Loading...
HomeMy WebLinkAboutContract 58320-CO1CSC No. 58320-CO1 FC3R-c WORTH City of Fort Worth Change Order Request Project Name: Clear Fork Force Main J Cily Sec No.: 1 58320 Project No.(s):l 560211070043011780 DOE No. I N/ A I City Proj. No.: 1 100996-2 Project Description- Approximately 14,330 linear feel of 36•inch sanitary sewer force main piping to convey wastewater from proposed Clear Fork Lift Station to downstream discharge point. Contractor: S.J. Louis Construction of Texas, Ltd Change Order # 1 Date: 1 6/2112023 City Project Mgr. Liam Conlon City Inspector: Carmen Drake Phone Number: 817-392-6824 Phone Number: 682-432-5486 Dept. Sewer Totals Contract Time (Calendar days) Original Contract Amount $29,829,815.71 $29,829,815.71 400 Extras to Dale Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $29,829,815.71 $29,829 815.71 400 Amount of Proposed Change Order $0.00 $0.6 020 Revised Contract Amount $29,829.815.71 $29,829,815.71 420; Original Funds Available for Change Orders $298,298.00 $298,298.00 Remaining Funds Available for this CO $298,298.00 $298,298.00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25116) $37,287,269.64 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 1 provides for the following: Revisions to various project vaults with dual 8-Inch combination air release valves and gate valves to accomodate actual field conditions that were encountered during construction. 8-Inch water line lowering to avoid conflict with 8-Inch ARV piping. Lowering of the force main beyond the design depth to accomodate the revised vault depth. Staff concu rs with the contractors request for 20 additional calendar days on the change order. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order, I Contractor's Company Name Contractor Name gnature Date ruction j S.J,Louis Constof Texas, Ltd I Adam Lunsford I Phtraclor -WA� 7/Io1Z3 ,f'nseector Date Project Manager , Date `61rector (W�r-0ept) Date Cohstruction,Supervisor (Water) Date I Laura R Wilson Jul 13, 2023 �r-- 6 Senior Assistant City Attorney Dale Assistant City Manager Dale I Jut 19, 2023 Daila BcaWL�(O f Jut 20, 2023 Council Action (If Required) M&C Number nla M&C Date Approved nla i Fo R r WC-) R"r H City of Fort Worth W ' Change Order Additions Project Name Clear Fork Force Main E City Sec No.: 58320 Project No.(s): 56021 10700430 11780 DOE No.1 N/A City Proj. No.: 100996-2 Project Approximately 14,330 linear feel of 36-inch sanitary sewer force main piping to convey wastewater from proposed Clear ` Description Fork Lift Station to downstream discharge point. I Contractor S.J. Louis Construction of Texas, Ltd I Change Order: [--T—] Date: 1 6/21/2023 City Project Mgr, j Liam Conlon l City Inspector I Carmen Drake ADDITIONS I I Em DES',;Ri1PI ION DEPT Qt�( Unit Unit Cost Total 61 Post -CCTV Inspection Sewer 876.00 LF $3.00 $2,628.00 62 Modified 36" Gale Valve wl Vault @ STA 89+85 Sewer 1.00 LS $14,000.00 $14,000.00 63 Modified Offset Dual 8" Sewer Air Release Valve & Vault @ STA 22+13 Sewer 1.00 LS $150,000.00 $150,000.00 64 Modified Dual 8" Sewer Air Release Valve & Vault @ STA 57+95 Sewer 1.00 LS $106,000.00 $106,000.00 65 Modified Offset Dual 8" Sewer Air Release Valve & Vault @ STA 86+81 Sewer 1.00 LS $150,000.00 $150,000.00 66 Modified Dual 8" Sewer Air Release Valve & Vault @ STA 139+60 Sewer 1.00 LS $106,000.00 $106,000.00 67 36" HDPE Force Main Extra Depth STA 18+16 to 18+88 and additional bend, Sewer 1.00 LS $49,000.00 $49,000.00 68 36" HDPE Force Main Extra Depth STA 86+10 to 92+06 Sewer 1.00 LS $48,000.00 $48,000.00 69 8" Waterline Lowering Sewer 1.00 LS $23,000.00 $23,000.00 Sewer $648,628.00 Page 2 of 4 Additions Sub Total I$648,628.00 FCi RT' W" RT H City of Fort Worth MW I Change Order Deletions Project Name Clear Fork Force Main City Sec No.: k MM Project No.(s): 56021 1070043011780. DOE No. N/A City Proj. No.: 100996-2 Project Description I Approximately 14,330 linear feet of 36-inch sanitary sewer force main piping to convey wastewater from proposed Clear Fork Lift Station to downstream discharge point, Contractor I S.J. Louis Construction of Texas, Ltd Change Order: 1� Date l 6/21/20231 City Project Mgr. I Liam Conlon City Inspector: I Carmen Drake ITEM DESCRIPTION 37 9999,0010 Dual 8" Sewer Air Release Valve & Vault 38 0241.2021 Remove 24" Sewer Line 39 3123.0101 Unclassified Excavation by Plan 40 3305.0202 Imported Embed men UBackfil1, CSS 60 9999.0018 Construction Allowance DELETIONS DEPT Qty Unit Unit Cost Total Sewer 4.00 EA $101,000.00 $404,000.00 Sewer 381.00 LF $64.00 $24,384.00 Sewer 1,092.00 CY $35.00 $38,220.00 Sewer 1,092.00 CY $110.00 $120,120.00 Sewer 0.30952 LS $200,000.00 $61,904.00 Page 3 of 4 Sewer $648,628.00 (Deletions Sub Total $648,628.00 IVIIWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co It DATE AMOUNT Total $0.00 Page 4 of 4 6/21/2023 Clear Fork Force Main CPN 100996-2 Change Order 1 Notes Staff has reviewed the requested prices and considers them to be fair and reasonable. .Contract Comaliance Manaeer By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Liam Conlon Name of Employee Project Manager Title ATTEST: Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX