permitting Authorities - Design Changes
If permitting authorities require design changes so as to comply with published
design criteria and/or current engineering practice standards which the
ENGINEER should have been aware of at the time this Agreement was
executed, the ENGINEER shall revise plans and specifications, as required,
at its own cost and expense. However, if design changes are required due to
the changes in the permitting authorities' published design criteria and/or
practice standards criteria which are published after the date of this
Agreement which the ENGINEER could not have been reasonably aware of,
the ENGINEER shall notify the CITY of such changes and an adjustment in
compensation will be made through an amendment to this AGREEMENT.
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Standard Agreement for Engineering Related Design Services CPN 104311
Revised Date: November 23, 2021
Page 6 of 15
P. Schedule
ENGINEER shall manage the PROJECT in accordance with the schedule
developed per Attachment D to this AGREEMENT.
Article V
Obligations of the City
A. City -Furnished Data
ENGINEER may rely upon the accuracy, timeliness, and completeness of the
information provided by the CITY.
B. Access to Facilities and Property
The CITY will make its facilities accessible to the ENGINEER as required for
the ENGINEER's performance of its services. The CITY will perform, at no
cost to the ENGINEER, such tests of equipment, machinery, pipelines, and
other components of the CITY's facilities as may be required in connection
with the ENGINEER's services. The CITY will be responsible for all acts of the
CITY's personnel.
C. Advertisements, Permits, and Access
Unless otherwise agreed to in the Scope of Services, the CITY will obtain,
arrange, and pay for all advertisements for bids; permits and licenses required
by local, state, or federal authorities; and land, easements, rights -of -way, and
access necessary for the ENGINEER's services or PROJECT construction.
D. Timely Review
The CITY will examine the ENGINEER's studies, reports, sketches, drawings,
specifications, proposals, and other documents; obtain advice of an attorney,
insurance counselor, accountant, auditor, bond and financial advisors, and
other consultants as the CITY deems appropriate; and render in writing
decisions required by the CITY in a timely manner in accordance with the
project schedule prepared in accordance with Attachment D.
E. Prompt Notice
The CITY will give prompt written notice to the ENGINEER whenever CITY
observes or becomes aware of any development that affects the scope or
timing of the ENGINEER's services or of any defect in the work of the
ENGINEER or construction contractors.
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Standard Agreement for Engineering Related Design Services CPN 104311
Revised Date: November 23, 2021
Page 7 of 15
F. Asbestos or Hazardous Substances Release.
(1) CITY acknowledges ENGINEER will perform part of the work at CITY's
facilities that may contain hazardous materials, including asbestos
containing materials, or conditions, and that ENGINEER had no prior
role in the generation, treatment, storage, or disposition of such
materials. In consideration of the associated risks that may give rise to
claims by third parties or employees of City, City hereby releases
ENGINEER from any damage or liability related to the presence of such
materials.
(2) The release required above shall not apply in the event the discharge,
release or escape of hazardous substances, contaminants, or asbestos is
a result of ENGINEER's negligence or if ENGINEER brings such
hazardous substance, contaminant or asbestos onto the project.
G. Contractor Indemnification
The CITY agrees to include in all construction contracts the provisions of
Article IV.E. regarding the ENGINEER's Personnel at the construction site,
and provisions providing for contractor indemnification of the CITY and the
ENGINEER for contractor's negligence.
H. Contractor Claims and Third -Party Beneficiaries
(1) The CITY agrees to include the following clause in all contracts with
construction contractors and equipment or materials suppliers:
"Contractors, subcontractors and equipment and materials
suppliers on the PROJECT, or their sureties, shall maintain
no direct action against the ENGINEER, its officers,
employees, and subcontractors, for any claim arising out of,
in connection with, or resulting from the engineering services
performed. Only the CITY will be the beneficiary of any
undertaking by the ENGINEER."
(2) This AGREEMENT gives no rights or benefits to anyone other than the CITY
and the ENGINEER and there are no third -party beneficiaries.
(3) The CITY will include in each agreement it enters into with any other entity or
person regarding the PROJECT a provision that such entity or person shall
have no third -party beneficiary rights under this Agreement.
(4) Nothing contained in this Section H. shall be construed as a waiver of any
right the CITY has to bring a claim against ENGINEER.
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Standard Agreement for Engineering Related Design Services CPN 104311
Revised Date: November 23, 2021
Page 8 of 15
Litigation Assistance
The Scope of Services does not include costs of the ENGINEER for required
or requested assistance to support, prepare, document, bring, defend, or
assist in litigation undertaken or defended by the CITY. In the event CITY
requests such services of the ENGINEER, this AGREEMENT shall be
amended or a separate agreement will be negotiated between the parties.
J. Changes
The CITY may make or approve changes within the general Scope of
Services in this AGREEMENT. If such changes affect the ENGINEER's cost
of or time required for performance of the services, an equitable adjustment
will be made through an amendment to this AGREEMENT with appropriate
CITY approval.
Article VI
General Legal Provisions
A. Authorization to Proceed
ENGINEER shall be authorized to proceed with this AGREEMENT upon
receipt of a written Notice to Proceed from the CITY.
B. Reuse of Project Documents
All designs, drawings, specifications, documents, and other work products of
the ENGINEER, whether in hard copy or in electronic form, are instruments
of service for this PROJECT, whether the PROJECT is completed or not.
Reuse, change, or alteration by the CITY or by others acting through or on
behalf of the CITY of any such instruments of service without the written
permission of the ENGINEER will be at the CITY's sole risk. The CITY shall
own the final designs, drawings, specifications and documents.
C. Force Majeure
CITY and ENGINEER shall exercise their best efforts to meet their
respective duties and obligations as set forth in this Agreement, but shall
not be held liable for any delay or omission in performance due to force
majeure or other causes beyond their reasonable control, including, but not
limited to: acts of the public enemy, fires, strikes, lockouts, natural disasters,
epidemics/pandemics, wars, riots, material or labor restrictions by any
governmental authority and/or any other similar causes.
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Standard Agreement for Engineering Related Design Services CPN 104311
Revised Date: November 23, 2021
Page 9 of 15
D. Termination
(1) This AGREEMENT may be terminated
a.) by the City for its convenience upon 30 days' written notice to
ENGINEER.
b.) by either the CITY or the ENGINEER for cause if either party fails
substantially to perform through no fault of the other and the
nonperforming party does not commence correction of such
nonperformance within 5 days' written notice or thereafter fails to
diligently complete the correction.
(2) If this AGREEMENT is terminated for the convenience of the City, the
ENGINEER will be paid for termination expenses as follows:
a.) Reasonable cost of reproduction or electronic storage of partial or
complete studies, plans, specifications or other forms of ENGINEER'S
work product;
b.) The reasonable time requirements for the ENGINEER'S personnel to
document the work underway at the time of the CITY'S termination for
convenience so that the work effort is suitable for long time storage.
(3) Prior to proceeding with termination services, the ENGINEER will
submit to the CITY an itemized statement of all projected termination
expenses. The CITY'S approval shall be obtained in writing prior to
proceeding with termination services.
E. Suspension, Delay, or Interruption to Work
The CITY may suspend, delay, or interrupt the services of the ENGINEER for
the convenience of the CITY. In the event of such suspension, delay, or
interruption, an equitable adjustment in the PROJECT's schedule,
commitment and cost of the ENGINEER's personnel and subcontractors, and
ENGINEER's compensation will be made.
F. Indemnification
The ENGINEER shall indemnify or hold harmless the CITY against
liability for any damage committed by the ENGINEER or ENGINEER's
agent, consultant under contract, or another entity over which the
ENGINEER exercises control to the extent that the damage is caused by
or resulting from an act of negligence, intentional tort, intellectual
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Standard Agreement for Engineering Related Design Services CPN 104311
Revised Date: November 23, 2021
Page 10 of 15
property infringement, or failure to pay a subcontractor or supplier. CITY
is entitled to recover its reasonable attorney's fees in proportion to the
ENGINEER's liability.
G. Assignment
ENGINEER shall not assign all or any part of this AGREEMENT without the
prior written consent of CITY.
H. Jurisdiction
The law of the State of Texas shall govern the validity of this AGREEMENT,
its interpretation and performance, and any other claims related to it. The
venue for any litigation related to this AGREEMENT shall be Tarrant County,
Texas.
Severability and Survival
If any of the provisions contained in this AGREEMENT are held for any reason
to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality,
or unenforceability will not affect any other provision, and this AGREEMENT
shall be construed as if such invalid, illegal, or unenforceable provision had
never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I.
shall survive termination of this AGREEMENT for any cause.
J. Observe and Comply
ENGINEER shall at all times observe and comply with all federal and State
laws and regulations and with all City ordinances and regulations which in any
way affect this AGREEMENT and the work hereunder, and shall observe and
comply with all orders, laws ordinances and regulations which may exist or
may be enacted later by governing bodies having jurisdiction or authority for
such enactment. No plea of misunderstanding or ignorance thereof shall be
considered. ENGINEER agrees to defend, indemnify and hold harmless
CITY and all of its officers, agents and employees from and against all
claims or liability arising out of the violation of any such order, law,
ordinance, or regulation, whether it be by itself or its employees.
K. Contract Construction/No Waiver
The parties acknowledge that each Party and, if it so chooses, its counsel,
have reviewed and revised Agreement and that the normal rule of contract
construction, to the effect that any ambiguities are to be resolved against
the drafting party, must not be employed in the interpretation of Agreement
or any amendments or exhibits hereto.
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Standard Agreement for Engineering Related Design Services CPN 104311
Revised Date: November 23, 2021
Page 11 of 15
The failure of CITY or ENGINEER to insist upon the performance of any
term or provision of this Agreement or to exercise any right granted herein
shall not constitute a waiver of CITY's or ENGINEER's respective right to
insist upon appropriate performance or to assert any such right on any
future occasion.
L. Immigration Nationality Act
ENGINEER shall verify the identity and employment eligibility of its
employees who perform work under this Agreement, including completing
the Employment Eligibility Verification Form (1-9). Upon request by CITY,
ENGINEER shall provide CITY with copies of all 1-9 forms and supporting
eligibility documentation for each employee who performs work under this
Agreement. ENGINEER shall adhere to all Federal and State laws as well
as establish appropriate procedures and controls so that no services will be
performed by any ENGINEER employee who is not legally eligible to
perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD
CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES
DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER,
ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR
LICENSEES. CITY, upon written notice to ENGINEER, shall have the right
to immediately terminate this Agreement for violations of this provision by
ENGINEER.
M. Prohibition On Contracts With Companies Boycotting Israel
ENGINEER unless a sole proprietor, acknowledges that in accordance with
Chapter 2271 of the Texas Government Code, if ENGINEER has 10 or
more full time -employees and the contract value is $100,000 or more, the
City is prohibited from entering into a contract with a company for goods or
services unless the contract contains a written verification from the
company that it: (1) does not boycott Israel; and (2) will not boycott Israel
during the term of the contract. The terms "boycott Israel" and "company"
shall have the meanings ascribed to those terms in Section 808.001 of the
Texas Government Code. By signing this contract, ENGINEER certifies
that ENGINEER'S signature provides written verification to the City
that if Chapter 2271, Texas Government Code applies, ENGINEER: (1)
does not boycott Israel; and (2) will not boycott Israel during the term
of the contract.
N. Prohibition on Boycotting Energy Companies
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Standard Agreement for Engineering Related Design Services CPN 104311
Revised Date: November 23, 2021
Page 12 of 15
ENGINEER acknowledges that in accordance with Chapter 2274 of the
Texas Government Code -(as added by Acts 2021, 87th Leg., R.S., S.B. 13,
§ 2), the CITY is prohibited from entering into a contract for goods or
services that has a value of $100,000 or more, which will be paid wholly or
partly from public funds of the City, with a company (with 10 or more full-
time employees) unless the contract contains a written verification from the
company that it: (1) does not boycott energy companies; and (2) will not
boycott energy companies during the term of the contract. The terms
"boycott energy company" and "company" have the meaning ascribed to
those terms by Chapter 2274 of the Texas Government Code (as added by
Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter 2274
of the Government Code is applicable to this Agreement, by signing
this Agreement, ENGINEER certifies that ENGINEER's signature
provides written verification to the CITY that ENGINEER: (1) does not
boycott energy companies; and (2) will not boycott energy companies
during the term of this Agreement.
O. Prohibition on Discrimination Against Firearm and Ammunition
Industries
ENGINEER acknowledges that except as otherwise provided by Chapter
2274 of the Texas Government Code (as added by Acts 2021, 87th Leg.,
R.S., S.B. 19, § 1), the CITY is prohibited from entering into a contract for
goods or services that has a value of $100,000 or more which will be paid
wholly or partly from public funds of the City, with a company (with 10 or
more full-time employees) unless the contract contains a written verification
from the company that it: (1) does not have a practice, policy, guidance, or
directive that discriminates against a firearm entity or firearm trade
association; and (2) will not discriminate during the term of the contract
against a firearm entity or firearm trade association. The terms
"discriminate," "firearm entity" and "firearm trade association" have the
meaning ascribed to those terms by Chapter 2274 of the Texas Government
Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1). To the extent
that Chapter 2274 of the Government Code is applicable to this
Agreement, by signing this Agreement, ENGINEER certifies that
ENGINEER's signature provides written verification to the CITY that
ENGINEER: (1) does not have a practice, policy, guidance, or directive
that discriminates against a firearm entity or firearm trade association;
and (2) will not discriminate against a firearm entity or firearm trade
association during the term of this Agreement.
This AGREEMENT, including its attachments and schedules, constitutes the entire
AGREEMENT, which supersedes all prior written or oral understandings, and may only be
changed by a written amendment executed by both parties. This AGREEMENT may be
executed in one or more counterparts and each counterpart shall, for all purposes, be
deemed an original, but all such counterparts shall together constitute but one and the
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Standard Agreement for Engineering Related Design Services CPN 104311
Revised Date: November 23, 2021
Page 13 of 15
same instrument.
The following attachments and schedules are hereby made a part of this AGREEMENT:
Attachment A -
Scope of Services
Attachment B - Compensation
Attachment C
- Amendments to Standard Agreement for Engineering Services
Attachment D
- Project Schedule
Attachment E -
Location Map
Attachment F
— Insurance Requirements
Duly executed by each party's designated representative to be effective on the date
subscribed by the City's designated Assistant City Manager.
BY:
CITY OF FORT WORTH
Wllhlam Johnson (J 22,202315:25CDT)
William Johnson
Assistant City Manager
Date: Jun 22, 2023
ATTEST:
pO�nqn
FORT�ad
�a
aana
nEoAsati
Jannette Goodall
City Secretary
APPROVAL RECOMMENDED:
_A
By: Lauren Prieur (Jun 16, 2023 13:31 CDT)
Lauren Prieur, PE
Director, Transportation and Public
Works
APPROVED AS TO FORM AND LEGALITY
I
By: DBlack (Jun 20, )02319:47 CD 1 )
Douglas W Black
Sr. Assistant City Attorney
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
Revised Date: November 23, 2021
Page 14 of 15
BY:
ENGINEER
Halff Associates, Inc.
End OGi�r 04
Brent Billington(Jun 15, 02321:19 CDT)
Brent Billington, PE
Public Works Team Leader
Date: J u n 15, 2023
2023-1007683
Form 1295 No.
M&C No. 23-0463
M&C Date: 06/13/2023
2022 Bond Year 3 — Contract 13
CPN 104311
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the monitoring and
administration of this contract, including ensuring all performance and reporting
requirements.
Greg Robbins, PE
Senior Project Manager
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Standard Agreement for Engineering Related Design Services CPN 104311
Revised Date: November 23, 2021
Page 15 of 15
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
ATTACHMENT A
Scope for Enqineerinq Desiqn Related Services for Paving, Water and/or Sanitary Sewer
Improvements
DESIGN SERVICES FOR
2022 BOND YEAR 3 CONTRACT 13
CITY PROJECT NO.: 104311
The scope set forth herein defines the work to be performed by the ENGINEER in completing
the project. Both the CITY and ENGINEER have attempted to clearly define the work to be
performed and address the needs of the Project.
CITY OF FORT WORTH WATER DEPARTMENT
WATER AND SANITARY SEWER REPLACEMENT
Street CD Water and Sewer Water LF Water Size Sewer Sewer Size Notes:
Map No LF
Hampshire Blvd N
5
79K
852
8"
Hightower Street
5
80F
1,023
8"
730
8"
Kipling Street
5
80K
210
8"
Milam Street
5
80F, 80K
2,131
8"
Proctor Street
5
80K
296
8"
Ruth Street
5
80K
662
8"
Hampshire Blvd S
5
79K
451
8"
Proctor Street
5
80K
357
8"
Kipling Street
5
80K
344
8"
427
8"
Yeager Street
5
79G
1 213
8"
Easement Between 5
329
8"
Hightower Street &
79G
Brenlee Street
Easement Between 5
121
8"
Major Street &
80K
Mims Street
Easement Between 5
556
8"
Louis Street &
80K
Proctor Street
Easement Between 5
113
8"
Proctor Street and
80K
Major Street
TOTAL Water 4,151 LF
TOTAL SS
5,664 LF
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment A CPN 104311
PMO Release Date: 08.1.2014
Page 1 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
CITY OF FORT WORTH TPW DEPARTMENT
PAVING
REHABILITATION
Street
Limits
Lane
Planned Limited
Full
Cross Drainage
Miles
Rehab Paving
Paving
Section Analysis
Procedure Design
Design
*** ****
*
**
Hampshire Blvd N
House Street to Tierney Road
0.38
Concrete Base/POL Alt.
X
Hightower Street
Weiler Blvd to Stark Street
0.26
Concrete Base/POL Alt.
X
X
Hightower Street
Halbert Street to Milam Street
0.51
Concrete Base/POL Alt.
X
X
Kipling Street
Milam Street to Major Street
0.28
Concrete Base/POL Alt.
X
X
Milam Street
Beaty Street to Church Street
0.90
Concrete Base/POL Alt.
X
X
Proctor Street
Kipling Street to Routt Street
0.13
Concrete Base/POL Alt.
X
Ruth Street
Mims to Rosehill Drive
0.47
Concrete Base/POL Alt.
X
X
TOTAL
2.93
Concrete Base/POL Alt.
CITY OF FORT WORTH WATER DEPARTMENT
PAVING REHABILITATION
Street
Limits
Lane
Planned
Limited
Full Cross Drainage
Miles
Rehab
Paving
Paving Section Analysis
Procedure
Design
Design *** ****
*
**
Hampshire Blvd S
House Street to Tierney Road
0.51
POL
X
Proctor Street
Kipling Street to Craig Street
0.06
POL
X
Kipling Street
Major Street to Mims Street
0.16
POL
X
Yeager Street
Greenlee Street to
0.53
POL
Meadowbrook Drive
X
TOTAL 1.26
*Limited Design Projects Include: existing typical section, plan and profile sheets with the existing ground labeled as
the proposed ground, and permitting requirements if applicable. Proposed profiles that modify existing grades,
driveway profiles, curb replacement, sidewalk design or replacement (including ramps and walls), and retaining walls
are not included.
"Full Design Projects Include: proposed typical section, plan and profile sheets with the proposed ground profile
designed, and permitting requirements if applicable.
—Cross Sections Include: proposed cross sections taken at all driveways showing the proposed driveway slope and
the limits of the driveways shown in plan view on the paving plan and profile sheets. Streets scoped for Full Paving
Design but not selected to include cross sections shall assume driveway replacement to the ROW line on the plan
and profile sheets.
****Drainage Analysis Includes: existing and proposed drainage area maps and drainage computations as detailed in
the scope below.
City of Fort Worth, Texas
Attachment A 2022 Bond Year 3 — Contract 13
PMO Release Date: 08.1.2014 CPN 104311
Page 2 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
CITY OF FORT WORTH STORMWA TER DEPARTMENT
PIPE REPLACEMENT
Street
Secondary Street
Ref. No. Per
Planned Rehab Procedure
Limited
STMWRT Pipe
Storm
Assessment 2022
Design
Report
Hightower Street
Yeager Street
P1008184
Replace 8 LF of 24' RCP pipe starting from
station 4.5 LF from MH000129
X
Hightower Street
Yeager Street
P1008183
Spot repair at Station 26 LF from
MH000129 (where lateral pipe P1008182
ties into P1008183 pipe)
X
Kipling Street
Louis Street
P1027303
Replace 64 LF of 24' RCP pipe from station
174 LF (from MH007570)
X
Weiler Boulevard
Hightower Street
P1008186
Spot repairs:
• Station 5 LF from MH000131
• Station 260 LF from MH000131
X
Kipling Street
Major Street
P1027227
Spot repair: Station 196 LF from
M H 007557
X
*Limited Storm Design Includes: Removal plan view and proposed plan view along with plan notes(s) for
pipe repairs or inlet replacement; No hydraulic analysis or calculations will be required for pipe repair
being shown on plans; No pipe profiles will be required on plans
WORK TO BE PERFORMED
This section includes design effort which will be shared between the Water Department and
Transportation & Public Works Department. The consultant shall prepare two separate level of
effort (LOE) spreadsheets and will provide their fees according to the departments which are
responsible for that subtask.
• Subtasks showing [Water] shall have all design fees on the Water Department LOE.
• Subtasks showing [Water/TPW] shall split the design fees according to effort or sheet
count between the two LOEs.
• Subtasks showing [TPW] shall have all design fees on the TPW Department LOE.
Task 1. Design Management
Task 2. Conceptual Design (30%)
Task 3. Preliminary Design (60%)
Task 4. Final Design (90% and 100%)
Task 5. Bid Phase Services
Task 6. Construction Phase Services
Task 7. ROW/Easement Services
Task 8. Survey and Subsurface Utility Engineering Services
Task 9. Permitting
Task 10. Plan Submittal Checklists
Task 11. Quality Control/ Quality Assurance
City of Fort Worth, Texas
Attachment A 2022 Bond Year 3 - Contract 13
PMO Release Date: 08.1.2014 CPN 104311
Page 3 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
TASK 1. DESIGN MANAGEMENT.
ENGINEER shall ensure efficient and effective use of ENGINEER's and CITY's time and
resources.
ENGINEER shall manage change,
■ communicate effectively,
■ coordinate internally and externally as needed, and
■ Proactively address issues with the CITY's Project Manager and others as necessary
to make progress on the work.
1.1. Managing the Team
Lead, manage and direct design team activities.
Hold meetings and communicate internally among team members to allocate team
resources. [Water/TPW]
Ensure quality control is practiced in performance of the work [Water/TPW]
1.2. Communications and Reporting
• Attend a pre -design project kickoff/chartering meeting with CITY staff to confirm
and clarify scope, understand CITY objectives, and ensure economical and
functional designs that meet CITY requirements [Water]
• Conduct review meetings with the CITY at the end of each design phase. [Water]
• Prepare invoices and submit monthly in the format requested by the CITY.
[Water/TPW]
• Prepare and submit monthly progress reports in the format provided by the Water
Department and TPW. [Water/TPW]
• Prepare and submit baseline Project Schedule initially, and Project Schedule
updates with a schedule narrative monthly, as required in Attachment D to this
Standard Agreement and according to the City of Fort Worth's Schedule Guidance
Document. [Water]
• Complete Monthly M/WBE Report Form and Final Summary Payment Report Form
at the end of the project. [Water]
• Coordinate with other agencies and entities as necessary for the design of the
proposed infrastructure, and provide and obtain information needed to prepare the
design [Water]
• With respect to coordination with permitting authorities, ENGINEER shall
communicate with permitting authorities such that their regulatory requirements are
appropriately reflected in the designs. ENGINEER shall work with regulatory
authorities to obtain approval of the designs, and make changes necessary to meet
their requirements, as part of the design scope. [Water]
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment A CPN 104311
PMO Release Date: 08.1.2014
Page 4 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
• Personnel and Vehicle Identification: When conducting site visits to the project
location, the ENGINEER or any of its sub -consultants shall carry readily visible
information identifying the name of the company and the company representative.
[Water]
ASSUMPTIONS
• 36 MWBE reports will be prepared
• 4 meetings with city staff
• 36 monthly progress reports will be prepared
• 36 monthly project schedule updates will be prepared
DELIVERABLES
A. Meeting summaries with action items
B. Monthly invoices
C. Monthly progress reports
D. Baseline design schedule
E. Monthly schedule updates with schedule narrative describing any current or
anticipated schedule changes
F. Monthly M/WBE Report Form and Final Summary Payment Report Form
G. Plan Submittal Checklists (See Task 10)
TASK 2. CONCEPTUAL DESIGN (30 PERCENT).
The Conceptual Design shall be submitted to CITY per the approved Project Schedule.
The purpose of the conceptual design is for the ENGINEER to
■ Study the project,
■ Identify and develop alternatives that enhance the system,
■ Present (through the defined deliverables) these alternatives to the CITY
■ Recommend the alternatives that successfully addresses the design problem, and
■ Obtain the CITY's endorsement of this concept.
ENGINEER will develop the conceptual design of the infrastructure as follows.
2.1. Data Collection
• In addition to data obtained from the CITY, ENGINEER will research proposed
improvements in conjunction with any other planned future improvements that may
influence the project. [Water]
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment A CPN 104311
PMO Release Date: 08.1.2014
Page 5 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
The ENGINEER will also identify and seek to obtain data for existing conditions that
may impact the project including but not limited to; utilities, agencies (TxDOT and
railroads), City Master Plans, and property ownership as available from the Tax
Assessor's office. [Water]
The data collection efforts will also include conducting special coordination meetings
with affected property owners and businesses as necessary to develop sewer re-
routing plans. [Water]
The ENGINEER shall visit the project site and obtain the meter numbers and sizes
on all existing meters to be replaced on the project and shall identify existing sample
stations and fire line locations. [Water]
2.2. Geotechnical Investigations
• ENGINEER shall advise the CITY of test borings and other subsurface
investigations that may be needed for the project. If the CITY determines that
such borings or investigations are needed, then the ENGINEER shall work with
the CITY and CITY's geotechnical consultant to draw up specifications for such
testing program. The cost of such testing will be paid for by the CITY. [Water]
2.3. Fire Line Reconnection
A fire line reconnection is not anticipated to be necessary for the lines that have been
identified and has therefore not been included in this scope of work. However, the
ENGINEER understands that if a fire line is encountered during design survey, then
the following procedure should be utilized for the reconnection of fire lines during
design and construction of water mains:
2.3.1 All fire lines on existing water mains to be replaced shall be clearly identified on the
plans and when necessary, detailed sequence of construction should be provided for
the reconnection to ensure that affected properties have adequate fire protection
during and after construction. The engineer may need to visit with affected property
owners to obtain fire flow and pressure requirements and incorporate the data into
the fire service reconstruction design. [Water]
2.3.2 Design Engineer must coordinate with Water Field Operations during the design
stage. For situations where the water main is removed and replaced in the same
trench, special attention should be given to maintain adequate fire protection. A 2-
inch temporary water line is grossly inadequate to feed a fire line. The transfer time
of the fire line to the new water main must be kept to a minimum. Where necessary
design and appropriate pay items must be provided for adequate temporary water
service to feed fire service lines during construction. If there is any question about
the adequacy of the temporary service to the fire line, then the inspector or project
manager will request field operations to perform a -pressure test at the nearest fire
hydrant or outlet to determine the adequacy of the temporary connections. If the
temporary connection is inadequate to provide fire protection until the permanent
feed is in place, the project manager will assess the situation and make a
determination as to the appropriate action. [Water]
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment A CPN 104311
PMO Release Date: 08.1.2014
Page 6 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
2.3.3 At pre -construction meeting, contractors should be informed of their responsibility to
locate, identify and maintain fire service to applicable buildings. The proposed
sequence of reconnection for fire lines should be discuss and enforced during
construction. The City inspector shall also inspect the project site and take inventory
of fire line locations. [Water]
2.3.4 During construction, the inspector shall notify Water Department Field Operations of
the pending fire line shut down. In addition, the contractor must notify the local fire
station and property owners of the time frame that the fire line will be shut down on
company letter head and inspector shall receive a copy. No fire line shut outs will be
allowed without this letter. [Water]
2.3.5 The project manager shall be responsible for the implementation and completion of
this procedure. [Water]
2.4. The Conceptual Design Package shall include the following:
• 1 Cover Sheet [Water]
• Graphic exhibits and written summary of alternative design concepts considered,
strengths and weaknesses of each, and the rationale for selecting the
recommended design concept. [Water]
• Proposed phasing of any water, sanitary sewer, and pavement work that is
included in this project documented in both the project schedule and narrative form.
[Water]
• Existing typical sections of the roadway to be constructed for streets designated as
limited paving scope. Proposed typical sections which outline the proposed
improvements for streets designated full paving scope. Typical sections shall
include existing and proposed ROW, existing and proposed lane widths and
direction arrows, existing and proposed curbs, sidewalks, and retaining walls. It is
assumed that the proposed roadway section will be POL or MOL depending on the
geotechnical report provided by the City or as directed by the City. [TPW]
Conceptual plan and profile sheets showing existing and proposed horizontal
roadway alignments, existing and proposed ROW, existing and proposed sidewalks
and driveways, proposed lane dimensions and lane arrows, existing drainage
structures, city owned and franchise utilities as determined by dig-tess, and existing
roadway vertical alignments (profiles). Since the street pavement is not being fully
replaced, the ENGINEER will attempt to match the existing pavement elevation.
The ENGINEER will attempt to not change the existing roadway drainage pattern. If
the existing street has no curbs, super elevated typical sections may be considered
to allow drainage to flow across the street. [TPW]
Estimates of probable construction cost. Estimates should be done by street.
[Water/TPW]
Documentation of key design decisions. [Water]
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment A CPN 104311
PMO Release Date: 08.1.2014
Page 7 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
ASSUMPTIONS
• 0 Geotechnical borings are included in this scope. Pavement cores will be
provided by in-house City crews.
• 2 half size copy 11"x17" copies of the conceptual design package (30% design)
will be delivered.
• PDF files created from design CAD drawings will be uploaded to the designated
project folder in the City's document management system (BIM 360).
• ENGINEER shall prepare the meeting minutes of the Concept Review meeting and
revise the report, if needed.
• ENGINEER shall not proceed with Preliminary Design activities without obtaining
written approval by the CITY of the Conceptual Design Package.
DELIVERABLES
A. Conceptual Design Package
B. Estimates of probable construction cost.
TASK 3. PRELIMINARY DESIGN (60 PERCENT).
Preliminary plans and specifications shall be submitted to CITY per the approved Project
Schedule.
ENGINEER will develop the preliminary design of the infrastructure as follows.
3.1. Development of Preliminary Design Drawings and Specifications shall include the
following:
Cover Sheet [Water]
A Project Control Sheet, showing all Control Points, used or set while gathering
data. Generally on a scale of not less than 1:400. The following information shall be
indicated for each Control Point: Identified (existing City Monument #8901, PK Nail,
5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system, and a
referred bearing base. Z coordinate on City Datum only; descriptive location (i.e. set
in the centerline of the inlet in the South curb line of North Side Drive at the East end
of radius at the Southeast corner of North Side Drive and North Main Street). [Water]
Overall proiect easement lavout sheet(s) with property owner information. [Water]
Overall proiect water and/or sanitary sewer layout sheets. The water layout sheet
shall identify the proposed water main improvement/ existing water mains in the
vicinity and all water appurtenances along with pressure plane boundaries, water
tanks, pump stations, valves, and fire hydrants. The sewer layout sheet shall
identify the proposed sewer main improvement/existing sewer mains and all sewer
appurtenances in the vicinity. [Water]
Overall water and/or sanitary sewer abandonment sheet. [Water]
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment A CPN 104311
PMO Release Date: 08.1.2014
Page 8 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
• Updated existing and proposed typical section sheets. [TPW]
• Updated roadway plan and profile sheets displaying station and coordinate data for
all horizontal alignment P.C.'s, P.T.'s, P.I.'s; station and elevation data of all vertical
profile P.C.'s, P.T.'s, P.I.'s, low points, and high points; lengths of vertical curves,
grades, K values, e, and vertical clearances where required. [TPW]
• Preliminary roadway details to include curbs, curb expansion joints, driveways,
sidewalks, and pavement details. It is assumed that the proposed roadway section
will be POL or MOIL depending on the geotechnical report provided by the City or
as directed by the City. ENGINEER will provide any necessary details not provided
in city standard details. [TPW]
• Driveway cross sections will be required for streets listed in the scope definition
above, to determine the driveway limits. Proposed cross sections should be
provided for all driveways and the proposed driveway slope shown. The limits of
the driveway replacement should be shown in plan view on the paving plan and
profile sheets. Streets not selected to include cross sections, shall assume
driveway replacement to the ROW line on the plan and profile sheets. [TPW]
• Preliminary signing and pavement marking notes, if applicable. [TPW]
• Coordinates on all P.C.'s, P.T.'s, P.I.'s, manholes, valves, mainline fittings, etc., in
the same coordinate system as the Control Points. [Water]
• Bench marks per 1,000 ft of plan/profile sheet — two or more. [Water]
• Bearings given on all proposed centerlines, or baselines. [Water]
• Station equations relating utilities to paving, when appropriate. [Water]
• Stormwater Removal and Plan sheets which show the following: Removal plan
view and proposed plan view along with plan notes(s) for pipe repairs or inlet
replacement No hydraulic analysis or calculations will be required for pipe repair
being shown on plans; No pipe profiles will be provided. [STORMWATER]
• Plan and profile sheets which show the following: proposed water and/or sanitary
sewer plan/profile and recommended pipe size, fire hydrants, water service lines
and meter boxes, gate valves, isolation valves, manholes, existing meter numbers
and sizes that are to be replaced, existing sample locations, existing fire line
locations, existing utilities and utility easements, and all pertinent information
needed to construct the project. Legal description (Lot Nos., Block Nos., and
Addition Names) along with property ownership shall be provided on the plan view.
[Water]
The ENGINEER shall make provisions for reconnecting all identifiable water and/or
wastewater service lines which connect directly to any main being replaced,
including replacement of existing service lines within City right-of-way or utility
easement. When the existing alignment of a water and sanitary sewer main or
lateral is changed, provisions will be made in the final plans and/or specifications by
the ENGINEER to relocate all service lines which are connected to the existing
main and connect said service lines to the relocated main. [Water]
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment A CPN 104311
PMO Release Date: 08.1.2014
Page 9 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
The following shall be applicable at all locations where it is necessary to relocate or
reroute the existing private sanitary sewer service line due to the abandonment or
realignment of the existing public sanitary sewer lateral or main: The CITY shall
furnish the ENGINEER with a sample format of how the sewer service line
reroute/relocation should be designed and submitted for construction. During
design survey, if a rod can be inserted through the cleanout to the bottom of the
service line, the ENGINEER will obtain the flow line elevation and design the
service line prior to advertising the project for bid. If the service flow line information
cannot be obtained during design survey, the ENGINEER shall delay the design of
the sewer service line until after a Quality Level A Subsurface Utility Engineering
(SUE investigation has been performed). The Level A SUE will be performed; (1)
by the ENGINEER if included in the fee proposal; or (2) by the CITY prior to bidding
if the CITY determines that it is needed for satisfactory completion of the design; or
(3) by the Contractor after the project has been bid, by means of a bid item to that
effect. In all options, the ENGINEER shall propose appropriate de -hole locations in
the project and collect flow line elevation and other applicable information of the
sewer service line. The ENGINEER shall use this information to provide the design
for the sanitary sewer service line to be rerouted or relocated. [Water]
Provide map showing location of new manhole construction at the end of existing
sewer segments, 90 degree bends, or tee connections. Site survey or specific
design plans for manhole construction is not included as part of the scope. The
contract documents shall specify that it is the Contractor's responsibility to
coordinate utility location, etc. manhole construction. [Water]
The ENGINEER will prepare standard and special detail sheets for water line
installation and sewer rehabilitation or replacement that are not already included in
the D-section of the CITY's specifications. These may include connection details
between various parts of the project, tunneling details, boring and jacking details,
waterline relocations, details unique to the construction of the project, trenchless
details, and special service lateral reconnections. [Water]
3.2. Constructability Review
Prior to the 60 percent review meeting with the CITY, the ENGINEER shall schedule
and attend a project site visit with the CITY Project Manager and Construction
personnel to walk the project. The ENGINEER shall summarize the CITY's
comments from the field visit and submit this information to the CITY in writing.
[Water/TPW]
3.3. Public Meeting
After the preliminary plans have been reviewed and approved by the CITY, the
ENGINEER shall prepare project exhibits, and attend public meeting to help explain
the proposed project to residents. The CITY shall select a suitable location, prepare
and mail the invitation letters to the affected customers. The ENGINEER needs to
coordinate with the City's project manager to format the mailing list of all affected
property owners accordingly. [Water/TPW]
3.4. Utility Clearance
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment A CPN 104311
PMO Release Date: 08.1.2014
Page 10 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
The ENGINEER will consult with the CITY's Transportation and Public Works
Department, Water Department, and other CITY departments, public utilities, private
utilities, private utilities and government agencies to determine the approximate
location of above and underground utilities, and other facilities (current and future)
that have an impact or influence on the project. ENGINEER will design CITY
facilities to avoid or minimize conflicts with existing utilities, and where known and
possible consider potential future utilities in designs. Where conflicts cannot be
avoided, coordination of Utility Conflicts will be identified at the Conceptual phase
and begin at the Preliminary Design phase. [Water]
• In the case of a public utility conflict, the ENGINEER will design CITY facilities to
avoid or minimize conflicts with existing utilities, and where known and possible
consider potential future utilities in designs. [Water]
• In the case of a private Utility Conflict, the ENGINEER will provide a PDF set of plans
with the utility conflicts highlighted and a Utility Conflicts Table of those conflicts to be
included in a Utility Clearance Letter for coordination at each design milestone. The
ENGINEER may need to coordination directly with the private utility provider if that
provider needs to undertake design to adjust their utility's location. [TPW]
• The ENGINEER shall upload individual PDF files for each plan sheet of the approved
preliminary plan set to the designated project folder in the City's document
management system (BIM 360) for forwarding to all utility companies which have
facilities within the limits of the project. [Water/TPW]
• The Engineer shall visit the site during
located facilities is acceptable and
verification is not included. [Water/TPW]
3.5. Traffic Control Plan
utility relocation to verify the location of re -
report any discrepancies found. Survey
Develop a traffic control plan utilizing standard traffic reroute configurations posted
as "Typicals" on the CITY's Project Resources website. The typicals need not be
sealed individually, if included in the sealed contract documents. [Water]
• Develop supplemental traffic control drawings as needed for review and approval by
the Traffic Division of the Transportation and Public Works Department. These
drawings shall be sealed by a professional engineer registered in the State of Texas.
[Water]
3.6. Estimates of probable construction cost. Estimates should be done by sheet.
[Water/TPW]
3.7. Documentation of key design decisions. [Water]
ASSUMPTIONS
• 1 public meeting(s) will be conducted or attended during the preliminary design
phase.
• 2 Utility verification site visits(s) will be conducted during the project.
• Traffic Control "Typicals" will be utilized to the extent possible. It is assumed an
additional 2 project specific traffic control sheets will be developed.
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment A CPN 104311
PMO Release Date: 08.1.2014
Page 11 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
• 1 sets of 11 x17 size plans will be delivered for the Constructability Review.
• 2 sets of 11 x17 size plans will be delivered for the Preliminary Design (60%
design).
• 2 sets of specifications will be delivered for the Preliminary Design (60% design).
• PDF files created from design CAD drawings will be uploaded to the designated
project folder in the City's document management system (BIM 360).
• All submitted documents and checklists will be uploaded to the designated project
folder in the City's document management system (BIM 360).
• The CITY's front end and technical specifications will be used. The ENGINEER shall
supplement the technical specifications if needed.
• ENGINEER shall not proceed with Final Design activities without written approval by
the CITY of the Preliminary Design plans.
DELIVERABLES
A. Preliminary Design drawings and specifications
B. Utility Clearance drawings
C. Traffic Control Plan
D. Storm Water Pollution Prevention Plan
E. Estimates of probable construction cost
F. Data Base listing names and addresses of residents and businesses affected by the
project.
G. Public Meeting Exhibits
TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100
PERCENT).
Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as follows:
4.1. For projects that disturb an area greater than one (1) acre, the Contractor will be
responsible for preparing and submitting the Storm Water Pollution Prevention Plan
(SWPPP) with appropriate regulatory agencies. The Engineer will prepare the iSWM
Construction Plan according to the current CITY iSWM Criteria Manual for Site
Development and Construction which will be incorporated into the SWPPP by the
contractor. [TPW]
4.2. Draft Final plans (90%) and specifications shall be submitted to CITY per the
approved Project Schedule. [Water/TPW/Stormwater]
4.3. Following a 90% construction plan review meeting with the CITY, the ENGINEER
shall submit Construction Documents (100%) to the CITY per the approved Project
Schedule. Each plan sheet shall be stamped, dated, and signed by the ENGINEER
registered in State of Texas. [Water/TPW/Stormwater]
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment A CPN 104311
PMO Release Date: 08.1.2014
Page 12 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
4.4. The ENGINEER shall submit a final design estimate of probable construction cost
with both the 90% and 100% design packages. This estimate shall use ONLY
standard CITY bid items, as applicable. [Water/TPW/Stormwater]
4.5. Documentation of key design decisions. [Water]
ASSUMPTIONS
• 2 sets of 11 x17 size drawings and 1 set of 24x36 size drawings and 1 set of
specifications will be delivered for the 90% Design package.
• A PDF file for the 90% Design will be created from design CAD drawings and will be
uploaded to the project folder in the City's document management system (BIM 360).
• 10 sets of 11x17 size drawings and 2 set of -specifications will be delivered for the
100% Design package.
• A PDF file for the 100% Design will be created from design CAD drawings and will be
uploaded to the project folder in the City's document management system (BIM 360).
DELVERABLES
A. 90% construction plans and specifications.
B. 100% construction plans and specifications.
C. Detailed estimates of probable construction costs including summaries of bid items and
quantities using the CITY's standard bid items and format. The paving quantities and
estimate should be street by street.
D. Original cover mylar for the signatures of authorized CITY officials.
TASK 5. BID PHASE SERVICES.
ENGINEER will support the bid phase of the project as follows.
5.1. Bid Support
The ENGINEER shall upload all plans and contract documents onto the City's
document management system (BIM 360) for access to potential bidders, sell
contract documents and maintain a plan holder list. [Water]
• Contract documents shall be uploaded in a .xIs file.
Unit Price Proposal documents are to be created utilizing city's unit price tool
only and combined in a specified spreadsheet workbook, Bid Proposal
Worksheet Template, and will be populated and configured so that all pages
are complete and the Summary Worksheet(s) in the workbook detail and
automatically summarize the totals from the inserted Unit Price Proposal
document worksheets.
• Plan Sets are to be uploaded to the City's document management system
(BIM 360) in two formats, .pdf and Awf files. The .pdf will consist of one file
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment A CPN 104311
PMO Release Date: 08.1.2014
Page 13 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
of the entire plan set. The Awf will consist of individual files, one for each
plan sheet, and will be numbered and named in a manner similar to that of
the plan set index.
• The ENGINEER shall sell contract documents and maintain a plan holders
list on the City's document management system (BIM 360) from documents
sold and from Contractor's uploaded Plan Holder Registrations in the City's
document management system (BIM 360).
The ENGINEER will develop and implement procedures for receiving and answering
bidders' questions and requests for additional information. The procedures shall
include a log of all significant bidders questions and requests and the response
thereto. The log shall be housed and maintained in the project's the City's document
management system (BIM 360) folder titled Request for Information. The
ENGINEER will provide technical interpretation of the contract bid documents and
will prepare proposed responses to all bidders' questions and requests, in the form of
addenda. The ENGINEER shall upload all approved addenda onto the City's
document management system (BIM 360) and mail addenda to all plan holders.
[Water]
• Attend the prebid conference in support of the CITY. [Water/TPW]
• Assist the CITY in determining the qualifications and acceptability of prospective
contractors, subcontractors, and suppliers. [Water]
• When substitution prior to award of contracts is allowed in the contract documents,
the ENGINEER will advise the CITY as to the acceptability of alternate materials and
equipment proposed by bidders. [Water]
• Tabulate and review all bids received for the construction project, assist the CITY in
evaluating bids, and recommend award of the contract. A copy of the Bid Tabulation
and the CFW Data Spreadsheet are to be uploaded into the project's Bid Results
folder on the City's document management system (BIM 360). [Water]
• Incorporate all addenda into the contract documents and issue conformed sets.
[Water/TPW]
5.2. Final Design Drawings
Final Design Drawings shall be submitted in both Adobe Acrobat PDF format
(version 6.0 or higher) format and DWF format. There shall be one (1) PDF file and
one (1) DWF file for the TPW plan set and a separate PDF and DWF file for the
Water plan set. Each PDF and DWF file shall be created from the original CAD
drawing files and shall contain all associated sheets of the particular plan set.
Singular PDF and DWF files for each sheet of a plan set will not be accepted.
PDF and DWF files shall conform to naming conventions as follows:
I. TPW file name example — "W-1956_org47.pdf" where "W-1956" is the
assigned file number obtained from the CITY, "_org" designating the file is of an
original plan set, "47" shall be the total number of sheets in this file.
Example: W-0053_org3.pdf and K-0320_org5.pdf
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment A CPN 104311
PMO Release Date: 08.1.2014
Page 14 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
II. Water and Sewer file name example — "X-35667_org36.pdf" where "X-
35667" is the assigned file number obtained from the CITY, "_org" designating
the file is of an original plan set, "36" shall be the total number of sheets in this
file.
Example: X-12755_org18.pdf
Both PDF and DWF files shall be uploaded to the project's Final Drawing folder in
the City's document management system (BIM 360)
2. In addition to the PDF and DWF files, the ENGINEER shall submit each plan sheet
as an individual DWG file with all reference files integrated into the sheet. If the plans
were prepared in DGN format, they shall be converted to DWG prior to uploading.
The naming convention to be used for the DWG files shall be as follows:
I. TPW files shall use the W number as for PDF and DWF files, but shall include
the sheet number in the name — "W-1956_SHT01.dwg", "W-1956_SHT02.dwg",
etc.
II. Water and Sewer file names shall use the X number as for PDF and DWF
files, but shall include the sheet number in the name — "X-12155_SHT01.dwg",
"X-12755_SHT02.dwg", etc.
ASSUMPTIONS
• The project will be bid only once and awarded to one contractor.
• 3 sets of construction documents will be sold to and made available on the City's
document management system (BIM 360) for plan holders and/or given to plan
viewing rooms.
• 5 sets of 11x17 size and 6 sets of 24x36 size drawings plans and 5
specifications (conformed, if applicable) will be delivered to the CITY.
PDF and DWG files will be uploaded to The City's document management system
(BIM 360).
DELIVERABLES
A. Addenda
B. Bid tabulations
C. CFW Data Spreadsheet
D. Recommendation of award
E. Construction documents (conformed, if applicable)
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment A CPN 104311
PMO Release Date: 08.1.2014
Page 15 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
TASK 6. CONSTRUCTION PHASE SERVICES.
ENGINEER will support the construction phase of the project as follows.
6.1 Construction Support
• The ENGINEER shall attend the preconstruction conference. [Water]
• After the pre -construction conference, the ENGINEER shall provide project exhibits
and attend public meeting to help explain the proposed project to residents. The CITY
shall select a suitable location and mail the invitation letters to the affected customers.
[Water]
• The ENGINEER shall visit the project site at requested intervals as construction
proceeds to observe and report on progress. [Water/TPW]
• The ENGINEER shall review shop drawings, samples and other submittals submitted
by the contractor for general conformance with the design concepts and general
compliance with the requirements of the contract for construction. Such review shall
not relieve the Contractor from its responsibility for performance in accordance with
the contract for construction, nor is such review a guarantee that the work covered by
the shop drawings, samples and submittals is free of errors, inconsistencies or
omissions. The ENGINEER shall log and track all shop drawings, samples and other
submittals in the City's document management system (BIM 360).
• As requested by the CITY, the ENGINEER shall provide necessary interpretations and
clarifications of contract documents, respond to Request for Information (RIF) from the
contractor, review change orders, and make recommendations as to the acceptability
of the work.
• The ENGIENER will meet with the Project Delivery Team and Contractor on -site to
review any field changes.
• ENGINEER shall obtain from the City's document management system (BIM 360) and
review project specific soils and compaction testing information and compare it to the
geotechnical bore data collected on the project. The ENGINEER shall, when
applicable, also review pipeline rehabilitation installation logs and associated materials
that the CITY provides. [Water]
• As requested by the CITY, the ENGINEER shall provide necessary interpretations and
clarifications of contract documents, review change orders, and make
recommendations as to the acceptability of the work. [Water/TPW]
• The ENGINEER shall attend the "Final" project walk through and assist with preparation
of final punch list
6.2 Record Drawings [Water/TPW]
• The ENGINEER shall prepare Record Drawings from information provided by the
CITY depicting any changes made to the Final Drawings during construction. The
following information shall be provided by the CITY:
o As -Built Survey
o Red -Line Markups from Contractor
o Red -Line Markups from City Inspector
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment A CPN 104311
PMO Release Date: 08.1.2014
Page 16 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
o Copies of Approved Change Orders
o Approved Substitutions
The ENGINEER shall modify the Final Drawings electronically and shall place a
stamp on the plans indicating that they represent Record Drawings of the project as
constructed. The stamp shall be signed and dated by the ENGINEER and shall be
placed on each plan sheet, whether there are any revisions on the sheet or not.
Each sheet shall clearly indicate all changes which apply to that sheet by clouding
and numbering, or other suitable means.
• The following disclaimer shall be included with the Record Drawing stamp:
o These Record Drawings were prepared using information provided by others
and represent the as constructed conditions to the extent that documented
changes were provided for recording. The ENGINEER assumes no liability
for undocumented changes and certifies only that the documented changes
are accurately depicted on these drawings.
• The ENGINEER shall submit a set of sealed Final Drawings, modified and stamped
as Record Drawings, in Adobe Acrobat PDF format and in DWF format. The
ENGINEER may keep copies of the information provided by the CITY for their files,
but all original red -lined drawings shall be returned to the CITY with the digital files.
I. TPW file name example — "W-1956_org47.pdf" where "W-1956" is the
assigned file number obtained from the CITY, "_org" designating the file is of an
original plan set, "47" shall be the total number of sheets in this file.
Example: W-0053_org3.pdf and K-0320_org5.pdf
II. Water and Sewer file name example — "X-35667_org36.pdf" where "X-
35667" is the assigned file number obtained from the CITY, "_org" designating the
file is of an original plan set, "36" shall be the total number of sheets in this file.
Example: X-12755_org18.pdf
• Both PDF and DWF files shall be uploaded to the project's Record Drawing folder in
the City's document management system (BIM 360).
• For information on the proper manner to submit files and to obtain a file number for
the project, the ENGINEER should coordinate with the City project manager. File
numbers will not be issued to a project unless the appropriate project numbers and
fund codes have been assigned and are in the Department of Transportation and
Public Works database.
ASSUMPTIONS
• One (1) Public Meeting is assumed.
• 3 RFI's are assumed.
3 Change Orders are assumed
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment A CPN 104311
PMO Release Date: 08.1.2014
Page 17 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
DELIVERABLES
A. Public meeting exhibits
B. Response to Contractor's Request for Information
C. Review of Change Orders
D. Review of shop drawings
E. Final Punch List items
F. Record Drawings in digital format
TASK 7. ROW/EASEMENT SERVICES.
ENGINEER will support and perform activities related to ROW and land as outlined below, per
scoping direction and guidance from the CITY's Project Manager.
7.1. Right -of -Way Research [Water]
• The ENGINEER shall determine rights -of -way, easements needs for
construction of the project. Required temporary and permanent easements will be
identified based on available information and recommendations will be made for
approval by the CITY.
7.2. Right-of-Way/Easement Preparation and Submittal [Water]
• The ENGINEER shall prepare documents to be used to obtain right-of-way
and permanent and/or temporary easements required to construct the improvements.
The ENGINEER shall submit the right-of-way and/or easement documents to
CITY PM for real property acquisition
• The documentation shall be provided in conformance with the checklists and
templates available on the CITY's Project Resources website.
7.3. Temporary Right of Entry Preparation and Submittal (Assumes 13 TROEs) [Water]
• Prior to construction, the ENGINEER should coordinate with the City project
manager to identify all needed Temporary Right of Entries from landowners.
• It is assumed that letters will only be required for land owners adjacent to temporary
construction easements or who are directly affected by the project and no easement
is required to enter their property.
• The documentation shall be provided in conformance with the checklists and
templates available on the CITY's Project Resources website.
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment A CPN 104311
PMO Release Date: 08.1.2014
Page 18 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
ASSUMPTIONS
• 15 Easements or right-of-way documents will be necessary (Assumes 5 Sewer
Facility Easements and 10 Temporary Construction Easements) [Water]
13 Temporary right -of -entry letters will be necessary.
• Right -of -Way research and mapping includes review of property/right-of-way records
based on current internet based Tarrant Appraisal District (TAD) information available at the
start of the project and available on -ground property information (i.e. iron rods, fences, stakes,
etc.). It does not include effort for chain of title research, parent track research, additional
research for easements not included in the TAD, right-of-way takings, easement vacations and
abandonments, right-of-way vacations, and street closures.
DELIVERABLES
A. Easement exhibits and meets and bounds provided on CITY forms.
B. Temporary Right of Entry Letters
TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES.
ENGINEER will provide survey support as follows.
8.1. Design Survey [Water/TPW]
• ENGINEER will perform field surveys to collect horizontal and vertical elevations and
other information needed by ENGINEER in design and preparation of plans for the project.
Information gathered during the survey shall include topographic data, elevations of all sanitary
and adjacent storm sewers, rim/invert elevations, location of buried utilities, structures, trees
(measure caliper, identify overall canopy, and have qualified arborist identify species of trees),
and other features relevant to the final plan sheets. Existing drainage at intersections will be
verified by field surveys. Spot elevations will be shown on intersection layouts with cross slope
to fit intersecting grade lines.
The minimum survey information to be provided on the plans shall include the
following:
A Project Control Sheet, showing ALL Control Points, used or set while gathering
data. Generally on a scale of not less than 1:400:
- The following information about each Control Point;
a) Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod)
b) X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing
base. Z coordinate on CITY Datum only.
c) Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of
North Side Drive at the East end of radius at the Southeast corner of North Side
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment A CPN 104311
PMO Release Date: 08.1.2014
Page 19 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
Drive and North Main Street).
— Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same coordinate
system, as the Control.
— No less than two horizontal bench marks, per line or location.
— Bearings given on all proposed centerlines, or baselines.
— Station equations relating utilities to paving, when appropriate.
8.2. SUBSURFACE UTILITY ENGINEERING (WHEN REQUESTED AND AS REQUESTED)
(TPW)
ENGINEER will perform Quality Level B (QL-B) SUE utilizing the appropriate surface
geophysical methods to determine the existence and horizontal position of virtually all
utilities with the project mains. For this project QL-B shall be limited to gas mains and
gas service lines.
8.3. Additional Services [Water & TPW]
• ENGINEER will perform engineering and survey services as requested by the City.
These services will require prior authorization from the City project manager.
8.4. Temporary Right of Entry Preparation and Submittal
• Prior to entering property, the ENGINEER shall coordinate with the City's project
manager to identify, mail and obtain Temporary Right of Entry from landowners (if
necessary).
• The documentation shall be provided in conformance with the checklists and templates
available on the City's document management system resources folder.
ASSUMPTIONS
• Topographic survey at intersection will include no more than 100 ft. in each direction.
• Normal minimal traffic control is included. Traffic control requiring lane closures, traffic
detouring, flag persons, police, etc., is considered special traffic control measures and will be
considered additional services if required.
DELIVERABLES
A. Copies of field survey data and notes signed and sealed by a licensed surveyor.
B. Drawing of the project layout with dimensions and coordinate list.
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment A CPN 104311
PMO Release Date: 08.1.2014
Page 20 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
TASK 9. PERMITTING.
ENGINEER will provide permitting support for the CITY to obtain permits as indicated below.
9.2. Texas Department of Licensing and Regulation (TDLR). This is required for projects with
sidewalk construction over $50,000 [TPW]
• Identify and analyze the requirements of the Texas Architectural Barriers Act,
Chapter 68 Texas Administrative Code, and become familiar with the governmental
authorities having jurisdiction to approve the design of the Project.
• Submit construction documents to the TDLR
• Completing all TDLR forms/applications necessary
• Obtain the Notice of Substantial Compliance from the TDLR
• Request an inspection from TDLR or a TDLR locally approved Registered
Accessibility Specialist no later than 30 calendar days after construction substantial
completion. Advise the CITY in writing of the results of the inspection.
• Responding to agency comments and requests
9.3 Storm Water Pollution Prevention Plan
For projects that disturb an area greater than one (1) acre, the Contractor will be
responsible for preparing and submitting the Storm Water Pollution Prevention Plan
(SWPPP) with appropriate regulatory agencies. The Engineer will prepare the iSWM
Construction Plan according to the current CITY iSWM Criteria Manual for Site
Development and Construction which will be incorporated into the SWPPP by the
contractor.
ASSUMPTIONS
• Permit preparation will begin after approval of the Conceptual Design.
• All costs associated with TDLR plan review and inspections are to be paid by the
ENGINEER during the course of the project.
• Engineer is responsible for providing plans that are in compliance with TDLR
requirements.
DELIVERABLES
Provide TDLR plan reviews and make required changes.
• Provide for timely inspection by a Registered Accessibility Specialist prior to the
construction final inspection.
• Copies of Permit Applications
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment A CPN 104311
PMO Release Date: 08.1.2014
Page 21 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
TASK 10. PLAN SUBMITTAL CHECKLISTS
Engineer shall complete and submit Plan Submittal Checklists in accordance with the following
table:
PLAN SUBMITTAL CHECKLIST REQUIREMENTS
Traffic
Traffic
Traffic
Street
Water
Control
Control
Control
"A"
Traffic
Storm
Storm
Lights
/Sewer
Traffic
30%
60 /0
90 /o
Attachment
Signal
Water
Water
(Submit
(Submit
Engineering
Type
(Submit All
30%
60%
All @
All @
(Submit All
@ 30%)
30%
60%)
@ 60%)
Required for all work
in City
ROW
Street
N/A
X
X
X
X.
N/A
X
X
X
Storm Water
X
X
X
X
X
Water / Sewer
X
X
X
X
*If included in street project
ASSUMPTIONS
DELIVERABLES
TASK 11. QUALITY CONTROL / QUALITY ASSURANCE
ENGINEER to provide to the City a Quality Control/ Quality Assurance Plan (QC/QA Plan)
outlining the ENGINEER's method of ensuring the highest levels of design and accuracy are
incorporated into the calculations, plans, specifications, and estimates.
ENGINEER is responsible for and shall coordinate all sub consultant activity to include quality
and consistency of plans.
If, at any time, during the course of reviewing a submittal of any item it becomes apparent to the
CITY that the submittal contains errors, omissions, and inconsistencies, the CITY may cease its
review and return the submittal to the ENGINEER immediately for appropriate action. A
submittal returned to the ENGINEER for this reason may be rejected by the CITY Project
Manager.
11.1. QC/QA of Survey and SUE Data
• The ENGINEER's Surveyor shall perform Quality Control/ Quality Assurance on all
procedures, field surveys, data, and products prior to delivery to the CITY. The CITY may
also require the ENGINEER's Surveyor to perform a Quality Assurance review of the
survey and/or subsurface utility engineering (SUE) work performed by other surveyors
and SUE providers.
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment A CPN 104311
PMO Release Date: 08.1.2014
Page 22 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
• ENGINEER's Surveyor shall certify in writing via a letter that the survey information
provided has undergone a Quality Control/ Quality Assurance process.
ENGINEER's Subsurface Utility Engineering provider shall certify in writing via a letter
that the SUE information provided has undergone a Quality Control/ Quality Assurance
process.
11.2. QC/QA of Design Documentation
• ENGINEER shall perform a QC/QA review of all documents being submitted for review at
all stages of the design including the 30%, 60%, and 90% and Final Document design
review submittals. QA should be performed by an individual within the firm who is not on
the design team.
ENGINEER is to acknowledge that each item on the Detailed Checklist has been
included by checking "done" on the checklist. If a particular checklist item is not
applicable, this should be indicated by checking "N/A". If an entire checklist is not
applicable, this should be indicated by checking every item on the list as "N/A" and still
included with the submittal. The ENGINEER shall use the Detailed Checklist provided by
CITY.
• A Comment Resolution Log must be used to document conflicting comments between
reviewers and to highlight comments made by the CITY that the ENGINEER is not
incorporating into the design documents along with the associated explanation. The
ENGINEER shall use the Comment Resolution Log provided by CITY.
• The documentation of a QC/QA review includes (1) a copy of the color -coded, original
marked -up document (or "check print") developed during the QA checking process and/or
review forms which sequentially list documents and associated comments; and (2) a QC
sign -off sheet with signatures of the personnel involved in the checking process. Mark-
ups may also be documented using the Comment Resolution Log.
• Evidence of the QC/QA review will be required to accompany all submittals.
Documentation shall include, but is not limited to, the following items:
PDF of the completed Detailed Checklists
PDF of the QC/QA check print of the calculations, plans, specifications, and
estimates demonstrating that a review has been undertaken;
PDF of previous review comments (if any) and the ENGINERR's responses
to those comments in the Comment Resolution Log.
• If any of the above information is missing, is incomplete or if any comments are not
adequately addressed; the CITY may contact the ENGINEER and request the missing
information. If the ENGINEER does not respond to the request within 24 hours, the CITY
shall reject the submittal. No additional time will be granted for a returned submittal.
• If the ENGINEER has not adequately addressed the comments, the submittal shall be
rejected and returned to the ENGINEER immediately to address the issues.
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment A CPN 104311
PMO Release Date: 08.1.2014
Page 23 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
ASSUMPTIONS
• All submittals to the City will be Quality checked prior to submission.
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICE
Additional Services not included in the existinq Scope of Services — CITY and ENGINEER
agree that the following services are beyond the Scope of Services described in the tasks
above. However, ENGINEER can provide these services, if needed, upon the CITY's written
request. Any additional amounts paid to the ENGINEER as a result of any material change to
the Scope of the Project shall be agreed upon in writing by both parties before the services are
performed. These additional services include the following:
• Negotiation of easements or property acquisition including temporary right -of -entries.
• Preparation of easements or right-of-way documents in excess of the number indicated in
the scope above.
• Quality Level A SUE or Quality Level B SUE in excess of what is specified in the scope
above.
• Services related to development of the CITY's project financing and/or budget.
• Services related to disputes over pre -qualification, bid protests, bid rejection and re -bidding
of the contract for construction.
• Construction management and inspection services
• Periodic site visits during construction phase
• Performance of materials testing or specialty testing services.
• Services necessary due to the default of the Contractor.
• Services related to damages caused by fire, flood, earthquake or other acts of God.
• Services related to warranty claims, enforcement and inspection after final completion.
• Services related to submitting for permits not already included above (ie.TRA, railroad,
etc...)
• Services related to Survey Construction Staking
• Services related to acquiring real property including but not limited to easements, right-of-
way, and/or temporary right -of -entries.
• Services to support, prepare, document, bring, defend, or assist in litigation undertaken or
defended by the CITY.
• Performance of miscellaneous and supplemental services related to the project as
requested by the CITY.
• Landscaping and Irrigation design services.
• Traffic counts or studies
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment A CPN 104311
PMO Release Date: 08.1.2014
Page 24 of 25
ATTACHMENT A
DESIGN SERVICES FOR
2022 BOND YEAR CONTRACT 13
CITY PROJECT NO.: 104311
• Electrical design and voltage drop calculations
• Photometric analysis
• Urban Forestry Permitting
• Tree removal permit preparation
• Grading permit preparation
• Floodplain development permitting
• Drainage Analysis, study, and checklist
• Stormwater pollution prevention plan
• Geotechnical engineering studies and pavement design services
• Environmental assessments
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment A CPN 104311
PMO Release Date: 08.1.2014
Page 25 of 25
ATTACHMENT B
COMPENSATION
Design Services for
2022 Bond Year 3 - Contract 13
City Project No. 104311
Lump Sum Project
Compensation
A. The ENGINEER shall be compensated a total lump sum fee of $597,591.00 as
summarized in Exhibit B-1 — Engineer Invoice and Section IV — Summary of Total
Project Fees. The total lump sum fee shall be considered full compensation for
the services described in Attachment A, including all labor materials, supplies, and
equipment necessary to deliver the services.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
Method of Payment
A. Partial payment shall be made to the ENGINEER monthly upon City's approval of
an invoice prepared and submitted by the ENGINEER in the format and including
content as presented in Exhibit B-1, Progress Reports as required in item 111. of
this Attachment B, and Schedule as required in Attachment D to this Agreement.
B. The estimated current physical percent complete as required on the invoice shall
be calculated from the progress schedule as required in Attachment D to this
Standard Agreement and according to the current version of the City of Fort
Worth's Schedule Guidance Document.
C. The cumulative sum of such monthly partial fee payments shall not exceed the
total current project budget including all approved Amendments.
D. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department and Water Department monthly
progress reports and schedules in the format required by the City.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 1 of 3
2022 Bond Year 3 — Contract 13
CPN 104311
B-1
IV. Summary of Total Project Fees
Firm Primary Responsibility
IPrime Consultant
Halff Associates, Inc. Engineering
(Proposed MBE/SBE Sub -Consultants
Gorrondona & Surveying
Associates, Inc.
JNon-MBE/SBE Consultants
ATTACHMENT B
COMPENSATION
Fee Amount Water Dept. Fees TPW Dept. Fees Stormwater Fees %
$ 457,949.00 $ 226,379.50 $ 226,954.50 $ 4,615.00 77%
$
$
$
TOTAL $
Texas Access TDLR Inspection $
Gorrondona & Right of Entry and Easement Services $
Associates, Inc.
$
$
$
TOTAL $
GRAND TOTAL $
City of Fort worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 2 of 3
114,942.00 $ 63,795.50 $
114,942.00 $ 63,795.50 $
2,500.00 $ - $
22,200.00 $ 22,200.00 $
24,700.00 $ 22,200.00 $
597,591.001 $ 312,375.001 $
51,146.50 $
51,146.50 $
2,500.00 $
2,500.00 $
280,601.001 $
Project Number & Name Total Fee MBE/SBE Fee MBE/SBE %
2022 Bond Year 3 Contract 13
City Project No. 104311 $ 597,591.00 $ 114,942.00 19%
City MBE/SBE Goal = 15% Consultant Comitted Goal = 19%
19%
0%
0%
0%
0%
19%
0%
0%
0%
0%
0%
4%
4,615.001 100%
2022 Bond Year 3 — Contract 13
CPN 104311
B-2
EXHIBIT "13-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across work types and work phases.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 3 of 3
LIM
Professional Services Invoice Project Manager: IGreg Robbins
Project: 2022 Bond Year 3 Contract 13
City Project #: 1104311 1
City Sec Number:
Company Name: I Halff Associates, Inc.
Supplier's PM: Joseph Buchanan
Supplier Invoice #:
Payment Request #:
Service Date:From
Service Date:To
Invoice Date:
Supplier Instructions:
Summary
Fill in green cells including Invoice Number, From and To Dates and the included worksheets
When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Project's folder.
email: r(214)
nan@halff.corn
Office Addressarkwood Blvd., Frisco, Texas 75034
Telephone: 37-3936
Fax: 32-9784
Remit Address P.O. Box 4897 Dept 331, Houston, Texas 77210
Sheet FID and Work Type Description
Work Type 1 WATER
Work Type 2 SANITARY SEWER
Work Type 3 PAVING
Work Type 4 STORMWATER
Work Type 5
Work Type 6
Totals This Invoice
Agreement LTD
Agreement Amendment
Amount to Completed Percent ($) Invoiced Current
Remaining
Amount Amount
Date Amount Spent Previously Invoice
Balance
$132,111.00
$132,111.00
$132,111.00
$180,264.00
$180,264.00
$180,264.00
$280,601.00
$280,601.00
$280,601.00
$4,615.00
$4,615.00
$4,615.00
$597,591.00 $597,591.00
Overall Percentage Spent:
$597,591.00
2022 Band Year 3 — Contract 13
CPN 104311
Professional Services Invoice
Project: 2022 Bond Year 3 Contract 13
City Project #: 104311
Work Type Desc: IWATER
FID:
City Sec Number:
Purchase Order:
Company Name: Halff Associates, Inc
Supplier's PM: Joseph Buchanan
Supplier Invoice #:
Payment Request #:
Service Date:From
Service Date:To
Invoice Date:
Pay Items
30 - Desiqn
Description
Totals This Unit:
Project Manager: Greg Robbins
Supplier Instructions:
Fill in green cells including Percent Complete and Invoiced Previously Ouanities
When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Project's folder.
email: juchanan@halff.com
Office Address: 3803 Parkwood Blvd., Frisco, Texas 75034
Telephone: (214) 937-3936
Fax: (817) 232-9784
Remit P.O. Box 4897 Dept 331, Houston, Texas 77210
Address:
Agreement LTD
Agreement Amendment Amendment Amount to Completed
Amount Number Amount Date Amount
$132,111.00 $132,111.0(
$132,111.00 $132.111.00
Overall Percentage Spent:
Percent ($)Invoiced
Spent Previously
Current Remaining
Invoice Balance
$132,111.0C
$132,111.00
2022 Band Year 3 — Contract 13
CPN 104311
Professional Services Invoice
Project: 2022 Bond Year 3 Contract 13
City Project #: 104311
Work Type Desc: ISANITARY SEWER
FID:
City Sec Number:
Purchase Order:
Company Name: Halff Associates, Inc
Supplier's PM: Joseph Buchanan
Supplier Invoice #:
Payment Request #:
Service Date:From
Service Date:To
Invoice Date:
Pay Items
30 - Desiqn
Description
Totals This Unit:
Project Manager: Greg Robbins
Supplier Instructions:
Fill in green cells including Percent Complete and Invoiced Previously Ouanities
When your Invoice is complete, save and close, start B—saw and Add your invoice to the
Consultant folder within Project's folder.
email: juchanan@halff.com
Office Address: 3803 Parkwood Blvd., Frisco, Texas 75034
Telephone: (214) 937-3936
Fax: (817) 232-9784
Remit P.O. Box 4897 Dept 331, Houston, Texas 77210
Address:
Agreement LTD
Agreement Amendment Amendment Amount to Completed
Amount Number Amount Date Amount
$180,264.00 $180,264.0(
$180,264.00 $180.264.00
Overall Percentage Spent:
Percent ($)Invoiced
Spent Previously
Current Remaining
Invoice Balance
$180,264.00
$180.264.00
2022 Bond Year 3 — Contract 13
CPN 104311
Professional Services Invoice
Project: 2022 Bond Year 3 Contract 13
City Project #: 104311
Work Type Desc: 1PAVING
FID:
City Sec Number:
Purchase Order:
Company Name: Halff Associates, Inc
Supplier's PM: Joseph Buchanan
Supplier Invoice #:
Payment Request #:
Service Date:From
Service Date:To
Invoice Date:
Pay Items
30 - Desiqn
Description
Totals This Unit:
Project Manager: Greg Robbins
Supplier Instructions:
Fill in green cells including Percent Complete and Invoiced Previously Quanities
When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Project's folde
email: juchanan@halff.com
Office Address 3803 Parkwood Blvd., Frisco, Texas 75034
Telephone: (214) 937-3936
Fax: (817) 232-9784
Remit P.O. Box 4897 Dept 331, Houston, Texas 77210
Address:
Agreement LTD
Agreement Amendment Amendment Amount to Completed
Amount Number Amount Date Amount
$280,601.00 $280,601.0(
$280,601.00 $280,601.00
Overall Percentage Complete:
Percent ($) Invoiced
Spent Previously
Current Remaining
Invoice Balance
$280,601.00
$280,601.00
2022 Band Year 3 — Contract 13
CPN 104311
Professional Services Invoice
Project: 2022 Bond Year 3 Contract 13
City Project #: 104311
Work Type Desc: ISTORMWATER
FID:
City Sec Number:
Purchase Order:
Company Name: Halff Associates, Inc
Supplier's PM: Joseph Buchanan
Supplier Invoice #:
Payment Request #:
Service Date:From
Service Date:To
Invoice Date:
Pay Items
30 - Desiqn
Description
Totals This Unit:
Project Manager: Greg Robbins
Supplier Instructions:
Fill in green cells including Percent Complete and Invoiced Previously Quanities
When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Project's folde
email: juchanan@halff.com
Office Address 3803 Parkwood Blvd., Frisco, Texas 75034
Telephone: (214) 937-3936
Fax: (817) 232-9784
Remit P.O. Box 4897 Dept 331, Houston, Texas 77210
Address:
Agreement LTD
Agreement Amendment Amendment Amount to Completed
Amount Number Amount Date Amount
$4,615.00 $4,615.0(
4 615.0 $4,615.00
Overall Percentage Spent:
Percent ($) Invoiced I Current Remaining
Spent Previously Invoice Balance
I I $4,615.oc
4 615.00
2022 Band Year 3 — Contract 13
CPN 104311
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Water Department Design Services for
2022 Bond Year 3 Contract 13
City Project No. 104311
Task Descri i Po'ero ect ct P
Task No. � un n
Principal � ___ Efr CARD
11.0
Project Management
191 411 291 111 61
1 1.1
Managing the Team
ONOC
1%
1.2
munx;ations an Reporting
y�Pre-Deli
1,2
n Coordination Meelm as es 1 mee0n
1 1
1.2,
: esign u mMa ew Meetings as um meMings1
4 8
Prepare Monl11 Pro Tess Reports as 12 months 8 split with TPW
11
1.2
repare o epsoss sutures
1'
1. .
1,ya
,,,,on mgs t as meetings)
12 1' 1'
2.0
Uoriceinual mingn - ercent
0
1a 44
2,1
D. Collection assumes9,815 LF Tdal
24
�onceptua ¢sign ac age as es 5 tota
1 3
2.4,1
Limit d Pavement Design (30%)sum
3
25
_stimate
2 8 12
3.0
re nary Design (60 e
1 31
Pmliminary Design Drawings
1 58 144 12
3.1.1
Limited Pavement Design 60 %
5 2 J 86 4
32
--structability RWaw
S 1T
3.3
Pubtic Meeting
J 1
34
cu
eamnce in es sue visins
15 1
3.5
Treff Control Plan
36
_stimate
2 2
T
4.0Final
Design
0 63 1621 1"
1 42
Final DraftConstruction Plans and SpecNcaOons
so 2
10J 2
4.2,1
Design
jl
J
4 3
. ma 100 ° ans an paa ications
5 1� 5416 :2
100%
Limdetl Pavement Deli n(100.k)
1 76
44
y onstruchon sbmMes 0 °an 0 °
2 8
5.0
QJ
i$ 15
1 5 1
Bid Support
Upload and Sell Contract Documents and Maintain Plan Holders List
1
5.14r� Issue Add.nd. (assumes 3)
4 4
\t
Attend Pre -bid Conference
Z
1
5.1
Attend Bid Opening
0 0
1
5.11
Tabulate Bids and Recommend A-d
1 L
1
5.1
Issue Conformed Contract Documents
2 T
6,0
e
oretruct on services
1
0 3 50 26I
1 6 1
Construction Support
1
6.1.
Attend Preconstructon Conference
1
6.1
Attend Public Meeting
2 2 4- 2
1
1
6. P
6.1,
Project Sue Visits (assumes 3)
Review SubmittalalShop Drawings
4, 17[
8 1U
1
6.1 1
Request for Information and CO Revew (assumes 6 total)
✓% 16'
01 01 01
1 62
`iecortl Drawings
2 8
24'
7.0
asemeM eryees
0 OI
O
177.1
Rightof-Way Research
1 7.2
`�Ightof-Way/Easement Preparation and Submittal (5 perm and 10 temp)
1 73
Temporary Right of Entry Submittal (assumes 13)
-L
8.0
�. urvey
0 0
0
1 81
2T
wadlrt onau'rveY
l:ny urtegleg aerviceeToblt04
16 101 613
22�
0
1 Footage / Footage Desgn Fee I
Waled 415 JJ° 12 J $ 132:21
Footage
Sewed 5fi61 58%J $ 180,264 I
Contract 1'
4151
TMal1 9815I 100%I $ 312,375 1 1
TOTAL
4151
City of Fat Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Dale: 8.09.2012
Total Labor Castl SubconsutaM Reproduction I Total Ezpenae Coal I Task Bob Total I %Complete Remainlrg
Budget
! 760.00
$ -
$U
$200
$200
$32,
$10,620
$0
$10,
$11:411
$0
$11,
$7,300
$20
$200
$7,
$3,430
$0
$3,
$200
$200
$68,
485.00 $ - 50 $400 S400 $41,883
I(
15,45V $0 $15,45UJ
$6,490 $20 $200 $6,6
13,220 $0 $13,220
$4, 115 $20 $200 $4,3i
$2,210 I $0 $2,210�
225.001 $ - I "1 $01 $0
o
o $0.00 $ -
$22.20d
$PI
$ 20,210.00
$fl
$ 1,9500.
0
11,120,00 $ 11,711,10
$1,52di $ 63,79550
$30,000.00
E
l 0
Water antl
2 16,98 1 $ ,796
63
Sewer Des�gn BrasKdavn
/I
$22,20VI
Water
Sanitary Serer
Total Cost
%Complete
42°° $1312,111
LF
56fi 58° $ 1.0,264
$ 312,375
42 °l $132,111
56fi 58°°1 $ 180,264
$ 312,375
$0
$22,200
$22,2AI -
$0
$7�0,250
50
$�0,25G
$1,950
1,950
$0
$63,796
$65,31 {
$fi3,79fi
$65,316
$0
$0
$30,00
$800
$86,796
$�3,776 041
Project b!
$0
Remaining
Budget
m
Total Hours
1,289
Total Labor
$216,980
0�� $
312,375
Toal Expense
$86:796
0°0l$
312,375
MWBE Subconsullanf
$63,796
Non-MWBE Subconsugmf
$22,200
10% Sub Markup
$8,599.55
MWBE Participation
204%
Total Project Cost
$312,375
2022 Bond Year 3 - Contract 13
CPN 104311
1M1
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Transportation & Public Works Department Design Services for
2022 BOND YEAR 3 CONTRACT 13
City Project No. 104311
I Labor lhoursl I E
Task Description I Project Project Survey Survey SUE Total Labor
Task No. c!I Principal En LAOD RPLS Atlministrative SubeonsultaM
Manager Engineer Tech crew Crew Cost Travel
not i $335 $2$ 1 $175 $130 $100 $225 $130 $190 $80 $801 MWBE I Non-MWBE I
11.0 Project Management
1.1 anaging the Team
1.1. OA/OC(splitpwith Watertr 9 1.2 _}Ilii, n iai 147 1.2.E r•re- ¢elm Slit with Wafer
12. esgn M1ta ew econgs su R Mer
1,2. Prepare Monthly P press R rts es 12 months and s Id with Water
124
repave as ales as mont s
1.2.1 Monthly Consfulant coordination Meetings (assumes 12 meetings)
2.0Conceptual sign rceM
2.4 Conce ual Dees n Package Limited Dees n
2.4 oncepfus ¢sign Package u Design Lane
2.5 Estimate
3.0 Preliminary Design (60 Percent)
3.1 Prelim na Deei n Drawin s for LimRed Des n
3.1 inary esgn ravnngs or u eagn
3.2 Construdabil0 Review
3.3 c eehng
3.4 Utlity Clearonce
3.6 sit..;ta
74.2 ne ee n
Final Dr 90 0 onstruction a pec ications Design
4.2 Final Drag 90% Construction Plans antl S ecRcations for Full Dees n
4.3 Final 100 a Plans antl pea icMions or Limitetl Design
4.3 Final (100%) Plans and Spec! st! for Full Design
4.4 Construction Estimates (90% and 100%)
5.0Bid -1
5.1 Bid Support
5.1.1 Upload and Sell Contract Documents and Maintain Plan Holders List
5 1 Issue Addenda (assumes 3)
5.1. Attend Prs-bid Conference
5 1. Tabulate Bids and Recommend Award
5.1. Issue Conformed Contract Documents
I6.0 ConetruMion Phase Services
6.1 Construction Support
6 1. Afend Preconstruc0on COMeronce
6.1. Attend Public Meeting
6, Prolecl Sile Visits
61.�'
.1 4 Request for Information/Change Order Review (assumes 3)
6.2 ¢cord Drawings
8.0 urvey
8.1 Design Survey (assumes 4,800 LF)
8.2 Subsurface Utility Engineering (SUE)
8.3 ddiomlServicets
9.0 ermMmg
9.1 Texas Department of Transportation (T)DOT) Permit (')
9.2 Railroad Permit (")
f g.3 uep-men, I licensing ana rt,gunnon I t ucn). 1-1
Totals
" Only it determined to be applicable.
City of Fail Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Dale: 8.09.2012
M
Roadway % Design Fee %Complete Remaining
Lane Miles Budget
1 2.9 J 100 $ 280,601 0 $ 280,601
TOTAL 2 9' 1 100° 1 $ 280,601 0° 1 $ 280,601 1
F
i
ICESPensel %Complete RButlini[g
ge
0%,
I Project Summary
Total Hours
1361
Total Labor
$220:490
Total E dense
$54747
MWBE Subcunsultanl
$51:147
Non-MWBE Subconsultan
$2,500
10% Sub Markup
$5,365
MWBE Participation
1
Total Project Cost
$280,601
2022 Bond Year 3 - Contract 13
CPN 104311
7M1
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Storm
ter Department Design Services for
wa
2022 BOND YEAR 3 CONTRACT 13
City Project No. 104311
Labor(houm)
I
Ezpanse
Task No.
Task Dascriptlon
Principal
Project
Mana a
Project
En in
EIT
CADD
RPLS
Survey
Tech
Survey
Crew
SUE
Crew
Administrative
Total Laborl
Cost
Subconsultan[ Travel
Reproduction
Total Ezpense
Cost
Complete
Remaining
gadget
a el $335
$235
$175
$130
$100
$225
$130
$IN
$80
$80
1
MWBE
N-11AWBE
0
Prallminary Design (50 Percent)
0
2
12
12
0
0
0
0
0
$3,110
EO
$0
$0 $0
EO
3 1
Prelimmary Design Drawmgs for L...t d Design
2
12
12
I
I
0
Final Design
0��10
2
4
4
0
0
0
0
0
E1,505
q 2
an 1au-iol -nsrrucnon runs anc .pecrticanws ror LIMI— uesign
2
q
4
otas 0
2
12
12
01
0
0
01 0
,615
EO
$0
01 W
Sol
Project Summary
Trial Hwm 26
Total Labor $4,615
Trial Expense $0
MWBE Subconsultan $0
Non-MWBE Subconsultan $0
10% Sub Markup $0
MWBE Padicip
Total Project Cost $4,615
2022 Bond Year 3 — Contract 13
CPN 104311
City d Fort Worth, Texas
Attachment B - Level d Egod Supplement
PMO Official Release Date: 8.09.2012
1d1
ATTACHMENT "C"
CHANGES AND AMENDMENTS TO STANDARD AGREEMENT
Design Services for
2022 Bond Year 3 Contract 13
City Project No. 104311
NONE
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment C CPN 104311
PMO Release Date: 05.19.2010
Page 1 of 1
FORT WORTH
ATTACHMENT "D"
PROJECT SCHEDULE
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment D CPN 104311
Revision Date: 07.20.2018
Page 1 of 1
CFW - Integrated Program Project Schedule Report Print Date: 06-Jun-23
Page 1 of 1
�`�``� I�Is�lodl�.loa �l�.el�.,i�lr«1 ',u l�al=a>todl�.lo«I.�l�l�.,l�nia�l dl�u l�al=eol«.la�,la.�
2022 BoadYear cnbad 13 u o 20-Jurr23 13Sep-26 0
1W5 r Ndice to Pm.W 120-J1123' 1111,311111 0 Ndice to Prwced
1010 D.,i Sur y 6020-Jun23 1SAug23 10W 3020 0
1015 L.M B SUE 14 20-J-23 03Jul-23 1 W5 1166
3010 Daly Cdledpn 720-J-23 26-Jun 1W5 11]5 - - - - - - - - - - - - - - - - - -
3020 Desigi D—ings 90 19Ap423 16-N-23 1010 3030 0 -
3030 Cost ESYmate 517-Nov-23 21-Now23 30M 3050 0
3050 CV R.vxw 21 22-Nov-23 12-Deo23 3030 4010, 4 W, 4 0 -
r. . .:
4010 Desig:Dmuinr� 9013Deo-23 11-Mar-24 3050 4020, 4070 0 .:...... .. ..... ......_. ........ .. ._ ..... ... .. ..........
4015 L. ASUE 1413D-23 29D-23 3050 W2
4020 Construct ,IV Renew ] 12-Mar-26 18 M ,24 4010 4040 895
4030 Pudic Meetiig 0 19Mar-24 19-Mar-24 4020 909 - - - - - - - - - - - - - - - - -
-24 4020
4040 UttlRy Clearance 1419Mar-26 01- .
406D Traffic Co td Plan 7 13Oeo-23 19Deu23 3050 999 - .. .. • • . .. • . .. .. • .. • .. - - - - - - .
4070 Cost Estimate 5 12-Mar-2_4 16Mar-24 4010 4090 0
4090 CV Renew 2117-Mar-26 06Apr-24 4070 5020, 5010 0 - -
• _
5010 iSWM Cor5Vuc6on Nan 307-Ppr-24 09Apr-24 4090 887 �
5020 Final Draft Plans V Sce s f90%) 90 07-Apr-24 O JuI-24 4090 5025 0 -
5025 Cost ESOmate90% 3'Juk2A 0&Jul-24 5020 5040, 5030 0
5030 C' ReNew 21 09JU 29Ju1-24 5025 5040 0 - - - - - - - - - - - - - - - - - -
5040 Final Plans aM Specs (100%) 30 30-Juk2A 28-Aug M 5025, M 5050 0 '
5050 Coll ESYmate 100% 5 29Au426 02-Se M 5040 5060
5060 A R.I.M Raul. far Sig w— 1003- ,24 12-S�24 5050 5070 0 .. .. .. .. .. .. .. .. .. .. ., ..
5070 Nnd D. M C-pW 0 12-Se M 5060 5060 0 - - Final Design Complde
ore 568D E.WM Ctr icn BE Gad 10 1,- ,24 22- 24 5070 5090 0
5090 P2 a Bq Package 10 23 26 02-Oc1-2A 5W 6010 0
• 6010 Advertise 0 03Oct-26 O3OC124 5090 11011, 602(1.6 0 .. . , .. .. - .. . , .. .. .. .. - ., ..
6015 MA-h Nan HddersJlssue Pdderga 35 03-OCt-24 07-N 24 6010 6]5 - - - -
6020 Pr bidC rfierence 0 0&Oct-24 O90ct24 6010 705
6030 Bq OPens9 0 07-No 24 07-No✓-24 6010 6040 0 -
6040 Tabdale Bids and Raommend M.d 7 0]-Nov-24 14N 24 60M
suedoimed Co E050 0
6050 IsCox[Dx .. ... .. ... .. ... ... .. ... .. -.. .. umen6 20 14Nov-24 02-Dec-24 6040 ]010 0 L
7010 Atlerd PrecgSW .Codeerce 020-F.b25 26 25 6050 7020, 70M 7 0
7020 Atlend Pudic Meeting 0 23-Fetr25 23F 25 7010 567 - - - - - - - - - -
7030 P ecl9le Vai6 540 20-Feb25 14Au 26 7010 30
7040 R.s D 530 20-Fetr25 74Au 26 7010 7050 0 r
7050 Record Dmwin 30,14Apg26 13- 26 7040 0
� Actual Work ♦ ♦ Milestone 104311 - 2022 Bond Year 3 Contract 13
O Remaining Work
Baseline Schedule
F--1 Critical Remaining Work
FORT WORTH
2022 Bond Year 3 — Contract 13
CPN 104311
FORT WORTH
ATTACHMENT "E"
LOCATION MAP
City of Fort Worth, Texas 2022 Bond Year 3 — Contract 13
Attachment D CPN 104311
Revision Date: 07.20.2018
Page 1 of 1
IL ■ ��; i
PE -:- ■•p .{
•I •}} • ■,4r ■. ter,/ ,� ii rq/ M
irry fal ■IA w./.".••11' .i�!! r.i
III-ifilif
M I LAM ST J •r: C.`�■'$:■` +M I!�!
,;4�KIPLING ST
"ALr •i ::_i iW . _
r : r if Jr" i �/r•i�//
PROCTOR FT ` "� . `� .41
6- 711
0 2,000 4,000
SCALE IN FEET
ATTACHMENT E
2022 BOND YEAR 3 CONTRACT 13
CITY PROJECT NO. 104311
&VW
000
haLff
3803 PARKWOOD BLVD, SUITE 800
FRISCO, TX 75034-8641
(214)618-4570
2022 Bond Year 3 — Contract 13
CPN 104311
EXHIBIT F
CITY OF FORT WORTH
STANDARD INSURANCE REQUIREMENTS
(1) INSURANCE LIMITS
a. Commercial General Liability — Insured shall maintain commercial general
liability (CGL) and, if necessary, commercial umbrella insurance as follows:
$1,000,000 each occurrence
$2,000,000 aggregate
If such Commercial General Liability insurance contains a general aggregate
limit, it shall apply separately to this Project or location.
City shall be included as an additional insured with all rights of defense
under the CGL, using ISO additional insured endorsement or a
substitute providing equivalent coverage, and under the commercial
umbrella, if any. This insurance shall apply as primary insurance with
respect to any other insurance or self-insurance programs afforded to
City. The Commercial General Liability insurance policy shall have no
exclusions or endorsements that would alter or nullify:
premises/operations, products/completed operations, contractual,
personal injury, or advertising injury, which are normally contained
within the policy, unless City specifically approves such exclusions in
writing.
ii. Insured waives all rights against City and its agents, officers, directors
and employees for recovery of damages to the extent these damages
are covered bythe commercial general liability or commercial umbrella
liability insurance maintained in accordance with Agreement.
b. Business Auto — Insured shall maintain business auto liability and, if
necessary, commercial umbrella liability insurance as follows:
$1,000,000 each accident (or reasonably equivalent limits
of coverage if written on a split limits basis).
Such insurance shall cover liability arising out of "any auto", including owned,
hired, and non -owned autos, when said vehicle is used in the course of Insured's
business and/or the Project. If Insured owns no vehicles, coverage for hired or
non -owned autos is acceptable.
Insured waives all rights against City and its agents, officers, directors and
employees for recovery of damages to the extent these damages are
covered by the business auto liability or commercial umbrella liability
insurance obtained by Insured pursuant to this Agreement or under any
applicable auto physical damage coverage.
CFW Standard Insurance Requirements Page 1 of 3
Rev. 5.04.21
c. Workers' Compensation — Insured shall maintain workers compensation and
employer's liability insurance and, if necessary, commercial umbrella liability
insurance as follows:
Coverage A: statutory limits
Coverage B: $100,000 each accident
$500,000 disease - policy limit
$100,000 disease - each employee
Insured waives all rights against City and its agents, officers, directors and
employees for recovery of damages to the extent these damages are
covered by workers compensation and employer's liability or commercial
umbrella insurance obtained by Insured pursuant to this Agreement.
d. Professional Liability (Errors & Omissions) — Insured shall maintain
professional liability insurance as follows:
$1,000,000 - Each Claim Limit
$2,000,000 - Aggregate Limit
Professional Liability coverage may be provided through an endorsement to
the Commercial General Liability policy, or a separate policy specific to
Professional E&O. Either is acceptable if coverage meets all other
requirements. Coverage shall be written on a claims -made basis, and
maintained for the duration of the contractual agreement and for five (5) years
following completion of services provided. The policy shall contain a retroactive
date prior or equal to the Effective Date of the Agreement or the first date of
services to be performed, whichever is earlier. An annual certificate of insurance
shall be submitted to City to evidence coverage.
(2) GENERAL INSURANCE REQUIREMENTS
a. Certificates of insurance evidencing that Insured has obtained all required
insurance shall be attached to Agreement concurrent with its execution. Any
failure to attach the required insurance documentation hereto shall not
constitute a waiver of the insurance requirements.
b. Applicable policies shall be endorsed to name City as an Additional Insured,
as its interests may appear, and must afford the City the benefit of any
defense provided by the policy. The term City shall include its employees,
officers, officials, and agents as respects the contracted services. Applicable
policies shall each be endorsed with a waiver of subrogation in favor of City
with respect to the Project.
c. Certificate(s) of insurance shall document that insurance coverage limits
specified in this Agreement are provided under applicable policies
documented thereon. Insured's insurance policy(s) shall be endorsed to
provide that said insurance is primary protection and any self -funded or
CFW Standard Insurance Requirements Page 2 of 3
Rev. 5.04.21
commercial coverage maintained by City shall not be called upon to
contribute to loss recovery. Insured's liability shall not be limited to the
specified amounts of insurance required herein.
d. Other than worker's compensation insurance, in lieu of traditional
insurance, City may consider alternative coverage or risk treatment
measures through insurance pools or risk retention groups. City must
approve in writing any alternative coverage for it to be accepted.
e. A minimum of thirty (30) days' notice of cancellation or material change in
coverage shall be provided to City. A ten (10) days' notice shall be acceptable
in the event of non-payment of premium.
f. Insurers must be authorized to do business in the State of Texas and have a
current A.M. Best rating of A:VII or equivalent measure of financial strength
and solvency as determined by the City's Risk Management division.
g. Any deductible or self -insured retention in excess of $25,000 that would
change or alter the requirements herein is subject to approval in writing by
City, if coverage is not provided on a first -dollar basis. City, at its sole
discretion, may consent to alternative coverage maintained through insurance
pools or risk retention groups. Dedicated financial resources or letters of credit
may also be acceptable to City.
h. In the course of the Agreement, Insured shall report, in a timely manner, to
City's Risk Management Department with additional notice to the Contract
Compliance Manager, any known loss or occurrence which could give rise
to a liability claim or lawsuit against City or which could result in a property
loss.
i. City shall be entitled, upon its request and without incurring expense, to
review Insured's insurance policies including endorsements thereto and, at
City's discretion, Insured may be required to provide proof of insurance
premium payments.
j. Lines of coverage, other than Professional Liability, underwritten on a claims -
made basis, shall contain a retroactive date coincident with or priorto the date
of this Agreement. The certificate of insurance shall state both the retroactive
date and that the coverage is claims -made.
k. Coverages, whether written on an occurrence or claims -made basis, shall be
maintained without interruption nor restrictive modification or changes from
date of commencement of the Project until final payment and termination of
any coverage required to be maintained after final payments.
I. City shall not be responsible for the direct payment of any insurance
premiums required by Agreement.
m. Subcontractors of Insured shall be required by Insured to maintain the same
or reasonably equivalent insurance coverage as required for Insured. Upon
City's request, Insured shall provide City with documentation thereof.
CFW Standard Insurance Requirements Page 3 of 3
Rev. 5.04.21
ENDORSEMENT
This endorsement, effective 12:01 A.M. 08/01/2022 forms a part of
Policy No. CA5717893 issued to Halff Associates, Inc.
by NATIONAL UNION FIRE INSURANCE COMPANY OF PITTSBURGH, PA
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
ADDITIONAL INSURED - WHERE REQUIRED UNDER CONTRACT OR AGREEMENT
This endorsement modifies insurance provided under the following:
GE BUSINESS A 0 COVERA FORM
SCHEDULE
ADDITIONAL INSURED:
ANY PERSON OR ORGANIZATION FOR WHOM YOU ARE CONTRACTUALLY BOUND
TO PROVIDE ADDITIONAL INSURED STATUS BUT ONLY TO THE EXTENT OF SUCH
PERSON'S OR ORGANIZATIONS LIABILITY ARISING OUT OF THE USE OF A
COVERED AUTO.
I. SECTION II - COVERED AUTOS LIABILITY COVERAGE, A. Coverage, 1. - Who Is Insured, is
amended to add:
d. Any person or organization, shown in the schedule above, to whom you become obligated
to include as an additional insured under this policy, as a result of any contract or agreement
you enter into which requires you to furnish insurance to that person or organization of the
type provided by this policy, but only with respect to liability arising out of use of a covered
"auto". However, the insurance provided will not exceed the lesser of:
11) The coverage and/or limits of this policy, or
(2) The coverage and/or limits required by said contract or agreement.
I AUTHORIZED REPRESENTATIVE
87950 (9/14) Includes copyrighted information of Insurance Services Office, Inc., Page 1 Of 1
with its permission.
ENDORSEMENT
This endorsement, effective 12:01 A.M. 08/01/2022 forms a part of
policy No. CA5717893 issued to Halff Associates, Inc.
by NATIONAL UNION FIRE INSURANCE COMPANY OF PITTSBURGH, PA
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US
This endorsement modifies insurance provided under the following:
BUSINESS AUTO COVERAGE FORM
Section IV - Business Auto Conditions, A. - Loss Conditions, 5. - Transfer of Rights of Recovery
Against Others to Us, is amended to add:
However, we will waive any right of recover we have against any person or organization with whom you have
entered into a contract or agreement because of payments we make under this Coverage Form arising out of
an "accident' or "loss" if:
(1) The "accident' or "loss" is due to operations undertaken in accordance with the contract existing
between you and such person or organization; and
(2) The contract or agreement was entered into prior to any "accident' or "loss".
No waiver of the right of recovery will directly or indirectly apply to your employees or employees of the
person or organization, and we reserve our rights or lien to be reimbursed from any recovery funds obtained
by any injured employee.
J /AUT14ORIZED REPRESENTATIVE
62897 (6/95)
POLICY NUMBER: GL5856923
COMMERCIAL GENERAL LIABILITY
CG20100413
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
ADDITIONAL INSURED - OWNERS, LESSEES OR
CONTRACTORS - SCHEDULED PERSON OR
ORGANIZATION
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
Name Of Additional Insured Person(s)
Or Organization(s)
ANY PERSON OR ORGANIZATION WHOM YOU
BECOME OBLIGATED TO INCLUDE AS
AN ADDITIONAL INSURED AS A RESULT OF
ANY CONTRACT OR AGREEMENT YOU
HAVE ENTERED INTO.
SCHEDULE
Location(s) Of Covered Operations
PER THE CONTRACT OR AGREEMENT.
Information required to complete this Schedule, if not shown above, will be shown in the Declarations.
A. Section II - Who Is An Insured is amended to that which you are required by the contract
include as an additional insured the person(s) or or agreement to provide for such additional
organization(s) shown in the Schedule, but only insured.
with respect to liability for "bodily injury", B. With respect to the insurance afforded to these
"property damage" or "personal and advertising additional insureds, the following additional
injury" caused, in whole or in part, by: exclusions apply:
1. Your acts or omissions; or
2. The acts or omissions of those acting on
your behalf;
in the performance of your ongoing operations
for the additional insured(s) at the location(s)
designated above.
However:
1. The insurance afforded to such additional
insured only applies to the extent permitted
by law; and
2. If coverage provided to the additional
insured is required by a contract or
agreement, the insurance afforded to such
additional insured will not be broader than
This insurance does not apply to "bodily injury"
or "property damage" occurring after:
1. All work, including materials, parts or
equipment furnished in connection with such
work, on the project (other than service,
maintenance or repairs) to be performed by
or on behalf of the additional insured(s) at
the location of the covered operations has
been completed; or
2. That portion of "your work" out of which
the injury or damage arises has been put to
its intended use by any person or
organization other than another contractor or
subcontractor engaged in performing
operations for a principal as a part of the
same project.
CG 20 10 04 13 0 Insurance Services Office, Inc., 2012 Page 1 of 2 ❑
C. With respect to the insurance afforded to these
additional insureds, the following is added to
Section III - Limits Of Insurance:
If coverage provided to the additional insured is
required by a contract or agreement, the most
we will pay on behalf of the additional insured
is the amount of insurance:
1. Required by the contract or agreement; or
2. Available under the applicable Limits of
Insurance shown in the Declarations;
whichever is less.
This endorsement shall not increase the
applicable Limits of Insurance shown in the
Declarations.
Page 2 of 2 0 Insurance Services Office, Inc., 2012 CG 20 10 04 13 ❑
POLICY NUMBER: GL5856923
COMMERCIAL GENERAL LIABILITY
CG 20 01 04 13
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
PRIMARY AND NONCONTRIBUTORY - OTHER
INSURANCE CONDITION
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART
The following is added to the Other Insurance
Condition and supersedes any provision to the
contrary:
Primary And Noncontributory Insurance
This insurance is primary to and will not
seek contribution from any other insurance
available to an additional insured under your
policy provided that:
(1) The additional insured is a Named Insured
under such other insurance; and
(2) You have agreed in writing in a contract
or agreement that this insurance would
be primary and would not seek contribu-
tion from any other insurance available to
the additional insured.
CG 20 01 04 13 0 Insurance Services Office, Inc., 2012 Page 1 of 1
POLICY NUMBER: GL5856923
COMMERCIAL GENERAL LIABILITY
CG 24 04 05 09
WAIVER OF TRANSFER OF RIGHTS OF RECOVERY
AGAINST OTHERS TO US
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART
SCHEDULE
Name Of Person Or Organization:
PURSUANT TO APPLICABLE WRITTEN CONTRACT OR AGREEMENT YOU ENTER INTO.
Information required to complete this Schedule, if not shown above, will be shown in the Declarations.
The following is added to Paragraph 8. Transfer Of
Rights Of Recovery Against Others To Us of Sec-
tion IV - Conditions:
We waive any right of recovery we may have
against the person or organization shown in the
Schedule above because of payments we make for
injury or damage arising out of your ongoing opera-
tions or "your work" done under a contract with
that person or organization and included in the
"products -completed operations hazard". This
waiver applies only to the person or organization
shown in the Schedule above.
CG 24 04 05 09 0 Insurance Services Office, Inc., 2008 Page 1 of 1 ❑
WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT
This endorsement changes the policy to which it is attached effective on inception date of the policy unless a different
date is indicated below.
This endorsement, effective 12:01 AM08/01/2022 forms a part Of Policy No. wc014195843
Issued to Halff Associates, Inc.
By NEW HAMPSHIRE INSURANCE COMPANY
We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce
our right against the person or organization named in the Schedule. This agreement applies only to the extent that you
perform work under a written contract that requires you to obtain this agreement from us.
This agreement shall not operate directly or indirectly to benefit any one not named in the Schedule.
Schedule
ANY PERSON OR ORGANIZATION TO WHOM YOU BECOME
OBLIGATED TO WAIVE YOUR RIGHTS OF RECOVERY
AGAINST, UNDER ANY WRITTEN CONTRACT OR AGREEMENT
YOU ENTER INTO PRIOR TO THE OCCURRENCE OF LOSS.
This form is not applicable in Kansas for private construction contracts as defined in K.S.A. 16-1801 through K.S.A
16-1807 or public construction contracts as defined in K.S.A. 16-1901 through 16-1908, except where permitted by
statute or other applicable law, such as for use in wrap-up insurance programs.
Any person or organization for which the employer has agreed by written contract, executed prior to loss, may execute
a waiver of subrogation. However, for purposes of work performed by the employer in Missouri, this waiver of
subrogation does not apply to any construction group of classifications as designated by the waiver of right to recover
from others (subrogation) rule in our manual.
This form is not applicable in California, Kentucky, New Hampshire, New Jersey, Texas, or Utah.
WC 00 03 13 Countersigned by
(Ed. 04/84)
Authorized Representative
6/14/23, 5:29 PM
M&C Review
CITY COUNCIL AGENDA
Create New From This M&C
DATE: 6/13/2023 REFERENCE
NO..
CODE: C TYPE:
Official site of the City of Fort Worth, Texas
FART WORTH
**M&C 23- LOG NAME: 202022 BOND YEAR 3 -
0463 CONTRACT 13 - HALFF
CONSENT PUBLIC NO
HEARING:
SUBJECT. (CD 5 and CD 11) Authorize Execution of an Engineering Agreement with Halff
Associates, Inc. in the Amount of $597,591.00 for Combined Water, Sanitary Sewer,
Stormwater, and Street Paving Improvements for 2022 Bond Year 3 - Contract 13 Project,
Adopt Appropriation Ordinances to Effect a Portion of Water's Contribution to and Amend
the Fiscal Years 2023-2027 Capital Improvement Program (2022 Bond Program)
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of an engineering agreement with Halff Associates, Inc. in the amount of
$597,591.00 for combined water, sanitary sewer, stormwater and street paving improvements for
2022 Bond Year 3 - Contract 13 project (City Project No. 104311);
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in
the Water and Sewer Capital Projects Fund in the amount of $521,393.00, transferred from
available funds within the Water and Sewer Fund, for the purpose of funding the 2022 Bond Year
3 - Contract 13 project (City Project No. 104311) to effect a portion of Water's Contribution to the
Fiscal Years 2023-2027 Capital Improvement Program;
3. Adopt the attached appropriation ordinance adjusting appropriations in the 2022 Bond Program
Fund by increasing appropriations in the 2022 Bond Year 3 - Contract 13 project (City Project No.
104311) in an amount of $500,351.00 and decreasing appropriations in the Street Improvement -
Deteriorating Streets programmable project (City Project No. PB0019) by the same amount;
4. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in
the Stormwater Capital Projects fund by increasing estimated receipts and appropriations in the
2022 Bond Year 3 - Contract 13 project (City Project No. 104311) in the amount of $10,000.00
and decreasing estimated receipts and appropriations in the Drainage Improvements
programmable project (City Project No. P00043) by the same amount; and
5. Amend the Fiscal Years 2023-2027 Capital Improvement Program.
DISCUSSION:
This Mayor and Council Communication (M&C) is to authorize the preparation of plans and specifications
for this Year 3 Neighborhood Streets Improvements project associated with the 2022 Bond Program. For
2022 Bond Year 3 - Contract 13 project, this includes water, sanitary sewer, stormwater and street paving
improvements on approximately 4.19 lane miles, on the following streets:
Street
N. Hampshire
Boulevard
Hightower Street
Hightower Street
Kipling Street
Milam Street
Proctor Street
Ruth Street
From
House Street
Weiler Boulevard
Halbert Street
Milam Street
Beaty Street
Kipling Street
Mims Street
To
Scope
Tierney Road Paving/Sewer
Stark Street
Paving/Stormdrain
Milam Street
Paving/Water/Sewer
Major Street
Paving/Sewer/Stormdrain
Church Street
Paving/Water
Routt Street
Paving/Water
Rosehill Drive
Paving/Sewer
apps. cfwnet.org/counci I_packet/mc_review.asp? I D=31091 &cou nciIdate=6/13/2023 1 /4
6/14/23, 5:29 PM
M&C Review
S. Hampshire
Boulevard*
Proctor Street*
Kipling Street*
Yeager Street*
Easement south of
Hightower Street*
Easement between
Major Street and
Mims Street*
Easement between
Louis Street and
Proctor Street*
Easement between
Proctor Street and
Major Street*
300 feet west of the
Tierney Road/S.
Hampshire Boulevard
Intersection
Kipliing Street
Major Street
Greenlee Street
Weiler Boulevard
Kipling Street
Craig Street
Kipling Street
600 feet west Sewer
Craig Street
Mims Street
300 feet north
of Hightower
Street
Yeager Street
Water
Water/Sewer
Sewer
Sewer
150 feet north Sewer
Routt Street Sewer
150 feet south Sewer
*As part of this CIP project, the Water Department will replace cast iron water mains and/or deteriorated
sanitary sewer mains as indicated.
The stormwater component of this project will rehabilitate portions of the existing storm drain system in
Hightower Street and Kipling Street. Some portions of the storm drain will be replaced in Hightower Street
and Kipling Street as well. These efforts will ensure continued drainage in the area.
In April 2020, the Transportation and Public Works Department (TPW), Capital Delivery Division,
published a Request for Qualifications (RFQ) for various engineering consulting services. Forty-six
consultants responded to the RFQ for the Planning, Design and Construction Services for Neighborhood
Streets Projects area with Statements of Qualifications (SOQ). An evaluation team of City staff subject
matter experts from the Capital Delivery Division of TPW scored the SOQs based on company
experience, prior projects, workload and team experience. A pool of nineteen consultants were
prequalified for Neighborhood Streets projects based upon these scores. In an effort to match consultants
with projects specific scope, TPW asked the consultants to submit a response to a Request for Additional
Information (RFAI) highlighting their proposed design schedule, sub -consultant availability, and project
manager workload among other potential project elements. Respondents to the RFAI were scored and
based on this scoring, Halff Associates, Inc. was selected as the most qualified consultant to perform
design services for this project.
The Transportation & Public Works Department's share on this contract is $285,216.00 (Paving:
$280,601.00; Stormwater: $4,615.00). The Water Department's share on this contract of $312,375.00
(Water: $132,111,00, Sewer: $180,264.00) will be available in the Water & Sewer Capital Projects Fund
for the project (City Project No. 104311).
In addition to the contract amount, $434,153.00 (Water: $97,918.00, Sewer: $111,100.00, Stormwater:
$5,385.00, Paving: $219,750.00) is required for project management, real property acquisition, utility
coordination and material testing. This project will have no impact on the Transportation and Public
Works' annual operating budget nor on the Water Department's operating budget when completed. Design
is expected to start in July 2023 and be completed by December 2024. Construction should commence in
May 2025 and be completed in May 2026.
The sanitary sewer component of this project is part of the Water Department's Sanitary Sewer Overflow
Initiative Program.
The action in this M&C will amend TPW's contribution to the Fiscal Years 2023-2027 Capital Improvement
Program as follows:
apps.cfwnet.org/council_packet/mc_review.asp?ID=31091 &counciIdate=6/13/2023 2/4
6/14/23, 5:29 PM
M&C Review
Capital project Name FY2023 CIP Budget Change Revised
Fund Name Appropriations (Increase/Decrease) FY2023 Budget
2022 Bond Street Impr-
Program - Deteriorating $35,409,202.00 $(500,351.00) $34,908,851.00
Fund 34027 Sts-PB0019
It is the practice of the Water Department to appropriate its CIP plan throughout the fiscal year, instead of
within the annual budget ordinance, as projects commence, additional funding needs are identified, and to
comply with bond covenants. The actions in this M&C will appropriate funds in support of the Water's
portion of the City of Fort Worth's Fiscal Years 2023-2027 Capital Improvement Program, as follows:
202022 BOND YEAR 3 - CONTRACT 13 - HALFF
Capital Project FY2023 CIP Budget Change Revised
Fund Name Name Appropriations Authority (Increase/Decrease) FY2023
Budget
W&S Capital 104311 -
Projects - 2022 Bond $0.00 This M&C $521,393.00 $521,393.00
Fund 56002 Year 3 -
Contract 13
2022 Bond 104311 -
Program - 2022 Bond $0.00 This M&C $500,351.00 $500,351.00
Fund 34027 Year 3 -
Contract 13
Storm Water 104311 -
Capital 2022 Bond $0.00 This M&C $10,000.00 $10,000.00
Project Fund Year 3 -
- 52002 Contract 13
Funding is bucgeted in the Sewer Department's Transfer to Water/Sewer account of the Water and Sewer
operating budget for the purpose of funding the 2022 Bond Year 3 - Contract 13 project within the Water &
Sewer Capital Projects Fund, in the Street Imprv-DeterioratingSts programmable project within the 2022
Bond Program Fund and the Drainage Improvement Projects programmable project within the Stormwater
Capital Projects Fund for the purpose of funding the 2022 Bond Year 3 - Contract 13 project.
Appropriations for the water, sanitary sewer, stormwater, and paving improvements for 2022 Bond Year 3 -
Contract 13 project by Fund will consist of the following:
Fund
2022 Bond Program -
Fund 34027
W&S Capital Projects -
Fund 56002
Storm Water Capital
Project - Fund 52002
Existing
Appropriatons
$0.00
$0.00
$0.00
Project Total $0.00
*Numbers rounded for presentation purposes.
Additional project Total
Appropriations
$500,351.00 $500,351.00
$521,393.00 $521,393.00
$10,000.00 $10,000.00
$1,031,744.00 $1,031,744.00
Business Equity Office: Halff Associates, Inc. is in compliance with the City's Business Equity Ordinance
by committing to 19 percent Business Equity participation on this project. The City's Business Equity goal
on this project is 15 percent.
This project is included in the 2022 Bond Program. The City's Extendable Commercial Paper (ECP) (M&C
22-0607; Ordinance 25675-08-2022) provides liquidity to support the appropriation. Available resources
will be used to actually make any interim progress payments until debt is issued. Once debt
associated with a project is sold, debt proceeds will reimburse the interim financing source in accordance
with the statement expressing official Intent to Reimburse that was adopted as part of the ordinance
canvassing the bond election (Ordinance 25515-05-2022).
apps.cfwnet.org/council_packet/mc_review.asp?ID=31091 &counciIdate=6/13/2023 3/4
6/14/23, 5:29 PM M&C Review
This Project is located in COUNCIL DISTRICTS 5 and 11.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are available in the current operating budget of the Water &
Sewer Fund and in the Street Imprv-DeterioratingSts programmable project within the 2022 Bond
Program Fund and the Drainage Improvement Projects programmable project within the Stormwater
Capital Projects Fund and upon approval of the above recommendations and adoption of the attached
appropriation ordinances, funds will be available in the current capital budgets, as appropriated in the
W&S Capital Projects, Stormwater Capital Projects and 2022 Bond Program Funds for the 2022 Bond
Year 3 — Contract 13 project to support the approval of the above recommendations and execution of the
construction contract. Prior to any expenditure being incurred, the Transportation & Public Works and
Water Departments have the responsibility of verifying the availability of funds.
TO
Fund Department Account Project ' Program Activity Budget
ID ID Year
FROM
Fund Department Account Project
ID ID
Submitted for City Manaqer's Office by_
Originating Department Head:
Additional Information Contact:
ATTACHMENTS
Program Activity Budget
Year
William Johnson (5806)
Lauren Prieur (6035)
Monty Hall (8662)
202022 BOND YEAR - CONTRACT 13 - HALFF.docx (CFW Internal)
2022 Bond Year 3-Contract 13 Halff Compliance Memo.pdf (CFW Internal)
2022 Bond Year 3-Contract 13 Halff Form 1295.pdf (CFW Internal)
2022 Bond Year 3-Contract 13 Halff Map.pdf (Public)
Reference # Amount
(Chartfield 2)
Reference # Amount
(Chartfield 2)
2022 Bond Year 3 Contract 13 Halff FID Table Rev.xlsx (CFW Internal)
ORD.APP 20 2022 BOND YEAR 3 - CONTRACT 13 - HALFF REC2 56002.docx (Public)
ORD.APP 20 2022 BOND YEAR 3 - CONTRACT 13 - HALFF REC3 34027.docx (Public)
ORD.APP 20 2022 BOND YEAR 3 - CONTRACT 13 - HALFF REC4 52002.docx (Public)
PBS CPN 104311.pdf (CFW Internal)
SAM Report Halff Associates Inc.pdf (CFW Internal)
apps.cfwnet.org/council_packet/mc_review.asp?ID=31091 &counciIdate=6/13/2023 4/4
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE• 2022 Bond Year 3 Contract 13 — Engineering Agreement
M&C: 23-0463 CPN: 104311 CSO: DOC#:
Date:
To:
Name
Department Initials
Date Out
1.
Filogonio Munoz
TPW - initial 4�L-
Jun 15, 2023
2.
Risk Management — initial
3.
Brent Billington
Consultant - signatures
Jun 15, 2023
4.
Greg Robbins
TPW - signature
Jun 15, 2023
5.
Mary Hanna
TPW - initials'
J u n 16, 2023
6.
Michael Owen
TPW - initialer
Jun 16, 2023
7
Lauren Prieur
TPW - signatures
Jun 16, 2023
8
Doug Black
Legal - signature d.b
Jun 20, 2023
9
William Johnson
CMO - signature W
J u n 22, 2023
10.
Jannette Goodall
CSO - signature
Jun 22, 2023
11.
TPW Contracts
TPW
12.
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments
requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval
first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ❑No
RUSH: DYES ®No SAME DAY: DYES ®No NEXT DAY: DYES ®No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContractsn,FortWorthTexas.sov at ext. 7233 for pick up when completed.
Thank you!