Loading...
HomeMy WebLinkAboutContract 41791-CO1DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: University Drive Mixed Use CHANGE ORDER No: CONTRACT: Water & Sanitary Sewer Im rovements CFA # 2011-013 1 CITY PARTICIPATION: Yes 1 CITY PROJECT # 1277 DOE # 6163 WATER PROJECT # P265-609150127783 SEWER PROJECT # P275-709130127783 FILE # X-20895 INSPECTOR: PROJECT MANAGER: Leslie Bagby Victor Tornero Phone No: Phone No: 817-944-1274 817-392-8574 CITY SECRETARY CONTRACT NO, I (I �0 CONTRACT UNIT CONTRACT DAYS WATER SEWER PAVING DRAINAGE STREET LIGHTS Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost ORIGINAL CONTRACT $106,829.99 $33,683.26 $6,369.00 180 EXTRAS TO DATE CREDITS TO DATE CONTRACT TO DATE $106,829.99 $33,683.26 $6,369.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 180 AMOUNT OF PROP. CHANGE ORDER ($10,976.95) $1,000.00 REVISED CONTRACT AMOUNT $95,853.04 $33,683.26 $7,369.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 180 TOTAL REVISED CONTRACT AMOUNT PER UNIT $129,536.30 $7,369.00 $0.00 $0.00 $0.00 REVISED COST SHARE Dev. Cost: $103,222.04 City Cost: $33,683.26 TOTAL REVISED CONTRACT $136,905.30 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Revised: 10-12-2011 06-15-12 P03:43 IN Page 1 You are directed to make the following changes in the contract documents PAY ITEM # CITY BID ITEM # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL _ Developer Cost WATER BID 1-16 -402 SY 2" Asphalt Overlay w/5' Milled Transition (12' Lane over Water Main) $14.25 ,;5,728.5ui 1-17 -1867 SY 2" Asphalt Overlay w/5' Milled Transition (Water Service Replacement) $14.25 26,604.75) 1-20 49 SF Sawcut, Remove & Replace Conc. Sidewalk (Wtr Service Repi,) $12,00 $588.00 1-29 1 EA w 12"x6" Tapping Sleeve & Valve $2,015.00 $2,015.00 1-30 390 LF Reinforced Concrete Base (Wtr Main & Prop. Building Services) $13.32 $5,194.80 1-31 300 LF Reinforced Concrete Base (Wtr Service Line Repl. Across University) $13.32 $3,996.00 1-32 48 CY Flowable Fill (Wtr Main & Prop. Building Services) $112.50 $5,400.00 1-33 37 CY Flowable Fill (Wtr Service Line Replacement Across University) $112.50 $4,162.50 SANITARY SEWER BID TOTAL•s .i u1J r o.; . 11-8 1 EA D-hole $1,000.00 $1,000.00 TOTAL $1,000.00 Cost Breakdown for City Participation on Project City Cost WATER BID CFA UNIT PRICE 762 6 EA 1-inch Domestic Water Service Tap $300.00 $1,800.00 CFA UNIT PRICE 758 306 LF 1-inch Domestic Water Service Line $17.84 $5,459.04 CFA UNIT PRICE 458 306 LF Permanent Concrete Pavement Repair (Services) $54.00 $16,524.00 CFA UNIT PRICE 426 17 LF Remove/Replace Concrete Curb & Gutter (Services) $22.00 $374.00 CFA UNIT PRICE 527 60 SF Remove/Replace Sidewalk (Services) $4.00 $240.00 CFA UNIT PRICE 372 306 LF Trench Safety $1.00 $306.00 CFA UNIT PRICE 181 306 LF Traffic Control $9.87 $3,020,22 CFA UNIT PRICE 768 315 LF Temporal Service Line $6.00 $1,890.00 CFA UNIT PRICE 224 37 CY Pipe -Grout -Non -Shrink $110.00 $4,070.00 TOTAL $33,683.26 REASONS FOR CHANGE ORDER Revised: 10-12-2011 Deleted items 1-16 & 1-17.' Change order required since the overlay for University Drive will be deleted from this project and will be constructed by the City of Fort Worth Water Department & T/PW Department. Increased quantities on 1-20: Change order required since concrete sidewalk quantities increased due to additional concrete sidewalk that had to be removed and replaced. Added Item 1-29: Change order required since this item was not included in the original bid proposal. Added Items 1-30 & i-31: Change order required since there was existing concrete pavement below asphalt surface. City inspector instructed the contractor to replace concrete base. Added items 1-32 & 1-33: Change order required since flowable fill was used due to groundwater and unsuitable trench material. City inspector instructed the contractor to use flowable fill. Added Item 11-8: Change order required since this item was not included in the original bid proposal. Page 2 **Since this project was a privately let project, City Participation was based on approved CFA Unit Pay Items. The City is responsible for all appurtenant work related to the replacement of the water services crossing University Drive. ** RECOMMENDED: (Consulting ngin r) By: l� Name: Title: I ) G€44 /ew odtf B Name: Title: M&C Number: M&C Date Approved: Revised: 10-12-2011 RECOMMENDED: APPROVED: (Developer) By: ame: 47-'2_ r Title: \il APPROVED: APPRO ED: (Contr By: Name: Title: APPROVED: B. Doug AI President (C•,• • :. rng aep. ?ent) INIMBEF (CF Ass;g Cit`'ttorney) By: 4e•CC Name: te-GGD4C Title: a (CFW - anager) By: /1444064~Z Name: Title: �in410 6da • ..., rib a 00 o Ji Al #44.44 J. Ka ¶; City _ : °0000QoQ°°° �`j NO M&C REQUIRED c�I14IfL OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 3 FORT ORTH MEMORANDUM TO THE RECORD TO: CONTRACT FILE NO. 31791-CO1 DATE: June 6, 2012 FROM: Stephanie Mills, Administrative/Records Technician City Secretary's Office SUBJECT: Change Contract Number to 41791-CO1 BACKGROUND On June 4, 2012, the City Secretary's Office received a Change Order to a contract which was missing any reference to the original contract number. Stephanie Mills was contacted by Victor Tornero from the Engineering office. Mr. Tornero stated the original contract number to be 31791. The Change Order was then processed with the number 31791-CO1. On June 6, Mr Tornero contacted Stephanie Mills to inform her the original contract number he had given her was wrong, and it needed to be changed to 41791-CO 1. Ms Mills has corrected the number on the City Secretary's original copy, and updated the M&C system. Mr Tornero has been informed to change the number on his copies and if he has given any out, to inform the recipients of the contract number change. AUTHORIZATION FOR CONTRACT NUMBER Per the direction of Victor Tornero, Engineer, Transportation/Public Works Department, the City Secretary's Office has been requested to change contract number 31791-CO1 to 41791-CO1. This request has been approved and carried out. The original executed change order has been updated and has also been updated online. City Secretary's Office Page 1 of 2 To nero, Victor From. Black, Doug Sent: Friday, June 15, 2012 3:33 PM To: Gonzales, Ronald Seidel, Nicole M. Cc: Mills, Stephanie; Tornero, Victor Subject: RE: University Drive Change Order Correction Thanks. It may be Vic Tornero bringing the page up to you. Doug Douglas SA , Black \ssistant City Attorney Cite of tort North woo Throcl:morton Fort Worth, TX 76t02 i7.3yL.7615 tel. 817.392.8:359 fax Doug.Black@fortworthtexas.gov fortworthtexas.gov (please note the new email address as of Oct. 1, 2011) From. Gonzales, Ronald Sent: Friday, June 15, 2012 3:21 PM To: Black, Doug; Seidel, Nicole M. Cc: Mills, Stephanie Subject: RE: University Drive Change Order Correction That will be fine; we won't actually "replace" the page but the new information, and this e-mail, will become part of the file. Bring it over when time permits. Ron Gonzales, TRMC/CMC Assistant City Secretary, City of Fort Worth Ronald Gonzales@fortworthtexas.gov 817.392.6164 I`tirt Vortb NOTE: As of October 1, 2011, the Citij of Fort Worth has a new web address: www.FortWorthTexas.gov From: Black, Doug Sent: Friday, June 15, 2012 2:58 PM To: Gonzales, Ronald; Seidel, Nicole M. Subject: FW: University Drive Change Order Correction I have a technical issue which has come up. Apparently there was a math error (less than 50 cents) on this change order which has recently been discovered Is there any chance that we can swap out the first page with the correct figures for the old one? Thanks, 6/15/2012 Page 2 of 2 Doug Don:: s W, Black Assistant City Attorney City of Fort Worth 1000 Throckmorton Fort Worth, TX 761O2 817 392.7615 tel. 817 392.8359 fax Doug.B1aCk@fortwOrthteXaS.gOV (please note the new email address as of Oct. 1, 2011) From: Tornero, Victor Sent: Friday, June 15, 2012 2:18 PM To: Black, Doug Subject: University Drive Change Order Correction Doug, The pdf attached is the change order that was executed, which shows the developer cost of $106,829.51. The excel spreadsheet shows the revised developer cost of $106 829.99. The difference is $0.48. If the City Secretary is okay with the switch out, I would assume the document would need to be printed in color to match the other ones. Let me know. It would be greatly appreciated if you could find out as soon as possible if this will be acceptable. Thanks, Victor V. Tornero Jr., E.I.T. Project Manager -Transportation Public Works/Infrastructure Design & Construction City of Fort Worth 1000 Throckmorton St. Fort Worth, TX 76102 Office # 817-392-8574, Mobile # 682-432-4131 Email:victor.tornero@fortworthtexas.gov FORT ORTH How am I doing? Please contact my supervisor: Mike.Domenech@fortworthtexas.gov 6/15/2012