HomeMy WebLinkAboutContract 55217-CO5CSC No. 55217-CO5
Foxes
Project Namel West 7th Street
Client Project #(s)l 101555
Project
Description
Contractorl Reyes Group, LTD
City Project Mgr.1 Mitch Aiton
City of Fort Worth
Change Order Request
I City Sec # I 55217
West 7th Street from University Drive to Trinity River Bridge Street Improvements
Change Order #1 5 1 Date l 6/30/2023
City Inspectorl Brandon Phillips
Dept.
TPW
Contract Time
Totals
(CDt
Original Contract Amount
$4,937,193.00
$4,937,193.00
300
Extras to Date
$757,769.34
$757,769.34
128
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
$5,694,962.34
$5,694,962.34
428
Amount of Proposed Change Order
-$123,689.72
-$123,689.72
131
Revised Contract Amount
$5,571,272.62
$5,571,272.62
559
Original Funds Available for Change Orders
$800,000.00
$800,000.00
Remaining Funds Available for this CO
$42,230.66
$42,230.66
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 12.84%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $6,171,491.25
JUSTIFICATION (REASONS) FOR CHANGE ORDER _ J�
This is the Reconciliation Change Order at end of construction to balance out overruns and underruns. All items are existing bid items with existing bid prices. No bid items
are added via this Change Order. This change order will also add 131 days to the contract. The existing waterline conflicted with the proposed design and there were 6
occurences when the contractor was delayed 3 days each for a total of 18 days. When the contractor was ready for the final and TDLR walkthrough, the TDLR inspector
was not currently under contract with the consultant and the TDLR inspection was delayed 50 days. The contractor was delayed 63 days in the scheduling of their work
adjacent to the Fort Worth Western Railroad while the city executed contracts for the work to be done on the railroad.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reporting requirements.
Reyes Group, LTD I Marco Reyes IMarcos 4 vBSo, I Jul 3, 2023
ection Supervisor
Date
Project and Contract Compliance Manager
Date
fF W
Jul 3, 2023
mad-A,2— „��.�
Jun 30, 2023
Program Manager
Date
Jul 6, 2023
Senior Capital P fficer
Date
Jul 6, 2023
Assistant Director (Dept)
Date
Director, Con t Dept
Date
Jul 6, 2023
Jul7, 2023
Assistant City Attorney
Date
JAssistant City Manager
Date
i
Jul 7, 2023
ATTEST:
4ae.,.... a c -&-Q
Ja�nnetteGoodall,CitySecretary o 4
oFFQpT°q�?9dA
od
�v
pVS °0=0
adann�6$gd
Council Action if required)
M&C Number I N/A M&C Date Approved IN/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
R FORTW _ TH
"7°a
City of Fort Worth
Change Order Additions
Project Name I West 7th Street
I City Sec # I
55217 I
Client Project # I 101555
I
Contractorl Reyes Group, LTD
I PMI Mitch Alton
Inspectorl Brandon Phillips
Change Order Submittal # 05
Date I 6130/2023
I
ADDITIONS
IIEM
UESCRIPI IUN
UEPI
O
unit
unit uost
local I
6
Remove Sidewalk
I PW
14U0000U
SF
$1.00,
$5.14I
19
6" Cone Pvmt (Bike Lane+Curb1
TPW
915.5600000E
SY
$58.OU
$53,102.48I
23
Banier Free amp, Type R-1 (ypicaq
TPW
1.00000006
EA
$2,301.OU'
$2,301.00I
29
Manhole Adjustment, Minor
TPW
1.000000OLP
EA
$935.511
$935.50I
107
MINERAL MULCH (3" DEPTH)
TPW
2.0000000111
CY
$181.0t1
$362.00I
113
3 GAL. SHRUB
TPW
27.00000000
EA
$32.00
$864.00I
115
IRRIGATION SYSTEM
TPW
0.00170000
AC
$313,800.OU�
$533.461
118
4" SLD Pvmt Marking HAS (Y)
TPW
130.00000000
LF
$1.51J
$195.00I
T(W $58,298.581
I
I
I
Sub Total Additions $58,298.581
Change Order Additions Page 2 of 4
FORTWORTH
City of Fort Worth
Change Order Deletions
Project Name I West 7th Street
City Sec # 1 55217 1
Client Project # 1 101555
1
Contractorl Reyes Group, LTD
I PMI Mitch
Alton
Inspectorl Brandon Phillips
Change Order Submittal # 0
Date 1 6/30/2023 1
DELETIONS
I I LM
ULJCKIP I ON
ULF I
u
unit
unit Cost
I otal 1
5
As-Builtaurvey
IPvv
'I. uuuuuuu
La
$(,au.uu
$(,r32.uu1
12
2" Surtace Milling (West 7th Mill)
TPW
38.9100000U
SY
$3.UU
$116.731
14
Special Riprap SS6'Stamped CA C Brick for Median)
TPW
144.930000OU
SY
$76.5U
$11,087.151
16
2" Asphalt Pvrr(1 Type D (West 7th Overlay)
TPW
38.91u0000U
SY
$12.25
$476.651
20
5" Conc Pvml (Plus Bus Pad)
TPW
4,703.920000OU
SF
$5.5U
$25,871.561
22
6' Concrete p veway
TPW
273.01000UU(J
SF
$10,0U
$2,73U.101
24
Barrier Free Ramp, Type R-1 (Modified)
TPW
5.0000000U
EA
$2,383.5U
$11,917.501
Zb
6" Conic Curb and Gutter
TPW
1,640.330000UU
LF
$29.OU
$47,569.571
35
Construction Allowance
TPW
4,422.040000OU
EA
$1.OU
$4,422.041
38
Base Repair (Asphal /Conc based on held condition)
TPW
100.00000UOU
SY
$61.5U
$5,15U.001
120
8" SLD Pvmt Marking HAS
TPW
2,060.000000OU
LF
$1.5U
$3,090.001
163
�W)
Railroad Pedestrian Wamin S1ignal (RioTech Scope)
TPW
0.0694211U
Lb
$316,103.62
$21,944.261
164
Railroad Pedestrian Warning Signal Contingency
TPW
0.820000OU
LS
$47,415.54
$38,880.141
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
j
TPW
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
$181,988.301
1
Sub l
otal Uelehons
1
1
$161,966.3U1
Change Order Deletions Page 3 of 4
MISBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
c0 #
DATE
AMOUNT
1
10/14/2021
$712,861.52
2
2/3/2022
$8,765.00
3
11 /4/2022
$36,142.82
4
3/13/2023
$0.00
Total I $757,769.34
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: West 7th Street CO #5
M&C: N/A CPN:
101555
CSO:
55217
Date:
6/30/2023
To:
Name
Department
Initials
1.
Michelle McCullough
TPW - Review
MM
2.
Mitch Alton
TPW
- Signature
I-d'ja-
3.
Marco Reyes
Reyes
- Signature
I MGR
4.
Don Watson
TPW
- Signature
k-FAL
Raul Lopez
TPW
- Signature
6.
Lissette Acevedo
TPW
— Signature
is w
7.
Patricia L Wadsack
TPW
— Signature
IRW
8.
Lauren Prieur
TPW
— Signature
—
9.
Doug Black
Legal
—Signature
idwb'�
10.
William Johnson
CMO
— Signature
�W
11.
Jannette Goodall
CSO
- Signature
12.
TPW Contracts
DOC#: N/A
Date Out
Jun 30, 2023
Jun 30, 2023
Jul 3, 2023
Jul 3, 2023
Jul 6, 2023
Jul 6, 2023
Jul 6, 2023
Jul 7, 2023
Jul 7, 2023
J u 110, 2023
J u 110, 2023
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW
Contracts
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: []YES ®No SAME DAY: ❑YES ®No NEXT DAY: ❑YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
® For Your Information
® Signature/Routing and or Recording
® Comment
❑ File
Return To: Please notify TPWContracts(dfortworthtexas.Lov for pickup when complete. Call ext.
7233 or ext. 8363 with questions. Thank you!