Loading...
HomeMy WebLinkAboutContract 54675-FP3City Secretary 54675 -FP3 Contract No. FORT WORTH. Date Received Dec 12, 2022 NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Altamesa Boulevard Extension for 46 Ranch Addition City Project No.: 102575 Improvement Type(s): ❑x Street Lights Original Contract Price: Amount of Approved Change Order(s): Revised Contract Amount: Total Cost of Work Complete: bay mot-Htaw Damon Norman (Dec 5. 202210:18 CST) Contractor Ridgemont Commercial Construction Title Director of Ofc. and Ind. Svc. Company Name Mal t Cain Matt Gin )D I5 2022 11:59 CST) Project Inspector C N.e�. Project Manager GIs GG 0 & ak !1 Rebecca Diane nwen )Der7 2(122 1157 CST) CFA Manager ,0� Interim TPW Director 111! 0 CST Asst. City Manager ❑x Traffic Signals ❑x Landscaping $751, 742.94 $36,248.92 $787,991.86 Dec 5, 2022 Date Dec 5, 2022 Date Dec 5, 2022 Date Dec 7, 2022 Date Dec 7, 2022 Date Dec 9, 2022 Date OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 of 2 Notice of Project Completion Project Name: Altamesa Boulevard Extension for 46 Ranch Addition City Project No.: 102575 City's Attachments Final Pay Estimate x❑ Change Order(s): ® Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time 180 WD Days Charged: 231 Work Start Date: 11/19/2020 Work Complete Date 09/07/2022 Completed number of Soil Lab Test: 940 Completed number of Water Test: 8 Page 2 of 2 FORT WORTH Mona '%qof vb�� CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name ALTAMESA BOULEVARD EXTENSION FOR 46 RANCH ADDITION Contract Limits Project Type STREET LIGHTS, TRAFFIC SIGNAL, LANDSCAPIN City Project Numbers 102575 DOE Number 2575 Estimate Number i Payment Number 1 City Secretary Contract Number Contract Date 9/23/2020 Project Manager NA Contractor RIDGEMONT COMPANY 1520 W. WALNUT HILL LANE IRVING, TX Inspectors CORDOVA, R / CAIN For Period Ending 75038 Contract Time Days Charged to Date Contract is 100.00 9/7/2022 WD 18WD 308 Complete Friday, December 2, 2022 Page 1 of 6 City Project Numbers 102575 DOE Number 2575 Contract Name ALTAMESA BOULEVARD EXTENSION FOR 46 RANCH ADDITION Estimate Number I Contract Limits Payment Number I Project Type STREET LIGHTS, TRAFFIC SIGNAL, LANDSCAPING For Period Ending 9/7/2022 Project Funding 6`1�� Cs7►`�Li>�yl Y_s7 31 *2 0 Ctl:_I_Y_l�Cl1) lu I;Z3s]'� �Mu I YT.y Item No. 1 2 3 4 5 6 7 8 9 10 11 Description of Items INSTALL ELEC SERV PEDESTAL 2" CONDT PVC SCH 80 (T) (CO #3) GROUND BOX TYPE B W/APRON (CO #3) RDWY ILLUM ASSMBLY TY 18, 18A, 19, AND D-40 LED LIGHTING FIXTURE (CO #3) RDWY ILLUM FOUNDATION TY 3,5,6, AND 8 (CO #3) NO.2 INSULATED ELEC CONDUrr NO. 8 INSULATED ELEC CONDUIT (CO #3) SALVAGE STREET LIGHT POLE RELOCATE STREET LIGHT POLE REMOVE EXISTING RDWY ILLU FOUNDATION (CO #3) — — — — — — — — — — — — — — — — — — — — — — — — — — — — Sub -Total of Previous Unit $242,719.55 Estimated Unit Unit Cost Estimated Quanity Total ------------- 1 EA $7,500.00 $7,500.00 6687 LF $15.00 $100,305.00 5 EA $900.00 $4,500.00 19 EA $2,111.00 $40,109.00 21 EA $753.00 $15,813.00 20 EA $1,580.00 $31,600.00 165 LF $2.55 $420.75 19896 LF $1.55 $30,838.80 1 EA $1,950.00 $1,950.00 1 EA $4,180.00 $4,180.00 1 EA $5,503.00 $5,503.00 Completed Completed Quanity Total 1 $7,500.00 6687 $100,305.00 5 $4,500.00 19 $40,109.00 21 $15,813.00 20 $31,600.00 165 $420.75 19896 $30,838.80 1 $1,950.00 1 $4,180.00 1 $5,503.00 $242,719.55 SECTION Vll : TRAFFIC SIGNAL RUPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 FURNISHANSTALL ELEC SERV PEDESTAL 2 EA $6,500.00 $13,000.00 2 $13,000.00 2 SALVAGE ELECTRICAL EQUIPMENT 1 EA $2,500.00 $2,500.00 1 $2,500.00 3 2" CONDT PVC SCH 80 (T) (CO Cl, El, Fl) 123 LF $15.00 $1,845.00 123 $1,845.00 4 2" CONDT PVC SCH 80 (B) (CO C1,E1,F1) 943 LF $29.00 $27,347.00 943 $27,347.00 5 Y CONDT PVC SCH 80 (T) (CO C1,E1,F1) 170 LF $18.00 $3,060.00 170 $3,060.00 6 Y CONDT PVC SCH 80 (B) (COC1,E1,F1) 750 LF $37.00 $27,750.00 750 $27,750.00 7 3-SECT SIGNAL HEAD ASSMBLY (CO C1,E1,F1) 22 EA $1,050.00 $23,100.00 22 $23,100.00 8 4-SECT SIGNAL HEAD ASSMBLY (CO C1,E1,F1) 1 EA $1,250.00 $1,250.00 1 $1,250.00 9 5-SECT SIGNAL HEAD ASSMBLY (CO C1,E1,F1) 1 EA $19650.00 $1,650.00 1 $1,650.00 10 PED SIGNAL HEAD ASSMBLY (CO C1,E1,F1) 8 EA $850.00 $6,800.00 8 $6,800.00 11 AUDIBLE PEDESTRIAN PUSHBUTTON 5 EA $1,285.00 $6,425.00 5 $6,425.00 12 FURNISH/INSTALL BBU SYSTEM EXT 2 EA $7,720.00 $159440.00 2 $15,440.00 MOUNTED Friday, December 2, 2022 Page 2 of 6 City Project Numbers 102575 DOE Number 2575 Contract Name ALTAMESA BOULEVARD EXTENSION FOR 46 RANCH ADDITION Estimate Number I Contract Limits Payment Number I Project Type STREET LIGHTS, TRAFFIC SIGNAL, LANDSCAPING For Period Ending 9/7/2022 Project Funding 13 FURNISH/INSTALL MODEL 7 11 PREEMPTION 2 EA $1,824.00 $3,648.00 2 $3,648.00 DETECTOR 14 FURNISH/INSTALL PREEMPTION CABLE (CO 373 LF $2.00 $746.00 373 $746.00 C1,E1,F1) 15 FURNISH/INSTALL RADAR PRESENCE 8 EA $8,100.00 $64,800.00 8 $64,800.00 DETECTION DEVICE 16 FURNISH/INSTALL RADAR ADVANCE 5 EA $8,100.00 $40,500.00 5 $40,500.00 DETECTION DEVICE 17 FURNISH/INSTALL RADAR CABLE 2816 LF $3.50 $9,856.00 2816 $9,856.00 18 5/C 14 AWG MULTI -CONDUCTOR CABLE (CO 1261 LF $1.75 $2,206.75 1261 $2,206.75 C1,E1,F1) 19 7/C 14 AWG MULTI -CONDUCTOR CABLE (CO 104 LF $2.00 $208.00 104 $208.00 C1,E1,F1) 20 20/C 14 AWG MULTI -CONDUCTOR CABLE (CO 817 LF $6.00 $4,902.00 817 $4,902.00 C1,E1,F1) 21 3/C 14 AWG MULTI -CONDUCTOR CABLE (CO 1002 LF $1.55 $1,553.10 1002 $1,553.10 C1,E1,F1) 22 NO 8 INSULATED ELEC CONDR (CO C1,E1,F1) 3130 LF $1.55 $4,851.50 3130 $4,851.50 23 GROUND BOX TYUPE D W/APRON 7 EA $1,100.00 $7,700.00 7 $7,700.00 25 FURNISH/INSTALL TYPE 41 SIGNAL POLE (CO 4 EA $1,250.00 $5,000.00 4 $5,000.00 C1,E1,F1) 26 FURNISH/INSTALL TYPE 41 SIGNAL POLE 2 EA $6,407.00 $12,814.00 2 $12,814.00 27 FURNISH/INSTALL TYPE 45 SIGNAL POLE 3 EA $9,226.00 $27,678.00 3 $27,678.00 28 FURNISH/INSTALL MAST ARM 52'-60' 1 EA $4,852.00 $4,852.00 1 $4,852.00 29 TY 1 SIGNAL FOUNDATION 4 EA $1,100.00 $4,400.00 4 $4,400.00 30 TY 3 SIGNAL FOUNDATION 2 EA $4,500.00 $9,000.00 2 $9,000.00 31 TY 4 SIGNAL FOUNDATION 3 EA $6,500.00 $19,500.00 3 $19,500.00 32 SIGNAL CABINET FOUNDATION3521 &BBU 2 EA $5,200.00 $10,400.00 2 $10,400.00 33 FURNISH/INSTALLATC SIGNAL CONTROLLER 2 EA $5,465.00 $10,930.00 2 $10,930.00 34 FURNISH/INSTALL 352I CONTROLLER 2 EA $18,500.00 $37,000.00 2 $37,000.00 CABINET ASSEMBLY 35 FURNISH/INSTALL LED LIGHTING FIXTURE 4 EA $753.00 $3,012.00 4 $3,012.00 (137 WATT AT132 COBRA HEAD) 36 INSTALL ALUM SIGN MAST ARM MOUNT 8 EA $750.00 $6,000.00 8 $6,000.00 37 SALVAGE SIGNAL POLE AND MAST ARM 1 EA $3,000.00 $3,000.00 1 $3,000.00 38 FURNISH/INSTALLPTZ CAMERA 2 EA $4,590.00 $9,180.00 2 $9,180.00 39 FURNISH/INSTALL PTZ CAMERA CABLE 125 LF $5.00 $625.00 125 $625.00 40 RELOCATE SINGAL HEAD (CO C1,E1,F1) 6 EA $1,960.00 $11,760.00 6 $11,760.00 Friday, December 2, 2022 Page 3 of 6 City Project Numbers 102575 DOE Number 2575 Contract Name ALTAMESA BOULEVARD EXTENSION FOR 46 RANCH ADDITION Estimate Number I Contract Limits Payment Number I Project Type STREET LIGHTS, TRAFFIC SIGNAL, LANDSCAPING For Period Ending 9/7/2022 Project Funding 41 4/C 14AWGMULTI-CONDUCTOR CABLE (CO 40 LF $3.90 $156.00 40 $156.00 C1,E1,F1) 42 NO. 6 INSULATED ELEC. CONDR (CO C1,E1,F1) 42 LF $2.30 $96.60 42 $96.60 43 NO. 6 BARE ELEC CONDR SLD (CO C1,E1,F1) 21 LF $2.12 $44.52 21 $44.52 44 FURNISH/INSATLL ALUM SIGN MAST ARM 13 EA $450.00 $5,850.00 13 $5,850.00 MOUNT (CO C1,E1,F1) 45 FURNISH/INSATLL VENTED AUMINUM 3- 4 EA $0.00 $0.00 SECTION SIGNAL HEAD BACK PLATE 46 FURNISH/INSTALL VENTED ALUMINUM 5- 1 EA $0.00 $0.00 SECTION SIGNAL HEAD BACK PLATE --------------------- Sub-Total of Previous Unit ------------------- $452,436.47 $452,436.47 SECTION VIII: LANDSCAPE IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 1 BLOCK SOD PLACEMENT 13578 SY $2.48 $33,673.44 13578 $33,673.44 2 -------------------------------------- TOPSOIL 1494 CY $39.60 $59,162.40 1494 $59,162.40 - - Sub-Total of Previous Unit - - - - - - - - - - - - - - - - - - - - - - - - $92,835.84 - - - - - - - - $92,835.84 - - - - Friday, December 2, 2022 Page 4 of 6 City Project Numbers 102575 DOE Number 2575 Contract Name ALTAMESA BOULEVARD EXTENSION FOR 46 RANCH ADDITION Estimate Number I Contract Limits Payment Number I Project Type STREET LIGHTS, TRAFFIC SIGNAL, LANDSCAPING For Period Ending 9/7/2022 Project Funding Contract Information Summary Original Contract Amount $751,742.94 Change Orders Change Order Number C1 $22,267.87 Change Order Number 3 $13,981.05 Change Order Number 4 $0.00 Total Contract Price $787,991.86 Total Cost of Work Completed $787,991.86 Less % Retained $0.00 Net Earned $787,991.86 Earned This Period $787,991.86 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $787,991.86 Friday, December 2, 2022 Page 5 of 6 City Project Numbers 102575 Contract Name ALTAMESA BOULEVARD EXTENSION FOR 46 RANCH ADDITION Contract Limits Project Type STREET LIGHTS, TRAFFIC SIGNAL, LANDSCAPING Project Funding Project Manager NA Inspectors CORDOVA, R / CAIN Contractor RIDGEMONT COMPANY 1520 W. WALNUT HILL LANE IRVING , TX 75038 DOE Number 2575 Estimate Number 1 Payment Number I For Period Ending 9/7/2022 City Secretary Contract Number Contract Date 9/23/2020 Contract Time 180 WD Days Charged to Date 308 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded -------------------- Total Cost of Work Completed $787,991.86 Less % Retained $0.00 Net Earned $787,991.86 Earned This Period $787,991.86 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $787,991.86 Friday, December 2, 2022 Page 6 of 6 Revised: 10-12-2011 DEVELOPER -AWARDED -PROJECT CHANGF ORDER IPROJECT NAME: Altafnesa Boulevard (to serve 46 Ranch Addition) 1 CONTRACT: (A) Water. (B) Sewer CHANGE ORDER No: ICFA# CFA20-0053 CITY PARTICIPATION: No CITY PROJECT # 102575 DOE V NIA I WATER PROJECT # Al, 61 SEWER PROJECT # I FILE # W-2694 INSPECTOR: John Robinson Phone No: 817-392-8306 PROJECT MANAGER: Fred Ehia Phone No: 682-432-5559 CONTRACT U fi WATER SEWER PAVING DRAINAGE STREETLIGHTS TRAFFIC SIGNAL o...wwr Con i" culow- 7I co•,1 I �W. —Con jo_ -ce_-I To Co-_t I eayC ouvolooereoet n cos$ I]evoloeer eon - ORIG NAL CONTRACT 017.587 61 I 1j)..eloPc. 5100.375 00 51.106.733.46 1 SS99.213.00 _ SY 11.73a.50 �_ _ _ St10,168.60 FJRRAS TO DATE 1100 I S0.00 .. CREDITS TO DATE S0.00 I -. J 50.00 CONTRACTTO DATE $317.5e7AS I�3Q09 5400.VSAD $ADO $1.406.733.d6 SOLO 1 $599,213.00 I_lO,Ov- SM8.73650 Sam. S430.168.60 OOFNPROP ORDER S 4,510961. S _ RA`MO1`UNN{�T AMOUNT $=.Mae'SW+`.16Ba7 50L0 S1.d06.733.d6 J0m 1.-213. 30�0 5228.736S0 50.00 LL10.168.60 `c`CHANGE T�T�/ VR AMOUNT PER UNIT S37 M0 61 5405148L7 $1406�13.46 $599.213.00 I 5228.738.5o 5400.1m REv COST SHARE Dv. Cost $3,392,100.24 " w SALO TOTAL REVISED CONTRACT $3,392,100.24 You Ara di,Woo to —kO INO fdL -- In IHC fgMm 2 (Oprimon'S.- PAY ITEM0 CITY BID ITEMA OUAMiTV UNR ITEM DESCRP71ON i UNITPRICE TOTAL 5 3311.0001 00875 TON Ouotila Iron Wale, FlI1I 16 w/ Restrain! S 54.33:.00 S 12ST 86 7 3311.0141 10 LF 11II 6'Weter Line 5 29.00 5 290.00 14 2,312 3002 1 EA E' C.I. Valve 5 1 059,00 S 1 OS9.00 18_ 3312.0001 1 EA 1 Fire HWrem 5 1.908.D0 S 790300 19 3305.0106 1 EA I Manhole- Maior AdiuMment wall Frame and Cover S 4.773.D7 S 4.773.07 TOTAL 5 9.284.03, REASONS FOR CHANGE ORDER Rop/ace a—W, 24'sanAery sewer cone wifn City appmvod 30'opening Add Uonal Fire byNant to be inVolkd on Wtfw-Lataral'A-7 along A716mosa Boulevard RECOMMENDED: APPROVED: APPROVED: HaIMA59oCiates, Inc uarJr—Sh-146 Ranch, LLC THE RIDGEMONT COMPANY, d1h/s RIDGEMONT COMMERCIAL CONSTRUCTION BY:. Osnlel W W""Id Br lac Nlmuire By Sleve Bell Name: ��'�%/� Nine: I / /1 �i� Title: Senior Vice President T1tle- DnecLrr ConatnlnDen Ti00: S-.of Pmiw IV, — Vf. 180 180 ISO DAYS Page 1 DocuSign Envelope ID: C51D357F-16FO-41AE-9A1D-2968FD5D7A3F DEVELOPER-AWARDFD-PRO.IECT CHANGE ORDER �PROJECTNAME' 1alvmasDevuleva111. serve 46 Ranch AEtlltlon) I CHANGE CONTRACT: (C)PDvlrw (El Street wen. In T]vIIIC So "I :ORDER NP: �DFA% 1IS 0053 CITY PARTICIPATION:1 Yee I CITY PROJECT 9 :102515 : [,n s INa IO,I E1, F, WATER PROJECT % SEWER PROJECT % �FIEE% IW-2694 INSPECTOR: John Robinson Phone No: 817-392.83D6 PROJECT MANAGER: Andrew Goatlman, P.E. Phone No: 817-392-625' I cDN]1xAcTu Ir 0614RRL riAT6R uwlR I� fmxe eW I �a��d51F� �r lriN[5 f i F ffylnL Pr+lvlxrCrr I CnrCw .cr, I ury I d...c GM Cw -�bwr� � �, ipM6.ac COxTIcsC, o... ; e .rs of p+1y;� � .nfu � .lu., M.eo faseei. Ilf CPf01TS TD DATE btN -W16et RSCTTO Wtt nE/.113M S12teel.c, ffwf � „ wn I sge?1EA8 ,um,Taff fsLF: I—W 1RE�s sseslR]M s522.vve.a, ilDs,lo.v1 so.fv .vsvlv.se taf, !WF �pF.St].m _EYS: s.sl:e�.�1 Gi TDTN. RE11sED CONTMCT AMDYHT -e T t]uaeAt HDA14ea] xtAM.ele]S E61R>tlf6)I k ,fxtSl RlsSS�COeT LHRII! Ow -Celt S,b SS .f14,2S4.1] CI Soho A TO—REYISm CDx1RACT I I $1,674.M.13 vDY ne mronoa b moke mP IvfmmR ananaaf le rtb mmmn eannaMMe� P r ITEM 4 CRY 010If£M 4 DISL111RY W%T ITEM DESCRIPTION GNn PRICE) TOTAL f 13 8213. 1. 20 SY B• Cvnc N. S 65 s 1.104.001 13 3213.050s 1-1 FA BRMmn FreaOc. awelk f 1A1t0015 It �0011 IIB ]218A1e1 1.2 LF 6 Cme. CUNgyeM (iLHor }i 1f5 tI(J s � )I u 2ee5]0,8 HO lF N SW PvmIP✓(! BO /W I 1 EB �U S (1.SY1. dl 1 ] 280.5Jo15 D tf 727'•Lf/O2�N1DTTTp�y/6" I AAA J 1 4 2608.]025 1. LF irt(1F7�I R3,1 )) f ,B.Ml 5 tt,180. �'' ].H.1DDt 1,0 EA 35vu/s-CONDr PVC SCA1 s 1.DSD 00 s o.saoJtol S 3441.1W2 -' Er 4-SvcISH= Ass j{}5(��� S (8.250.00t1 �.I{ I f 0M1.100.1 EA SSen yIB IHvva Av S 1.k5U.UU 5 41,850.00f1 1 O 0 3U1.10Oil 3 EA POC elac6)I �ol�HmnU j 1�98D(n0�I0n� s �ssoao 14 = — �ODa LF Fy�� p�p�Bln j�11Hly f �.UU I s 1982.001 Ia* I l0 LF UL 7b 'IJII�EM SFIE �LaUlo { ].so s 1--beAWGM 1 1]i] F '31C 14s—nd-1-1. y l.)f 5 508.15 ,9 ]J IS,t 81, LF 7/C 14 AWG MWiFCOMucbr CaEln S ,'I�,��s ,2Y1.DD1 'T II ]ut.1N2 J22 YCI4AWG MWHCvnd-11C— f &SS S 14( BB 1) NO' In w1140B lF NO BwlLailoO Ekc C.— S >351$ ,.]05.1�DiI 11 \� 24 ]W1., 501 I J LFw Y,mbDRmo O S P...— 1-Bun;o'/n��Plroa %S ,(90y0�J0�01 i5 700.00) (i,tix 3N1.4001 ] G FumlHNlnabll aumist��SP�Meye�lAyrnmlMlAdMJ�1C' 8s�`N�n S 1In-a51111(115 .B50.fp .....de I EA e,,,,,ntnr„Ean venlea aambum sslL�Itlh�')T IIE�HlE�6.21EOlE s -I s rorA, s 2]s74s] 'l REASONS FOR CHANGE ORDER 1rv!/c En9heer:y ln,arsxian Ravlbv (.NaeH ]7. ]6. t1...1 t1, 5'u1. 79.87 99. 9S 102. t0., ?M 106 107 108 iDA 110 111, lIZ 113. i1t, 115) RECOMMENDED: APMOs'ED: APPROVED' HfMAeRxLMe Pc a BARM'e6 Rrc6. ll.0 THE RICOE coMPANY.— CT1oy By.,DenWw WRHIifH BY' ZCMrnulron l' /1 BYODr,aa,r»sMM�,02��.�y'EY Neroe: Nvmv: /vGG //(Clf(!l fhb: serlN—PmNHrvn N. grnnvr df. ,neHbn U TWe VP Df Dp5 EF` pNi56iDCE®.. ll REVIEWED J By Andrew Goodman at 7:46 am, Jul 09, 2021 J LANDSI—E-1 TSICOMRACT IvEGUEu Avs 1B0 fexueA. Us : Revlea0: 1D12-2N 1 Paso 1 DEVELOPER -AWARDED -PROJECT CHANGE ORDER REVIEWED By Andrew Goodman at 2:08 pm, May 11, 202; IPROJECT NAME: Altamesa boulevard (to serve 46 Ranch Addition) CHANCE (CONTRACT: (C) Paving, (E) Street Lights,(F) Traffic Signal ORDER No: ICFA # CFA20-0053 I CITY PARTICIPATION:( Yes ICITVPROJECT# 102575 IDOE# WA WATER PROJECT # 3 SEWER PROJECT FILE # w-2594 INSPECTOR: John Robinson Phone No: $17-392-8306 PROJECT MANAGER: Andrew Goodman, P.E. Phone No: 817-392-6251 GENERAL WATER SEWER Dvvvlvavr Cost CM Cat IAewlowf Cevr J CIMCD. .-la arc.. (ORIGINAL CONTRACT s1e5.-ca 1 5317.SeT.65 BAW.]TSAO I-ASTO-1 34.s1o,9G f4.7].0) CREDITS TO DATE $.,.a S O ICONTRACTTO DATE 5165.IB3.at SR, k322.0.1- SLUM � uos.14B.0T (AMOUNT OF PROP. CHANGE OROER REVVXDCONIRACTAMWNT stcs,le].oa SOAR _ SV7....... I. lau" sI]].14e.B7 TOTAL REVIS FER ONTRAMOUNT UNITACT $165.760.OB sm.ne.01 101-07� REVISED COST SHARE D., Co.,: $3.686,573.52 TOTAL REVISED CONTRACT CONTRACT UNIT PAVING DRAI-GE STREETUIOM ',oat Davvlvovl Coer ! cae 1Davvlvovr .44 ss991v.00 i[ a saea] S1A01.040.56 S it.79t.e S1A0G.M.90 3309315.00 S]1B.St].90 S ].961AS1 SO81t AO ]424/4.65 SSM31]AO S]ISIKGS $3.686,573.62 You are directed to make the following charges In he cunlrecl yjowmenls: PA-Wir CAYBID REMe OU-- UNIT REM DESCRIPTION MIT PRICE TOTAL I j 0241.1000 20 SY Remove Cox. Pvmt 5 10.16 5 601 i 0241.1300 dB LF Romova Conn CUN6Gutter i 9.00 5 DOI 13 3213.0103 -20. SV 9'Conc Pvml S S5.2D S 7,10d.001� 3213.0301 24 SF 4• Canc Sidewalk 3 5, $ 135.12 15 3213.0506 -t EA Bem...... Re S 1,914.00 i '7 9U.00 I 16 3216,0101 -55 LF e• Do- Curb nd 11gr i ;10 S I115.5 I (F 24•SLD Mruiryr HAE (W) i 5.06 S Y64.4B1 ] 332 217.O0501 1B EA Bmt f�roo /n 5 180A0 5 150.80 II 3217A402 1 1 EA RomOve Gnu Le Ond Arrow i 104.40 i 1D4.40 30 3217.4305 9889.D0200 I 125 266 LF LF v. R.-- IlMohetSrarrDDkl��nDa SFtl S �8 i 6910It .60 31 3441.4004 _ EA FMNSNInsbo Alum Sian eMouM S 42500 S MOOD E 2 2505.3015 137 LF 2'CONDT PVC SON BOjT) 6 15.goo.WQ S 3" .3201 3 EA Ground Burr Typ� ZO5.OD 5 8 3441.3201 3441.3302 2 1 EA EA LED Lla' urodrBA ftd%y Foun a on T 1. Shc and If fs i 753.00 j 1,5BO.Od j 1 506.00 �580.D0 8 3441.1405 all LF D.m - - No. B Insulated Elec Candit" 1.55 5 637.D5 11 I I I 1 EA Remove Ekisfinq Rdwv Illum Foundation 5.503.00 i 5.503.110 I I`I TOTAL S 12279.39 REASONS FOR CHANGE ORDER Rempva/al Medan Ramp. Moths, Nose. endCros-%Sldperg W-fs 33.3643&79); RetOeafron 0/Sheet Lgm A-g Campus Dmro (eheala 87 & 89) Rekwhe f Pedeshfan Push ""`s (sheen 36,4J.47,52A. 104. 107110 & 112) Added Sipkogo and Shlpmg for New Lano Assgnmoms (shoats 33 & 79) RECOMMENDED: APPROVED: APPROVED: H41ff Aemdelm, Inc. Jac- ShewV6 Rehch, LLC THE RIDGEMONT COMPANY, db RIDGEMONTCDATIERCIAL CONS1RUCnON By. Dahloi W. WalOeld Bv: Zee Minutia,BV Damon Norman Nema: �'�'v'wl. I 1 Q6N. wAI(rLyL Name or�var` Name �o�ti Title: Senior Vice President Title: Director of Construction TWO' DMicuu of Office, is Industrial SoNiees Revised: 10.12.2011 I TRAFFIC SIGNAL LANDSCAPE IMROVEMENTS (CONTRACT DAYS awlovar ca.l pvwlooa co.l $430.111111 $92,935.84 'Be n- DocuSign Envelope ID: B52A375F-856E-40DB-985A-70BCC7EC7DD1 DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: AI!Tmesa Boulevard (to serve 46 Ranch Addition) CHANGE CONTRACT: Water. Sewer. Drainaoe. PavinrA. Street Liohtin0. and Landscaoe ORDER No: CFA # CFA2-0053 I CITY PARTICIPATION: I No CITY PROJECT # 102575 4 FID # 30114-0200431-102575-EO7685 FILE # W-2694 i INSPECTOR: John Robinson Phone No: (817) 392-8306 PROJECT MANAGER: Andrew Goodman Phone No: (817) 392-6251 CONTRACT UNIT I GENERAL WATER SEWER DRAINAGE PAVING STREETLIGHTING TRAFRC SIGNAL I LANDSCAPE Developer Developer Developer Developer Developer Developer Developer Developer Cost ClhtCost Cost ON Cost Cost CIN Cost Cost City Cost Cost City Cost Cost City Cost Cost sit Cost City Cost ORIGINAL CONTRACT 5765783.08 5317.567.65 Sd00.375.00 $599,213.00 S1,406,733A6 S22&738.50 EXTRAS TO DATE SCS10.96 $4.773.07 $13.756.15 CREDITS TO DATE S39iCONTRACT TO DATE 5165.783.08098.61 540 148.07� 5599213.00 S 406.338.90 S2d2d90.65592835.80'AMOUNT 116&60S92.835.84 OF PROP CWWGE ORDER tf0.021 /Sd.651 22d.90ISEREVIR 322093.96 405148.07 599213.00 1406 JJ890 24271955 592835.Bd OTAL CONTRACTAMOUNT165783.06 PER UNIT S16S783.06 $322093.96 i405.148.07 S59A213.00 $1.40&338.90 S242719.55 S452.436.47 $92.835.84 REVISED COST SHARE Dev. Cost: $3,686,568.85 City Cost TOTAL REVISED CONTRACT $3,686,568.85 CONTRACT DAYS 180 -You asa directed to rnai loll io kla t:nanoes in the conlracl documenis•. SECTION I: GENERAL PAYITEM% ICITY131DITEM.1 QUANTITY UNIT I I1M(1FS('j21P'npN UNITPRICE Tom. TAIL 1-3 3471.0001 -2.52427E-06 MO Trallic Lonlrol 57.923.07 (SO.021 I I I I I I TOTAL SECTIONI I: GENERALI 11011121 I SECTION II: WATER I PAY ITEM% ICITIBIDITEM.11 OUANTIIY UNIT I q�„j�e�ION UNIT PRICE TOTAL 2-8 3311.0241 -0.15 LF (a er 1pe S31.00 (54.65) I I I TOTAL SECTION It: WATER IMPROVEMENTSI rS4AS11 REASONS FOR CHANGE ORDER Corrective Change Order NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. IjE(�nMMEP ED: APPROVED: APPROVED: a /II EE,.ssoaa es J% ks She./46 Ranch, LLC The Ridgemont Company, d hlal Ridpemont Commercial Construchon rmatM4 alr Den1F1,r� R �a�ER �l...» N.».. I.- praA1C... %tAIATAAY SFaA.. ev `6UA?e12EsA F0.. Name:.Joseph Such, n n P F Name Zac McGuire Name: Damon Norman Ttle:.Proiect Manaaer TiBe-DiredoLof Consirucfion Title:, Director of Office a Industrial services Revised: 10-12.2011 Page 1 FORT WORTH. '0"'q TRANSPORTATION AND PUBLIC WORKS October 18, 2022 Ridgemont Commercial Construction 1520 W. Walnut Hill Ln. Irving, TX. 75038 RE: Acceptance Letter Project Name: Altamesa Blvd.-46 Ranch Addition Project Type: Developer City Project No.: 102575 To Whom It May Concern: On September 7, 2022 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on October 18, 2022. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on October 18, 2022, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at (817)392-6251. Sincerely, C,,A, Andrew Goodman, Project Manager Cc: Matt Cain, Inspector Ron Cordova, Inspection Supervisor Edward D'Avila, Senior Inspector Victor Tornero, Program Manager HALFF, Consultant Ridgemont Commercial Construction, Contractor Jackson-Shaw/46 Ranch, LLC., Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 AFFIDAVIT STATE OF TEXAS COUNTY OF TARANT Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Damon Norman, Director of Office and Industrial Servises Of Ridgemot Commercial Construciton, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Altamesa Boulevard Extension for 46 Rz nch Addtion ? BY —[�v, ,N Z 04 rY/t Maureen McDonnell - Project Coordinator Subscribed an swor before me on this date 1 of November, 2022. Nota Publi J" Dallas Count "�~ 4tAJREEN ° MCDONNELL .3 Notary Pubic s�.✓�7,� STATE OF TEXAS i '.',;r`,:;.:•� 'C# 12973278.9 " 1!t Comm. UP Mar. 3 2026 CONSENT OF OWNER ❑ SURETY COMPANY ARCHITECT ❑ TO FINAL PAYMENT CONTRACTOR ❑ SURETY ❑ OTHER ❑ Bond No. SU61878 PROJECT: (Name, Address) Northeast and Southeast Comer of E. Altamesa Blvd and Oak Grove Road TO: City of Fort Worth, Texas 200 Texas Street ARCHITECT'S PROJECT NO.: Fort Worth, TX 76102 CONTRACT FOR: Water, Sewer, Paving, Storm Drain, Street Lights and Signals CONTRACT DATE: CONTRACTOR: Jackson Shaw/46 Ranch, LLC 4890 Alpha Road, Suite 100, Dallas, TX 75244 In accordance with the provisions of the Subcontract between McCarthy and the Subcontractor as indicated above, the (here insert name and address of Surety as it appears in the bond) United States Fire Insurance Company, 305 Madison Avenue, Morristown, NJ 07960 on bond of (here insert name and address of Subcontractor as it appears in the bond) Jackson Shaw/46 Ranch, LLC, 4890 Alpha Road, Suite 100, Dallas, TX 75244 , SURETY COMPANY ,SUBCONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to (here insert name and address of Owner): City of Fort Worth, 200 Texas Street, Fort Worth, TX 76102 as set forth in the said Surety Company' IN WITNESS WHEREOF, the Surety has hereunto set its hand this 111" day of November 2022. Attest: �� � � • „ y�"� (Seal): United States Fire Insurance Company S u rety Signature of Authorized Representative Alicia Grumbles. Attornev-in-Fact Title OWNER, NOTE: This forms is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Current Edition. surety.doc-12/1l94 POWER OF ATTORNEY UNITEDSTATES FIRE INSURANCE COMPANY PRINCIPAL OFFICE - !11ORRISTO'VVN, NEW JERSEY KNOW ALL MIEN BY THESE PRESENTS: That United States Fire Insurance Company. a corporation duly organized and existing under the laws of the slate of Dcla%vare, has made, constituted and appointed, and does hereby make, constitute and appoint. Alicia Grumbles; KJ Wagner; Sam Siddons; Eric S. Feighl; Vincent Tran each, its true and lawful Attomey(s)-In -Fact , Nvith till[ power and authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver: Any and all bonds and undertakings of surety and other documents that the ordinary course of surety business may require, and to bind United States Fire Insurance Company thereby as fully and to the same extent as if such bonds or undertakings had been duly executed and acknowledged by file regularly elected officers of United States Fire Insurance Company at its principal office, in amounts or penalties not exceeding: One Hundred Twenty Five Million Eight hundred Dollars ($125,800,000) This Power of Attorney limits the act of those named therein to the bonds and undertakings specifically named therein, and they have no authority to bind United States Fire Insurance Company except in the manner and to the extent therein stated. This Power of Attomcy revokes all previous Powers of Atlomey issued on behalf of the Attorneys -In -Fact named above and expires on January 1, 2023. This Power of Atlonrcy is granted pursuant to Article IV of the By -Laws of [fined States Fire Insurance Company as now in full force and effect, and consistent with Article III thereof, which Articles provide, in pertinent part: Article IV, Execution of Instruments - Except as the Board of Directors may authorize by resolution, the Chairman of the Board. President. any Vice -President, any Assistant Vice President, the Secretary, or any Assistant Secretary shall have power on belialf of the Corporation: (a) to execute, affix the corporate seal manually or by facsimile to, acknowledge, verify and deliver any contracts, obligations, instruments and documents whatsoever in connection with its business including, Avithout limiting the foregoing, any bonds, guarantees, undertakings, recognizances, powers of attorney or revocations of any powers of attorney stipulations, policies of insurance, deeds, leases, mortgages, releases, satisfactions and agency agreements: (b) to appoint, in writing. one or more persons for any or all of the purposes mentioned in the preceding paragraph (a), including affixing the seal of the Corporation. Article III, Officers, Section 3.11, Facsimile Signatures. The signature of ally officer authorized by the Corporation to sign any bonds, guarantees. undertakings, recognizances, stipulations, powers of attorney or revocations of any powers of attorney and policies of insurance issued by the Corporation may be printed, facsimile, lithographed or otherwise produced. In addition, if and as authorized by the Board of Directors, dividend Nvannnts or checks, or other numerous instruments similar to one another in form, may be signed by the facsimile signature or signatures, lithographed or otherwise produced, of such officer or officers of the Corporation as from time to time may be authorized to sign such instnmuents on behalf of the Corporation. The Corporation may continue to use for the purposes herein stated the facsimile signature of any person or persons who shall have been such officer or officers of the Corporation, notwithstanding the fact that he may have ceased to be such at the time when such instruments shall be issued. IN WITNESS WHEREOF. United States Fire Insurance Company has caused these presents to be signed and attested by its appropriate officer and its corporate seal hereunto affixed this I I m day of March. 2021. UNITED STATES FIRE INSURANCE COMPANY 6 Anthony R. Slinuowicz, F,xecutive Vice President State of New Jersey) County of Morris ) On this I 111, day of March 2021, before me, a Notary public of the State of Nev, Jersey, came the above named officer of United States Fire Insurance Company, to me personally known to be the individual and officer described herein, and acknowledged that he executed the loregoing instmment and affixed the seal of United States Fire Insurance Company thereto by the authority of his office. SONIA SCALA _A. e,lee) (z.-. NOTARY PUBLIC OFNE"'JERSEY Sonia Scala, (Notary Public) MY COMMISSION EXPIRES 3/25/2024 No. 2163686 I. the undersigned officer of United States Fire Insurance Company, a Delaware corporation, do hereby certify that the original Power of Attorney of which the foregoing is a fiull, true and correct copy is still in force and effect and has not been revoked. IN WITNESS WHEREOF, 1 have hereunto set my hand and affixed the corporate seal of lJnited States Fire Insurance Company on thei 1 day of NOVMn"20 tNrrl:D s Es FI E INSU VCE C0�1P NY In ®� l .TAT R A Daniel Sussman, Scnior Vice President *For verification of the authenticity of the Power of Attomey. phase contact Pat Taber at 860-956-3424 or email: Suretvinnuiriest ann'ntam-oun.com APPENDIX 1 Final Inspection and Testing Fee Worksheet City of Fort Worth Project Name: Altamesa Blvd. Date: 7/26/2023 Developer Name: Jackson -Shaw Estimator: Mike Weiss IPRC Record No.: 20-0023 TPW Construction City Project No.: 102575 Signed Bid Proposal Working Days: 180 Construction Inspection Services Fee Description Rate Construction Inspection $ 245.00 Administrative Material Testing Services Fee Description I Rate Administrative Material Testing 1 $ 24.50 Water Testing Lab Fee Total ,uantity Amount $ 1 Notes 231 $ 56,595.00 Subtotal: $ 56,595.00 ;uantity Amount $ Notes 940 $ 23,030.00 Subtotal: $ 23,030.00 1 Total Amount:) $ 79,865.00 1 1 Notes 1. The construction Inspection Service fee is based on the number of working days as denoted above. The Rate ($/Day) for Construction Inspection Services is inclusive of inspection services labor, supervision and mileage, and applies to all working days based on information provided by Design Engineer. 2. Should the construction duration exceed the Design Engineer's Estimated Working Days defined above, the City will invoice the Developer at the stated daily rate, for all working days in excess of the denoted days above. 3. The Administrative Material Testing Fee Amount is based on the quantity of Tests to be performed on the project. The Material Testing Services Rate ($/Test) is inclusive of the City's labor and other incidental costs associated with the City's role in this service. The Developer must separately contract with one of the City's approved material testing labs and pay the lab for the actual cost of material testing. 4. The Water Testing Lab Fee is based on the quantity of Bacterial Tests to be performed by the City's Lab. The testing rate ($/Test) is inclusive of the City's labor and other incidental costs associated with the City's role in this service. Two consecutive passing bacterial water tests are required per 1,000 feet of line, for each dead-end on a project, fire lines, fire hydrants, branch at a minimum of one joint of water mains. A minimum of four tests will be estimated for a project. 5. In the event the number of tests performed during the project exceed the Quantity noted above, the City will invoice the Developer (at the rate stated above) for the number of tests in excess of the Quantity noted above. Payment of the "Total Amount" denoted above is due to the City of Fort Worth as part of the CFA process. Any payments due to the City pursuant to the above must be paid to the Development Coordination Office beore the CFA is executed. This is an estimate in accordance with the CFA Ordinance. The project will be reconciled at closeout when accepted, developer may be required to pay additional fees or be entitled to a refund.