NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Beltmill Phase 1
City Project No.: 103406
Improvement Type(s): ❑ Paving ❑ Drainage x❑ Street Lights ❑ Traffic Signals
Original Contract Price: $301,167.85
Amount of Approved Change Order(s):-$4,837.35
Revised Contract Amount: $296,330.50
Total Cost of Work Complete: $296,330.50
,pl Jun 30, 2023
Contractor Date
President
Title
Independent Utility Construction, Inc.
Company Name
�1 Jun 30, 2023
Project Inspector Date
C,�, ' 21'� , P. �. Jul 3, 2023
Project Manager
Date
sn
Jul 5, 2023
Rebe¢e Diane Owen (Jul 5,202309:00 CDT)
CFA Manager
Date
x
Jul 5 2023
Lauren Prieur Oul 5. 2023 09.06 CDT)
TPW Director
Date
0x_4QJ`"11 Jul 5 2023
am WilliInh nsnnl hi 5 202315: 18 CDT) i
Asst. City Manager Date
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX Page 1 of 2
Notice of Project Completion
Project Name: Beltmill Phase 1
City Project No.: 103406
City's Attachments
Final Pay Estimate x❑
Change Order(s): ❑x Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time 220 WD Days Charged: 260
Work Start Date: 4/7/2022 Work Complete Date 6/29/2023
Completed number of Soil Lab Test: 1706
Completed number of Water Test: 35
Page 2of2
FoRTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name BELTMILL PHASE 1
Contract Limits
Project Type STREET LIGHTING
City Project Numbers 103406
DOE Number 3406
Estimate Number I Payment Number 1
City Secretary Contract Number
Contract Date 1/18/2022
For Period Ending 6/29/2023
WD
Project Manager NA
Contractor INDEPENDENT UTILITY CONSTRUCTION
5109 SUN VALLEY DRIVE
FORT WORTH, TX 76119
Inspectors GLOVER, M / WALKER, E
Contract Time 4WD
Days Charged to Date 260
Contract is 100.00 Complete
Friday, June 30, 2023 Page 1 of 4
City Project Numbers 103406
Contract Name BELTMILL PHASE 1
Contract Limits
Project Type STREET LIGHTING
Project Funding
DOE Number 3406
Estimate Number 1
Payment Number 1
For Period Ending 6/29/2023
UNIT V: STREET LIGHTING IMPROVEMENTS
Item Description of Items
Estimated Unit
Unit Cost Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1 2" CONDT PVC SCH 80 (T)
6345 LF
$13.63 $86,482.35
6345
$86,482.35
2 FURNISH/INSTALL LED LIGHTING FIXTURE (70
61 EA
$282.00 $17,202.00
61
$17,202.00
WATT ATBO COBRA HEAD)
3 RDWY ILLUM FOUNDATION TY 1,2, AND 4
4 FURNISH/INSTALL RDWAY ILLUM TY 11 POLE
5 FURNISHANSTALL TYPE 33B ARM
6 NO 10 INSULATED ELEC CONDR
7 NO 6 TRIPLEX OH INSULATED ELEC CONDR
(CO #3)
8 FURNISH/INSTALL LED LIGHTING FIXTURE
(137) (CO #3)
9 FURNISH/INSTALL 8' WOOD LIGHT POLE ARM
(CO #3)
61 EA $1,021.00 $62,281.00
61 EA $1,625.00 $99,125.00
61 EA $172.00 $10,492.00
19035 LF $1.09 $20,748.15
0 LF $3.17 $0.00
0 EA $502.00 $0.00
0 EA
Sub -Total of Previous Unit
61 $62,281.00
61 $99,125.00
61 $10,492.00
19035 $20,748.15
0 $0.00
0 $0.00
$524.00 $0.00 0 $0.00
$296,330.50 $296,330.50
Friday, June 30, 2023 Page 2 of 4
City Project Numbers 103406
Contract Name BELTMILL PHASE 1
Contract Limits
Project Type STREET LIGHTING
Project Funding
Contract Information Summary
Original Contract Amount
Chanhe Orders
Change Order Number 3
Total Contract Price
DOE Number 3406
Estimate Number 1
Payment Number 1
For Period Ending 6/29/2023
$301,167.85
($4,837.35)
$296,330.50
Total Cost of Work Completed $296,330.50
Less % Retained $0.00
Net Earned $296,330.50
Earned This Period $296,330.50
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$296,330.50
Friday, June 30, 2023 Page 3 of 4
City Project Numbers 103406
Contract Name BELTMILL PHASE 1
Contract Limits
Project Type STREET LIGHTING
Project Funding
Project Manager NA
Inspectors GLOVER, M / WALKER, E
Contractor INDEPENDENT UTILITY CONSTRUCTION
5109 SUN VALLEY DRIVE
FORT WORTH, TX 76119
DOE Number 3406
Estimate Number 1
Payment Number 1
For Period Ending 6/29/2023
City Secretary Contract Number
Contract Date
1/18/2022
Contract Time
45 WD
Days Charged to Date
260 WD
Contract is .000000
Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $296,330.50
Less % Retained $0.00
Net Earned $296,330.50
Earned This Period $296,330.50
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$296,330.50
Friday, June 30, 2023 Page 4 of 4
REVIEWED 1
By Andrew Goodman at 2.36 pm, Sap 20, 2022 J
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
PROJECT NAME:
Beltmill Phase 1
CHANGE
CONTRACT:
Water, Sewer, Pavinq. Drainaqe, and Street Liqhts ORDER No:
CFA #
CFA21-0132
CITY PARTICIPATION: NO
CITY PROJECT #
103406
DOE #
X-26951
�30114-0200431-103406-E()7685
CO3
WATER PROJECT #
SEWER PROJECT #
130114-0200431-103406-EO7685
FILE #
IW-2783
INSPECTOR:
Eddie Walker
Phone No: (469)-658-5100
PROJECT MANAGER:
Andrew Goodman
Phone No: (817)-392-6251
CONTRACT UNIT
WATER SEWER PAVING DRAINAGE STREET LIGHTS CONTRACT
Developer DAYS
Cost City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost
IORIGINAL CONTRACT $1,081,563.00 $1,318,674.00 $2,768,567.50 $2,312,431.00 $301,167.85
(EXTRAS TO DATE $28,698.00 $19,780.00 ($180,937.36) ($124,200.00)
ICREDITS TO DATE
ICONTRACTTO DATE
$1,110,261.00
AMOUNT OF PROP. CHANGE ORDER
$0.00
REVISED CONTRACT AMOUNT
$1,110,261.00
TOTAL REVISED CONTRACT AMOUNT
PER UNIT
$1,110,261.00
REVISED COST SHARE
Dev. Cost:
TOTAL REVISED CONTRACT
$1,338,454.00 $2,587,630.14 $2,188,231.00
$0.00 $0.00 $0.00
$1,338,454.00 $2,587,630.14 $2,188,231.00
$1,338,454.00 $2,587,630.14 $2,188,231.00
$7,520,906.64 City Cost:
$7,520,906.64
$0.00
$301,167.85 $0.00 0
($4,837.35)
$296,330.50 $0.00 0
$296,330.50
Revised: 10-12-2011 Page 1
REVIEWED
By Andrea Goodman of 2:76 pm. Sep 20, 2022
You are directed to make the rollawin4 changes in the contract docurnl/¢nts;
I CITY B# ITEM I
I
I
PAY ITEM X
QUANTITY I
UNIT ITEM DESCRIPTION
UNIT PRICE
TOTAL
STREET LIGHTING IMPROVEMENTS
94
1 3441.1403 -555
LF NO 6 TRIPLEX OH INSULATED ELEC CONDR
$3.17
-$1,759.35
95
1 3441.3051
EA I FURNISH/INSTALL LED LIGHTING FIXTURE (137 WATT T COBRA HEAD)
$502.00
-$1.506.00
96
1 3441.3323 1 -3
EA I FURNISH/INSTALL 6' WOOD LIGHT POLENIL
$524.00 1
41.572.00
TOTAL
-$4,637.35
REASONS FOR CHANGE ORDER
Removed Wagley Robertson proposed streetlights.
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100 % OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED:
Peloton Land Sala ns
Name: Ban Raef. P.E.
Title: Proiect Manager, Associate Principal
APPROVED:
D.R. Horton
By: -
c
Name's � �ei.��.�!•f
Title: rY/2- dl IAr a 06 ✓-
APPROVED: /
Independe(I,Vblily construction
Name: Richard Wolfe
Tille: President
Revised:ld-12-2011
Page 2
FORT WORTH.,
TRANSPORTATION AND PUBLIC WORKS
June 29, 2023
Independent Utility Construction, Inc.
5109 Sun Valley Dr.
Fort Worth TX. 76119
RE: Acceptance Letter
Project Name: BELTMILL PHASE 1
Project Type: Street light
City Project No.: 103406
To Whom It May Concern:
On April 19, 2023 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on June 29, 2023. The final inspection and
the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is
therefore accepted by the City. The warranty period will start on June 29, 2023, which is the date of
the punch list completion and will extend of two (2) years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-6251.
Sincerely,
n
Andrew Goodman, Project Manager
Cc: Eddie Walker, Inspector
Mike Glover, Inspection Supervisor
Daniel Roy, Senior Inspector
Victor Tornero, Program Manager
Peloton Land Soltions, Consultant
Independent Utility Construction, Inc., Contractor
DR HORTON-TX,LTD., Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared RICHARD
WOLFE, PRESIDENT Of INDEPENDENT UTILITY
CONSTRUCTION, INC., known to me to be a credible person, who being
by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Beltmill Phase 1 - City Project No. 10 4
BY
Richard Wolfe, President
Subscribed and sworn before me o is date 16th of June, 2023.
Notary Public
Tarrant County, State of
Texas CHRISTINA GARCIA
_Notary Public, State of Texas
Comm. Expires 12-20-2024
Notary ID 130940785
CONSENT OF OWNER ❑
SURETY COMPANY ARCHITECT ❑
CONTRACTOR ❑
TO FINAL PAYMENT SURETY ❑
OTHER
(SIMILAR TO AIA DOCUMENT G707)
Bond No. 170884P
PROJECT: City Project #103406 for Street Lighting Improvements to serve Beltmill Phase 1,
(name, address) Fort Worth, TX
TO (Owner)
F- City of Fort Worth
200 Texas Street
Fort Worth, TX 76102
1
CONTRACTOR: Independent Utility Construction, Inc.
ARCHITECT'S PROJECT NO:
CONTRACT FOR:
J CONTRACT DATE:
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the (here insert name and
address of Surety Company)
Westfield Insurance Company
555 Republic Drive, Suite 450 , SURETY COMPANY,
Plano, TX 75074
on bond of (here insert name and address of Contractor)
Independent Utility Construction, Inc.
5109 Sun Valley Drive , CONTRACTOR,
Fort Worth, TX 76119
hereby approves of the final payment to the Contractor, and agrees that the final payment to the Contractor shall not relieve the
Surety Company of any of its obligations to (here insert name and address of Owner)
City of Fort Worth
200 Texas Street OWNER,
Fort Worth, TX 76102
as set forth in the said Surety Company's bond.
IN WITNESS WHEREOF,
The Surety Company has hereunto set its hand this
Attest:
(Seal):
16th day of June , 2023
WESTFIELD INSURANCE COMPANY
Surety CompanAnRV-
Signature By of Auresentative
Kyle W. Sweeney Attorney —in —Fact
Title
Note: This form is intended to be used as a companion document to the Contractor's Affidavit of Payment of Debts and Claims, Current Edition
THIS POWER OF ATTORNEY SUPERCEDES ANY PREVIOUS POWER BEARING I His sAMt
POWER # AND ISSUED PRIOR TO 04/20/11, FOR ANY PERSON OR PERSONS NAMED BELOW.
POWER NO. 4220052 06
General Power Westfield Insurance Co.
of Attorney Westfield National Insurance Co.
Ohio Farmers Insurance Co.
CERTIFIED COPY Westfield Center, Ohio
Know All Men by These Presents, That WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO
FARMERS INSURANCE COMPANY, corporations, hereinafter referred to individually as a "Company" and collectively as "Companies," duly
organized and existing under the laws of the State of Ohio, and having its pri4hcipal office in Westfield Center, Medina County, Ohio, do by these
presents make, constitute and appoint
CHARLES D. SWEENEY, MICHAEL A. SWEENEY, KYLE W. SWEENEY, ELIZABETH GRAY, JOINTLY OR SEVERALLY
of FORT WORTH and State of TX its true and lawful Attorney(s) -i n- Fact, with full power and authority hereby conferred in its name,
place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings, or other instruments or contracts of
suretyship- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --
LIMITATION: THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE
GUARANTEE, OR BANK DEPOSITORY BONDS.
and to bind any of the Companies thereby as fully and to the same extent -as if such bonds were signed by the President, sealed with the corporate
seal of the applicable Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney(s)-in-Fact may do in
the premises. Said appointment is made under and by authority of the following resolution adopted by the Board of Directors of each of the
WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY:
"Be It Resolved, that the President, any Senior Executive, any Secretary or any Fidelity & Surety Operations Executive or other Executive shall
be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attorney(s)-i n -Fact to represent and act for
and on behalf of the Company subject to the following provisions:
The Attorney -in -Fact. may be given full power and authority for and in the name of and on behalf of the Company, to execute, acknowledge and
deliver, any and all bonds, recognizances, contracts, agreements of indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attorney -in -Fact shall be as binding upon the Company as if signed by the President and sealed and attested by the Corporate Secretary."
"Be it Further Resolved, that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any
power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signatures or facsimile
seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached." (Each adopted at a meeting
held on February 8, 2000).
In Witness Whereof, WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE
COMPANY have caused these presents to be signed by their Senior Executive and their corporate seals to be hereto affixed this 20th day of
APRIL A.D., 2011 .
yaawWl,,, pau1•aau44r
Corporate ~ Na,, a e "•' uga�q,,i
Seals ' •`4SUR.(�" , .•�p��nNA( !/lS'•, 1llSU WESTFIELD INSURANCE COMPANY
Affixed�v ' .cs. ••t �,' p: •.Gp: ;;�1'�, WESTFIELD NATIONAL INSURANCE COMPANY
IARTE f• OHIO FARMERS INSURANCE COMPANY
SEAL SEAL
1848 : !�•= `
B*)yr:
State of Ohio "aa as """"""'aaaa• Richard L. Kinnaird, Jr., National Surety Leader and
County of Medina ss.: Senior Executive
On this 20th day of APRIL A.D., 2011 , before me personally came Richard L. Kinnaird, Jr. to me known, who, being by me duly
sworn, did depose and say, that he resides in Medina, Ohio; that he is Senior Executive of WESTFIELD INSURANCE COMPANY, WESTFIELD
NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, the companies described in and which executed the above
instrument; that he knows the seals of said Companies; that the seals affixed to said instrument are such corporate seals; that they were so affixed
by order of the Boards of Directors of said Companies; and that he signed his name thereto by like order.
Notarial .aN•''«aa.u,,,,N
Seal a1 A L S
Affixed
• William J. Kahelin, A rney at Law, Notary Public
State of Ohio N d go My Commission Does Not Expire (Sec. 147.03 Ohio Revised Code)
County of Medina ss.: �,-
QT� 06 0
I, Frank A. Carrino, Secretary of WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS
INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said
Companies, which is still in full force and effect; and furthermore, the resolutions of the Boards of Directors, set out in the Power of Attorney are
in full force and effect.
In Witness Whereof, I_hVe hereunto set my hand and affixed the seals of said Companies at Westfield Center, Ohio, this /t6rla of
e 1 �• A.D. l Y
A SEAL m
� .fiL. 'ail' •n
�'�aenwaaaM" .0 nn••••aaaa,
a / Secretary
1848 Frank A. Carrino, Secretary
BPOAC2 (combined) (06-02)