Loading...
HomeMy WebLinkAboutContract 57293-CO2Attest: uFF°°Rr�°o o�9.i0 Ov$ o^=A Oa * ooQ o00 *�d IN FORTWORTH. City Of Fort Worth Change Order Request Facility and Project) Far SW Library Municipal Court Finishout Description: Funding (FID) No.(s)I30100-0210410-5740010-104203-CAPEXP-9999 Contractor: I Muckleroy & Falls City Project Mgr. JAlphonso Meza Phone Number:1(817) 392-8274 CSC NO. 57293-0O2 City Sec No. 157293 City Proj. No. 1101658 Change Order # Date: 1 6/23/2023 1 City Inspector: IJackson Jones I Phone Number: 1(817) 392- 8078 1 Contract Time (CD) Original Contract Amount--------------------------------------------------------------{ $6,987,500.00 365 Extras to Date--------------------------------------------------------------------------A $77,617.00 0 Credits to Date--------------------------------------------------------------------------I 0.00 0 Pending Change Orders (in M&C Process) --------------------------------------A 0.00 0 Contract Cost to Date---------------------------------------------------------------- I $7,065,1 7.00 365 Amount of Proposed Change Order--------------------------------------------------------------- ,$69,567.00) 0 Revised Contract Amount-------------------------------------------------------------- $6, 95,550.00 365 Original Funds Available for Change Orders---------------------------------------------------------------- 0.00 Remaining Funds Available for this CO------------------------------------------------------------------- 0.00 Additional Funding (if necessary)------------------------------------------------------------- '0.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT I 0. 15 MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) I 58,734,375.00 Final calculation of contract amount. The General Contingency Allowance for the project was $323,613.00. There was a total of $254,046.00 that was expended from the allowance. This resulted in a deduction in the contract amount of $69,567.00 due to not using all of the General Contingency Allowance. There was a total of $77,617.00 added to the contract through Change Order #1. The final contract amount is $6,995,550.00. A 0.115% increase from the original contract amount of $6,987,500.00. No additional days were added to the contract through previously approved General Contingency Allowance expenditures or delays due to facilities not being accessible to the contractor because of scheduled events. It is understood and agreed that the acceptance of this Change Order by the contractor consitutes an accord and satisfaction and represents payment in full (both Contractor's Company Name Contractor Na Contractor Signature Muckleroy & Falls Josh Roher 17oshma o Jun 23, 2023 PMD Inspector Date Architecural Services Manager D Y Jun 23, 2023 Jul 3, 2023 PMD Superintendent Date Director/Property Management Department Date Jun 23, 2023 Jul 6 2023 Project Manager Date Assistant City Attorney Date Jun 28 2023 s Jul 7, 2023 Project Architect Date Assistant City Manag Darte �%foY rtKs, J u 13, 2023 Jul 7, 2023 M&C Number I N/A M&C Date Approved N/A Contract Compliance Manager: OFFICIAL RECORD'IA col" for By signing I acknowledge that I am the person responsible W— for the monitoring and adminstration of this contract, including CITY SECRETARY Brian R. Glass, AIA ensuring all performance and reporting requirements. FT. WORTH, TX Assistant Director MuCKLEROY FALLS COFW SW Library 8829 McCartAve, Fort Worth TX 76123 Change Order Request: 026 To: Lisa Pyper City of Fort Worth 401 W 13th St Fort Worth, TX 76102 Description Contingency Reconciliation Reference Attached Notes PCO No Date Reference Description PCO 026 5/30/2023 Contingency Reconciliation Item No Item Description 001 Contingency Reconciliation Approved By: Signature Name Prolog Converge Change Order Request Detailed (with Breakdown of PCOs), Grouped by Each Number Project # 22008 HM & MF Ltd., d/b/a MUCKLEROY & FALLS Tel: Fax: Date: 6/21/2023 From: Joshua Rohrer HIM & MF Ltd., d/b/a MUCKLEROY & FALLS 3200 Riverfront Dr Suite 200 Fort Worth, TX 76107 Category Status Sent Required By Days Req Amt Req 6/28/2023 0-69.567 Amt Prop Days Req Category Reason Notes -69,567 0 This PCO is issued to deduct the remaining City of Fort Worth contingency balance from the contract amount. Amt Prop Reference -69,567 Printed on: 6/21/2023 MuckleroyFallsProlog Date Page 1