HomeMy WebLinkAboutContract 57920-CO1CSC No. 57920-CO1
FORTWORTH, City of Fort Worth
Change Order Request
Project Name Foil Worth Nature Center & Refuge Boardwalk Phase II
City Sec # l 57920
Client Project q(s)l 102320
Projecl Oescriptionl
Fort Worth Nature Center & Refuge Boardwalk Phase II Parking Lot and additional
Loop Trail
Conlraclorl Fain Group I Change Order#1 #1
Datel 5I2612023
City Project Mgr. l Tonda Rice I City Inspectorl
Steven ftster
Dept. PARD
Contract Time
Totals (CD)
Original Contract Amount $2.386,402.10
$2,386,402.10 240
Extras to Dale
7
Credits to Dale
Pending Change Orders (in M&C Process)
Contract Cost to Date $2,386,402.10
$2,386,402.10 247
(Amount of Proposed Change Order §24,189A3
$24,189.43
Revised Contract Amount $2, 10,591.53
$2,410.591.63 247
Original Funds Available for Change Orders
117,766.72
$117,766.72
Remaining Funds Available for this CO
1117,766.72
$117,766.72
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
1.01%
MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACTCOST + 25%)
$2,983,002.63
JUSTIFICATION (REASONS) FOR CHANGE ORDER 'e"MROW
During construction it was determined that additional grading work would be needed for the landing of the boardwalk to connect to the existing [rail. Requiring the follow Items:
three tree removals, additional 8'-12' rip rap plus pre/bed, flat work stained, earthwork excavation, one additional pier 12 foot.
Additionally the parking lot requires further drainage control. One concrete curb to be added at 10' height X 6' depth and 75' length
to the pavement section and doweled
into the concrete parking lot.
It is understood and agreed that the accept anceof this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsiblefor the monitoring and administration of this contract, Including ensuring all performance and reporting requirements.
I ConlraclorsCompany Name
Contractor (Name) I Contract Signature
ale
l The Fain Group, Inc
Larry Frazier
Jun 28, 2023
I InspeclorMspeclion Supervisor B
Pmierl a Id F.
Mnnaner
Dal
lSteven Wester/Donald Watson SO
J-2a,2.D
Tonda Rice
Jun 26,2023
IPfogramManagef =. �._,�.-.__}_
��.Date
Senior CaplIKE( J:tO(ficer
_ _ .D
l JinppYang� ✓j
IAssislanlDireclor Dept
Jul 5, 2023
ate
Scott Penrt5—P
Interim Direil8f`P'ark Recrealantkaadmenl(Depl)
Jut 5, 2023
. `mot
Dave Lewis
Ju113,2023
(Joel McElhan,.`s� c,
Jul 5, 2023
IAssistanl City Atlomey
Dale
Assistant City Manage
Oale
�Jeremy AnaloMensa6—
iJu[14,2023
JesicaMcEacher
Ju114,20231
I
ATTEST: A zS,�
Jannette Goodall, City Secretary na
po4Fortr°°gyp
`'°°°°
vim° �9d0
PV0 o=d
000
darn nEXPS.00
Council Action Of required)
M&C Number 1 M&C Dale Approved
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORTWORTH
City of Fort Worth
.' *"
Change Order Additions
Project Name I Fort Worth Nature Center & Refuge Boardwalk Phase II
CitySec # 57920 1
Client Project# 1 102320
1
Contractorl Fain Group
PMI Tonda Rice
I
Inspectorl Steven Wester
Change Order Submittal # #1
Dale 1 512612023 1
ADDITIONS
I ITEM DESCRIPTION
DEPT
Oty
Unit Unit Cost
Total
Tree Removal 3 @ $800.00
PARD
$2,4UU.UUI
8' -12' Rip Rap plus prop/bed 25 Ton
PARD
25.00000000
Ton $195.DU
$4,875.00
Flat Work stained 2.5 CY @ $195.00
PARD
2.50000000
CY $1,300.01.1
$3,250.00
Earthwork Excavation
PARR
60.00000000
CY $30.W
$1,800.00
1 Pier
PARD
12.00000000
Ft $480.00
$5,75U.W
6' Parking Lot Island curb
PARR
275.00000000
Ft $9.90
$2,722.501
10' X Height X 6' depth X 75' Length concrete wall dowel into parking lot. PARD
75.00000000
Ft $52.OU
$3,900.001
1
1
I
I I
1
1
1
I I
1
I
1
1
I
I I
I
1
1
1
1
I I
I
1
1
PA 2D $24,707.501
I
I
Sub Total Additions $24,707.501
Change Order Additions Page 1 of 1
FORTWORTH City of Fort Worth
T Change Order Deletions
Project Name I Fort Worth Nature Center & Refuge Boardwalk Phase II City Sec # 1 57920 1
Client Project# 1 102320 1
Contractorl Fain Group I PMI Tonda Rice I Inspectorl Steven Wester l
Change Order Submittal# #1 Date 1 512612023 1
I I FM
Credit Reduction
DELETIONS
DESCRIPTION DFPI Qty Unit Unit Cost total I
PARD $518.071
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1
I
1
1
I
I
I
I
I
I
1
I
I
I
I
I
1
I
I
I
1
1
I
1
I
I
I
1
1
I
I
I
I
I
I
I
I
I
I
PARD $518.071
1
1
1
Sub Total Deletions $518.071
Change Order Deletions Page 1 of 1
N/A
MISBE for this Change Order
M/SBE Sub Type of Service
Previous Change Orders
co # I DATE
N/A
Total
Amount for this CO
Total $0.00 1
AMOUNT
$0.00