Loading...
HomeMy WebLinkAboutContract 57283-AR3CSC No. 57283-AR3 FoR,�RTH ., City of Fort Worth Construction Allowance Request Project Named Park Vista Boulevard and Keller Haslet Road Intersection Client Project #(s) l 101020 Project Park Vista Boulevard and Keller Haslet Road Intersection Improvements Description ContractorlXIT Paving and Construction, Inc. City Project Mgr. I Mitch Aiton UNIT or DEPT Original Contract Amount Extras to Date Credits to Date Current Contract Amount JAmount of Proposed Allocation Original Allowance Available to Allocation Allowance Funds Previously Allocated Revised Allowance Balance l City Sec # l 57283 CA#1 3 I Datel 7/7/2023 City Inspectorl Travis Overstreet Unit 1 $1,580,011.10 I Totals $1,580,011.10 $1,580,011.10 $1 580 011.10 $4127.57 $0.00 $0.00 $0.00 4127.57 $100,000.00 $8,802.60 $100,000.00 $8,802.60 $87,069.83 $0.00 $0.00 $0.00 1 $87,069.83 NMI JUSTIFICATION (REASONS) FOR CONSTRUCTION ALLOWANCE IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST, THE CONTRACT SHALL: Furnish all labor and material as per attached proposed Construction Allowance Request (with attachments): This construction allowance is to add Item 117 -Remove Luminaire at $875.00 per EA. A traffic signal luminaire was installed on the NE corner of the intersection, however TriCounty Electric said the luminaire was located too close to their line and requested it be removed. There is an illumiantion pole at the intersection that will keep the intersection illuminated. Price is fair and justified comparing to txdot average bid price to remove an item with a bucket truck. This will also add item 118 - TriCounty Electric Invoice for Installing Traffic Signal Power at $3,252.57 per LS. This item will install a new power source to serve existing bid item 109 Metered Pedestal. This will replace the previoulsy added Item 116 - Furnish/Install Elec Sery Pedestal and that item will not be used. Invoice from TriCounty Electric is attached for reference. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Construction Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. XIT Paving and Construction, Inc. l Riley Gilfeather Jul 11, 2023 Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date Ro Jul 11, 2023 Mifah Arlon Jul 10, 2023 Program Manager Date pct Officer Date Jul 11, 2023 Jul 13, 2023 Assistant Director (Dept) Date LJ11 VULU Date PcrtriciaL. wadsacK Jul 14, 2023 Jul 14, 2023 Assistant City Attorney Date Assist Date 9 t Jul 20, 2023 LIL6; " Jul 20, 2023 ATTEST: �_A �&_ Jannette Goodall, City Secretary 4aoon cF FORt�oaA °° o 9dd pro ,•Id Pvo o=d P�Q*° b Q�n nEapSapp OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Construction Allowance SUMMARY Page 1 of 4 FORT WORTH, City of Fort Worth Construction Allowance Additions Project Name I Park Vista Boulevard and Keller Haslet Road Intersection I City Sec # I 51283 Client Project # 1 101020 1 ContractorIXIT Paving and Construction, Inc. PMJ Mitch Aiton I Inspector) Travis Overstreet Construction Allowance Submittal # 0 Date 1 7/7/2023 1 ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 117 Remove Luminaire Unit 1 1.00000000 EA $875.00 $875.001 118 TriCounty Invoice for Traffic Signal Power Unit 1 1.00000000 LS $3,252.57 $3,252.57 Un i 1 $4,127.571 $0.001 $0.001 $0.001 Construction Allowance Additions Page 2 of 4 FORT WORTH. City of Fort Worth Construction Allowance Value Project Name I Park Vista Boulevard and Keller Haslet Road Intersection I City Sec # I 5/283 Client Project # 1 101020 1 Contractor XIT Paving and Construction, Inc. I PM1 Mitch Aiton I Inspector) Travis Overstreet Construction Allowance Submittal # Date 1 /I//2023 1 CONSTRUCTION ALLOWANCE VALUE BEING USED ITEM DESCRIPTION Qty Unit Unit Cost Total 37 9999.0220 Miscellaneous Utilities Force Account 4,127.57 EA $1.00 $4,127.57 Construction Allowance Value 3of4 M/SBE for this Construction Allowance Request M/SBE Sub I Type of Service I Amount for this CAR Total $0.00 Previous Construction Allowance Requests CAR # DATE AMOUNT 1 7/29/2022 $355.52 12/5/2022 $8,447.08 Total 1 $8,802.60 Construction Allowance MSBE Data Page 4 of 4 REQUEST FOR INFORMATION REPORT (RFI) Park Vista Boulevard at Keller Haslet Road Intersection Riley Gilfeather Project Manager Install Electical Service POTENTIAL• NO CHANGE INCREASE IN COST $ 3,252.57 DECREASE IN COST 3.1 1 • PRIME CONTRACTOR 57283 XIT Paving and Construction, Inc. XIT NO CHANGE INCREASE IN TIME DECREASE IN TIME 214-980-0805 1 06/14/23 # of Days = # of Days = TriCounty Electric is requesting $3,252.57 to install a new power source for the Traffic Signal. Please provide direction. Mitch Aiton Sr Professional Engineer 682-715-9424 06/14/23 06/14/23 Contractor to pay TriCounty Electric and City to reimburse Contractor. COST IMPACT JUSTIFICATION SCHEDULE IMPACT JUSTIFICATION Please see attached invoice from TriCounty Electric. No Schedule Impact QA REVIEWER'S NAME TITLE QA REVIEWER'S SIGNATURE Mitch Aiton, Sr Professional• -- 07/06/23 REQUEST FOR INFORMATION REPORT (RFI) 3.2 Park Vista Boulevard at Keller Haslet Road Intersection Riley Gilfeather Install Electical Service 57283 1 XIT Paving and Construction, Inc. NO CHANGE NO CHANGE I INCREASE IN COST $ 875.00 INCREASE IN TIME # of Days = DECREASE IN COST DECREASE IN TIME # of Days = INFORMATION REQUESTED TriCounty Electric is requesting to remove the luminaire because it is too close to their overhead electric line. 0009- CONTRACTOR RECOMMENDATION or Please provide direction. Mitch Aiton Sr Professional Engineer 682-715-9424 06/27/23 06/14/23 GOVERNMENT• TO CONTRACTOR Contractor to remove luminaire, existing illumination pole at intersection will provide light for the intersection. Please see attached TxDOT bid item reference for Remove Spread Spectrum Antenna for $1,067.60 per EA. Item is similar in No Schedule Impact scope as the contractor will need a bucket truck to get to the top fo the pole and remove the luminaire. QA REVIEWER'S NAME & TITLE QA REVIEWER'S SIGNATURE I ll j i� I I II II II l sills I 'I 4 REVISIONS a 22 I 76 I ! I� V G _ INSTALL NEW CITY OF FORT WORTH I® I lsi PEDESTAL ELECTRICAL SERVICE TYPE D �o I I I 31 E I R- I#�8� I j of a I ; v I R_ I INSTALL 16 CHANNEL INTELIGHT SIGNAL CONTROLLER 5 15 30 _ m c CABINET WITH ATC CONTROLLER — REPLACEIEXISTING HID LUMINAIRE FIXTURE m m .I 13' 13. 5' 12. 5' 9® 14' 13' I AND 4G MODEM WITH NEW LED LUMINAIRE FIXTURE o I6 C\ r rl R-21 I of NOTE: DAY CARE I o, FOR PAVEMENT MARKING/ROADWAY DETAILS, `V Luminaire to remove j I ® f SEE PAVEMENT MARKING SHEETS 6G-69. Power source added to avoid TriCounty \ I RI- L� I¢ 6 to this pole from Electric overhead line. -� 5' I%- I -I �I �I i� 5 6 7 j 1 R-7 OPEN FIELD TriCounty Electric. _ -------- -------� - — 1 POWERPOLE E RELOCATED PRIOR T CONSTRUCTION _ R CON TR CTION 4 v v:P -1 5 TRAFFI IGNAL ELECTRICAL SERVICE WILLBEFROM _ � w oz R 1 / loP I I I I I I I I I I i — -1 \ NE RANSFORMER AT NEW POLE LOCAT ,o' �mm rns¢ucrv. s. uo ozieoeas R. 0.W oaerc. _ _—_— _ _ __ _ _ - _—__—__—_____——__—_____—__—__— OSED R. . T. � �' PROPOSED R.O.W. PROP 0 W KELLER-HASLTRD» 36'' ++ --.,-L' --—»---m---»'— R-12 11 I(rl I rn_i IArlLrr nD R 1 6 _ � 2_I Pantetl Spaetl =30 mpM1 — act= za W ------------------------- — ` I I I 9 �p`E, OF TEFFI JF s P- — {�onrvP DervnaMln % G m OPEN FIELD lam`rS� 97330 --_ I I I I A I LEG -ND OF SYMBOLS I �w. 'o I � SIGNAL POLE/MAST ARM ASSEMBLY ORTWORT 22 3' 13 A' I� I T-2 POLE NUMBERS I" RIIM 1-- TRAFFIC SIGNAL HEAD IM I I 4 SIGNAL HEAD NUMBERS _ -I CONDUIT RUN & NO. sn-z,ewos �, Y gee eneiieetme H \A I MAS 'P T IT MOUNTED SIGN I K-2736 1 pss66wII 17' 'I am- VIDEO DETECTION CAMERA I crrr vaa�Fcr •�e�eza raaasca Ha. az Q Issue a I I IcVEHICLE DETECTION ZONE CITY OF FORT WORTH, TEXAS M1 4 I ® oPncoM DErecroR TRANSPORTATION AND PUBLIC WORKS a l 4u1 pp II I PEDESTAL POLE ASSEMBLY W/APS TRANSPORTATION PROGRAMMING Q E o & CAPITAL PROJECTS DIVISION -;, —R_0, W___- RIGHT OF WAY LINES Ln O m I NEW TYPE B GROUND BOX W/APRON > PARK VISTA & KE'LLER HASLET I ® NEW TYPE D GROUND BOX W/APRON INTERSECTIONIMPROVEMENTS 4-1 PEDESTRIAN HEAD a- I NEW CONT. CABINET ASSEMBLY � TRAFFIC SIGNAL -PROPOSED LAYOUT " LUMINA CRE i DESIGNED: D SDPLE: DATE' SHEEP ILNUINLLH RI - 1 C � PTZ CAMERA Q \ I I ORnwH JMS I AS SHOWN I NOV 5, 2021� 61 OF 125 p" �\T PAVING & COSTRCCTIM INC. N—A XIT PAVING AND CONSTRUCTION, INC. 3934 HWY 287 WAXAHACHIE, TEXAS ATTN: PROJECT NAME: PROJECT # : CDR DESCRIPTION: CHANGE ORDER REQUEST Mitch Aiton Park Vista and Keller Haslet Intersection P22-32 Remove Luminaire & Set Service for Traffic Signals COR # 2 DATE: 07/06/23 PRIORITY: High Original Contract Value: $1,580,011.10 This Change Order: $4,585.73 Previous Change Order Amts: ($2,073.48) Proposed Contract Amount: $2,584,596.83 COR 2 - Remove Luminaire & Set Service for Traffic Signals DEDUCT: ITEM No. DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE DEDUCTSUBTOTAL: $0.00 ADD: ITEM No. DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE 1 Remove Luminaire & Set Service for Traffic Signals 1.00 LS $ 4,585.73 $ 4,585.73 ADD SUBTOTAL: $ 4,585.73 COR -2 TOTAL: $4,585.73 Qualifications: 1 Extra day to be added to contract time for the luminaire — 18 extra days to be added to contract time for the service, paid on 6/19/23 service set on 7/7/23 Owner: City of Fort Worth Accepted By: Please sign and return as an agreement and notice to proceed. Contractor: XIT Paving & Construction, Inc. Pricing By: HIIey iffea-mer, Project Manager Pagel of 2 Change Order Request Cost Breakdown County Tarrant Project Park Vista Control Highway Description of Work: Remove luminaire fixture and arm from signal mast pole on NW corner of Park Vista/Keller Haslet intersection, done by Mel's Electric. Set service for the traffic signal power, done by Tri-County Electric. Date: 7/6/2023 Equiprb'ont Labor H,urs Rate Description Hrs Rate Amount Amount Reg. O.T. Reg. O.T. Sub -Total $ Sub -Total $ 15% $ 15% $ 0% $ Total Equipment: $ Total Labor: $ Material - Supply Subcontract Description Quantity UOM Rate Amount Quanity UOM Rate Amount $ Remove Luminaire 1.00 LS $ 875.000 $ 875.00 $ Set Service for Traffic Signals 1.00 LS $ 3,252.570 $ 3,252.57 Sub -Total $ Sub -Total $ 4,127.57 15% $ 10% $ 412.76 Total Material: $ Total Subcontract: $ 4,540.33 Summary Approved: Date 07/06/23 Labor MIT Paving & Construction, Inc. Equipment $ Date Material $ City of Fort Worth Subcontract $ 4,540.33 Bond 1 % $ 45.40 Total This Sheet $ 4,585.73 PCO MELS ELECTRIC LLC 6305 S. IH 45, P.O. BOX 40, WILMER, TEXAS 75172 9721441-6208 FAX-972/441-6394 BID QUOTATION PROJECT: PARK VISTA LOCATION: FT WORTH, TEXAS Item Description DATE: 6-30-23 TOTAL $875.00 Quan. I Unit Price I Per i REMOVE FIXTRUE AND ARM FROM MAST ARM POLE 1 1.000 1 $875.00 1 LS I I I I I I I ADDENDUM: 1,2 NOTES: Bid quotation does NOT include: engineering, temp. power, tax, bond, pavement markings, utility co charges I sm rdsd signs, irrigation controller or xfmr's, traffic control or equipment, 1 temp. traffic signals or, any unforeseen subsoil condition, 1 I Extended Price $875.00 TOTAL BID PRICE $875.00 From: msmeridian@tcectexas.com Sent: Monday, June 19, 2023 5:21 PM To: Riley Gilfeather Subject: Payment Receipt from Tri-County Electric Co -Op Inc Payment Confirmation Dear Member: Thank you for your payment of $3,252.57 that was submitted on 19-JUN-2023. The payment has been applied to: Electric Acct 800974101 $3,252.57 We appreciate your business and value you as a member. Please retain this email for your records. You may also review this information by logging into your account here. If you have any questions about your account, call 1-817-444-3201 or 1-800-367-8232. Our Member Service Representatives are available to assist you Monday through Friday from 8:00 AM to 5:00 PM. Sincerely, Tri-County Electric Co -Op Inc 7/6/23, 2:52 PM Workbook: Bid Item Average Cost Filters: Adjust filters to refine your analysis of bid item average Use Qty Filter: 66 Data Date: 7/6/2023 2 13 04 AM Standard Specification Costs. INO'Pow Chart Code I(AIl) BID ITEM BID ITEM DESCRIPTION UNITOF Min- Bid Item Max. Bid Item Avg. Unit Price Min. Unit Price Max. Unit Price Std. dev. of Unit Median Unit MEASURE Qty Qty Price Price Bid Item I(AII) Actual Let Date Range 690-6093 REPLACE RED SIG LEDTRAF SIG LAMP UNIT EA 5.0 50.0 $209 50 $66.40 $352 60 $202 37 $209 50 Last 3 months ' Bidder Rank 690-6094 REMOV PED SIG LED TPAF SIG LAMP UN IT EA 11.0 11.0 $420 00 $420 00 $420 00 $420 00 Low Bidder District I(AII) 690-6095 INSTALL PEDSGNLED TPAFSIG AMP UNIT EA 20.0 20.0 $69.10 �69.10 $69.10 $69.10 County I(AII) 690-6097 REMOVE SPREAD S?ECTRUM ANTENNAJWL i0 1.0 $1,057.60 $1,057.60 $1,057.60 $1,057.60 Project Classification - I(AII) G90-6098 INSTALL SPREAD SPECTRUM ANTENNA EA 1.0 1.0 $1,847.SS $1,200.00 $2,495.70 $91620 $1,847.85 Vendors (Select to Exclude) I(AII) 690-6099 SALVAG E TP AF F I C 5 1 G NAL EA 4.0 4.0 $1,989.50 $1,989.50 $1,989.50 $1,989.50 G90-6106 INSTALL0FF0UNDATION(PEDEETA LPOLE) LF 1.0 1.0 $2,000.00 $2,000.00 $2,000.00 $2,000.00 690-6108 REPLAC EELECSERV(TYD)(EXCLDPOLE) EA 30.0 30.0 $2,000.00 $2,000.00 $2,000.00 $2,000.00 690-6111 PERIL VEHSIG SEC (12")LED(GRN) EA 100.0 100.0 $35.00 $35.00 $35.00 $35.00 690-6112 REP LVEHSIGSEC(12")LED(GRNAR)N) EA 56.0 50.0 $35.00 $35.00 $35.00 $35.00 https://tableau.txdot.gov/views/Bid ltemAverageCost/Bid ItemAvgCostDashboard?%3Aembed=y&%3AisGuestRed irectFromVizportal=y&%3Aorigin=card_share_Ii nk 1 /1 FORTWORTH. Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: Park Vista and Keller Haslet CA #3 M&C: N/A CPN: 101020 CSO: 57283 DOC#: N/A Date: 7/7/2023 To: Name Department Initials Date Out 1. Mitch Aiton TPW - Signature "A Jul 10, 2023 2. Jessica Rodriguez TPW - Review Jul 10, 2023 3. Riley Gilfeather XIT - Signature's Jul 11, 2023 4. Travis Overstreet TPW - Signature , RO Jul 11, 2023 5. Raul Lopez TPW - Signature e,-z Jul 11, 2023 6. Lissette Acevedo TPW - Signature Jul 13, 2023 7. Patricia L Wadsack TPW — Signature PAW w Jul 14, 2023 8. Lauren Prieur TPW — Signature Jul 14, 2023 9. Doug Black Legal — Signature d,.,�wb Jul 20, 2023 10. William Johnson CMO — Signature „ Jul 20, 2023 11. Jannette Goodall CSO - Signature TSG Jul 20, 2023 12. TPW Contracts CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: ❑YES ❑No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ®No ROUTING TO CSO: ®YES ❑No Action Required: ❑ Attach Signature, Initial and Notary Tabs ❑ As Requested ® For Your Information ® Signature/Routing and or Recording ® Comment ❑ File Return To: Please notify TPWContractsnu,fortworthtexas.gov for pickup when complete. Call ext. 7233 or ext. 8363 with questions. Thank you!