HomeMy WebLinkAboutContract 37013-A8CSC No. 37013-A8 AMENDMENT No . 8 TO CITY SECRETARY CONTRACT No. 37013 WHEREAS, the City of Fort Worth (CITY) and Kimley--Horn and Associates, .Inc., (ENGINEER) made and entered into City Secretary Contract No. 37013, (the CONTRACT) which was authorized by M&C C-22765 on the 15thday of April, 2008 in the amount of $2,533,113.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount of $1,580,000.00 which was authorized by M&C C-25303 on November 15, 2011, Amendment No. 2 in the amount of $1,896,000.00 which was authorized by M&C C-26276 on May 21, 2013, Amendment No. 3 in the amount of $1,736,800.00 which was authorized by M&C C-26838 on June 10, 2014, Amendment No. 4 in the amount of $1,596,900.00 which was authorized by M&C C-27628 on February 16, 2016, Amendment No. 5 in the amount of $589,800.00 which was authorized by M&C C-29040 on February 12, 2019, Amendment No. 6 in the amount of $556,900.00 which was authorized by M&C 20-0139 on March 3, 2020 and Amendment No. 7 in the amount of $523,400.00 which was authorized by M&C 20-0905 on Decembelr 1, 2020; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Main Relocations for the Trinity River Vision - Central City Project and the Trinity Uptown Service Area Phase 8; and WHEREAS, it has become necessary to execute Amendment No. 8 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $1,418,400.00. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed Prof Services Agreement Amendment Template I [W&SS Main Relocations for TRV - Central City Revision Date: November 23, 2021 OFFICIAL RECORD Project and Trinity Uptown Phase 81 Page 1 of 3 CITY SECRETARY [CPN C009691 FT. WORTH, TX under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $12,431,313.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. Prof Services Agreement Amendment Template [W&SS plain Relocations for TRV - Central City Revision Date: November 23, 2021 Project and Trinity Uptown Phase $] Page 2 of 3 [CPN C00969] APPROVED: City of Fort Worth Dana Burghdoff ( 5, 202I(f6:52 CDT) Dana Burghdoff Assistant City Manager DATE: J u l 5, 2023 APPROVAL RECOMMENDED: Christopher arder (Jul 3, 2023 06:48 CDT) Chris Harder, P.E. Director, Water Department ENGINEER Kimley-Horn and Associates, Johzl Atkins, P.E. Vice President DATE: 6/30/2023 -Inc. Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all a formance and reporting requirements. 16�A� S o U 40 'f0i Liam Conlon Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: 23-0507 Date: 06/13/2023 DBlack (Jul 3, 2023 14:59 CDT) Douglas W. Black Form 1295: 2023-1004670 Senior Assistant City Attorney d 449 �II�fl p OF FORT�ad C �o .0�-10 /.o ATTEST: °opvo o=a Jeannette S. Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Pro[ Services Agreement Amendment Template (w&SS Main Relocations for TRV - Central City Revision Date: November 23, 2021 Project and Trinity Uptown Phase 8] Page 3 of 3 (CPN C00969) Kimley»)Horn June 21, 2023 Mr. Liam Conlon Project Manager City of Fort Worth Water Department 200 Texas St. Fort Worth, TX 76102 RE: City's Water & Sanitary Sewer Relocations for the Trinity River Vision Central City Project & the Trinity Uptown Service Area Phase 9 — Bridge and Channel Relocations Amendment No. 8 — Phase 8 KHA No. 061018052 Dear Liam: Kimley-Horn and Associates, Inc. is pleased to submit our Amendment No. 8 for the City's Trinity River Vision Project. Attached is the additional scope of services (Attachment A) and the following is a summary of the individual project descriptions and the scope and fee per project for Amendment No. 8. The fees for this Amendment, as stated in Attachment B, are not to exceed $1,418,400, increasing the total not to exceed fee to $12,431,313. Part 10 —Channel Segment A $859,300 o This project consists of water and sanitary sewer relocations associated with the USACE Channel Segment A Project and includes approximately 1,900 LF of 12-inch water line and 4,600 LF of 8- to 24-inch sanitary sewer line in order to clear conflicts for the USACE. The project area encompasses the N Main Street/N Houston Street area north of downtown Fort Worth. Amendment 8 includes the following project phases: ■ Final Design to incorporate the Grand Ave. Storm Drain and Northern Laterals into the Part 10 project, update the Fort Worth and Western Railroad permits, revise construction sequencing to all construction to proceed prior to City obtaining the final easement, and design two local sanitary sewer lines. • Bidding Phase Services ■ Final Design to break water, sanitary sewer, and Grand Ave. Storm Drain and Norther Laterals into two bid packages: o Section I — Water and Sanitary Sewer Lines A, D, & E o Section II —Grand Ave Strom Drain and Northern Laterals and Sanitary Sewer Lines B & C ■ Bidding Phase Services for Section i and II projects ■ Construction Phase Services for Section I and II Projects Kimley»>Horn Part 13 — Channel Segment D Page 2 $67,400 o This project consists of sanitary sewer relocations associated with the USAGE Channel Segment D Project and includes approximately 4,000 LF of 30- to 60-inch sanitary sewer lines to clear conflicts for the USAGE. The project area encompasses the Henderson Street and Clear Fork Trinity River area north of downtown Fort Worth. In addition to the USAGE relocations, this project includes approximately 1,800 LF of 60- inch for the Upper Clear Fork sanitary sewer main o Amendment 8 includes the following project phases: ■ Preliminary Design to include combining M-439 and M-272B into one siphon crossing the Clear Fork Trinity River and a new siphon crossing of the Purcey Street storm drain outfall, • Revising Preliminary Design to increase the sanitary sewer capacity. Part 14 -- Channel Segment C $186,500 o This project consists of sanitary sewer relocations associated with the USAGE Channel Segment C Project and includes approximately 5,800 LF of 30- to 66-inch sanitary sewer line in order to clear conflicts for the USAGE. The project area encompasses the Henderson Street and the West Fork Trinity River area north of downtown Fort Worth. Amendment 8 includes the following project phases: • Final Design to incorporate the alternate bid items for the 120-inch casing pipe and three sanitary sewer siphons • Final Design to incorporate the Part 23 Channel Segment D project • Archeological Services to meet USACE permitting • Bidding Phase Services Design Program Management $252,700 o This Amendment includes 30 months of overall program management for the Water and Sanitary Sewer Relocations for the Trinity River Vision Central City Project. This includes project kickoff meetings, coordination meetings, monthly reporting, scheduling, capital planning and tracking and other tasks necessary to manage the program as a whole. Development Assistance $10,500 o This Amendment includes providing City support for the new City Council Chambers and the Heritage Park easement. This includes coordination meetings, review of the developer's plans, preparing exhibits, and coordination with City staff. 801 Cherry Street, Unit 11, Suite 1300, Ft. Worth, TX 76102 Kimley»>Horn Page 3 Panther Island Revisioning $42,000 o This Amendment includes providing City support for the Panther Island Revisioning. This includes coordination meetings, review of the Panther Island Master Plans, preparing exhibits, and coordination with City and TRWD staff. For the services listed above, the following table summarizes the fee per Work Phase: Work Phase Water Sewer Total 31 $0 $0 $0 32 $0 $0 $0 33 $324,460 $1,093,940 $1.418,400 51 $0 $0 $0 Total Project $324,460 $1,093,940 $1,418,400 For the services listed above, the recommended breakdown for FWCC and Non-FWCC services is as follows: Description FWCC Non-FWCC Total Part 10 Channel Segment $687,440 $171,860 $859,300 Part 13 Channel Segment D $49,013 $18,387 $67,400 Part 14 Channel Segment C $186,500 $0 $186,500 Design Program Management $252,700 $0 $252,700 Development Analysis $0 $10,500 $10,500 Panther Island Revisioning $0 $42,000 $42,000 Total Project $1,175,653 $242,747 $1,418,400 Kimley»>Horn Page 4 The following table summarizes our recommended budget revisions and shows the revised total contract amount: Original Amend Amend Amend Amend Amend Amend Amend Amend Revised Description Fee No.1 No.2 No.3 No.4 No.5 No.6 No.7 No.8 Contract Pre - Engineering $ 243,500 $ 221,300 $ 307,300 $ 294,800 $ 464,250 $249,000 $163,600 $ 50.000 $ 305,200 $ 2,298,950 Conceptual Engineering $ 365,413 $ 345,400 $ 157,100 $ 230,800 $ 77,000 $ 0 $ 12,400 $ 0 $ 0 $ 1,188,113 Preliminary - Construction Plans $ 852,500 $ 520,500 $ 526,800 $ 535,500 $ 173,300 $ 5,200 $ 12,500 $453,100 $ 107,000 - - $ 3,185,400 Final Construction Plans $ 974,200 $ 434,000 $ 502,900 $ 87,000 $ 282,900 $ 0 $368,400 $ 0 $ 198,200 $ 2,847,600 Pre - Construction Services $ 30,400 $ 40,600 $ 57,900 $ 37,500 $ 18,700 $ 25.000 $ 0 $ 20,300 $ 102,700 $ 333,100 Construction Phase Services $ 67,100 $ 18,200 $ 345,000 $ 551,200 $ 580,750 $310,600 $ 0 $ 0 $ 705,300 $ 2,578,150 Total Project $2,633,113 $1,680,000 $1,896,000 $1,736,800 $1,696,900 $589,800 $656,900 $623,400 $1,418,400 $12,431,313 Kimley-Horn will subcontract a portion of these services to Gorrondona and Associates, Inc. Jaster- Quintanilla, Inc. Geisler Partners Consulting Engineers, and PIC-Printing, LLC; M/WBE subconsuitants. The amount we will be subcontracting is $121,700. This represents an M1WBE participation percentage of 8.6% for these additional services. With these Additional Services, our revised contract amount will be $12,431,313. This will revise our total contract MNVBE participation from $2,968,008.92 (27.0%) to $3,089,708.92 (24.9%). kimley-horn.com 1 801 Cherry Street, Unit 11, Suite 1300, Ft, Worth, TX 76102 Kimley»>Horn The water and sewer design fees are as follows: Water Sanitary Sewer Original Contract $ 1,346,789 $ 1,186,324 Phase 2A $ 462,400 $ 1,117,600 Phase 2B $ 732,800 $ 1.163,200 Phase 3 $ 669,700 $ 1,067,100 Phase 4 $ 290,549 $ 1,306,351 Phase 5 $ 192,660 $ 397,140 Phase 6 $ 94,250 $ 462,650 Phase 7 $ 29,060 $ 494,340 Phase 8 $ 324,460 $ 1,093,940 Total Project $ 4,142,668 $ 8,288,645 Page 5 We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. Texas Registration No. F-928 �...-�C44, E. John R. Atkins, P.E. Vice President CC: Carl T. DeZee, P.E., Kimley-Horn ATTACHEM ENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION - CENTRAL CITY PROJECT - PHASE 8 CITY PROJECT NO.00969 ATTACHMENT "A" SCODe for Enaineerina Design Related Services for Water and Sanitary Sewer Relocations DESIGN SERVICES FOR WATER AND SANITARY SEWER RELOCATIONS FOR THE TRINITY RIVER VISION — CENTRAL CITY PROJECT: PHASE 8 CITY PROJECT NO. 00969 General Scope of Services The scope set forth herein defines the work to be performed by the ENGINEER in conjunction with the PROJECT. Both the CITY and ENGINEER have attempted to define services to be performed and address the needs of the PROJECT through August of 2024. OBJECTIVE The objective of this PROJECT is to facilitate the relocation of the CITY's water and sanitary sewer facilities that are in conflict with the Trinity River Vision improvements, and to relocate or rehabilitate those facilities for the Panther Island Redevelopment Project. WORK TO BE PERFORMED Task 1. Design/Program Management Task 2. Conceptual Design — None Task 3. Preliminary Design Task 4. Final Design Task 5. Bid Phase Services Task 6. Construction Phase Services Task 7. ROW/Easement Services — None Task 8. Survey Services — None Task 9. Permitting Task 10. Holly Analysis — None Task 11. Development Analysis Task 12. USACE Plan Reviews — None Task 13. Ham Branch Study — None Task 14. Panther Island Sanitary Sewer Master Plan — None Task 15. Additional Service — None Task 16. Panther Island Revisioning TASK 1. DESIGNIPROGRAM MANAGEMENT Anticipated durations 30 months (January 2021 thru June 2023) 1.1 Kick -Off Meeting: Attend one (1) pre -design PROJECT kickoffs for Design PROJECT Parts with CITY staff to confirm and clarify scope and objectives. CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE 08.2214 PAGE i OF 30 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION -CENTRAL. CITY PROJECT- PHASE 8 CITY PROJECT NO.00969 1.2 Regular Period Meetings: Attend regular periodic meetings as required by CITY and TRWD. The number of meetings is only intended to be an approximation of the frequency and content of the meetings. A. Semi-monthly CITY Progress Meetings: Conduct and document fifteen (15) semi- monthly PROJECT update meetings with the CITY PROJECT Manager B. Semi-monthly TRWD and CITY Coordination Meetings: Conduct fifteen (15) semi- monthly PROJECT update meetings with CITY PROJECT Manager, Other CITY Consultants, and TRWD PROJECT partners. Prepare and distribute meeting notes and action items. C. Franchise Utility Progress Meetings: Attend fifteen (15) franchise utility PROJECT update meeting with CITY PROJECT Manager and TRWD PROJECT partners. D. TRWD CITY Program Manager's Progress Meetings: Attend approximately six (6) TRWD CITY Program Manager's progress meetings. E. Semi-monthly TRWD PROJECT Managers Review Meetings: Attend approximately six (6) semi-monthly TRWD PROJECT Managers review meetings. F. Quarterly USACE Coordination Meetings: Attend one (1) quarterly USACE PDT meetings for PROJECT coordination. 1.3 City Reporting: A. Progress Reports B. Monthly Schedule Update: Prepare thirty (30) monthly PROJECT schedule status updates to be provided to both CITY and TRWD. The schedules should reflect all of the CITY's PROJECT Parts associated with this contract, appropriately labeled to distinguish between FWCC and Non-FWCC PROJECT Parts. The design schedule will not be cost loaded With the ENGINEER's fees. C. MIWBE Reporting: Complete thirty (30) Monthly MIWBE Report Forms for both TRWD and the CITY. Submit MIWBE Change forms as necessary for any changes in MIWBE Status. D. Monthly Invoices and PROJECT Tracking by PROJECT Part: Prepare thirty (30) monthly invoices that meet the CITY and TRWD invoice format requirements. 1.4 TRWD Program Reporting: Facilitate coordination of PROJECT financial information and track status A. PROJECT Cost Monthly Update: Prepare and update monthly a spreadsheet that tracks each PROJECT Part including projected Construction and Engineering Cost, changes to the projected Construction and Engineering Cost, and actual Construction and Engineering Cost. B. Monthly CITY Actuals Reporting: Review the CITY's Water and Sanitary Sewer, Storm Drain, Franchise, Bridges and Local Street Modifications monthly Project Management Reports and prepare thirty (30) Actual vs. Budget Cost Summary Reports. C. Monthly Contracted and Reimbursable Tracking CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGF 2 OF 30 ATTACHEM ENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION - CENTRAL CITY PROJECT -PHASE 8 CITY PROJECT NO.00969 D. CIP Coordination: The quarterly coordination of the CITY's Five -Year CIP to verify how each PROJECT Part is included in each fiscal year budget. Cost shall be summed by fiscal year. E. Quarterly TRWD Schedule Review: Perform eight (8) quarterly review of modifications to the TRWD schedule and report potential impacts to both TRWD and CITY. Coordinate with both TRWD and CITY as CITY and TRWD work to achieve a schedule that is mutually agreed upon by each party. F. TRWD PROJECT Change Form: Document PROJECT scope and cost changes and report to TRWD. 1.5 Coordination of other CITY Consultants: Facilitate action items/tasks for other CITY Consultants as a result of the TRWD PROJECT Managers meeting. Services may include delegation of tasks and conducting additional meetings associated with the directives of the PROJECT Managers meeting. 1.6 Deliverables A. Meeting Notes for Kickoff Meetings B. Monthly M/WBE Reporting to both TRWD and CITY C. Meeting Notes and action items from TRWD and CITY Monthly coordination meeting D. TRWD Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes E. CITY Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes F. Monthly invoices G. Monthly CITY Actual vs. Budget Cost Summary Report H. Capital Tracking Spreadsheet (Quarterly) TASK 2. CONCEPTUAL DESIGN (30 PERCENT) There are no projects included in the conceptual design task for the Phase 8 contract. TASK 3. PRELIMINARY DESIGN (60 PERCENT) Complete Preliminary Design based on information developed or obtained during Task 2 — Conceptual Design and Task 8 — Surveying Services. CITY OF FORT WORTH, TEXAS ATTACHMENT REVISION DATE 08.22.14 PAGE 3 OF 30 ATTACHEMENTA DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION -CENTRAL CITY PROJECT -PHASE 8 CITY PROJECT NO.00969 Water Relocations Name Size Range Length (LF) Part 13 Channel Segment D 16" 150 Water Subtotal 150 LF Sewer Relocations Name Size Range Length (LF) Part 13 Channel Segment D 42"-78" 4,200 Upper Clear Fork 60" 1,800 Sewer Subtotal 6,000 LF Total 6,150 LF 3.1 Preliminary Design Drawings: Preliminary Design Drawings will include the following Sheets: A. Cover Sheet B. Sheet Index and General Notes 1. CITY's General Notes as found on Buzzsaw. 2. PROJECT Part Specific Notes: Add notes, as required, to meet the specific needs of the PROJECT Part. C. Shutdown and Phasing Notes D. Control Points and Benchmarks in accordance with Task 8 — Survey Services E. Overall Location Map and Sheet Reference for Proposed Water and Sewer Lines F. Overall Existing Water and Sewer Line Map G. Overall Existing Water and Sewer Line Abandonment Plan H. Overall Proposed Easement Map I. Preliminary Water Plan and Profile Sheets: (1 Sheets) Water lines shall be designed in accordance with the CITY Design Standards for water lines, and in accordance with CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE 08.22.14 PAGE 4 OF 30 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVERVISION -CENTRAL CITY PROJECT -PHASE 8 CITY PROJECT NO.00969 TCEQ requirements as depicted in Chapter 290 of the TAC. Plan and Profile Sheets shall include proposed: 1. Water lines: plan view only (water lines 8-inches and smaller) 2. Water lines: plan and profile (water lines 12-inches and larger) 3. Water line sizes 4. Water line grades for 12-inch and larger 5. Fire hydrants 6. Water service lines and meter boxes 7. Valves and valve vaults 8. Air release valves, vaults, and vents 9. Blow -off valves and blow -off valve manholes 10. Sample stations 11. Water services and sizes a. Make provisions to reconnect all water service lines which connect directly to any main being replaced. b. Locations where water services will require relocation across private property due to the location of the proposed water main relative to the existing water main c. The number and location of water services where relocation is significant and will require a detail as part of Task — 4 Final Design d. Temporary water service locations 12. Fire lines 13. Casing limits and size 14. Connection to existing Water lines 16. Isolation Valves 16. Major Connections: Locations where connection to existing main is significant and will require a detail as part of Task 4 — Final Design 17. Proposed limits of the utility trench and pavement removal and replacement J. Preliminary Sanitary Sewer Plan and Profile Sheets: (11 Sheets) Wastewater lines shall be designed in accordance with the CITY Design Standards for wastewater lines, and in accordance with TCEQ requirements as depicted in Chapter 217 of the TAG. Plan and Profile Sheets shall include proposed: 1. Sanitary sewer lines: plan and profile 2. Manholes and junction structures 3. Sewer line sizes CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE 08.22,14 PAGE 5 OF 30 ATTACHE6IENT A DESIGN SERVICES FOR WATER AND SANTiARY SEWER RELOCATIONS FOR TRINITY RIVER VISION -CENTRAL CITY PROJECT - PHASE 9 CITY PROJECT NO.00969 4. Sewer line grades 5. Sewer service lines and sizes a. Make provisions to reconnect all wastewater services lines which connect directly to any main being replaced, including replacement of existing service lines within City right-of-way or utility easement. When the existing alignment of a water and sanitary sewer main or lateral is changed, provisions will be made in the final plans and/or specifications by the ENGINEER to relocate all service lines which are connected to the existing main and connect said service lines to the relocated main. b. The following shall be applicable at all locations where it is necessary to relocate or reroute the existing private sanitary sewer service line due to the abandonment or realignment of the existing public sanitary sewer lateral or main: The CiTY shall furnish the ENGINEER with a sample format of how the sewer service line reroute/relocation should be designed and submitted for construction. During design survey, if a rod can be inserted through the cleanout to the bottom of the service line, the ENGINEER will obtain the flow line elevation and design the service line prior to advertising the project for bid. If the service flow line information cannot be obtained during design survey, the ENGINEER shall delay the design of the sewer service line until after a Quality Level A Subsurface Utility Engineering (SUE investigation has been performed). The Level A SUE will be performed; (1) by the ENGINEER if included in the fee proposal; or (2) by the CITY prior to bidding if the CITY determines that it is needed for satisfactory completion of the design; or (3) by the Contractor after the project has been bid, by means of a bid item to that effect. in all options, the ENGINEER shall propose appropriate de -hole locations in the project and collect flow line elevation and other applicable information of the sewer service line. The ENGINEER shall use this information to provide the design for the sanitary sewer service line to be rerouted or relocated. c. Provide map showing location of new manhole construction at the end of existing sewer segments, 90 degree bends, or tee connections. Site survey or specific design plans for manhole construction is not included as part of the scope. The contract documents shall specify that it is the Contractor's responsibility to coordinate utility location, etc. manhole construction. d. The ENGINEER will prepare standard and special detail sheets for water line installation and sewer rehabilitation or replacement that are not already included in the D-section of the CITY's specifications. These may include connection details between various parts of the project, tunneling details, boring and jacking details, waterline relocations, details unique to the construction of the project, trenchless details, and special service lateral reconnections. 6. Connections to existing sewer lines 7. Identify structures that will require special details in Task 4 — Final Design 8. By-pass pumping locations 9. Casing limits and size CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 6 OF 30 ATTACHEM ENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION -CENTRAL CITY PROJECT -PHASE 9 CITY PROJECT NO.00969 10. Proposed limits of the utility trench and pavement removal and replacement K. In general, PROJECT Part Plan and Profile Sheets shall include the following: 1. Existing conditions as identified in Task 8 -- Survey Services 2. CITY standard border 3. CITY water and sewer Project number 4. North arrow 5. Graphic scale 6. Engineers Preliminary Seal 7. No less than Two (2) benchmarks per plan/profile sheet 8. General notes and sheet notes 3.2 Stakeholder Progress Update Meetings: Conduct stakeholder meetings during Preliminary Design when design of the proposed improvements directly affects the property owner's operations. 3.3 Geotechnical Investigations: Perform a geotechnical analysis of the boring site utilizing a qualified geotechnical laboratory to determine subsurface conditions. Provide recommendations regarding foundation design parameters. The geotechnical analysis will include the following: A. Subsurface exploration 1. Four (4) bores up to 75-ft deep 2. Seven (7) bores up to 50-ft deep E. Laboratory tests for classification purposes and strength characteristics. 1. Moisture content and soil identification 2. Percent passing #200 sieve 3. Liquid and plastic limit determinations 4. Unconfined compression tests on soil 5. Unconfined compression tests on rock 6. Unit weight determinations 7. Absorption pressure and/or one -point pressure swell tests C. The geotechnical report will present the results of the field and laboratory data as well as analyses and recommendations. The data contained in the geotechnical report will be made available to contractors during the bidding process for information purposes. The report will address: 1. General soil and groundwater conditions 2. Comments on general soil and rock excavation CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION GATE: 08,22.14 PAGE 7 OF 30 ATTACHENI ENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION -CENTRAL CITY PROJECT - PHASE 8 CITY PROJECT NO.00969 3. Earthwork and Trench recommendations 4. Lateral Earth Pressure for Blocking 5. Pavement Design recommendations, where required 3.4 Environmental Analysis A. Perform a Limited Phase II investigation in the following locations: 1. Part 13: Twenty-five (25) soil borings along the sanitary sewer alignment adjacent to the Clear Fort Trinity River and within the Forest Park right-of-way. Five (5) soil borings will be converted into temporary monitoring wells. B. Samples will be tested to identify total petroleum hydrocarbons (TPH), volatile organic compounds (VOCs) and other chemicals of concern (COCs) and will be compared to the Texas Risk Reduction Program (TRAP) protective concentration levels. 3.5 By Other than Open Cut Installation A. Prepare trenchless alignments which include entry and exit locations, equipment layout, and other site constraints for the following trenchless crossings 1. Two (2) double barrel 42-inch and 30-inch sewer siphon carrier pipe by 440-LF crossing of the Clear Fork Trinity River, 2. One (1) 60-inch sewer carrier pipe by 50-LF crossing of an existing raw water line 3.6 Special Structural Design: Develop Design (60 percent) calculations, drawings, specifications, for the following special structures A. Four (4) Siphon Structures with stop logs B. Zero (0) Siphon Drop Structures C. Six (6) Junction Structures D. Zero (0) Aerial Crossings E. Zero (0) Butterfly Valve Vaults F. Zero (0) Access Manhole G. Zero (0) Siphon Structure Modification 3.7 Constructability Review and Site Visit A. Prior to the preliminary design review meeting with the CITY, schedule and attend a PROJECT Part site visit with the CITY Project Manager and Construction personnel. Prepare meeting notes capturing the CITY's comments from the site visit. B. The PROJECT requires coordination with other Fort Worth Central City Projects. Review modifications to the other Fort Worth Central City Project submittals to verify there are no changes affecting the existing and/or proposed water and wastewater infrastructure. 3.8 Utility Clearance CITY OF FORT WORTH, TEXAS ATTACHMENT A REVIS€ON DATE: 08.22.54 PAGE 0 OF 30 ATTACHEMENTA DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION -CENTRAL CITY PROJECT -PHASE 8 CITY PROJECT NO, 00969 A. Coordinate with the CITY's Transportation and Public Works Department, Water Department, and other CITY departments, public utilities, private utilities and government agencies to determine the approximate location of above and underground utilities and other facilities that have an impact or influence on the PROJECT Part. Design CITY facilities to avoid or minimize conflicts with existing utilities, and where known and possible, consider potential future utilities in designs. B. Upload one (1) set of the approved preliminary construction plans to Buzzsaw for the CITY's Utility Coordinator to forward to all utility companies which have facilities within the limits of the PROJECT Part. 3.9 Opinion of Probable Construction Cost: (OPCC) D. Prepare an opinion of probable construction cost updated to reflect preliminary design. The OPCC should separate the cost based on CITY fund account numbers: water, sewer, storm water, and streets. Line item cost should be based on CITY standard bid items. 3.10 Deliverables A. Six (6) copies of the Preliminary Design Package will be delivered to CITY for each PROJECT Part. Four (4) copies will include full size (22" x 34") plan sheets and Two (2) copies will include half size (I V x 17") plan sheets. B. Ten (10) copies of the Preliminary Design Package will be delivered to TRWD/USAGE for each PROJECT Part. Drawings will be full size (22" x 34") plan sheets. C. One (1) PDF Copy of the Preliminary Design Package uploaded to Buzzsaw for each PROJECT Part. D. One (1) Copy of the Opinion of Probable Construction Cost (OPCC) for each PROJECT Part 3.11 Preliminary Design Review Meeting A. Conduct five (5) review meetings with the CITY to review Preliminary Design and receive comments from the CITY. CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE 08.22.14 PAGE 9 OF 30 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVERVISION -CENTRAL CITY FROJECT - PHASE 8 CITY PROJECT NO.00969 TASK 4. FINAL DESIGN (90 PERCENT PLANS) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT PLANS) Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as follows: Water Relocations Name Part 10 Channel Segment A Water Subtotal Name Part 10 Channel Segment A Part 14 Channel Segment C Sewer Subtotal Total Size Range 8" — 12" Length (LF) 1,900 1,900 LF Sewer Relocations Size Range Length (LF) 8" — 24" 4,600 8" — 66" 6,500 11,100 LF 13,000 LF 4.1 Preliminary Design Comments A. Incorporate comments from Task 3 -- Preliminary Design (included in previous contract) from the CITY as well as Utility Clearance in the Final Design Documents. 4.2 Final Design (90 Percent Plans): Each plan sheet shall be sealed, dated, and signed by an Engineer licensed in State of Texas with appropriate Firm Registration Number. A. Cover Sheet B. Sheet Index and General Notes C. Shutdown and Phasing Notes D. Overall Existing Water and Sewer Line Map E. Overall Existing Water and Sewer Line Abandonment Plan F. Overall Location Map and Sheet Reference for Proposed Water Lines G. Overall Location Map and Sheet Reference for Proposed Sewer Lines CITY OF FORT WORTH, TEXAS ATTACF MENT A REVISION HATE: 08.22A4 PAGE 10 OF 30 ATTACHEM E NT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION -CENTRAL CITY PROJECT - PHASE 8 CITY PROJECT NO.00969 H. Overall Existing Water Line Abandonment Plan 1. Overall Existing Sewer Line Abandonment Plan J. Control Points and Benchmarks in accordance with Task 8 — Survey Services (included in a previous contract) K. Subsurface Utility Engineering Maps L. Water Plan and Profile Sheets: (4 Sheets for the Part 10 project) In addition to the information identified in Task 3 — Preliminary Design (included in a previous contract), the following information should be added to the Plan and Profile sheet to communicate the design, 1. Stationing for proposed water and sewer lines 2. Noting of Design Features — Plan a. Stationing of the feature b. Name of Feature c. X and Y NAD 83 coordinates d. Reference to appropriate CITY Standard Details, or PROJECT Part Specific Details 3. Noting of Design Features -- Profile a. Stationing of the feature b, Name of the feature c. Elevation in the Profile (at 50' intervals) d. Provide top of pipe elevations for water lines e. Reference to Standard or PROJECT Part Specific Details 4. Pavement Restoration: Indicate the limits of pavement removal and replacement in accordance with CITY Pavement Replacement Policy. Limits should reflect all improvements which require pavement cuts including: a. Water lines b. Structures: vaults and others c. Service lines d. Abandonment of existing utilities e. Indicate the type of patch to be performed and reference the appropriate standard detail. 5. Backfill: Indicated the type and locations of the design trench backfill CITY OF FORT WORTH, TEXAS ATTACHMENT A REVI&ON DATE: 08.22.14 PAGE 11 OF 30 ATTACHEM ENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION -CENTRAL CITY PROJECT - PHASE 8 CITY PROJECT NO.00969 6. Water Pipe Line Restraint: If the water line is designed to have restrained joints, calculate and indicate on the plan and profile sheets the designed sections that are to be restrained. (3 pipe types). 7. By Other than Open Cut Installation: Design tunnel/bore including casing/tunnel liner plate minimum thickness and inside diameter, shafts, allowable methods, control of ground water, and appropriate tolerances with the chosen method. Indicate the following on the plan and profile sheets: a. Casing or Tunnel Line Plate Thickness b. Jacking Shaft and Receiving Shaft Location 8. Water Services: Provide the following on the plan and profile sheets a. Water Service Table: Include the station of the service, the action to be taken on the service, meter box type, service size, meter size, and the meter number associated with each service b. Temporary Water Service: Indicate locations which will require temporary service M. Sewer Plan and Profile Sheets: (8 Sheets for the Part 10 project and 13 Sheets for the Part 14 project) In addition to the information identified in Task 3 — Preliminary Design (included in a previous contract), the following information should be added to the Plan and Profile sheet to communicate the design. 1. Stationing for proposed water and sewer lines 2. Noting of Design Features - Plan a. Stationing of the feature b. Name of Feature c. X and Y NAD 83 coordinates d. Reference to appropriate CITY Standard Details, or PROJECT Part Specific Details 3. Noting of Design Features — Profile a. Stationing of the feature b. Name of the feature c. Elevation in the Profile (at 50' intervals) d. Provide flow line elevations for sewer lines e. Reference to Standard or PROJECT Part Specific Details 4. Pavement Restoration a. Indicate the limits of pavement removal and replacement in accordance with CITY Pavement Replacement Policy. Limits should reflect all improvements which require pavement cuts including: CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE 08.22,14 PAGE 12 OF 30 ATTACHEM ENT A DESIGN SERVICES FOR WATER AND SANTIARY $EWER RELOCATIONS FOR TRINITY RIVERVISION -CENTRAL CITY PROJECT -PHASE 8 CITY PROJECT NO.00969 b. Sanitary sewer lines c. Structures: manholes, vaults and others d. Service lines e. Abandonment of existing utilities f. Indicate the type of patch to be performed and reference the appropriate standard detail. 5. Backfill: Indicated the type and locations of the design trench backfill 6. By Other than Open Cut Installation: Design tunnel/bore including casing/tunnel liner plate minimum thickness and inside diameter, shafts, allowable methods, control of ground water, and appropriate tolerances with the chosen method. Indicate the following on the plan and profile sheets: a. Casing or Tunnel Line Plate Thickness b. Jacking Shaft and Receiving Shaft Location N. Standard Details: Incorporate Standard Details into the construction plans as required by the PROJECT Part scope O. PROJECT Part Specific Details: Prepare PROJECT Part specific details 1. Connections to Existing Water Transmission Mains: [Zero (0) Detail] Prepare details where existing water transmission mains will be cut into to connect a new pipe line or where ductile iron and steel -based pipe lines will be tied together. 2. Butterfly Valve Vaults: [Zero (0) Details] Provide Butterfly vault structural design and details 3. Large Meter Vaults: [Zero (0) Details] Provide large water meter vault structural design and details 4. By -Pass Pumping: [Zero (0) Details] Provide size, and details for by-pass pumping 5. Manhole Junction Structures: [Six (6) Structures] Provide manhole junction structure structural design and details 6. Siphon Structures: [Four (4) Structures] Provide siphon structure structural design and details 7. 45° Bend Siphon Drop Structures: [Zero (0) Structures] Provide structural design and details 8. Corrosion Control: [Zero (0) Details] Provide corrosion control final design according to preliminary design report and final design details 9. Access Structures: [Zero (0) Structure] Provide access structure structural design and details 10. Tunneling: [Two (2) Location] Provide tunneling details CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE 08.22A4 PAGE 13 OF 30 ATTACHEMENTA DESIGN SE RVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION -CENTRAL CITY PROJECT - PHASE 0 CITY PROJECT NO, 00969 11. Storm Structure Modifications: [Zero (0) Structure] Provide structural design and details 12. Aerial Crossing: [Zero (0) Crossings] Provide aerial crossing structural design and details 13. Shoring Plan/Coffer Dam: [Zero (0) Location] Provide shoring details 14. Grading: [Zero (0) Location] Provide grading details P. Traffic Control Plans (TCP): 1. TCP: Prepare TCP [One (1) Sheet] based on the UMTCD and the CITY's Standard details. 2. CITY Standard Details: Incorporate CITY Standard detail sheets in the Construction plans as required. 3, PROJECT Part Specific Details: Prepare Specific Traffic Control Details as required by the PROJECT Part. Q. Erosion Control Plans: [Three (3) Sheets] Provide erosion control plans in accordance with CITY and TCEQ requirements. 4.3 Final Design Project Manual: Prepare a Project manual in accordance with the CITY's standards as found on the CITY's Buzzsaw site. Prepare the following according to the requirements of the PROJECT Part. A. Division 00 1. Invitation to Bid: Modify/complete the Invitation to Bidders as required by the PROJECT Part. 2. Instructions to Bidders: Modify/complete the Instructions to Bidders as required by the PROJECT Part. 3. Bid Form: Prepare the PROJECT Part Bid Form using the standard CITY bid items as located on the CITY's Buzzsaw site. 4. Supplementary Conditions: Modify/complete supplemental conditions for the PROJECT Part including insurance requirements, construction time, and liquidated damages. B. Division 01 1. Modify/complete Division 01 requirements for inclusion in the Project manual and in accordance with the requirements of the PROJECT Part. C. Division 02-49 1. Modify/complete Division 02-49 requirements for inclusion in the Project manual and in accordance with the requirements of the PROJECT Part. D. Non -Standard Specifications 1. Prepare specifications for requirements which are not included in the CITY standard specifications for inclusion in the Project manual and in accordance with the CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22,14 PAGE 14 OF 30 ATTACHEM ENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION -CENTRAL CITY PROJECT -PHASE 8 CITY PROJECT NO, 00969 requirements of the PROJECT Part. These may include, but are not limited to specifications for the following: a. Shafts b. Tunneling c. Odor Control d. Shoring E. Appendix: Include the following with Project Manual Appendix: 1. Easements 2. Permits 3. Geotechnical Investigation 4. Paving Cores 4.4 Opinion of Probable Construction Cost (OPCC) A. Prepare an OPCC updated to reflect Final Design. The OPCC should separate the cost based on CITY fund account numbers: water, sewer, storm water, and streets. Line item cost should be based on CITY standard bid items. 4.5 Stakeholder Meetings: Conduct stakeholder meetings during Final Design when the proposed improvements directly affect the property owner's operations. 4.6 CITY Plan Review Submittals A. Pavement Removal and Replacement: Submit Plans to the CITY's TPW department for review of proposed pavement removal and replacement. B. Traffic Control Plans: Submit Plans to the CITY's TPW department for review of proposed traffic control measures. 4.7 Construction Plan Review Meetings A. Constructability Review: Conduct one (1) review meeting(s) with CITY Project manager and the CITY Inspector to receive comments. B. Water Operational Review: Conduct one (1) review meeting(s) with Water Department Field Operation valve crews and with Water Production to review system shut down requirements. C. Wastewater Operational Review: Conduct one (1) review meeting(s) with Water Department Field Operation wastewater personnel to review impacts on the wastewater system and to review proposed by-pass pumping. D. TRWD Review: Conduct one (1) review meeting(s) with TRWD personnel to review impacts and coordination with the entire TRWD Project, E. USACE Review: Conduct one (1) review meeting(s) with USACE personnel to review impacts and coordination where USACE has jurisdiction or proposed construction. CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 15 OF 30 ATTACHEM ENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVERVISION -CENTRAL CITY PROJECT -PHASE 8 CITY PROJECT NO.00969 4.8 Construction Documents: Based on the various meetings and reviews revise the final design plans and Project manual to produce the Final Construction Documents for Bidding. 4.9 Deliverables A. Six (6) copies of the 90% Design Package will be delivered to CITY for each PROJECT Part. Four (4) copies will include full size (22" x 34") plan sheets and zero (0) copies will include half size (11" x 17") plan sheets. B. Ten (10) copies of the 90% Design Package will be delivered to TRWDIUSACE for each PROJECT Part. Drawings will be full size (22" x 34") plan sheets. C. One (1) PDF copy of the Final Design Package uploaded to Buzzsaw for each PROJECT Part. D. One (1) copy of the Opinion of Probable Construction Cost (OPCC) for each PROJECT Part E. One (1) mylar cover Sheet for Signatures by CITY for each PROJECT Part F. Six (6) copies of the 100% Design Package will be delivered to CITY for each PROJECT Part. Four (4) copies will include full size (22" x 34") plan sheets and two (2) copies will include half size (11" x 17") plan sheets. G. Ten (10) copies of the 100% Design Package will be delivered to TRWDIUSACE for each PROJECT Part. Drawings will be full size (22" x 34°) plan sheets. H. Electronic Version of 100% Construction Plans and Project Manual will be delivered as the As -bid set. Construction plans will be in DWF and PDF format and the Project Manual will be in PDF format for each PROJECT Part. TASK S. BID PHASE SERVICES Name Bid Packages Part 10 Channel Segment A 1 Part 14 Channel Segment C 1 Total 2 5A General A. Separate sets of Bidding Documents are planned for each PROJECT Part. B. Services below will be performed for each bid set. 5.2 Advertisement A. The CITY will publish the Invitation to Bidders in the local paper of record. CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08,22.14 PAGE 16 OF 30 ATTACHEM ENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISfON -CENTRAL CITY PROJECT- PHASE 8 CITY PROJECT NO.00969 5.3 Issuing Bid Sets A. Make available at an agreed location sufficient copies of the Bidding Documents to distribute to potential bidders. B. Upload Bidding Documents to Buzzsaw for electronic distribution C. The ENGINEER may charge a non-refundable fee up to $100 per set of Bidding Documents. D. issue Bidding Documents to four (4) Plan Rooms as determined by the CITY. E. Maintain a log of all plan holders. 5.4 Request for Information A. Receive requests for information from prospective bidders and maintain a log of bidder's significant questions. B. Provide technical interpretations of the Contract Documents. C. Send written clarifications to all plan holders. 5.5 Addenda A. Issue Addenda as necessary when clarifications require a modification to the Contract Documents. 5.6 Pre -bid Meeting A. Conduct a pre -bid meeting for each PROJECT Part as indicated in the Table above. 5.7 Bid Opening A. Attend bid opening held at the CITY. 5.8 Recommendation of Award A. Obtain Bidder's proposals from the CITY, B. Review all bids for completeness and prepare a bid tabulation of all Bidder proposals. C. Evaluate the apparent low bidder and the two (2) subsequent low bidders. D. Verify the qualification and the acceptability of the low bidder. E. Prepare a letter to the CITY with a recommendation of award. 5.9 Conformance Documents A. Incorporate all addenda into the construction plans and the project manual. 5.10 Contract Execution A. Prepare three (3) copies of the conformed Construction Documents for each bid Package to be executed by the CITY and the Contractor per bid package. 5.11 Deliverables GhTY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE 08.22.14 PAGE 17OF30 ATTACHEM ENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION - CENTRAL CITY PROJECT- PHASE 8 CITY PROJECT NO.00969 A. Addenda and Clarifications B. Upload to BIM 360 bidding documents (construction plans and project manuals). C. Ten (10) sets of bidding documents (construction plans and project manuals) for each bid package D. Three (3) sets of conformed bidding documents for execution for each bid package E. One (1) Award Letter for each Bid Package F. One (1) Bid Tabulation for each Bid Package G. Ten (10) full size (22"x34") Ten (10) half size (11"x 17") of Conformed Plans and Specifications for Preconstruction Meeting for each Bid Package. TASK 6. CONSTRUCTION PHASE SERVICES Name Anticipated Months of Submittal Construction Construction Construction Review: Services Duration in This CITY/KHA Activity. Contract Part 10 Channel 17 Mo. 17 Mo. KHA Weekly/Daily Segment A 6.1 Public Meeting A. The CITY shall be responsible for establishing the location and mailing the invitation for the public meeting, B. Attend one (1) Public Meetings for each PROJECT Part. C. Prepare up to two (2) exhibits for each PROJECT Part for use in the public meeting, 6.2 Construction Support A. The ENGINEER will provide professional construction phase services to the CITY during construction of this project. The estimated construction period of the project is seventeen (17) months for the basis of establishing the ENGINEER's Fee. The construction phase services are as follows: 1. Pre -Construction Conference a. Prepare for and attend a pre -construction conference prior to commencement of Work at the Site 2. Visits to Site and Construction Observation — The ENGINEER will provide on -site construction observation services during the construction phase. The ENGINEER will make visits at intervals as directed by the CITY in order to observe the progress of the Work. Such visits and observations by the ENGINEER are not intended to be CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION GATE: 08,22.14 PAGE 18 OF 30 ATTACHEMENTA DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION -CENTRAL CITY PROJECT - PHASE 8 CITY PROJECT NO.8Q969 exhaustive or to extend to every aspect of Contractor's work in progress. Observations are to be limited to spot checking, selective measurement, and similar methods of general observation of the Work based on the ENGINEER's exercise of professional judgment. Based on information obtained during such visits and such observations, the ENGINEER will evaluate whether Contractor's work is generally proceeding in accordance with the Contract Documents, and the ENGINEER will keep the CITY informed of the general progress of the Work. The purpose of the ENGINEER's site visits will be to enable the ENGINEER to better carry out the duties and responsibilities specifically assigned in this Agreement to the ENGINEER, and to provide the CITY a greater degree of confidence that the completed Work will conform in general to the Contract Documents. The ENGINEER shall not, during such visits or as a result of such observations of Contractor's work in progress, supervise, direct, or have control over Contractor's work, nor shall the ENGINEER have authority over or responsibility for the means, methods, techniques, equipment choice and usage, sequences, schedules, or procedures of construction selected by Contractor, for safety precautions and programs incident to Contractor's work, nor for any failure of Contractor to comply with laws and regulations applicable to Contractor's furnishing and performing the Work. Accordingly, the ENGINEER neither guarantees the performance of any Contractor nor assumes responsibility for any Contractor's failure to furnish and perform its work in accordance with the Contract Documents. 4. Resident Project Representative. ENGINEER's role as Resident Project Representative will include furnishing a Resident Project Representative ("RPR") to assist ENGINEER in observing progress and quality of the work. a. The duties and responsibilities of the RPR are limited to those of ENGINEER in the Agreement with the CITY and in the Contract Documents, and are further limited and described as follows: b. General RPR is ENGINEER's agent at the Site, will act as directed by and under the supervision of ENGINEER, and will confer with ENGINEER regarding RPR's actions. It is assumed for the scope of this project that the RPR will perform an average of 3 site visits per week for construction observation. d. RPR's dealings in matters pertaining to a Contractors work in progress shall in general be with ENGINEER and Contractor, keeping CITY advised as necessary e. RPR's dealings with subcontractors shall only be through or with the full knowledge and approval of Contractor f. RPR shall generally communicate with CITY with the knowledge of and under the direction of ENGINEER g. Schedules h. Review the progress schedule, schedule of Shop Drawing and submittals, and any other schedules prepared by Contractor and consult with the ENGINEER concerning acceptability CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 0012.14 PAGE 19 OF 30 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION -CENTRAL CITY PROJECT -PHASE 8 CITY PROJECT NO.00969 Conferences and Meetings j. Attend meetings with Contractor, such as preconstruction conferences, progress meetings, job conferences and other project -related meetings, and prepare and circulate copies of minutes thereof k. Liaison I. Serve as ENGINEER's liaison with Contractor, working principally through Contractor's superintendent, and assist in providing information regarding the intent of the Contract Documents m. Assist ENGINEER in serving as CITY's liaison with Contractor when Contractor's operations affect CITY's on -site operations n. Assist in obtaining from CITY additional details or information, when required for proper execution of the Work o. Interpretation of Contract Documents p. Report to ENGINEER when clarifications and interpretations of the Contract Documents are needed and transmit to Contractor clarifications and interpretations as issued by ENGINEER q. Shop Drawings and Submittals r. Maintain Shop Drawing and Submittal Record log s. Advise ENGINEER and Contractor of the commencement of any portion of the Work requiring a Shop Drawing or submittal for which RPR believes that the submittal has not been approved by ENGINEER t. Modifications u. Consider and evaluate Contractor's suggestions for modifications in Drawings or Specifications and report such suggestions, together with RPR's recommendations, to ENGINEER. Transmit to Contractor in writing decisions as issued by ENGINEER v. Review of Work and Rejection of Defective Work w. Conduct on -Site observations of Contractor's work in progress to assist ENGINEER in determining if the Work is in general proceeding in accordance with the Contract Documents x. Report to ENGINEER whenever RPR believes that any part of Contractor's work in progress will not produce a completed project that conforms generally to the Contract Documents or will imperil the integrity of the design concept of the completed Specific Project as a functioning whole as indicated in the Contract Documents, or has been damaged, or does not meet the requirements of any inspection, test or approval required to be made; and advise ENGINEER of that part of work in progress that RPR believes should be corrected or rejected or should be uncovered for observation, or requires special testing, inspection or approval CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE:08,22.14 PAGE 20OF 30 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION - CENTRAL CITY PROJECT - PHASE 8 CITY PROJECT NO, 00969 y. Inspections, Tests, and System Start-ups z. Consult with ENGINEER in advance of scheduled major inspections, tests, and systems start-ups of important phases of the Work aa. Verify that tests, equipment, and systems start-ups and operating and maintenance training are conducted in the presence of appropriate CITY's personnel, and that Contractor maintains adequate records thereof bb. Observe, record, and report to ENGINEER appropriate details relative to the test procedures and systems start-ups cc. Accompany visiting inspectors representing public or other agencies having jurisdiction over a Specific Project, record the results of these inspections, and report to ENGINEER dd. Records ee. Maintain at the Site orderly files for correspondence, reports of job conferences, reproductions of original Contract Documents including all Addenda, Change Orders, Field Orders, additional Drawings issued subsequent to the execution of the Contract, ENGINEER's clarifications and interpretations of the Contract Documents, progress reports, Shop Drawing and submittals received from and delivered to Contractor, and other Specific Project -related documents ff. Prepare a daily report or keep a diary or log book, recording Contractor's hours on the Site, weather conditions, data relative to questions of Change Orders, Field Orders, or changed conditions, Site visitors, daily activities, decisions, observations in general, and specific observations in more detail as in the case of observing test procedures; and send copies to ENGINEER gg. Record names, addresses, fax numbers, e-mail addresses, web site locations and telephone numbers of all Contractors, subcontractors, and major suppliers of materials and equipment hh. Maintain records for use in preparing project documentation ii. Upon completion of the Work, furnish original set of all RPR Specific Project documentation to ENGINEER jj. Reports kk. Furnish to ENGINEER periodic reports, as required, of progress of the Work and of Contractor's compliance with the progress schedule and schedule of Shop Drawing and submittals II. Draft and recommend to ENGINEER proposed Change Orders and Field Orders. Obtain backup material from Contractor mm. Furnish to ENGINEER and CITY copies of all inspection, test, and system startup reports nn. Immediately notify ENGINEER of the occurrence of any Site accidents, emergencies, acts of God endangering the Work, damage to property by fire or other causes, or the discovery of any Constituent of Concern CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 21 OF 30 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION -CENTRAL CITY PROJECT - PHASE 8 CITY PROJECT NO.00969 oo. Payment Request — Not Included pp. Completion qq. Participate in a final inspection in the company of ENGINEER, CITY, and Contractor and prepare a final list of items to be completed and deficiencies to be remedied rr. Observe whether all items on the final list have been completed or corrected and make recommendations to ENGINEER concerning acceptance and issuance of the Notice of Acceptability of the Work ss. Resident Project Representative shall not: tt. Authorize any deviation from the Contract Documents or substitution of materials or equipment (including "or -equal" items) uu. Exceed limitations of ENGINEER's authority as set forth in the Agreement OF the Contract Documents vv. Undertake any of the responsibilities of a Contractor, subcontractors, suppliers, or a Contractor's superintendent ww. Advise on, issue directions relative to, or assume control over any aspect of the means, methods, techniques, sequences or procedures of the Contractor's work unless such advice or directions are specifically required by the Contract Documents xx. Advise on, issue directions regarding, or assume control over safety practices, precautions and programs in connection with the activities or operations of CITY or Contractor yy. Participate in specialized field or laboratory tests or inspections conducted off - site by others except as specifically authorized by ENGINEER zz. Accept Shop Drawings or submittals from anyone other than Contractor aaa. Authorize CITY to occupy a Specific Project in whole or in part bbb. Through such observations of Contractor's work in progress and field checks of materials and equipment by the RPR, ENGINEER shall endeavor to provide CITY a greater degree of confidence that the completed Work will conform in general to the Contract Documents. However, ENGINEER shall not, during such visits or as a result of such observations of Contractor's work in progress, supervise, direct, or have control over Contractor's work, nor shall ENGINEER have authority over or responsibility for the means, methods, techniques, equipment choice and usage, sequences, schedules, or procedures of construction selected by Contractor, for safety precautions and programs incident to Contractor's work, nor for any failure of Contractor to comply with laws and regulations applicable to Contractor's furnishing and performing the Work. Accordingly, ENGINEER neither guarantees the performance of any Contractor nor assumes responsibility for any Contractor's failure to furnish and perform its work in accordance with the Contract Documents. CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 22 OF 30 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION -CENTRAL CITY PROJECT - PHASE 8 CITY PROJECT NO, 00959 5. Recommendations with Respect to Defective Work Provide recommendations to CITY that Contractor's work be disapproved and rejected while it is in progress if, on the basis of site visit evaluations, the ENGINEER believes such work will not produce a completed Project that conforms generally to Contract Documents or that it will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated in the Contract Documents. Notwithstanding the foregoing, the CITY reserves the right to disapprove or reject Contractor's work without a recommendation from the ENGINEER. 6. Clarifications and Interpretations a. Issue necessary clarifications and interpretations of the Contract Documents to CITY as appropriate to the orderly completion of Contractor's work. Such clarifications and interpretations will be consistent with the intent of the Contract Documents. Any orders authorizing variations from the requirements of the Contract Documents will be made by CITY. 7. Change Orders a. Recommend change orders to CITY, as appropriate. b, Review and make recommendations related to Change Orders submitted or proposed by the Contractor. 8. Shop Drawings and Samples a. Review and approve or take other appropriate action in respect to Shop Drawings and Samples and other data which Contractor is required to submit, but only for conformance with the information given in the Contract Documents and compatibility with the design concept of the completed Project as a functioning whole as indicated in the Contract Documents. Such review and approvals or other action will not extend to means, methods, techniques, equipment choice and usage, sequences, schedules, or procedures of construction or to related safety precautions and programs. 9. Substitutes and "or -equal" a. Evaluate and determine the acceptability of substitute or "or -equal" materials and equipment proposed by Contractor in accordance with the Contract Documents, but subject to the provisions of applicable standards of state or local government entities. b. Provide recommendations to the CITY 10. Material Testing Coordination and Evaluation a. Maintain Report Log b. ENGINEER will maintain a log of test results as they are received. c. Coordination with Testing Lab and City CITY Or FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 23 OF 30 ATTACHEM ENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION -CENTRAL CITY PROJECT -PHASE 8 CITY PROJECT NO.00969 d, ENGINEER will coordinate with Testing Lab regarding any discrepancies as well as timing of proposed testing. ENGINEER will notify CITY of failed tests. e. Review of Testing Reports f. ENGINEER will review materials testing reports as they are received to determine conformance with the Construction Contract Documents, and whether further clarification is required from the Testing Lab. g. Limitation of Responsibilities h, ENGINEER shall not be responsible for the acts or omissions of the City's testing lab. ENGINEER shall not have the authority or responsibility to direct the work of the City's testing lab 11. Disagreements between CITY and Contractor a. As necessary, the ENGINEER will, with reasonable promptness, render initial written decision on all claims of the CITY and Contractor relating to the acceptability of Contractor's work or the interpretation of the requirements of the Contract Documents pertaining to the progress of the Contractor's work. In rendering such decisions, the ENGINEER will be fair and not show partiality to the CITY or Contractor and will not be liable in connection with any decision rendered in good faith in such capacity. The initial decision of the ENGINEER shall be required as a condition precedent to mediation or litigation of any claim arising prior to the date final payment is due to the Contractor, unless thirty (30) days have passed after a claim has been referred to the ENGINEER with no decision having been rendered. 12. Final Walkthrough and Punchlist Preparation a. Attend final walkthrough with Contractor and the CITY to determine if the completed work of Contractor is generally in accordance with the Contract Documents. b. Limitation of Responsibilities: The ENGINEER will not be responsible for the acts or omissions of any Contractor, or of any of their subcontractors, suppliers, or of any other individual entity performing or furnishing the work, The ENGINEER will not have the authority or responsibility to stop the work of any Contractor. Compile punch list from information gathered during final walkthrough with the CITY and Contractor. 13. Limitation of Responsibilities. ENGINEER shall not be responsible for the acts or omissions of any Contractor, or of any of their subcontractors, suppliers, or of any other individual or entity performing or furnishing the Work. ENGINEER shall not have the authority or responsibility to stop the work of any Contractor. 6.3 Record Drawings A. The ENGINEER shall prepare Record Drawings from information provided by the CITY depicting any changes made to the Final Drawings during construction CITY OF FORT WORTH, TEXAS ATTACHMENT REVISION DATE 08.22.14 PAGE 24 OF 30 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION -CENTRAL CITY PROJECT - PHASE 8 CITY PROJECT NO.0069 B. The ENGINEER shall modify the Final Drawings electronically and shall place a stamp on the plans indicating that they represent Record Drawings of the project as constructed. The stamp shall be signed and dated by the ENGINEER and shall be placed on each plan sheet, whether there are any revisions an the sheet or not. Each sheet shall clearly indicate all changes which apply to that sheet by clouding and numbering, or other suitable means. C. The following disclaimer shall be included with the Record Drawing stamp: 1. These Record Drawings were prepared using information provided by others and represent the as constructed conditions to the extent that documented changes were provided for recording. The ENGINEER assumes no liability for undocumented changes and certifies only that the documented changes are accurately depicted on these drawings. D. The ENGINEER shall submit a set of sealed Final Drawings, modified and stamped as Record Drawings, on mylar for record storage. The ENGINEER may keep copies of the information provided by the CITY for their files, but all original red -lined drawings shall be returned to the CITY with the myiars. E. PDF files shall be uploaded to the project's Record Drawings folder in BIM360 6.4 ASSUMPTIONS A. One (1) construction contract will be awarded for each Project Part. B. ENGINEER will provide up to two (2) exhibits for one (1) virtual public meeting for each contract and prepare a listing of names and addresses of residents and businesses affected by the project. C. Four (4) RFI's are assumed for each contract. D. Two (2) Change Orders are assumed for each contract. E. Thirty (30) Shop Drawings reviews are assumed for each contract. F. One (1) evaluation of substitutes is included for each contract. G. Twenty-eight (28) Site Observation Visits are assumed. H. One (1) PDF copy of full size (22"x34") record drawing plans will be delivered to the CITY for each construction contract. 6.5 Deliverables A. Public meeting exhibits B. Fifty-six (56) Progress Meeting Agendas and Notes C. Responses to Contractor's Requests for Information D. Review of Change Orders E. Review of shop drawings F. Record Drawings on PDF CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE 08.22.14 PAGE 25 OF 30 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION -CENTRAL. CITY PROJECT - PHASE 8 CITY PROJECT NO.00969 TASK 7. ROW/EASEMENT SERVICES There are no projects included in the ROW/Easement Services task for the Phase 8 contract. TASK B. SURVEY There are no projects included in the Survey task for the Phase 8 contract. TASK 9. PERMITTING 9.1 TXDOT A. Prepare two (2) permits for utilities accommodation within TxDOT ROW in accordance with the TXDOT UAR. 9.2 Railroads B. Coordinate two (2) railroad crossings. 1. Obtain Railroad crossing requirements. 2. Submit one (1) plan sheet to railroad owner for each proposed utility crossing. a. Plan sheets will be formatted per the AREMA guidelines. b. Proposed utilities crossing railroads will be designed in accordance with the railroad owner and AREMA guidelines. 3. The ENGINEER will attend one (1) coordination meeting with the CITY PROJECT Manager and or a Representative from the Railroad for each proposed utility crossing. a. Prepare one (1) exhibit for each proposed utility crossing. 4. The ENGINEER will make one (1) visit to each proposed utility crossing with the CITY Project Manager and or a Representative from the Railroad to convey the design intent. 5. CITY is responsible for obtaining Permit/Easement, paying all fees, and necessary CITY Council action. 9.3 Tarrant Regional Water District (TRWD) and U.S. Army Corp of Engineers (USACE) A. Prepare one (1) submittal to TRWDIUSACE for each project consisting of the following: 1. Ten (10) copies of each CITY PROJECT Part submittal (Conceptual, Preliminary, 90 percent and 100 percent Construction Plans) and provide to TRWD for review and comment. 2. Review and respond to one set of DR Checks comments for each submittal. 9A Trinity River Vision Authority (TRWD) Project Change Requests (PCR) — Not include CITY OF FORT WORTH. TEXAS ATTACHMENT A REVISION DATE 08.2214 PAGE 26 OF 30 ATTACHEPAENT A DESIGN SERVICES FOR WATER AND SANUARY SEWER RELOCATIONS FOR TRINITY RIVER VISION - CENTRAL CITY PROJECT - PHASE 8 CITY PROJECT NO, 00969 9.5 Park Land Conversion A. The ENGINEER will prepare and submit One (1) City of Fort Worth Park's Department Conversion Application including the following: One (1) aerial exhibit indicating existing easements, tree save/removal areas, construction staging and storage areas, landscape areas, fences, signs, access points and all alternate alignment options. Proposed pipeline should be labeled with pipe size, linear footage of pipe, width of easement and boringlopen cut locations. One (1) CD including snapshot size color photographs of the existing conditions of the park property. 3. Explanation of use for any park road or property identifying duration and frequency of anticipated use as well as types of vehicles that will require access. Necessary signage plans and anticipated disruptions to traffic will also need to be submitted. 4. Proposed preservation, security, environmental protection and restoration plans for all staging and storage areas. 5. Letter of Request for Conversion 6. Letter of Permission to Survey 7. 8.5" x 11" Survey Exhibit for Park Board 8. Legal Description, Copy of Deed and Copy of Plat/Abstract B. Stake proposed alignment, permanent boring locations and temporary workspaces for final approval. 9.6 United States Army Corps of Engineers (USACE) Permitting A. Cultural resource compliance (Section 106) — Part 14 West Fork Trinity River Crossing 1. Archeological Services a. Conduct a search of the Texas Archeological and Historic Sites Atlas, maintained by the THC and Texas Archeological Research Laboratory (TARL) to identify previously documented archeological sites, cemeteries, historical markers, properties and districts listed on the National Register of Historic Places (NRNP), and State Antiquities Landmarks (SALs). Results of the search will be integrated with soil information, topographic maps, aerial photographs, and other pertinent data into an Agency Coordination letter on behalf of the Trinity Regional Water District and the City of Fort Worth. A recommendation of no additional archeological investigation or archeological monitoring during the bore pit excavation will be made at this level. b. Much of this area has been previously investigated and numerous impacts have occurred, including the straightening of the Trinity River at this location. However, if either the USACE or THC require the monitoring investigation, ENGINEER will follow the current guidelines as developed by the Council of Texas Archeologists and approved by the THC in April 2020. Archeological monitoring will only be conducted at the proposed bore pits to a depth of no more than 15 feet, as that level is well outside of cultural bearing strata as has been CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 27 OF 30 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTiARY SEWER RELOCATIONS FOR TRINITY RIVER VISION - CENTRAL CITY PROJECT - PHASE 8 CITY PROJECT NO, 00%9 identified in previous archeological investigations in the same area. As the bore pits are being excavated, ENGINEER will watch for indication of archeological deposits, artifacts, or features that may occur within the bore pits. Photographs and detailed notes will be taken of each monitored bore pit, cultural aspects will be documented as observed. Should additional information be required a small sample of the aspect will be inspected more closely. c. A report of the findings will be prepared and submitted to the THC and USACE for review and concurrence. Final reports will be submitted once concurrence is received and submitted to THC. Survey shapefiles will be submitted to both THC and TARL for uploading to the Atlas in order to assist future researchers. TASK 10. HOLLY ANALYSIS There is no scope for the Holly Analysis included in the Phase 8 contract TASK 11. DEVELOPMENT ANALYSIS 11.1 Deveiopment Review Assistance A. Provide assistance for upcoming development projects in the Panther Island, Cultural District, and Downtown Areas. Based upon the recommended design criteria, the ENGINEER will assist the CITY to help determine what infrastructure improvements will be required associated with proposed developments. As an example, the ENGINEER will: 1. Review developer's water system analysis and input data into Holly water system model to analyze the impact of development to the existing water system, 2. Review developer's sanitary sewer analysis and input data into drainage basin to analyze the impact of development to the existing sanitary sewer system, 3. Prepare opinions of probable construction costs associated with the recommended infrastructure improvements, 4. Attend Community Facilities Agreement (CFA) or Pre-Deveiopment Conference meetings when requested, and 5. Review calculations associated with domestic and fire services for the proposed facilities. TASK 12. USACE FORT WORTH CENTRAL CITY CONSTRUCTION PROJECTS There is no scope for the USACE FWCC construction projects included in the Phase 7 contract. TASK 13. HAM BRANCH STUDY There is no scope for the Ham Branch Study included in the Phase 7 contract. TASK 14. PANTHER ISLAND SANITARY SEWER MASTER PLAN C TY OF FORT WORTH, TEXAS ATTACHMENTA REVISION DATE: 08.22.14 PAGE 28 OF 30 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION -CENTRAL CITY PROJECT- PHASE 8 CITY PROJECT NO.00969 There is no scope for the Panther Island Sanitary Sewer Master Plan included in the Phase 7 contract. TASK 16. ADDITIONAL SERVICES There is no scope for the Additional Services included in the Phase 7 contract. TASK 16. PANTHER ISLAND REVISIONING 16.1 Panther Island Revisioning A. Provide assistance for the revisioning of Panther Island. The ENGINEER will: 1. Prepare proposed water, wastewater, and storm drain Panther Island Infrastructure Maps. 2. Prepare master plan franchise utility map for Panther Island, 3. Prepare Panther Island Road exhibit. 4. Prepare TRWD Bond cost breakdown for Panther Island East and West Island infrastructure improvements. 5. Prepare presentation slides for proposed infrastructure improvements on Panther Island. 6. Prepare presentation slides for the interim development areas associated with canal development. 7. Attend meetings with CITY, and other Panther Island Revisioning project partners. ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the Tasks above. However, ENGINEER can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the PROJECT shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: A. Preparation of Permitting Documents and Coordination for Permits, not listed in Scope of Services. B. Negotiation of easements or property acquisition. C. Services related to development of the CITY's project financing and/or budget. D. Services related to disputes over pre -qualification, bid protests, bid rejection and rebidding of the contract for construction. E. Construction management and inspection services F. Performance of materials testing or specialty testing services. G. Services necessary due to the default of the Contractor. H. Services related to damages caused by fire, flood, earthquake or other acts of God. CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08,22.14 PAGE 29 OF 30 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION -CENTRAL CITY PROJECT - PHASE 8 CITY PROJECT NO.00969 I. Services related to warranty claims, enforcement and inspection after final completion. Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. K. Performance of miscellaneous and supplemental services related to the PROJECT as requested by the CITY. CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE 08.22A4 PAGE 30 OF 30 ATTACHMENT B COMPENSATION Design Services for WATER AND SANITARY SEWER RELOCATIONS FOR THE TRINITY RIVER VISION — CENTRAL CITY PROJECT: PHASE 8 City Project No. 00969 Time and Materials with Rate Schedule Project Compensation A. The ENGINEER shall be compensated for personnel time, non -labor expenses, and subcontract expenses in performing services enumerated in Attachment A as follows: i. Personnel Time. Personnel time shall be compensated based upon hours worked directly in performing the PROJECT multiplied by the appropriate Labor Cateoory Rate for the ENGINEER's team member performing the work. Labor Cateaory Rate as presented in the rate schedule table below is the rate for each labor category performing the work and includes all direct salaries, overhead, and profit. The following rates will only apply for Task 6 Construction Phase Services. All other tasks will be performed under the rates in Amendment No, 7. Labor Category 2023 Rate Whour) Analyst $150 - $230 Professional $200 - $275 Senior Professional 1 $240 - $330 Senior Professional II $295 - $350 Senior Technical Support $150 - $260 Support Staff $105 - $135 Technical Support $95 - $140 Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct Expenses at invoice or internal office cost. 4.6% will be added to each invoice to cover certain other internal office cost expenses as to these tasks, such as telecommunications, in-house reproduction, postage, supplies, project related computer time, and local mileage. Direct EXDenSeS (non -labor) include, but are not limited to, mileage, travel and lodging expenses, mail, supplies, printing and reproduction services, other direct expenses associated with delivery of the work; plus applicable sales, use, value added, business transfer, gross receipts, or other similar taxes. Direct reimbursable expenses such as express delivery services, fees, travel, and other direct expenses will be billed at 1.10 times the cost. iii. Subcontract Expenses. Subcontract expenses and outside services shall be reimbursed at cost to ENGINEER plus a markup of ten percent (10%). City of Fart Worth, Texas Attachment B PMO Official Release Date: 8.09.2012 Page 1 of 3 All ATTACHMENT B COMPENSATION iv. Budgets. ENGINEER will make reasonable efforts to complete the work within the budget and will keep the City informed of progress toward that end so that the budget or work effort can be adjusted if found necessary. ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be adjusted, nor is the City obligated to pay ENGINEER beyond these limits. If ENGINEER projects, in the course of providing the necessary services, that the PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether by change in scope of the project, increased costs or other conditions, the ENGINEER shall immediately report such fact to the City and, if so instructed by the City, shall suspend all work hereunder. When any budget has been increased, ENGINEER's excess costs expended prior to such increase will be allowable to the same extent as if such costs had been incurred after the approved increase. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. Method of Payment A. The ENGINEER shall be paid by the City based upon an invoice created on the basis of statements prepared from the books and records of account of the ENGINEER, based on the actual hours and costs expended by the ENGINEER in performing the work. B. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. C. ENGINEER shall prepare and submit invoices in the format and including content as presented in Exhibit B-1. D. Payment of invoices will be subject to certification by the City that such work has been performed. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Water Department monthly progress reports and schedules in the format required by the City. City of Fort Worth. Texas Attachment 8 PMO Official Release Date: 8.09.2012 Page 2 of 3 IV. Summary of Total Project Fees Firm Primary Responsibility Prime Consultant Kimley-Horn and Design Management, Associates, Inc. Conceptual Design, Preliminary Design, Final Design and Easements Proposed MWBE Sub -Consultants Gorrondona & Survey/Easements Associates, Inc. Jaster-Quintanilla, LLP Structural Engineering Geisler Partners Civil Engineering Consulting Engineers PIC Printing, LLC Printing Non-MBEISBE Consultants Bennett Trenchless Trenchless Design Raymond L. Goodson Civil Engineering Jr., Inc. Stantec Environmental Permitting TOTAL Project Number & Name CPN 00969 — Water and Sanitary Sewer Relocations for the Trinity River Vision — Central City Project: Phase 8 City MBEISBE Goal = 8% Total Fee $1,418,400 Fee Amount % $1,214,119 90.1 $3,000 0.2 $25,540 1.8 $83,590 5.9 9,570 0.7 $9,760 0.7 $50,805 3.6 $22,016 1.6 100% MWBE Fee MWBE % $121.700 8.6% Consultant Committed Goal = 8.6% TRV Phase 8 Contract Amendment Task 1 Design/Program Management Task 3 Preliminary Design Task 4 Final Design Task 5 Bidding Task 6 Construction Phase Services Task 9 Permitting Task 11 Development Assistance Task 16 Panther Island Revisioning Total Contract MWSE % Labor Expense MWBE Tota[Fee $ 251,200 $ 1,500 $ - $ 252,700 $ 43,400 $ 24,000 $ 20,860 $ 67,400 $ 115,400 $ 82,800 $ 24,010 $ 198,200 $ 70,600 $ 32,100 $ 19,316 $ 102,700 $ 636,100 $ 69,200 $ 57,514 $ 705,300 $ 15,300 $ 24,300 $ - $ 39,600 $ 10,000 $ 500 $ - $ 10,500 $ 40,000 $ 2,000 $ - $ 42,000 $ 1,182,000 $ 236,400 $ 121,700 $ 1,418,400 &6% Project Design Program Management Part 10 Channel Segment A (NTP 2) Part 13 Channel Segment D Part 14 Channel Segment C Development Assistance Panther Island Revisioning Total City of Fort Worth Water and Sanitary Sewer Relocations for the Trinity River Vision Phase 8 Improvements Engineering Contract Kimley-Horn and Associates, Inc. FWCC and Non-FWCC Cost Breakdown Total Contract JI5cope & Description Task 1- Design/Project Management ask 4 - Final Design ask 5 - Bidding Phase Services Task 6 - Construction Phase Services IITask 3 - Preliminary Design Task 4 - Final Design Task 5 - Bidding Phase Services Task 9 - Permitting +Task 11- Development Assistance +Task 16 - Panther Island Revisioning ^ FWCC I Non-FWCC Total OPCC/Bid $ 252,700 1 $ - 1I $ 252,70011 $ 96,080 I $ 24,020 $ 27,120 $ 6,780 $ 859,300 $ 6,400,000 $ 564,240 I $ 141,060 $ 49,013 1 $ 18,387 1I $ 67,400 11 $ 22,000,000 $ 78,100 $ $ 68,800 $ - $ 186,500 $ 32,200,000 $ 39,600 $ $ - 1 $ 10,500 11 $ 10,50011 1 $ _ _j $ 42,000 j( $ 42,000 j+ 1 $ 1,175,653 j $ 242,747 jJ $ 1,418,400 11 Advertisement Nov-22 Nov-23 Jan-23 TRV Phase 8 Contract - Total Fee Breakdown Gorrondona & Jaster- P I C Printing, Geisler Partners Consulting Firm Associates, Inc. Quintanilla, LLP LLC Consulting Engineers Primary Service Survey Services Structural Reproduction Civil Engineering Engineering Services Task 1 Design Management $ - S $ - $ $ Design Management $ $ I $ $ $ Task 3 Preliminary Design $ $ 20,860 $ $ $ Part 13 Channel Segment D $ $ 20,860 $ - $ - $ Task 4 Final Design $ $ $ 3,570 $ 20,440 $ Part 10 Channel Segment A $ $ $ 170 $ 20,440 $ Part 14 Channel Segment D $ $ $ 3,400 $ . $ Task Bidding $ $ 4,680 $ 4,500 $ 20,136 $ Part 10 Channel Segment A $ $ - I $ 2,400 $ 10,136 $ Part 14 Channel Segment D $ - $ 4,680 S 2,100 $ - $ Task 6 Construction Phase Services $ 3,000 $ - $ 2,500 $ 53,014 $ Part 10 Channel Segment A $ 3,000 $ $ 1,500 $ 53,014 $ Task 9 Permitting $ $ $ - $ - $ Part 14 Channel Segment C $ $ $ $ l $ Task 11 Development Assistance $ $ $ $ $ Development Assista nce $ $ $ $ $ I Task 16 Panther Island Revisioning $ $ $ $ $ Panther Island Revisioning $ $ $ $ $ I Kimley-Horn Kimley-Horn Bennett Raymond L. and Associates, and Associates, Trenchless Goodson Jr., Stantec Inc. Inc. Engineers Inc. Labor Expense Trenchless Civil Archaeological Engineering Engineering Permitting - 5 251,200 $ 1,500 $ - $ $ $ 252,700 IiS2,700 - $ 251,200 $ 1,500 1 $ $ $ $ 252,700 $ 252,700 20,860 $ 43,400 $ 3,140 $ $ $ $ 46,540 $ 20,860 $ 43,400 I $ 3,140 $ $ $ $ 46,540 _67,400 $ 67,400 24,010 $ 115,400 $ 7,985 $ $ 50,80.1 $ $ 174,190 $ 398 200 20,610 $ 41,100 $ 7,585 $ $ 50,805 I $ $ 99,490 _ $ 120,100 3,400 $ 74,300 $ 400 $ $ - $ $ 74,700 $ 78,100 19,316 $ 70,600 $ 3,024 $ 9,760 $ $ $ 83,384 $ 1Q2,70012,536 S 20,100 $ 1,264 $ - $ $ $ i is 21,364 $ 33,900 6,780 $ 50,500 $ 1,760 $ 9,760 $ $ 62,020 $ 68,800 57,514 $ 636,100 $ 11,686 1 - $ $ $ 647,786 $ 705,300 57,514 $ 636,100 I $ 11,686 $ $ $ 5 647,786 $ 705,300.00 $ 15,300 $ 2,284 $ $ $ 22,016 $ 39,600 $ 39,600 $ 15,300 $ 2,284 $ $ $ 22,015 $ 39,600 _ $ 39,600 $ 10,000 I $ Soo $ $ $ - $ 10,500 $ 30,500 $ 10,000 Il $ Soo $ $ $ $ 10,500 S 1055CC $ 40,000 $ 2,000 $ $ $ $ 42,000 $ 42,000 $ 40,000 I $ 2,000 $ $ $ $ 42,000 $ 42,060 TOTAL FEE $ 1,418,400 TOTAL KHA LABOR $ 1,182,000 TOTAL EXPENSE $ 236,400 TOTAL MWBE $ 121,700 MWBE 0/a 8.6% TRV Phase 8 Contract - FWCC-Fee Breakdown Geisler Partners Kimley-Horn Kimley-Horn Bennett Raymond L. Ja P f C Printing, Consulting and Associates, and Associates, Trenchless Goodson Jr., Stantec Inc.lona& Associates, Associates, I nillater- Quintanilla, LLP LLC Engineers lit Inc. Inc. Engineers Inc. "'; Total Fee Chees Survey Services Structural Reproduction Civil Engineering Labor Expense Trenchless Civil Archaeological TT Engineering Services Engineering Engineering Permitting ' Task 1 Design Management $ - $ $ - $ $ $ 251,200 $ 1,500 $ $ $ $ 252,700 $ 252,700 Design Management $ $ $ $ $ $ 251,200 $ 1,500 $ $ $ $ 252,700 $ 252,700 Task 3 Preliminary Design $ $ 15,269 S $ S 15,169 $ 31,560 $ 2,283 $ $ $ $ 33,844 $ 49,_013 Part 13 Channel Segment D $ $ 15,169 $ $ 15,169 $ 31,56C 5 2,283 $ $ $ $ 33,844 $ 49,013 Task Final Design $ S - $ 3,536 $ 26,352 $ 19,888 $ 207,180 $ 6,468 $ 40,644 S $ 154,292 $ 174,180 Part 10 Channel Segment A $ $ $ 136 $ 16,352 $ 16,488 $ 32,880 $ I 6,068 $ $ 40,644 $ $ 79,592 $ I 96,080 Part 14 Channel Segment D 5 $ $ 3,400 $ - $ 3,400 $ 74,3D0 $ 400 $ $ $ $ 74,700 $ 78,100 Task 5 Bidding $ $ 4,6801 S 4,020 $ 8,109 $ 15,809 $ 66,580 $ 2,771 $ 9,760 $ $ $ 79,111 $ 95,920 Part 10 Channel Segment A $ $ $ 1,920 $ 8,109 $ 10,029 $ 16,080 $ 1,011 $ - $ $ S 17,091 5 27,120 Part 14 Channel Segment D $ $ 4,'80 $ 2,100 $ - $ 6,780 $ 50,500 $ 1,760 $ 9,760 $ $ $ 62,020 $ 68,800 Task 6 Construction Phase Services $ 2,400 $ - $ 1,200 $ 42,411 $ 46,011 $ 508,880 $ 9,349 $ - $ $ $ 518,229 $ 564,240 Part 10 Channel Segment A $ 2,400 $ $ 1,200 $ 42,411 $ 46,011 $ 508,880 $ 9,349 $ $ $ 518,279 $ 564,240 Task 9 Permitting $ - $ $ $ $ - $ 15,300 $ 2,284 $ $ $ 22,016 $ 39,600 S 39,600 Part 14 Channel Segment C $ I $ $ $ $ $ 15,300 5 2,284 1 $ S I $ 22,016 $ 39,600 $ 39,600 Task 11 Development Assistance $ $ $ $ $ $ - $ - I $ $ - Development Assistance $ 1 $ $ 1 $ S $ - ($ - Is $ $ - I $ $ Task 16 Panther Island Revisioning $ $ $ I $ $ $ $ $ $ $ $ $ Panther Island Revisioning $ I $ I $ II $ $ $ $ I I $ I $ I $ I $ $ TOTAL FWCC FEE $ 1,175,653 TOTAL KHA LABOR $ 980,700 TOTAL EXPENSE $ 194,953 TOTAL MWBE $ 97,878 MWBE % 8.3% TRV Phase 8 Contract - Non-FWCC Fee Breakdown Gorrondona & Jaster- P I C Printing, Geisler Partners Kimley-Horn Kimley-Horn Bennett Raymond L. Associates, Inc. Quintanilla, LLP LLC Consulting and Associates, and Associates, Trenchless Goodson Jr., Stantec Engineers _r �11Ji,V_ Inc. Inc. Engineers Inc. ary - Survey Services Structural Reproduction Civil Engineering Labor Expense Trenchless Civil Archaeological - - - - Engineering Services Engineering Engineering Permitting .._ _ m Task 1 Design Management $ - $ - $ - $ - $ $ - $ - $ _ $ _ $ _ $ _ $ Design Management $ - $ - $ - $ - S - $ - $ - 5 - $ - $ - $ - $ �- Task 3 Preliminary Design $ $ 5,691 $ $ $ 5,691 $ 11,940 $ 857 $ $ $ $ 12,696 Part 13 Channel Segment ❑ $ $ 5,691 S $ 5,691 $ 11,840 $ 857 $ $ $ $ 12,696 $ 18,387 Task 4 Final Design $ $ - S 34 $ 4,089 $ 4,122 $ 8,220 $ 1,517 $ $ 10,261 $ $ 19,898 $ 24,020 Part 10 Channel Segment A $ $ - $ 34 $ 4,068 $ 4,122 $ 8,220 $ 1,517 $ $ 10,161 $ $ 19,898 $ 24,020 Part 14 Channel Segment D $ $ $ - $ - $ - $ - $ - $ $ - S S - $ - Task 5 Bidding $ $ $ 480 $ 2,027 $ 2,507 $ 4,020 $ 253 $ $ $ $ 4,273 $ 6,780 Part 10 Channel Segment $ 5 S 480 $ 2,027 $ 2,507 $ 4,020 $ 253 5 $ $ $ 4,273 5 6,780 Part 14 Channel Segment D $ $ $ S - $ - $ $ - $ $ $ $ - $ - Task 6 Construction Phase Services $ 600 $ $ 300 $ 10,603 $ 11,503 $ 127,220 + $ 2,337 $ $ $ $ 129,557 $ 141,060 Part 10 Channel Segment A $ 600 $ I $ 300 $ 10,603 S 11,503 $ 127,220 I $ 2,337 I $ I $ $ 129,557 $ 141,060 Task 9 Permitting $ $ I $ - $ - $ $ - $ $ $ - $ $ Part 14 Channel Segment C $ S f $ $ 15 $ $ $ I I $ $ $ $ $ Task 11 Development Assistance $ $ I $ $ I $ $ 10,000 $ 5001 $ - $ $ $ 10,500 $ 10,500 Development Assistance $ $ $ !15 $ 10,00D $ 500 $ $ $ 10,500 $ 30,500 Task 16 Panther Island Revisioning $ $ $ $ 3 $ 40,000 $ 2,000 $ $ $ 42,000 $ 42,000 Panther Island Revisioning 5 ' S $ I $ $ 40,000 $ 2,000 I $ $ $ $ 42,000 _ $ 42,000 TOTAL Non-FWCC FEE $ 242,747 TOTAL KHA LABOR $ 201,300 TOTAL EXPENSE $ 41,447 TOTAL MWBE $ 23,823 MWBE% 9.8% EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for FWCC Sum City Project No. 00969 Task Description P Task No. Principal Rate $350.00 Pro'oct l Mana or 9 $330.00 ` 'or'nou Pro"oct 7 En Ineor g $275.00 ! EfT S230.00 Expense Total Total Labor SubconsuRant Travel Task Sub Admin Cost Exponso MWBE Non-MWBE Markup Reproduction! Cost Total 5135.00 Foos l Permitting 1.0 IDesign Management 25 3501 320 140 50 $251,200 Sol Sol SO $1.500 $1,500 $252.700 rogram management 25 350 320 140 Part lu bypasschannal segment a 0 0 Dl D ran 13 ti� sCnannoi sdglnent u 0 0 01 0 Nan 14 6Sy ''h&surtonnel segment C 0l ( 01 0 I I I 5o 0 o 0 5251.2C0 $0 §o so sl,5oc s0 So so so $9, $0 r'a $o S I so 56 So S1,500 $252,700 $0 so $0 SO $0 so SD s0 s0 2,o Conceptual Design (3 % 01 o 01 DI D $0 Sol §0 $o so $0 $0 Program Management Part 10 6�2SS hannel segment B ran 1a dybassunannol adljmant u Part14 dypasschannelsagmontC 1 ol ol o of 0 DI D D o D1 0 0 I I 0 0 0 0 Dl 0 of 0 I $0 s0 $0 $0 50 7--;6- Sol $$0 $01 SD I so 50 $0 SD $0 $C $0 so so s0 s0 3.0 lProliminary Design 60%1 0 36 43 82 5 $43,400 $20,860 $0 $2,140 $1.000 $24.000 $67.400 rogram Management o o 0 0 1Parthu eypad4L nannet segment ti of 01 0 0 lPart 13 tl�lasschannel segment D DI 361 43 !i (Part 148ybasscnannel sa�iFnontC CI of 0 0 I + D ( 5 0E$43,�400 0 So $yD $0 sc $0 6 §Dl S01 so 520,66o1 $01 S2,140 SlAO Sol Sol $D Sb I I so so $o $0 $24,000 S67.400 $D 50 4.0 IFinaL Design (90%and 100%) 1101 1301 100 1T0 16 $115,400 $24,010 $50,805 $7,515 $470 $82.800 $198,200 IF'rogram Management 0 IPart lLtly asst annelsegmontts I of IF 13 dy�bssGhannel sdgTtVnt i7 1 0 1Part 14 LiVl5hssohannol sditntC I 10 I I 0 0 0 0 701 2CI 501 6 01 a DI 0 Sol 80 120 10 I I I s0 Sol ol 50 $20.5101 S50,1 5J $7,0i Sol Sol Sol $3,4001 Sol $340 I I $0 1 $41C s0 $60 So $0 $41,100 $79,000 $120,100 $0 $D So $74,300 $3.800 $78,1co 5.0 181d Phase Services 10 86 125 24 10 $70,600 $19.316 S9160 $3.024 $0 $32,100 $102.703 rogram Management Part 10 6y'/pawumannel be ment tl D'art 13 dy'hllassUhannel sd arm U Part 14 bolssChannal segment C 0 I 0 0 D ol 0 ol o 241 36 81 0 0 0 01 0 62 89 161 10 I so 5o Sol SD $0 $12,536 $01 $1.264 So So $01 Sol �y0 $6.780 59,75CI S1,7601 0 I $C 50 $20,100 $13.800 $33 900 s0 $o so $50,500 $18,300 $58.800 6.0 constmletion Phase Services 0 9971 1 0191 94 28 $636,100 $57.5141 SO $5,756 $5,930 $69.200 $705,300 rogram Vainagoment 01 ol 1PartlntlypossChannolsegment tl D1 9971101S Part 13 i schannel s44lnent U C (;� Fart 14 GypassChannol tidl&ftntC ' 0 of I 0 01 941 0 of DI DI I C 2 0 0 $0 $0 $001 so $57,514 so,�$5,930 so Sol Sol So $0 Sol Sol So I so $636,101 $69,20C $7 05,3S00O §0 $o $0 $0 So $0 7.0 ROWlEasement Services ol 01 0 0 o So $0 $D So $0 So §0 rogram Management 0 0 D 0 -Part 10 tsypassUhannel soggment e I 0 0 0 0 Part 13 i UsChannel sdQTfl�ni U 0 0 0 0 Part 14 ypassGhannal Belmont C I of 0 cl 0 l I D D D C 50 So 50 so 9+D tb $01 50 Sd $0 $0 $DI $C S� SD 501 s0 I So SO so $0 $D Sol s0 $o ao SO s0 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FW WTR Official Release Data: 8.09.2012 2121t2023 Completed Percent Amount Complete Page 1 of 2 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for FWCC Sum City Project No. 00969 Task No. Task Description Nato Principal $350.00 Labor(hoursl ProJoct Manager $330.00 Project Engineer $275.00 EIT 3230.00 Admin $135.00 Total Labor Cost Expanse Subcunsultant I Travel I MWSE 1 Non-MWBE Markup Reproduction! 1 Permitting Total Expense Cost Task Sub Total AO Survey and SUE Services 0 01 0 ol 0 s0 Sol Sol So $0 $0 so rogram Management q Part 10 tjypassGhannvl segment B 0 Part 13 t A-SSGhannel segment U 0 Part 14 6YOSSsunannol Sdjlrent G 0 D D 0 D 0 0 C 0 0 o d of of 0 0 I I $0 50 SO SD SO $D $D 50 y$y,0 so g{y0 S01 5d $01 Sbl $01 $0 I I I SO $O SO 5p §0 $o SD so $o SD $0 9.0 Permitting 0 151 25 15 0 $15,300 EO 522,016 $2,284 $0 $24.300 $39,600 Program Management 0 Part 1U uypassurannel Segment tl Dl Pan 13 byp5S5Ghannel Sde)Ment U 01 Part 1a Sy�1'j� unannel Segment c 0 D 0 0 o 0 0 Ol D of ql 01 0 151 25 151 0 SO 5p {o 5o N $01 5bI S01 SO $0 Sol $0 5o $01 $22,0161 $2.284 So so SD $0 $D SO $0 $0 So $15.300 $24,300 $39.600 11.9 evolapment Assstance 0 15 10 Si 8 $10,o00 50 SO $0 $500 $500 $17500 ovelopmont Assistance 0 15 10 5 8 510,000 SO SO 50 $500 $500 $10,500 16.0 iPanthar Island Ravisioning 1 0 60 301 50 3 $40,000 Sol So §o $2.000 $2,000 S42,000 anthor s and ovinon ng D 60 30 50 3 $40,000 $0 $q $0 S2,000 S2,000 $42,000 Subtowl 351 1689 16721 5801 120 $1,182,000 $121:70ul $82.581 J $20.7-191 511,400 $23s,aaq 51,418,400 2012023 Completed Percent Amount Complete I I I Totals: 51,318,400 50.00 0.0 I aler Line F0Re iA9 I 23% I werOnoFoo[[ago 16,i95 77% I�1900 18,0e5 100% (A) Total Fee $1,418,400 (B) Survey Fee $D (C) Total Fo0 f-) survaip Foe $1d418,400 1 Water Fad (23 , 8f C) Sewer Fee (77% 9f C) �424,460,00 I $1,093,940_f1G Project S mqM, PM S305,200 Doscrr�ly� DQg,IVn Total F(tJP Water Sewer I I �jD I S324,460,00 l $1,093.940,00 $1,418,d00.00 I ,8�t(p ours 4 096 Totai Labof $ ,]82,000 Total E:r( so W6 MWBE� $1�� � � Part 1D Pan 13 Part 14 Sum $859.300 $67,400 S186,500 $1A18,4D0 Non-MQ,H , $12.5 M0V8c Pocipation 8.6% City of Fart Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacoment FWWTR Official Rofease Data: 8.09.2012 Page 2 of EXHIBIT B-2 Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Design Services for FWCC Program Management City Project No. 00969 Wy9rlhoursl - P:eeese Task Description Task No. Principal Rate $350.00 Project Manager g $330.00 Project Engineer SVS.00 EIT $230.00 Total Labor Subconsultant Travel! Total Task Sub Admin Cost Expense MWBE Non-MWBE Markup Reproduction 1 Cost Total $135.00 Fees I Pomnitting 1.0 l0esign Management 1 251 350 320 1401 50 52511200 $0 $0 so $1,500 $1.500 $252.700 1.1 �esign Management 25 350 320 140 50 1.2 ommunicahons and Reporting I 12.1 Pre-besign L^oordination Meeting 12.2 Monthly Design Coordination Meetings I 1.2.3 Prepare Baseline Schedule I Prepare Monthly Progress Reports With 1.2.4 Schedule I 12.5 Prepare Monthly MBFJSBE Reports Invoicing 1.2.7 Permitting Coorddloaon $251,200 $1.500 I I I I I I J I $1.500 s252.700 so s0 §0 50 $0 $0 $0 so So $D so $0 so SO $0 so S 0 sosSO12.6 so so $0 2.0 conceptual Design ( 0%) 0 Of 0 0 0 $0 Sol SO $O $0 SD $0 $0 $0 so TO Preliminary Design (60%) 01 Ol Ol 0 0 $0 Sol $0 $0 SO so $0 SO $0 $O aD Final Dosign (90% and 10 % 0 D j Ol 0 0 $0 Sol so $D $0 So $0 §0 $D $0 5.0 Bid Phase Services 0 Ol Oj 0 0 so Sol $0 50 So So $6 $0 s0 So 6.0 Construction Phase Servicws 0 Oj oj Oj 0 $0 SO SO SO $0 $0 SD s0 s0 s0 7,0 R W! sment Services 0 Ol 0 0 0 $0 Sol so SO s0 so $o $o so sD 8.0 Survey and SUE Services ol 0 0 0 o so Sol so sc $0 $0 s0 sD so $0 go Permitting o 0 0 Oi 0 Sol so $D $0 $0 so so so so s0 11.0 Developmont Assistanco 0 15 10 5 8 $10,0001 $o So $0 $500 $500 $10,500 ovelopmont Assistance 15 101 5 8 570,000 5500 $SOD $10.500 16.0 Panther Island Rovisioning 0 60 30 SO 3 54D,ODD SO SO $0 §2,000 S2,0o0 542.000 anther Island evimonin9 60 30 50 3 W. 00 $2,000 §2,00D S42,o00 Sub -WWI 25 350 3201 140 50 $251.200 50 §0 50 51,500 51,SD0 5305,200 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FVVVVTR Official Release Date: 6.09.2D12 2/2112023 Completed Percent Amount Complete T Totals: 1 $305, 1 $0.00 0.00% Page 1 of 2 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for FWCC Program Management City Project No. 00969 I Labor (hours) Exponso Task Doscription Task No. Project Project Total Labor Principal EIT Atlmin Subconsultant Travel I Total I Task Sub Manager Engineer Cost Ro roduction/ Cow° MWBE Non-MWBE Markup Total care $350.00 $330.00 $275.00 $230.00 $135.00 I I I Foos l Permitting J Water Line Footage 1001 50% Sewer Line Footage 1001 50% 200 100% (A) Total Foe 5305,200 (B) Survey Fee $0 (C) Total Foe (-) sunray Foe $305,200 Water Fee (50% of C) I Sewer Fee (50% of C) Projoct Summary $152,600.00 5152,600.00 I Total Hours j Sas Total Labor 1 $251,200 1 DescdPticn WP Water. Sewer I Total �i�Denso I $1.500 DesiGn 30 $152.60000 5752.600.00 I MWBE Subconsu0antl $0 1 Total $305. 00.00 Non-MWBE Subconsultantl $0 MWBE Participation 0.0% City of Fart Worth. Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Cffiaal Release Date: 8.09.2012 22112023 Completed I Percent Amount Complete Page 2 of 2 EXHIBIT B-2 Level of Effort Spreadsheet TASK(HOUR BREAKDOWN Design Services for FWCC Part 10 Bypass Channel Segment A Water and Sanitary Sewer Relocations City Project No. 00969 Labor(hourl) Expense Task No, Task Description Kate Principal $350.00 Project Manager $330.00 I Projoct Enginoor $275.00 EIT $230.00 Ad $135.00 Total Labor Total Cost Subconsultant MWBE Non-MWBE Markup I Travel f Reproduction! l FoosPermittin 9 Total Expense Cost Task Sub Total 1.0 Design Management 0 0 0 0 0 Sol So $0 so SO $0 $5 Not included to Amendment No. 8 SO $0 $0 2.0 Conceptual Design (30%) 0 0 0 0 0 so! so $0 SO SO So SO Not included in Amendment No. ti Sol SD S0 3.0 Preliminary Design 160%) 10 01 01 0 0 $0 $0 $0 $O $0 $0 $0 Not included in Amendment No, so s0 s0 4.0 iFinal Design (0% and 100%) 0 701 201 50 6 541.10o $20,610 $50,805 $7,175 5410 $79,000 $120.100 4.1 4.1 4.2 l'inal Dostgn Kevisions Revise Final (1 DA) Plans and Project Manual e(� Q I ov ; Final (100%) Plans and Project Manual (Section 10 I 50 10 10I 2CI I I 301 10 10 4 1 1 S29,500 $1701 $12,2o01 $8.2401 $50,8051 $5,115 I $1,220 I S840 $410 $56.500 $86.005 $5,800 $13,420 $79,220 $5.500 $9,080 $14.880 5.0 Bid Phase Services 0 24 361 8 0 $20,100 $12,536 SO $1,264 $ $13,800 $33.902 5.1 RoSid Support- Section I 5.1.1 I Upload Itlans to BIM 360 I 5.1.2 I7I1 Print Hardcopies AI 5.1,3 I Maintain Plan holders List 5.1.4 + knswaTIResponcl to Bidding Questions I 5,1.5 I `ssud Addenda I 5.1 6 Prepare for and Attend Pro -Bid Meeting I 5.1.6,1 Tabuleto bids and review I 5.1.7 1 RecommondQoforonces 5.1A I Precertification Requirern 52 [Final Design Drawings 5.1 RoSid Support -Suction ll 5.1.1 I i)plcad Plans to BIM 360 I 5.1.2 I Print Hordmpies t6) 5.1.3 Maintain Plan honors List I 5.1.4 Answer/Respond to Bidding Questions 1 5,1.5 Issue Addenda 1 5.1.6 Prepare for and Attend Pro -Bid Meeting 1 5.1.6.1 1 Tabulate bids and review I 5.1.7 I RecommondlReferencos I 5.1.8 I Precertification Requirements I 5.2 IFinal Design Drawings 1 I I + I I I 1 I 1 I i 1 1 1 I 1 I 1 21 I I f I 1 21 I 1 21 41 21 1 I I 21 4 8I I 4 4 1 41 81 1 1 I 41 I I I 41 I 1 1 I 1 1 I 1 I 4I SO S6,400 I 52.4001 1 I 1 I I $3,7371 1 1 I 1 I I 1 ' I I I) I I I $7, I $2401 I I I $3831 1 I I I I 1 I 1 I1 1 $7,040 $7.040 $0 So $0 SD $2,640 $2.640 $0 SO s0 S1,800 So 31.806 $3.600 $D $ $700 $700 57so SO $0 $2,500 NOD S2.500 $0 So $2,7001 so S2,700 SO SO SO $0 $4.120 S4, 120 SO $0 so $0 $0 s0 $0 $0 $0 $1.800 $0 $1,800 $3.600 $0 $3.600 $700 $0 $700 $0 S0 s0 So 30 So SO 32,700 SD $2,700 City of Fort Worth, Texas Attachment B - Lovel of Effort Supplement Typical Water and Sewer Replacement FWW1R Official Release Date: 8.09.2012 212112023 Completed Porcont Amount Complete Page 1 of 3 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for FWCC Part 10 Bypass Channel Segment A Water and Sanitary Sewer Relocations City Project No. 00969 Labor(houl,:) Expense Task Description Task No. Principal Kate $350.00 Project Manager 9 $330.00 Project Engineer EIT 9 $275.00 $230.06 Total Total Labor Subcpnsukanf Trawl! Task Sub Admin Cost Expense MWBE Nan-MWBE Markup j Reproduction Cost Total $135.00 Foes 1 Permitting 6.0 lCon5truction Phase Services 0 997 1o19 94 26 $636.100 $57,514 $0 $5,756 $5.930 $69.200 $705.300 6.1 Constructriton Support - Section 1 Attend F'reconstruction Conference 2 2 Attend Public Meetm9 2 2 F46k �6 exhibits �q 1 1 21 P'&CCK Meeting 4 4 I Uri-s� s6'Ufflirvabons JZJmonOt! I 4E 40 I Prbj(633N66hd(1S(1.StfY!lAt�,AmtglmoJ j 60' 60 1 20 Shop Drawing Review (50) 1 5 50 Ql 1 Review Materials Testing Reports 1 1E 10 20 RFIs (41 1 8' 10� 16 Changearders (2) 1 61 121 16 Final aIkthroug 1 41 41 1 Puna List I 1 11 41 Follow Up Walkthrough 1 21 21 RPR Coordination 1 4801 41111 6.2 Record Drawings - Section I I I Revisions 1 41 61 6 Deliverables I I I 2 I I I I 5.1 Construction Support - Section If I I 1 I Attend Precdnstruction Conference 1 21 21 Attend Public Meotng 1 21 21 1 Pro -Con Meeting 1 41 41 1 On-Sito Observations 2lmomh 4 months 1 1 161 161 Progress Mootings (1. r�mfg, mtglmo) 1 1 241 24I I 8 Shop Drawing Review (15) I 1 151 15 1 Roview Materials Testing Reports 1 1 41 4 el RFIs (2) 1 41 5 81 Change brders(1) 1 3I 6 81 Final Walkthrough 1 4 4 1 1 Puncn List 1 I 2 I Follow Up Walkthrough I 1+ 2 IRPR Coordination + 2401 240 6.2 }iecerd Drawings- Section II I I I Revisions I 21 a al Delivemblos 1 I 1 21 Casement Preparation vacabons 1 21 21 21 $0 $35,315 53,535 I I ' I I I I I I 1 1 I I I I I I 1 $3.600 I I I $1,500 1 $150 I S17,699I I + $1,771 I 1 I I 1 I I I I 1 I I I I 1 $1.800 I I + 1 1 $530 $3,0001 $3001 $38,1150 538,85E S1,30C Sc 51,300 $1,300 $1.100 50 51,30E S1,100 $2,500 524,20E $2.SEC $39.000 $0 $39.000 $30,300 $30,30E $30,3D0 570,70E so S10.700 59,1017 5o 59,10E $9.0c01 $0 S9,000 $2,500 $0 32,500 S1,500 so $1,500 $1.300 So $1,300 $290,400 $3.500 5294.00E $D 50 SO S4,400 $D S4,400 $500 $1.650 S2,150 50 $79,47E $19.47E $1 300 so $1,300 51,30E $0 $1,30D $2.500 52.50E S9,700 S9,700 $15,600 515,60E $9.100 SO 59,10E S4,300 so S4,300 $4.600 $C S4,600 $4.500 50 $4.505 S2,500 So $2,500 SEE SO $600 $900 $0 $900 S145,200 $1,800 5147,000 so $0 s2.700 so $2.700. $500 S530 $1,030 51,70E 53,30E $5,000 7.0 OWl asomeM rvices 0 0 0 0 0 $0 s0 $0 $O $O $O $O Not Included in Amendment No. 5 $C $0 $E 8.0 Surwy and SUE Sorvicos 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 Not incuded in Amendment NO, 5 $0 $0 $0 9.0 Permitting 0 0 0 0 0 $0 $0 $0 SO $0 $0 $0 of Included in Amendment o. 50 $0 SE bt 0 1091 7075 152 34 5697,30E $90,66E $50,805 $74,195 56,34E 5162,00E 2659,30E City of Fort Worth, Toxas Attachment 5 - Level of Effort Supplement Typical Water and Sewer Replacement FW WTR Official Release Dale: 8.09.2012 =112023 Comploted Percent Amount Complete Tietels: I 5859,30E1 $0.001 0.00% Page 2 of 3 Task No. EXHIBIT B-2 Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Design Services for FWCC Part 10 Bypass Channel Segment A Water and Sanitary Sewer Relocations City Project No. 00969 Labor (hours) I Exponso 1 Task Description Principal EIT Admin TotaloLaber Total I, T ask b manager EnB Hoar I1I MWBE I Non MW ESubconsuftant Mzrkup Re roductiors 1 ExCosn't ° Total �� $350.00 $330.00 $275.001 $230A 1 $135.001 1 oos 1 Permitting 1 I Water Line Footage 1,9001 29% 1 Sewer Line Footage 4,500 71% I 6SW 100% (A) Total Foo $859,300 (B) Survey Faa s0 (C) Total FOG (-) survey Foe $859,300 1 Water Fee (20 % of C) Sower Foe (801/6 of C) $171,860M $887,440.00 I Project Summary Total Hours! 2,352 DesaiPtien WP Water Sower I Total Labor! $697,300 Desipn 30 $171.860.00 5687,440.00 I Total Expense S162.000 Total I $859, ,00 I MWBE SubconsultantJ S90.660 Non-MWBE Subconsultan(I $50.805 MWBE Participation! 10.61/6 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FW WTR Official Release Date: 8.09.2012 Completed Amount M112023 Percent Complete Page 3 of 3 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for FWCC Part 14 Bypass Channel Segment C Sanitary Sewer Relocations City Project No. 00969 Labor (hout,.,) Expense Task Description Task No. Principal Rate $350.00 Project Manager 9 $330.00 Project Engineer EIT 9 $275.00 $230.00 Total Labor Subconsukant Admin Cost MWBE Nan-MWBE Markup $135.00 Trawl! Total Task Sub Expense Reproduction Cost Total Fees ) Permitting 1,0 Design Management 0 0 0 0 0 so $0 $0 $D $0 $0 $0 1.1 Not included in Amendment NC. 8 $p $o $D 2.0 Conceptual Design (30%) D 0 0 0 0 $o $0 $9 so So So $5 2.1 Not mGuded in Amarament No. d so SO SO 3,0 Preliminary O*xign (60%) 0 0 0 0 0 $0 $0 $0 $0 $0 $0 SO 3.1 Not included in Amendment No. 8 Sp so 50 4.0 Final Design (90% and 100%) 10 601 90 120 10 $74,300 S3,4p0 $0 $340 $60 33,800 $78,100 4.1 ina esign avisions 10 601 Sol 120 10 S74,300 S3,4001 1 S340 $hp $3.800 $78,100 5,0 Bid phase services Iol 62 89 16 10 $50,500 $6,780T $9,760 $1,760 s0 $18.300 $66,305 5.1 Bid Support 5.1.1 Upload Plans to BIM 360 I 21 1 5.1.2 P rit Hardcopies (6) I I 21 1 5.1.3 Maintain Plan holders List I 1 11 5 5.1.4 AnswerlRespond to Bidding Ouos6ons 1 6 101 5.1.5 Prodyf�li caitons 1 40 401 5.7.5 issue Atldon�a 4 41 5.1.6 Propare for and Attend Pre -Bid MeetingI1 I 4 8 5.1.6.1 Tabulate bids and roviow 1 21 4111, 5.1.7 1 RecommendrReferences 1 4 41 1 5.1.8 I PrecorGrication Requirements 2 61 1 5.2 IFinal Design Drawings 2 10 16 $p $2.1001 S3001 1 $4,680 $9.760 $1,460I + I I I 1 + I I SO Sp $600 so $606 $600 $24400 $3.000 $1.100 So $1.100 $4.800 $15.900 S24700 S24,200 So $24.200 $2.500 $o $2,5p0 53,600 S0 $3.600 S1,100 Sp $1.100 $2.500 so S2,500 $2.400 $0 S2,400 57.100 So $7,100 6.0 Construction his* Services 0 0 01 ol 0 Sol Sol S0 $0 $0 $0 so 6.1 Not included in Amendment Ne, $0 So s0 7.0 ROW/Easement Services 0 0 0 0 C $0 $01 Sol s0 $0 $0 $0 7.1 Not included in Amendment No. 8 1so SO 50 Fo Survey and SUE services 01 0 0 0 0 $0 $0 Sol So $0 $0 $0 Not me u otl in Amendment No. 8 SO SO SD 9.0 P*rmiteng 0 15 25 151 0 $15.300 $0 $22,016 $2,284 $0 $24.300 $39.600 9.1 SA 4 Permit 9.1.1 I1 exas Historical Commission Survey 1 1S 251 15 I I 1 I Sp $22,0161 S2,2841 I $o SO $15,300 $24.300 $39.600 so so so S.bt.tWI10 137 194 151 20 $140,100 310,180 431.776 $4,384 $60 $46.4001 $186.500 City of Fart Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FW WTR Official Release Date: 8.09.2012 2r212023 Completed Percent Amount Complete ToeUe: $186,500 I$0.00 0.0 Page 1 of2 EXHIBIT B-2 Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Design Services for FVVCC Part 14 Bypass Channel Segment C Sanitary Sewer Relocations City Project No. 00969 � Labor (hours) Exponso Task No, Task Description Principal Project P- oct EIT Ad min Tots{ Labor Subconsultant Total Travel ! Expense Task Sub Manager Engineer Cost MWBE Markup RoosroPormduct'it nI Cost Total iNon-MWBEI Rate $350.00 $330,0, $275.00 $230.00 $135.00 I I Water Line Footage 0 0% Sewer Lino Footage 5,795 100% 5,795 100% (A) Total Fee $186.500 (B) Survey Fee SO (C) Total Foe (-) survey Foe $1861500 Water Fee (0% of C) .1.1 Fee (100 % of C1 $0.00 S186,500.00 Project Summary Total Hours 512 Desertion I WP Water Sewer tal ToLabor S140.100 Design 30 30.00 5186,5DO.00 Total Expense S46.400 Total S186, 00.00 MWBE Subconsultantl $10.180 Non-MWBE Suboonsultant� 31, 3776 MWBE Participation 5.5% City of Fort Worth, Texas Attachment B- Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Of cal Release Date: 8.092012 2/21/2023 Completed I Percent Amount Complete Page 2 of 2 City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, June 13, 2023 LOG NAME: 60WSTRAVA8-KHA REFERENCE NO.: **M&C 23-0507 SUBJECT: (CD 2 and CD 9) Authorize Execution of Amendment No. 8 in the Amount of $1,418,400.00 to an Engineering Agreement with Kimley-Horn Associates, Inc., for Design and Easement Documents Associated with Water and Sanitary Sewer Main Relocations for the Trinity River Vision - Central City Project and the Trinity Uptown Service Area Phase 8 RECOMMENDATION: It is recommended that the City Council authorize execution of Amendment No. 8 in the amount of $1,418,400.00 to City Secretary Contract No. 37013 an engineering agreement with Kimley-Horn Associates, Inc., for the Trinity River Vision - Central City Project and the Trinity Uptown Service Area Phase 8 project for a revised contract amount of $12,431,313.00. DISCUSSION: On April 15, 2008, Mayor and Council Communication (M&C C-22765) the City Council authorized an engineering agreement in the amount of $2,533,113.00 for Water and Sanitary Sewer Main Relocations for the Trinity River Vision - Central City project and the Trinity Uptown Service Area Phase 1 — Bridge and Channel Relocations. The engineering agreement was subsequently revised by Amendment No. 1 in the amount of $1,580,000.00 (M&C C-25303, November 15, 2011) that primarily provided design services for the relocation of conflicting water and/or sanitary sewer mains for Main Street bridge and White Settlement Road bridge, Amendment No. 2 in the amount of $1,896,000.00 (M&C C-26276, May 21, 2013) that primarily provided for design services for the relocation of conflicting water and/or sanitary sewer mains for Commerce Street, Channel Segment B and Greenleaf Avenue, Amendment No. 3 in the amount of $1,736,800.00 (M&C C-26838, June 10, 2014) that primarily provided design services for the relocation of conflicting water and/or sanitary sewer mains for Gateway/Oxbow Valley Storage Site A and Channel Segments A, B, C. and D, Amendment No. 4 in the amount of $1,596,900.00 (M&C C-27628, February 16, 2016) that primarily provided construction phase services, geotechnical investigations, subsurface utility engineering, Ham Branch Sanitary Sewer Study and Panther Island Sanitary Sewer Master Plan, Amendment No. 5 in the amount of $589,800.00 (M&C C-29040, February 12, 2019) that primarily provided design services for the relocation of water and sanitary sewer mains to accommodate the United States Army Corps of Engineering Channel Segment A project and easement documents preparation, Amendment No. 6 in the amount of $556,900.00 (M&C 20-0139, March 3, 2020) that primarily provided design services for the relocation of water and sanitary sewer mains to accommodate the United States Army Corps of Engineering Channel Segment C Project and easements document preparation and Amendment No. 7 in the amount of $523,400.00 (M&C 20-0905, December 1, 2020), that primarily provided design services for the relocation of water and sanitary sewer services to accommodate the United States Army Corps of Engineering Channel Segments A and D project and additional design survey. Amendment No. 8 provides for the following: • Final design to separate the water, sanitary sewer, Grand Avenue and northern laterals into two separate bid packages • Final design of the Part 10 water and sanitary sewer project • Construction assistance services for the Part 10 project • Bidding phase services • Design to combine sanitary sewer mains M-43 and M-272B into one siphon crossing the Clear Fork Trinity River and a new siphon crossing of the Purcey Street storm drain outfall • Final design to incorporate the Part23 Channel Segment D project Additional archeological services on the project • Program Management for water and sanitary sewer relocations • Updating Fort Worth and Wester Railroad Permits Kimley-Horn and Associates, Inc., proposes to provide the necessary additional services for a fee not to exceed the amount of $1,418,400.00. Staff considers the fee to be fair and reasonable for the scope of services proposed. In addition to the amendment amount $100,000.00 (water: $30,000.00; sewer: $70,000.00) is required for project management. This project will have no impact on the Water Department's operating budget when complete. Funding for the Trinity River Vision, Phase 1 project is depicted below: Fund Existing Appropriations W&S Capital Projects - Fund $529,294.00 56002 Specially Funded Projects — Fund $5,809,127.94 39007 Water Capital - $14,404,708.40 Fund 59601 Sewer Capital Legacy- Fund $7,769,673.12 59607 Water/Sewer Bond 2016 — $6,855,400.00 Fund 56005 Water & Sewer Bond 2015A— Fund 56007 W&S Rev Bonds Series 2021 — Fund 56019 W&S Rev Bonds Series 2022 — Fund 56020 Project Total $6,167,422.45 $443,312.00 $407,022.00 $42,385,959.91 Additional Appropriations $0.00 Project Total` $529,294.00 $0.00 $5,809,127.94 $0.00II$14,404,708.40 $0.00 $7,769,673.12 $0.00 $6,855,400.00 $0.00, $6,167,422.45 $0.00 $443,312.00 $0.00 $407,022.00 $0.00 $42,385,959.91 Out of the $1,418,400.00 amendment amount $1,175,653.00 (Water: $126,350.00; Sewer $1,049,303.00) is considered Trinity River Vision (TRV)-related work, which is eligible for funding from Tax Increment Reinvestment Zone No. 9 (TRVA TIF) pursuant to the TRVA Project Plan. Having met its $26.6 million commitment to the TRV Project, the City will be reimbursed the amount of $1,175,653.00 by the Tarrant Regional Water District (TRWD) upon project completion, in accordance with the provisions of the executed lnterlocal Agreement between the City and the TRWD (City Secretary Contract No. 43425, as amended). Staff will record a receivable every month for reimbursable expenses, and the TRV Program Manager in the Planning & Data Analytics Department will be responsible for collecting the full reimbursement from TRWD upon project completion. Funding is budgeted in the Water Capital, Water/Sewer Bond 2016 and the Sewer Capital Legacy Funds for the purpose of funding the Trinity River Vision, Phase 1, as appropriated. Business Equity: Kimley-Horn and Associates, Inc., is in compliance with the City's Business Equity Ordinance by committing to eight percent MWBE participation on this project. The City's MWBE goal on this project is eight percent. This project is located in COUNCIL DISTRICTS 2 and 9. FISCAL INFORMATION 1 CERTIFICATION.: The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the Water Capital, Water/Sewer Bond 2016 and the Sewer Capital Legacy Funds for the Trinity River Vision, Phase 1 project to support the approval of the above recommendation and execution of the change order. Prior to any expenditure being incurred, the Water Department has the responsibility to validate the availability of funds. FUND IDENTIFIERS (FIDs).: TO Fund Department ccount Project Program) ctivity Budget Reference # l mount ID I ID Year (Chartfield 2) FROM Fund) Department Account Project Programs ctivlty Budget Reference # mount ID I ID I Year (Chartfield 2) CERTIFICATIONS: Submitted for City Manager's Office bye Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Liam Conlon (6824) ATTACHMENTS 1. 60WSTRAVA8-KHA 1295 Form.Ddf (CFW Internal) 2. 60WSTRAVA8-KHA Compliance Memo.i,)df (CFW Internal) 3. 60WSTRAVA8-KHA FID Table (WCF 05.01.23) U.xlsx (CFW Internal) 4. 60WSTRAVAB-KHA MAP.r)df (Public) 5. 60WSTRAVA8-KHA.docx (CFW Internal) 6. Entitvinformation- KHA.ndf (CFW Internal) 7. PBS CPN C00969 v2.pdf (CFW Internal) 60WSTRAVA8-KHA PID Table 2 59607 I 0700430 5110101 I C00969 I C01785 9999 $70,000.00 Staff Costs - Inspection Current Approp 1 56005 0700430 I 5740010 I C00969 I C01780 9999 I $1,093,940.00 To pay consultant 2 56002 I I 2060000 I C00969 I CRETAN I Combo Code