Loading...
HomeMy WebLinkAboutContract 58490-A1CSC No. 58490-A1 AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 58490 WHEREAS, the City of Fort Worth (CITY) and Freese and Nichols, Inc., (ENGINEER) made and entered into City Secretary Contract No. 58490, (the CONTRACT) which was authorized by M&C 22-0846 on the Ilth day of October, 2022 in the amount of $ 275,895.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Forest Hill Drive and Royal Crest Drive Intersection Improvements Project, CPN 103308; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $35,000.00. (See Attached Funding Breakdown Sheet, Page -4-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $310,895.00. 3. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX All other provisions of the Contract, which are not expressly amended City of Fort Worth, Texas [Forest Hill Drive and Royal Crest Drive Intersection Improvements] Prof Services Agreement Amendment Template [City Project Number 103308] Revision Date: November 23, 2021 Page 1 of 5 herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as designated Assistant City Manager. APPROVED: City of Fort Worth l,�,Pl�^�(Ju.Jl-�- n William Johnso8, 2023 09:29 CDT) William Johnson Assistant City Manager DATE: Jul 28, 2023 APPROVAL RECOMMENDED: of the date subscribed by the City's ENGINEER Freese and Nichols, Inc. Chris Bosco (Jul 21, 2023 12:28 CDT) Chris Bosco Principal DATE: Jul 21, 2023 Lauren Prieur (Jut 24, 202317:08 CDT) Lauren Prieur Director, Transportation and Public Works Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. r-Ani- , r, ba. Fanta Kaba, P.E. Professional Engineer City of Fort Worth, Texas [ orest Hill Drive and Royal C est Drive Intersection Improvements] Prof Services Agreement Amendment Template [City Project Number 103308] Revision Date: November 23, 2021 Page 2 of 5 APPROVED AS TO FORM AND LEGALITY: I DBIack (Ju126, 2023 18:02 CDT) Douglas W. Black Sr. Assistant City Attorney ATTEST: oa� '� -&Zr� Jannette Goodall City Secretary M&C: N/A Date: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas [Forest Hill Drive and Royal Crest Drive Intersection Improvements] Prof Services Agreement Amendment Template [City Project Number 103308] Revision Date: November 23, 2021 Page 3 of 5 FUNDING BREAKDOWN SHEET City Secretary No. 58490 Amendment No. 1 Department Fund -Account -Center Amount TPW 34027-0200431-5330500-103308-003930-9999- $ 35,000.00 22010204 Total: $ 35,000.00 City of Fort Worth, Texas [Forest Hill Drive and Royal Crest Drive Intersection Improvements] Prof Services Agreement Amendment Template [City Project Number 103308] Revision Date: November 23, 2021 Page 5 of 5 FORT WORTH. ATTACHMENT "A" Scope for Enaineerina Desian Related Services for Intersection Improvements The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. OBJECTIVE The objective of the Forest Hill Drive and Royal Crest Drive Intersection Improvement project is to improve the intersection safety and capacity by the construction and installation of dedicated left turn lanes for the northbound and southbound direction, traffic signal replacement (pole, mast arm, signal heads, detection, communication), pedestrian curb ramps, signing, striping, and utility adjustments. The improvements will be completed using City of Fort Worth — 2022 Bond Program funds. Based on the intersection traffic analysis performed by the ENGINEER (on 4/4/2023), the CITY (on 6/7/2023) requested that the ENGINEER proceed with the design of the widening of the western leg of the intersection from two lanes to three lanes. Work to be performed under this agreement is as follows and is in addition to the previous agreement: Task 1. Design Management — Not Used (Included in Previous Agreement) Task 2. Conceptual Design (30%) — Not Used (Included in Previous Agreement) Task 3. Preliminary Design (60%) Task 4. Final Design (90% and 100%) Task 5. Bid Phase Services — Not Used (Included in Previous Agreement) Task 6. Construction Phase Services — Not Used (Included in Previous Agreement) Task 7. ROW/Easement Services — Not Used (Included in Previous Agreement) Task 8. Survey and Subsurface Utility Engineering Services Task 9. Permitting — Not Used (Included in Previous Agreement) Task 10. Quality Control/ Quality Assurance City of Fort Worth, Texas Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements PMO Release Date: 07.23.2012 CPN 103308 Page 1 of 7 FORT WORTH. TASK 1. DESIGN MANAGEMENT. Not Used (Included in Previous Agreement) TASK 2. CONCEPTUAL DESIGN (30 PERCENT). Not Used (Included in Previous Agreement) TASK 3. PRELIMINARY DESIGN (60 PERCENT). ENGINEER will not proceed with Preliminary Design activities without written approval by the CITY of the Conceptual Design Package. Preliminary Design will be submitted to CITY per the approved Project Schedule. ENGINEER will develop the preliminary design of the infrastructure as follows: 3.1. Preliminary Design Plans: • ENGINEER will add, update, or revise the design plans listed: GENERAL DESIGN o QUANTITY SUMMARY— Including tables of quantities per sheet. o TYPICAL SECTIONS — Including existing and proposed typical sections showing pavement (roadway, sidewalk, curb), ROW, lane widths (with direction arrows), and retaining walls. o REMOVAL PLAN — Including removal of above and below ground features necessary for the construction of the project improvements. ROADWAY DESIGN o ROADWAY PLAN AND PROFILE — Including plan and profile sheets showing existing and proposed horizontal and vertical roadway alignments, right-of-way/easements, sidewalks, driveways, lane dimensions, drainage structures, and City and franchise -owned utilities. Station and elevation data of all vertical profile P.C.'s, P.T.'s, P.I.'s, low points and high points; lengths of vertical services, grades, K-values, e, and vertical clearance information will be provided where required. UTILITY DESIGN o MINOR UTILITY ADJUSTMENT PLAN —Including plan sheets for the minor adjustment (for example, adjustment of valve or manhole to proposed finished grade) of existing water and sanitary sewer utilities. TRAFFIC SIGNAL DESIGN o PROPOSED SIGNAL LAYOUT — Including plan sheets for layout of traffic signal poles, mast arms, signal heads, communication, and detection improvements. o SIGNAL EQUIPMENT DETAIL INTERSECTION QUADRANTS — Including detailed views of each of the four intersection quadrants showing the existing utilities and proposed roadway and traffic signal layout. o SIGNAL SUMMARY— Including conduit and cable tables, signal pole summaries, signal head summaries, and detection zone summary. City of Fort Worth, Texas Page 2 of 7 Attachment A PMO Release Date: 02.06.2015 Page 2 of 7 FORT WORTH. SIGNING AND PAVEMENT DESIGN o SIGNING AND PAVEMENT MARKING PLAN —Including pavement markings, traffic buttons, and traffic signage (CITY and TMUTCD compliant) for the roadway improvements. CROSS SECTION DESIGN o CROSS SECTIONS — Including centerline station at a 50' interval, existing top of ground line, proposed roadway section, and easement and right-of-way limits. TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). • ENGINEER will not proceed with Final Design activities without written approval by the CITY of the Preliminary Design Package. Final Design will be submitted to CITY per the approved Project Schedule. • ENGINEER will develop the Final Design of the improvements as follows: Final Desiqn (90%) Plans: • ENGINEER will progress, update, or revise the design plans from the previous submittal. Final Design (100%) Plans: • ENGINEER will progress, update, or revise the design plans from the previous submittal. TASK 5. BID PHASE SERVICES. Not Used (Included in Previous Agreement) TASK 6. CONSTRUCTION PHASE SERVICES. Not Used (Included in Previous Agreement) TASK 7. ROW/EASEMENT SERVICES. Not Used (Included in Previous Agreement) TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES. 8.3. Subsurface Utility Engineering ENGINEER will perform the Level A Subsurface Utility Engineering (SUE) work required for this project in general accordance with the recommended practices and procedures described in ASCE Publication Cl/ASCE 38-02 (Standard Guideline for the Collection and Depiction of Existing Subsurface Utility Data). As described in the mentioned ASCE publication, four levels have been established to describe the quality of utility location and attribute information used on plans. The quality levels are as follows: Quality Level A (QL"A") — Three dimensional (x,y,z) utility information obtained utilizing non-destructive vacuum excavation equipment to expose utilities at City of Fort Worth, Texas Page 3 of 7 Attachment A PMO Release Date: 02.06.2015 Page 3 of 7 FORT WORTH. critical points which are then tied down by surveying. Also known as "locating", this quality level provides precise horizontal and vertical positioning of utilities within approximately 0.05 feet. • ENGINEER will provide appropriate traffic control measures (barricades and signs). ENGINEER will utilize non-destructive vacuum excavation equipment to excavate test holes at the required locations. Due to the risk of damage, ENGINEER will not attempt to probe or excavate test holes on any AC water lines unless approval is obtained from the CITY in advance. ENGINEER will record the utility type, size, material, depth to top, and general direction. Each test hole will be assigned a unique ID number and will be marked with a nail/disk. The test -hole ID number and other pertinent utility information will be painted at each test -hole location. • ENGINEER will provide up to four (4) test holes (estimated to be between 8 and 12 feet in depth and within existing pavement) Subsurface Utility Engineering (SUE) to Quality Level A, as described below: o Expose and locate utilities at specific locations. o Tie horizontal and vertical location of utility to survey control. o Provide utility size and configuration. o Provide paving thickness and type, where applicable. o Provide general soil type and site conditions and such other pertinent information as is reasonably ascertainable from each test hole site. o Backfill cored holes within existing concrete pavement with temporary concrete pavement to a minimum of 9" in depth. ASSUMPTIONS • Up to four (4) Level A test holes are included (estimated to be between 8 and 12 feet in depth and within existing pavement). DELIVERABLES A. SUE plan drawings sealed by a professional engineer registered in the State of Texas. TASK 9. PERMITTING. Not Used (Included in Previous Agreement) City of Fort Worth, Texas Page 4 of 7 Attachment A PMO Release Date: 02.06.2015 Page 4 of 7 FORT WORTH. TASK 10. QUALITY CONTROL / QUALITY ASSURANCE ENGINEER to provide to the City a Quality Control/ Quality Assurance Plan (QC/QA Plan) outlining the ENGINEER's method of ensuring the highest levels of design and accuracy are incorporated into the calculations, plans, specifications, and estimates. ENGINEER is responsible for and shall coordinate all subconsultant activity to include quality and consistency of plans. If, at any time, during the course of reviewing a submittal of any item it becomes apparent to the CITY that the submittal contains errors, omissions, and inconsistencies, the CITY may cease its review and return the submittal to the ENGINEER immediately for appropriate action. A submittal returned to the ENGINEER for this reason may be rejected by the CITY Project Manager. 10.1. QC/QA of Design Documentation • ENGINEER shall perform a QC/QA review of all documents being submitted for review at all stages of the design including the 30%, 60%, and 90% and Final Document design review submittals. QA should be performed by an individual within the firm who is not on the design team. ENGINEER is to acknowledge that each item on the Detailed Checklist has been included by checking "done" on the checklist. If a particular checklist item is not applicable, this should be indicated by checking "N/A". If an entire checklist is not applicable, this should be indicated by checking every item on the list as "N/A" and still included with the submittal. The ENGINEER shall use the Detailed Checklist provided by CITY. • A Comment Resolution Log must be used to document conflicting comments between reviewers and to highlight comments made by the CITY that the ENGINEER is not incorporating into the design documents along with the associated explanation. The ENGINEER shall use the Comment Resolution Log provided by CITY. The documentation of a QC/QA review includes (1) a copy of the color -coded, original marked -up document (or "check print") developed during the QA checking process and/or review forms which sequentially list documents and associated comments; and (2) a QC sign -off sheet with signatures of the personnel involved in the checking process. Mark-ups may also be documented using the Comment Resolution Log. • Evidence of the QC/QA review will be required to accompany all submittals. Documentation shall include, but is not limited to, the following items: - PDF of the completed Detailed Checklists - PDF of the QC/QA check print of the calculations, plans, specifications, and estimates demonstrating that a review has been undertaken; - PDF of previous review comments (if any) and the ENGINERR's responses to those comments in the Comment Resolution Log. • If any of the above information is missing, is incomplete or if any comments are not adequately addressed; the CITY may contact the ENGINEER and request City of Fort Worth, Texas Page 5 of 7 Attachment A PMO Release Date: 02.06.2015 Page 5 of 7 FORT WORTH. the missing information. If the ENGINEER does not respond to the request within 24 hours, the CITY shall reject the submittal. No additional time will be granted for a returned submittal. • If the ENGINEER has not adequately addressed the comments, the submittal shall be rejected and returned to the ENGINEER immediately to address the issues. ASSUMPTIONS • All submittals to the City will be Quality checked prior to submission. A PDF of the QC/QA documentation will be uploaded to the project folder in Buzzsaw. DELIVERABLES A. QC/QA documentation City of Fort Worth, Texas Page 6 of 7 Attachment A PMO Release Date: 02.06.2015 Page 6 of 7 FORT WORTH. ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES Additional Services not included in the existinq Scope of Services — CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon — be sure to track changes. The CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon — be sure to track changes. In writing by both parties before the services are performed. These additional services include the following: • Negotiation of easements or property acquisition. • Services related to development of the CITY's project financing and/or budget. • Services related to disputes over pre -qualification, bid protests, bid rejection and re- bidding of the contract for construction. • Construction management and inspection services • Performance of materials testing or specialty testing services. • Services necessary due to the default of the contractor. • Services related to damages caused by fire, flood, earthquake or other acts of God. • Services related to warranty claims, enforcement and inspection after final completion. • Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. • Performance of miscellaneous and supplemental services related to the project as requested by the CITY. • Effort exceeding those outlined in the "Assumptions" section of each task description. City of Fort Worth, Texas Page 7 of 7 Attachment A PMO Release Date: 02.06.2015 Page 7 of 7 ATTACHMENT B COMPENSATION Design Services for Forest Hill Drive and Royal Crest Drive Intersection Improvements City Project No. 103308 Time and Materials with Rate Schedule Project Compensation A. The ENGINEER shall be compensated for personnel time, non -labor expenses, and subcontract expenses in performing services enumerated in Attachment A as follows: i. Personnel Time. Personnel time shall be compensated based upon hours worked directly in performing the PROJECT multiplied by the appropriate Labor Cateaory Rate for the ENGINEER's team member performing the work. Labor Cateaory Rate as presented in the rate schedule table below is the rate for each labor category performing the work and includes all direct salaries, overhead, and profit. Labor Category Professional 1 Professional 2 Professional 3 Professional 4 Professional 5 Professional 6 Construction Manager 1 Construction Manager 2 Construction Manager 3 Construction Manager 4 Construction Manager 5 Construction Manager 6 Construction Representative 1 Construction Representative 2 Construction Representative 3 Construction Representative 4 CAD Technician/Designer 1 CAD Technician/Designer 2 CAD Technician/Designer 3 Corporate Project Support 1 Corporate Project Support 2 Corporate Project Support 3 Intern / Coop Senior Advisor City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 1 of 4 2023 Rate 2024 Rate ($/hour) ($/hour) $112 $116 $137 $142 $153 $159 $177 $184 $207 $215 $236 $245 $97 $101 $120 $125 $131 $136 $164 $171 $197 $205 $225 $234 $87 $90 $97 $101 $120 $125 $131 $136 $96 $100 $123 $128 $152 $158 $91 $95 $110 $114 $146 $152 $56 $58 $175 $182 Forest Hill Drive and Royal Crest Drive Intersection Improvements CPN 103308 ATTACHMENT B COMPENSATION Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct Expenses at invoice or internal office cost. Direct Expenses (non -labor) include, but are not limited to, mileage, travel and lodging expenses, mail, supplies, printing and reproduction services, other direct expenses associated with delivery of the work; plus applicable sales, use, value added, business transfer, gross receipts, or other similar taxes. iii. Subcontract Expenses. Subcontract expenses and outside services shall be reimbursed at cost to ENGINEER plus a markup of ten percent (10%). iv. Budgets. ENGINEER will make reasonable efforts to complete the work within the budget and will keep the City informed of progress toward that end so that the budget or work effort can be adjusted if found necessary. ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be adjusted, nor is the City obligated to pay ENGINEER beyond these limits. If ENGINEER projects, in the course of providing the necessary services, that the PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether by change in scope of the project, increased costs or other conditions, the ENGINEER shall immediately report such fact to the City and, if so instructed by the City, shall suspend all work hereunder. When any budget has been increased, ENGINEER's excess costs expended prior to such increase will be allowable to the same extent as if such costs had been incurred after the approved increase. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. Method of Payment A. The ENGINEER shall be paid by the City based upon an invoice created on the basis of statements prepared from the books and records of account of the ENGINEER, based on the actual hours and costs expended by the ENGINEER in performing the work. B. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. C. ENGINEER shall prepare and submit invoices in the format and including content as presented in Exhibit B-1. D. Payment of invoices will be subject to certification by the City that such work has been performed. III. Progress Reports City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 2 of 4 Forest Hill Drive and Royal Crest Drive Intersection Improvements CPN 103308 ATTACHMENT B COMPENSATION A. The ENGINEER shall prepare and submit to the designated representative of the Transportation and Public Works Department monthly progress reports and schedules in the format required by the City. IV. Summary of Total Project Fees Firm Primary Responsibility Fee Amount % Prime Consultant Freese and Nichols, Inc. Project Management and Design Services Prime Consultant Total Proposed MWBE Sub -Consultants The Rios Group, Inc. Subsurface Utility Engineering and Locating Services MWBE Sub -Consultants Total Non-MWBE Consultants $29,200.00 83.4% $29,200.00 83.4% $5,800.00 16.6% $5,800.00 16.6% Non-MWBE Consultants Total: $0.00 0.0% TOTAL $35,000.00 100.0% Project Number & Name (CPN 103308 — Forest Hill Drive and Royal Crest Drive Intersection Improvements) Original Agreement Addendum No. 1 Total (Original Agreement + Addendum No. 1) City MWBE Goal = 14.0% City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 3 of 4 Total Fee MWBE Fee MWBE % $275,895.00 $40,750.00 14.8% $35,000.00 $5,800.00 16.6% $310,895.00 $46,550.00 15.0% Consultant Committed Goal = 14.0% Forest Hill Drive and Royal Crest Drive Intersection Improvements CPN 103308 B-3 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for City of Fort Worth - Forest Hill Drive and Royal Crest Drive Inter section Improvements (CPN 103308) S o iawak�3. p/�On�Inery Daslan 160%1 I Dwyan LL�'Rpe4te Reviae Devan Plena lar Roval Creal Dnve Wltl mo AGtlEE— DESIGN OVANTY ANY TYPICALSE—ANSI ROADWAY DESIGN ROADWAY PLAN AND PROFILE LOOT -ROADWAY DETAILS - DESIGN MINOR UTILITY ADJUSTNENT PLAN TR 10F FIS RT WORTH DESIGN WATER DETAIL PROPOSEDSIGNAL LAYOUT SIGNAL EQUIPMENT DETAIL INTERSECTION OUADRANTS SII AND PAVEMENT SIGNING AND PAVEMENT MARIKING DESIGNNG FEAR La035_SFrd, �E<i�N ��� 1 H .e 3amw vawidwwr ocawa.d 'rs1 a ve ana zh nQada�k DDT INAeEPM, o ENS eNALOM�3�NAL RALcaoD St]_ Ste— RO]I Sti E8E'� �ieE I I I I 9 I 1 qqq I I J I i\� I I } 2 d I 7 d k I 4,0 Twk S. Final pwlun IN%and 10M 1 1 %De ER P U�Dppee1(�Rl evlw Devan %awham Previous SubmlOel n IIEssII;N 8 I S'IGNIN°WOESIGN SG AND PAVEMENT MARKING DESIGN �) caoss gErrinu nF31ru d I 100% GE ER11GNwiw Oetlan Plamlram Previous 3-1-1ff ROADWAY DESIGN %JJ tl �'�AEryOs`iG'I MIGN ff4 J a MANKIND DESIGN 1 a 3 SO Twk 6. con--. Pbaee Servlcw 8.0 Twk 8. 3urvev and SUbsarfaw WllN E-1—daSen— /y(�.'��✓Iy act 10.0 iPrel" �yC( S^eYp SaIIPIa IPraegPNl nua�l.— PEE, PEE, I %ntl D€ddh ITEM sandIP du Lry MTe a �arCPOO Toral Labor TOWI Ea.,— ia QUQ it] NT SeF M EM1VBE laon'MB_a Trml ReprotluNon I P I 531.8]6 I SO MBEANBE SUbwwulWn I on 1. Sub Mark 5000 cyR 0 0% I Tool Prol/ACp 531.8]5 Qty Ton WoTh. Texas Forest Hill Drive and Royal Crest Drive Intersection Improvements Anacnmem B - Level or ERon sopplemem CPN 103308 PMO ONiaal Rd-- S.OS 2012 EXHIBIT "13-1" ENGINEER INVOICE (Supplement to Attachment B) Insert required invoice format following this page, including negotiated total budget and allocations of budgets across desired work types and work phases. City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 4 of 4 Professional Services Invoice Project Manager: IFanta Kaba, P.E. Project: IForest Hill Dr and Royal Crest Dr Intersection City Project #: 1103308 1 City Sec Number: Company Name: IFreese and Nichols, Inc. Supplier's PM: Todd Buckingham, P.E. Supplier Invoice #: Payment Request #: Service Date:From Service Date:To Invoice Date: Supplier Instructions: Summary Fill in green cells including Invoice Number, From and To Dates and the included worksheets. When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. email: lodd.buckingham@freese.com Office Address 801 Cherry Street, Suite 2800,Fort Worth, TX 76102 Telephone: 817-735-7517 Fax: 817-735-7491 Remit Address', 801 Cherry Street, Suite 2800,Fort Worth, TX 76102 Agreement LTD Agreement Amendment Amount to Completed Percent ($) Invoiced Current Remaining Sheet FID and Work Type Description Amount Amount Date Amount Spent Previously Invoice Balance Work Type 1 Design Services $275,895.00 $275,895.0C $275,895.00 Work Type 2 Design Services $31,875.00 $31,875.00 $31,875.00 Work Type 3 Work Type 4 Work Type 5 Work Type 6 Totals This Invoice $275,895.0 $31,875.00 $307,770.00 $307,770.00 Overall Percentage Spent: Forest Hill Drive and Royal Crest Drive Intersection Improvements CPN 103308 Freese and Nichols, Inc. 817-735-7517 817-735-7491 801 Cherry Street, Suite 2800, 801 Cherry Street, Suite 2800, Fort Worth, TX 76102 Fort Worth, TX 76102 CFW Project Manager Fanta Kaba, P.E. Supplier's Project Manager: JTodd Buckingham, P.E. Supplier's PM email: todd.buckingham@freese.com Name of Project: Forest Hill Dr and Royal Crest Dr Intersection I ahnr ratennry Name Invoice Supplier Project No. Proj. Invoice No. Invoice date: Period Service Date:From Service Date:To City Secretary Contract #: P.O. Number: Hniim Rate Mffir1 Professional 1 112.00 Professional 2 137.00 Professional 3 153.00 Professional 4 177.00 Professional 5 207.00 Professional 6 236.00 Construction Manager 1 97.00 Construction Manager 2 120.00 Construction Manager 3 131.00 Construction Manager 4 164.00 Construction Manager 5 197.00 Construction Manager 6 225.00 Construction Representative 1 87.00 Construction Representative 2 97.00 Construction Representative 3 120.00 Construction Representative 4 131.00 CAD Technician/Designer 1 96.00 CAD Technician/Designer 2 123.00 CAD Technician/Designer 3 152.00 Corporate Project Support 1 1 1 1 91.00 Corporate Project Support 2 110.00 Corporate Project Support 3 146.00 Intern / Coop 56.00 Senior Advisor 175.00 Total Labor Subcontract Service Yellow Rose Mapping, LLC The Rios Group, Inc. K+K Associates, LLP GRAM Traffic North Texas, Inc. Subcontractor Subtotal 10 Percent Markup on Subcontract Services Nonlabor Expenses Nonlabor Expense Subtotal 0.0 Total Expenses (Subcontract Services+Markup+Nonlabor Expenses) TOTAL DUE THIS INVOICE Amount $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Forest Hill Drive and Royal Crest Drive Intersection Improvements CPN 103308 Professional Services Invoice Project Manager: Fanta Kaba, P.E Project: Forest Hill Dr and Royal Crest Dr Intersection City Project #: 103308 Work Type Desc: Design Services Supplier Instructions: FID: City Sec Number: Fill in green cells including Percent Complete and Invoiced Previously Quanities Purchase Order: When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. Name' Freese and Nichols, Inc. Supplier's PM: Todd Buckingham, P.E. email: lodd.buckingham@freese.com Supplier Invoice #: Todd Buckingham, P.E. Office Address 801 Cherry Street, Suite 2800,Fort Worth, TX 76102 Payment Request #: Telephone: 817-735-7517 Service Date:From Fax: 817-735a491 Service Date:To Invoice Date: Remit Address:801 Cherry Street, Suite 2800,Fort Worth, TX 76102 Pay Items Agreement LTD Agreement Amendment Amendment Amount to Completed Description Amount Number Amount Date Amount 30 - Design $275,895.00 $275,895.0 Totals This Unit: $275,895.00 $275,895.00 Overall Percentage Spent: Percent ($) Invoiced Spent Previously Current Remaining Invoice Balance $275,895.00 $275,895.00 Forest Hill Drive and Royal Crest Drive Intersection Improvements CPN 103308 Professional Services Invoice Project Manager: Fanta Kaba, RE Project: Forest Hill Dr and Royal Crest Dr Intersection City Project #: 103308 Work Type Desc: IDesign Services Supplier Instructions: FID: City Sec Number: Fill in green cells including Percent Complete and Invoiced Previously Quanities Purchase Order: When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. Company Name: Freese and Nichols, Inc. Supplier's PM: Todd Buckingham, P.E. email: todd.buckingham@freese.com Supplier Invoice #: Office Address: 801 Cherry Street, Suite 2800,Fort Worth, TX 76102 Payment Request #: Telephone: 817-735-7517 Service Date:From Fax: 817-735-7491 Service Date:To Invoice Date: Remit Address: 801 Cherry Street, Suite 2800,Fort Worm, TX 76102 Pay Items Agreement LTD Agreement Amendment Amendment Amount to Complete Description Amount Number Amount Date Amount 30-Design 1 $31,875.00 $31,875.00 Totals This Unit; $31,875.00 $31,875.00 Overall Percentage Spent Percent ($) Invoiced Spent Previously Current Remaining Invoice Balance $31,875.00 $31,875.00 Forest Hill Drive and Royal Crest Drive Intersection Improvements CPN 103308 .'ses....- 1. —e— 1. --see..u. n,. I—. '6ee'.— ...... za ---see, sse—.11-1 6.. sue "w N 11— —ses, —ses zu............ n orare a I Foresl Hill Dfiva antl Royal Crest Diva Intaroection Improvements .1033-0: FORT WORTH.; Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: Forest Hill Dr & Royal Crest Dr Intersection Improvements Engineering Contract Amendment #1 M&C: 22- CPN: 103308 CSO: 58490 DOC#: 0846 Date: To: Name Department Initials Date Out 1. Ann Estes TPW - initial J u 121, 2023 2. Fanta Kaba TPW - signature K J u 121, 2023 3. Chris Bosco, Consultant Consultant Jul 21, 2023 4. Chad Allen TPW - initial J u 121, 2023 5. Lissette Acevedo TPW -initial o(v Jul 21, 2023 6. Patricia Wadsack TPW - initial PLwpLW Jul 24, 2023 7 Lauren Prieur TPW - signature W- Jul 24, 2023 8 Doug Black Legal - signature Jul 26, 2023 9 William Johnson CMO - signature w Jul 28, 2023 10. Jannette Goodall CSO - signature 741- Jul 31, 2023 11. TPW Contracts TPW DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: ❑YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No ROUTING TO CSO: ®YES ❑No Action Required: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return To: TPWContracts aFortWorthTexas. aov at ext. 7233 or 8363, for pick up when coma_ leted. Thank you! Updated 08.22.2022, mdhm