NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Altamesa Boulevard Extension for 46 Ranch Addition
City Project No.: 102575
Improvement Type(s): ❑x Paving ❑x Drainage ❑ Street Lights ❑ Traffic Signals
Original Contract Price: $2,005,946.46
Amount of Approved Change Order(s):-$394.56
Revised Contract Amount:
Total Cost of Work Complete: $2,005,551.90
Oamon Atoman Dec 1 2022
pamnn Norman (ner 1 ?_m_ 210:17 CST
Contractor Date
Ridg_emont Commercial Construction
Title
Director of Ofc. and Ind. Svc.
Company Name
De1;C�I�.' Dec 1, 2022
Project Inspector
Date
C,,J,,., P. �.
Dec 1, 2022
Project Manager
Date
Rg&gggs, 1154u� oR&m,
Dec 6 2022
Rh—,, Diane Owen (De, 6. 70?2 1438 CST)
CFA Manager
Date
10 -
Dec 6, 2022
Interim TPW Director
Date
G�Johnsonl--�
Dec 6 2022
Willia202215:18 CST)
Asst. City Manager
Date
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page 1 of 2
Notice of Project Completion
Project Name: Altamesa Boulevard Extension for 46 Ranch Addition
City Project No.: 102575
City's Attachments
Final Pay Estimate x❑
Change Order(s): ® Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time 180 WD Days Charged: 231
Work Start Date: 11/19/2020 Work Complete Date 09/07/2022
Completed number of Soil Lab Test: 940
Completed number of Water Test: 8
Page 2 of 2
FORTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name ALTAMESA BOULEVARD EXTENSION FOR 46 RANCH ADDITION
Contract Limits
Project Type DRAINAGE & PAVING
City Project Numbers 102575
DOE Number 2575
Estimate Number i Payment Number 1
City Secretary Contract Number
Contract Date 9/23/2020
Project Manager NA
Contractor RIDGEMONT COMPANY
1520 W. WALNUT HILL LANE
IRVING, TX
Inspectors CORDOVA, R / CAIN
For Period Ending
75038
Contract Time
Days Charged to Date
Contract is 100.00
9/7/2022
WD
18WD
308
Complete
Tuesday, November 1, 2022 Page 1 of 5
City Project Numbers 102575 DOE Number 2575
Contract Name ALTAMESA BOULEVARD EXTENSION FOR 46 RANCH ADDITION Estimate Number I
Contract Limits Payment Number I
Project Type DRAINAGE & PAVING For Period Ending 9/7/2022
Project Funding
SECTION IV: DRAINAGE IMPROVEMENTS
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
---------------------------------------
1
21"PRESSURE PLUG
2 EA
$800.00
$1,600.00
2
$1,600.00
2
30" PRESSURE PLUG
1 EA
$839.00
$839.00
1
$839.00
3
REMOVE HEADWALL/SET
1 EA
$3,672.00
$3,672.00
1
$3,672.00
4
POST -CCTV INSPECTION OF STORM DRAIN
3296 LF
$1.00
$3,296.00
3296
$3,296.00
5
MANHOLE VACUUM TESTING
5 EA
$220.00
$1,100.00
5
$1,100.00
6
TRENCH SAFETY
3296 LF
$1.00
$3,296.00
3296
$3,296.00
7
UTILITY MARKERS
1 LS
$1,576.00
$1,576.00
1
$1,576.00
8
18" RCP CLASS III
54 LF
$51.00
$2,754.00
54
$2,754.00
9
21" RCP CLASS III
732 LF
$55.00
$40,260.00
732
$40,260.00
10
24" RCP CLASS III
1010 LF
$65.00
$65,650.00
1010
$65,650.00
11
30" RCP CLASS III
544 LF
$80.00
$43,520.00
544
$43,520.00
12
36" RCP CLASS III
387 LF
$105.00
$40,635.00
387
$40,635.00
13
48" RCP CLASS III
132 LF
$157.00
$20,724.00
132
$20,724.00
14
8X4 BOX CULVERT
332 LF
$411.00
$136,452.00
332
$136,452.00
15
8X5 BOX CULVERT
105 LF
$446.00
$46,830.00
105
$46,830.00
16
4' STORM JUNCTION BOX
4 EA
$5,014.00
$20,056.00
4
$20,056.00
17
18" SET 1 PIPE
2 EA
$1,823.00
$3,646.00
2
$3,646.00
18
24" SET 1 PIPE
4 EA
$2,397.00
$9,588.00
4
$9,588.00
19
10' CURB INLET
9 EA
$4,601.00
$41,409.00
9
$41,409.00
20
15' CURB INLET
5 EA
$5,795.00
$28,975.00
5
$28,975.00
21
11.5' X TXT STORM JUNCTION BOX
1 EA
$10,556.00
$10,556.00
1
$10,556.00
22
HEADWALL 24" RCP
2 EA
$4,248.00
$8,496.00
2
$8,496.00
23
HEADWALL 8' X 5' BOX CULVERT
1 EA
$13,259.00
$13,259.00
1
$13,259.00
24
HEADWALL (2) 8'X4' BOX CULVERT
1 EA
$23,969.00
$23,969.00
1
$23,969.00
25
STD. "Y" INLET
4 EA
$5,455.00
$21,820.00
4
$21,820.00
26
--------------------------------------
CONNECT TO EX. STORM LINE
1 EA
$5,235.00
$5,235.00
1
$5,235.00
Sub-Total of Previous Unit
$599,213.00
$599,213.00
SECTION V: PAVING IMPROVEMENTS
Item Description of Items
No.
---------------
Tuesday, November 1, 2022
Estimated Unit Unit Cost
Estimated Completed Completed
Quanity Total Quanity Total
----------------------
Page 2 of 5
City Project Numbers 102575 DOE Number 2575
Contract Name ALTAMESA BOULEVARD EXTENSION FOR 46 RANCH ADDITION Estimate Number I
Contract Limits Payment Number I
Project Type DRAINAGE & PAVING For Period Ending 9/7/2022
Project Funding
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
REMOVE FENCE
REMOVE CONC PVMT
REMOVE CONC CURB & GUTTER
SITE CLEANING
6"-12" TREE REMOVAL
12"-18" TREE REMOVAL
18" -24" TREE REMOVAL
UNCLASSIFIED EXCAVATION BY PLAN (CUT:
37898,FILL:25001)
LARGE STONE RIPRAP, DRY
6' LIME TREATMENT
8' LIME TREATMENT
8' CONC PVMT
9' CONC PVMT (CO C1, El, F1, 3)
4" CONC SIDEWALK (CO #C1,E1,F1, 3)
BARRIERFREE RAMP (CO #C1,E1,F1, 3)
6" CONC CURB AND GUTTER (CO #C1,E1,F1,3)
4" SLD PVMT MARKING HAS (W)
4" SLD PVMT MARKING HAS (Y)
4" BRK PVMT MARKING HAS (Y)
8' SLD PVMT MARKING HAS (W)
12" SLD PVMT MARKING HAE (W)
24" SLD PVMT MARKING HAE (W) (CO
#C1,E1,F1,3)
LANE LEGEND ARROW (CO #3)
LANE LEGEND DBL ARROW
LANE LEGEND ONLY
RAISED MARKER TY Y
REMOVE LANE LEGEND ARROW (CO #3)
REMOVE LANE LEGEND ONLY
REMOVE 12" PVMT MARKING (CO #3)
REMOVE HATCHED STRIPING (CO #3)
FURNISH/INSTALL ALUM SIGN EX. POLE
MOUNT (CO #3)
3451
LF
$1.00
$3,451.00
3451
$3,451.00
499
SY
$10.18
$5,079.82
499
$5,079.82
1077
LF
$9.00
$9,693.00
1077
$9,693.00
1
LS
$7,650.00
$7,650.00
1
$7,650.00
86
EA
$150.00
$12,900.00
86
$12,900.00
40
EA
$350.00
$14,000.00
40
$14,000.00
12
EA
$750.00
$9,000.00
12
$9,000.00
62899
CY
$2.46
$154,731.54
62899
$154,731.54
661
SY
$66.00
$43,626.00
661
$43,626.00
720
SY
$15.00
$10,800.00
720
$10,800.00
16800
SY
$5.66
$95,088.00
16800
$95,088.00
15223
SY
$41.62
$633,581.26
15223
$633,581.26
627
SY
$55.20
$34,610.40
627
$34,610.40
53814
SF
$5.63
$302,972.82
53814
$302,972.82
17
EA
$1,914.00
$32,538.00
17
$32,538.00
7787
LF
$2.10
$16,352.70
7787
$16,352.70
1092
LF
$1.22
$1,332.24
1092
$1,332.24
4782
LF
$1.22
$5,834.04
4782
$5,834.04
4782
LF
$0.52
$2,486.64
4782
$2,486.64
300
LF
$2.32
$696.00
300
$696.00
388
LF
$4.64
$1,800.32
388
$1,800.32
132
LF
$6.96
$918.72
132
$918.72
11
EA
$150.80
$1,658.80
11
$1,658.80
6
EA
$185.60
$1,113.60
6
$1,113.60
7
EA
$150.80
$1,055.60
7
$1,055.60
150
EA
$4.64
$696.00
150
$696.00
4
EA
$104.40
$417.60
4
$417.60
3
EA
$104.40
$313.20
3
$313.20
125
LF
$3.20
$400.00
125
$400.00
266
LF
$2.60
$691.60
266
$691.60
2
EA
$425.00
$850.00
2
$850.00
Sub -Total of Previous Unit $1,406,338.90 $1,406,338.90
Tuesday, November 1, 2022 Page 3 of 5
City Project Numbers 102575 DOE Number 2575
Contract Name ALTAMESA BOULEVARD EXTENSION FOR 46 RANCH ADDITION Estimate Number I
Contract Limits Payment Number I
Project Type DRAINAGE & PAVING For Period Ending 9/7/2022
Project Funding
Contract Information Summary
Original Contract Amount $2,005,946.46
Change Orders
Change Order Number 1 $1,307.10
Change Order Number 3 ($1,701.66)
Total Contract Price $2,005,551.90
Total Cost of Work Completed $2,005,551.90
Less % Retained $0.00
Net Earned $2,005,551.90
Earned This Period $2,005,551.90
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$2,005,551.90
Tuesday, November 1, 2022 Page 4 of 5
City Project Numbers 102575
Contract Name ALTAMESA BOULEVARD EXTENSION FOR 46 RANCH ADDITION
Contract Limits
Project Type DRAINAGE & PAVING
Project Funding
Project Manager NA
Inspectors CORDOVA, R / CAIN
Contractor RIDGEMONT COMPANY
1520 W. WALNUT HILL LANE
IRVING, TX 75038
DOE Number 2575
Estimate Number 1
Payment Number 1
For Period Ending 9/7/2022
City Secretary Contract Number
Contract Date
9/23/2020
Contract Time
180 WD
Days Charged to Date
308 WD
Contract is .000000
Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
------------------------
Total Cost of Work Completed $2,005,551.90
Less % Retained
$0.00
Net Earned
$2,005,551.90
Earned This Period $2,005,551.90
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$2,005,551.90
Tuesday, November 1, 2022 Page 5 of 5
Revised: 10-12.2011
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
] PROJECT NAME:
IAltalnesa Boulevard (to serve 46 Rand, Addition)
CONTRACT:
(A) Water, (B) Sewer
CHANGE
ORDER No:
jCFA#
CFA20-0053 I
CITY PARTICIPATION: No
CITY PROJECT #
102575
�(OOE #
-N/A
Al, 81
WATER PROJECT #
ISEWER PROJECT #
FILE #
I W-2694
INSPECTOR:
John Robinson
Phone No: 817-392-8306
PROJECT MANAGER:
Fred Ehia
Phone No: 682-432-5559
CONTRACT U IT
I
WATER SEWER PAVING DRAINAGE STREETLIGHTS
TRAFFIC SIGNAL (CONTRACT DAYS
OswAewr Ca+t Desebosr Coat
wc'" pwloest Cost
Gf9 I3ewlelavrC---r
_CyCos: pA-I—,Coat lover Coat
ORIGINAL CONTRACT
V117.511170 S4D0.37500
51Ada.733.46
5599.213-00
sna'731I
5410.168.60 180
EXTRAS TO DATE
So o0 SD.00
CREDITS TO DATE
S000 50.00
CONTRACT TO DATE
S317.507.65 1400,375.00
$400 $1.406.733.46 _ �Jp ,J 5599.213.00
_ IV S=8.71550 _ S 30.168.60 180
AMOUNT OF PROP CHANCE ORDER
S 4.51096 a 4.M.07
REVISED CONTRACT AMOUNT
5322.09fl 01 S405.14807
1111 ._�...I.�
=Do S1.406,T33A8 FIwZAmeNi
i SDAO 5226.73850 SO-00
5430.168.W 180
TOT/LLREVISEDCONTRACT AMOUNT
PER VNIT
5372090.61 5405148L7 St �oe731.A6
399.213.00
f228.738.50REVI.COSTSHARE
Day. Cost.
$3,332,100.24141529.21,1'.
:
e,.
il..11. ni�IHil laY w.. Il Oalll J�
TOTAL REVISED CONTRACT
$3,392.100.24
VDU ore direOM 10 ..ko I" fo;L -Ina
^nllee: In tee f m'a (0pa�mon�.-
l
PAY ITEM 0
CIT1' BID ITEM a OUAMRV
UNR
ITEM DESCRIPTION
I
1 UNIT PRICE
TOTAL 1
5
3311.0001 00875
TON 1
Du .. Iron Water Flor w/ Reetrawl
S 1433'..00 S
1.253 96
733110141
10
LF
fj
6'Weter Line
5 29.00 5
290D0
14
3312 3002 1
EA
6' Gate Valve
5 1 059.00 S
1 059.00
_ 18
3312.MOI 1
EA
Fire HWrant
5 1.908.130 S
190300
19
3305.0106 1 1 EA {
Manhole - Maor Adiustment wlf l Frame and Cover
S 4.Til S
4773.07
TOTAL
5
9.284.0 1
REASONS FOR CHANGE ORDER
Replace —.1— 24-sanhary --ewer cone with Cdy approved 30^ opening
Additional Fire hydanl to be installed on Water Lateral ''-2' along ARamosa Boulevard
RECOMMENDED_
APPROVED:
APPROVED:
Halfl Asso—les, Inc
Jackson-Shaww/46 Ranch, L L C
THE RIDGEMONT COMPANY, G/bb
RIOGEMONT COMMERCIAL CONSTRUC71ON
By.
.. D�ni W W J011Id
�ift-1
By 2Rc Meeulre
By. %V?' Be I ,J�
Name:
_// '//E6�
Name: r /� �—
Name:'.. /I .(1�
Title:
Senior Vice President
711je- Dire[9[ Cenrtn¢Y.an
Tito: S-n,nr PeliM M—
Page 1
DocuSign Envelope ID: C51D357F-16FO-41AE-9A1D-2968FD5D7A3F
DEVELDPER-AWARDED-PRO.IECT CHANCE ORDER
REVIEWED J
lBy Andrew Goodman at 7:46 am, Jul 09, 2021 J
PROJECT NAME 1Alnmem RONevord /,o serve 46 RencN Addlbnl I CNANOE
CONTRACT' ICl Povino fE161ree1lAMs. fF3 Trollic SYnDI (ORDER No:
CFAE ICFA20 0053 I CITY PARTICIPATION:] Vv.
CITY PROJECT 4 I111115 I
DOE fi (NIA ICI E1, F1
WATER PROJECT R
SEW ER PROJECT C
FILE % W- .
INSPECTOR: John RODlnson Ph NO: 817-392-R3D6
PROJECT MANAGER: And— Gond-1, P.E. Phone No: 817-392-6251
' CDNIRAC "NI 1
OB.IDIAi YYm — R RArnNO 1M_E BSAllE1.IO.S.B .TR.STtrB..+A LANOSCYFIYMOYENEI,l3 CONTRACT
CI Ia.lO.a DAYS
]OMfAYy CO„n.ACT O.v. t,rs.lv... p,lLTW�S` imeal3m � M,w..n1..3 �. �rM-t �irii f.a.frm vY4Y _ U. I
saE1Ar KmE1 I
CREDITS TO DATE 1i.3B SLL.m _ I �1 3
R]CTTOf1Att NKTp.OB 33]amu, SYSHApI KU'• it..ii.>v nl mm siEavain i.]A1Km 6"J" 1B0 I
t 1!P• E DftlN S Y/ELTE t
IRENSEDCa1TMLTAC1eu amen 31— siss.m.a, imsuv.vl SLWReca. I •MA tWa,Am B Tx "Ia3LM few ,BD
TDTALREM3EDCONTRACTAYODMr _ •vy,9m., vc +.em s,Am.euJi .N vER urR H.s.13]..ye .fE..13A1/ 3>1B.d
IroAiw DOar MSN1E Dev-Cmt S]•nd,taa.]]
TOTALR MM—RACT I I 5361d2N.13
ae dhmbd m mvkp Ine InbMn9 �anevf In Din vnnNRd PcumaHr � I Vm PAV ITEM p C-... 1EM a GDMSf1Tv IAS! ITEM DEBCRIPTION U—FlCE J TOTAL
3213.1. 30 SY B-Cont Pvml S 55IifU/ S 1.10/.001
c.
II S 3213DSN, ,;0 FA /eyo�mm�nqfff,
;'k f{ 1.B17d 001S (,$td.W)I
1.2
V 22 32t)DSIn 1m F 24`BA2o)1111.530ALIjj`SCNffff6� t v.00 3 IS 15000I �I�
T �i1.1 0� ; 110 A SSbcl $f �,.050 W S D.S.
EA
1 B 3N1.t00.1 i EA SSen �IHvm Am S TfsU� S �B.250.WW
� S 1.850.0011
1 O 3M1.tO011 3 EA POCn$$'1y� jyeolNmnqq��uu 19%8�0 Q0�0Js �D.
sso oo
]. ]a411229 �m LF FumlchhriflNI Pr..�2f n i:Eply 1 '1 , S' 1992AOI
�I D —1t31D I dD F NC 14AWG MUISLoM+cbr Cnply � 1.)5 f 5fI6�M e ]a�11 333 ]et LF `JC I4 AWG MUIIICvrNucur Cnply
1312 61, F ]IC td AWG MW9LOMucbr Cnpl. f 20015 .222.Om
33t2 I J22 F 2WNC td AWG MWe{amucbrC— f 135 5 I�HM tO
LF
{(yl 'JJ ]N1.1d0Y I m2 F NOB(—Ad—C.— f It S ,.-1.
—1.1413
\� 26 3K1./E01 ' J EA ,mthnmo 5 S P-1 n P.Ah Bun;;onPIyTM jjS 9��0yy01�JJA��D I S ]00.001II
3N1�d001 1D EA Y Fumn9le'�N(l(nIa{NIII�NpuIm14 PM ep1Arylm MdJA1 3 �d5BJ101 5B5000I
,j `� BB89.OD,B , TOTRI =N"VdI118E NI11BIM115"iron SlHnei Men: Bf2lElaiu f :I S -'
..��1111-= 9BBB.0010 EA II
3 21,5)dJNI
REASONS FOR CHANCE ORDER Trvl/c Fngnavhy laerimfbn Revllbn3 (SnesL ]].76. df, d3. dT. 52A. TA HS B8, 8S 102. t0.. 105 f05 f0) tOB 109. 1f0 11f. 112. 1]3, ]IJ, 115)
RECOMMENDED: APMOYED: APPROVED:
H.a IJC INC R�EEN CWT .NY,dM
9Y.,DvnW w. WMI.15 By.
Nam: Nnmv:
TXIo: SANervmn PrnaNnnl 'Mn: d.,kly. e, GeminRien U Tm, VP of Ops EF9D.iF5e]RCECB..r
R—ed: 10 124011 PvpI
REVIEWED
By Andrew Goodman at 2:08 pm, May 11, 202;
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
I PROJECT NAME:
(CONTRACT:
I CFA 17
ICITY PROJECT O
I DOE #
WATER PROJECT C
SEWERPROJECTO
FILE
INSPECTOR:
PROJECT MANAGER:
ORIGINAL CONTRACT
E%RUS TO DATE
CREDRS TO DATE
CONTRACT TO DATE
qA■MOUENNTTy�O�.���Fryy,PRROP... CHANGE ORDER
TAL Vd% >CD�RACT AMDUNT
'etUNIT
REVISED COST SHARE
TOTAL REVISED CONTRACT
Altamesa boulevard (to Some 46 Ranch Addition) CHANGE
(C) Paving. (E) Street Lights.(F) Traffic Signal ORDER No
CFA20-0053 I Cl7Y PARTICIPATION: Yes
102575
NIA 3
W-2694
John Robinson Phone No: 817-392-8306
Andrew Goodman, P.E. Phone No: 817-392-6251
CONTRACT UNIT
GENERAL I WATER SEWER PAVING DRAINAGE STREETLIGHTS TRAFFIC SIGNAL LANDSCAPEIMPROVEMENTSI CONTRACT
rf1 DAYS
Dvv-Cost UV Cw[ el.wr C-u I GJrr f,u Dovcl-Dar CRet D...-ar CAu CIy C9M Dovola a CI %e 0-v-b c- cyCeu out LI Lou IDevolAurCw[
S1e5,TB].OL kf]1T,58T,65 3400.])Sp0 st4oe.rv.4e 5599.21r].00telr�.` 054]0.16a.B0 592.a25.� t80
34.51006 id T3.OT 1.3011r rS221.90r 2r..1BTT
5165,Te].Oe f0 iJ]2,098.61 SO.W 5105 i-01 514D6..1.31 SOAO 1011J.OD F2B,613.fA 50.00 44,661.]7 592,931N ISO
f
S 11.T01.6A S ta.fiff I,
3+LS.le].Oe +T+10e.41 me 5105.t48.0) 51 A06.J]eAD WAO 559931]AO / 5242494.63 50.00 `II 34A 661.]) I f0.00 S02.e]SA4 1B0
StGS.M].OB m $=.,B.G1 f405,14e.01 51.4aL.]]Ba03/ SSM,21]A01/ Std2AB0.65 1 S45].6L1.]T SB2s]S4'
D., COSD $3,686.573.52 City
$3.686.S73.S2
YoU are dkected to make
the follDwbg charges In the contracl �owm6Wft
PAYIiFIAs
Y BID
I1
�A8
UNI
ITEMDESCRIPTION
UNIT PRICE)0UJS
OTAL
TJ,93Z00)
Its
241/3100
SFT
Rom-�11c.
PvmCulbaGutter
21(lJ S
r 1,10d.001
3213.0Wl 1
24
SF
I Conc. Sldew-Ik
S 5.6lJ S
135.12
15
16
3213.OSIX i
3216.0101 1
-t
S5
EA
LF
Barrier Free R-uq
6- Con.. CYlI and GuYor
S 1,914.0d1 S
S 2.1(/ S
If 914.001
115.50)
22
3217.0501 1
-3.
LF
24'
SLD Pvml MorklnqQ MAE Mil
S 6.96S•
%48)
23
3217.1002 I
1
EA
Wn-Legend Ai JI'
$ 150.BO S
50.80
II
3217.4402 I
1
EA
R-rrove WroL(� dArrow
S 104.4 JJ 5
104.40
31
330
�����1) j10A
gB98 d�9- I
125
266
LF
LF
Remove 12" Pvmt Markl9'�
Re --Hatched SByI/q
S 3.2d C
S 2.60/111S
400.00
691.60
31
3441.4004
2
EA
Fuml'101-ll Alum SDn Ex Pole Mount
S 42SOOI S
850.00
2
2605.3015
137
LF
2-CONDT PVC SCH'061r1rT'1`
S 15.0 S.
2055.OD
3
3441.1502
3
EA
Ground Bok T re B. wl ACrofr
S 900.0 i
2.700.0D
6
3441. 02
1
EA
Rdwyy Ileum Four onF7Y 3.5.6.ond 8
S 1.SB0
�580.00I
8
3441,1411
411
LF
ND, a Insulated Elec Conduct
S 1.55 S
637.051
11
I
1
EA
R.-Eki-.Rd- lllum Foundation
I
5 5503.00 S
5.503.001
I
I
``I
I
iGTla
S
12279.391
REASONS FOR CHANGE ORDER Ranwvel of Medrnn RAnrp,
Mrrdsn Nosre.a,rd Crosswa/k Shro-V(sh.els 33. 3643879);
Refoeellon o1 Simal LVI Along Campus Omo Meet-
87 B 89)
Reloc000n of P-1,1an Push S-(sheets X-13 47.52A IN. 107. 110 4 112)
Aokmd Slgnag- Md Shrprng
for Now Lrn-
A-gnm-nts (shoats 33 a 79)
RECOMMENDED:
APPROVED:
APPROVED;
HeIP As .blos, I-
JsckswSMwL6 R-ch.. LLC
TNERIDGEMONTCOMPANY,W
RIDGEMONTCOAWERCIAL CONSTRUCTION
By: Oonld W. Warold
Bv: Zec Mco.k.
0, Damon Norman
Namc II1 - I I
D.kL WAVf Lµ
NemD- �°/ie��
7' �
Namo "mot^ti
�e4e... N. ,.
1 ille: Senor Vic. Pmt,!dont
710e: Director of Constmolon
TWO. Director of Office 8 Industrial Smic-s
Revised: 10-122011
DocuSign Envelope ID: B52A375F-856E-40DB-985A-70BCC7EC7DD1
PROJECT NAME
CONTRACT:
CFA #
CITY PROJECT #
FID #
FILE #
INSPECTOR:
PROJECT MANAGER:
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
Altamesa Boulevard (to serve 46 Ranch Addition)
Water. Sewer. Orainaae, Pavin/p. Street Liahtina. and Landscape
CFA2-0053 I CITY PARTICIPATION:1
102575
30114-0200431-102575-EO7685
W-2694
CHANGE
ORDER No:
No
4
Jahn Robinson
Phone No:
(817)392-8306
Andrew Goodman
Phone No:
(817)392-6251
CONTRACT UNIT
GENERAL
WATER
SEWER
DRAINAGE
PAVING
Developer
Developer
Developer
Developer
Developer Cost City Cort
Cost
Clry Cost
Cost Clry Cost
Cost
City Cost
Cost
5165783.�
$317.1.7.65
S400.37500
S599.213.00
$4.510.9fi
S4,773.07
EXTRAS TO DATE
CREDITS TO DATE
CONTRACT TO GATE
OF PROP. CHANGE ORDER6
�167.AMOUNT
rISED CONTRACT AMOUNT
TOTAL REMISED CONTRACT AMOUNT
PER UNIT
$16S783.06
REVISEDCOSTSHARE
De, Cost: $3.686.S68.85
TOTAL REVISED CONTRACT
S322093.96 1 $405148.07 1 SS99,213.00 1 $1.408338.90
$0.00
$3,686,568.85
STREETLIGHTING
TRAFFIC SIGNAL
LANDSCAPE
CONTRACT
Developer
Developer -
Developer
GAYS
Cost City Cost
Cost ' CiN Cost
CostCr
S228738.50
$430.168.60
$92.335.54
160
S13.756.15 _
S22.492.77
124 49A65.145,2661.37
592835.84
180
522490
(IL43
524271
— t
�
$452436.4955 7
4
192835.84
S242719.SS S452,436.47 $92.835.04
-7
"iou are directed to ne-a Tne ioiiovlela dnanaes in the contract documents -
SECTION I: GENERAL
PAV ITEM#
CITY BI DITEM# DUAN11Y UNIT
ITEM DESCRIPTION
1-3
1471.0001-2.52427E.06 MO
Traffic Control
I
I I I I
TOTAL SECTIO I: GENERAL
I
SECTION If: WATER
PAV ITEM#
IC.IYBIDI-M.1 DUANTITY I UNIT
ITEM DESCRIPTION
2-8
3311.0241 .0.15 LF
8' Water Pipe
f
TOTAL SECTION II: WATER IMPROVEMENTSI
REASONS FOR CHANGE ORDER
C—live Change Ortfer
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BESOUGHT BY THE DEVELOPER.
ME
APPROVED:
APPROVED:
RE
allllll Essona es
JacksonShaw,146 Ranch. LLC
The Ridgemont Company, &h/a/ Ridgemonf Commercial Conshuchon
P . �of W.
--W—/W.
ayI L.7..7lFs�aw.
o q
Bvf
cnCwoe7eera
Name:.Joseph Buchanan P F
Name: Zee Mcauire
Name: Damon Norman
T10e:.Proiect Manager
Ti8¢,.Difpc'10 2LOWEVCH n
Title' nimetnr of Office R Indudrial Senrires
Revised: 10-12-2011
UNIT PRICE Tj�TAL
S7.923.07 IgT.AL,
tie nu
(
UNIT PRICE I TOTAL
531.00 (54.85) I
/54.65)I
Page 1
FORT WORTH.
TRANSPORTATION AND PUBLIC WORKS
October 18, 2022
Ridgemont Commercial Construction
1520 W. Walnut Hill Ln.
Irving, TX. 75038
RE: Acceptance Letter
Project Name: Altamesa Blvd.-46 Ranch Addition
Project Type: Developer
City Project No.: 102575
To Whom It May Concern:
On September 7, 2022 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on October 18, 2022. The final inspection
and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and
is therefore accepted by the City. The warranty period will start on October 18, 2022, which is the date
of the punch list completion and will extend of two (2) years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at
(817)392-6251.
Sincerely,
CJ, AJ., P �.
Andrew Goodman, Project Manager
Cc: Matt Cain, Inspector
Ron Cordova, Inspection Supervisor
Edward D'Avila, Senior Inspector
Victor Tornero, Program Manager
HALFF, Consultant
Ridgemont Commercial Construction, Contractor
Jackson-Shaw/46 Ranch, LLC., Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARANT
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Damon Norman,
Director of Office and Industrial Servises Of Ridgemot Commercial
Construciton, known to me to be a credible person, who being by me duly
sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Altamesa Boulevard Extension for 7CtALJp
ch Addtion
BY0 C D�eil�!j
Maureen McDonnell - Project Coordinator
Subscribed an sworn before me on this date 1 of November, 2022.
Nota Publi a�
Dallas Count xas
"�~ 4tAJREEN
° MCDONNELL .3
Notary Pubic
s�.✓�7,� STATE OF TEXAS i
'.',;r`,:;.:•� 'C# 12973278.9
" 1!t Comm. UP Mar. 3 2026
CONSENT OF OWNER ❑
SURETY COMPANY ARCHITECT ❑
TO FINAL PAYMENT CONTRACTOR ❑
SURETY ❑
OTHER ❑
Bond No. SU61878
PROJECT:
(Name, Address) Northeast and Southeast Comer of E. Altamesa Blvd and Oak Grove Road
TO: City of Fort Worth, Texas
200 Texas Street ARCHITECT'S PROJECT NO.:
Fort Worth, TX 76102 CONTRACT FOR:
Water, Sewer, Paving, Storm Drain,
Street Lights and Signals
CONTRACT DATE:
CONTRACTOR: Jackson Shaw/46 Ranch, LLC
4890 Alpha Road, Suite 100, Dallas, TX 75244
In accordance with the provisions of the Subcontract between McCarthy and the Subcontractor as indicated above, the
(here insert name and address of Surety as it appears in the bond)
United States Fire Insurance Company, 305 Madison Avenue, Morristown, NJ 07960
on bond of (here insert name and address of Subcontractor as it appears in the bond)
Jackson Shaw/46 Ranch, LLC, 4890 Alpha Road, Suite 100, Dallas, TX 75244
, SURETY COMPANY
, SUBCONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety
Company of any of its obligations to (here insert name and address of Owner):
City of Fort Worth, 200 Texas Street, Fort Worth, TX 76102
as set forth in the said Surety Company'
IN WITNESS WHEREOF,
the Surety has hereunto set its hand this 11'" day of November 2022.
Attest:
(Seal):
United States Fire Insurance Company
Surety
Signature of Authorized Representative
Alicia Grumbles. Attornev-in-Fact
Title
OWNER,
NOTE: This forms is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND
CLAIMS, Current Edition.
surety.doc-1211l94
POWER OF ATTORNEY
UNITED STATES FIRE INSURANCE COMPANY
PRINCIPAL OFFICE - MORRISTOWN, NEW JERSEY
KNOW ALi. NiEN BYTHESE PRESENTS: That United States Fire Insurance Company, a corporation duly organized and existing under the laws of the
state of Delaware, has made, constituted and appointed, and does hereby make, constitute and appoint: Alicia Grumbles; KJ Wagner; Sam Siddons;
Eric S. Feighl; Vincent Tran each, its true and lawful Attomey(s)-In-Fact, with bill power and authority hereby conferred in its name, place and stead,
to execute. acknowledge and deliver: Any and all bonds and undertakings ol' surety and other documents that the ordinary course of surety business may
require, and to bind United States Fire Insurance Company thereby as fully and to the same extent as if such bonds of' undertakings had been duly executed and
acknowledged by the regularly elected officers of United States Fire insurance Company at its principal office, in amounts or penalties not exceeding: One
Hundred Twenty Five Million Eight Hundred Dollars ($125,800,000)
This Power of Attorney limits the act of those named therein to the bonds and undertakings specifically named therein, and they have no authority to
bind United States Fire insurance Company except in the manner and to the extent therein stated.
This Power of Attorney revokes all previous Powers of Attorney issued on behalf of the Attorneys -In -Fact named above and expires on January I, 2023.
This Power of Attorney is granted pursuant to Article IV of the B)•-Laws of United States Fire Insurance Company as now in full force and effect,
and consistent with Article III thereof, which Articles provide, in pertinent part:
Article IV. Execution of Instruments - Except as the Board of Directors may authorize by resolution. the Chairman of the Board. President, any
Vice -President, any Assistant Vice President, the Secretary, or any Assistant Secretary shall have power on behalf of the Corporation:
(a) to execute, affix the corporate seal manually or by facsimile to, acknowledge, verify and deliver and contracts, obligations, instruments and
documents whatsoever in connection with its business including, without limiting the foregoing, any bonds, guarantees, undertakings,
recognizances, powers of attorney or revocations of any powers of attorney, stipulations, policies of insurance, deeds, leases, mortgages,
releases, satisfactions and agency agreements;
(b) to appoint, in writing, one or more persons for any or all of the purposes mentioned in the preceding paragraph (a), including affixing the
seal of the Corporation.
Article III, Officers, Section 3.11, Facsimile Signatures. The signature of any officer authorized by the Corporation to sign any bonds,
guarantees, undertakings, recognizances, stipulations, powers of attorney or revocations of any powers of attorney and policies of insurance
issued by the Corporation may be printed, facsimile, lithographed or otherwise produced. In addition, if and as authorized by the Board of
Directors, dividend %varants or checks, or other nunnerous instnnnents sinnilar to one another in form, may be signed by the facsimile signature
or signatures, lithographed or otherwise produced, of such officer or officers of the Corporation as from time to time may be authorized to sign
such instruments on behalf of the Corporation. The Corporation may continue to use for the purposes herein stated the facsimile signature of
any person or persons who shall have been such officer or officers of the Corporation, notwithstanding the fact that he may have ceased to be
such at Ilse time when such instruments shall be issued.
iN WITNESS WHEREOF. United States Fire Insurance Company has caused these presents to be signed and attested by its appropriate officer and
its corporate seal hereunto affixed this I I ' day of March, 2021.
UNITED STATES FiRE INSURANCE COMPANY
Anthony R. Shinowicz, Executive Vice President
State of New Jersey)
County of Morris )
On this l I` day of March 2021, before ne, a Notary public of the State of New Jersey, came the above named officer of United States Fire
Insurance Company, to me personally kno-.Nn to be the individual and officer described herein, and acknowledged that he executed the foregoing
instrument and affixed the seal of United Slates Fire Insurance Connpany thereto by the authority of his office. //
SONIA SCALA /_.1_Au.� a ,Id_CIG._
NCYFARY PUBLIC OF NE%V3ERSEY Sonia Scala, (Notary Public)
t►IY COMMISSION EXPIRES 3/25/2024
No. 2163686
I. the undersigned officer of United States Fire Insurance Connpany, a Delaware corporation, do hereby certify that the original Power of Attorney of which
the toregoing is a fiull, true and correct copy is still in toree and effect and has not been revoked.
iN WITNESS WHEREOF, 1 have hereunto set iffy hand and affixed the corporate seal of United States Fire insurance Company on thei 1 day
of NoVeMnU20
1N1 T EllTAT S ES TIRE INSURANCE CO A \IP NY'
�O�
Daniel Sussman, Senior Vice President
*For verification of the authenticity c,f the Power of Attomey. please contact Pat Taber at 860-956-3424 or email: Suretvinnuiriesr,annmtaeroun.com
APPENDIX 1
Final Inspection and Testing
Fee Worksheet
City of Fort Worth
Project Name: Altamesa Blvd. Date: 7/26/2023
Developer Name: Jackson -Shaw Estimator: Mike Weiss
IPRC Record No.: 20-0023 TPW Construction
City Project No.: 102575
Signed Bid Proposal Working Days: 180
Construction Inspection Services Fee
Description Rate
Construction Inspection $ 245.00
Administrative Material Testing Services Fee
Description I Rate
Administrative Material Testing 1 $ 24.50
Water Testing Lab Fee
Total
,uantity
Amount $
1 Notes
231
$ 56,595.00
Subtotal: $ 56,595.00
;uantity
Amount $
Notes
940
$ 23,030.00
Subtotal: $ 23,030.00 1
Total Amount:) $ 79,865.00 1 1
Notes
1. The construction Inspection Service fee is based on the number of working days as denoted above. The Rate ($/Day) for Construction Inspection Services is inclusive of
inspection services labor, supervision and mileage, and applies to all working days based on information provided by Design Engineer.
2. Should the construction duration exceed the Design Engineer's Estimated Working Days defined above, the City will invoice the Developer at the stated daily rate,
for all working days in excess of the denoted days above.
3. The Administrative Material Testing Fee Amount is based on the quantity of Tests to be performed on the project. The Material Testing Services Rate ($/Test) is
inclusive of the City's labor and other incidental costs associated with the City's role in this service. The Developer must separately contract with one of the City's
approved material testing labs and pay the lab for the actual cost of material testing.
4. The Water Testing Lab Fee is based on the quantity of Bacterial Tests to be performed by the City's Lab. The testing rate ($/Test) is inclusive of the City's labor and other
incidental costs associated with the City's role in this service. Two consecutive passing bacterial water tests are required per 1,000 feet of line, for each dead-end on a
project, fire lines, fire hydrants, branch at a minimum of one joint of water mains. A minimum of four tests will be estimated for a project.
5. In the event the number of tests performed during the project exceed the Quantity noted above, the City will invoice the Developer (at the rate stated above) for the
number of tests in excess of the Quantity noted above.
Payment of the "Total Amount" denoted above is due to the City of Fort Worth as part of the CFA process. Any payments due to
the City pursuant to the above must be paid to the Development Coordination Office beore the CFA is executed.
This is an estimate in accordance with the CFA Ordinance. The project will be reconciled at closeout when accepted, developer
may be required to pay additional fees or be entitled to a refund.