Loading...
HomeMy WebLinkAboutContract 56722-A2CSC No. 56722-A2 AMENDMENT No. 2 TO CITY SECRETARY CONTRACT No. 56722 WHEREAS, the City of Fort Worth (CITY) and Garver LLC, (ENGINEER) made and entered into City Secretary Contract No. 56722, (the CONTRACT) which was authorized by M&C 21-0876 on the 9th day of November, 2021 in the amount of $217,498.00; and WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in the amount of $71,325.00 administratively authorized on September 4, 2022; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2019, WSM-N; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $259,802.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $548,625.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Prof Services Agreement Amendment Template Revision Date: November 23, 2021 {W&SS Repl. Contract 2019 WSM--N] Page 1 of 2 [CPN 1033581 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth Dana Burehdoff ( 5. 2021(f6.46 CDT) Dana Burghdoff Assistant City Manager DATE: Jul 5, 2023 APPROVAL RECOMMENDED: �'Izll �� Christopher arder (Jun 29, 202315:17 CDT) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: ENGINEER Garver LLC Mar�%E�abet Mach, P.E. Vice President DATE: June 26, 2023 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Pra ti.ma Poudyal, P . E . Project Manager APPROVED AS TO FORM AND LEGALITY: A I DBlack (Jul3, 202313:44 CDT) Douglas W. Black Senior Assistant City Attorney 4 QpUOpQ GFo oA �d ATTEST: ago o=o za �j ,.�4�`'m'ty adQIl nEXASo� o Jannette S. Goodall City Secretary M&C: Date: Form 1295: 23-0501 06/13/23 2023-999870 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Prof Services Agreement Amendment Template Revision Date: November 23, 2021 [W&SS Repl. Contract 2019 t9SN-N] Page 2 of 2 [CPN 1033581 500 West 71" Street Suite 803 Fort Worth, TX 76102 TEL 817.740.9575 www.GarverUSA.com January 11, 2023 Ms. Pratima Poudyal City of Fort Worth Water Department 311 W 10th Street Fort Worth, TX 76102 Re: Water and Sanitary Sewer Replacement Contract 2019, WSM-N - Amendment No. 2 Dear Ms. Poudyal: Enclosed with this letter is the request for Amendment No. 2 for the above referenced project. On October 19111, 2022, the City provided correspondence directing the inclusion of the identified infrastructure for replacement and to be included in a separate design package as part of the project. The proposed additional infrastructure is shown in the table below: Water Streets From To Scope of Work Proposed Length Size (LF) 35W NB Service Rd. 275 ft. South of Oak Felix St. Water 12" 913 Grove Rd. 35W NB Service Rd. Felix St. Beddell St. Water 8" 1,519 Felix St. 35W NB Service Rd. Oak Grove Rd. Water/Sewer 8', 12 & 16" 2,001 Oak Grove Rd. 35W NB Service Rd. 1,415 ft. Southeast of Oak Grove Rd. Water/Sewer 8" & 24" 2,167 Brown Dr. Felix St. Cole St. WaterlSewer 8" 1,672 Southway Circte 35W NB Service Rd. East Dead Fnd Water 8" 907 Easement North of Southway Circle 268 ft. North of Water B" 268 Southway Circle Southway Circle i Total 9,447 Garver proposes to incorporate surrey work recently performed as part of the project that overlaps the proposed improvements along with additional field survey where no recent field survey exists. Garver will also conduct record drawing and utility research in the proposed improvement areas to identify utility conflicts and challenges. The proposed improvements are in the existing City right of way and TXDOT right of way. It is anticipated that this work will be conducted in accordance to the project basic scope of services. In addition to the basic scope of services, TXDOT permitting, and coordination is anticipated to be required to support this project. Ms. Poudyal 11/08/2022 Page 2 of 2 The proposed fee and increase to the Contract is detailed in the table below: Original Contract Amount $217,498.00 Amendment No. 1 $71,325.00 Additional Amount Requested (Amendment No. 2) $259802 00 Proposed Contract Total Amount $548,625.00 Please call me if you have any questions. Sincerely, GARVER ❑erek T. Schwanke, P.E. Senior Project Manager Attachments: Level of Effort Worksheet Attachment E-4 Location Map Task Description Task No. 1.0 Project Management 1.1 Mana ing the Team 1.1.1 Intornorfoam Mornings 1.1.2 QAlQC 12 Communications and Ro`Conin 1.2.1 Pro -Design CoordinationMoon9 (assumes 1 mootin 1.2.2 Design Submittal Ravlow Meetings (assumos 3 moo: 1.2.3 Proparo invoicos In fomtat mqueslod (assumos 15 mo6 s & split whh TPW) 12.4 Prepare Monthly Progress Reports 4assumrs 15 months 3 split with TPW) 1.2.5 Prepare Baseline Schedule and Updatos 4assumas 15 months) I 1.2.0 Prepare Monthly MBEISBE Ropoh (assumos 15 months) 1.2.7-8 Coordination With Other Agancios I 2.0 IConcoptual Desir, f30-Porcent( 2.1 IData Collection d Roviow 2.2 Ilmlity Coordination 2.3 IConcoptual (30%1 Dasl9n Drawings I2.4 IConcoptual (30%) CPLtt 12.5 IQwQC 1 1 13.0 IProliminar/ Desl/9n/f60 Percent) 13.1 Preliminary ,(60%, D�ign Drawings I3.2 Proliminary `'bl/) Specifications 3.3 Preliminary (6C%) OPCC 3.3.1 Public Mooting (Assume 1) 3.4 ConstrudaDillty Roviow 3.5 Utility Clearance 3.5 ITrafflc Control Plan (f OT Required) 3.7 IQA/QC 1 4.0 JFinal Dosl n 4.1 Final Drart JO%) Construction Plans and Spoclficatlons 4.2 Anal (100% Plans and SPor'OcaUons 4.3 IConswctio Estlmat05 Zl and 100%) 4.4 IQ.AIQC I Loval of Effort Sproadsheot TAS KIROUR BREAKDOWN WATER AND SANITARY SEWER REPLACEMENT CONTRACT WSM-N Amendment No. 2 Prot -act No. 103358 Labor (hours I Subconsultant Eaponsa Principal I Project I Project CADD OAOC Survoy Survoy Total Labor Subconsultant Total 6rponse%Com Task Sub p toteManager Remaining Rate $290.OU $� 11 Enginoor Toam Toch Crow pAdmin Cost MWBE Nan-MWBE Reproduction Cost Total Budget $190.00 $108.00 $270.00 - - 62.5D 2 2 2 $ 1,400.00 S S 1.400.00 $ t 400.00 0 8 s 214800D 5 -$ 2460.0D S 2480.001 1 4 $ 1.210.00 s - $ 1,210.00 $ 1,21C.00 4 6 $ 1.429.00 I $ - S 1,420.cc s 1.420.00 2 4 5 1.180.00 I $ - S 1,180.00 $ 1,180.00 3 18 12 0 0 0 D 8 S 7,570.00 S $ 7.670.00 $ 7.570.00 2 40 30 S 10,900,00 $ - $ 10.900.00 s 10.900.00 I 2 I 24 I I I Is 4,780.00 I s 5 4.780.00 S 4.780.00 I I 4 I 40 I ED I I I I I s 16,7EC,00 I I $ S 16.760.D0 s 1$.760,00 I I 2 I 5 I I I I I $ 1.900.00 I I $ - S 1,900.00 1 Is 1,900.00 I 4 1 I I I I I 1 $ 1.16000 I I $ S 1.180.00 1 Is 1,150.00 1 4 10 112 110 0 0 0 0 S 35,500.00 5 S 5 35.500.00 1 I$ 35,500.00 1 I I Is 5S.8SD.00 24 110 280 $ 55.850.00 5 - S 56.850.001 1 1 I 24 1 I 1 $ 4,550.00 I I S S 4.550.00 1$ 4,550.00 1 I 12 1 I $ 2,390.00 I I 5 $ 2.390.00 1$ 2.390.00 3 4 $ 1,410*00 I 5 - $ , 41D.DD 1$ 1.410.00 3 3 S 1,230.00 I 5 S 1,230,00 IS 1.230,DD 2 24 I S 4.780.00 I 5 - S 4.780.00 I S 4.780,O1) I 2 4 E 1 I I 5 1.829.00 I I 5 5 1,829.05 1$ 1.829,OD 4 1 I I I s 1$160.00 I 5 $ 1.180.00 I S 1.180.00 I 5 3E 181 1 2aE 1 1 1 0 1 0 1 0 5 73,199.001 i i $ S 73,199.00 I$ 73,199.00 1 10 60 I ISO S 30.970.00 S 25O.OD $ 250.DC I $ 31.220,00 I $ 31.220,00 I 1 I 10 I 40 I 5C I 1 1 5 16-270,OD1 I I S 250.001 $ 250.00 S 16.520,00 $ 16 520.00 I 1 I 6 I I I I 1 5 1,310.00 I I 5 $ 1.31000 $ 1310.00 I 4 I I + I I I s 1,160.00 $ $ 1.160.00 $ 1.160.00 1 6 27 I 106 I 210 I 0 I 0 1 D I 0 15 49.710.00 S 500.00 S $0.210.0-01 S 50,210.00 Page 1 of 2 Level of Effort Sproadsheet TASKIHOUR BREAKDOWN WATER AND SANITARY SEWER REPLACEMENT CONTRACT WSM-N Amendment No. 2 CIt1y' Protect No, 103358 Labef 111°urCJ Subconsukant Ex ports° Principal I Project Project I I CADD I QAOC I Survey I Survey Admin Total Labor I Subconsultant I Total Expe ns° Task Sub p c° '/o Com 1 t Remaining Task Description Manager Engineer To= Toch Grew Cost COct Total Budget Rawl $290.00 $230.00 $180.00 $108.00 $270.00 - - i62.50 MWBE Non-MWBE Reproduction Task No. $X Bid Phase 5.1 Bid Support 2 0 $ 1,900.00 S 1.900.00 S 1,900.00 5.1.1 Upload and Sell Contract Documents and Maintain Plan Holders List 2 4 $ 610.00 S 610.00 $ 810.00 5.1.2 Issue Addonda `assumos 3) 3 8 $ 2,130.00 S 2, 130.00 S 2.130.00 5.1.3 Attend Pro -bid Canforanco 2 5 450.00 S 480.00 $ 460.00 5.1.5 Attord Bid Openin0 -....:-r.-.-.. : ;. .., :.:::. - .-l-: ..... .- ' '........:....- :... ..S.._,. S :: _ - 5.1�abulala Bids and � ocemmond Award 2 4 1 $ 1,242.50 5 1,242.50 I S 1 242.50 5.1.7 Issue Conformed Contract Documents 4 4 I S 1,152.OD $ 1,800.00 $ 1.600.00 S 2,752.00 S 2.752.00 0 9 28 4 a 0 0 5 $ 7,494.50 $ 1.600.00 $ 9.094.50 I $ 9694.50 st Construction Phase Services I! 8.1 Consirudlon Su pan P S.. 8.1.1 - ttonci PrcconsWCOon Conference 2 $ 460.00 S - S 460.00 $ 460.00 5.1.2 Attend Public Meetinp 3 5 690.00 $ S 690 00 1 $ 690.00 6.1.3 Pro+oct Site Visits Sassumos 8 me. of consrr 81 visit per month) 10 8 $ 3.740,00 S $ 3 740 00 _ $ 3 740,00 GAA Request for Information Revlow jusumos 0) 6.1.5 Change Order Preparation (assdmos 0) 82 Record Drawings 4 16 $ 2.448.00 S $ 2.4a8.00 S 2,a48,00 I I 0 15 12 18 0 0 0 0 S 7,338,00 S - $ 7,338.00 I S 7,338.00 7.0 Services I 7.1 Right -of --Way Research 1 4 4 S 1,382 00 $ - 5 1,382.00 5 1,382.CC 7.2 �ROWrEasoment TXDOT Permit Submission (Assumes 2-OraB Submission and Final Submission) 2 4 5 $ 2,C44 00 $ 5 21044.00 3 2.044.00 0 3 8 12 0 0 0 0 $ 3.428.00 S ; 3,426.00 S 3,428.00 �,0 Survey 8.7 Desllgn Survey 2 8 8 S 2,784.00 $ 48.000A0 S 46,000.00 S 48.764,00 �S 46.7e4.00� 8.2 jAddtional Sorvieos I I 5- I 0 2 8 8 a 0 0 0 $ 2,784.00 $ 48 000.00 $ 48,764.00 IS 48,784.00 9 n �Acldlti...lServices .1 Omar Directed Additional Services 520,000.00 $ - S 20,00D.00 S 20,000.00 1 I s 2D,00D.Do s -$ zo,00D,D0 S ZglpoI�o= Totals 18 120 465 646 1 0 0 13 ;207,102 $43,100 $255,202 I I $2$5,2d.00 Project Summary Water and Sower Design Breakdown Total Hours,,11lI 1,283 Water Sanitary Sower Total Cost % Complete Remaining Total Labdf' $207.102,00 Foots o % $ LF % $ Total Expense U8,100.& 9Bd� 75% $193$,827 2399 A5 6 S 65,975 Me FJSBE Subconsultant $48,000.00 Non.W� )St t Sl`o, nsagan4 $0.00 I TOTAL �1) ,u�i� Wow 54,800.00 MSEISA'Partiwpat6n 18% I fotaf Projecitos4 $259,90700 Page 2of2 Citv of Fort Worth Water & Sanitary Sewer Replacement Contract 2019 WSM-N Part 2 Pre -Design (June 19. 2023) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST UNIT I: WATER Item No. Item Quantity Unit Unit Price Total 1 8" PVC Water Pipe 3,880 LF $200.00 $776,000.00 2 12" PVC Water Pipe 1,990 LF $225.00 $447,750.00 3 16" PVC Water Pipe 20 LF $275.00 $5,500.00 4 24" PVC Water Pipe 1,440 LF $500.00 $720,000.00 5 12" and Smaller Gate Valve 12 EA $10,500.00 $126,000.00 6 30" Gate Valve 1 EA $80,000.00 $80,000.00 7 Fire Hydrants (Remove + Salvage) 5 EA $5,500.00 $26,400.00 8 Ductile Iron Water Fittings w/ Restraint 5 TN $25,000.00 $125,000.00 9 Water Service 55 EA $1,800.00 $99,000.00 10 SWPPP (_ > 1 acre) 1 LS $30,000.00 $30,000.00 11 Traffic Control 1 LS $10,000.00 $10,000.00 12 Pavement Repair Replacements 21,990 SF $30.00 $659,700.00 13 Trench Safety 7,330 LF $5.00 $36,650.00 Unit I Subtotal $3,142,000.00 UNIT II: SEWER Item No. Item Quantity Unit Unit Price Total 1 8" Sewer Pipe 2,400 LF $180.00 $432,000.00 2 4' Manhole 8 EA $12,000.00 $96,000.00 3 Pre -CCTV Inspection 2,400 LF $7.00 $16,800.00 4 Post -CCTV Inspection 2,400 LF $5.00 $12,000.00 5 Trench Safety 2,400 LF $5.00 $12,000.00 7 4" Sewer Service 20 EA $1,800.00 $36,000.00 8 Traffic Control 1 LS $10,000.00 $10,000.00 9 SWPPP (_ > 1 acre) 1 LS $15,000.00 $15,000.00 10 Pavement Repair Replacements 9,600 SF $30.00 $288,000.00 Unit II Subtotal $917,800.00 Unit I & II Subtotal $4,059,800.00 Contin ency (35%) $1,420,930.00 Projec?Total $5,480,730.00 ID Task Name Duration Start Finish 2024 2025 2026 Otr 2 Otr 3 Otr 4 Otr 1 Otr 2 Otr 3 Otr 4 Otr 1 Otr 2 Otr 3 Otr 4 Otr 1 1 City of Fort Worth Water and Sanitary Sewer Replacement Contract 2019, WSM-N 703 days Tue 6/13/23 Thu 2/19/26 u CPN No. 103358 Part 2 2 Design 321 days Tue 6/13/23 Tue 9/3/24 3 Design Engineer Agreement 20 days Tue 6/13/23 Mon 7/10/23 F-1 4 Award Design Agreement Amendment #2 0 days Tue 6/13/23 Tue 6/13/23 G 6/13 5 Execute Amendment #2 0 days Tue 6/27/23 Tue 6/27/23 6/27 6 Issue Notice To Proceed 0 days Mon 7/10/23 Mon 7/10/23 q1 7/10 7 Conceptual Design (30%) 95 days Mon 7/10/23 Mon 11/20/23 J 17/10 8 Design Kick-off Meeting 0 days Mon 7/10/23 Mon 7/10/23 9 Topographic Survey 50 days Tue 7/11/23 Mon 9/18/23 10 Prepare Preliminary 30% Design Drawings 30 days Tue 9/19/23 Mon 10/30/23 11 Develop Permitting Schedule From Utility Coordination 10 days Tue 10/17/23 Mon 10/30/23 12 Prepare Preliminary 30% OPCC 10 days Tue 10/17/23 Mon 10/30/23 13 Internal QAQC Review 15 days Tue 10/31/23 Mon 11/20/23 14 30% Design Submittal 0 days Mon 11/20/23 Mon 11/20/23 11/20 15 Review 30% Conceptual Plans (CFW) 20 days Tue 11/21/23 Mon 12/18/23 16 Preliminary Design (60%) 55 days Tue 12/19/23 Mon 3/4/24 17 Prepare Preliminary 60% Design Drawings 40 days Tue 12/19/23 Mon 2/12/24 18 Develop Technical Specifications 10 days Tue 2/13/24 Mon 2/26/24 19 Develop 60% OPCC 10 days Tue 2/13/24 Mon 2/26/24 20 Internal CtAQC Review 10 days Tue 2/20/24 Mon 3/4/24 21 60% Design Submittal 0 days Mon 3/4/24 Mon 3/4/24 13/4 22 Review 60% Package Submittal (CFW) 15 days Tue 3/5/24 Mon 3/25/24 23 Generate Database with Names and Addresses of Residents and Businesses 5 days Tue 3/26/24 Mon 4/1/24 Affected By The Project 24 Conduct Design Public Meeting #1 0 days Mon 3/25/24 Mon 3/25/24 < 3/25 25 Final Design (90%) 40 days Tue 3/26/24 Mon 5/20/24 26 Easement Metes and Bounds Development 32 days Tue 3/26/24 Wed 5/8/24 27 Prepare Final 90% Design Drawings 30 days Tue 3/26/24 Mon 5/6/24 28 Develop Final Technical Specifications 15 days Tue 4/16/24 Mon 5/6/24 29 Develop 90% OPCC 10 days Tue 4/23/24 Mon 5/6/24 30 Internal OAQC Review 10 days Tue 5/7/24 Mon 5/20/24 31 90% Design Submittal 0 days Mon 5/20/24 Mon 5/20/24 5/20 32 Review 90% Package Submittal (CFW) 20 days Tue 5/21/24 Mon 6/17/24 33 Conduct Constructability Review (Walk Through) 1 day Tue 6/18/24 Tue 6/18/24 34 Final Construction Documents (100%) 55 days Wed 6/19/24 Tue 9/3/24 35 Prepare Final 100% Design Drawings 25 days Wed 6/19/24 Tue 7/23/24 36 Develop Final Technical Specifications 10 days Wed 7/10/24 Tue 7/23/24 37 Develop 100%OPCC 5 days Wed 7/17/24 Tue 7/23/24 38 Internal QAQC Review 5 days Wed 7/24/24 Tue 7/30/24 Project: CPN No. 103358 Task Split Milestone O Summary u u Project Summary r - - - - - - - Date: Mon 6/19/23 Page 1 ID Task Name Duration Start Finish 39 100% Design Submittal 0 days Tue 7/30/24 Tue 7/30/24 40 Approve Final Construction Documents and Route for Signatures 5 days Wed 7/31/24 Tue 8/6/24 41 Establish MBE Goal for Construction Contract 10 days Wed 8/7/24 Tue 8/20/24 42 Prepare Bid Package 10 days Wed 8/21/24 Tue 9/3/24 43 Construction 10 days Tue 9/3/24 Tue 9/17/24 44 Bid and Award 10 days Tue 9/3/24 Tue 9/17/24 45 Start Advertisement 0 days Tue 9/3/24 Tue 9/3/24 46 Award Construction Contract 0 days Tue 9/17/24 Tue 9/17/24 47 Construction, Material Testing and Landscape Execution 260 days Wed 10/30/24 Tue 10/28/25 48 Closeout 20 days Wed 12/10/25 Tue 1/6/26 49 As Built Plans 20 days Wed 12/10/25 Tue 1/6/26 50 Receive As -Built Survey from Contractor 5 days Wed 12/10/25 Tue 12/16/25 51 Engineer Prepare As -Built Plans 15 days Wed 12/17/25 Tue 1/6/26 52 Close Design Agreement 22 days Wed 1/7/26 Thu 2/5/26 53 Receive Final Invoice for Design Contract 10 days Wed 1/7/26 Tue 1/20/26 54 Final Design Contract Invoice Paid 10 days Wed 1/21/26 Tue 2/3/26 55 Design Contract Closed 1 day Wed 2/4/26 Wed 2/4/26 56 Final Project Report/Lessons Learned 1 day Thu 2/5/26 Thu 2/5/26 57 Prepare/Archive Close-out Docs 5 days Frig/6/26 Thu 2/12/26 58 Financial Closeout/Asset Capitalization 5 days Fri 2/13/26 Thu 2/19/26 2024 Otr 2 Otr 3 Otr 4 Otr 1 I Otr 2 Project: CPN No. 103358 Task Split Milestone O Summary u u Project Summary r - - - - - - - Date: Mon 6/19/23 Page 2 I M&C LOCATION MAP Aa MIIIIIIIIIIII -jw- ML 1:470-10 1I City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, June 13, 2023 LOG NAME: 60WSSC19WSMNA2-GARVER REFERENCE NO.: **M&C 23-0501 SUBJECT: (CD 8) Authorize Execution of Amendment No. 2, in the Amount of $259,802.00, to an Engineering Agreement with Garver, LLC. for Water and Sanitary Sewer Replacement Contract 2019 WSM-N project for a Revised Contract Amount of $548,625.00 and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2023-2027 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of Amendment No. 2 in the amount of $259,802.00, to City Secretary Contract No. 56722, an engineering agreement with Garver, LLC, for the Water and Sanitary Sewer Replacement Contract 2019 WSM-N project for a revised contract amount of $548,625.00; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $289,802.00, from available funds, for the purpose of funding the Water and Sanitary Sewer Replacement Contract 2019 WSM-N project (City Project No. 10335B) and to effect a portion of Water's contribution to the Fiscal Years 2023-2027 Capital Improvement Program. DISCUSSION: On November 09, 2021, Mayor and Council Communication (M&C) 21-0876, the City Council authorized an engineering agreement in the amount of $217,498.00 with Garver, LLC. (City Secretary Contract No. 56722) for the Water and Sanitary Sewer Replacement Contract 2019 WSM-N project. The agreement was subsequently revised by Amendment No. 1 in the amount of $71,325.00 administratively authorized September 4, 2022, that provided for additional survey and design for the replacement of deteriorated water and sanitary sewer mains on the project. Amendment No. 2 will provide for the additional design and survey for the replacement of deteriorated water and sanitary sewer mains on the following street and easement located in the immediate vicinity of the project: Streets I.H. 35W NB Service Road Felix Street From '275 feet South of Oak Grove Road I.H. 35W NB Service Road Oak Grove Road I.H. 35W NB Service Road Brown Drive Southway Circle Easement North ,of Southway Circle Felix Street I.H. 35W NB Service Road Southway Circle To Scope of Work Beddell Street Water Oak Grove Road Water/Sewer 1,415 feet Southeast of Oak Water/Sewer Grove Road 11Cole Street 'Water/Sewer East Dead End Water 268 ft. North of Sewer Southway Circle In addition to the amendment amount, an additional $30,000.00 (Water: $20,000.00; Sewer: $10,000.00) is required for project management. It is the practice of the Water Department to appropriate its CIP plan throughout the fiscal year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2023-2027 Capital Improvement Program, as follows: Project FY2023 CIP Budget Change Revised f Fund Name Appropriations Authority (Increase/Decrease) FY2023 Budget Fund 103358 56002 - -- W&S Contract $0.00 This M&C $289,802.00 $289,802.00 Capital 2019 Projects WSM-N Funding is budgeted in the Unspecified -All Funds Project with in the Water & Sewer Capital Project Funds for the purpose of funding the Contract 2019 WSM-N project within the Water & Sewer Capital Projects Fund. Appropriations for Contract 2019 WSM-N project are as depicted below: Fund Existing Additional Project Appropriations Appropriations Total* W&S Capital Projects - Fund $406,798.00 $289,802.00 $696,600.00 56002 Project Total 1 $406,798.0011 $289,802.0011$696,600.001 *Numbers rounded for presentation purposes. Business Equity: Garver, LLC agrees to maintain its initial MIWBE commitment of 10 percent that it made on the original agreement and extend and maintain that same MIWBE commitment of 10 percent to all prior amendments up to and inclusive of this Amendment No. 2. Therefore Gamer, LLC remains in compliance with the City's MIWBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous MIWBE Commitment form executed by an authorized representative of its company. This project is located in COUNCIL DISTRICT 8. FISCAL INFORMATION I CERTIFICATION: The Director of Finance certifies that funds are available in the Unspecified -All Funds project within the W&S Capital Projects Fund, and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Capital Projects Fund for the Contract 2019 WSM-N project to support the approval of the above recommendations and execution of the contract amendment. Prior to any expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds, FUND IDENTIFIERS (FIDs): TO Fund Department ccount Project Programl ctivity Budget Reference # mount ID 1 I ID Year (Chartfield 2) r I FROM Fund Department ccount Project Programs ctivity Budget ID ID I Year CERTIFICATIONS: Submitted for City Manager's Office by, Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Pratima Poudyal (6149) ATTACHMENTS 1. 60WSSC19WSMNA2-GARVER APCF.,pdf (CFW Internal) Reference # AAmount! (Chartfield 2) 2. 60WSSC19WSMNA2-GARVER FID Table (WCF 05.18.23).xlsx (CFW Internal) 3. 60WSSC19WSMNA2-GARVER Form 1295.r)df (CFW Internal) 4. 60WSSC19WSMNA2-GARVER Marn.pdf (Public) 5. 60WSSC19WSMNA2-GARVER.docx (CFW lnternal) 6. EntitOnformation- Garver.pdf (CFW Internal) 7.ORD.APP 60WSSC19WSMNA2-GARVER 56002 AO23(r2).docx (Public) 8. PBS CPN 103358.pdf (CFW Internal) 60WSSC19WS.MNA2-GARVER FID Table 56002 0600430 4956001 UNSPEC 2023 ($213,827.00) 56002 0600430 103358 2023 $213,827.00 56002 0600430 UNSPEC 1 1 2023 1 1 ($213,827.00) 1 56002 0700430 4956001 103358 2023 I $75,975.00 56002 0600430 4956001 UNSPEC 2023 I ($75,975.00) 56002 0700430 103359 I 2023 { $75,975.00 56002 0600430 UNSPEC 2023 I ($75,975.00) 56002 0600430 4956001 UNSPEC UNSPEC 9999 56002 0600430 4956001 103358 001730 9999 56002 0600430 4956001 UNSPEC UNSPEC 9999 56002 I 0700430 4956001 I 103358 I 001730 f 9999 56002 0600430 4956001 103358 001730 56002 0600430 5110101 103358 001730 56002 0600430 5330500 103358 001730 56002 0700430 4956001 103358 001730 56002 0700430 5110101 103358 001730 56002 0700430 5330500 103358 001730 9999 9999 9999 9999 9999 9999 $213,827.00 ($213,827.00) $75,975.00 56002-UNSPEC is in 060 ($75,975.00) $20,000.04 Water Staff Cost $193,827.00 Contract ($75,975.00) 1 $10,000.00 1 Water Staff Cost $65,975.00 IContract