HomeMy WebLinkAboutContract 59783Date Received: J u 120, 2023
Time Received: 2:22 p.m. City Contract No.: 59783
FUTURE IMPROVEMENTS AGREEMENT
FOR
INFRASTRUCTURE IMPROVEMENTS
RIVER'S EDGE PHASE 3B BRIDGE
This FUTURE IMPROVEMENTS AGREEMENT ("Agreement"), is made and entered into
by and between the City of Fort Worth ("City"), a home -rule municipal corporation of the State of
Texas, acting by and through its duly authorized Assistant City Manager, and Forestar (USA) Real
Estate Group Inc. ("Developer"), a Texas limited liability company, acting by and through its duly
authorized representative. City and Developer are referred to herein individually as a "party" and
collectively as the "parties."
WHEREAS, Developer is the owner of a tract of land within the City of Fort Worth located
north of State Highway 114, south and east of the BNSF Railroad, and west of Cowboy Trail, which is
the subject of Preliminary Plat PP- 19-035 ("Property"); and
WHEREAS, a bridge crossing over Harriet Creek is necessary to provide access to the tract of
land located north of the Property; and
WHEREAS, Developer is required to construct a two-lane bridge from future Severn Lane over
Harriet Creek and terminating at the northern boundary of the preliminary plat; and
WHEREAS, when the tract of land located north of the Property develops, the owner of the land
would be responsible for completing the second half of the bridge over Harriet Creek; and
WHEREAS, it is not feasible for Developer to construct half a bridge at this time; and
WHEREAS, as a condition of the approval of the preliminary plat for the Property and before
Developer constructs River's Edge Phase 313, Developer is required to pay to the City the Developer's
portion of the cost to construct the two lane bridge over Harriet Creek;
WHEREAS, The City agrees to accept from Developer the Developer's share of the cost to
construct the bridge and City will construct or cause the construction of the bridge in the future; and
WHEREAS, the determination of the Developer's share of the cost to construct the bridge is not
an assessment pursuant to Chapter 313 of the Texas Transportation Code;
NOW THEREFORE, in consideration of the above recitals, incorporated herein for all
purposes, City and Developer, acting by and through their duly authorized representatives, do hereby
agree as follows:
1.
Incorporation of Recitals
OFFICIAL RECORD
Future Improvements Agreement for Infrastructure Improvements CITY SECRETARY
River's Edge Phase 3B Bridge FT. WORTH, TX
Forestar (USA) Real Estate Group Inc Page 1 of 14
City and Developer agree that the foregoing recitals are true and correct, form the basis of this
Agreement, and are incorporated into this Agreement.
2.
Improvements
Developer is responsible for the cost of constructing a two lane bridge from future Severn Lane
over Harriet Creek and terminating at the northern boundary of Preliminary Plat PP-19-035,
("Improvements") as depicted in Exhibit A which is attached hereto and incorporated herein by
reference.
3.
Future Improvements Funds
Concurrently with the execution of this Agreement, Developer has paid to the City
$1,484,586.00, which amount represents one hundred twenty five percent of the estimated cost of
constructing the Improvements ("Future Improvements Funds"), as described in Exhibit B which is
attached hereto and incorporated herein by reference. The Future Improvements Funds shall serve as the
entire amount of Developer's contribution for the cost to construct the Improvements.
4.
Construction of Improvements
The City may construct (or cause to be constructed) the Improvements at a time convenient to the
City provided that adequate public funds, or additional funds from the owner of the tract of land to the
north of the Property, may need to be secured before such construction may commence. City and
Developer agree that the Future Improvements Funds are calculated pursuant to an engineer's estimate of
probable costs and are not based upon an actual design of the Improvements. City shall have the right to
determine the design and construction of the Improvements.
5.
Use of Future Improvements Funds
By accepting the Future Improvements Funds and by execution of this Agreement, City agrees
that the Developer will have no further obligation to pay any amounts in addition to the Future
Improvements Funds or take any further action with regard to the construction of the Improvements, even
if (a) the actual costs to construct the Improvements exceeds the costs expected by the City as of the date
of this Agreement, (b) the specifications, composition, or other characteristics of the Improvements
hereafter change for any reason, (c) a mistake has been made (mutual or unilateral) in computing the costs
of the Improvements, or (d) the costs or scope of the Improvements change for any reason. No refund of
any balance shall be made by the City to Developer of the Future Improvements Funds.
6.
Notices
All notices required or permitted under this Agreement may be given to a party by hand -
delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be
deemed to have been received when deposited in the United States mail so addressed with postage
prepaid:
Future Improvements Agreement for Infrastructure Improvements
River's Edge Phase 3B Bridge
Forestar (USA) Real Estate Group Inc Page 2 of 14
CITY:
Development Coordination Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
With copies to:
City Attorney's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
and
City Manager's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
DEVELOPER:
Forestar (USA) Real Estate Groun Inc.
2221 E. Lamar Blvd, #790
Arlington, Texas 76006
Or to such other address one party may hereafter designate by notice in writing addressed
and mailed or delivered to the other party hereto.
7.
Applicable Law; Venue
This Agreement shall be construed under and in accordance with Texas law. Venue shall be in
the state courts located in Tarrant County, Texas or the United States District Court for the Northern
District of Texas, Fort Worth Division.
8.
Headings
The paragraph headings contained herein are for the convenience in reference and are not
intended to define or limit the scope of any provision of this Agreement.
9.
Severability
In the event that any clause or provision of this Agreement shall be held to be invalid by any
court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of
the remaining provisions hereof.
10.
Review of Counsel
City and Developer, and if they so choose, their attorneys, have had the opportunity to
review and comment on this Agreement; therefore any rule of contract construction or interpretation
Future Improvements Agreement for Infrastructure Improvements
River's Edge Phase 3B Bridge
Forestar (USA) Real Estate Group Inc Page 3 of 14
that would normally call for the document to be interpreted as against the drafting party shall not
apply in interpretation of this Agreement, and each section, portion, and provision of this Agreement
shall be construed solely on the basis of the language contained therein, regardless of who authored
such language.
11.
Amendment
No amendment, modification, or alteration of the terms of this Agreement shall be binding unless
the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer.
12.
No Third -Party Beneficiaries
The provisions and conditions of this Agreement are solely for the benefit of the City and
Developer, and any lawful assign or successor of Developer, and are not intended to create any rights,
contractual or otherwise, to any other person or entity.
13.
Prohibition on Boycotting Israel
Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code,
the City is prohibited from entering into a contract with a company with 10 or more full-time employees
that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City for
goods or services unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel"
and "company" have the meanings ascribed to those terms by Chapter 2271 of the Texas Government
Code. To the extent that Chapter 2271 of the Government Code is applicable to this Agreement, by
signing this Agreement, Developer certifies that Developer's signature provides written verification to the
City that Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of this
Agreement.
14.
Prohibition on Boycotting Energy Companies
Developer acknowledges that in accordance with Chapter 2274 of the Texas Government Code
(as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2), the City is prohibited from entering into a contract
for goods or services that has a value of $100,000 or more, which will be paid wholly or partly from
public funds of the City, with a company with 10 or more full-time employees unless the contract
contains a written verification from the company that it: (1) does not boycott energy companies; and (2)
will not boycott energy companies during the term of the contract. The terms "boycott energy company"
and "company" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government
Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter 2274 of the
Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that
Developer's signature provides written verification to the City that Developer: (1) does not boycott
energy companies; and (2) will not boycott energy companies during the term of this Agreement.
15.
Prohibition on Discrimination Against Firearm and Ammunition Industries
Future Improvements Agreement for Infrastructure Improvements
River's Edge Phase 3B Bridge
Forestar (USA) Real Estate Group Inc Page 4 of 14
Developer acknowledges that except as otherwise provided by Chapter 2274 of the Texas
Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1), the City is prohibited from
entering into a contract for goods or services that has a value of $100,000 or more which will be paid
wholly or partly from public funds of the City, with a company (with 10 or more full-time employees)
unless the contract contains a written verification from the company that it: (1) does not have a practice,
policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and
(2) will not discriminate during the term of the contract against a firearm entity or firearm trade
association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning
ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th
Leg., R.S., S.B. 19, § 1). To the extent that Chapter 2274 of the Government Code is applicable to this
Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written
verification to the City that Developer: (1) does not have a practice, policy, guidance, or directive that
discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a
firearm entity or firearm trade association during the term of this Agreement.
16.
Right to Audit
Developer agrees that, until the expiration of three (3) years after execution of this Agreement
that the City shall have access to and the right to examine any directly pertinent books, documents, papers
and records of the Developer involving transactions relating to this Agreement. Developer agrees that the
City shall have access during normal working hours to all necessary Developer facilities and shall be
provided adequate and appropriate workspace in order to conduct audits in compliance with the
provisions of this section. The City shall give Developer reasonable advance notice of intended audits.
17.
Governmental Powers and Immunities.
It is understood that by execution of this Agreement, the City does not waive or surrender
any of its governmental powers or immunities.
18.
Signature Authority
The person signing this Agreement on behalf of Developer warrants that he or she has the legal
authority to execute this Agreement on behalf of the Developer, and that such binding authority has been
granted by proper order, resolution, ordinance or other authorization of the entity. The City is fully
entitled to rely on this warranty and representation in entering into this Agreement.
19.
Counterparts
This Agreement may be executed in multiple counterparts, each of which will be deemed an
original, but which together will constitute one instrument.
20.
Entire Agreement
This written instrument (together with any attachments, exhibits, and appendices) constitutes the
entire understanding between the City and Developer, and any prior or contemporaneous, oral or written
Future Improvements Agreement for Infrastructure Improvements
River's Edge Phase 3B Bridge
Forestar (USA) Real Estate Group Inc Page 5 of 14
agreement that purports to vary from the terms hereof shall be void.
[REMAINDER OF PAGE INTENTIONALLY BLANK]
Future Improvements Agreement for Infrastructure Improvements
River's Edge Phase 3B Bridge
Forestar (USA) Real Estate Group Inc Page 6 of 14
IN WITNESS WHEREOF, the City and Developer have each executed this Agreement by their
duly authorized signatories to be effective on the date executed by the City's Assistant City Manager.
CITY OF FORT WORTH
15AA4, au.-Vh iaj�f
Dana Burghdoff ( 17, 202314:13 CDT)
Dana Burghdoff
Assistant City Manager
Jut 17, 2023
Date
Recommended by:
Dwayne Hollars (Jul 17, 2023 09:58 CDT)
Dwayne Hollars
Contract Compliance Specialist
Development Services
APPROVED AS TO FORM AND LEGALITY
Richard A. McCracken (Jul 17, 202313:08 CDT)
Richard A. McCracken
Sr. Assistant City Attorney
Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including ensuring
all performance and reporting requirements.
City Secretary
Name: Tyson Thompson, PE
Title: Assistant Director
DEVELOPER:
Forestar (USA) Real Estate Group Inc.
Ke%inin L��2ares (Jul 17, 202309:40 CDT)
Name: Kevin Lazares
Title: Vice President — Real Estate Investments
& Development
Ju117,2023
Date
Future Improvements Agreement for Infrastructure Improvements
River's Edge Phase 3B Bridge
Forestar (USA) Real Estate Group Inc Page 7 of 14
ATTEST:
x
Jannette S. Goodall
p aovvopR
�a
pORt a
pad. Fo,o ,^ oho
100,
do
Pvo 0=0
dap41 645dp.o'
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
EXHIBIT A
4 PR OJ ECT y /j, N
a
LOCATION
FUTURE ry
PHASE 3B
IL � L.
j PHASE 1
PHASE 2 D.O.E. 4863
PROJECT 00772
RIVER'S EDGE - PHASE 3A - CPN 102868
MAPSCO NO. 641 R
COUNCIL DISTRICT NO. 7
LIA ENGINEERING, INC.
3917 W 7TH STREET
OWNER/DEVELOPER:
SUITE 30O
FCRESTAR (USA) REAL ESTATE GROUP INC.
FORT WORTH, TX 76017
KENN LAZARES
PHONE: (464)-621-0710
2221 E LAMAR BLVD, SUFE 79a ARLINGTON, TEYAS 76006 TEXAS REGISTRATION F-1366
PHONE (817) 769-1873
Future Improvements Agreement for Infrastructure Improvements
River's Edge Phase 3B Bridge
Forestar (USA) Real Estate Group Inc Page 8 of 14
VICINITY MAP
3G17 WW ree4'w bw .Ph— 469.621.0710
&sw 300
FortW.thj xas 76107 FRN-F1386
IMPROVEMENTS
� � 3R_00 SO.a� #3.T2•� �
30WIDE PIPELINE
EVENT
OUT STERR GAS
RIPEE l4C.
C.� O.P.R, ,RG,7S6sy0
.CJ,
1
TRACT z
] 2,670 ACRES
REAL ESTATE OROUP. -me--
2014-25303
,P.R.O.C.T.
Future Improvements Agreement for Infrastructure Improvements
River's Edge Phase 3B Bridge
Forestar (USA) Real Estate Group Inc Page 9 of 14
EXHIBIT B
RIVER'S EDGE CREEK CROSSING
A- _ — , . I -
S
144,760.00
B. SANITARY SEWER SYSTEM
C. STORM SEWER SYSTEM
46,955.00
D. WATER DISTRIBUTION SYSTEM
$
6D,64G.00
E. STREET PAYING
674,663.00
F. RETAINING WALLS
G. MISCELLANEOUS ITEMS
43,456.00
H. LANUSCAPING
9,610.00
I.DEVELOPMENT FEES
$
207,500.00
SUB -TOTAL:
F1,187.586.07
25% -- s_ -
1-757.0 WOO
LOT COUM:
0
COST/LOT.
tF OF STREET:
470
COST) t F OF STREET-
S3,200
NET OFVELOPAKE ACREAGE:
0.S5
COST j OEYELdPAKE ACRE
$2.699,300
TOTAL GROSS A CREAGF:
2.25
COST/ GROSS ACRE:
5559,900
OPINION OF PROBABLE COST River's Edge °"°'" s '-IId`s
FArFL 5S,M L4f DkCdOT`,4T}LAN1A4d5:—Fs_.—VaZl OTC.&&—dl AQS3
Future Improvements Agreement for Infrastructure Improvements
River's Edge Phase 3B Bridge
Forestar (USA) Real Estate Group Inc Page 10 of 14
RIVER'S EDGE CREEL{ CROSSING
GMERAL
f This estimate is based on the alignment approved with Preliminary Plat PP-19-054 and the extent of approved construction plans for Rivers
Edge Phase 311i, othrrwisethis design is conceptual.
2 The tract is located within the City of Fart Word% Denton County, Texas. The tract is zoned A-5 and is located in Council District 7.
3 This tract is located in Northwest ISD-
A This estimate used the current water, sewer, paving, and storm drainage design crrkeria specified by the City of Fort Worth.
5 This estimate is based on unit prices updated in February 2D21.
6 Unit prices do not reflect rock excavation-
7 Estimate does not include lard €m-� land maintenance, interest, HOA support, legal, financing, marketing, etc
& Impactfees assessments<Qedits, etc. are not included it the estimate-
9 This estimate includes an allowance for geotechnical testi ng andlor reports.
t0 This estimatewm prepared without the benefrtof geatechnical data far the entire site. A g eotechnical report and recommendations for
R-rver+s Edge Phase 3A & 3114was produced for Forestar by Alpha in September2U19-
tI This estimate does not include tree survey or tree mitigation feet
t2 This estimate is bused on LTA paint datatopography.
13 The fees listed were provided by The City of Fort Worth. Procedureforcollection ofMaterial Testing and InTection Fees has changed in
the City of Fort Wort to a poficythat applies a dak rate and per tESt fee. At this tine, a place holder fee amount based on a histarir
percent ge of irftastrurture casts has been applied.I PRC Review fees are assessed per page of construction plans and a place holder fee
based on percentage of assumed infrastructure cast has been included in this estimate.
U This estimate assumes ROW dedication ftsr the future Harriet Creek read cross ng is included with Phase 3B platting.
WATER
f This estimate _. _ the eztermion ofthe proposed W waterline that is to be built with Rivers Edge Phase 38 construction plans
(North ide IIIj.
2 This estimate -. :_ \ the waterline under the bridgem be €orrstrurted using ductile Iran pipe and require steel encasement
Water line includes all fittings, tees, crosses, etc-
4 Fire hydrant assembly includes all frttings, tees and vahres.
9 Assumes all water lines are Less than 10' deep.
6 This estimate does not nr►rde cost to remove and relocate existing water lines.
7 Meter installatonfimpactfees arenot induded.
STORM DRAINAGE
t Additional grade -to -drain quantities may be required based on final design.
2 This estimate uses iS%hW values for rational method inputs to generate pre- and post-developrnew flows.
C = G..67 (ResidentiaB
3 This estimate does not include any cast for the enlargement. reconstruction, or' - - - _ . of arty off -site drainage structures or ponds.
GRADING
J Additional erosion control may be required.
PAVING
l This estimate is based on the folowiw3 street sections:
59 ROW 29' B-B, fi reinforced concrete with 6' lime subgrade (section has a S' crown}
2 Lime subgrade of 35 Ibfsy is assumed-
3 Estimate does not include median paving and{or pavers -
a All sidewalk is assumed) to be 5—in width.
5 Estimate does not include road sgnal¢atiorE Additional pavement markings and traffic signs may also be required.
6 Bridge component assumed to include bridge dent (superstru€tumk abutmer% piers, approach slab, railngs, scour protection, and bonds
required in construct 9C of the ultirnadm bridge sertian. Ody€osts located with in the River's Edge property boundary have been included -
MISCELLANEOUS
t Street lights are spaced at a maximum of 2♦10'.
2 Franchise utilRy installation cost andlor relocation is not indudled
Future Improvements Agreement for Infrastructure Improvements
River's Edge Phase 3B Bridge
Forestar (USA) Real Estate Group Inc Page 11 of 14
RIVER'S EASE CREEK GROSSING
A- EXCAVATION
CLEARING AND GRUBBING
ACRE
$1,D10.00
1_
$1,a1aAa
MOBILIZATION
LS
S2,DDO.00
1_
S2.DD0.00
PROCESS 3A & 3B UTILIWALL SPOILS
CY
$1.51)
19500.
$2!Lzw o
IMPORT FILL MATERIAL
CY
S15.01)
7500_
$112.5M.01)
TOTAL EXUVATION
f
144.760-00
B_ SAN ITARY SEWER SYSTEM
TOTAL SANITARY SEWER SYSTEM 000
LLLLLLLLLLL� r
C. STORM SEWER SYSTEM
21-RCP
LF
W.Ga
7&
P-150A0
27- RCP
LF
S90.00
135_
MIS000
19 INLET
-:4
$�60a.0a
2
$71?J00A0
27-HEADWALL
-:4
S2.6M.0a
1_
$z60000
INLET PROTECTION
-:4
S2DO.00
2
U00M
RELOCATE21' HEADWALL
EA
$1,750.01)
1_
$1175000
24' ROCK RI PRAP
SY
$09.00
150_
$13350A0
GRADE TO DRAIN
CY
$15.00
250_
$3,750A0
TRENCH SAFETY
LF
$1.00
20S_
$21)SM
BONDS
PERCENT
2.0% $
4595520
TOTAL STORK. —..: , -� s : 1,
$
❑_ WATER DISTRIBUTION SYSTEM
S' GATE VALVE & BOX
EA
$125D.DD
1_
$1250M
FIRE HYDRANT ASSEMBLY
EA
$3,B9D.DD
1_
$3,89d0o
R' PVC WATERLINE
LF
$W.SD
400_
$16,200M
R' DUCTILE IRON WATERLINE
LF
S75.00
w
$6.omm
20' STEEL ENCASEMENT BY OPEN CUT
LF
$22D.DD
811
$17A800.CID
CONNECT TO EXISTING WATER LINE
EA
$1.DDD.DD
1.
$101(m
RIPRAP ARMORING AT CREEK CROSSING
EA
$1 DW.DD
1_
$120M
TRENCH SAFETY
LF
$1.00
4W
$4B0-00
TESTING (EXCLUDING GEOTECHI
LF
$1.50
4W
$720M
BONDS
PERCENT
2.0% $
Skow.00
$150m
TOTAL WATER._ ,_ _
$
60.640.00
OPINION OF PROBABLE COST River's Ed Prerleek Grossing
F7.TFL aSNTX LAN7y0007VW LAN UWS Ei Ei:�12021,OT C&&Cr—dr%jy10531G OLnk1)09wrf 61jF:lYiL C..&r h.
Future Improvements Agreement for Infrastructure Improvements
River's Edge Phase 3B Bridge
Forestar (USA) Real Estate Group Inc Page 12 of 14
ox 3— ❑.—W 21, 2D21
rows
RIVER'S EDGE [REEK CROSSING
E. STREET PAYING
6'REINF-CONCRETESTREEFPAVEMENT
Sy
$35.00
Vw. $56oU0o0
6' SUBGRADE PREPARATION
Sy
$2.7D
1,700 $4 r�90a0
HYDRATED LIME
TON
$163.04
31. $505300
4 CONCRETE SIDEWALK
LF
$3D.00
930L $27-qOOA0
REMOVE SIDEWALK
SF
$3.0D
Ift $54M
SASYCUT & REMOVE EXISTING CURB
LF
M.DD
60- $1ASOM
BONDS
PERCENT
2.0% $
95,163.00 $2,ONM
BRIDGE
BRIDGE
SF
$150.00
3,6W $-Qlaowbo
BRIDGEAPPROACII SLAB
LF
SIGNAGE AND STRIPING
L5
CRASH -RATED BARRI ER
LF
GUARDRAIL
LF
BONDS
PERCENT
SUS- TOTAL BRODGE
TOTAL STREET PAVING
R RETAINING, WA L LS
TOTAL RETAINING SMALLS
G- M ISCELLANEOU5 ITEMS
$20.00
20.
$s oao ao
$S,DDD.OD
1_
$S,U00_U0
$50.DD
220.
$110MM
$S4.00
100-
$SOUOoO
20% $
SKODD.UO
$11-1AB0UO
$577,02 00
S
674.663-00
EROSION CONTROL
SILT FENCE
LF
$1.90
800-
$152
GEOGRID REINFORCEMENT
SF
$0.75
10AM
$744110Oo
CURLER
LF
$1.10
580
$638M
CONSTRUCTION ENTRANCE
EA
MODAL
1_
$2.060-a0
SSYPPP & MONITORING
LS
$5,DDO.00
1-
$5.006-a0
TREE PROTECTION
TREE PROTECTION FENCING
LF
$1D.OD
350
$34110o0
STREET LIGHTS
STREET LIGHT
EA
$3,52D.OD
3-
$10-51OAO
4' ELECTRIC CONDUIT
LF
$12.00
1AM
W24000
BONDS
PERCENT
20% $
22,8D0.01)
$5000o
TOTAL MISCELLANEOUS ITEM
$
43,4SE-00
H. LANDSCAPING
HYDROMULCH [NO IRRIGATION} SF $0.10 6QOO4. $kowbo
BLOCK SOD PLACEMENT Sy $2.00 570 $1,140-00
TOPSOIL cy $26.00 9& $Z470.00
TOTAL LANDSCAPING $ 9,610-DO
OTC Ow 0-bu 21, D21
OPINION OF PROBABLE COST River's Edge Creek Cro 1a15
FATH- R,KrrXLNUVA0]\43- LAN LW5'— E'er,—. ,2a21.01 CruC:l[ Ir4lyW5.3 ME OM—,,wr, Edg. L..k
Future Improvements Agreement for Infrastructure Improvements
River's Edge Phase 3B Bridge
Forestar (USA) Real Estate Group Inc Page 13 of 14
RIVER'S EDGE CREEK CROSSING
L DEVELOPMENT FEES
WATER INSPECTION & TESTING FEE
PAVING INSPECTION & TESTING FEE
DRAINAGE INSPECTION &TESTING FEE
STREET LIGHT INSPECTION FEE
IPRC PLAN REVIEW FEE l&E, 0
WATER STUDY
_ � : _ . 3 , IRVEYING
FLOOD STUDY/LOMRICLOMR
& TESTING
MUNICIPALITY & JURISDICTIONAL FEES
PERCENT
PERCENT
PERCENT
PERCENT
PERCENT
PROFESSIONAL FEES
LS
LS
LS
LS
4.0% $
60.640.D0
P-5013110
6.0% $
674,663.00
wo 50o_00
6.0% $
46.955.00
3,000-00
2.0% $
22.800.00
$500110
1.5% $
BDS,058.131)
S1?-0o-00
U.004.00
1-
$B.oxm
$98.000.00
1-
$96.OMM
130.000.00
1_
$3RDIX100
$12 500.00
1-
S1a++-1
$
2o7,S0
h _ - , , -
$ 144,760A0
8- SANITARY SEWER SYSTEM
$
C. STORM SEWER SYSTEM
$ 46,955.o0
D. WATER DISTRIBUTION SYSTEM
$ 60,640.00
E. STREET PAVING
$ 674,6HJM
F. RETAINING WALLS
$
G_MISCELLANEOUS ITEMS
$ 43A-S&W
FL LANDSCAPING
$ 9,61000
I. DEVELOPMENT FEES
$ 207S00Ad
SUB -TOTAL
S 1,187.586L10
0 VEFL4tL
25%
$297.0W.00
LOTCOUNT.'
COSTILOT:
!F OF STREET
470. COST{LF OF STREET:
s3200
NET DEVEtOPABLEACREAGE
0.55 COSTIDEVELOPA18LEACRE
#Z685300
TOTAt GROSSACRE4GE:
2.25 COSTIGROSSACRE,
$559.900
OPINION OF PROBABLE COST Rnrer's Edge Cr OPC Eau D.a ", 21, W21�«s��
PATH- RWa L wdAoDujVw IANQ�65 Cffi E 7-07 €..& oft wwl� 3 Y6 oft p—
Future Improvements Agreement for Infrastructure Improvements
River's Edge Phase 3B Bridge
Forestar (USA) Real Estate Group Inc Page 14 of 14