HomeMy WebLinkAboutContract 36324-A4 aCITY SECRETARY, it -41
w CONTRACT N0,
TO CITY SECRETARY CONTRACT
`WHEREA , the City of Fort Worth CITY and, Klmley-Horn
and Associates Inc. , ENGINEER made and entered into City
Secretary Contract No. " 632 4, the CONTRACT) which was
authorized by M&,C C�-22555 on the 4th .ay of December, 2007 in
the amount of $,251,355l. and
WHER EAS, the CONTRACT was subsequently revised by
Amendment Number I in the amount of $138 ,730 . 00 which was
�f1 "" in M C C-25028 +gin July 19, 2011, Amendme 1t No 2 in
the amount of $49, 600 .00 which was administratively, authorized
on August 23, 2 1 and Amendment No. 3 in the amount of
$27,000.00 which was, administratively authorized on December
6, 2012; and
WHEREAS, the CONTRACT involves, ngi-nee ring services, for
the following prof e�ct:
Water and Sanitary Sewer Relocations for State Highway
121T. Part 3; and
WHEREAS. it has, become necessary to execute Amendment
N'o.4 to the CONTRACT to include an increased scope of work and
revised fee
NOWTIMUEFORE, CITY and ENGINEER, acting herein by and
through their duly authorized representatives, enter into the
following agreement, which amends the CONTRACT:
1 .
title I of the CONTRACT is amended tai include the
additional engineering services specified, in a proposal dated
July 3 2013, copy of which is attached hereto and
incorporated herein. The cost to City for the additional
design services to be performed by Engineer totals $48,300 . 001 .
2 .
Article IBC o the CONTRACT is amended to provide for an
increase, in the fee to be plaid to, Engineer for all work ,end
services performed under the Contract, as amended, so that the
total fee paid by the City for all, work and se vices. shall, 'be-
an amount of $514, 985.00 . OFFICIAL RECORD l
CITY SlECRETARY
R F C F I V F.0 1.1 u I.- 20A�
Page FT. WORTH9 TX
All other provisions of the Contract, which are not
expr ssly amended herein, shall remain in full force, and
effect,.
EXECUTED and EFFECTIVE as of the date last written, by a
signatory, below.
APPROVED: ENGINEER
City of Fort Worth Kimley-Horn and, Associates, Inc. ,
Fernando Costa %.7.L91121 %3CE.Ly P A:
Assistant City Manager ienior Vice-President,
.1 A
DATE: DATE-
7'
APP RECONV71ENDED/.:
S. Frank Crumb, P.E.
Director Water Department
APPROVED AS TO FO IRM AND LEGALITY*. M&C: N/A
Date-, N/A
-WIT.- VIA
4 a 101%'j 3
Assistant City Attorney
0 Y,
cat
0
ACI
ri J. Kayser 000000
ity Secretary
OFFICIAL RECORD
CITY SECRETARY
FTn WORTH,TX
Page -2-
lr
Kirnley-Horn
and Associates, Inc.
July 3,2013
Sufte 950
801:Cherry Sleet,unit 11
Fort Worth,,Texas
Mr. Liam Conlon 76102
Project Manager.
City of Fort Worth Water Department
10!00 Throckmorton Street
Fort Worth,TX 761012
Re: Water and,Sanitary Sewer Relocations for SH-121T(Southwest Parkway),
Part 3
Add itional.Services—Amendment No. 4
KHA No. 061018049
City Project,No.,008919
Dear Liam:
This is an arnendment,to a contract between Kimley-florn.and Associates,Inc.
and the City of Fort Worth("the City")dated 12-19-2007 referred to herein as
the"'Contract".
The City ended a construction contract for this project with SJ Louis. Kim ley
-
Horn wl R redesign a portion of the sewer line thrOUgh the Villages of Sunset
Pointe Subdivision, approximately 1,000 feet of which will now be by other than
open cut alongBi Spruce Lane. Kiinley-Horn,will also prepare plan, profile and
19
grading sheets for a screen wall to be located between the City ROW and NTTA
ROW.Kinley-Hom will prepare an additional bid-package to rebid the
i
remaining portion of the project as defined in more detail below:
Item 1 (Sanitary Sewer Design)
Kiniley-Horn presented the City with alignment alternatives to the original
sanitary sewer design along Big Spruce Lane for Contract Amendment No. 3.
The City selected the Big Spruce alignment by other than open cut for the
sanitary sewer.Kimley-Horn will design separate plans and contract documents
for the alignment as chosen by the City, for bidding and constniction purposes.
Kim ley-Horn will attend bi-weekly coordination meetings with the City,(up to
12).
111
TEL 17 335 6511
FAX 817 335 5070
.....................
Mr.Liar i Conlon,July 3,2013,,Page 2
ley-Ho m
and Associates,Inc.
Item 2(Screen Wall Design)
The City has agreed to construct a 6-foot tail concrete screen wall along the
Villages of Sunset Pointe Subdivision and Chisholm Trail Parkway ROW
(-11100 1,F).Kimley-Horn will prepare contract documents which will requff" e
the contractor to prepare the structural design for the wall. The wall will also be
required to be stained to meet the Chisholm Trail Parkway Master Plan
Southwest Parkway Bu�ff color, Kimley-Horn will prepare the wall plan,profile
grading sheets and the architectural details.
Kirnley-Horn wI'll attend one(1)meeting to present architectural wall options
and to coordinate construction activities with the Villages of Sunset Pointe HOA.
Geotechmical Engffieering for the screen wall will be performed by a sub-
contractor and admin.1stered by Kimley-Hom. Kimley-Horn will utilize
remaining funds in the current contract currently designated for an MIVVBE
survey via a change forrn,.
Item 3 (Pre-Construction Assistance)
Kim ley-Hom will provide pre-construction assistance as defined in the Contract
Exhibit"A-I"Part C—Pre Construction Assistance'Including:
* Delivery of did d Documents as defined in the Contract
* Bidding Assistance as defined U'l the Contract
Item 4(Construction Phase Services—NOT INCLUDED IN T SCOPE
OF SERVICES)
Kimley-Horn will provide construction phase services as defined in the Contract
Exhibit"A-P'Part D—Construction Phase Services 111clud ing,
* Attend one(I)preco ristruction conference prior to construction
* Perform one(1)site visit per month as defined in the Contract and no
more than two(2)
* Review shop drawings and sample submissions as defined in the
Contract
o Revise drawings and provide record drawings to the City as defined in
the Contract
o Attend one(1)final site inspection as defined in the Contract
Additionally,, Kimley-Horn will attend one(1)meeting with the Villages of
Sunset Pointe,HOA and one(1)public meeting prior to construction.
Scope of Services
The scope of services for this amendment is divided into the following tasks-,
Mr.Liam Conlon,July 3,2013,Page 3
Kirnley-Horn
and Associates,Inc.
Item 1 (Sanitary Sewer Design).- 828,500 Kimley-Horn
1,051 PrintingSub
149 10% Sub Fee
$299700 Total
(Water SO; Sewer$29,700)
* Task 1—Revised plans for the sanitary sewer line based upon the
approved atignment and preparing a bid package for advertisement.
* Task 2—Progress meetings,with the city.
# Task 3—Printing of Bid Documents.
Item 2(Screen Wall Design),- $13,500 Ki,mley-Horn
(Water$0; Sewer$13,500)
ol Task 1—Screenmig wall profile, layout, site grading and coordination,
* Task 2—Attend one(1)HOA meetmig.
Itein 3 (Pre-Construction Assistance): $5,100 Kimley-Horn
(Water$0- Sewer$5,100)
e Task I—Assist with advertising of revised plans, prepare and issue
addenda as required,attend pre-bid and bid opening,, provide award
recommendation,and prepare conformance documents.
'Item 4(Construction Phase-Services—NOT MCLUDED IN TIIIS SCOPE
0,
OF SERVICES), Kimley-Horn
(Water S Sewer$N/A)
Task I—Meeting with the Villages of Sunset Pointe HOA,
:pr econstruction Meeting,, Site Observations, and Final Walkthrough.
Task 2—Shop Drawing and Substitution Review.
We recommend that the City increase the budget by$48,300 fo�r these
additional services., From the additional services listed above, the
recommended breakdown for water and sewer services is as fiollows.:
Description Water Sewer Total
Item I —Sanitary Sewer Design $0 $29 700 $29,700
Item 2—Screen Wall Design $0 $13,,500 $13,500
Item 3—Pre-Construction $0 $,5 1 OO $5 100
Assi'stance
Total so S48r34 O $48,300
Mr.Liam Conlon,July 10,2013,Page 4
Ki'miley-Horn
and Associates,, Inc.
The following table sunimarizes the fee per Work Phase:
Total
Work Phase Water Fee Sewer Fee Fee
3 1 $0 $0 $0
32 $0 $0 $0
33 $0 $48)300 $48)300
$0
Total $0 $489,300 L$48931
The following table summarizes,our recommended budget revisions by Item
(please see attached Fee Breakdown for an hourly breakdown of each item).-
Deserlipti"On Item I Item 2 Item 3 Item 4 Total
Pre-Enginleering $0
Conceptual Engineering $ $0
Preliminary Construction $ $ - $ $ - $0
Plans
-,--Final Construction Plans $ 29,700 $13500 $ $ - $431,1200
Pre-Con, truction Services, $- $ - $ 5)100 $ - $5,100
Construction Phase $
Services
Total $299700 $13,500 $5JOO $48300
Mr.Liani Conlon,,July 10,2013,Page 5
Kirnley-Horn
and Associates, Inc.
r
the following table summarizes our recommended budget revisions and shows
the revised contract amount.*
Descrl*ptl*on Orlglinal Amend Amend Amend Amend Revised
Fee No. I No.2 No. 3 No. 4 Contract
Pre-Engineering $355900 $351400 $5>200 $43800 $_ $8 1,300
Conceptual Engineering $62,,980 $8,7900 $ - $ - $- $7100
Preliminary k onstruction $49!05 $321130 $ - $ - $ - $8 1�7915
Plans
Final Construction Plans $857010 $46,300 $445400 $ $431200 $218�91 01
Pre-Construction Services $3y 600 $,51000 $ - $ $ 5,1010 $13 700
Construction Phase $14)200 $1111000 $ - 22 200 $47)400
Services
Total Project $2511355 $138,730 $491,600 $1275000 $48,300 1- $51499851
The-following tables summarize our revisions to the NVW'BE percentages:
This Amendment
Sub-Consultant Fee
PIC Printing $112010
Total $19200
NIJWBE Percentage 2.4
Total Contract
Description Per Amend No. 3 Revised
Contract Amount $46605 $5141985
Total Contract M/W]BE $871 80 $8%080
7-
Total Contract 17,2%
1T B E Percentage
MT.Liam Con]on, any 3,20 13,Page 6
Kimley-Horn
and Associates, I:nc.
The fo I'lowing table summarizes our revisions to the water and sanitary sewer
sign fees:
Description Original Amend�. Amend, Amend# Am,en,d Total
No. 1 No 2 No.3 No, 4
Water $13311377 $10�8�1695 $36,300 $0 $0 $2781372
`2
Sewer $117,978_ $3,01035' ' $13,360 L$27,000 '$48,3,0�O S23616-13
We appreciate the opportunity to be of contm' ued service to the City. Pleasile
contact its if we need to provide any further inforniation.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES,WC.
Texas Registered Engineering Firth F-92a
Glenn A. Gary,P.E.
Sr.Vice President
GAG,/CTDjek
Attachments
\\F TWFPQ1WaiaTrqjc(.-tTTW_Lhi litics'06101:9044\PPP\Asiictidiment-4\)(RA-SH 121 Pt IS Amend,4-Urdoe
v
Kimiley-Hor'n
and Associates,, Inc. Budget Summary
Project Wow l an Budget ry e: Jul 1$20,13
General .ject Information, LFee Informationi
Client: Clay of Fort Worth Fee Type: CP
Project, SH 121T Part 115 Expense Mule. 1.10
KHA No., 061018,049
PM: Josh Kercho Allocation-, 0.01%,
Tas-k Budget Summary w
'. Task Name Hours Labor Expenses Allocatio n Subtotal
190----,Sanita Sewer Design 257 $l _28,50 $ 281500
31600
300 Bidding 67 $ 51
�.....m �A. ._
777 Coinitinaency
T T" S 41.91 $ 470100 1 $ - $ $ 4701
Oil
w
Task No.' k Name C t r lti ller Subtotal
71 � ctior IC Printing �._ �.. 11x51 �.w 1.1 11200 .
11 0
1.101
1.110
TOTALSI: 1 06 11200
L 470100
E
X `
E OT16w
aqe 2 of 5
t ley p
and Associates. Inc.
Project an B,udget ate: July 11,2013
Project on�Generalll a
client. Cry Fob Worth Labor: $ 287500 Number, 100
Project: SH 121,T Part is Expenses: Name: Sanitary Se�we,r Design
061 809 location Task - Josh Kercho
2 500
'Task Descrjpfion and g
N.
I Mail
Task Descriptions: GLC. P5 P2 NS ( r Expenses �
1111. .. _...._ ..._
qty Schedule Updates 3 3 6
onths
Project Management 6 mr ont1's 61 6�.._ ,�. ..��..�.
Administration,(6 Months) 12 12
.�.. . ..�.�......�. 1111.._. , _ .. ...��
Bi-weekly Progress Meetinge 6 6 12,
rots/' .5tr each mgt),
.. w
.. ,�._..,. ... .. .. _._1111.
N,TTA Coordination,, � � 1111
1111.,. _..
Drawings
Covw Sty 2
_.. m _. ..., �
City Standard Notes 2
Project Specific Notes 1 2 3
Shy Index 1
i_7— ...........w,
�..�._.. ��
Sewer Location app 3 Sits) 1 3 4
Plan i
Standard l and Special Details 1
7-
Tr;47ftc contro't Plan 4 12 16
A/ C 6 61, 112
90%Contract Documents
Division 00 and 01 1 2 1 15
�_...�.� . .......�.�._. �..��... ..�..�..�.�..o ..�... _1111. �.._.�. ._.��...�.... ..._
Division 2 thru� 1 2 112 15
Construction Drawings
90%Design:Comments 20 Shuts) 1 4 15 20
on tr�chon Contract Documents
..
900/0 Contract Documents Cornments 1 21 12 15
Deliverables
Construction Drawings and Contract Docs 1
WIN m
i
S tals: 11 641 1611 0 25
Task Cost/Effort o raw Lbr Expenses,(S
Cost .6 2.71 4.3 0.,4 8.1
E`er rt. 2.2 9.. 2 1".5 ::F 1 28-41;$
Paae3of5
Klmley-Horn
and Associates, Inc.
Project Work an Budget Date- Jidly 1.20,13
„ e ormation Task Effort Summa,ry Task Information
Client: City of Fort Worth Labor: $ 1306001 Number.- 200
Project* SH 121T Part 15 Expenses-: $ - Name: Screen Wall Design
KHA No.- 061018049 Allocation: $ - Task Mgr-. Josh Kercho
PM: Josh Kercho TOTAL: $ 13,5100
'Task Description and Budgeting
69 11
'IV
Task biscrIptions.-I GLC P6 P5 P2 1 NS (Hrs) Expenses($)
'00
Villages olf Su niset Pointe!HOA Mig,s w/City 2 2i 4
(1 mtg/2hrs)l
...... . .....
............
Screen!Wall Des igin(3 shts PIP) .......
Plan 12 20
Elevation 12 20 32
Grading 12 20 32
Screen 11 Architectural Details 4 12 16
ti
F_
....... ......
2 421 72V
Suwals. $
3-8
0.11 1 8F 71.SL
E 6,21 6,81 .4 1 I� I I
Paqe 4 of 5
Klml'ey-Horn
and Associate ►., Inc.
Projec rkplan Budget Date- July 1, 13
............. ............... --------
,General Project Information �Tas,k Pffort Surnmary Task Information,
Client-. City of Fort Worth Labor.-, $ 51100 Number: 300
Project: Shy 1'21T Part 15 Expenses: $ om Name: Bidding
KHA No-# 061018049 Allocat ion d. $ Task Mlgr. Josh Kercho
M. Josh Kercho TOTAL: $ 511100
�Task,Desicriptioni and Budgeting
%L
"A
Task Descriptio.ns I GLCV F% P6 P2 N'S (Hirs) ExpenSes($)i
Advertisem&if_
--Invitation to Bidders 1 2
Maintaining Conlractor's,List 2 2
Request for Informatim 9
Addenda 3 91
Pr` id Meeting 2 2 2 6
Bid Opening 1
...........
Recommendgon of Award 1 2 2
Conformance Documents 1 -4, 5
DeWerables, 1 4 2, 7
41
------------
. .... .........
.............
21 121 28] 46 $
R no &9ff I=#
Cost: 0.11 04-0-al- 0.11 1 ............
5.1 $
Effcntl 0.41 1,81 2.611, 0.31 1 1
Paqe 5 of 5