HomeMy WebLinkAboutContract 58528-CO3CSC No. 58528-CO3
FORT WC3 RT H City of Fort Worth
Change Order Request
Project Name:1 Sanitary Sewer Rehabilitation Contract 98 City Sec No.: 1 58528
Project No.(s):l 56002-0600430-0700430-0200430-5740010 M&C: 1 22-0888 1 CityProj. No.:1 CO2719
Project Description:) Water, sanitary sewer, and paving Improvements In the Northside Neighborhood.
Contractor: I Woody Contractors, Inc. Change Order # 3 1 Date:
City Project Mgr.1 Suzy Abbe City Inspector: Charles Hayes
Phone Number:) 817-392-8209 Phone Number: 682-213-0240
Dept. Water Sewer Paving Totals
6/20/2023 1
Contract Time
(Calender days)
Original Contract Amount $3,043,559.00 $3,253,980.00 $957,884.25
$7,255,423.25 550
Extras to Date $6,200.00 $8,431.00 $0.00
$14,631.00
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Dale $3,049,759.00 $3,262,411.00 $957,884.25
$7,270,054.25 550
Amount of Proposed Change Order $0.00 $0.00 $0.00
$0.00
Revised Contract Amount $3,049,759.00 $3,262,411.00 $957,884.25
$7,270,054.25 550
Original Funds Available for Change Orders $121,742.00 $130,159.00 $57,473.00
$309,374.00
Remaining Funds Available for this CO $115,542.00 $121,728.00 $57,473.00
$294,743.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
0.20%
MAKALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%)
$9,069,279.06
JUSTIFICATION,(REASONS) FOR CHANGE'ORDER
Change Order No. 3 provides for the replacement of severly deteriorated segments of 18 and 24-inch
storm drain laterals that were
encountered in close proximity (and broke apart) during water main installation at the Prairie Avenue /
NW 22nd Street intersection.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Company Name Contractor:NaRIM7 "factor &pat ' Date
Woody Contractors, Inc. I Troy Woody ���, I �'ot3 ' 3 ! 1
Inspecyi'' Date r'°IPro'ec a e t
06/28/23
Director (Water De Date Construction Supervisor (TP)/V Dept)
e' Jun 30, 2023 6)4-CCvL /ryrL 06-27-23
Senior Assistant City Attorney Date Assistant -City Mana er
e I Jul 3, 2023 Dana FacandOE Jul 5, 2023
Council Action (If Required)
M&C Number N/A M&C Date Approved
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
F_ cO RT WORTHCity of Fort Worth
Change Order Additions
Project Name I Sanitary Sewer Rehabilitation Contract 98 City Sec No.: 1 58528
Project No.(s): 56002-0600430-0700430-0200430-5740010 DOE No.1 22-08881 City Proj. No.: I CO2719
Project I Water, sanitary sewer, and paving Improvements in the Northside Neighborhood.
Description
Contractor Woody Contractors, Inc. Change Order: 0 Date: 1 6/20/2023
City Project Mgr. Suzy Abbe City Inspector I Charles Hayes
ADDITIONS
I tM ULSURIF I IUN DEPT Qty Unit Unit Cost Total
97 18" RCP CL III Storm Drain Water 31.00 LF $197.00 $6,107.00
98 24" RCP CL III Storm Drain Water 28.00 LF $203.00 $5,684.00
lWater $11,791.00
Sewer
Page i of i Paving
Additions Sub Total $11,791.00
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name Sanitary Sewer Rehabilitation Contract 98 City Sec No.: 58528
Project No.(s): 56002-0600430-0700430-0200430-5740010 I DOE No. 1 22-08 City Proj. No.: CO2719
Project Description Water, sanitary sewer, and paving Improvements in the Northside Neighborhood,
Contractor I Woody Contractors, Inc. Change Order: FTJ Date 6/2012023 II
City Project Mgr. I Suzy Abbe I City Inspector: I Charles Hayes
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
96 Construction Allowance Water 0.11791 I-S $100,000.00 $11,791.00
Water $11,791.00
(Sewer
(Paving
Page 1 of 1 IDeletions Sub Total $11,791.00
MIWBE Breakdown for this Change Order
MISWIN'Kn,,0 ` t��aa r �Y( fit �r7}rpw4�(f0rff /cr�y Isrllt�, @tu %e� g F s sice.7ev' td� f0u.r � s�.Sr }�'+dr'h
41,111,
? MA (��;{rW+ � .Total ,.
Previous Change Orders
,'ii"i' 1
Total,��', Q
Page 1 of 1
6/15/2023
CPN CO2719
Sanitary Sewer Rehabilitation Contract 98
Chanee Reauest 3 Notes
Conflicts with existing storm drain were encountered during the installation of the water line at Prairie
Avenue and NW 22"d Street. The storm drain pipe that was uncovered was unreinforced concrete pipe
with segments of PVC pipe. The condition of the pipe was poor and the contractor determined that
tunneling underneath without damaging the pipe was not possible. A sketch of the replaced segments,
photos, and the contractor's proposal are attached. The work included removal and haul of existing
pipe, 3 connections to an existing manhole, 5 connections to existing pipe, 8 concrete collars, and wiping
inside manhole and pipe.
The contractor's proposed unit price is comparable to recent average bid prices which are summarized
in Table 1. Note that the bid prices below do not include removal of existing storm drain which would
add approximately $30/LF to the average unit price.
Table 1: Unit Price Comparison
Size Woody (Class III) 2022 Bond Year 1(Class IV)
Contract 1 Contract 2
18" $197/1-F --- ---
21"
Low Bidder Price $203/LF $250/LF $105
Average Bid Price $223.30/1-F $194.20
Range of Bids $105 - $350/LF $105 - $312
WOODY CONTRAC-FORS INC
,lob: S.S. CONTRACT 98
Date June 15, 2023
CHANGE ORDER 3
wWCONTRACTOCTORS
650 TOWER 1217
KENNEDALE,TX 76060
PRONE- 1117-483-4707
FAX 817-483.20.18
Item Description Quantity Unit Price Total Price
'1 18 " RCP CL III 31 LF $ '197,00 $ 6,107.00
2 21" RCP CL III 28 LF $ 203.00 $ 5,684.00
j Total for Sheet $ 11,791.001
Total For Job $ 11,791.00
INCLUDED IN PIPE PRICE:
REMOVAL $ HAUL OFF EXISTING PIPE
3 EA. CONNECTIONS TO EXISTING MANHOLE
5 EA. CONNECTIONS TO EXISTING PIPE
8 EA, CONCRETE COLLARS
8 EA. WIPE INSIDE MANHOLE & PIPE
C
c 1.
I
CCa ^ \-/ r— ?-
`*t
/ ••
ul11i •
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Suzanne Abbe
Name of Employee
Senior Engineer, Capital Project Delivery
Title
ATTEST:
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX