Fox_ T� x,
City of Fort Worth
Change Order Request
Project Namel 2021 North Riverside Resurfacing Project I City Sec # I 57922
Client Project #(s)l 102877
Project Description) Street resurfacing and signage improvement at N. Riverside Dr from 200 ft south of Clary Ave to NE 28th St
Contractorl
City Project Mgr.l
Texas Bit Change Order #1
Tariqul Islam
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
TPW
$1,707,683.14
$45,305.56
Date 7/13/2023
City Inspector Eric Tinner
$1,752,988.70
$0.00
$1,752,988.70
$100,000.00
$54,694.44
Contract Time
Totals (CD)
$1,707,683.14 180
$45,305.56 28
$1,752,988.70 208
73
$1,752,988.70 281
$100,000.00
$54,694.44
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 2.65%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) 1 $2,134,603.93
JUSTIFICATION (REASONS) FOR CHANGE ORDE
This change order is to add $0 dollar and 73 calendar days to contract # 57922.1.The plan called for installation of Rectangular Rapid Flushing Beacon (RRFB) at NE comer of
Hollis SUN. Riverside Dr and SE corner Honeysuckle/N. Riverside Dr intersection. However, during construction it was identified that installation of RRFB with drilled shaft
foundation were not possible at these two locations due to existing gas and electrical line. This conflict was resolved by changing drilled shaft foundation with 5ft X 5ft spread
foundation. To accomplish the work, a quote was received from contractor and verified with Traffic Management established unit price for similar work, the stafffound that
contractor's quote was reasonable. The change order added $6,923.08 additional amount to the contract cost and deleted the same amount from construction allowance pay
item to make the net change order amount to $0.2.During construction, the Contractor had to stop working until several conflicts were resolved. Due to the type of contract being
calendar days, this necessitated to add 73 additional days to contract time as stated below: -Installation of Ped Pole with Push button at Springdale Intersection (25 days):
During construction it was identified that N. Riverside Dr and Springdale Dr signalized intersection required installation of pedestrian pole with push button at all four curb ramps
to make them ADA compliant. To accomplish this additional work Traffic Management was requested to share cost of the work. Traffic Management came up with their fund to
share and completed the work by their preapproved contractor and pre -established unit cost. To prepare the plan and completion of work by Traffic Management the project work
was stopped from 1/20/2023 until 2/13/2023. -Supply issue of RRFB and sod (35 days): After completion of all major works contractor notified that they had an issue with their
sub to get RRFB with correct materials and supply of sod from their supplier due to persistent wet weather. The work was stopped from 4/19/2022 until 512312022. Contractor's
request letter is attached for reference. -Rain/Weather delays (13 days): Experienced more than average yearly rain days and couldn't do any work on the following days:
8/22/2022, 8/23/2022, 8/31/2022, 9/1/2022, 9/2/2022, 10/24/2022, 10/28/2022, 11/4/2022, 11/14/2022, 12/13/2022, 2/14/2023, 3/2/2023 and 3/16/2023.
The inspector's log and email communications and weather report pertaining to these delays have been documented.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Name
Contractor (Name)
Contract Signature
Texas Bit
Matthew Harper
1719W1111
Jul 14, 2023
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
J u 1.17, 2023
J u l 15, 2023
Program Manager
Date
Senior Capital Project Officer
Date
�abv�
Ju119,2023
Ju120,2023
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
Ju120,2023
Ju121,2023
Assistant City Attorney
Date
Assistant City Manager
Date
Ju124, 2023
„m „<zz,4t4 0,
Ju1 24, 2023
BEL Council Ac
ATTEST:
q_ A .d—
Jannette Goodall, City Secretary
M&C Number
4,a4vnUp�U
00000
,&.16 o
P8° o * ov°a
a
*96 �o
°° °d v
aafl �EXA?o�p
M&C Date Approved
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORTWORTH City of Fort Worth
Change Order Additions
Project Name 2021 North Riverside Resurfacing Project
Client Project # 102877
Contractorl Texas Bit PMI
ADDITIONS
I I tM UESCRIP I ION UEP I
Unit 2 -New 25 Furnish/Install RRFB Assembly Double Sided(Solar) with spread foundaiton TPW
City Sec # 57922 1 ###
I
Tariqul Islam Inspectorl Eric Tinner l
Ragle, Inc. 0 Date 1 7/13/2023 1 4/28/2022
Oty Unit Unit Cost I otal 1
2.00000000 EA $13,646.54 $27,291.081
1
1
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
TPW $27,291.081
1
1
1
Sub Total Additions $27,291.081
Change Order Additions Page 2 of 4
FORTWORTH
City of Fort Worth
Change Order Deletions
Project Name 1 2021 North Riverside Resurfacing Project
City Sec # 1 57922 1 ###
Client Project # I 102877
I
Contractorl Texas Bit
IPMI Tariqul Islam I
Inspectorl Eric Tinner
Ragle, Inc. 0
Date 1 7/13/2023
4/28/2022
DELETIONS
ITEM DESCRIPTION
DEPT Oty
Unit Unit Cost
Total
Umt2,Item18 Furnish/Install KKhB Assembly Double Sided (solar)
I PW 2.000UUUUU
EA $10,184.UU
$20,368.001
Unit2,Item241Pavement Marking Construction Allowance
TPW 0.34615406
EA $20,000.00
$6,923.081
1
I
1
I
1
I
I
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
TF W
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
$27,291.081
I
I
Sub Total Deletions
I
$27,291.081
Change Order Deletions Page 3 of 4
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
2021 North Riverside Resurfacing Project
102877
2021 North Riverside Resurfacing Project
Total $0.00
Previous Change Orders
co # DATE AMOUNT
1 12/7/2022 $45,305.56
Total I $45,305.56
FORT WORTH.,
Routing and Transmittal Slip
Transportation and Public Works
Department
DOCUMENT TITLE: 2021 North Riverside Resurfacinq Proiect, CO 2
M&C CPN 102877 CSO #
DATE: 7/13/2023 INITIALS
To: Valentina Riera if
1.
Texas Bit — Matthew Harper
2. M H'
3. Eric Tinner (Inspector) E
ET
4.Tariqul Islam (PM) ri
T.I.
5 Omar Elbagalati (PGM) o0
6 Mary Hanna (SCPO) W//
PL w
7. Patricia Wadsack (AD) PLW
s Lauren Prieur (Director) LP
g Doug Black (ACA) &b
dwb
10. William Johnson (ACM)
Wj
11, Jannette Goodall (CS) TSG
J5G
57922 DOC#
DATE OUT
Jul 1412023
Jul 14) 2023
Jul 17, 2023
J u l 15, 2023
Jul 1% 2023
Jul 20, 2023
Jul 20, 2023
Jul 21, 2023
Jul 24, 2023
Jul 24, 2023
Jul 24, 2023
DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: U Yes❑✓ No
RUSH: ❑ Yes ❑✓ No SAME DAY: [:]Yes ❑✓ No NEXT DAY: []Yes ❑✓ No
ROUTING TO CSO: ❑✓ Yes [—]No
Action Required: