Loading...
HomeMy WebLinkAboutContract 57768-CO5Attest FORT WORTH. O p�8 -i0 POo oSd AP�,f o 000 *p aaap QEXA?o'Op City Of Fort worth Change Order Request Facility and Project Sycamore Community Center Renovation Description: Funding (FID) No.(s) 30100-0210410-5430101-104433-CAPEXP-9999 Contractor: I Muckleroy & Falls City Project Mgr.IAlfonzo Meza Phone Number: 1 (817) 392-8274 Original Contract Amount------------------------------- --------------------------- Extrasto Date------------------------------- ------------------------------------------ Credits to Date ------------------------------------------------- Pending Change Orders (in M&C Process) ------------------------------------------------- Contract Cost to Date------------------------------ --------------------------------- Amount of Proposed Change Order ------------------------------------------------- Revised Contract Amount-------------------------------- ------------------------ Original Funds Available for Change Orders ----------------------------------------------- Remaining Funds Available for this CO ------------------------------------------------- Additional Funding (if necessary) ------------------------------------------------- CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) Change Order # City Inspector: Phone Number: CSC No. 57768-005 City Sec No. 157768 City Proj. No. 101655 0 Date: 1 7/14/2023 Lisa Pyper 1 (817) 392-2391 ---------------------- 52,150,000.00 ------- $84,506.00 ----------------------------------------� 0 ----------I �0�0000 ---------------- $2,234,56.00 -----------------�13,824.00 ----------------------- i $2,248,330.00 -------0.00 -----------I 0.00 -------------------j 0.00 .6 $2,687,500.00 JUSTIFICATION (REASONS) FOR CHANGE ORDER Contract Time (CD) 175 243 0 0 418 418 The purpose of Change Order #5 is to apply a traffice coating to the existing gym bleachers and base of stairs on either side of the stage. This per PARD's request. This change order is represented as COR 026 from the Contractor. Change Orders No. 1, 2, 4 and 5 increases the original contract ($2,150,000.00) by $98,330.00 for a revised contract amount of $2,248,330.00, a 4.6% increase to the original contract. Contractor's Company Name IContractor Name Contractor Signature I Date Muckleroy & Falls I Josh Rohrer„ao� a Jul 18, 202 PMD Inspector Date Sr Capital Projects Officer Date P Jul 19, 2023 Ju120, 2023 PMD Superintendent Date Director/Property Management Department Date Vanager Jut19,2023 Ju120,2023 Project Date ttorney Date J u 120, 2023 Jul 24, 2023 Project Architect Date Assistant City Manager Darte J u 120, 2023 . . ... ..... . . ...r, Jul 24, 2023 M&C Number I N/A M&C Date Approved N/A Contract Compliance Manager: OFFICIAL RECORD By signing I acknowledge that I am the person responsible for the monitoring and adminstration of this contract, including CITY SECRETARY Nikita Watts ensuring all performance and reporting requirements. FT. WORTH, TX Sr Capital Projects Officer MuCKLEROY FALLS Sycamore Community Center 2525 E. Rosedale Street, Fort Worth, TX 76105 Change Order Request: 026 To: Lisa Pyper City of Fort Worth 401 W 13th St Fort Worth, TX 76102 Description Traffic Coating at Bleachers Reference Attached Notes PCO No Date Reference Description PCO 026 5/25/2023 Traffic Coating at Bleachers Item No Item Description 001 Waterproofing - GDA - Traffic Coating at Bleachers, 128 at Base of Stairs, 131 002 Payment and Performance Bond Increase at 1.3% 003 Muckleroy and Falls - Overhead at 10% Approved By: Signature Name Prolog Converge Change Order Request Detailed (with Breakdown of PCOs), Grouped by Each Number Project # 22033 HM & MF Ltd., d/b/a MUCKLEROY & FALLS Tel: Fax: From: Joshua Rohrer HIM & MF Ltd., d/b/a MUCKLEROY & FALLS 3200 Riverfront Dr Suite 200 Fort Worth, TX 76107 Category Status Required By Days Req 6/ 1 /2023 0 Notes Date: 5/25/2023 Amt Prop Days Req Category Reason 13,824 0 This PCO includes costs of installing a traffic coating at gym bleachers, base of stairs in 128, and 131. This is not included in the current scope of work, but is being priced at the request of the City of Fort Worth due to condition of existing floors. This PCO is issued to incorporate the scope of work items as specifically detailed on the attached cost summary and supporting documents. This Proposed Change does not include any additional scope provisions not specifically included herein. If additional costs become apparent at a later date, or additional information regarding this scope of work becomes available, we reserve the right to price any additional cost and/or schedule impacts as they become known. Printed on: 5/25/2023 MuckleroyFallsProlog Amt Prop Reference 12,407 161 1,256 Date Amt Req 13,824 Page 1 The George D. Alan Company Waterproofing * Caulking * Firestopping Page 1 of 1 BID / QUOTATION To: M&F Attn: Josh Rohrer Project: Sycamore Community Center Item Description 1 Traffic Coating @ Gym Bleachers + Two Small Rooms, Shot Blast Prep and Perimeter Detailing 1600 SF Acknowledge Addenda: 01 & 02 Date: 5/23/2023 Item Price Total Amount $ 12,407 JIQuote is valid for 30 Days Exclusions General: Excludes Building envelope testing, Any work not clearly shown on construction documents, Composite Cleanup UNO, Job Specific Software, BIM, non- working supervision, composite cleanup crew. Sealants Excludes Sealants @ Roof, Parapet, Metal Panels, Sheet Metal & Flashing, Glass & Glazing, Aluminum, Drywall, Tile, Mill Work, Plumb Fixtures, Custom Colors, Interior finish sealants, Parapet Cap, Stone to Stone CJ & Terra Cotta. Firest000ina - Excludes Cable trays, putty pads, firestopping or smoke sealing penetrations and joints at all non -rated assemblies UNO. Wateroroofina — Excludes patch concrete holes / honeycomb greater than %"; Paver Edge Restraints, Trays, Paver Lockdown Devices, Insulation, Filter Fabric, Root barrier, Tile Pavers. Expansion Joints- Excludes all expansion joint assemblies UNO, Blockouts, substrate leveling or repair for EJ's. Air Barrier - Excludes all metal flashing and thru wall flashing, insulation, 3rd party inspection/ testing, air barrier @ soffits, joint prep at gyp & CMU Backupwall (for sheet Air Barrier), air barrier behind prefab panels. Sincerely, The George D. Alan Company Hunter Matz h m atz6D G DAContractors.com 1829 W. Shady Grove, Grand Prairie, TX 75050 214.496.9999 - Office 214.496.9998 - Fax www.waterproof.pro BOXING G M STG o—Z I 1 ( STAGE 1 eX NG WOOD GYMNASIUM ........................................ ......... A41 O J�FRE STRDOM 0 STAIR \""`r VESTIBULE - V _ BOXING GYM 0 IIII S UT TG LT ITV RID RO Q i : 10-1 :Z_� M1 Yeo V— 1 1{{{���STRO $TGOFFICE OFFICE OBBYH) 112 CO177, RRIDOR • •••••••CLASSROOM ••••••• ••••••••••••CLASSROOM •• OFFICE O LOBBY COMMUNITY ROOM LJ STG i �I Floor Plan WEIGHTS L-IF B7 OFFICE 0 GENERAL NOTES ELEMENTS 1 ALL RECEIVE WALLS INALLROOMSTHATCURRENTLYHAVEPAINT S NEW PAINT INCLUDING FOLLOW I.— OOR­DP_. Of architecture NOTES BY SYMBOL 12016rM1 A.re., Suue 100F. WeHh, iX T6104 81XJ33.3380 FlemeNwfAn.<.m l Flrvlse D LEVEL EmsrINC STAGE FL NANDADD LVF FLOOR CONFIDENTIAL AND PROPRIETARY EX— BE E] EXISTING WOOD STAGE STAIR RATFOREW M BY4'WITH N NEW HANDRAILS - NEW STAIR BE CONFIGURED LIREIEXISTING- PROVIDE NEW RUBBER TREADS AND RISERS ON BOTH STAGE STAIRS w[rceeuuns wmxaur wnT[x vFxusspx 3❑ REPAIRBROKEN PA NELATCLERESTORYWITHMETALPANELTO M1TCIT EXISTING °R-NOSUBSTNGEONSALMT cuExr/wafer xneE FORT WORTH, CONTRG GWEDUNL UNLESS FOOTPRINT, CLEAMNCES (INCLUDING FLOOR TO FLOOR) AND TRUE MACHINE ROOM— CONFIGURATION CAN BE MAINTAINED NEW CONNOR'REZILLBASE'GYMNASIUMFINISHFLOORAND ADCRBGGRIEBTOMATCH DIMENSIONS AND IAYGUTOFEMSTING GYM FLOOR PROVIDE STRIPING FOR BASKETBALL AND Sycamore - PICKLEBALL Community 6❑ CLEAN EXISTING TECTUM CEILING TILES Center Renovations PROWDETMNSITIONSTRIP NEW PORCH SIAB- REFER TO STRUCTUML nPROVIDE CONCRETE SPIASHBLOCKSATNEW PORCH DRAINS 2525 E. Rosedale St. ❑0 Fort worth, TX CONTRACTORINEPROVIDEDBYOWNERANDINSTPLLEOBY 75105 11 NEW UTILITYSINK, REF PLUMBING sML(s) / cola —T L ayyF ae�y 03/23/2022 Issue wsrz 19-101, 00 March 23, 2022 Qj RCV1 0' 1 - ApNI 22, 2022 Rev ] - September 26, 2022 Overall Floor Plan 1"'­A2.1