Loading...
HomeMy WebLinkAboutContract 51712-FP1FORT WORTH. -FP1 City Secretary Contract No. 51712 Date Received 06/29/2023 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Calloway Cemetery Road THE Railroad Crossing City Project No.: 101442 Improvement Type(s): x❑ Paving Original Contract Price: Amount of Approved Change Order(s): Revised Contract Amount: Total Cost of Work Complete: Contractor V.P. of Field Operations Title Rebcon Inc. Company Name 16— charleshaves (Jun 7 02313:34 CDT) Project Inspector Bfi`�AE MLtf^AIt" eoree} arauez (Jun 2�, 202313:57 CDT) Project Manager 71 OwDa a Owen(Jun 29. 202314:26CDT) CFA Manager A. — Lauren Prieur Oun 29. 202315:03 CDT) TPW Director 1Niuiam Inhncnn lli 79 7n7316 lgr[M Asst. City Manager ❑x Drainage x❑ Street Lights ❑ Traffic Signals $1,166, 562.50 $256,274.43 $1,422,836.93 $1,422,836.93 Jun 29, 2023 Date Jun 29, 2023 Date J u n 29, 2023 Date Jun 29, 2023 Date J u n 29, 2023 Date Jun 29, 2023 Date OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 of 2 Notice of Project Completion Project Name: Calloway Cemetery Road THE Railroad Crossing City Project No.: 101442 City's Attachments Final Pay Estimate x❑ Change Order(s): ❑x Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time 130 WD Days Charged: 279 Work Start Date: 4/18/2022 Work Complete Date 6/21/2023 Completed number of Soil Lab Test: 0 Completed number of Water Test: 0 Page 2of2 FORT WORT 11 CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name CALLOWAY CEMETERY RD THE RAILROAD CROSSING Contract Limits Project Type STORM DRAIN & PAVING City Project Numbers 101442 DOE Number 1442 Estimate Number I Payment Number 1 For Period Ending 6/26/2023 WD City Secretary Contract Number Contract Time 13WD Contract Date Days Charged to Date 279 Project Manager NA Contract is 100.00 Complete Contractor REBCON, INC. 1868 W. NORTHWEST HWY DALLAS, TX 75220 Inspectors OWEN / C. Hayes Tuesday, June 27, 2023 Page 1 of 6 City Project Numbers 101442 Contract Name CALLOWAY CEMETERY RD THE RAILROAD CROSSING Contract Limits Project Type STORM DRAIN & PAVING Project Funding STORM DRAIN Item Description of Items No. 1 REMOVE RIP RAP 2 REMOVE 30" STORM LINE 3 30" STORM ABANDONMENT PLUG 4 REMOVE HEADWALL/SET 5 MEDIUM STONE RIPRAP 6 TRENCH SAFETY 7 21" RCP 8 24" RCP 9 24" RCP, CLASS V (CO #1) 10 36" RCP (CO 91) 11 36" RCP 12 4' STORM JUNCTION BOX 13 21" SET, 1 PIPE 14 10' CURB INLET 15 4' DROP INLET 16 CONCRETE ENCASEMENT FOR UTILITY PIPES 17 CONCRETE FLUME 18 30" STEEL PIPE (CO #1) 19 BORE FOR 30" STEEL PIPE (CO #1) 20 18" RCP, CLASS V (CO #1) 21 36" STEEL PIPE (CO #1) 22 BORE FOR 36" STEEL PIPE (CO #1) 23 CONSTRUCTION MATERIAL & LABOR INCREASE (CO #1) DOE Number 1442 Estimate Number I Payment Number 1 For Period Ending 6/26/2023 Estimated Unit Unit Cost Estimated Completed Completed Quanity Total Quanity Total 1800 SF $5.00 $9,000.00 1800 $9,000.00 56 LF $51.00 $2,856.00 56 $2,856.00 1 EA $1,270.00 $1,270.00 1 $1,270.00 1 EA $1,815.00 $1,815.00 1 $1,815.00 70 SY $94.00 $6,580.00 70 $6,580.00 352 LF $14.00 $4,928.00 352 $4,928.00 77 LF $146.00 $11,242.00 77 $11,242.00 47 LF $148.00 $6,956.00 47 $6,956.00 92 LF $161.00 $14,812.00 92 $14,812.00 0 LF $215.00 $0.00 0 $0.00 80 LF $313.00 $25,040.00 80 $25,040.00 l EA $5,390.00 $5,390.00 1 $5,390.00 1 EA $1,870.00 $1,870.00 1 $1,870.00 2 EA $5,115.00 $10,230.00 2 $10,230.00 3 EA $5,720.00 $17,160.00 3 $17,160.00 11.8 CY $385.00 $4,543.00 11.8 $4,543.00 7 SY $495.00 $3,465.00 7 $3,465.00 0 LF $117.00 $0.00 0 $0.00 0 LF $721.00 $0.00 0 $0.00 34 LF $169.40 $5,759.60 34 $5,759.60 104 LF $158.00 $16,432.00 104 $16,432.00 104 LF $770.00 $80,080.00 104 $80,080.00 1 LS $22,185.29 $22,185.29 1 $22,185.29 Sub -Total of Previous Unit $251,613.89 $251,613.89 PAVING Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 RAILROAD COORDINATION 1 LS $25,000.00 $25,000.00 1 $25,000.00 2 RAILROAD FLAGMEN (CO #2) 45 WD $1,100.00 $49,500.00 45 $49,500.00 Tuesday, June 27, 2023 Page 2 of 6 City Project Numbers 101442 DOE Number 1442 Contract Name CALLOWAY CEMETERY RD THE RAILROAD CROSSING Estimate Number I Contract Limits Payment Number 1 Project Type STORM DRAIN & PAVING For Period Ending 6/26/2023 Project Funding 3 MOBILIZATION 1 LS $81,000.00 $81,000.00 1 $81,000.00 4 REMOVE CONCRETE DRIVE 810 SF $2.50 $2,025.00 810 $2,025.00 5 REMOVE ASPHALT DRIVE 880 SF $2.50 $2,200.00 880 $2,200.00 6 REMOVE FENCE 524 LF $10.00 $5,240.00 524 $5,240.00 7 REMOVE ASPHALT PVMT 3721 SY $17.00 $63,257.00 3721 $63,257.00 8 12"-18" TREE REMOVAL 2 EA $1,250.00 $2,500.00 2 $2,500.00 9 UNCLASSIFIED EXCAVATION BY PLAN (CO 241 CY $30.00 $7,230.00 241 $7,230.00 #1) (CO #2) 10 EMBANKMENT BY PLAN 1028 CY $64.00 $65,792.00 1028 $65,792.00 11 SWPPP 1 LS $26,000.00 $26,000.00 1 $26,000.00 12 6" FLEXIBLE BASE TYPE A GR-2 (CO #1) 428 SY $22.00 $9,416.00 428 $9,416.00 13 CEMENT 35 TN $242.00 $8,470.00 35 $8,470.00 14 8" CEMENT TREATMENT 2557 SY $21.00 $53,697.00 2557 $53,697.00 15 2" ASPHALT PVMT TYPE C (CO #2) 338.18 SY $26.00 $8,792.68 338.18 $8,792.68 16 7" ASPHALT BASE TYPE B (CO #2) 338.18 SY $68.00 $22,996.24 338.18 $22,996.24 17 9" CONC PVMT 2105 SY $119.00 $250,495.00 2105 $250,495.00 18 6" CONCRETE DRIVEWAY 5222 SF $12.00 $62,664.00 5222 $62,664.00 19 4" SLD PVMT MARKING HAS 1550 LF $1.20 $1,860.00 1550 $1,860.00 20 24" SLD PVMT MARKING HAE 90 LF $7.00 $630.00 90 $630.00 21 LANE LEGEND RR 2 EA $1,045.00 $2,090.00 2 $2,090.00 22 REFL RAISED MARKER 22 EA $5.50 $121.00 22 $121.00 23 6' CHAIN LINK STEEL (CO #2) 0 LF $33.00 $0.00 0 $0.00 24 20' GATE STEEL (CO #2) 0 EA $4,950.00 $0.00 0 $0.00 25 TOPSOIL 290 CY $76.00 $22,040.00 290 $22,040.00 26 BLOCK SOD PLACEMENT 1066 SY $6.00 $6,396.00 1066 $6,396.00 27 SEEDING HYDROMULCH 3835 SY $2.10 $8,053.50 3835 $8,053.50 28 FURNISH/INSTALL ALUM SIGN GROUND 10 EA $891.00 $8,910.00 10 $8,910.00 MOUNT CITY STD 29 TRAFFIC CONTROL (CO #2) 14 MO $10,000.00 $140,000.00 14 $140,000.00 30 VALVE BOX ADJUSTMENT 2 EA $231.00 $462.00 2 $462.00 31 MANHOLE ADJUSTMENT, MAJOR W/COVER 2 EA $1,612.00 $3,224.00 2 $3,224.00 32 REMOVE CONCRETE TRAFFIC RAIL 300 LF $34.00 $10,200.00 300 $10,200.00 33 REMOVE STEEL BOLLARD 9 EA $200.00 $1,800.00 9 $1,800.00 34 TEMPORARY 6" FLEXIBLE BASE TYPE A GR-2 355 SY $32.00 $11,360.00 355 $11,360.00 35 CONCRETE STREET HEADER 130 LF $15.00 $1,950.00 130 $1,950.00 Tuesday, June 27, 2023 Page 3 of 6 City Project Numbers 101442 Contract Name CALLOWAY CEMETERY RD THE RAILROAD CROSSING Contract Limits Project Type STORM DRAIN & PAVING Project Funding 36 30' GATE, STEEL (CO #2) 37 8" FLEXIBLE BASE TYPE A GR-1 (CO #1) 38 3" ASPHALT PVMT TYPE D (CO #1) 39 6" ASPHALT BASE TYPE B (CO #1) 40 CONSTRUCTION MATERIAL & LABOR INCREASE (CO #1) DOE Number 1442 Estimate Number I Payment Number 1 For Period Ending 6/26/2023 0 EA $6,050.00 $0.00 0 $0.00 304 SY $26.00 $7,904.00 304 $7,904.00 304 SY $28.00 $8,512.00 304 $8,512.00 304 SY $55.00 $16,720.00 304 $16,720.00 1 LS S101,811.04 $101,811.04 1 $101,811.04 Sub -Total of Previous Unit $1,100,318.46 $1,100,318.46 - - - - - - - - - - - - - - - - - - - ST LIGHT Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 1 FURNISH/INSTALL ELEC SERV POLE MNT 2 EA $7,700.00 $15,400.00 2 $15,400.00 2 2"CONDT PVC SCH 80 450 LF $18.00 $8,100.00 450 $8,100.00 3 NO 10INSUALTED ELEC CONDR 1425 LF $1.00 $1,425.00 1425 $1,425.00 4 GROUND BOX TYPE B W/APRON 3 EA $935.00 $2,805.00 3 $2,805.00 5 INSTALL TYPR 33B ARM 4 EA $369.00 $1,476.00 4 $1,476.00 6 LED LIGHTING FIXTURE 4 EA $715.00 $2,860.00 4 $2,860.00 7 RDWY ILLUM FOUNDATION 4 EA $1,265.00 $5,060.00 4 $5,060.00 8 CONTACT ENCLOSURE, PAD MOUNT 2 EA $7,700.00 $15,400.00 2 $15,400.00 9 RDWY ILLUM TY 8 POLE 4 EA $1,969.00 $7,876.00 4 $7,876.00 10 CONSTRUCTION MATERIAL & LABOR 1 LS $6,770.83 $6,770.83 1 $6,770.83 INCREASE (CO #1) 11 REMOVE EXISTING STREETLIGHT (CO #2) 1 EA $3,731.75 $3,731.75 1 $3,731.75 -------------------------------------- Sub -Total of Previous Unit $70,904.58 $70,904.58 Tuesday, June 27, 2023 Page 4 of 6 City Project Numbers 101442 Contract Name CALLOWAY CEMETERY RD THE RAILROAD CROSSING Contract Limits Project Type STORM DRAIN & PAVING Project Funding Contract Information Summary Original Contract Amount Change Orders Change Order Number Al Change Order Number Al Change Order Number Al Change Order Number A2 Change Order Number A2 DOE Number 1442 Estimate Number 1 Payment Number 1 For Period Ending 6/26/2023 $1,166,562.50 $53,700.89 $131,049.04 $6,770.83 $61,021.92 $3,731.75 Total Contract Price $1,422,836.93 Total Cost of Work Completed $1,422,836.93 Less % Retained $0.00 Net Earned $1,422,836.93 Earned This Period $1,422,836.93 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $1,422,836.93 Tuesday, June 27, 2023 Page 5 of 6 City Project Numbers 101442 Contract Name CALLOWAY CEMETERY RD THE RAILROAD CROSSING Contract Limits Project Type STORM DRAIN & PAVING Project Funding Project Manager NA Inspectors OWEN / C. Hayes Contractor REBCON, INC. 1868 W. NORTHWEST HWY DALLAS , TX 75220 Line Fund Account Center DOE Number 1442 Estimate Number 1 Payment Number 1 For Period Ending 6/26/2023 City Secretary Contract Number Contract Date Contract Time 130 WD Days Charged to Date 279 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Amount Gross Retainage Net Funded Total Cost of Work Completed $1,422,836.93 Less % Retained $0.00 Net Earned $1,422,836.93 Earned This Period $1,422,836.93 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $1,422,836.93 Tuesday, June 27, 2023 Page 6 of 6 PROJECT NAME: CONTRACT: CFA # CITY PROJECT # DOE # WATER PROJECT # SEWER PROJECT # FILE # INSPECTOR: PROJECT MANAGER: ORIGINAL CONTRACT EXTRAS TO DATE CREDITS TO DATE CONTRACT TO DATE AMOUNT OF PROP. CHANGE ORDER REVISED CONTRACT AMOUNT TOTAL REVISED CONTRACT AMOUNT PER UNIT REVISED COST SHARE TOTAL REVISED CONTRACT Revised: 10-12-2011 DEVELOPER -AWARDED -PROJECT CHANGE ORDER Calloway Cemetery Road THE Railroad Crossing 51712-A1 2018-028 CITY PARTICIPATION: NO 101442 N/A N/A N/A K-2587 APPROVED By George Marqeuez, P.E. at 5:22 pm, Jun 16, 2023 CHANGE ORDER No: Al Aaron Ybarra Phone No: (817) 392-8306 George Marquez Phone No: (817) 392-6826 CONTRACT UNIT WATER SEWER PAVING DRAINAGE STREET LIGHTS CONTRACT Developer �a �� Developer =, .Developer,";Developer DAYS Cost Cost 2C1 eveloper Cost Cost CI Cost Cost CII Cost $0.00 i0 00�� �� $0.00 4j0 fi _ $908,247.50 0 OOm �" E197,913.00 �F SO 00 $60,402.00 SO 00 130 $o.00 so 00 $o.00 �v�, So-y� $0.00 oo r saao ;o 0o So.00 �� o $0.00 4.1 $ so 00 $0.00 j0 00 $0.00 j0 00 , $0.00 �0 00 3 $0.00 0 $0.00 xi j0 005"1I11,1K $0.00 v;m l $908,247.50 f0 O yi $197,913.00 J SO 00 $60,402.00 130 $0.00 0 00 $0.00 s0 00i - u # r r r V0 �r i $131,049.04 fd OQ $53,700.89 f0 00 56,77D.83 z j0 00 12 �n�ttDCT�'i C�. ytlWYpgq'i�l^;'y $0.00 1)il �j,0 00w `t $0.00 f0 00a $1,039,296.54 1, fO.OQ ., , ` $251,613.89 7f04.0,Owl �kA�a E67,172.83 t0:0 142 $0.00 $0.00 $1,039,296.54 $251,613.89 $67,172.83 Dev. Cost $1,358,083.26 Clty Coat r 5* SU 00 s n $1,358,083.26 Page 1 es in the ntract You are directed 10 make the following I Cl; BID ITEM�QUANTITY Tents I I UNIT PRICE I TOTAL PAY ITEM # # IUNIT ITEM DESCRIPTION DRAINAGE 9 3341.0207 92 -30 LF 24" RCP, Class V $ 161.00 $ 14,68i2.00 $ (4,830.00) 49 3344 9399 d -26 SY V' F'vftIt Ya. e A GR $ 245.00 _2 $ (5,590.00) 4-9 8889.9992 -, _72 LP _ $ (8,424.00) Dacia341.0105 a _72 Rare feF33{�^�8 � $ (51,912.00) 20 20 39999 3341.0105 34 LF LF 18" RCP, lass 169.40 $ 5,759.60 21 9999.0009 104 LF 36" Steel Pipe $ 158.00 $ 16,432.00 22 9999.0010 104 LF Bore for 36" Steel Pipe $ 770.00 $ 80,080.00 23 9999.0011 1 LS Construction Material & Labor Increase $ 22,185.29 $ 22,185.29 TOTAL $139.28885 $ 53,700.89 PAVING 9 3123.0101 J-92 93 CY Unclassified Excavation by Plan $ 30.00 $ 5,', 60.0U $ 2,790.00 12 3211.0122 420-304 SY 6" Flexible Base Type A GR-2 $ 22.00 S 941-&. $ (6,688.00) 37 3211.0113 304 SY 8" Flexible Base Ty e A GR-1 $ 26.00 $ 7,904.00 38 3212.0303 304 SY 3" Asphalt Pvmt�ype D $ 28.00 $ 8,512.00 39 3212.0503 304 SY 6" Asp`halt Base Ty ve B $ 55.00 $ 16,720.00 40 9999.0012 1 LS Construction Material & Labor Increase $ 101,811,04 $101,811.04 TOTAL 5150;123:04 $ 131,049.04 STREET LIGHTS 10 I 9999.0013 I 1 I LS I Construction Material & Labor Increase I $ 6,770.83I $ 6,770.83 TOTAL S 6,770.83 REASONS FOR CHANGE ORDER 1) Change orderrequired for revised paving section at commercial driveway for vehicle load and frequency. Changes correspond to Revision No. 1 as shown on sheet 8 of the construction plans. 2) Revised drainage utility lines and structures to accommodate field conflict with existing franchise utilities. Changes correspond to Revision No. 1 as shown on sheets 14, 18, and 19 of the construction plans 3) Change order required and developedowner approved for material and labor increase in cost over project delay, not caused by contractor. NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: APPROVED: APPROVED: Graham Associates, Inc. Wridian Municipal a agement D' 'ct Rebcon, Inc. Name: Christian J. Conners, P.E. Name: -Ihl A /L- z '�cPNEa ZAAACE Name: Danny Krieg Title: Principal Title: Z: - ......I U tere- I.HAIIILAU L Title: President Revised: 10-12-2011 Page 2 DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: Calloway Cemetery Road THE Railroad Crossing CONTRACT: 51712-A1 3HANGE ORDER No: CFA # 2018-028 CITY PARTICIPATION: NO CITY PROJECT # 101442 DOE # NIA A2 WATER PROJECT # NIA SEWER PROJECT # NIA FI LE # K-2587 INSPECTOR: Aaron Ybarra Phone No: (817) 392-8306 PROJECT MANAGER: George Marquez Phone No: (817) 392-6826 CONTRACT UNIT WATER SEWER PAVING DRAINA jE STREET LIGHTS CONTRACT Developer Cost ¢ ,a eveloperrn N Icy G#s ,^�CosY I^ ;Developer i GItS� GosY ` Developu Cast 4i�y Cost Deve[oper Cast a#s: e 0 3f . DAYS ORIGINAL CONTRACT $0.004 OQ $0.00 $D 00. �GSA $908,247.50 $197 913 OD $60,402 00 H 130 EXTRAS TO DATE $0.00le Ff $A oQ $0.00 $b oo • $131,049.04 $D pg ; $53,f00,89 11VII $¢! a $0,770 B3 O 0 12 CREDITS TO DATE $0.00 ''k 2 1`., 6" DSO 0, $0,00 £"A4h K 0 00 . �L.4 ii $0.00 $OQxx' ' ry $9.00 "4y Q $0.00 NAl -0$00 txg,,,,;;;;$QaiOr� 0 CONTRACT TO DATE $0.00 �+� }�O,QQ`t a, $0.00£O.RO+ $1,039,298.54 $QY $251,613.89 $gw $8T,1T283 %4�t 142 AMOUNT OF PROP. CRAN GEURDER $OAO 11 $0.00 $Q .0.. $3,731 T5 i" 240$61,021.92 REVISED CONTRACT AMOUNT $0,00 5!„ $OG'00; +;f.� g0,00 $1,100,318.46 $t}�QU'.: � $251613.89 Qr?, t $70,W4.58 ? Oq ✓ 382 TOTAL REVISED CONTRACT AMOUNT PER UNIT $0.00 $0.00 $1,100,31BAR $251,51309 $70,904.58 REVISED COST SHARE Dev. Cost: $1,422,836.93 GItJ Cc sf A 4? Ask $0.0019 s" TOTAL REVISED CONTRACT $1,422,836.93 Revised: 10-12-2011 Page 1 You are directed to make the follaavinq changes in the contract documents: I CITY B# ITEM I I PAY ITEM # QUANTITY UNIT ITEM DESCRIPTION PAVING 2 15 WD Railroad Flagman 9 3123.0101 49 CY Unclassified Excavation 6'(Plan 15 3212.0201 23.18 SY 2" Asphatt Pvmt Type C 15 3212,0504 23,18 SY 7" Asphalt Base Type B 23 3231-0113 -519 LF 6' Chain Link, Sleet 24 3231-0307 -2 EA 20' Gate` Steel 29 3471.0001 8 MO Traffic Control 36 9999,0008 -2 EA 30' Gate, Steel TOTAL STREET LIGHTS 11 I 9999-0014 I 1 { EA I Remove Existinq Streetlight TOTAL REASONS FOR CHANGE ORDER UNIT PRICE I TOTAL $ 1.100.00 $ 16,500.00 $ 3000 $ 1470,00 $ 26,00 S �o2.6a $ (38.00 $ 1,575.24 $ 33.00 $ (17.127.00) $ 4,950,00 $ (9,900.-001 $ 10,000.00 $ 80,000,00 $ 6,050,00 $ (12100,00) $ 6�.021.92 $ 3,731.75I I $ 3,731.751 $ 3,731.751 1) Change order required to manage crossing closures for extended construciton time for projecl close out. 2) Change ordder required for a field adjustment to the asphalt area of a driveway. 3) Change order required for the removal of items realated to the replacment of the Clyde Godfrey private fence and gate systems- 4) Change order required for additional contract time to cover work stoppage and delays NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 1006% OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: Graham Associates, Inc. By: Name: Christian J. Conners, P.E. Title: Principal APPROVED: Viridian Municipal AAana By: t Name: Michelle Deuell Title: Chairman APPROVED: Reboon, irr BY J?� Name: Danneg Title: President Revised: 10-12-2011 Page 2 FORTWORTH. TRANSPORTATION AND PUBLIC WORKS June 23, 2023 Rebcon Inc. 1868 W Northwest Hwy Dallas TX, 75220 RE: Acceptance Letter Project Name: Calloway Cemetery Rd. THE Railroad Crossing Project Type: Drainage, Paving, Street Lights City Project No.: 101442 To Whom It May Concern: On June 23, 2023 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on June 26, 2023. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on June 26, 2023, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-6826. Sincerely, eorge arquez (Jung ,202313:57 CDT) George Marquez P.E., Project Manager Cc: Charles Hayes, Inspector Don Watson, Inspection Supervisor Oscar Aguillon, Senior Inspector Victor Tornero P.E., Program Manager Graham & Associates Inc., Consultant Rebcon Inc., Contractor Veridian Holdings LP, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 CONTRACTOR'S AFFIDAVIT OF FINAL PAYMENT AND RELEASE THE STATE OF TEXAS COUNTY OF TARRANT BEFORE ME, the undersigned authority, on this day personally appeared Jim Schumann ("Affidant"), who, after being by me duly sworn, deposes and says that he is Rebcon. Inc, a Corporation (corporation, partnership, trade name) of Dallas County, State of Texas (the "Contractor"), which said Contractor was awarded the contract dated the 27th of June. 2023, forthe construction of Vista Wav Extension and Associated Paving Improvements at Citv of Fort Worth (the "Work"), for a total consideration of $1.422,836.93 dollars to be paid to the said Contractor (the "Contract"), and that Affiant has full power of authority to make this affidavit. That Citv of Fort Worth (Viridian Municipal Management District) (the "Owner") has approved the final estimate on said Work, and that the said Contractor has fully satisfied and paid any and all claims that may be covered by Chapter 53 of the Texas Property Code, and Article 5160 of the Revised Civil Statutes of the State of Texas, or any other applicable statutes or charter provisions, and that all just bills for labor and materials have been paid and discharged by said Contractor insofar as they pertain to the Work in question. That in addition to any funds which may have been previously paid by the Owner, the Contractor hereby accepts the amount of $78.792.67 Dollars as FULL AND FINAL PAYMENT under the aforementioned Contract, and hereby waives and releases any right Affiant and/or the Contractor may have to pursue claims of any nature against the Owner arising out of or in any manner connected with the performance of the Work and/or the Contract, including but not limited to claims of third parties that supplied material and/or labor for the Work for or through the Contractor ("Subcontractors"), as well as claims for delay, additional compensation orfor recovery of liquidated damages which may have been withheld by the Owner. The Contractor shall defend, hold harmless and indemnify the Owner from any such claims of such Subcontractors. This affidavit is given pursuant to the final payment provisions of the Contract and shall not be deemed to alter or modify the terms and provisions of said Contract. Operations} Rebcon. Inc. ® (Affiant) Jim Schumann (Printed Name) Vice President (Field SUBSCRIBED AND SWORN TO BEFORE ME, thiss227th day of June , 2023 . i ,•� Via,......,, � -. ;,�,�Y. �(�s.,,•: (Notary Public in and for the State of Texas) {N �r OF ';i RE3 05ma.�` "1iir111101� thou nc'cL T. 00-ry (Printed Name of Notary) My commission expireN4/ Z0 . CONSENT OF OWNER ❑ SURETY COMPANY ARCHITECT ❑ TO FINAL PAYMENT CONTRACTOR ❑ SURETY ❑ AIA DOCUMENT G707 OTHER Bond No. PRF9335140 PROJECT: Calloway Cemetery Road THE Railroad Crossing, Project No. 101442, City of Fort Worth, (name, address) TX TO (Owner) [ City of Fort Worth & Viridian Municipal Management District 3100 McKinnon Street, Suite 1100 Dallas, TX 75201 CONTRACTOR: Rebcon, LLC 1868 W. Northwest Hwy Dallas, TX 75220-7018 ARCHITECT'S PROJECT NO: CONTRACT FOR: CONTRACT DATE: December 10, 2019 In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the (here insert name and address of Surety Company) Colonial American Casualty and Surety Company Fidelity and Deposit Company of Maryland 1299 Zurich Way, 5th Floor, Schaumburg, IL 60196-1056 , SURETY COMPANY, on bond of (here insert name and address of Contractor) Rebcon, LLC 1868 W. Northwest Hwy Dallas, TX 75220-7018 , CONTRACTOR, hereby approves of the final payment to the Contractors, and agrees that final payment to the Contractor shall not rclicvc the Surety Company of any of its obligations to (here insert name and address of Owner) City of Fort Worth & Viridian Municipal Management District 3100 McKinnon Street, Suite 1100 Dallas, TX 75201 ,OWNER, as set forth in the said Surety Company's bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this 29th day of June 2Q23 Colonial American Casualty and Surety Company Ejdf-liiy and Deposit Company of Maryland Surety Company i alure of Authorised Repre �ntative Attest: (Seal): Andrea Rose Crawford Ariarnev-In-Fact Tills NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Current Edition AIA DOCUMENT G707 a CONSENT OF SURETY COMPANY TO FINAL, PAYMENT • APRIL 1970 EDITION • AIA® ONE PAGE' @ 1970 • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 New York Ave., NW, WASHINGTON, D.C. 20006 ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND POWER OF ATTORNEY KNOW ALL MEN BY 'THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Illinois, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois (herein collectively called the "Companies"), by Robert D. Murray, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which are set forth on the reverse side hereof and arc hereby cerlifted to be in Rill force and effect on the date hereof, do hereby nominate, constitute, and appoint John William NEWSY, Troy Russell KEY, Debra Lee MOON, Andrea Rose CRAWFORD, Sandra Lee RONEY, Linda Michelle STALDER, Suzanne KH=beth NIEDZWIEDZ, Sherie Michelle GREENOUGH, Cheri Lynn IRBY and Joshua D. TRITT, all of Addison, Texas, its true and lawful agent and Attorney -in -Fact, to snake, execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: any and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland, and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland, in their own proper persons. The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of the By -Laws of said Companies and is now in force. IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 5th day of March, A,D. 2020. oft all � s ATTEST. ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND By: Robert D. Murray Vlce President 1kD 4 vtxou —.- By. Down R Brown Secretary State of Maryland County of Baltimore On this 5° day of Mardi, A.D. 2020, before the subscriber, a Notary Public of the State of Maryland, duly coma iWoned and qualified, Robert!). Murray, Vice President and Dawn L Brown, Secretary of the Companies, to me personally known to be the Individuals and officers described in and who execthted the preceding instrument, and acknowledged the execution of same, and being by me duly sworn, deposeth and saith, that he/she is the said officer of the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and that the said Corporate Seals and the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and you first above written. r 11;� m134`t'j�` Constance A. Dunn Notary Public f.,rifj;•W�� ti., I,,IIrin,,,,, My Commission Expires: July 9,2023 EXTRACT FROM BY-LAWS OF THE COMPANIES "Article V, Section 8, Attornevs-in-Fact. The Chief Executive Officer, the President, or any Executive Vice President or Vice President may, by written instrument under the attested corporate seal, appoint attorneys -in -fact with authority to execute bonds, policies, recognizances, stipulations, undertakings, or other like instruments on behalf of the Company, and may authorize any officer or any such attorney -in -fact to affix the corporate seal thereto; and may with or without cause modify of revoke any such appointment or authority at any time." CERTIFICATE I, the undersigned, Vice President of the ZURICH AMERICAN INSURANCE COMPANY, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and the, FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that Article V, Section 8, of the By- Laws of the Companies is still in force. This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the ZURICH AMERICAN INSURANCE COMPANY at a meeting duly called and held on the I5th day of December 1998. RESOLVED: "That the signature of the President or a Vice President and the attesting signature of a Secretary or an Assistant Secretary and the Seal of the Company may be affixed by facsimile on any Power of Attorney...Any such Power or any certificate thereof bearing such facsimile signature and seal shall be valid and binding on theCompany." This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the 5th day of May, 1994, and the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly called and hold on the loth day of May,1990. RESOLVED: "Thal the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect as though manually affixed. IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seals of the said Companies, this 20 day of 4- . 2 OkIrlJo a i r2 8 By: Brian M. Hodges Vice President TO REPORT A CLAIM WITH REGARD TO A SURETY BOND, PLEASE SUBMIT A COMPLETE DESCRIPTION OF THE CLAIM INCLUDING THE PRINCIPAL ON THE BOND, THE BOND NUMBER, AND YOUR CONTACT INFORMATION TO: Zurich Surety Claims 1299 Zurich Way Schaumburg, IL 601%-1056 wwwjewrtsfclaim as zxr chna.com 800-626-4577 Texas Important Notice IMPORTANT NOTICE To obtain information or make a complaint: You may call Zurich North America's toil -free telephone number for information or to make a complaint at: 1-800-382-2150 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights, or complaints at: 1-800.252-3439 You may write the Texas Department of Insurance: P.O. Box 149104 Austin, TX 78714-9104 Pax: (612) 490-1007 Web: www.tdl.texas.gov E-mail: ConsumerProtecbon@tdi.texas.gov PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim, you should contact the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice Is for information only and does not become a part or condition of the attached document. ZURICH. AVISO IMPORTANTE Para obtener informaci6n o Para presentar una queja: Usted puede Ilamar al nOmero de teldfono gratuito de Zurich North America's Para obtener informacion o Para presentar una queja al: 1-800-382-2150 Usted puede comunicarse can el Departamento de Se- guros de Texas para obtener Informad6n sobre com- panlas, coberturas, derechos, o quejas al: 1-800-252-3439 Usted puede escribir al Departamento de Seguros de Texas a: P.O. Box 149104 Austin, TX 78714-9104 Fax (512) 490-1007 Sitio web: www,tdi.texas.gov E-mail: ConsumerProtection@tdi.texas,gov DISPUTES POR PRIMAS DE SEGUROS 0 RECLAMACIONES: SI tiene una disputa relacionada con su prima de seguro o con una reclamaci6n, listed debe comunicarse con la compahla primero. Si la disputa no es resuefta, usted puede comunicarse con el Departamento de Seguros de Texas. ADJUNTE ESTE AVISO A SU P6LIZA: Este aviso es solamente Para prop6sitos informativos y no se con- vierte en parts o en condici6n del documento adjunto. U-GU-2WE (06116) Page 1 of 1