Loading...
HomeMy WebLinkAboutContract 59697CSC No. 59697 CITY OF FORT WORTH, TEXAS STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL SERVICES This AGREEMENT is between the City of Fort Worth, a Texas home -rule municipality ("CITY"), and Kimley-Horn and Associates, Inc. authorized to do business in Texas, ("ENGINEER"), for a PROJECT generally described as: FM-156 Cantrell-Sansom Road Water Main Relocation -- Project No, 104515. Article Scope of Services The Scope of Services is set forth in Attachment A. Negotiated changes to this Agreement, if any, are included in Attachment C. Article II Compensation The ENGINEER's compensation shall be in the amount up to. $282,600.00 as set forth in Attachment B. Payment shall be considered full compensation for all labor (including all benefits, overhead and markups), materials, supplies, and equipment necessary to complete the Services. Engineer shall provide monthly invoices to City. The Engineer shall provide the City sufficient documentation, including but not limited to meeting the requirements set forth in Attachment D to this AGREEMENT, to reasonably substantiate the invoices. Payments for services rendered shall be made in accordance with the Texas Prompt Payment Act (Texas Government Code Ch. 2251). Acceptance by Engineer of said payment shall release City from all claims or liabilities under this Agreement for anything related to, performed, or furnished in connection with the Services for which payment is made, including any act or omission of City in connection with such Services. Article [ll Term Time is of the essence. Unless otherwise terminated pursuant to Article VI, D. herein, this Agreement shall be for a term beginning upon the effective date, as described below, and shall continue until the expiration of the funds or completion of the subject matter contemplated herein pursuant to the schedule, whichever occurs first. Unless specifically otherwise amended, the original term shall not exceed five years from the original effective date. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services Revised Date: November 23, 2021 Page i of 15 FM-156 Cantrell-Sansom 104515 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Article IV Obligations of the Engineer A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement, providing professional engineering consultation and advice and furnishing customary services incidental thereto. B. Standard of Care The ENGINEER shall perform its services-. (1) with the professional skill and care ordinarily provided by competent engineers practicing under the same or similar circumstances and professional license; and (2) as expeditiously as is prudent considering the ordinary professional skill and care of a competent engineer. C. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER. City of Fort Worth, Texas FM-156 Cantrell-Sansom Standard Agreement for Engineering Related Design Services 104515 Revised Date: November 23, 2021 Page 2 of 15 D. Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible mylar sheets and electronic files in .pdf format, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. E. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on -site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the contract documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with the contract documents, nor shall anything in the contract documents or this AGREEMENT between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on -site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT. If the ENGINEER makes on -site observation(s) of a deviation from the contract documents, the ENGINEER shall inform the CITY. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the contract documents. City of Fort Worth, Texas FAR-156 Cantrell-Sansom Standard Agreement for Engineering Related Design Services 104515 Revised Date: November23, 2021 Page 3 of 15 F. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by third parties; quality, type, management, or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. G. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the contract documents; that the final work will be acceptable in all respects; that the ENGINEER has made an examination to ascertain how or for what purpose the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are no other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. H. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. City of Fort Worth, Texas FM-156 Cantrell•Sansom Standard Agreement for Engineering Related Design Services 104515 Revised Date: November 23, 2021 Page 4 of 15 I. Business Equity Participation City has goals for the full and equitable participation of minority business and/or women business enterprises in City contracts greater than $100,000. In accordance with the City's Business Equity Ordinance No. 25165-10-2021 (replacing Ordinance No. 24534-11-2020, as codified in Chapter 20, Article X of the City's Code of Ordinances, as amended, and any relevant policy or guidance documents), the City has goals for the full and equitable participation of minority business and/or women business enterprises in City contracts greater than $100,000. Engineer acknowledges the MBE and WBE goals established for this contract and its execution of this Agreement is Engineer's written commitment to meet the prescribed MBE and WBE participation goals. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Engineer may result in the termination of this Agreement and debarment from participating in City contracts for a period of time of not less than three (3) years. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract. ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of five (5) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subconsultant, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3) hereof. CITY shall give subconsultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to reproduce such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of hard copies at the rate published in the Texas Administrative Code in City of Fort Worth, Texas FM-156 Cantrell-Sansom Standard Agreement for Engineering Related Design Services 104515 Revised Date: November 23, 2021 Page 5 of 15 effect as of the time copying is performed. IIkqE.'111;L1r;[y:4 Engineer shall not commence work under this Agreement until it has obtained all insurance required under Attachment F and City has approved such insurance. L. Independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. The doctrine of respondeat superior shall not apply. M. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. N. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. O. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, at its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. City of Fort Worth, Texas FM-156 Cantrell-Sansom Standard Agreement for Engineering Related Design Services 104515 Revised Date: November 23, 2021 Page 6 of 15 P. Schedule ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment D to this AGREEMENT. Article V Obligations of the City A. City -Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Access to Facilities and Property The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's performance of its services. The CITY will perform, at no cost to the ENGINEER, such tests of equipment, machinery, pipelines, and other components of the CITY's facilities as may be required in connection with the ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights -of -way, and access necessary for the ENGINEER's services or PROJECT construction. D. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule prepared in accordance with Attachment D. E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. City of Fort Worth, Texas FM-156 Cantrell-Sansom Standard Agreement for Engineering Related Design Services 104515 Revised Date: November 23, 2021 Page 7 of 15 F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazardous materials, including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage, or disposition of such materials. In consideration of the associated risks that may give rise to claims by third parties or employees of City, City hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER's negligence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. G. Contractor Indemnification The CITY agrees to include in all construction contracts the provisions of Article IV.E. regarding the ENGINEER's Personnel at the construction site, and provisions providing for contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third -Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the CITY will be the beneficiary of any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third -party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third -party beneficiary rights under this Agreement. (4) Nothing contained in this Section H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. City of Fort Worth, Texas FM-156 Cantfell-Sansom Standard Agreement for Engineering Related Design Services 104515 Revised Date: November 23, 2021 Page 8 of 15 Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. J. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article VI General Legal Provisions A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. B. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. C. Force Majeure CITY and ENGINEER shall exercise their best efforts to meet their respective duties and obligations as set forth in this Agreement, but shall not be held liable for any delay or omission in performance due to force majeure or other causes beyond their reasonable control, including, but not limited to: acts of the public enemy, fires, strikes, lockouts, natural disasters, epidemics/pandemics, wars, riots, material or labor restrictions by any governmental authority and/or any other similar causes. City of Fort Worth, Texas FM-156 Cantrell-Sansom Standard Agreement for Engineering Related Design Services 104515 Revised Date: November 23, 2021 Page 9 of 15 D. Termination (1) This AGREEMENT may be terminated a.) by the City for its convenience upon 30 days' written notice to ENGINEER. b.) by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and the nonperforming party does not commence correction of such nonperformance within 5 days' written notice or thereafter fails to diligently complete the correction. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Reasonable cost of reproduction or electronic storage of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b.) The reasonable time requirements for the ENGINEER'S personnel to document the work underway at the time of the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all projected termination expenses. The CITY'S approval shall be obtained in writing prior to proceeding with termination services. E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT's schedule, commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER's compensation will be made. F. Indemnification The ENGINEER shall indemnify or hold harmless the CITY against liability for any damage committed by the ENGINEER or ENGINEER's agent, consultant under contract, or another entity over which the ENGINEER exercises control to the extent that the damage is caused by or resulting from an act of negligence, intentional tort, intellectual City of Fort Worth, Texas FM-156 Cantrell -Sansom Standard Agreement for Engineering Related Design Services 104515 Revised Date: November 23, 2021 Page 10 of 15 property infringement, or failure to pay a subcontractor or supplier. CITY is entitled to recover its reasonable attorney's fees in proportion to the ENGINEER's liability. G. Assignment ENGINEER shall not assign all or any part of this AGREEMENT without the prior written consent of CITY. H. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, Texas. I. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause. J. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. K. Contract Construction/No Waiver The parties acknowledge that each Party and, if it so chooses, its counsel, have reviewed and revised Agreement and that the normal rule of contract construction, to the effect that any ambiguities are to be resolved against the drafting party, must not be employed in the interpretation of Agreement or any amendments or exhibits hereto. City of Fort Worth, Texas FM-156 Cantrell-Sansom Standard Agreement for Engineering Related Design Services 104515 Revised Date: November 23, 2021 Page 11 of 15 The failure of CITY or ENGINEER to insist upon the performance of any term or provision of this Agreement or to exercise any right granted herein shall not constitute a waiver of CITY's or ENGINEER's respective right to insist upon appropriate performance or to assert any such right on any future occasion. L. Immigration Nationality Act ENGINEER shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (1-9). Upon request by CITY, ENGINEER shall provide CITY with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. ENGINEER shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any ENGINEER employee who is not legally eligible to perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER, ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. CITY, upon written notice to ENGINEER, shall have the right to immediately terminate this Agreement for violations of this provision by ENGINEER. M. Prohibition On Contracts With Companies Boycotting Israel ENGINEER unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of the Texas Government Code, if ENGINEER has 10 or more full time -employees and the contract value is $100,000 or more, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, ENGINEER certifies that ENGINEER'S signature provides written verification to the City that if Chapter 2271, Texas Government Code applies, ENGINEER: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. N. Prohibition on Boycotting Energy Companies ENGINEER acknowledges that in accordance with Chapter 2274 of the City of Fort Worth, Texas FM-156 Cantrell-Sansom Standard Agreement for Engineering Related Design Services 104515 Revised Date: November 23, 2021 Page 12 of 15 Texas Government Code --(as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2), the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more, which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full- time employees) unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER's signature provides written verification to the CITY that ENGINEER: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement, 0. Prohibition on Discrimination Against Firearm and Ammunition Industries ENGINEER acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1), the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER's signature provides written verification to the CITY that ENGINEER: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, which supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. This AGREEMENT may be executed in one or more counterparts and each counterpart shall, for all purposes, be deemed an original, but all such counterparts shall together constitute but one and the same instrument. City of Fort Worth. Texas FM-156 Cantrell -Sansom Standard Agreement for Engineering Related Design Services 104515 Revised DaW November 23, 2021 Page 13 of 15 The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment A - Scope of Services Attachment B - Compensation Attachment C - Amendments to Standard Agreement for Engineering Services Attachment D - Project Schedule Attachment E. - Location Map Attachment F -- Insurance Requirements City of Fort Worth, Texas Fbi-156 Cantrell-Sansom Standard Agreement for Engineering Related design Services 104515 Revised Date: November 23, 2021 Page 14 of 15 Duly executed by each party's designated representative to be effective on the date subscribed by the City's designated Assistant City Manager. BY: CITY OF FORT WORTH � a� Dana Burghdoff (J 5, 202 2CDT) Dana Burghdoff Assistant City Manager Date: Jul 5, 2023 ATTEST: Jannette S. Goodall City Secretary 4 n nab aoF FO°°Rr�°o pro %V �o PVo o=d o�Q % a *p �db TEXAS 4 dbnnuaa 4p APPROVAL RECOMMENDED: ckn�� tArder By: Christopher Ffarder (Jul3, 2023 06:48 CDT) Chris Harder, P. E. Director, Water Department APPROVED AS TO FORM AND LEGALITY p By: DBlack (Jul 3, 202314:54 CDT) Douglas W Black Sr. Assistant City Attorney Contract Compliance Manager: BY: ENGINEER Kimley-Horn and Associates, Inc. u/,P,'.'If ,rE' John Atkins, P. E. Vice President Date: 06/29/2023 Form 1295 No. 2023-976255 M&C No.: 23-0492 M&C Date: 06/13/2023 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Joh&(Kasavich P.E. Project Manager OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas FM-i% Cantrell-Sansom Standard Agreement for Engineering Related Design Services 104515 Revised Date: November 23, 2021 Page 15 of 16 ATTACHMENT A DESIGN SERVICES FOR FM-W AT CANTRELL.SANSOM WATER LINE RELOCATION CITY PROJECT NO.: 104515 ATTACHMENT A Scope for Engineerina Design Related Services for Water Improvements DESIGN SERVICES FOR FM-156 AT CANTRELL-SANSOM WATER LINE RELOCATION CITY PROJECT NO.: 104515 The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. OBJECTIVES The following utilities are anticipated to be relocated for the TxDOT FM-156 at Cantrell- Sansom` project: Water J Project I FM-156 at Cantrell- Approximate t a e Length I � jjjj Sansom Relocations g ) 1 124-inch Water Line in 42" Steel Casing FM-156 at Cantrell-Sansom 800 2 Water Line Vault and Appurtenances FM-156 at Cantrell-Sansom NIA Total Water I 800 WORK TO BE PERFORMED Task 1. Design Management Task 2. Conceptual Design Task 3. Preliminary Design Task 4. Final Design Task 5. Bid Phase Services Task 6. Construction Phase Services — Not included in this contract Task 7. ROW/Easement Services — Not included in this contract Task 8. Survey and Subsurface Utility Engineering Services Task 9. Permits TASK 1. DESIGN MANAGEMENT. ENGINEER shall ensure efficient and effective use of ENGINEER's and CITY's time and resources. ENGINEER shall manage change, communicate effectively, coordinate internally and externally as needed, and proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. 1.1. Managing the Team • Lead, manage and direct design team activities • Ensure quality control is practiced in performance of the work • Communicate internally among team members City of Fort Worth, Texas Attachment A PMO Release Date: 07.23.2012 Page 1 of 14 ATTACHMENT A DESIGN SERVICES FOR FIA-156 AT CANTRELL-SANSOM WATER LINE RELOCATIONS CITY PROJECT NO.: 104515 • Task and allocate team resources 1.2. Communications and Reporting • Attend a pre -design project kickoff/chartering meeting with CITY staff to confirm and clarify scope, understand CITY objectives, and ensure economical and functional designs that meet CITY requirements • Conduct review meetings with the CITY at the end of each design phase • Prepare invoices and submit monthly in the format requested by the CITY. • Prepare and submit monthly progress reports in the format provided by the Water Department. • Prepare and submit baseline Project Schedule initially, and Project Schedule updates with a schedule narrative monthly, as required in Attachment D to this Standard Agreement and according to the City of Fort Worth's Schedule Guidance Document. • Complete Monthly MWWBE Report Form and Final Summary Payment Report Form at the end of the project • Coordinate with other agencies and entities as necessary for the design of the proposed infrastructure, and provide and obtain information needed to prepare the design • With respect to coordination with permitting authorities, ENGINEER shall communicate with permitting authorities such that their regulatory requirements are appropriately reflected in the designs. ENGINEER shall work with regulatory authorities to obtain approval of the designs, and make changes necessary to meet their requirements, as part of the design scope. • Personnel and Vehicle Identification: When conducting site visits to the project location, the ENGINEER or any of its sub -consultants shall carry readily visible information identifying the name of the company and the company representative. ASSUMPTIONS • 12 MWBE reports will be prepared • 6 meetings with city staff • 2 meetings with the developer • 1 meeting with a stakeholder • 12 monthly water department progress reports will be prepared • 12 monthly project schedule updates will be prepared DELIVERABLES A. Meeting summaries with action items B. Monthly invoices City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 2 of 14 ATTACHMENT A DESIGN SERVICES FOR FM•165 AT CANTRELL•SANSOM WATER LINE RELOCATIONS CITY PROJECT NO.: 104515 C. Monthly progress reports D. Baseline design schedule E. Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes F. Monthly MIWBE Report Form and Final Summary Payment Report Form TASK 2. CONCEPTUAL. DESIGN (30 PERCENT). The Conceptual Design shall be submitted to CITY per the approved Project Schedule. The purpose of the conceptual design is for the ENGINEER to ■ Study the project, ■ Identify and develop alternatives that enhance the system, • Present (through the defined deliverables) these alternatives to the CITY ■ Recommend the alternatives that successfully addresses the design problem, and ■ Obtain the CITY's endorsement of this concept. ENGINEER will develop the conceptual design of the infrastructure as follows. 2.1. Data Collection • In addition to data obtained from the CITY, ENGINEER will research proposed improvements in conjunction with any other planned future improvements that may influence the project. • The ENGINEER will also identify and seek to obtain data for existing conditions that may impact the project including but not limited to; utilities, agencies (TxDOT and railroads), City Master Plans, and property ownership as available from the Tax Assessor's office. • The data collection efforts will also include conducting special coordination meetings with affected property owners and businesses as necessary to develop sewer re-routing plans. • The ENGINEER shall visit the project site and obtain the meter numbers and sizes on all existing meters to be replaced on the project and shall identify existing sample stations and fire line locations. 2.2. The Conceptual Design Package includes the following scope of services. • Graphic exhibits (aerial at a scale of 1" = 40') for re -alignment options. • Identification of potential access routes and easement requirements. • Fire line reconnections, if needed • Proposed phasing of any water work that is included in this project documented in both the project schedule and narrative form. City of Fart Worth, Texas Attachment A PMO Release Data: 08.1.2014 Page 3 of 14 ATTACHMENT A DESIGN SERVICES FOR FM•156 AT CANTRELL•SANSOM WATER LINE RELOCATIONS CITY PROJECT NO.: 104515 • Documentation of key design decisions. Estimates of probable construction cost. ASSUMPTIONS • Two (2) Geotechnical borings are expected for this project. TASK 3. PRELIMINARY DESIGN (60 PERCENT). Preliminary plans and specifications shall be submitted to CITY per the approved Project Schedule. ENGINEER will develop the preliminary design of the infrastructure as follows. 3.1. Development of Preliminary Design Drawings and Specifications shall include the following: • Cover Sheet • A Project Control Sheet, showing all Control Points, used or set while gathering data. Generally on a scale of not less than 1:400. The following information shall be indicated for each Control Point: Identified (existing City Monument #8901, PK Nail, 5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on City Datum only; descriptive location (i.e. set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). • Overall project easement lavout_sheet(s) with property owner information. Overall oroiect water and/or sanitary sewer layout sheets. The water layout sheet shall identify the proposed water main improvement/ existing water mains in the vicinity and all water appurtenances along with pressure plane boundaries, water tanks, pump stations, valves, and fire hydrants. The sewer layout sheet shall identify the proposed sewer main improvement/existing sewer mains and all sewer appurtenances in the vicinity. • Overall water and/or sanitary sewer abandonment sheet.. • Coordinates on all P.C.'s, P.T.'s, P.I.'s, manholes, valves, mainline fittings, etc., in the same coordinate system as the Control Points. • Benchmarks per 1,000 ft of plan/profile sheet — two or more. • Bearings qiven on all proposed centerlines, or baselines. • Station equations relating utilities to paving, when appropriate. • Plan and profile sheets. which show the following: proposed water and/or sanitary sewer plan/profile and recommended pipe size, fire hydrants, water service lines and meter boxes, gate valves, isolation valves, manholes, existing meter numbers and sizes that are to be replaced, existing sample locations, existing fire line locations, existing utilities and utility easements, and all pertinent information City of Fort Worth, Texas Attachment A PMO Release bate: 08.1.2014 Page 4 of 14 ATTAC14MENT A DESIGN SERVICES FOR FM-156 AT CANTRELL-SANSOM WATER LINE RELOCATIONS CITY PROJECT NO,: 104515 needed to construct the project. Legal description (Lot Nos., Block Nos., and Addition Names) along with property ownership shall be provided on the plan view. The ENGINEER shall make provisions for reconnecting all identifiable water and/or wastewater service lines which connect directly to any main being replaced, including replacement of existing service lines within City right-of-way or utility easement. When the existing alignment of a water and sanitary sewer main or lateral is changed, provisions will be made in the final plans and/or specifications by the ENGINEER to relocate all service lines which are connected to the existing main and connect said service lines to the relocated main. • The following shall be applicable at all locations where it is necessary to relocate or reroute the existing private sanitary sewer service line due to the abandonment or realignment of the existing public sanitary sewer lateral or main: The CITY shall furnish the ENGINEER with a sample format of how the sewer service line reroute/relocation should be designed and submitted for construction. During design survey, if a rod can be inserted through the cleanout to the bottom of the service line, the ENGINEER will obtain the flow line elevation and design the service line prior to advertising the project for bid. If the service flow line information cannot be obtained during design survey, the ENGINEER shall delay the design of the sewer service line until after a Quality Level A Subsurface Utility Engineering (SUE investigation has been performed). The Level A SUE will be performed; (1) by the ENGINEER if included in the fee proposal; or (2) by the CITY prior to bidding if the CITY determines that it is needed for satisfactory completion of the design; or (3) by the Contractor after the project has been bid, by means of a bid item to that effect. In all options, the ENGINEER shall propose appropriate de - hole locations in the project and collect flow line elevation and other applicable information of the sewer service line. The ENGINEER shall use this information to provide the design for the sanitary sewer service line to be rerouted or relocated. • Provide map showing location of new manhole construction at the end of existing sewer segments, 90 degree bends, or tee connections. Site survey or specific design plans for manhole construction is not included as part of the scope. The contract documents shall specify that it is the Contractor's responsibility to coordinate utility location, etc. manhole construction. • The ENGINEER will prepare standard and special detail sheets for water fine installation and sewer rehabilitation or replacement that are not already included in the D-section of the CITY's specifications. These may included connection details between various parts of the project, tunneling details, boring and jacking details, waterline relocations, details unique to the construction of the project, trenchless details, and special service lateral reconnections. 3.2. Geotechnical Investigation Soil investigations, including field and laboratory tests, borings, related engineering analysis and recommendations for determining soil conditions will be made. In addition to the above investigations, borings and appropriate field and laboratory analysis will be made at reasonable intervals along the project alignment for the Contractor's use in determining soil conditions for preparing bids and a Trench Safety Plan. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 5 of 14 ATTACHMENT A DESIGN SERVICES FOR FM-156 AT CANTRELL-SANSOM WATER LINE RELOCATIONS CITY PROJECT NO.: 104515 3.3 By Other than Open Cut Installation • Prepare trenchless alignments which include entry and exit locations, equipment layout, and other site constraints for the following trenchiess crossings: o One (f) Highway/Frontage Road crossings o Analysis of geotechnical bore logs o Assistance in design of proposed by other than open cut installation locations and methods 3.4. Constructability Review • Prior to the 60 percent review meeting with the CITY, the ENGINEER shall schedule and attend a project site visit with the CITY Project Manager and Construction personnel to walk the project. The ENGINEER shall summarize the CITY's comments from the field visit and submit this information to the CITY in writing. 3.5. Utility Clearance The ENGINEER will consult with the CITY's Transportation and Public Works Department, Water Department, and other CITY departments, public utilities, private utilities, private utilities and government agencies to determine the approximate location of above and underground utilities, and other facilities (current and future) that have an impact or influence on the project. ENGINEER will design CITY facilities to avoid or minimize conflicts with existing utilities, and where known and possible consider potential future utilities in designs. • The ENGINEER shall upload a PDF file of the approved preliminary plan set to the designated project folder in BIM360 for forwarding to all utility companies which have facilities within the limits of the project. CAD files shall be made available to the utility companies, if requested. 3.6. Cathodic Protection Study Cathodic Protection Design — ENGINEER's subconsultant will provide Cathodic Protection Design Services for three (3) pipe material alternatives, ductile iron, steel, and bar -wrapped concrete steel cylinder pipe, along the water line alignment. Tasks will include Field Survey, Data Analysis and Lab Work, and Design Recommendations. A report will be prepared that documents test data, analysis, and an opinion of probable construction cost for cathodic protection and interference control systems. 3.7. Traffic Control Plan • Develop a traffic control plan utilizing standard traffic reroute configurations posted as "Typicals" on the CITY's BIM360 site. The Typicals need not be sealed individually, if included in the sealed contract documents. • Develop supplemental traffic control drawings as needed for review and approval by the Traffic Division of the Transportation and Public Works Department. City of Fort WoAh, Texas Attachment A PMO Release pate: 08.1.2014 Page 6 of 14 ATTACHMENT A DESIGN SERVICES FOR FM•i56 AT CANTRELL•SANSOM WATER LINE RELOCATIONS CITY PROJECT NO.: 104515 These drawings shall be sealed by a professional engineer registered in the State of Texas. ASSUMPTIONS • Zero (0) public meeting(s) will be conducted or attended during the preliminary design phase. • Two (2) borings at an average bore depth of twenty-five (25) feet each will be provided. • Three (3) pipe materials will be evaluated as part of the Cathodic Protection Study. • Traffic Control "Typicals" will be utilized to the extent possible. It is assumed zero (0) additional project specific traffic control sheets will be developed. • Three (3) sets of 22 x 34 size plans will be delivered for the Constructability Review. • Three (3) sets of 22 x 34 size plans will be delivered for the Preliminary Design (60% design). • One (1) set of specifications will be delivered for the Preliminary Design (60% design). • PDF files will be uploaded to the designated project folder in BIM360 for each bid package. • The CITY's front end and technical specifications will be used. The ENGINEER shall supplement the technical specifications if needed. • Zero (0) sets of drawings will be delivered for Utility Clearance. • ENGINEER shall not proceed with Final Design activities without written approval by the CITY of the Preliminary Design plans. DELIVERABLES A. Preliminary Design drawings and specifications B. Cathodic Protection Design Recommendations Report (up to 3 copies) C. Geotechnical Report (1 copy) D. Traffic Control Plan E. Estimates of probable construction cost F. Data Base listing names and addresses of residents and businesses affected by the project. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1,2014 Page 7 of 14 ATTACHMENTA DESIGN SERVICES FOR FM•156 AT CANTRELL•SANSOM WATER LINE RELOCATIONS CITY PROJECT NO.: 104515 TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as follows: For projects that disturb an area greater than one (1) acre, the Contractor will be responsible for preparing and submitting the Storm Water Pollution Prevention Plan (SWPPP) with appropriate regulatory agencies. The Engineer will prepare the iSWM Construction Plan according to the current CITY iSWM Criteria Manual for Site Development and Construction which will be incorporated into the SWPPP by the contractor. • Draft Final plans (90%) and specifications shall be submitted to CITY per the approved Project Schedule. • Cathodic Protection: Final Design will include Cathodic Protection Design Plans as prepared by ENGINEER's Cathodic Protection subconsultant. • Following a 90% construction plan review meeting with the CITY, the ENGINEER shall submit Construction Documents (100%) to the CITY per the approved Project Schedule. Each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in State of Texas. • The ENGINEER shall submit a final design estimate of probable construction cost with both the 90% and 100% design packages. This estimate shall use ONLY standard CITY bid items. ASSUMPTIONS • One (1) virtual (WebEx, or other) public meeting will be attended upon completion of Final Design. ENGINEER will provide up to two (2) exhibits to be included in the virtual presentation for the Public Meeting. • Traffic Control "Typicals" will be utilized to the extent possible. It is assumed zero (0) additional project specific traffic control sheets will be developed. • Three (3) sets of 22 x 34 size drawings and three (3) sets of 11 x 17 size drawings and one (1) set of specifications will be delivered for the 90% Design package. • A PDF file for the 90% Design will be created from design CAD drawings and will be uploaded to the project folder in BIM360 for the bid package. • Three (3) sets of 22 x 34 size drawings and three (3) specifications will be delivered for the 100% Design package for the bid package. • A PDF file for the 100% Design will be created from design CAD drawings and will be uploaded to the project folder in BIM360 Final sheet list: cover, index and general notes, shutdown and phasing notes, control and benchmarks, overall location and proposed sheet reference (water), overall existing (water & sanitary sewer) (2), line abandonment (1), proposed easements (0), 2 of plan/profiles, detail sheets (8), erosion control (2), cathodic protection (4), and traffic control (1). City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 8 of 14 ATTACHMENT A DESIGN SERVICES FOR FM•156 AT CANTRELL•SANSOM WATER LINE RELOCATIONS CITY PROJECT NO.: 104515 DELIVERABLES A. 90% construction plans and specifications. B. Traffic Control Plan C. 100% construction plans and specifications. D. Detailed estimates of probable construction costs including summaries of bid items and quantities using the CITY's standard bid items and format. E. Original cover mylar for the signatures of authorized CITY officials. TASK 5. BID PHASE SERVICES, ENGINEER will support the bid phase of the project as follows. 5.1. Bid Support • The ENGINEER shall upload all plans and contract documents onto Buzzsaw for access to potential bidders. • Contract documents shall be uploaded in a .xIs file. • Unit Price Proposal documents are to be created utilizing CFW Bidtools only and combined in a specified spreadsheet workbook, Bid Proposal Worksheet Template, and will be populated and configured so that all pages are complete and the Summary Worksheets) in the workbook detail and automatically summarize the totals from the inserted Unit Price Proposal document worksheets. • Plan Sets are to be uploaded to Buzzsaw in two formats, .pdf and Awf files. The .pdf will consist of one file of the entire plan set. The Awf will consist of individual files, one for each plan sheet, and will be numbered and named in a manner similar to that of the plan set index. • The ENGINEER shall sell contract documents and maintain a plan holders list on Buzzsaw from documents sold and from Contractor's uploaded Plan Holder Registrations in Buzzsaw. • The ENGINEER will develop and implement procedures for receiving and answering bidders' questions and requests for additional information. The procedures shall include a log of all significant bidders questions and requests and the response thereto, The log shall be housed and maintained in the project's Buzzsaw folder titled Request for Information. The ENGINEER will provide technical interpretation of the contract bid documents and will prepare proposed responses to all bidders questions and requests, in the form of addenda. The ENGINEER shall upload all approved addenda onto Buzzsaw and mail addenda to all plan holders. • Attend the prebid conference in support of the CITY. • Assist the CITY in determining the qualifications and acceptability of prospective contractors, subcontractors, and suppliers. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1,2014 Page 9 of 14 ATTACHMENT A DESIGN SERVICES FOR FM•156 AT CANTRELL•SANSOM WATER LINE RELOCATIONS CITY PROJECT NO.: 104515 • When substitution prior to award of contracts is allowed in the contract documents, the ENGINEER will advise the CITY as to the acceptability of alternate materials and equipment proposed by bidders. • Attend the bid opening in support of the CITY. • Tabulate and review all bids received for the construction project, assist the CITY in evaluating bids, and recommend award of the contract. A copy of the Bid Tabulation and the CFW Data Spreadsheet created utilizing CFW Bidtools only are to be uploaded into the project's Bid Results folder on Buzzsaw. • Incorporate all addenda into the contract documents and issue conformed sets. 5.2 Final Design Drawings 1) Final Design Drawings shall be submitted in both Adobe Acrobat PDF format (version 6.0 or higher) format and DWF format. There shall be one (1) PDF file and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for the Water plan set. Each PDF and DWF file shall be created from the original CAD drawing files and shall contain all associated sheets of the particular plan set. Singular PDF and DWF files for each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: I. TPW file name example — "W-1956_org47.pdf" where "W-1956" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "47" shall be the total number of sheets in this file. Example: W-0053_org3.pdf and K-0320—org5.pdf 11. Water and Sewer file name example — "X-35667_org36.pdf" where "X- 35667" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "36" shall be the total number of sheets in this file. Example: X-12755_orgl8.pdf PDF shall be uploaded to the project's Final Drawing folder in BIM360. ASSUMPTIONS • The project will be bid only once and awarded to one contractor. • One (1) set of digital construction documents will be made available for plan holders via the City's purchasing website. • Three (3) sets of construction documents will be sold to and made available on City's Website/BIM 360 for plan holders and/or given to plan viewing rooms. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 10 of 14 ATTACHMENT A DESIGN SERVICES FOR FM-156 AT CANTRELL•SANSOM WATER LINE RELOCATIONS CITY PROJECT NO.: 104M • Six (6) sets of 22 x 34 size and six (6) sets of 11 x 17 size drawings plans and six (6) specifications (conformed, if applicable) will be delivered to the CITY. • PDF, DWF and DWG files will be uploaded to BIM360. DELIVERABLES A. Addenda B. Bid tabulations C. CFW Data Spreadsheet D. Recommendation of award E. Construction documents (conformed, if applicable) TASK 6. CONSTRUCTION PHASE SERVICES. Construction Phase Services is not included in this contract. TASK 7. ROW/EASEMENT SERVICES. ROW/Easement Services is not included in this contract. TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES. ENGINEER will provide survey support as follows. 8.1. Design Survey ENGINEER will perform field surveys to collect horizontal and vertical elevations and other information needed by ENGINEER in design and preparation of plans for the project. Information gathered during the survey shall include topographic data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations, location of buried utilities, structures, trees 6-in and larger (measure caliper, identify overall canopy, and have qualified arborist identify species of trees), and other features relevant to the final plan sheets. Existing drainage at intersections will be verified by field surveys. Spot elevations will be shown on intersection layouts with cross slope to fit intersecting grade lines. • The minimum survey information to be provided on the plans shall include the following: — A Project Control Sheet, showing ALL Control Points, used or set while gathering data. Generally on a scale of not less than 1:400: -- The following information about each Control Point; a. Identified (Existing. CITY Monument #8901, PK Nail, 518" Iron Rod) b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on CITY Datum only. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 11 of 14 ATTACHMENT A DESIGN SERVICES FOR FM•156 AT CANTRELL•SANSOid WATER LINE. RELOCATIONS CITY PROJECT NO.: 104515 C. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). - Coordinates on all P.C.'s, P.T.'s, P.L's, Manholes, Valves, etc., in the same coordinate system, as the Control. - No less than two horizontal bench marks, per line or location. - Bearings given on all proposed centerlines, or baselines. - Station equations relating utilities to paving, when appropriate. 8.2. Temporary Right of Entry Preparation and Submittal • Prior to entering property, the ENGINEER shall prepare and submit Temporary Right of Entry for landowners to CITY PM. • The documentation shall be provided in conformance with the checklists and templates available on the CITY's Buzzsaw site. ASSUMPTIONS • Topographic survey at intersection will include no more than 100 ft. in each direction. DELIVERABLES A. Copies of field survey data and notes signed and sealed by a licensed surveyor. B. Drawing of the project layout with dimensions and coordinate list. TASK 9. Permits 9.1 Texas Department of Transportation (TxDOT) Permit • Texas Department of Transportation (TxDOT) Permitting • ENGINEER will prepare and coordinate submittal of one utility permit applications for the FM-156 at Cantrell-Sansom water line replacement crossing FM-156 in accordance with TxDOT requirements. • CITY will file permit using TxDOT's online permitting process, utilizing plans prepared by the ENGINEER. • ENGINEER will include executed permits in contract documents for bidding. • ENGINEER will assist the City with the TxDOT Advanced Funding Agreement (AFA). City of Fort Worth, Texas Atlachment A PMO Release Date: 08.1.2014 Page 12 of 14 ATTACHM ENT A DESIGN SERVICES FOR FM•156 AT CANTRELLSANSOM WATER LINE RELOCATIONS CITY PROJECT NO.: 104515 City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.26i4 Page 13 of 14 ATTACHM ENT A [DESIGN SERVICES FOR FM•156AT CANTRELL•SANSOM WATERLINE RELOCATIONS CITY PROJECT NO,: 104515 ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES Additional Services not included in the existina Scope of Services — CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: • Negotiation of easements or property acquisition including temporary right -of -entries. • Services related to development of the CITY's project financing and/or budget. • Services related to disputes over pre -qualification, bid protests, bid rejection and re- bidding of the contract for construction. • Construction management and inspection services • Periodic site visits during construction phase • Design phase public meetings • Performance of materials testing or specialty testing services. • Services necessary due to the default of the Contractor. • Services related to damages caused by fire, flood, earthquake or other acts of God. • Services related to warranty claims, enforcement and inspection after final completion. • Services related to Survey Construction Staking • Services related to acquiring real property including but not limited to easements, right-of-way, and/or temporary right -of -entries. • Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. • Construction Shop drawing review, samples and other submittals submitted by the contractor. • Performance of miscellaneous and supplemental services related to the project as requested by the CITY. City of Fort Worth, Texas Attach me nt A PMO Release Date: 08.1.2014 Page 14 of 14 ATTACHMENT B COMPENSATION Design Services for FM-156 at Cantrell-Sansom Water Line Relocations City Project No.104515 Time and Materials with Rate Schedule Project Compensation A. The ENGINEER shall be compensated for personnel time, non -labor expenses, and subcontract expenses in performing services enumerated in Attachment A as follows: i. Personnel Time. Personnel time shall be compensated based upon hours worked directly in performing the PROJECT multiplied by the appropriate Labor Cateaory Rate for the ENGINEER's team member performing the work. Labor Cateaory Rate as presented in the rate schedule table below is the rate for each labor category performing the work and includes all direct salaries, overhead, and profit. Labor Category 2023 Rate ($/hour) Analyst $150 - $230 Professional $200 - $275 Senior Professional 1 $240 - $330 Senior Professional II $295 - $350 Senior Technical Support $150 - $260 Support Staff $105 - $135 Technical Support $95 - $140 Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct Expenses at invoice or internal office cost. 4.6% will be added to each invoice to cover certain other internal office cost expenses as to these tasks, such as telecommunications, in-house reproduction, postage, supplies, project related computer time, and local mileage. Direct Expenses (non -labor) include, but are not limited to, mileage, travel and lodging expenses, mail, supplies, printing and reproduction services, other direct expenses associated with delivery of the work; plus applicable sales, use, value added, business transfer, gross receipts, or other similar taxes. Direct reimbursable expenses such as express delivery services, fees, travel, and other direct expenses will be billed at 1.10 times the cost. iii. Subcontract Expenses. Subcontract expenses and outside services shall be reimbursed at cost to ENGINEER plus a markup of ten percent (10%). iv. Budgets. ENGINEER will make reasonable efforts to complete the work within the budget and will keep the City informed of progress toward that end so that the budget or work effort can be adjusted if found necessary. City of Fort Worth, Texas Attachment B PMO Official Release Date: 8.09.2012 Page 1 of 4 B-1 ATTACHMENT B COMPENSATION ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be adjusted, nor is the City obligated to pay ENGINEER beyond these limits. If ENGINEER projects, in the course of providing the necessary services, that the PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether by change in scope of the project, increased costs or other conditions, the ENGINEER shall immediately report such fact to the City and, if so instructed by the City, shall suspend all work hereunder. When any budget has been increased, ENGINEER's excess costs expended prior to such increase will be allowable to the same extent as if such costs had been incurred after the approved increase. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. Method of Payment A. The ENGINEER shall be paid by the City based upon an invoice created on the basis of statements prepared from the books and records of account of the ENGINEER, based on the actual hours and costs expended by the ENGINEER in performing the work. B. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. C. ENGINEER shall prepare and submit invoices in the format and including content as presented in Exhibit B-1. D. Payment of invoices will be subject to certification by the City that such work has been performed. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Water Department monthly progress reports and schedules in the format required by the City. City of Fort Worth, Texas Attachment B PMO Official Release Date: 8.09.2012 Page 2 of 4 ATTACHMENT B COMPENSATION IV. Summary of Total Project Fees Firm Primary Responsibility Fee Amount % Prime Consultant Kimley-Horn and Design Management, $218,217 77.2 Associates, Inc. Conceptual Design, Preliminary Design, Final Design and Bidding Proposed MBE/SBE Sub -Consultants Gorrondona & Survey $23,150 8.2 Associates, Inc. The Rios Group Subsurface Utility Engineering $11,025 3.9 JQ Infrastructure, LLC Structural Engineering $10,955 3.9 Non-MBE/SBE Consultants CMJ, Inc. Geotechnical Investigation $7,088 2.5 Black Mesa Cathodic Design $12,125 4.3 Engineering & Consulting, PLLC TOTAL 100% Project Number & Name Total Fee MBE/SBE Fee MBE/SBE CPN 104515 — FM-156 at Cantrell- $282.600 $45.170 16.0% Sansom Water Line Relocations City MBE/SBE Goal = 10% City of Fort Worth, Texas Attachment B PMO Official Release Date: 8.09.2012 Page 3 of 4 Consultant Committed Goal = 10% EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) Insert required invoice format following this page, including negotiated total budget and allocations of budgets across desired work types and work phases. City of Fort Worth, Texas Attachment B PMO Official Release Date: 8.09.2012 Page 4 of 4 C d Professional Services Invoice Project Manager: I John Kasavich Project: FM-156 at Cantrell-Sansom Water Line Relocations City Project #: 1104515 I City Sec Number: Company Name: IKimley-Horn and Associates, Inc. Supplier's PM: Carl DeZee Supplier Invoice #: Payment Request #: Service Date:From Service Date:To Invoice Date: Supplier Instructions: Summary Fill in green cells including Invoice Number, From and To Dates and the included worksheets When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. email: Carl.Dezee' imlev-horn.com Office AddreSS 801 Cherry St., Unit 11 Suite 1300, Fort Worth, TX 76102 Telephone: 817-339-2287 Fax: 817-335-5070 Remit Address P.O. Box 951640, Dallas, Texas 75395-1640 Agreement LTD Agreement Amendment Amount to Completed Percent ($) Invoiced Current Remaining Sheet FID and Work Type Description Amount Amount Date Amount Spent Previously Invoice Balance Work Type 1 Water $282,600.00 $282,600.00 $282,600.00 Work Type 2 Work Type 3 Work Type 4 Work Type 5 Work Type 6 Totals This Invoice $282,600.00 $282,600.00 $282,600.00 Overall Percentage Spent: Professional Services Invoice Project Manager: John Kasavich Project: FM-156 at Cantrell-Sansom Water Line Relocations City Project #: 104515 Work Type Desc: lWater Supplier Instructions: FID: City Sec Number: Fill in green cells including Percent Complete and Invoiced Previously Ouanities Purchase Order: When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. Company Name: Kim ley -Horn and Associates, Inc. Supplier's PM: Carl DeZee Supplier Invoice #: Payment Request #: Service Date:From Service Date:To Invoice Date: Pay Items 30 - Design Description Totals This Unit email: Carl.Dezee@kimley-horn.com Office Address: 801 Cherry St., Unit 11 Suite 1300, Fort Worth, TX 76102 Telephone: 817-339-22 8 7 Fax: 817-335-5070 Remit P.O. Box 951640, Dallas, Texas 75395-1640 Address: Agreement LTD Agreement Amendment Amendment Amount to Completed Amount Number Amount Date Amount $282,600.00 $282,600.00 $282,600.00 $282,600.00 Overall Percentage Spent: Percent ($) Invoiced I Current Spent Previously Invoice Remaining Balance $282,600.00 $282,600.00 1=11:I1 Sri IPA Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for FM-156 at Cantrell-Sansom Water Relocations City Project No. 104515 Labor (hours) Expense 2/16/2023 Task No. Task Description Compensation Senior Professional)) $350.00 Senior Professional $330.00 Professional $275.00 Analyst $230.00 Support Staff $135.00 Total Labor Cost Subconsultant MWBE Non-MWBE Markup Travel Reproduction/ � Fees / Permitting TotalTask Expense Cost Sub Total 1.0 1.1 1.1.A. 1.1.B. 1.1.C. 1.2 1.2.A. 1.2.B. 1.2.C. lProject Management Project Admin BIDE Reporting Invoicing Prepare Monthly Progress Reports Communications and Reporting City Progress Meetings (6) Developer Progress Meetings (2) Stakeholder Meetings 0 45 12 6 6 12 4 5 39 6 12 12 4 5 12 12 18 12 6 $31,100 $0 $0 $0 $0 $0 $31,100 5,600 0 5,600 $4,500 $0 $4,500 $0 $0 $0 $8,100 $0 $8,100 $0 $0 $0 $7,300 $0 $7,300 $2,500 $0 $2,500 $3,100 $0 $3,100 2.0 2.1 2.2 lConceptual Design Data Collection Conceptual Design Package Graphic Exhibits Easements, phasing, OPCC Deliverables 01 71 1 4 1 1 01 6 8 4 2 2711 6 15 4 2 14,200 $0j $0 $0 $200 $200 $14,400 $3,400 $200 $0 $3,400 $0 $0 $7,000 $0 $7,000 $2,400 $0 $2,400 $1,400 $200 $1,600 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 Preliminary Design (60%) Preliminary Design Drawings Cover Sheet Index and General Notes Shutdown & Phasing Notes Control and Benchmarks Overall Loc & Prop Sht Ref (1) Overall Existing Map (W&SS) (2) Abandonment (W) (1) Prop Easement Layout (1) Easement Vacations (0) Prop Plan & Prof (2) Standard Details Project Spec. Details Specifications QA/QC and Revisions Geotechnical By Other than Open Cut Installation Constructability Review Project Site Visit Utility Clearance Cathodic Protection Study Traffic Control (City/TxDOT Standard) OPCC Deliverables Review with City/Meeting Notes 01 201 1 2 2 2 1 2 2 2 1 1 1 1 2 571 1 1 1 1 1 2 1 12 2 2 8 2 2 4 4 2 2 4 2 1 2 110 2 4 4 4 4 4 4 30 12 8 4 4 1 4 2 6 1 4 2 2 4 2 2 $48,700 2331 $1,1271 $1,640 $14,000 $62,700 $0 $0 $7,088 $712 $4,145 $415 $1,640 $0 $0 $800 $0 $800 $1,200 $0 $1,200 $1,600 $0 $1,600 $1,200 $0 $1,200 $1,200 $0 $1,200 $1,500 $0 $1,500 $1,200 $0 $1,200 $0 $0 $0 $0 $0 $0 $10,900 $0 $10,900 $3,400 $0 $3,400 $2,400 $0 $2,400 $3,800 $0 $3,800 $2,200 $0 $2,200 $1,200 $7,800 $9,000 $2,700 $0 $2,700 $1,800 $0 $1,800 $1,700 $0 $1,700 $2,300 $0 $2,300 $1,700 $4,560 $6,260 $1,800 $0 $1,800 $1,100 $0 $1,100 $800 $1,640 $2,440 $2,200 $0 $2,200 4.0 lFinal Design (90 % and 100%) 101 411 1011 1241 3 $71,900 $9,6151 $7,030 $1,675 $3,180 $21,5001 $93,400 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 Page 1 of 3 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for FM-156 at Cantrell-Sansom Water Relocations City Project No. 104515 2/16/2023 Labor (hours) Expense Task Description Senior Senior Support Total Labor Subconsultant Travel/ TotalTask Sub Task No. Professional)) Professional Professional Analyst Staff Cost Reproduction/ Expense Total MWBE Non-MWBE Markup Cost Fees / Permitting Compensation $350.00 $330.00 $275.00 $230.00 $135.00 Preliminary Design (60%) Comments 2 2 4 $2,200 90% Design Drawings $0 Cover 1 $300 Sheet Index and General Notes 1 2 $800 Shutdown & Phasing Notes 1 2 4 $1,800 Control and Benchmarks 1 $300 Overall Loc & Prop Sht Ref (1) 1 2 $800 Overall Existing Map (W&SS) (2) 2 4 $1,500 Abandonment (W) (1) 1 2 $800 Prop Easement Layout (0) $0 Easement Vacations (0) $0 Prop Plan & Prof (2) 2 10 20 $8,100 Standard Details 1 2 $800 Project Spec. Details 1 4 $1,200 Surface Repair (1) 1 1 4 $1,600 Traffic Control Plans (1) 2 2 4 $2,200 Cathodic Protection Plans 1 4 1 $1,700 Erosion Control and Details 1 2 6 $2,300 90 % Project Manual $0 Division 00 2 6 2 $2,800 Division 01 5 6 2 $3,800 Divisions 20-49 2 6 2 $2,800 Non-Std. Specs 2 6 2 $2,800 Appendix 2 6 2 $2,800 Quantities/OPCC 1 4 8 $3,300 QA/QC and Revisions 2 8 12 $5,700 Deliverables 1 2 2 $1,100 Public Meeting Prep/Exhibits 2 4 6 $3,200 Review with City/Meeting Notes 2 2 4 $2,200 Construction Plan Review (2) 4 4 4 $3,400 Review 90 % City Design Comments 2 4 2 $2,300 100% Design Drawings 2 5 10 $4,400 100% OPCC 1 2 2 $1,400 100% Project Manual 2 6 2 $2,800 Deliverables 1 1 $700 5.0 IBid Phase Services I 01 201 381 101 1 $21,100 5.1 Bid Support $0 Upload Plans to BIM 360 1 $300 Print Hardcopies (6) 2 $600 Maintain Plan holders List 2 6 $1,400 Answer/Respond to Bidding Questions 6 10 $4,800 Issue Addenda 4 6 $3,000 Prepare for and Attend Pre -Bid Meeting 4 6 $3,000 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 $9,615 $965 $7,030 $710 $1,3801 $9501 $235 $1,380 $950 $235 $0 $1,E $0 $- $0 $E $0 $1,E $0 $E $0 $0 $0 $8,1 $0 $E $10,580 $11,7 $0 $1,E $0 $2,2 $7,740 $9,4 $0 $5,700 $1,100 $1,100 $2,200 $0 $3,200 $0 $2,200 $0 $3,400 $0 $2,300 $0 $4,400 $0 $1,400 $0 $2,800 $2,080 $2,080 $2,780 $1,83'4 $4,40 $25,500 $0 $0 $0 $300 $1,835 $1,835 $2,435 $0 $1,400 $2,565 $7,365 $0 $3,000 $0 $3,000 Page 2 of 3 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for FM-156 at Cantrell-Sansom Water Relocations City Project No. 104515 Labor (hours) Expense 2/16/2023 Task Description Senior Task No. Professional ll Compensation $350.00 Senior Professional ) $330.00 Professional $275.00 Analyst $230.00 Support Total Labor Subconsultant Staff Cost MWBE Non-MWBE Markup $135.00 Travel / TotalTask Sub Reproduction / Expense Total Cost Fees /Permitting 5.2 Tabulate bids and review Recommend/References Final Design Drawings 4 2 2 4 5 10 4 $1,100 $0 $1500 $2,500 $0 $2,500 $4,400 $0 $4,400 6.0 Construction Phase Services 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 Not included in this contract 0 $0 0 7.0 ROW/Easement Services 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 Not included in this contract 0 $0 0 8.0 Survey and SUE Services 0 4 4 14 0 $5,800 $34,175 $0 $3,425 $0 $37,600 $43,400 8.1 8.2 Design Survey Temporary Right of Entry (see Task 5.6.13) Subsurface Utility Excavation 2 2 2 2 10 4 $3,600 $23,150 $11,025 $2,320 $1,105 $25,470 $29,070 $0 $0 $0 $2,200 $12,130 $14,330 9.0 Permitting 0 7 6 23 0 $12,100 $0 $0 $0 $0 $0 $12,100 TxDOT Permit AFA 5 2 10 6 15 8 7, 000 0 7,900 $4,200 $0 $4,200 Subtotal 0 1441 275 320 33 204,900 45,170 $19,213 $6,462 $6,855 $77,700 $282,600 Task 5 & 6 Water LF 310 100 % Task 5 & 6 Sewer LF 0 0% 310 100% (A) Total Fee $282,600 (B) Survey Fee $43,400 (C) Total Fee (-) survey Fee $239,200 Water Fee (100°% of C) Sewer Fee (0% of C) $239,200.00 $0.00 Description WP Water Sewer Conceptual Design (30%) 31 $71,760.00 $0.00 Preliminary Design (60%) 32 $143,520.00 $0.00 Final Design (10%) 33 $23,920.00 $0.00 Survey 51 $43,400.00 $0.00 Subtotal $282,600.00 $0.00 Total $282,600.60 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 Totals: $282,600 Project Summary Total Hours 772 Total Labor $204,900 Total Expense $77,700 MWBE Subconsultant $45,170 Non-MWBE Subconsultant $19,213 MWBE Participation 16.0% Page 3 of 3 EXHIBIT B-3 Engineer's Opinion of Probable Construction Cost Design Services for FM 156 and Cantrell Sansom Road Water Line Relocation City Project No. 104515 Client: laity of Fort Worth Date: 1013)2022 Project: FM 156 and Cantrell Sansom Road Water Line Relocation Prepared By: CTD ID No,: Checked By: - ARE f ITilte: Water Relocations Option 1 Line 14o.' Description Quantity Unit Unit Price I �Osl i 3311.0644 24" Water Pipe (Restrained Joints) 3311 10, 33 11 12, 33 600 LF $400.60 $240,000 2 3305.2007 24" Water Carrier Pipe 33 05 24 200 LF $375.00 $75.000 3 33D5.1107 42" Casing By Other Than Open Cut 330522 200 LF $900,OC $160,000 4 3311.0142 6" Water Pipe, CSS Backhll 33 11 10. 33 11 12 20 LF $90.00 $1,800 6 3312.3008 24" Gale Valve vd Vault 33 12 20 3 EA $50,000,00 $150,000 6 3312.3002 6" Gate Valve 33 12 20 0 EA $2,000.00 $0 7 0241.1001 Water Line Grouting 0241 14 60 CY $300.001 $18,000 8 0241.1209 24"Water Abandon menlPlug 02 41 14 5 FA $4,000.001 $20,000 9 02411.1109 24" Pressure Plug 0241 f4 4 EA $5,000.001 $20.000 10 3304.0002 Cathodic Protection 3304 12 1 LS S50,000.001 $50.000 11 0241.1351 Salvage 16" Water Valve 0241 14 1 EA $2,000.06- $2,000 12 0241 A354 Salvage 24" Water Valve 0241 14 2 EA $4,000.00 $8,000 13 0241.1510 Salvage Fire Hydrant 0241 14 1 EA $1,500.00 $f,500 14 3312.0DD1 Fire Hydrant 33 12 40 1 EA $3,500.00 $3,500 15 3312.0108 Connection to Existing 24" Water Main 33 12 25 4 EA $30,000.00 S120,000 16 3311.0001 Ductile Iron Water Fittings vd Restraint 3311 11 10 TON $8,500.00 $85,000 17 3201.0128 12' Wide Asphalt Pvmt Repair, Arterial 32 01 17 0 LF $150.00 $0 18 3201.0400 Temporary Asphalt Paving Repair 3201 18 120 LF $400,00 $48,000 19 3201,0614 Conc Pvmt Repair, Residential 32 Of 29 300 SY $100.00 $30,000 20 3216.0101 6" Conc Curb and Gutter 32 16 13 200 LF $10.00 $2,000 21 3305,0112 Concrete Collar 330517 2 EA $500.00 $1.000 22 3312.6003 8" Blow Off Valve 33 12 60 1 EA $15,000.00 $15,000 23 3312.1003 3" Combination Air Valve Assembly for Water 33 12 30 1 EA $35,000.00 $35,000 24 3305.0106 Manhole Adjustment, Major 33 05 14 1 EA $4,000.00 $4,000 25 3305.0108 Miscellaneous Structure Adjustment 33 05 14 0 EA $25,000.00 $0 26 3305.0111 Valve Box Adjustment 330514 1 EA $1,500.00 $1,500 27 3305.0103 Exploratory Excavation of Existing Utilities 33 05 30 5 EA $2,000.00 $10,000 28 3305.0110 Utility Markers 33 05 26 2 LS S7,000.00 $14,000 29 3305.01D9 Trench Safety 3305t0 620 LF $10.00 $6,200 30 3292.0400 Seeding, Hydro mulch 32 92 13 500 SY $5.00 $2.500 31 3125.0101 SWPPP >_ 1 acre 312500 1 LS $5,000.00 $5,000 32 0171.01i01 Construction Staking 01 70 00 1 LS $10,000.00 $10,000 33 0171.0102 As -Built Survey 01 70 00 1 LS $5,000.00 $5,000 34 3471,0001 Traffic Control 3471 13 4 MO $5,000.00 $20 `0000 q No DesignComp!eted Subtotal: lconlirlt(%+1_) $1,{{84,000 ❑ Preliminarynesgn 30 I $356,000 ❑ Final Pes!gn ITotal Construction $1,540,000 The Engineer has no control over the cost of labor, materials, equipmont, or over the Contractors methods of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineers judgment as a design professional familiar with Ule construction industry. The Engineer cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinions of probable costs. KtiF r W_r.5 a rlteli nglForE_W o rth52022_Fr.5-156-C antrerl S ansomi4VIl540AC C_F (•A-15G-Canlrel V-Sa nsom, xl sx ATTACHMENT "C" CHANGES AND AMENDMENTS TO STANDARD AGREEMENT Design Services for FM-156AT CANTRELL-SANSOM WATER LINE RELOCATIONS City Project No. 104515 NO CHANGES City of Fort Worth, Texas Attachment C PMO Release Date: 05.19.2010 Page t of E A achm,t 0 - City P,,J,d No. 104515 FM-1564TCANTRELL-SANSOMWATER LINE RELOCATIONS . . .. . ........... D~ ill, mnW -4121-diji'--iii. 413123 MW 11111f24 L", R.1ocDbna NMI -to P—d I day Mo. 4rVM Man 4= 2 day. Tu. 414M3 Wad 4MI23 2 .7-1 &d,.Cff M..tg -h City 2 day. Two 4141= VV.d VSM s Data Ca6oeson 2 day, Tu, 441423 Wad 415M Rmp.ra Sub Cm.- 2 day. T- 4A= W.a 4=1 Concoptuai Design 32 days Thu 410;23 Fri 5119123 1 S.—Y 32 days Thu 416123 Fri SM9;23 RpN of Fnlry 2 lay. Thu 4M= Fm Q7W 10- Fiald Su—y today. Mon 4MWM Fn 4r21f= 9 11 S,braata! to KH 20 daya Win 4242I Fm 5119M 10 11 do" M111J11111 T114111113 Mgnmont Exhib". 5 day. Mon 411 DIM F6*14ra 9 Mon 4,17r Con"'Wal GPCC I day Man 4117=1 , 3 Sbmd Pocimp to CZy I day 7wo 4M SM Tuo4Ra/Z3 13,14 li- Cdy R-ow 5 day. WOVISM T.. 42523 15 17 Ft— Co mWApprovid 2 days Wad 42625 Thu 42723 I ft.. CAY is PWaalnary D.1g. 45 days Mon 5=23 Fri V21123 7 iiC Pmpaz* 611% Documents 40 dayv Mon Sf2ZF23 F11 V14123 ie SO 'p ',onaraj Sh--k- 5 day. ma, S2= Ffl WG= 21 Plan & P,.191. Shoat. 5 day. Man 529r23 Fri 6=1 20 2:F Dotal sh.at. 10 day. Man 11523 Fri 6M W3 21 N T-1 D..Vn 5 day. man 626423 R 6r3= 34 ii- K14AWalkAligmant 2 day. Man G= T.. W23 21 2, KM DAMC Ra— 2 Oy. Wad 6723 Thu SM 24 R*— 24 -9 day. FA W9= Thu S01523 25 v Prd*nary Sp.c atlna 5 day. Wad 51723 Tu. V1 31N 24 GD% OPCC 2 day. Fd 611623 Man WIV23 26 Cay R.b- 10 day. Mon TT= Fd T/1 4rD 25.23 Solnut Plan. W UtAty 011,anto 5 days Man 7117rM Fri 7/21M 29 It Guoth. a ',bivestgation, 25days Mon == F,1 W-&23 --11 73 FUght of E 5 V. Mon 5r=0 Fri 51211M F41d j..mjG.U_. 10 dayg Man V6r23 Fri 61923 32 St S.b.MW 1. KHA IC daya Mon rd I 2= R1 Sr= 33 is E.—MA'ul,ldan 0 day. Fri In SI23 FA stlwn 4 "1 M d Fri"Wn Fd SM 9r23 7 dy, Apo W. a Y. FA 5/19M Fri SM9= 3 C.u.d Offs AUWL.11-1 0 day. FA ShWn Fri 5MS21 3 IC PannItting Fd 5M WV Fd SMSM 38 Atq"ItIon 0 day. 09 day. M.. 6IN23 Fri lU2923 21 T.D07 UtR Go day. ma, 5't.23 R1 Or,= Find D.,Ign 32 day, M..TMT/23 To. UMS 29 1 P'.P., 90% D.—17 lays Mm TFI7/23 To. W6 23 74- C.—IL.yout Sh-tv 3 day. Mon 71171m Wad 7119M Ganaral NOW Fatal,. No-, 6 day, Mo. 7117= Fa 7Mr23 46- L..11orVF..rr.nt Map Shoal. 2 day. Mon 7M7M Two 711823 17 Plan& ftU. Shoat- 10 day. Man 7d'17123 Shutdown and S.q.a ... p Sh..2 day. Man 7f31123 Two BPI= 47 a Dai.j sh.— 10 4.y. Man 711723 Fm 72623 W Tram. C.M.1 Plan Snaabt 2 day. man j1ri723 T-7110= st 90% sp..ftainn. 10 days Man 717= Ffi 7/2a23 iF 9D% OPCC 2 day. Mon TIM= Tu:&1123 47.51 53 W.RAJIgn—t 24" Man T131r23 Tu 1!1=3 47.51 5.1 DAOOC R.11- 2 lap Man W31 rn 7.. 6l12.3 47,51 P.g. I of 3 dl TadWmr JDur.11.n P1 fin" Aad•en .........................il day. _ Wall 87fYd Si Fill D". Palatal Wed N123 Tue&=: 43 IF si submit Find D.ugn P.da9a to CS days Wad fl19(19 Tua 11nS23 50 Submit OPCC to MwBE for 5 day. Wod 61923 T.. Ill Camt.mn Goal City R.— 10 dayo Wed 6l923 T.. Ill 0 Plnr Cone h lon D..—.- S day. Wad 62323 TB.2f2a23 56 Package 4i Submb Fad Cone Dora d City 5 days Wod a23/L! Tua all Coy App-1 5 day. Wod 927123 Tu. 5=3 `W -'I Bidding 95 day. Tu. a2923 Tua 12120123 60.35.4C W Ady.rNal 36 days ru, 31 Wed 1 W13123 66 Bid AdvsNaemant 0days Tua 62923 Tuo 0;2923 -. .... AV"Pahl Porlod 30 ay. Wad 4131=1 Tw 1an0/13 65 J, i7 Hold M.atng Pre -Did 1 day Wad 91623 W.d 9MJL! 86F$- W W 1— Add... (A. needed) 5 days Thu 9723 Wod 911323 57 49 Old OP-1,ti 0 days T"1011cm Tua 1011025 66 ..�. Row Bps -Bd Tabulallom 6day. Wad 1011123 Wod IOM112369 and Sake Cuntrooar n MWBE D«umaMauan sseay Thu,o/u/7a Tb. f3/2/n st SuomN MWBE Comploneo 5days TM. I G1923 Wod 101= 70 D. hal,rta n.I Ft.ln.nd Appr-.MWBECom6daya Thu 132623 Thu 11= 72 7a. J M&C Process 22 days Thu 111a27 Men 12W23 P Sl.rt M.. Prod - C— u.-O day. Thu l l= Thu 1117123 73 id M&C Pracoaa 22 day. Po 117573 Mon 12/423 75 ]y Award CAnaact - Con.irudmn 0 day. Mon 121423 Mon 12'423 76 sib C.Mraet E.-W IP. 16 day. Too 121523 Tuo 12y2623 ra Awmd Contract-COn.trumion 11 day. Tull, 12y523 Tue IZM90 77 ad Fallout. Contrael Documard. (CF5 tlay. Wad 122G23 Tua 122G23 79 It, conathl 229 day, Wad 1212723 Man 11r124 4 P—Conriruclan A0,1ika 16 days W.d 122723 Wod 1117124 a Dabibute Executed Contr t 0-5 days W,d 12a723 Tu. 1=4 DO M Hold Pre-Coralrucaon Mo.unp 11 dby Wad 1/324 Wad l 24 IIIa5 Ia.u. NPlo. to Proa.od far Carl day. Wall 1=4 W,d 1=4 84 Ill Hold Poflo Mooting- Pre-Con.11tl day Thu 11424 Thu 1/424 a5 R Subn al. and Appror.k 10d.y. Thu 11424 Wad 111724 85 p Can.trudVon Conbract 116 day. Thu 11424 Wad 1012124 ba Co..tueeon 160day. Th.114241 Wad Oft 24 65 to Fnal Map—, 15 day. Thu9112124 Wad 1OM4 E9 df Cunabv—Phase Complete 0day. Wad 1O(224 Wad IDrM4 90 022 Clo.oaut 22 days Wed 101224 Moll lln=4 Cia—ut Report and Ra,low 26 days Thu 1a3124 Mon 11n124 M Subhl (PmjM Clo,. Dell days Thu 1 W324 Wed 10n624 91 as Contmm RaconcUmf 15 days Th u 1011724 Wod 111624 94 �f6 Prate tAecepanee (Ax.ptmlcl day Thu 111724 Thu 111724 95 Sy NMI -Of ComplotloNGroen Sh0 day. Thu 11f724 Thu 11I124 96 Y Clu,s-Out Ropon and dollar, 2 day. Frl 11114124 Man 11n 124 97 99 A,.S.1N 9urvay 54.ya Thultil Wad 11l 1W Aa Oudt Surrey 6 day. Thu 1OW4 Wad 101%24 91 ,M M.p Ping 20 aye Thu 14`14124 Wad 1111l 10t- Mappine 20 day. Thu 10M 24 W.d 11824 100 _1N.. A.-Bu13 PI... 10 day. Thu IAnI124 Wad 1=3124 104 Aa Bulh Para 10 days Thu 1011024 W,d 10=4 100 Ea:.moot Abandonments 0 dsy Wad 101224 Wad ta2/24 Parcel lD-TOO 0days Wed 10224 Wed 10224 91 P'P- FM-1S6.t O.mom naNl-SW. n. oea: Sun 1/2923 tr++ I � x..wa. ♦ wo..l am.,n �--_-t a,.r�.r.u.o.,,. �.�..........., Amf rl D -City Praf.et No. toasts FW156 AT CANTRELL-SANSOM WATER LINE RELOCATIONS :ar ia.n141a� �,. e�u.IL�uryNWn ,w-mry Page 2 011 C Wnm4ln.a tr.ew i a1.m..t crop.... MAYOR AND COUNCIL COMMUNICATION MAP ATTACHMENT E �i�Si��Y� ; .yam --- � i _. F'��~�4 li�,]�zi+�sl�7�!'islllf���7111�i•'q����7�� �!'E•Itl�';9i+•:1}'f7Ml1':11 " � �°;fit ����t 9 =�� /�{y,S l ,. V S I.�t � " I}•� [�tflilY��l�_��t�`��S AMIL I� I; 447 ` Ir ��� � ' 1 j �� � j � ■ � �Tt�l=trjr� ult�l !•�"�"'�1'�T'y A 1 9 I� � 1F a ,([��i•H'�yl} I i �rw •:'I �. . ,a i -- � �, � ���'� - i:;�t1�1►�1`#!11E,u � q'nr�.:�'{f:-ty M -. i.r �� RyRyey __ I:� ri il'r � -at ,�, � rll ;•,I$;�=� � Ati - 'x {CANTRELLSANSOM RD. `�' c E!' INDUSTRlAI--AVE:k_ `.13 � � ?, � � �, 1 � ... LI•-mot Ul l 1 y ' rk � 1 TI � �w �^ -- � i I_ A _ �I I. � •��,If � 5 '1 �n 1 ; � ° 'ten •� r � ��' •� ��+ � Sr i� � 1}1 °� L� . A L'AWSON'RD. r NORTHWAY DR. ' 1 • 1 • i 1 �•4 ai�'y��y y 1 { 'I '_„ � A •� � I III • �l )'.'•Y Ji - I � , �� � ,�� LEGEND O PROPOSED VAULTISTRUCTURE ADJUSTMENT ,' 1 ,, ,� .. FORT WORTH - PROPOSED WATER LINE RELOCATION FM 156 RECONSTRUCTION AND WIDENING LIMITS �. _ AVATER ATTACHMENT "F" CERTIFICATE OF INSURANCE FM-156 at Cantrell-Sansom City Project No. 104515 City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, June 13, 2023 REFERENCE NO.: **M&C 23-0492 LOG NAME: 60FM156CANTRELLSANSOM-KHA SUBJECT: (CD 2) Authorize Execution of an Engineering Agreement with Kimley-Horn and Associates Inc., in the Amount of $282,600.00 for the Farm to Market 156 at Cantrell-Sansom Road Water Main Relocation Project, Adopt Resolution Expressing Official Intent to Reimburse Expenditures with Proceeds of Future Debt, and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2023-2027 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of an engineering agreement with Kimley-Horn and Associates, Inc. in the amount of $282,600.00 for the Farm to Market 156 at Cantrell-Sansom Road Water Main Relocation project; 2. Adopt the attached resolution expressing official intent to reimburse expenditures with proceeds from future debt for the Farm to Market 156 at Cantrell-Sansom Road Water Main Relocation project; and 3. Adopt the attached appropriation ordinance adjusting appropriations in the W&S Commercial Paper Fund by increasing appropriations in the FM-156 at Cantrell-Sansom Road Water Main Relocation project (City Project No. 104515) in the amount of $362,600.00 and decreasing appropriations in the W&S Commercial Paper project (City Project No. UCMLPR) by the same amount to effect a portion of Water's Contribution to the Fiscal Years 2023-2027 Capital Improvement Program. DISCUSSION: On September 14, 2021, (Mayor and Council Communication (M&C) 21-0669) the City of Fort Worth executed an Interiocal Agreement with the City of Saginaw for intersection improvements at Cantrell Sansom Road and Farm to Market 156 (FM 156). The proposed roadway improvements are in conflict with existing City water main crossing FM 156 and water vault structures on E. Industrial Avenue 1 Cantrell Sansom Road that must be relocated and adjusted,, respectively. The proposed scope of services consists of design, coordination with and review of with Texas Department of Transportation and its contractor's plans, shop drawing reviews, permit applications and project meetings with all stake holders. Kimley-Horn and Associates, Inc. proposes to provide the necessary services for a fee not to exceed $282,600.00. Staff considers the proposed fee to be fair and reasonable for the scope of services proposed. In addition to the contract amount, $80,000.00 is required for project management, material testing and inspection. This project will have no impact on the Water Department operating budget when complete. This project is anticipated to be included in a future revenue bond issue for the Water & Sewer Fund. Available cash within the Water and Sewer portfolio and the City's portfolio along with the appropriation authority authorized under the Callable Commercial Paper Program (CP) will be used to provide interim financing for this project until debt is issued. Once debt associated with this project is sold, bond proceeds will be used to reimburse the Water and Sewer portfolio and the City's portfolio in accordance with the attached reimbursement resolution. Under federal law, debt must be issued within approximately three years in order for these expenses to be reimbursable. Adoption of the attached resolution does not obligate the City to sell bonds, but preserves the ability of the City to reimburse itself from tax-exempt bond proceeds. It is the practice of the Water Department to appropriate its Capital Improvement Program (CIP) plan throughout the fiscal year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2023-2027 Capital Improvement Program, as follows: �lCapital Project J� FY2023 CIP IlAuthorityll Budget �{ Revised Fund Name Appropriations) Change I FY2023 Name ' (Increase/ Budget Decrease) 104515 Fund — FM- 56022 — 156 at Commercial Cantrell - Sansom Paper Water Project $0.00 This M&C $362,600.00 $362,600.D0 Funding for the FM-156 at Cantrell-Sansom Road Water Main Relocation Project is depicted below: Fund l Existing Additional project Total* I Appropriations Appropriations W&S Commercial $0.00" $362,600.00 $362,600.00 Paper -- Fund :56022 Project Total 1 $0.001 $362,600.0011 $362,600.00 *Numbers rounded for presentation purposes. Funding is available in Water Department's W&S Commercial Paper project within the W&S Commerical Paper Fund for the purpose of funding the Cantrell-Sansom Road Water Relocation project. Business Equity: Kimley-Horn and Associates, Inc., is in compliance with the City's Business Equity Ordinance by committing 16 percent Business Equity participation on this project. The City's Business Equity goal on this project is 10 percent. This project is located in COUNCIL DISTRICT 2 and FUTURE COUNCIL DISCTRICT 2. FISCAL INFORMATION I CERTIFICATION: The Director of Finance certifies that funds will be available after the sale of Water and Sewer bonds in the W&S Commercial Paper project within the W&S Commercial Paper Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Commercial Paper Fund for the FM-156 at Canrell-Sansom Water project to support the approval of the above recommendations. Prior to an expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs),: TO Fund Department ccount Project Programl ctivity Budget Reference # I moun l ID ID I Year (Chartfield 2) FROM Fund Department ID ccoun 1 Project ID �Programl ctivity Budget Year Reference # (Chartfield 2) i mount] I CERTIFICATIONS: Submitted for Cite Manacier's Office bv: Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: John Kasavich (8480) ATTACHMENTS 1. 60FM156CANTRELLSANSOM-KHA 1295 form. pdf (CFW Internal) 2. 60FM156CANTRELLSANSOM-KHACompMemo.pdf (CFW Internal) 3. 60FM156CANTRELLSANSOM-KHA funds availabilitv.pdf (CFW Internal) 4.60FM156CANTRELLSANSOM-KHA MAP.pdf (Public) 5. 60FM156CANTRELLSANSOM-KHA Updated FID.xlsx (CFW internal) 6.ORD.APP 60FM156CANTRELLSANSOM-KHA 56022 A023(r3).docx (Public) 7. PBS CPN 104515.pdf (CFW Internal) 8. Res.60FM156CANTRELLSANSOM-KHA(Rev.5.10.23).docx (Public) 9. SAM Kimlev-Horn and Associates Inc..pdf (CFW Internal) 60FM156CANTRELLSANSOM-K'HA FED Table 1 56022 0600430 5330500 104515 001730 9999 $282,600.00 Contract 2 & 3) 56022 0600430 5110101 10451S 001730 9999 $40,000.00 Water Staff 2 & 3) 56022 0600430 5310350 104515 001784 9999 $2,000.00 Soil Lab TPW Staff 2 & 3) 56022 0600430 5330500 104515 001784 9999 $8,000.00 Soil Lab Consultant 2 & 3) 56022 0600430 5110101 104515 001785 9999 $30,000.00 Water Inspection Staff