Loading...
HomeMy WebLinkAboutContract 18445 i STATE OF TEXAS § COUNTY OF TARRANT § CITY SECRETARY CONTRACT NO. 18279 AMENDMENT I INSTALLATION OF AVIATION GASOLINE, JET A AVIATION FUEL AND AUTOMOTIVE GASOLINE UNDERGROUND STORAGE TANKS MEACHAM AIRPORT, FORT WORTH, TEXAS, TEXAS JET BY LES GRAY & COMPANY, INC. This amendment is made and entered into this day of A, 1991, by and between the City of Fort Worth, a municipal corporation situated in Tarrant County, Texas; acting by and through David Ivory, City Manager, its duly authorized agent, hereinafter referred to as "CITY, " and Les Gray & Company, Inc. , hereinafter referred to as "CONTRACTOR. " This agreement hereinafter set forth shall supplement and be considered an amendment to a contract designated as Fort Worth City Secretary Contract No. 18279 (hereinafter referred to as "the CONTRACT" ) , dated January 18 , 1991. For and in consideration of the mutual covenants and agreements herein contained, CITY and the CONTRACTOR do hereby covenant and agree as follows: 1 . CONTRACTOR will complete the project described in the original contract and also as described below: Delete the two 550-gallon single- wall fiberglass underground storage tanks, and replace with two 550-gallon double-wall fiberglass underground storage tanks. Delete the M-20 model Jet A Aviation fuel dispensing unit and replace with an M-30 model. Delete vertical filters and replace with horizontal filters which comply with API Bulletin 1581 and 150 pounds per square inch ASME Code Construction. Welded flanged pipe fittings may be used for this project. Contract time will be extended by 11 calendar days to a total of 71 OFFICIAL RECORD calendar days. CITY SECRETARY ' FT. NORTH, TEX. 2 . CONTRACTOR shall be entitled to additional compensation for provision of services and materials described herein in accordance with the terms of the Contract, as amended. The Contract is hereby amended to increase the maximum "not-to- exceed" compensation for all services and materials rendered under the Contract, as amended, to $290, 949. 00 . RECORD 3 . The foregoing amendment shall not affect the method!, or manner of payment of funding provided in the Contract, Q' any other amendment thereto. The provisions of the - Contract, as amended, shall remain in force and effect except as specifically amended herein. EX in the City of Fort Worth, Texas, this 1A day of A.D. , 1991. APPROVED: APPROVED: LES GRAY & COMPANY, INC. 1800 Commerce Street CITY OF FORT WORTH Garland, Texas 75040 BY• BY: NAME: T' ! Mike Groomer, TITLE: Assistant City Manager WITNESS: ATTEST: i NAME'. � � t oward, City Secretary ` TITLE: (Seal) (Seal) / APPROVED AS TO FORM: u"cho izati Date Assists t City Attorney City of Fort Worth, Texas Mayor and Council Communication DATE REFERENCE SUBJECT: PROPOSED CHANGE ORDER NO. 1 AND PAGE NUMBER 2, INSTALLATION OF UNDERGROUND FUEL 2 4-9-91 **C-12794 STORAGE TANKS AT MEACHAM AIRPORT, CITY for SECRETARY CONTRET NO. 18279— RECOMMENDATIONS: It is recommended that City Council : 1. Approve Change Order No. 1 in the amount of $3,933 with no increase in the Contract Time of sixty (60) calendar days; 2. Approve Change Order No. 2 in the amount of $11,283 and adding eleven (11) calendar days to the Contract Time; and 3. Authorize the City Manager to increase City Secretary Contract No. 18279 with Les Gray and Company, Inc. by $15,216, a new total Contract Amount of $290,949, and a total of seventy-one (71) calendar days for the installation of Underground Fuel Storage Tanks at Meacham Airport. DISCUSSION: On December 18, 1990 (M&C C-12657) , the City Council awarded a contract in the amount of $275,733 to Les Gray and Company, Inc. to install underground fuel storage tanks at Meacham Airport. The contract required installation of five (5) underground fuel storage tanks and two (2) underground waste fuel storage tanks. In addition, the contract allowed for additional compensation should the excavation require non-standard equipment. Total contract time was sixty (60) calendar days. Proposed Change Order No. 1: The plans and specifications as bid required double wall construction for the five (5) underground fuel storage tanks and single wall construction on the two (2) underground waste fuel storage tanks. Staff required the contractor to install double wall tanks in place of the single wall waste fuel tanks. The contractor agreed to this change for the additional cost of $3,933. Staff has reviewed this cost and finds it to be reasonable and cost effective in adding additional protection against future environmental impacts. Proposed Change Order No. 2: Additional equipment for excavation was necessary to complete the project. The contractor provided a lump sum cost of $11,283 plus eleven (11) additional days for excavation and time lost. Staff has reviewed this proposal and finds it to be reasonable and justifiable. Project Cost: _ Original Contract Cost: $275,733 Change Order No. 1: $ 3,933 s; .; T Change Order No. 2: $ 111283 " X11 R Amended Contract Amount $290,949 f . WORM TEX. DATE REFERENCE SUB!ECTPROPOSED, CHANGE ORDER NO. 1 AND 2, PAGE NUMBER INSTALLATION OF UNDERGROUND FUEL 2 2 4-9-91 **C-12794 STORAGE TANKS AT MEACHAM AIRPORT, CITY -- of- - - ECRFTARY tffN—T RA T N . Approval of these change orders constitute a 6% increase in the contract amount. FINANCING: Sufficient funds are available in Aviation Improvements Capital Project Fund, GC24 Center No. 020240438100, Six New Tanks. Expenditures will be made from Account No. 539120. DAI:v 02CHNGES SUBMITTED FOR THE DISPOSITION BY COUNCIL: PROCESSED BY CITY MANAGER'S OFFICE BY: Mike Groomer 6140 a APPROVED Q OTHER (DESCRIBE) ORIGINATING DEPARTMENT HEAD: Rick Hay 6095 CITY SECRETARY FOR ADDITIONAL INFORMATION CONTACT' Hay DATE