Change Order Request
Facility and Project Sycamore Community Center Renovation
Description:
Funding (FID) No.(s) 30100-0210410-5430101-104433-CAPEXP-9999
Contractor: I Muckleroy & Falls
City Project Mgr.IAlfonzo Meza
Phone Number: 1 (817) 392-8274
Original Contract Amount------------------------------- ---------------------------
Extrasto Date------------------------------- ------------------------------------------
Credits to Date -------------------------------------------------
Pending Change Orders (in M&C Process) -------------------------------------------------
Contract Cost to Date------------------------------ ---------------------------------
Amount of Proposed Change Order -------------------------------------------------
Revised Contract Amount-------------------------------- ------------------------
Original Funds Available for Change Orders -----------------------------------------------
Remaining Funds Available for this CO -------------------------------------------------
Additional Funding (if necessary) -------------------------------------------------
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%)
Change Order #
City Inspector:
Phone Number:
CSC No. 57768-005
City Sec No. 157768
City Proj. No. 101655
0 Date: 1 7/14/2023
Lisa Pyper
1 (817) 392-2391
---------------------- 52,150,000.00
------- $84,506.00
----------------------------------------� 0
----------I �0�0000
---------------- $2,234,56.00
-----------------�13,824.00
----------------------- i $2,248,330.00
-------0.00
-----------I 0.00
-------------------j 0.00
.6
$2,687,500.00
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Contract Time
(CD)
175
243
0
0
418
418
The purpose of Change Order #5 is to apply a traffice coating to the existing gym bleachers and base of stairs on either side of the stage. This per PARD's
request. This change order is represented as COR 026 from the Contractor.
Change Orders No. 1, 2, 4 and 5 increases the original contract ($2,150,000.00) by $98,330.00 for a revised contract amount of $2,248,330.00, a 4.6% increase
to the original contract.
Contractor's Company Name IContractor Name Contractor Signature I Date
Muckleroy & Falls I Josh Rohrer„ao� a Jul 18, 202
PMD Inspector
Date
Sr Capital Projects Officer
Date
P
Jul 19, 2023
Ju120, 2023
PMD Superintendent
Date
Director/Property Management Department
Date
Vanager
Jut19,2023
Ju120,2023
Project
Date
ttorney
Date
J u 120, 2023
Jul 24, 2023
Project Architect
Date
Assistant City Manager
Darte
J u 120, 2023
. . ... ..... . . ...r,
Jul 24, 2023
M&C Number I N/A
M&C Date Approved
N/A
Contract Compliance Manager: OFFICIAL RECORD
By signing I acknowledge that I am the person responsible
for the monitoring and adminstration of this contract, including CITY SECRETARY Nikita Watts
ensuring all performance and reporting requirements. FT. WORTH, TX Sr Capital Projects Officer
MuCKLEROY FALLS
Sycamore Community Center
2525 E. Rosedale Street, Fort Worth, TX 76105
Change Order Request: 026
To: Lisa Pyper
City of Fort Worth
401 W 13th St
Fort Worth, TX 76102
Description
Traffic Coating at Bleachers
Reference
Attached
Notes
PCO No Date Reference
Description
PCO 026 5/25/2023
Traffic Coating at Bleachers
Item No Item Description
001 Waterproofing - GDA - Traffic Coating at Bleachers,
128 at Base of Stairs, 131
002 Payment and Performance Bond Increase at 1.3%
003 Muckleroy and Falls - Overhead at 10%
Approved By:
Signature
Name
Prolog Converge
Change Order Request
Detailed (with Breakdown of PCOs), Grouped by Each
Number
Project # 22033 HM & MF Ltd., d/b/a MUCKLEROY & FALLS
Tel: Fax:
From: Joshua Rohrer
HIM & MF Ltd., d/b/a MUCKLEROY & FALLS
3200 Riverfront Dr
Suite 200
Fort Worth, TX 76107
Category Status
Required By Days Req
6/ 1 /2023 0
Notes
Date: 5/25/2023
Amt Prop Days Req Category Reason
13,824 0
This PCO includes costs of installing a traffic coating at gym bleachers,
base of stairs in 128, and 131. This is not included in the current scope
of work, but is being priced at the request of the City of Fort Worth due
to condition of existing floors.
This PCO is issued to incorporate the scope of work items as
specifically detailed on the attached cost summary and supporting
documents. This Proposed Change does not include any additional
scope provisions not specifically included herein. If additional costs
become apparent at a later date, or additional information regarding this
scope of work becomes available, we reserve the right to price any
additional cost and/or schedule impacts as they become known.
Printed on: 5/25/2023 MuckleroyFallsProlog
Amt Prop Reference
12,407
161
1,256
Date
Amt Req
13,824
Page 1
The George D. Alan Company
Waterproofing * Caulking * Firestopping
Page 1 of 1
BID / QUOTATION
To:
M&F
Attn:
Josh Rohrer
Project:
Sycamore Community Center
Item Description
1 Traffic Coating @ Gym Bleachers + Two Small Rooms, Shot Blast Prep
and Perimeter Detailing 1600 SF
Acknowledge Addenda: 01 & 02
Date: 5/23/2023
Item Price Total Amount
$ 12,407
JIQuote is valid for 30 Days
Exclusions
General: Excludes Building envelope testing, Any work not clearly shown on construction documents, Composite Cleanup UNO, Job Specific Software, BIM, non-
working supervision, composite cleanup crew.
Sealants Excludes Sealants @ Roof, Parapet, Metal Panels, Sheet Metal & Flashing, Glass & Glazing, Aluminum, Drywall, Tile, Mill Work, Plumb Fixtures, Custom
Colors, Interior finish sealants, Parapet Cap, Stone to Stone CJ & Terra Cotta.
Firest000ina - Excludes Cable trays, putty pads, firestopping or smoke sealing penetrations and joints at all non -rated assemblies UNO.
Wateroroofina — Excludes patch concrete holes / honeycomb greater than %"; Paver Edge Restraints, Trays, Paver Lockdown Devices, Insulation, Filter Fabric, Root
barrier, Tile Pavers.
Expansion Joints- Excludes all expansion joint assemblies UNO, Blockouts, substrate leveling or repair for EJ's.
Air Barrier - Excludes all metal flashing and thru wall flashing, insulation, 3rd party inspection/ testing, air barrier @ soffits, joint prep at gyp & CMU Backupwall (for
sheet Air Barrier), air barrier behind prefab panels.
Sincerely,
The George D. Alan Company
Hunter Matz
h m atz6D G DAContractors.com
1829 W. Shady Grove, Grand Prairie, TX 75050
214.496.9999 - Office 214.496.9998 - Fax
www.waterproof.pro
BOXING G M
STG
o—Z I 1
(
STAGE
1 eX NG
WOOD
GYMNASIUM
........................................ .........
A41 O
J�FRE STRDOM
0
STAIR \""`r
VESTIBULE
-
V _
BOXING GYM
0
IIII S
UT TG
LT ITV
RID RO Q
i
: 10-1 :Z_�
M1 Yeo
V— 1 1{{{���STRO $TGOFFICE OFFICE OBBYH) 112
CO177,
RRIDOR
• •••••••CLASSROOM ••••••• ••••••••••••CLASSROOM •• OFFICE
O LOBBY
COMMUNITY
ROOM
LJ STG
i
�I Floor Plan
WEIGHTS
L-IF
B7
OFFICE
0
GENERAL NOTES
ELEMENTS
1 ALL
RECEIVE
WALLS INALLROOMSTHATCURRENTLYHAVEPAINT S
NEW PAINT INCLUDING FOLLOW I.— OORDP_.
Of architecture
NOTES BY SYMBOL
12016rM1 A.re., Suue 100F. WeHh, iX T6104
81XJ33.3380 FlemeNwfAn.<.m
l
Flrvlse D LEVEL EmsrINC STAGE FL NANDADD LVF FLOOR
CONFIDENTIAL AND PROPRIETARY
EX— BE
E]
EXISTING WOOD STAGE STAIR RATFOREW M BY4'WITH N
NEW HANDRAILS - NEW STAIR
BE CONFIGURED LIREIEXISTING- PROVIDE NEW RUBBER TREADS
AND RISERS ON BOTH STAGE STAIRS
w[rceeuuns wmxaur wnT[x vFxusspx
3❑
REPAIRBROKEN PA NELATCLERESTORYWITHMETALPANELTO
M1TCIT EXISTING
°R-NOSUBSTNGEONSALMT
cuExr/wafer xneE
FORT WORTH,
CONTRG GWEDUNL UNLESS
FOOTPRINT, CLEAMNCES (INCLUDING FLOOR TO FLOOR) AND
TRUE MACHINE ROOM— CONFIGURATION CAN BE MAINTAINED
NEW CONNOR'REZILLBASE'GYMNASIUMFINISHFLOORAND
ADCRBGGRIEBTOMATCH DIMENSIONS AND IAYGUTOFEMSTING
GYM FLOOR PROVIDE STRIPING FOR BASKETBALL AND
Sycamore
-
PICKLEBALL
Community
6❑
CLEAN EXISTING TECTUM CEILING TILES
Center
Renovations
PROWDETMNSITIONSTRIP
NEW PORCH SIAB- REFER TO STRUCTUML
nPROVIDE
CONCRETE SPIASHBLOCKSATNEW PORCH DRAINS
2525 E. Rosedale St.
❑0
Fort worth, TX
CONTRACTORINEPROVIDEDBYOWNERANDINSTPLLEOBY
75105
11
NEW UTILITYSINK, REF PLUMBING
sML(s) / cola —T
L
ayyF
ae�y
03/23/2022
Issue wsrz
19-101, 00
March 23, 2022
Qj
RCV1 0' 1 - ApNI 22, 2022
Rev ] - September 26, 2022
Overall Floor Plan
1"'A2.1